Search results for: T section beam bridge
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 3062

Search results for: T section beam bridge

1502 Socialist Ideology in Africa: A Comparative Study of Pre and Post Socialism

Authors: Haymanot Gebre-Amlak, Selamawit Gebre-Amlak

Abstract:

Since its original declaration in the 18th century, Karl Marx and Friedrich Engels's Communist Manifesto has become one of the most influential political tracts. Socialism is a political path that leads towards communism by fostering a cooperative economy through the creation of cooperative enterprises, common ownership, state ownership, or shared equity. The ultimate objective of communism is to bring everyone working toward the same collective goal of a healthy, happy, and free society. The European establishment of 19-century colonial rule over the continent of Africa reinforced inflows of European investment and forced a profound change in the operation of labor and land markets. The colonial era and forced labor schemes in Africa lasted for several decades. When exiting from colonialism, these African countries were attracted to socialism’s ideology to bridge the social gap and freedom to their society. In this paper, we compare a pre and post socialist ideology and the impact in various African countries. We analyse the different aspects, which led to inconsistent outcomes. Our finding indicates that while they have some facets in common, each African country had a unique interpretation and influence from the socialist ideology.

Keywords: African politics, socialism in Africa, African history, Africa

Procedia PDF Downloads 155
1501 Analysis of Simple Mechanisms to Continuously Vary Mach Number in a Supersonic Wind Tunnel Facility

Authors: Prateek Kishore, T. M. Muruganandam

Abstract:

Supersonic wind tunnel nozzles are generally capable of producing a constant Mach number flow in the test section of the wind tunnel. As a result, most of the supersonic vehicles are widely designed using steady state flow characteristics which may have errors while facing unsteady situations. This study aims to explore the possibility of varying the Mach number of the flow during wind tunnel operation. The nozzle walls are restricted to be inflexible for cooling near the throat due to high stagnation temperature requirement of the flow to simulate the conditions as experienced by the vehicle. Two simple independent mechanisms, rotation and translation of nozzle walls have been analyzed and the nozzle ranges have been optimized to vary the Mach number from Mach 2 to Mach 5 using minimum number of nozzles in the wind tunnel.

Keywords: method of characteristics, nozzle, supersonic wind tunnel, variable mach number

Procedia PDF Downloads 281
1500 Performance of Stiffened Slender Built up Steel I-Columns

Authors: M. E. Abou-Hashem El Dib, M. K. Swailem, M. M. Metwally, A. I. El Awady

Abstract:

The present work illustrates a parametric study for the effect of stiffeners on the performance of slender built up steel I-columns. To achieve the desired analysis, finite element technique is used to develop nonlinear three-dimensional models representing the investigated columns. The finite element program (ANSYS 13.0) is used as a calculation tool for the necessary nonlinear analysis. A validation of the obtained numerical results is achieved. The considered parameters in the study are the column slenderness ratio and the horizontal stiffener's dimensions as well as the number of stiffeners. The dimensions of the stiffeners considered in the analysis are the stiffener width and the stiffener thickness. Numerical results signify a considerable effect of stiffeners on the performance and failure load of slender built up steel I-columns.

Keywords: columns, local buckling, slender, stiffener, thin walled section

Procedia PDF Downloads 306
1499 Puereria mirifica Replacement Improves Skeletal Muscle Performance Associated with Increasing Parvalbumin Levels in Ovariectomized Rat

Authors: Uraporn Vongvatcharanon, Kochakorn Sukjan, Wandee Udomuksorn, Ekkasit Kumarnsit, Surapong Vongvatcharanon

Abstract:

Sarcopenia is a loss of muscle mass, and strength frequently found in menopause. Estrogen replacement has been shown to improve such a loss of muscle functions. However, there is an increased risk of cancer that has to be considered because of the estrogen replacement therapy. Thus, phytoestrogen supplementation has been suggested as an alternative therapy. Pueraria mirifica (PM) is a plant in the family Leguminosae, that is known to be phytoestrogen-rich and has been traditionally used for the treatment of menopausal symptoms. It contains isoflavones and other compounds such as miroestrol and its derivatives. Parvalbumin (PV) is a calcium binding protein and functions as a relaxing factor in fast twitch muscle fibers. A decrease of the PV level results in a reduction of the speed of the twitch relaxation. Therefore, this study aimed to investigate the effect of an ethanolic extract from Pueraria mirifica on the estrogen levels, skeletal muscle functions and PV levels in the extensor digitorum longus (EDL) and gastrocnemius of ovariectomized rats. Twelve-week old female Wistar rats (200-250 g) were divided into 6 groups: SHAM (un-ovariectomized rats, that received double distilled water), PM-0 (ovariectomized rats, OVX, receiving double distilled water), E (OVX, receiving an estradiol benzoate dose of 0.04 mg/kg), PM-50 (OVX receiving PM 50 mg/kg), PM-500 (OVX receiving PM 500 mg/kg), PM-1000 (OVX receiving PM 1000 mg/kg) all for 90 days. The PM-0 group had estrogen levels, uterus weights, muscle mass, myofiber cross-section areas, peak tension, fatigue resistance, speed of relaxation and parvalbumin levels of both EDL and gastrocnemius that were significantly reduced compared to those of the SHAM group (p<0.05). Also the α and β estrogen receptor immunoreactivities and the parvalbumin immunoreactivities of both EDL and gastrocnemius were decreased in the PM-0 group. In contrast the E, PM-50, PM-500 and PM-1000 group had estrogen levels, uterus weights, muscle mass, myofiber cross-section areas, peak tension, fatigue resistance, speed of relaxation of both EDL and gastrocnemius that were significantly increased compared with PM-0 group (p<0.05). In addition, the α and β estrogen receptor immunoreactivities and parvalbumin immunoreactivity of both the EDL and gastrocnemius were increased in the E, PM-50, PM-500 and PM-1000 group. In addition the extract of Pueraria mirifica replacement group at 50 and 500 mg/kg had significantly increased parvalbumin levels in the EDL muscle but in the gastrocnemius, only the dose of 500 mg/kg increased the parvalbumin levels (p<0.05). These results have demonstrated that the use of the Pueraria mirifica extract as a replacement therapy for estrogen produced estrogenic activity that was similar to that produced by the estradiol benzoate replacement. It seems that the phytoestrogens could bind with the estrogen receptors and stimulate the transcriptional activity to synthesise muscle protein that caused an increase in muscle mass and parvalbumin levels. Thus, muscle synthesis may restore parvalbumin levels resulting in an enhanced relaxation efficiency that would lead to a shortened latent period before the next contraction.

