Search results for: Egyptian construction industry
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 8647

Search results for: Egyptian construction industry

8497 Theory about the Gebel El-Arak Knife: Egyptian Knife with Canaanite Relief

Authors: Doaa El-Shereef

Abstract:

This paper will focus on proving a theory that it is an Egyptian knife with Canaanite relief and will discuss the nature of the Gebel el-Arak Knife and the civilization to which it belongs and the relationship of the Canaanite deity with Mount Abydos in Egypt, and the influence between the ancient Egyptian religion and the Canaanite religion and their effect on each other. Finally, the paper will discuss in full detail the engraving of the two faces of the knife handle and analyze the register on the front face, which is the scene of the two lions engraved, and between them, an old man symbolized as the deity in the middle and compared it with other drawings similar in the Egyptian civilization. The paper will also discuss the registers on the back face, which are the engravings of a battle, soldiers, uniforms, and boats, and how the back face describes a water battle between three Egyptian boats and two foreign ships. In addition, it will prove that those foreign ships were not Mesopotamian ships because, in the period to which the knife of Gebel Al-Arak belongs, between 3300-3100 BC, there were no battles or trade exchanges between Egypt and Mesopotamia on sea routes. However, there was already a strong land and sea trade between Canaan and Egypt during Chalcolithic Age (4500-3500 BC), as described in many primary sources.

Keywords: Canaan, Egypt, Gebel el-Arak Knife, Louvre

Procedia PDF Downloads 169
8496 Managing Projects in Practice. A Perspective of Stakeholder Management in Managing Stakeholders within the UK Construction Projects

Authors: Faraz Ali Memon

Abstract:

Stakeholders are a vital part of any organisation. It includes working on the demands of different stakeholders within the projects. However, the reality of construction projects is slightly different when it comes to practice. The UK construction projects have a history of failing to complete projects on time and within the budget. The purpose of this qualitative study is to enhance knowledge of stakeholder engagement. Semi-structured interviews will be carried out using a purposive sampling technique. It includes interviewing and getting knowledge from industry practitioners from top UK construction firms on how to manage stakeholders effectively. The findings from this study will help in understanding stakeholders' impact and how the engagement of stakeholders can affect construction projects. The conclusions of this study add value to the existing body of knowledge on stakeholder management, especially in the UK, where academic studies on construction projects are few. As a contribution, this study will provide a practical guide for the practitioners to engage stakeholders within the scope of the project. In addition, this study is limited to UK construction projects. Therefore, the outcome may not be generalised to other developing and underdeveloped countries.

Keywords: stakeholders, UK construction, project management, cost and time

Procedia PDF Downloads 95
8495 Optimisation Model for Maximising Social Sustainability in Construction Scheduling

Authors: Laura Florez

Abstract:

The construction industry is labour intensive, and the behaviour and management of workers have a direct impact on the performance of construction projects. One of the issues it currently faces is how to recruit and maintain its workers. Construction is known as an industry where workers face the problem of short employment durations, frequent layoffs, and periods of unemployment between jobs. These challenges not only creates pressures on the workers but also project managers have to constantly train new workers, face skills shortage, and uncertainty on the quality of the workers it will attract. To consider worker’s needs and project managers expectations, one practice that can be implemented is to schedule construction projects to maintain a stable workforce. This paper proposes a mixed integer programming (MIP) model to schedule projects with the objective of maximising social sustainability of construction projects, that is, maximise labour stability. Aside from the social objective, the model accounts for equipment and financial resources required by the projects during the construction phase. To illustrate how the solution strategy works, a construction programme comprised of ten projects is considered. The projects are scheduled to maximise labour stability while simultaneously minimising time and minimising cost. The tradeoff between the values in terms of time, cost, and labour stability allows project managers to consider their preferences and identify which solution best suits their needs. Additionally, the model determines the optimal starting times for each of the projects, working patterns for the workers, and labour costs. This model shows that construction projects can be scheduled to not only benefit the project manager, but also benefit current workers and help attract new workers to the industry. Due to its practicality, it can be a valuable tool to support decision making and assist construction stakeholders when developing schedules that include social sustainability factors.

Keywords: labour stability, mixed-integer programming (MIP), scheduling, workforce management

Procedia PDF Downloads 250
8494 Building a Lean Construction Body of Knowledge

Authors: Jyoti Singh, Ahmed Stifi, Sascha Gentes

Abstract:

The process of construction significantly contributes to high level of risks, complexity and uncertainties leading to cost and time overrun, customer dissatisfaction etc. lean construction is important as it is a comprehensive system of tools and concepts focusing on moving closer to customer satisfaction by understanding the process, identifying the waste and eliminating it. The proposed work includes identification of knowledge areas from lean perspective, lean tools/concepts used in lean construction and establishing a relationship matrix between knowledge areas and lean tools/concepts, thus developing and building up a lean construction body of knowledge (LCBOK), i.e. a guide to lean construction, aiming to provide guidelines to manage individual projects and also helping construction industry to minimise waste and maximize value to the customer. In this study, we identified 8 knowledge areas and 62 lean tools/concepts from lean perspective and also one tool can help to manage two or more knowledge areas.

