Search results for: SAEMC project
4893 Questionnaire for the Evaluation of Entrepreneurship Project Psychopedagogical Practices: Construction Proceedings and Validation
Authors: Cristina Costa-Lobo, Sandra Fernandes, Miguel Magalhães, José Dinis-Carvalho, Alfredo Regueiro, Ana Carvalho
Abstract:
This paper is a report on the findings of the construction and the validation of a questionnaire monetized in a portuguese higher education context with undergraduate students. The Questionnaire for the Evaluation of Entrepreneurship Project Psychopedagogical Practices consists of six scales: Critical appraisal of the project, Developed Learning and Skills, Teamwork, Teacher and Tutor Roles, Evaluation of Student Performance, and Project Effectiveness as a Teaching-Learning Methodology. The proceedings of its construction are analyzed, and the validity and internal consistency analysis are described. Findings indicate good indicators of validity, good fidelity and an interpretable factorial structure.Keywords: entrepreneurship project, higher education, psychopedagogical practices, teacher and tutor roles
Procedia PDF Downloads 3814892 The Mashishing Marking Memories Project: A Culture-Centered Approach to Participation
Authors: Nongcebo Ngcobo
Abstract:
This research explores the importance of including a multitude of voices in the cultural heritage narrative, particularly in South Africa. The Mashishing project is an extension of and builds on the existing ‘Biesje Poort project’ which is a rock art project that was funded by the National Heritage Council in 2010 - 2013. Hence, the Mashishing marking memories project applies comparable Biesje Poort project objectives, though in a different geographical area. The wider project objectives are to transfer skills, promote social cohesion and empowerment, and lastly to add to the knowledge base of the Mashishing region and the repository of the local museum in the Lydenburg museum. This study is located in the Mashishing area, in Mpumalanga, South Africa. In this area, there were no present multi-vocal heritage projects. This research assesses the Mashishing marking memories project through the culture-centered approach for communication for social change, which examines the impact that the diverse participants have on the operations of the Mashishing project and also investigates whether the culturally diverse participants facilitates or hinders effective participation within the project. Key findings of this research uncovered the significance of participation and diverse voices in the cultural heritage field. Furthermore, this study highlights how unequal power relations affect effective participation. As a result, this study encourages the importance of bringing the researcher and the participant in a safe space to facilitate mutual learning. It also encourages an exchange of roles, where the researcher shifts from being an authoritarian figure to being in the role of a listener.Keywords: culture, heritage, participation, social change
Procedia PDF Downloads 1214891 Risk Management in Construction Projects
Authors: Mustafa Dogru, Ruveyda Komurlu
Abstract:
Companies and professionals in the construction sector face various risks in every project depending on the characteristics, size, complexity, the location of the projects and the techniques used. Some risks’ effects may increase as the project progresses whereas new risks may emerge. Because of the ever-changing nature of the risks, risk management is a cyclical process that needs to be repeated throughout the project. Since the risks threaten the success of the project, risk management is an important part of the entire project management process. The aims of this study are to emphasize the importance of risk management in construction projects, summarize the risk identification process, and introduce a number of methods for preventing risks such as alternative design, checklists, prototyping and test-analysis-correction technique etc. Following the literature review conducted to list the techniques for preventing risks, case studies has been performed to compare and evaluate the success of the techniques in a number of completed projects with the same typology, performed domestic and international. Findings of the study suggest that controlling and minimizing the level of the risks in construction projects, taking optimal precautions for different risks, and mitigating or eliminating the effects of risks are important in order to prevent additional costs for the project. Additionally, focusing on the risks that have highest impact is the most rational way to minimize the effects of the risks on projects.Keywords: construction projects, construction management, project management, risk management
Procedia PDF Downloads 3194890 Improving Internal Efficiency of Local Universities and Colleges: Asseessing the Impact of the 085 Project in Shanghai
Authors: Qing Hui Wang, You Lin Fang, Min Chen
Abstract:
In 2003 the percentage of students in Shanghai taking part in tertiary education reached 53% of the age cohort, which is at the universal level according to Trow's typology. This achievement led to a conscientious effort by the government to improve internal efficiency of local universities and colleges through a series of programs, the most important of which is the 085 Project. This paper considers the effects of the 085 Project- the 5 initiatives launched in 2008 on increasing the investment to improve institutional overall visibilities, teaching excellence, knowledge innovation, faculty development as well as internationalization. Using the approach of ERC (a theory of equality, reciprocity, and competition) model, it was found that the initiatives helped the lower tier universities and colleges make full play in the aspects of strategic planning and identifying themselves. It was also found that the rate of growth of social resources for universities as a whole increased more quickly after the implementation of the 085 Project.Keywords: 085 Project, impact, internal efficiency, local universities and colleges