Keywords: Puereria mirifica, Parvalbumin, estrogen, ovariectomized rats

Procedia PDF Downloads 372
1498 Reliability Analysis of Soil Liquefaction Based on Standard Penetration: A Case Study in Babol City

Authors: Mehran Naghizaderokni, Asscar Janalizadechobbasty

Abstract:

There are more probabilistic and deterministic liquefaction evaluation procedures in order to judge whether liquefaction will occur or not. A review of this approach reveals that there is a need for a comprehensive procedure that accounts for different sources of uncertainty in liquefaction evaluation. In fact, for the same set of input parameters, different methods provide different factors of safety and/or probabilities of liquefaction. To account for the different uncertainties, including both the model and measurement uncertainties, reliability analysis is necessary. This paper has obtained information from Standard Penetration Test (SPT) and some empirical approaches such as: Seed et al, Highway bridge of Japan approach to soil liquefaction, The Overseas Coastal Area Development Institute of Japan (OCDI) and reliability method to studying potential of liquefaction in soil of Babol city in the north of Iran are compared. Evaluation potential of liquefaction in soil of Babol city is an important issue since the soil of some area contains sand, seismic area, increasing level of underground waters and consequently saturation of soil; therefore, one of the most important goals of this paper is to gain suitable recognition of liquefaction potential and find the most appropriate procedure of evaluation liquefaction potential to decrease related damages.

Keywords: reliability analysis, liquefaction, Babol, civil, construction and geological engineering

Procedia PDF Downloads 489
1497 Modeling, Analysis and Control of a Smart Composite Structure

Authors: Nader H. Ghareeb, Mohamed S. Gaith, Sayed M. Soleimani

Abstract:

In modern engineering, weight optimization has a priority during the design of structures. However, optimizing the weight can result in lower stiffness and less internal damping, causing the structure to become excessively prone to vibration. To overcome this problem, active or smart materials are implemented. The coupled electromechanical properties of smart materials, used in the form of piezoelectric ceramics in this work, make these materials well-suited for being implemented as distributed sensors and actuators to control the structural response. The smart structure proposed in this paper is composed of a cantilevered steel beam, an adhesive or bonding layer, and a piezoelectric actuator. The static deflection of the structure is derived as function of the piezoelectric voltage, and the outcome is compared to theoretical and experimental results from literature. The relation between the voltage and the piezoelectric moment at both ends of the actuator is also investigated and a reduced finite element model of the smart structure is created and verified. Finally, a linear controller is implemented and its ability to attenuate the vibration due to the first natural frequency is demonstrated.

Keywords: active linear control, lyapunov stability theorem, piezoelectricity, smart structure, static deflection

Procedia PDF Downloads 377
1496 Hydro-Sedimentological Evaluation in Itajurú Channel–Araruama Lagoon-Rj, Due Superelevation of the Sea Level by Climate Change

Authors: Paulo José Sigaúque, Paulo Rosman

Abstract:

The Itajurú channel, located in the Eastern side of the Araruama lagoon, Rio de Janeiro state, is the one who makes the connection between Araruama lagoon and the sea. It is important to understand the hydrodynamic circulation of the location and effects of the sedimentological processes, and also estimate of the hydrodynamic and sedimentological processes in the future after the sea level change due to effects of climate change. This work presents results of a study about sediments dynamics in the Araruama lagoon focusing on the Itajurú channel region considering the present mean sea level and a foreseen sea level rise of 0.5 meters due to climate changes. The study was conducted with the aid of computer modeling for hydrodynamic and morphodynamic in SisBaHiA®. The results indicate that Araruama lagoon is composed by two hydrodynamics compartments; one is dominated by the action of the tide between the entrance of the channel and the strait of Perynas, and another one by the action of wind in narrow region between strait of Perynas and western extreme of the lagoon. With sea level rise, the magnitude of current velocities and flow rates is increased and consequently flow of sediment transport from upstream to downstream of Itajurú channel is increased and has more effect in the bridge Feliciano Sodré.