Keywords: knowledge areas, lean body matrix, lean construction, lean tools

Procedia PDF Downloads 431
8493 Schooling Culture in Egyptian Public Schools: Reform in Professional Development for Equity and hope in Education

Authors: Nora El-Bilawia

Abstract:

This paper discovers the challenges and/or opportunities to implementing multiple intelligence (MI) practices in English as foreign language (EFL) classrooms at Egyptian public schools as part of the government’s educational reform plan. It is found that Egyptian EFL teachers value the use of MI’s ways of teaching as means for active and higher order thinking. However, teachers believed they were underprivileged, as the government did not provide appropriate trainings, tools, or means to integrate MI in their daily lessons. They also conferred challenges they face due to some Egyptian schooling cultural practices. At the end of this chapter, a proposed need for a paradigm shift in the schooling culture in Egypt to implement practical changes in schools to promote hope in education such as the use of MI teaching tools. This study promotes cross-cultural understanding of educational opportunities and efforts for equal learning outcomes around the globe.

Keywords: professional development, schooling culture, acculturation, equitable education

Procedia PDF Downloads 96
8492 Descriptive Assessment of Health and Safety Regulations and Its Current Situation in the Construction Industry of Pakistan

Authors: Khawaja A. Wahaj Wani, Aykut Erkal

Abstract:

Pakistan's construction industry, a key player in economic development, has experienced remarkable growth. However, the surge in activities has been accompanied by dangerous working conditions, attributed to legislative gaps and flaws. Unhealthy construction practices, uncertain site conditions, and hazardous environments contribute to a concerning rate of injuries and fatalities. The principal aim of this research study is to undertake a thorough evaluation based on the assessment of the current situation of Health & Safety policies and the surveys performed by stakeholders of Pakistan with the aim of providing solution-centric methodologies for the enforcement of health and safety regulations within construction companies operating on project sites. Recognizing the pivotal role that the construction industry plays in bolstering a nation's economy, it is imperative to address the pressing need for heightened awareness among site engineers and laborers. The study adopts a robust approach, utilizing questionnaire surveys and interviews. As an exclusive investigative study, it encompasses all stakeholders: clients, consultants, contractors, and subcontractors. Targeting PEC-registered companies. Safety performance was assessed through the examination of sixty safety procedures using SPSS-18. A high Cronbach's alpha value of 0.958 ensures data reliability, and non-parametric tests were employed due to the non-normal distribution of data. The safety performance evaluation revealed significant insights. "Using Hoists and Cranes" and "Precautionary Measures (Shoring and Excavation)" exhibited commendable safety levels. Conversely, "Trainings on Safety" displayed a lower safety performance, alongside areas such as "Safety in Contract Documentation," "Meetings for Safety," and "Worker Participation," indicating room for improvement. These findings provide stakeholders with a detailed understanding of current safety measures within Pakistan's construction industry.

Keywords: construction industry, health and safety regulations, Pakistan, risk management

Procedia PDF Downloads 52
8491 An Investigation of Challenges in Implementing Sustainable Supply Chain Management for Construction Industry in Thailand by Interpretive Structural Model Approach

Authors: Shaolan Zou, Kullapa Soratana

Abstract:

Construction industry faces tremendous challenges in sustainability issue in recent years. Building materials, generally, are non-recyclable with short service life time, leading to economic loss. Building sites also cause social issues, e.g. noise, hazardous substances, and particulate matters. Sustainable supply chain management (SSCM) has been recognized as an appropriate method to balance three pillars of sustainability: environment, economy, and society. However, most of construction companies cannot successfully adopt SSCM due to numerous challenges. In this study, a list of challenges in implementing SSCM was collected from peer-reviewed literature on sustainable implementation. A building materials company in Thailand, which has successfully adopted SSCM for almost two decades and established the sustainable development committee since 1995, was used as a case study. Management-level representatives in sustainability department of the company were interviewed, mainly, to examine which challenges on the list complies with the company’s condition when adopting SSCM. The interview result was analyzed by interpretive structural model (ISM) with sustainability experts’ opinions to identify top 5 influential challenges. The results could assist a building construction company in assigning appropriate strategies to overcome most influential barriers, as well as in using as a reference or guidance for other construction companies adopting SSCM.

Keywords: sustainable supply chain management, challenges, construction industry, interpretive structural model

Procedia PDF Downloads 174
8490 Acoustic and Thermal Compliance from the Execution Theory

Authors: Saou Mohamed Amine

Abstract:

The construction industry has been identified as a user of substantial amount of materials and energy resources that has an enormous impact on environment. The energy efficient in refurbishment project is being considered as one of the approaches to achieve sustainability in construction industry. The increasing concern for environment has made building owners and designers to incorporate the energy efficiency features into their building projects. However, an overwhelming issue of existing non-energy efficient buildings which exceeds the number of new building could be ineffective if the buildings are not refurbished through the energy efficient measures. Thus, energy efficient in refurbishment project is being considered as one of the approaches to achieve sustainability that offers significant opportunities for reducing global energy consumption and greenhouse gas emissions. However, the quality of design team attributes and the characteristics of the refurbishment building projects have been argued to be the main factors that determine the energy efficiency performance of the building.