Procedia PDF Downloads 4684889 Contractor Selection by Using Analytical Network Process
Authors: Badr A. Al-Jehani
Abstract:
Nowadays, contractor selection is a critical activity of the project owner. Selecting the right contractor is essential to the project manager for the success of the project, and this cab happens by using the proper selecting method. Traditionally, the contractor is being selected based on his offered bid price. This approach focuses only on the price factor and forgetting other essential factors for the success of the project. In this research paper, the Analytic Network Process (ANP) method is used as a decision tool model to select the most appropriate contractor. This decision-making method can help the clients who work in the construction industry to identify contractors who are capable of delivering satisfactory outcomes. Moreover, this research paper provides a case study of selecting the proper contractor among three contractors by using ANP method. The case study identifies and computes the relative weight of the eight criteria and eleven sub-criteria using a questionnaire.Keywords: contractor selection, project management, decision-making, bidding
Procedia PDF Downloads 884888 A Comparative Analysis of Safety Orientation and Safety Performance in Organizations: A Project Management Perspective
Authors: Dina Alfreahat, Zoltan Sebestyen
Abstract:
Safety is considered as one of the project’s success factors. Poor safety management may result in accidents that impact human, economic, and legal issues. Therefore, it is necessary to consider safety and health as a project success factor along with other project success factors, such as time, cost, and quality. Organizations have a knowledge deficit of the implementation of long-term safety practices, and due to cost control, safety problems tend to receive the least priority. They usually assume that safety management involves expenditures unrelated to production goals, thereby considering it unnecessary for profitability and competitiveness. The purpose of this study is to introduce, analysis and identify the correlation between the orientation of the public safety procedures of an organization and the public safety standards applied in the project. Therefore, the authors develop the process and collect the possible mathematical-statistical tools supporting the previously mentioned goal. The result shows that the adoption of management to safety is a major factor in implementing the safety standard in the project and thereby improving safety performance. It may take time and effort to adopt the mindset of safety orientation service development, but at the same time, the higher organizational investment in safety and health programs will contribute to the loyalty of staff to safety compliance.Keywords: project management perspective, safety orientation, safety performance, safety standards
Procedia PDF Downloads 1794887 Project Time Prediction Model: A Case Study of Construction Projects in Sindh, Pakistan
Authors: Tauha Hussain Ali, Shabir Hussain Khahro, Nafees Ahmed Memon
Abstract:
Accurate prediction of project time for planning and bid preparation stage should contain realistic dates. Constructors use their experience to estimate the project duration for the new projects, which is based on intuitions. It has been a constant concern to both researchers and constructors to analyze the accurate prediction of project duration for bid preparation stage. In Pakistan, such study for time cost relationship has been lacked to predict duration performance for the construction projects. This study is an attempt to explore the time cost relationship that would conclude with a mathematical model to predict the time for the drainage rehabilitation projects in the province of Sindh, Pakistan. The data has been collected from National Engineering Services (NESPAK), Pakistan and regression analysis has been carried out for the analysis of results. Significant relationship has been found between time and cost of the construction projects in Sindh and the generated mathematical model can be used by the constructors to predict the project duration for the upcoming projects of same nature. This study also provides the professionals with a requisite knowledge to make decisions regarding project duration, which is significantly important to win the projects at the bid stage.Keywords: BTC Model, project time, relationship of time cost, regression
Procedia PDF Downloads 3824886 The Academic Achievement of Writing via Project-Based Learning
Authors: Duangkamol Thitivesa
Abstract:
This paper focuses on the use of project work as a pretext for applying the conventions of writing, or the correctness of mechanics, usage, and sentence formation, in a content-based class in a Rajabhat University. Its aim was to explore to what extent the student teachers’ academic achievement of the basic writing features against the 70% attainment target after the use of project is. The organization of work around an agreed theme in which the students reproduce language provided by texts and instructors is expected to enhance students’ correct writing conventions. The sample of the study comprised of 38 fourth-year English major students. The data was collected by means of achievement test and student writing works. The scores in the summative achievement test were analyzed by mean score, standard deviation, and percentage. It was found that the student teachers do more achieve of practicing mechanics and usage, and less in sentence formation. The students benefited from the exposure to texts during conducting the project; however, their automaticity of how and when to form phrases and clauses into simple/complex sentences had room for improvement.Keywords: project-based learning, project work, writing conventions, academic achievement