Keywords: hydrodinamic, superelevation, sea level, climate change

Procedia PDF Downloads 298
1495 Impact of Different Modulation Techniques on the Performance of Free-Space Optics

Authors: Naman Singla, Ajay Pal Singh Chauhan

Abstract:

As the demand for providing high bit rate and high bandwidth is increasing at a rapid rate so there is a need to see in this problem and finds a technology that provides high bit rate and also high bandwidth. One possible solution is by use of optical fiber. Optical fiber technology provides high bandwidth in THz. But the disadvantage of optical fiber is of high cost and not used everywhere because it is not possible to reach all the locations on the earth. Also high maintenance required for usage of optical fiber. It puts a lot of cost. Another technology which is almost similar to optical fiber is Free Space Optics (FSO) technology. FSO is the line of sight technology where modulated optical beam whether infrared or visible is used to transfer information from one point to another through the atmosphere which works as a channel. This paper concentrates on analyzing the performance of FSO in terms of bit error rate (BER) and quality factor (Q) using different modulation techniques like non return to zero on off keying (NRZ-OOK), differential phase shift keying (DPSK) and differential quadrature phase shift keying (DQPSK) using OptiSystem software. The findings of this paper show that FSO system based on DQPSK modulation technique performs better.

Keywords: attenuation, bit rate, free space optics, link length

Procedia PDF Downloads 338
1494 High-Frequency Full-Bridge Isolated DC-DC Converter for Fuel Cell Power Generation Systems

Authors: Nabil A. Ahmed

Abstract:

DC-DC converters are necessary to interface low-voltage fuel cell power generation systems to a higher voltage DC bus system. A system and method for generating a regulated output power from fuel cell power generation systems is proposed in this paper, this includes a soft-switching isolated DC-DC converter to reduce the idling and circulating currents. The system incorporates a high-frequency center tap transformer link DC-DC converter using secondary-side soft switching control. Snubber capacitors including the parasitic capacitance of the switching devices and the transformer leakage inductance are utilized to achieve zero-voltage switching (ZVS) in the primary side of the high-frequency transformer. Therefore, no extra resonant components are required for ZVS. The inherent soft-switching capability allows high power density, efficient power conversion, and compact packaging. A prototype rated at 6.5 kW is proposed and simulated. Simulation results confirmed a wide range of soft-switching operation and consequently high conversion efficiency will be achieved.

Keywords: secondary-side, phase-shift, high-frequency transformer, zero voltage, zero current, soft switching operation, switching losses

Procedia PDF Downloads 299
1493 Aeroelastic Stability Analysis in Turbomachinery Using Reduced Order Aeroelastic Model Tool

Authors: Chandra Shekhar Prasad, Ludek Pesek Prasad

Abstract:

In the present day fan blade of aero engine, turboprop propellers, gas turbine or steam turbine low-pressure blades are getting bigger, lighter and thus, become more flexible. Therefore, flutter, forced blade response and vibration related failure of the high aspect ratio blade are of main concern for the designers, thus need to be address properly in order to achieve successful component design. At the preliminary design stage large number of design iteration is need to achieve the utter free safe design. Most of the numerical method used for aeroelastic analysis is based on field-based methods such as finite difference method, finite element method, finite volume method or coupled. These numerical schemes are used to solve the coupled fluid Flow-Structural equation based on full Naiver-Stokes (NS) along with structural mechanics’ equations. These type of schemes provides very accurate results if modeled properly, however, they are computationally very expensive and need large computing recourse along with good personal expertise. Therefore, it is not the first choice for aeroelastic analysis during preliminary design phase. A reduced order aeroelastic model (ROAM) with acceptable accuracy and fast execution is more demanded at this stage. Similar ROAM are being used by other researchers for aeroelastic and force response analysis of turbomachinery. In the present paper new medium fidelity ROAM is successfully developed and implemented in numerical tool to simulated the aeroelastic stability phenomena in turbomachinery and well as flexible wings. In the present, a hybrid flow solver based on 3D viscous-inviscid coupled 3D panel method (PM) and 3d discrete vortex particle method (DVM) is developed, viscous parameters are estimated using boundary layer(BL) approach. This method can simulate flow separation and is a good compromise between accuracy and speed compared to CFD. In the second phase of the research work, the flow solver (PM) will be coupled with ROM non-linear beam element method (BEM) based FEM structural solver (with multibody capabilities) to perform the complete aeroelastic simulation of a steam turbine bladed disk, propellers, fan blades, aircraft wing etc. The partitioned based coupling approach is used for fluid-structure interaction (FSI). The numerical results are compared with experimental data for different test cases and for the blade cascade test case, experimental data is obtained from in-house lab experiments at IT CAS. Furthermore, the results from the new aeroelastic model will be compared with classical CFD-CSD based aeroelastic models. The proposed methodology for the aeroelastic stability analysis of gas turbine or steam turbine blades, or propellers or fan blades will provide researchers and engineers a fast, cost-effective and efficient tool for aeroelastic (classical flutter) analysis for different design at preliminary design stage where large numbers of design iteration are required in short time frame.