Keywords: construction industry, design team attributes, energy efficient performance, refurbishment projects characteristics

Procedia PDF Downloads 363
8489 Photographic Documentation of Archaeological Collections in the Grand Egyptian Museum

Authors: Sameh El Mahdy

Abstract:

Recording and documenting archaeological collections, especially photographic documentation, is considered one of the very important matters that museums care about and give great priority, as photographic documentation is of great importance. We monitor some of them for example, Photographs of collectibles are considered evidence and an archival record that proves the condition of the collectibles at various stages. A photo of the possessions is placed on the paper record of the possessions registration. These photos are used in inventorying archaeological collections. These pictures are viewed by researchers and scholars interested in studying these collections. These images are used in advertising campaigns for museum displays of archaeological collections. The Grand Egyptian Museum is considered one of the museums that is a unique model in terms of establishing a specific system that is used when photographing archaeological collections. The Grand Egyptian Museum sets standards for the photos that are taken inside the Grand Egyptian Museum. We mention some of them for example, Pictures must be of high quality. It is necessary to set a color scale for the drawing in order to clarify the dimensions of the collectibles in the picture and also in order to clarify the natural colors of the collectibles without any additions. Putting the numbers of the collectibles in the pictures, especially the number of the Grand Egyptian Museum. To take a good photo of the artifacts in the Grand Egyptian Museum, there are many steps: (1) Create a good location, (2) How to handle the Artifacts. (3) Choose the best position for the artifact, (4) Make the light to create a good photo without shadows to make the photo represent all the artifact details. (5) Be sure of the camera settings, and their quality. All of these steps and other ones are the best criteria for taking the best photo, which helps us in the database to represent the details of the artifact in our interface.

Keywords: grand egyptian museum, photographing, museum collections, registration and documentation

Procedia PDF Downloads 34
8488 Geographic Aspects of Egyptian Illegal Migration to Europe

Authors: Mohamed Ahmed Aly Hassanien

Abstract:

This study examines the geographic aspects of Egyptian illegal migration to Europe. It used files of Egyptian government bodies and data obtained from a field study carried out in 2015 on the areas of origin. The study revealed that the phenomenon has passed historically through four phases. Areas of origin are classified geographically into three areas: coastal, river, and interior. The study developed a map for routes of migration which identified the main and secondary routes. The main routes included the Libyan, the Mediterranean and the Arab-Turkish routes. Recently, The Mediterranean route has been the largest and the most dangerous.

Keywords: areas of destination, areas of origin, illegal migration, routes of migration

Procedia PDF Downloads 348
8487 A Review of Digital Twins to Reduce Emission in the Construction Industry

Authors: Zichao Zhang, Yifan Zhao, Samuel Court

Abstract:

The carbon emission problem of the traditional construction industry has long been a pressing issue. With the growing emphasis on environmental protection and advancement of science and technology, the organic integration of digital technology and emission reduction has gradually become a mainstream solution. Among various sophisticated digital technologies, digital twins, which involve creating virtual replicas of physical systems or objects, have gained enormous attention in recent years as tools to improve productivity, optimize management and reduce carbon emissions. However, the relatively high implementation costs including finances, time, and manpower associated with digital twins have limited their widespread adoption. As a result, most of the current applications are primarily concentrated within a few industries. In addition, the creation of digital twins relies on a large amount of data and requires designers to possess exceptional skills in information collection, organization, and analysis. Unfortunately, these capabilities are often lacking in the traditional construction industry. Furthermore, as a relatively new concept, digital twins have different expressions and usage methods across different industries. This lack of standardized practices poses a challenge in creating a high-quality digital twin framework for construction. This paper firstly reviews the current academic studies and industrial practices focused on reducing greenhouse gas emissions in the construction industry using digital twins. Additionally, it identifies the challenges that may be encountered during the design and implementation of a digital twin framework specific to this industry and proposes potential directions for future research. This study shows that digital twins possess substantial potential and significance in enhancing the working environment within the traditional construction industry, particularly in their ability to support decision-making processes. It proves that digital twins can improve the work efficiency and energy utilization of related machinery while helping this industry save energy and reduce emissions. This work will help scholars in this field to better understand the relationship between digital twins and energy conservation and emission reduction, and it also serves as a conceptual reference for practitioners to implement related technologies.

Keywords: digital twins, emission reduction, construction industry, energy saving, life cycle, sustainability

Procedia PDF Downloads 86
8486 Planning of Construction Material Flow Using Hybrid Simulation Modeling

Authors: A. M. Naraghi, V. Gonzalez, M. O'Sullivan, C. G. Walker, M. Poshdar, F. Ying, M. Abdelmegid

Abstract:

Discrete Event Simulation (DES) and Agent Based Simulation (ABS) are two simulation approaches that have been proposed to support decision-making in the construction industry. Despite the wide use of these simulation approaches in the construction field, their applications for production and material planning is still limited. This is largely due to the dynamic and complex nature of construction material supply chain systems. Moreover, managing the flow of construction material is not well integrated with site logistics in traditional construction planning methods. This paper presents a hybrid of DES and ABS to simulate on-site and off-site material supply processes. DES is applied to determine the best production scenarios with information of on-site production systems, while ABS is used to optimize the supply chain network. A case study of a construction piling project in New Zealand is presented illustrating the potential benefits of using the proposed hybrid simulation model in construction material flow planning. The hybrid model presented can be used to evaluate the impact of different decisions on construction supply chain management.

Keywords: construction supply-chain management, simulation modeling, decision-support tools, hybrid simulation

Procedia PDF Downloads 200
8485 Construction of Green Aggregates from Waste Processing

Authors: Fahad K. Alqahtani

Abstract:

Nowadays construction industry is developing means to incorporate waste products in concrete to ensure sustainability. To meet the need of construction industry, a synthetic aggregate was developed using optimized technique called compression moulding press technique. The manufactured aggregate comprises mixture of plastic, waste which acts as binder, together with by-product waste which acts as fillers. The physical properties and microstructures of the inert materials and the manufactured aggregate were examined and compared with the conventional available aggregates. The outcomes suggest that the developed aggregate has potential to be used as substitution of conventional aggregate due to its less weight and water absorption. The microstructure analysis confirmed the efficiency of the manufacturing process where the final product has the same mixture of binder and filler.

Keywords: fly ash, plastic waste, quarry fine, red sand, synthetic aggregate

Procedia PDF Downloads 223
8484 The Supply Chain Operation Reference Model Adaptation in the Developing Countries: An Empirical Study on the Egyptian Automotive Sector

Authors: Alaa Osman, Sara Elgazzar, Breksal Elmiligy

Abstract:

The Supply Chain Operation Reference (SCOR) model is considered one of the most widely implemented supply chain performance measurement systems (SCPMSs). Several studies have been proposed on the SCOR model adaptation in developed countries context; while there is a limited availability of previous work on the SCPMSs application generally and the SCOR model specifically in developing nations. This paper presents a research agenda on the SCOR model adaptation in the developing countries. It aims at investigating the challenges of adapting the SCOR model to manage and measure supply chain performance in developing countries. The research will exemplify the system in the Egyptian automotive sector to gain a comprehensive understanding of how the application of the SCOR model can affect the performance of automotive companies in Egypt, with a necessary understanding of challenges and obstacles faced the adaptation of the model in the Egyptian supply chain context. An empirical study was conducted on the Egyptian automotive sector in three companies considering three different classes: BMW, Hyundai and Brilliance. First, in-depth interviews were carried out to gain an insight into the implementation and the relevance of the concepts of supply chain management and performance measurement in the Egyptian automotive industry. Then, a formal survey was designed based on the SCOR model five main processes (plan, source, make, deliver and return) and best practices to investigate the challenges and obstacles faced the adaptation of the SCOR model in the Egyptian automotive supply chain. Finally, based on the survey results, the appropriate best practices for each process were identified in order to overcome the SCOR model adaptation challenges. The results showed that the implementation of the SCOR model faced different challenges and unavailability of the required enablers. The survey highlighted the low integration of end-to-end supply chain, lacks commitment for the innovative ideas and technologies, financial constraints and lack of practical training and support as the main challenges faced the adaptation of the SCOR model in the Egyptian automotive supply chain. The research provides an original contribution to knowledge by proposing a procedure to identify challenges encountered during the process of SCOR model adoption which can pave a way for further research in the area of SCPMSs adaptation, particularly in the developing countries. The research can help managers and organizations to identify obstacles and difficulties of the SCOR model adaptation, subsequently this can facilitate measuring the improved performance or changes in the organizational performance.

Keywords: automotive sector, developing countries, SCOR model, supply chain performance

Procedia PDF Downloads 367
8483 The Micro-Activated Organic Regeneration in Rural Construction: A Case Study of Yangdun Village in Deqing County, Zhejiang Province

Authors: Chengyuan Zhu, Zhu Wang

Abstract:

With the strategy of Rural Rejuvenation proposed in China, the rural has become the focus of all works today. In addition to the support of industry and policy, the rural planning and construction which is the space dependence of Rural Rejuvenation are also very crucial. Based on an analysis of the case of Yangdun Village in Deqing County, this paper summarizes village existing resources and construction status quo. It tries to illuminate the micro-activated organic renewal strategies and methods, based on ecological landscape, history context, industry development and living life requirements. It takes advantage of industrial linkage and then asks for the coordination of both spatial and industrial planning, the revival and remodeling of the rural image can be achieved through shaping the of architectural and landscape nodes as well as the activation of street space.