Keywords: aeroelasticity, beam element method (BEM), discrete vortex particle method (DVM), classical flutter, fluid-structure interaction (FSI), panel method, reduce order aeroelastic model (ROAM), turbomachinery, viscous-inviscid coupling

Procedia PDF Downloads 257
1492 Jet-Stream Airsail: Study of the Shape and the Behavior of the Connecting Cable

Authors: Christopher Frank, Yoshiki Miyairi

Abstract:

A jet-stream airsail concept takes advantage of aerology in order to fly without propulsion. Weather phenomena, especially jet streams, are relatively permanent high winds blowing from west to east, located at average altitudes and latitudes in both hemispheres. To continuously extract energy from the jet-stream, the system is composed of a propelled plane and a wind turbine interconnected by a cable. This work presents the aerodynamic characteristics and the behavior of the cable that links the two subsystems and transmits energy from the turbine to the aircraft. Two ways of solving this problem are explored: numerically and analytically. After obtaining the optimal shape of the cross-section of the cable, its behavior is analyzed as a 2D problem solved numerically and analytically. Finally, a 3D extension could be considered by adding lateral forces. The results of this work can be further used in the design process of the overall system: aircraft-turbine.

Keywords: jet-stream, cable, tether, aerodynamics, aircraft, airsail, wind

Procedia PDF Downloads 353
1491 The Truism of the True and Fair View of Auditor’s Report

Authors: Ofuan James Ilaboya, Okhae J. Ibhadode

Abstract:

The objective of this paper is to theoretically examine the truism of the “true and fair view” in the context of financial reporting. The paper examines the concepts such as true, fair, true and fair view, problems of true and fair view, the origin/history of true and fair view, review of attributes and key issues relating to true and fair view. The methodological approach adopted in this paper is library-based research, focusing on the review of relevant and related extant literature. The findings based on the review of relevant and related literature is suggestive of the fact that the true and fair concept in financial reporting environment is contentious. The study concludes that given the circumstances as chronicled on this paper, it is evident that the truism of the true and fair view of the auditor’s opinion is under serious threat. The way forward may be for the auditor to certify the accuracy and the correctness of the financial statement. While this position being canvassed here may help to substantially bridge the age-long expectation gap, it may as well require an upward review of the current audit fee structure in order to be able to operationalize the onerous task of certifying the accuracy and correctness of the financial statement. This position is contentious and will require a robust consideration which is not within the purview of the present review.

Keywords: fiduciary duty, financial statement, true and correct, true and fair

Procedia PDF Downloads 121
1490 Non-Linear Static Pushover Analysis of 15 Storied Reinforced Concrete Building Structure with Shear Wall

Authors: Hamid Nikzad, Shinta Yoshitomi

Abstract:

In this paper, nonlinear static pushover analysis is performed on 15 storied RC building structure with a shear wall to evaluate the seismic performance of the building. Section sizes of the members are obtained based on structural optimization method utilizing MATLAB frame optimizer, then the structure is simulated and designed in ETABS program conforming ACI 318-14 design code. The pushover curve has been generated by pushing the top node of the structure to the limited target displacement. Members failure due to the formation of plastic hinges, considering shear wall-frame structure was observed and the result of this study is presented based on current regulation of FEMA356, ASCE7-10, and ACI 318-14 design criteria

Keywords: structural optimization, linear static analysis, ETABS, MATLAB, RC moment frame, RC shear wall structures

Procedia PDF Downloads 148
1489 Investigation of Ground Disturbance Caused by Pile Driving: Case Study

Authors: Thayalan Nall, Harry Poulos

Abstract:

Piling is the most widely used foundation method for heavy structures in poor soil conditions. The geotechnical engineer can choose among a variety of piling methods, but in most cases, driving piles by impact hammer is the most cost-effective alternative. Under unfavourable conditions, driving piles can cause environmental problems, such as noise, ground movements and vibrations, with the risk of ground disturbance leading to potential damage to proposed structures. In one of the project sites in which the authors were involved, three offshore container terminals, namely CT1, CT2 and CT3, were constructed over thick compressible marine mud. The seabed was around 6m deep and the soft clay thickness within the project site varied between 9m and 20m. CT2 and CT3 were connected together and rectangular in shape and were 2600mx800m in size. CT1 was 400m x 800m in size and was located on south opposite of CT2 towards its eastern end. CT1 was constructed first and due to time and environmental limitations, it was supported on a “forest” of large diameter driven piles. CT2 and CT3 are now under construction and are being carried out using a traditional dredging and reclamation approach with ground improvement by surcharging with vertical drains. A few months after the installation of the CT1 piles, a 2600m long sand bund to 2m above mean sea level was constructed along the southern perimeter of CT2 and CT3 to contain the dredged mud that was expected to be pumped. The sand bund was constructed by sand spraying and pumping using a dredging vessel. About 2000m length of the sand bund in the west section was constructed without any major stability issues or any noticeable distress. However, as the sand bund approached the section parallel to CT1, it underwent a series of deep seated failures leading the displaced soft clay materials to heave above the standing water level. The crest of the sand bund was about 100m away from the last row of piles. There were no plausible geological reasons to conclude that the marine mud only across the CT1 region was weaker than over the rest of the site. Hence it was suspected that the pile driving by impact hammer may have caused ground movements and vibrations, leading to generation of excess pore pressures and cyclic softening of the marine mud. This paper investigates the probable cause of failure by reviewing: (1) All ground investigation data within the region; (2) Soil displacement caused by pile driving, using theories similar to spherical cavity expansion; (3) Transfer of stresses and vibrations through the entire system, including vibrations transmitted from the hammer to the pile, and the dynamic properties of the soil; and (4) Generation of excess pore pressure due to ground vibration and resulting cyclic softening. The evidence suggests that the problems encountered at the site were primarily caused by the “side effects” of the pile driving operations.