Keywords: rural construction, rural human settlements, micro-activation, organic renewal

Procedia PDF Downloads 223
8482 Conflict Causes within Construction Projects; Conflict Interaction across Project Phases

Authors: Abdullah Mohammed Alshehri

Abstract:

The projects in the construction industry have significantly increased, given its contribution to the overall Gross Domestic Product (GDP) of the countries. Reflecting upon the complex nature and involvement of various agents, the study aims to analyze the conflicts cause within construction projects. Therefore, the study strived to come out with understanding the levels of conflict interaction across project phases. However, this conducted by investigating the association between antecedents and apparent conflicts inherent in. The study used a qualitative approach for collecting the data through a quantitative, semi-structured method. Formation of a questionnaire survey has been conducted for over 30 respondents. However, the survey came out with the identification of 25 conflict cause categories, which can take place in different construction project phases, including pre-design phase, pre-construction phase, construction phase, commissioning, and completion phase. For example, conflicts associated with inconsistencies or discrepancies within or between project documents, which took place at tendering time in the pre-construction phase were relatable with the selection of material specifications that should be supplied or used in the construction projects at the construction phase. Its analysis can provide comprehensive understanding, trace the root of the problem, which offers a roadmap to deepen the understanding of the conflict conditions and ‘course of action’ necessary for project management strategy actions toward avoiding or minimizing conflict causes at project life.

Keywords: construction, conflict causes, levels, interaction, phases

Procedia PDF Downloads 175
8481 Utilization of Safety Measures in Prevention of Site Accidents in Nigerian Construction Industry

Authors: Samuel Opeyemi Williams, Razali Adul Hamid, Mohd Saidin Misman, Dominic Ileyemi Ajayi, Taki Eddine Seghier

Abstract:

Construction industry is famous with hazardous and high-risk environment with operatives facing a greater risk of work-related fatality or injury than operatives in other industries. It is characterised with different types of accident, ranging from electrocution, trip and slip, fall from height, struck-by, explosion, trench collapse, to scaffolding accidents, with each type being caused by different factors. However, accidents are unplanned, unforeseeable and unexpected events, but regardless of the high-risk nature of the industry, accidents are preventable. The aim of the paper is to determine the extent of the utilization of the safety measures, as well as identifying the factors underlining the non-usage. A research methodology consisting of a literature review was used to identify the types and causes of site accidents, while a well-structured questionnaire was used to determine the level of the usage of safety measures on site. The data were analysed with the results revealing the use of protective clothing, safety helmet, first aid, protective shoe, safety belt, and face shield to aid safety of workers, as well as ascribing non-usage of safety measures to cost, ignorance, lack of experts and non-inclusion in contract document. Recommendations are included in the paper suggesting the enforcement of the utilization of safety measures in reducing the spate of accident occurrence on construction sites.

Keywords: construction industry, safety measures, accident, prevention

Procedia PDF Downloads 310
8480 Integrating Music on Construction Sites: Key Benefits and Cautions: A Literature Perspective

Authors: Oluwatayomi Daniel Fadumo, Chinyere Celestina Esimone

Abstract:

The construction industry, as a massive human capital-related sector, requires an always motivated workforce. The inability to maintain this state has been found to hamper productivity which ultimately leads to poor project delivery, infrastructural development decline, and low morale among citizens. The need to develop an approach to keep this set of people inspired before, during, and after work becomes a necessity; this paper aims to evaluate the key benefits and cautions in integrating music on construction sites in Nigeria to improve effective project delivery. In attaining this, the study identified the advantages of music on construction sites, evaluated the key considerations in introducing music on construction sites, and recommended measures for the effective integration of music on construction sites in Nigeria. The study is a descriptive research through the use of secondary data gleaned from relevant literature, journals, and research sites. The study concluded that different forms of music genres can be implemented ranging from Pop music, rock, metal, and classical music. Introducing music has the advantage of industrial branding, improving workers` morale, setting the pace for working, helping in information retention, and improving mental health and happiness. The key consideration, however, is to provide the right volume and music that doesn’t pose health and safety challenges. The study finally recommended that for effective integration of music on construction sites in Nigeria, policies should be drafted regulating its use, specific radio customized for the site be introduced and that research-based music, proven to have previously helped, should be given to a group of workers.

Keywords: music, construction sites, workers, construction industry, construction management practice

Procedia PDF Downloads 43
8479 Application of GIS-Based Construction Engineering: An Electronic Document Management System

Authors: Mansour N. Jadid

Abstract:

This paper describes the implementation of a GIS to provide decision support for successfully monitoring the movements and storage of materials, hence ensuring that finished products travel from the point of origin to the destination construction site through the supply-chain management (SCM) system. This system ensures the efficient operation of suppliers, manufacturers, and distributors by determining the shortest path from the point of origin to the final destination to reduce construction costs, minimize time, and enhance productivity. These systems are essential to the construction industry because they reduce costs and save time, thereby improve productivity and effectiveness. This study describes a typical supply-chain model and a geographical information system (GIS)-based SCM that focuses on implementing an electronic document management system, which maps the application framework to integrate geodetic support with the supply-chain system. This process provides guidance for locating the nearest suppliers to fill the information needs of project members in different locations. Moreover, this study illustrates the use of a GIS-based SCM as a collaborative tool in innovative methods for implementing Web mapping services, as well as aspects of their integration by generating an interactive GIS for the construction industry platform.

Keywords: construction, coordinate, engineering, GIS, management, map

Procedia PDF Downloads 299
8478 An Explanatory Study into the Information-Seeking Behaviour of Egyptian Beggars

Authors: Essam Mansour

Abstract:

The key purpose of this study is to provide first-hand information about beggars in Egypt, especially from the perspective of their information seeking behaviour including their information needs. The researcher tries to investigate the information-seeking behaviour of Egyptian beggars with regard to their thoughts, perceptions, motivations, attitudes, habits, preferences as well as challenges that may impede their use of information. The research methods used were an adapted form of snowball sampling of a heterogeneous demographic group of participants in the beggary activity in Egypt. This sampling was used to select focus groups to explore a range of relevant issues. Data on the demographic characteristics of the Egyptian beggars showed that they tend to be men, mostly with no formal education, with an average age around 30s, labeled as low-income persons, mostly single and mostly Muslims. A large number of Egyptian beggars were seeking for information to meet their basic needs as well as their daily needs, although some of them were not able to identify their information needs clearly. The information-seeking behaviour profile of a very large number of Egyptian beggars indicated a preference for informal sources of information over formal ones to solve different problems and meet the challenges they face during their beggary activity depending on assistive devices, such as mobile phones. The high degree of illiteracy and the lack of awareness about the basic rights of information as well as information needs were the most important problems Egyptian beggars face during accessing information. The study recommended further research to be conducted about the role of the library in the education of beggars. It also recommended that beggars’ awareness about their information rights should be promoted through educational programs that help them value the role of information in their life.

Keywords: user studies, information-seeking behaviour, information needs, information sources, beggars, Egypt

Procedia PDF Downloads 312
8477 Hybrid Risk Assessment Model for Construction Based on Multicriteria Decision Making Methods

Authors: J. Tamosaitiene

Abstract:

The article focuses on the identification and classification of key risk management criteria that represent the most important sustainability aspects of the construction industry. The construction sector is one of the most important sectors in Lithuania. Nowadays, the assessment of the risk level of a construction project is especially important for the quality of construction projects, the growth of enterprises and the sector. To establish the most important criteria for successful growth of the sector, a questionnaire for experts was developed. The analytic hierarchy process (AHP), the expert judgement method and other multicriteria decision making (MCDM) methods were used to develop the hybrid model. The results were used to develop an integrated knowledge system for the measurement of a risk level particular to construction projects. The article presents a practical case that details the developed system, sustainable aspects, and risk assessment.

Keywords: risk, system, model, construction

Procedia PDF Downloads 163
8476 Optimizing Recycling and Reuse Strategies for Circular Construction Materials with Life Cycle Assessment

Authors: Zhongnan Ye, Xiaoyi Liu, Shu-Chien Hsu

Abstract:

Rapid urbanization has led to a significant increase in construction and demolition waste (C&D waste), underscoring the need for sustainable waste management strategies in the construction industry. Aiming to enhance the sustainability of urban construction practices, this study develops an optimization model to effectively suggest the optimal recycling and reuse strategies for C&D waste, including concrete and steel. By employing Life Cycle Assessment (LCA), the model evaluates the environmental impacts of adopted construction materials throughout their lifecycle. The model optimizes the quantity of materials to recycle or reuse, the selection of specific recycling and reuse processes, and logistics decisions related to the transportation and storage of recycled materials with the objective of minimizing the overall environmental impact, quantified in terms of carbon emissions, energy consumption, and associated costs, while adhering to a range of constraints. These constraints include capacity limitations, quality standards for recycled materials, compliance with environmental regulations, budgetary limits, and temporal considerations such as project deadlines and material availability. The strategies are expected to be both cost-effective and environmentally beneficial, promoting a circular economy within the construction sector, aligning with global sustainability goals, and providing a scalable framework for managing construction waste in densely populated urban environments. The model is helpful in reducing the carbon footprint of construction projects, conserving valuable resources, and supporting the industry’s transition towards a more sustainable future.