Keywords: pile driving, ground vibration, excess pore pressure, cyclic softening

Procedia PDF Downloads 222
1488 Experimental Analysis of Advanced Multi-Axial Preforms Conformability to Complex Contours

Authors: Andrew Hardman, Alistair T. McIlhagger, Edward Archer

Abstract:

A degree of research has been undertaken in the determination of 3D textile preforms behaviour to compression with direct comparison to 2D counterparts. Multiscale simulations have been developed to try and accurately analyse the behaviour of varying architectures post-consolidation. However, further understanding is required to experimentally identify the mechanisms and deformations that exist upon conforming to a complex contour. Due to the complexity of 3D textile preforms, determination of yarn behaviour to a complex contour is assessed through consolidation by means of vacuum assisted resin transfer moulding (VARTM), and the resulting mechanisms are investigated by micrograph analysis. Varying architectures; with known areal densities, pic density and thicknesses are assessed for a cohesive study. The resulting performance of each is assessed qualitatively as well as quantitatively from the perspective of material in terms of the change in representative unit cell (RVE) across the curved beam contour, in crimp percentage, tow angle, resin rich areas and binder distortion. A novel textile is developed from the resulting analysis to overcome the observed deformations.

Keywords: comformability, compression, binder architecture, 3D weaving, textile preform

Procedia PDF Downloads 152
1487 Time Travel Testing: A Mechanism for Improving Renewal Experience

Authors: Aritra Majumdar

Abstract:

While organizations strive to expand their new customer base, retaining existing relationships is a key aspect of improving overall profitability and also showcasing how successful an organization is in holding on to its customers. It is an experimentally proven fact that the lion’s share of profit always comes from existing customers. Hence seamless management of renewal journeys across different channels goes a long way in improving trust in the brand. From a quality assurance standpoint, time travel testing provides an approach to both business and technology teams to enhance the customer experience when they look to extend their partnership with the organization for a defined phase of time. This whitepaper will focus on key pillars of time travel testing: time travel planning, time travel data preparation, and enterprise automation. Along with that, it will call out some of the best practices and common accelerator implementation ideas which are generic across verticals like healthcare, insurance, etc. In this abstract document, a high-level snapshot of these pillars will be provided. Time Travel Planning: The first step of setting up a time travel testing roadmap is appropriate planning. Planning will include identifying the impacted systems that need to be time traveled backward or forward depending on the business requirement, aligning time travel with other releases, frequency of time travel testing, preparedness for handling renewal issues in production after time travel testing is done and most importantly planning for test automation testing during time travel testing. Time Travel Data Preparation: One of the most complex areas in time travel testing is test data coverage. Aligning test data to cover required customer segments and narrowing it down to multiple offer sequencing based on defined parameters are keys for successful time travel testing. Another aspect is the availability of sufficient data for similar combinations to support activities like defect retesting, regression testing, post-production testing (if required), etc. This section will talk about the necessary steps for suitable data coverage and sufficient data availability from a time travel testing perspective. Enterprise Automation: Time travel testing is never restricted to a single application. The workflow needs to be validated in the downstream applications to ensure consistency across the board. Along with that, the correctness of offers across different digital channels needs to be checked in order to ensure a smooth customer experience. This section will talk about the focus areas of enterprise automation and how automation testing can be leveraged to improve the overall quality without compromising on the project schedule. Along with the above-mentioned items, the white paper will elaborate on the best practices that need to be followed during time travel testing and some ideas pertaining to accelerator implementation. To sum it up, this paper will be written based on the real-time experience author had on time travel testing. While actual customer names and program-related details will not be disclosed, the paper will highlight the key learnings which will help other teams to implement time travel testing successfully.

Keywords: time travel planning, time travel data preparation, enterprise automation, best practices, accelerator implementation ideas

Procedia PDF Downloads 145
1486 On the Thermal Behavior of the Slab in a Reheating Furnace with Radiation

Authors: Gyo Woo Lee, Man Young Kim

Abstract:

A mathematical heat transfer model for the prediction of transient heating of the slab in a direct-fired walking beam type reheating furnace has been developed by considering the nongray thermal radiation with given furnace environments. The furnace is modeled as radiating nongray medium with carbon dioxide and water with five-zoned gas temperature and the furnace wall is considered as a constant temperature lower than furnace gas one. The slabs are moving with constant velocity depending on the residence time through the non-firing, charging, preheating, heating, and final soaking zones. Radiative heat flux obtained by considering the radiative heat exchange inside the furnace as well as convective one from the surrounding hot gases are introduced as boundary condition of the transient heat conduction within the slab. After validating thermal radiation model adopted in this work, thermal fields in both model and real reheating furnace are investigated in terms of radiative heat flux in the furnace and temperature inside the slab. The results show that the slab in the furnace can be more heated with higher slab emissivity and residence time.