Keywords: circular construction, construction and demolition waste, material recycling, optimization modeling

Procedia PDF Downloads 52
8475 Optimizing Recycling and Reuse Strategies for Circular Construction Materials with Life Cycle Assessment

Authors: Zhongnan Ye, Xiaoyi Liu, Shu-Chien Hsu

Abstract:

Rapid urbanization has led to a significant increase in construction and demolition waste (C&D waste), underscoring the need for sustainable waste management strategies in the construction industry. Aiming to enhance the sustainability of urban construction practices, this study develops an optimization model to effectively suggest the optimal recycling and reuse strategies for C&D waste, including concrete and steel. By employing Life Cycle Assessment (LCA), the model evaluates the environmental impacts of adopted construction materials throughout their lifecycle. The model optimizes the quantity of materials to recycle or reuse, the selection of specific recycling and reuse processes, and logistics decisions related to the transportation and storage of recycled materials with the objective of minimizing the overall environmental impact, quantified in terms of carbon emissions, energy consumption, and associated costs, while adhering to a range of constraints. These constraints include capacity limitations, quality standards for recycled materials, compliance with environmental regulations, budgetary limits, and temporal considerations such as project deadlines and material availability. The strategies are expected to be both cost-effective and environmentally beneficial, promoting a circular economy within the construction sector, aligning with global sustainability goals, and providing a scalable framework for managing construction waste in densely populated urban environments. The model is helpful in reducing the carbon footprint of construction projects, conserving valuable resources, and supporting the industry’s transition towards a more sustainable future.

Keywords: circular construction, construction and demolition waste, life cycle assessment, material recycling

Procedia PDF Downloads 65
8474 Towards Sustainable Construction in the United Arab Emirates: Challenges and Opportunities

Authors: Yousef Alqaryouti, Mariam Al Suwaidi, Raed Mohmood AlKhuwaildi, Hind Kolthoum, Issa Youssef, Mohammed Al Imam

Abstract:

The UAE has experienced rapid economic growth due to its mature oil production industry, leading to a surge in urbanization and infrastructure development in the construction sector. Sustainable development practices are becoming increasingly important, and the UAE government has taken proactive measures to promote them, including the introduction of sustainable building codes, energy-efficient technologies, and renewable energy sources. Initiatives such as the Masdar City project and the Emirates Green Building Council further demonstrate the government's commitment to a cleaner and healthier environment. By adopting sustainable practices, the UAE can reduce its carbon footprint, lessen its reliance on fossil fuels, and achieve cost savings in the long run. The purpose of this paper is to conduct a thorough review of the current state of sustainability in the construction industry of the UAE. Our research methodology includes a local market survey and qualitative observational analysis of executed housing construction projects by the Mohammed Bin Rashid Housing Establishment. The market survey assesses eleven different challenging factors that affect sustainable construction project delivery. The qualitative observational research is based on data collected from three projects, including construction progress, bill of quantity, and construction program. The study concludes that addressing these challenges requires a collaborative team approach, incentivized contracts, traditional project management practices, an integrated project team, and an increase in sustainability awareness among stakeholders. The recommendations proposed in this study aim to promote and improve the application of sustainability in the UAE's construction industry for the future.

Keywords: sustainability, construction, challenges, opportunities, case study, market survey

Procedia PDF Downloads 51
8473 Innovation in Lean Thinking to Achieve Rapid Construction

Authors: Muhamad Azani Yahya, Vikneswaran Munikanan, Mohammed Alias Yusof

Abstract:

Lean thinking holds the potential for improving the construction sector, and therefore, it is a concept that should be adopted by construction sector players and academicians in the real industry. Bridging from that, a learning process for construction sector players regarding this matter should be the agenda in gaining the knowledge in preparation for their career. Lean principles offer opportunities for reducing lead times, eliminating non-value adding activities, reducing variability, and are facilitated by methods such as pull scheduling, simplified operations and buffer reduction. Thus, the drive for rapid construction, which is a systematic approach in enhancing efficiency to deliver a project using time reduction, while lean is the continuous process of eliminating waste, meeting or exceeding all customer requirements, focusing on the entire value stream and pursuing perfection in the execution of a constructed project. The methodology presented is shown to be valid through literature, interviews and questionnaire. The results show that the majority of construction sector players unfamiliar with lean thinking and they agreed that it can improve the construction process flow. With this background knowledge established and identified, best practices and recommended action are drawn.

Keywords: construction improvement, rapid construction, time reduction, lean construction

Procedia PDF Downloads 366
8472 A Social Network Analysis for Formulating Construction Defect Generation Mechanisms

Authors: Hamad Aljassmi, Sangwon Han

Abstract:

Various solutions for preventing construction defects have been suggested. However, a construction company may have difficulties adopting all these suggestions due to financial and practical constraints. Based on this recognition, this paper aims to identify the most significant defect causes and formulate their defect generation mechanism in order to help a construction company to set priorities of its defect prevention strategies. For this goal, we conducted a questionnaire survey of 106 industry professionals and identified five most significant causes including: (1) organizational culture, (2) time pressure and constraints, (3) workplace quality system, (4) financial constraints upon operational expenses and (5) inadequate employee training or learning opportunities.

Keywords: defect, quality, failure, risk

Procedia PDF Downloads 621
8471 Improving Fire Resistance of Wood and Wood-Based Composites and Fire Testing Systems

Authors: Nadir Ayrilmis

Abstract:

Wood and wood-based panels are one of the oldest structural materials used in the construction industry due to their significant advantages such as good mechanical properties, low density, renewable material, low-cost, recycling, etc. However, they burn when exposed to a flame source or high temperatures. This is very important when the wood products are used as structural or hemi-structural materials in the construction industry, furniture industry, so on. For this reason, the fire resistance is demanded property for wood products. They can be impregnated with fire retardants to improve their fire resistance. The most used fire retardants, fire-retardant mechanism, and fire-testing systems, and national and international fire-durability classifications and standard requirements for fire-durability of wood and wood-based panels were given in this study.

Keywords: fire resistance, wood-based panels, cone calorimeter, wood

Procedia PDF Downloads 158
8470 The Sufi Madad in Arabic Literature and Translation

Authors: Riham Debian

Abstract:

This paper deals with the translational mystic in Arabic aesthetics and their linguistic and narrative revelation and mediation across textual spaces. The paper particularly engages with the nature of the Egyptian Sufi Madad, its relation to spaces/places, its intergenerational and intertextual manifestations, and its intersection with questions of identity—the historical spaces and geographical places one inhabits and embodies. Opening a repertoire between contextualized stylistics and poetics semiology (Boise-Bier2011; Jackobson 1960), the paper reads in al-Ghitany’s Kitab al-Tagiliat (The Book of Revelation1983), Bassiouny’s Sabil Al-Ghareq (2018) and its translation (Fountain of the Drowning2022). The paper examines the stylistic and poetical encoding and recoding of the Sufi Madads from Ghitany to Bassiouny and their entanglement in the question of Egyptian identity-politics through the embodiment of historical places and geographical spaces. The paper argues for the intergenerational intertextuality of Arabic aesthetics that stylistically and poetically enacts the mysticism of Sufi Madad through historical and geographical semioticization of the Egyptian character continuity across time and space. Both Ghitany and Bassiouny engage with the historical novel as a form of delivery of their Egyptian mystical relation with time and place. Both novelist-historians are involved with the question of place and the life-worlds that spaces generate across time and gender.

Keywords: intertextuality, interdiscusivity, madad, egyptian identity

Procedia PDF Downloads 92
8469 An Analysis of Prefabricated Construction Waste: A Case Study Approach

Authors: H. Hakim, C. Kibert, C. Fabre, S. Monadizadeh

Abstract:

Construction industry is an industry saddled with chronic problems of high waste generation. Waste management that is to ensure materials are utilized in an efficient manner would make a major contribution to mitigating the negative environmental impacts of construction waste including finite resources depletion and growing occupied landfill areas to name a few. Furthermore, ‘material resource efficiency’ has been found an economically smart approach specially when considered during the design phase. One effective strategy is to utilizing off-site construction process which includes a series of prefabricated systems such as mobile, modular, and HUD construction (Department of Housing and Urban Development manufactured buildings). These types of buildings are by nature material and resource-efficient. Despite conventional construction that is exposed to adverse weather conditions, manufactured construction production line is capable of creating repetitive units in a factory controlled environment. A factory can have several parallel projects underway with a high speed and in a timely manner which simplifies the storage of excess materials and re-allocating to the next projects. The literature reports that prefabricated construction significantly helps reduce errors, site theft, rework, and delayed problems and can ultimately lead to a considerable waste reduction. However, there is not sufficient data to quantify this reduction when it comes to a regular modular house in the U.S. Therefore, this manuscript aims to provide an analysis of waste originated from a manufactured factory trend. The analysis was made possible with several visits and data collection of Homes of Merits, a Florida Manufactured and Modular Homebuilder. The results quantify and verify a noticeable construction waste reduction.

Keywords: construction waste, modular construction, prefabricated buildings, waste management

Procedia PDF Downloads 261
8468 Effect of Pre-Construction on Construction Schedule and Client Loyalty

Authors: Jong Hoon Kim, Hyun-Soo Lee, Moonseo Park, Min Jeong, Inbeom Lee

Abstract:

Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client satisfaction. A total of 65 construction projects and 93 clients were investigated for this research in an attempt to identify (a) the relationship between pre-construction and schedule reduction, and (b) pre-construction and client loyalty. Based on the quantitative analysis, this research was able to establish a negative correlation based on 65 construction projects between pre-construction and project schedule existed. This finding represents that the more pre-construction is performed for a certain project, the overall construction schedule decreased. Then, to determine the relationship between pre-construction and client satisfaction, Net Promoter Score (NPS) of 93 clients from the 65 projects was utilized. Pre-construction and NPS was further analyzed and a positive correlation was found between the two. This infers that clients tend to be more satisfied with projects with higher ratio of pre-construction than those projects with less pre-construction.

Keywords: client loyalty, NPS, pre-construction, schedule reduction

Procedia PDF Downloads 350