Keywords: reheating furnace, steel slab, radiative heat transfer, WSGGM, emissivity, residence time

Procedia PDF Downloads 273
1485 Investigation of Occupational Health and Safety of Bakeries in Izmir, Turkey

Authors: Pinar Ercan, Bulut Mert

Abstract:

The baking industry is prone to occupational health challenges like other industries. Workers in bakeries face many hazards in their work environment; hazards have the potential for causing injury, illness or work accidents. Most of these hazards are preventable and arise from the neglect of occupational safety measures. Some bakeries in Izmır Turkey was evaluated according to occupational health and safety. First of all, the production process was evaluated. The survey was administered to a total of 50 employees. The survey consisted of two sections. The first one comprised only demographic questions and items related to job characteristics. The remaining section was assessing the satisfaction and confidence about occupational health and safety in terms of employees consist of a 10-item questionnaire by using HSE (2010) survey with some modifications. Also, hazards, risks and control measures in the bakeries were determined. Risk assessment has been done by the use of '5x5 Risk Assessment Table' for this purpose.

Keywords: bakeries, occupational health and safety, hazards, risks, risk assessment

Procedia PDF Downloads 360
1484 Seismic Behavior of Steel Moment-Resisting Frames for Uplift Permitted in Near-Fault Regions

Authors: M. Tehranizadeh, E. Shoushtari Rezvani

Abstract:

Seismic performance of steel moment-resisting frame structures is investigated considering nonlinear soil-structure interaction (SSI) effects. 10-, 15-, and 20-story planar building frames with aspect ratio of 3 are designed in accordance with current building codes. Inelastic seismic demands of the superstructure are considered using concentrated plasticity model. The raft foundation system is designed for different soil types. Beam-on-nonlinear Winkler foundation (BNWF) is used to represent dynamic impedance of the underlying soil. Two sets of pulse-like as well as no-pulse near-fault earthquakes are used as input ground motions. The results show that the reduction in drift demands due to nonlinear SSI is characterized by a more uniform distribution pattern along the height when compared to the fixed-base and linear SSI condition. It is also concluded that beneficial effects of nonlinear SSI on displacement demands is more significant in case of pulse-like ground motions and performance level of the steel moment-resisting frames can be enhanced.

Keywords: soil-structure interaction, uplifting, soil plasticity, near-fault earthquake, tall building

Procedia PDF Downloads 540
1483 Fiber Based Pushover Analysis of Reinforced Concrete Frame

Authors: Shewangizaw Tesfaye Wolde

Abstract:

The current engineering community has developed a method called performance based seismic design in which we design structures based on predefined performance levels set by the parties. Since we design our structures economically for the maximum actions expected in the life of structures they go beyond their elastic limit, in need of nonlinear analysis. In this paper conventional pushover analysis (nonlinear static analysis) is used for the performance assessment of the case study Reinforced Concrete (RC) Frame building located in Addis Ababa City, Ethiopia where proposed peak ground acceleration value by RADIUS 1999 project and others is more than twice as of EBCS-8:1995 (RADIUS 1999 project) by taking critical planar frame. Fiber beam-column model is used to control material nonlinearity with tension stiffening effect. The reliability of the fiber model and validation of software outputs are checked under verification chapter. Therefore, the aim of this paper is to propose a way for structural performance assessment of existing reinforced concrete frame buildings as well as design check.

Keywords: seismic, performance, fiber model, tension stiffening, reinforced concrete

Procedia PDF Downloads 59
1482 Development of Intelligent Construction Management System Using Web-Camera Image and 3D Object Image

Authors: Hyeon-Seung Kim, Bit-Na Cho, Tae-Woon Jeong, Soo-Young Yoon, Leen-Seok Kang

Abstract:

Recently, a construction project has been large in the size and complicated in the site work. The web-cameras are used to manage the construction site of such a large construction project. They can be used for monitoring the construction schedule as compared to the actual work image of the planned work schedule. Specially, because the 4D CAD system that the construction appearance is continually simulated in a 3D CAD object by work schedule is widely applied to the construction project, the comparison system between the real image of actual work appearance by web-camera and the simulated image of planned work appearance by 3D CAD object can be an intelligent construction schedule management system (ICON). The delayed activities comparing with the planned schedule can be simulated by red color in the ICON as a virtual reality object. This study developed the ICON and it was verified in a real bridge construction project in Korea. To verify the developed system, a web-camera was installed and operated in a case project for a month. Because the angle and zooming of the web-camera can be operated by Internet, a project manager can easily monitor and assume the corrective action.

Keywords: 4D CAD, web-camera, ICON (intelligent construction schedule management system), 3D object image

Procedia PDF Downloads 499
1481 Mobile Cloud Application in Design Build Bridge Construction

Authors: Meng Sun, Bin Wei

Abstract:

In the past decades, design-build has become a more popular project delivery system especially for the large scaled infrastructure project in North America. It provides a one-stop shopping system for the client therefore improves the efficiency of construction, and reduces the risks and overall cost for the clients. Compared to the project with traditional delivery method, design-build project requires contractor and designer to work together efficiently to deliver the best-value solutions through the construction process. How to facilitate a solid integration and efficient interaction between contractor and designer often affects the schedule, budget and quality of the construction therefore becomes a key factor to the success of a design-build project. This paper presents a concept of using modern mobile cloud technology to provide an integrated solution during the design-build construction. It uses mobile cloud architecture to provide a platform for real-time field progress, change request approval, job progress log, and project time entry with devices integration for field information and communications. The paper uses a real filed change notice as an example to demonstrate how mobile cloud technology applies in a design-build project and how it can improve the project efficiency.

Keywords: cloud, design-build, field change notice, mobile application

Procedia PDF Downloads 240
1480 Large-Scale Photovoltaic Generation System Connected to HVDC Grid with Centralized High Voltage and High Power DC/DC Converter

Authors: Xinke Huang, Huan Wang, Lidong Guo, Changbin Ju, Runbiao Liu, Shanshan Meng, Yibo Wang, Honghua Xu

Abstract:

Large-scale photovoltaic (PV) generation system connected to HVDC grid has many advantages compared to its counterpart of AC grid. DC connection can solve many problems that AC connection faces, such as the grid-connection and power transmission, and DC connection is the tendency. DC/DC converter as the most important device in the system has become one of the hot spots recently. The paper proposes a centralized DC/DC converter which uses Boost Full Bridge Isolated DC/DC Converter(BFBIC) topology and combination through input parallel output series(IPOS) method to improve power capacity and output voltage to match with the HVDC grid voltage. Meanwhile, it adopts input current sharing control strategy to realize input current and output voltage balance. A ±30kV/1MW system is modeled in MATLAB/SIMULINK, and a downscaled ±10kV/200kW DC/DC converter platform is built to verify the proposed topology and control strategy.

Keywords: photovoltaic generation, cascaded dc/dc converter, galvanic isolation, high-voltage, direct current (HVDC)

Procedia PDF Downloads 437
1479 Effect of Welding Parameters on Mechanical and Microstructural Properties of Aluminum Alloys Produced by Friction Stir Welding

Authors: Khalil Aghapouramin

Abstract:

The aim of the present work is to investigate the mechanical and microstructural properties of dissimilar and similar aluminum alloys welded by Friction Stir Welding (FSW). The specimens investigated by applying different welding speed and rotary speed. Typically, mechanical properties of the joints performed through tensile test fatigue test and microhardness (HV) at room temperature. Fatigue test investigated by using electromechanical testing machine under constant loading control with similar since wave loading. The Maximum stress versus minimum got the range between 0.1 to 0.3 in the research. Based upon welding parameters by optical observation and scanning electron microscopy microstructural properties fulfilled with a cross section of welds, in addition, SEM observations were made of the fracture surfaces

Keywords: friction stir welding, fatigue and tensile test, Al alloys, microstructural behavior

Procedia PDF Downloads 328
1478 A Study on the Etching Characteristics of High aspect ratio Oxide Etching Using C4F6 Plasma in Inductively Coupled Plasma with Low Frequency Bias

Authors: ByungJun Woo

Abstract:

In this study, high-aspect-ratio (HAR) oxide etching characteristics in inductively coupled plasma were investigated using low frequency (2 MHz) bias power with C4F6 gas. An experiment was conducted using CF4/C4F6/He as the mixed gas. A 100 nm (etch area)/500 nm (mask area) line patterns were used, and the etch cross-section and etch selectivity of the amorphous carbon layer thin film were derived using a scanning electron microscope. Ion density was extracted using a double Langmuir probe, and CFx and F neutral species were observed via optical emission spectroscopy. Based on these results, the possibility for HAR oxide etching using C4F6 gas chemistry was suggested in this work. These etching results also indicate that the use of C4F6 gas can significantly contribute to the development of next-generation HAR oxide etching.

Keywords: plasma, etching, C4F6, high aspect ratio, inductively coupled plasma

Procedia PDF Downloads 59
1477 A Mother’s Silent Adversary: A Case of Pregnant Woman with Cervical Cancer

Authors: Paola Millare, Nelinda Catherine Pangilinan

Abstract:

Background and Aim: Cervical cancer is the most commonly diagnosed gynecological malignancy during pregnancy. Owing to the rarity of the disease, and the complexity of all factors that have to be taken into consideration, standardization of treatment is very difficult. Cervical cancer is the second most common malignancy among women. The treatment of cancer during pregnancy is most challenging in the case of cervical cancer, since the pregnant uterus itself is affected. This report aims to present a case of cervical cancer in a pregnant woman and how to manage this case and several issues accompanied with it. Methods: This is a case of a 28 year-old, Gravida 4 Para 2 (1111), who presented with watery to mucoid, whitish, non-foul smelling and increasing in amount. Internal examination revealed normal external genitalia, parous outlet, cervix was transformed into a fungating mass measuring 5x4 cm, with left parametrial involvement, body of uterus was enlarged to 24 weeks size, no adnexal mass or tenderness. She had cervical punch biopsy, which revealed, adenocarcinoma, well-differentiated cervical tissue. Standard management for cases with stage 2B cervical carcinoma was to start radiation or radical hysterectomy. In the case of patients diagnosed with cervical cancer and currently pregnant, these kind of management will result to fetal loss. The patient still declined the said management and opted to delay the treatment and wait for her baby to reach at least term and proceed to cesarean section as route of delivery. Results: The patient underwent an elective cesarean section at 37th weeks age of gestation, with an outcome of a term, live baby boy APGAR score 7,9 birthweight 2600 grams. One month postpartum, the patient followed up and completed radiotherapy, chemotherapy and brachytherapy. She was advised to go back after 6 months for monitoring. On her last check up, an internal examination was done which revealed normal external genitalia, vagina admits 2 fingers with ease, there is a palpable fungating mass at the cervix measuring 2x2 cm. A repeat gynecologic oncologic ultrasound was done revealing cervical mass, endophytic, grade 1 color score with stromal invasion 35% post radiation reactive lymph nodes with intact paracolpium, pericervical, and parametrial involvement. The patient was then advised to undergo pelvic boost and for close monitoring of the cervical mass. Conclusion: Cervical cancer in pregnancy is rare but is a dilemma for women and their physicians. Treatment should be multidisciplinary and individualized following careful counseling. In this case, the treatment was clearly on the side of preventing the progression of cervical cancer while she is pregnant, however due to ethical reasons, the management deviates on the right of the patient to decide for her own health and her unborn child. The collaborative collection of data relating to treatment and outcome is strongly encouraged.

Keywords: cancer, cervical, ethical, pregnancy

Procedia PDF Downloads 231
1476 Structural Health Monitoring of Buildings and Infrastructure

Authors: Mojtaba Valinejadshoubi, Ashutosh Bagchi, Osama Moselhi

Abstract:

Structures such as buildings, bridges, dams, wind turbines etc. need to be maintained against various factors such as deterioration, excessive loads, environment, temperature, etc. Choosing an appropriate monitoring system is important for determining any critical damage to a structure and address that to avoid any adverse consequence. Structural Health Monitoring (SHM) has emerged as an effective technique to monitor the health of the structures. SHM refers to an ongoing structural performance assessment using different kinds of sensors attached to or embedded in the structures to evaluate their integrity and safety to help engineers decide on rehabilitation measures. Ability of SHM in identifying the location and severity of structural damages by considering any changes in characteristics of the structures such as their frequency, stiffness and mode shapes helps engineers to monitor the structures and take the most effective corrective actions to maintain their safety and extend their service life. The main objective of this study is to review the overall SHM process specifically determining the natural frequency of an instrumented simply-supported concrete beam using modal testing and finite element model updating.

Keywords: structural health monitoring, natural frequency, modal analysis, finite element model updating

Procedia PDF Downloads 329
1475 Optimization of Copper-Water Negative Inclination Heat Pipe with Internal Composite Wick Structure

Authors: I. Brandys, M. Levy, K. Harush, Y. Haim, M. Korngold

Abstract:

Theoretical optimization of a copper-water negative inclination heat pipe with internal composite wick structure has been performed, regarding a new introduced parameter: the ratio between the coarse mesh wraps and the fine mesh wraps of the composite wick. Since in many cases, the design of a heat pipe matches specific thermal requirements and physical limitations, this work demonstrates the optimization of a 1 m length, 8 mm internal diameter heat pipe without an adiabatic section, at a negative inclination angle of -10º. The optimization is based on a new introduced parameter, LR: the ratio between the coarse mesh wraps and the fine mesh wraps.

Keywords: heat pipe, inclination, optimization, ratio

Procedia PDF Downloads 318
1474 Branding Destination for Major Event: A Case Study of Liverpool as the 2008 European Capital of Culture

Authors: Yi-De Liu

Abstract:

Destination branding is a popular practice adopted by many cities in the context of intensified tourism competition. However, branding for major event is a relatively new domain in the studies of destination marketing. Based on a case study of Liverpool as the 2008 European Capital of Culture, the aim of this paper is to explore the effectiveness of the key branding campaign - the ‘Look of the City’ programme. This study looks at quantitative data collected from on-street face-to-face survey. 611 questionnaires were distributed to and collected from local residents, visitors from the immediate hinterland, domestic tourists and overseas visitors. The analysis is done, first by investigating respondents’ impression on the Liverpool 08 brand and the branding campaign, and then by exploring the effects of campaign. The positioning of Liverpool compared with other similar cities is addressed in the end. The final section extracts lessons from this empirical investigation.

Keywords: destination branding, major event, European capital of culture, Liverpool

Procedia PDF Downloads 308
1473 Electromagnetic Simulation of Underground Cable Perforation by Nail

Authors: Ahmed Nour El Islam Ayad, Tahar Rouibah, Wafa Krika, Houari Boudjella, Larab Moulay, Farid Benhamida, Selma Benmoussa

Abstract:

The purpose of this study is to evaluate the electromagnetic field of an underground cable of very high voltage perforated by nail. The aim of this work shows a numerical simulation of the electromagnetic field of 400 kV line after perforation through a ferrous nail in four positions for the pinch pin at different distances. From results for a longitudinal section, we observe and evaluate the distribution and the variation of the electromagnetic field in the cable and the earth. When the nail approaches the underground power cable, the distribution of the magnetic field changes and takes several forms, the magnetic field increase and become very important when the nail breaks the metal screen and will produce a significant leak of the electric field, characterized by a large electric arc and or electric discharge to earth and then a fault in the electrical network. These electromagnetic analysis results help to detect defects in underground cables.

Keywords: underground, electromagnetic, nail, defect

Procedia PDF Downloads 215