Procedia PDF Downloads 3334885 Sustainable Framework Integration for Construction Project Management: A Multi-Dimensional Analysis
Authors: Tharaki S. Hettiarachchi
Abstract:
Sustainable construction has gained massive attention in the present world as the construction industry is highly responsible for carbon emissions and other types of unsustainable practices. Yet, the construction industry has not been able to completely attain sustainable goals. Therefore, the present study aims to identify the extent to which sustainability has been considered within the scope of construction project management and to analyze the challenges, gaps, and constraints associated. Accordingly, this study develops a sustainable framework to integrate in construction project management. In accomplishing the research aim, this research integrates a qualitative approach while relying on secondary data sources. The data shall be then analyzed with the use of a systematic literature review (SLR) method while following the PRISMA (2020) guideline and represented in a statistical form. The outcomes of this study may become highly significant in identifying the nature of the existing sustainable frameworks associated with construction project management scopes and to develop a new framework to integrate in order to enhance the effectiveness of sustainable applications in construction management. The outcomes of this research may benefit present and future construction professionals and academicians to organize sustainable construction-related knowledge in a useful way to apply in practical implementation for effective project management. Overall, this study directs present and future construction professionals toward an advanced construction project management mechanism.Keywords: construction, framework development, project management, sustainability
Procedia PDF Downloads 604884 Cost Overruns in Mega Projects: Project Progress Prediction with Probabilistic Methods
Authors: Yasaman Ashrafi, Stephen Kajewski, Annastiina Silvennoinen, Madhav Nepal
Abstract:
Mega projects either in construction, urban development or energy sectors are one of the key drivers that build the foundation of wealth and modern civilizations in regions and nations. Such projects require economic justification and substantial capital investment, often derived from individual and corporate investors as well as governments. Cost overruns and time delays in these mega projects demands a new approach to more accurately predict project costs and establish realistic financial plans. The significance of this paper is that the cost efficiency of megaprojects will improve and decrease cost overruns. This research will assist Project Managers (PMs) to make timely and appropriate decisions about both cost and outcomes of ongoing projects. This research, therefore, examines the oil and gas industry where most mega projects apply the classic methods of Cost Performance Index (CPI) and Schedule Performance Index (SPI) and rely on project data to forecast cost and time. Because these projects are always overrun in cost and time even at the early phase of the project, the probabilistic methods of Monte Carlo Simulation (MCS) and Bayesian Adaptive Forecasting method were used to predict project cost at completion of projects. The current theoretical and mathematical models which forecast the total expected cost and project completion date, during the execution phase of an ongoing project will be evaluated. Earned Value Management (EVM) method is unable to predict cost at completion of a project accurately due to the lack of enough detailed project information especially in the early phase of the project. During the project execution phase, the Bayesian adaptive forecasting method incorporates predictions into the actual performance data from earned value management and revises pre-project cost estimates, making full use of the available information. The outcome of this research is to improve the accuracy of both cost prediction and final duration. This research will provide a warning method to identify when current project performance deviates from planned performance and crates an unacceptable gap between preliminary planning and actual performance. This warning method will support project managers to take corrective actions on time.Keywords: cost forecasting, earned value management, project control, project management, risk analysis, simulation
Procedia PDF Downloads 4034883 Through Integrated Project Management and Systems Engineering to Support System Design Development: A Project Management-based Systems Engineering Approach
Authors: Xiaojing Gao, James Njuguna
Abstract:
This paper emphasizes the importance of integrating project management and systems engineering for innovative system design and production development. The research highlights the need for a flexible approach that unifies these disciplines, as their isolation often leads to communication challenges and complexity within multidisciplinary teams. The paper aims to elucidate the intricate relationship between project management and systems engineering, recommending the consolidation of engineering disciplines into a single lifecycle for improved support of the design and development process. The research identifies a synergy between these disciplines, focusing on streamlining information communication during product design and development. The insights gained from this process can lead to product design optimization. Additionally, the paper introduces a proposed Project Management-Based Systems Engineering (PMBSE) framework, emphasizing effective communication, efficient processes, and advanced tools to enhance product development outcomes within the product lifecycle.Keywords: system engineering, product design and development, project management, cross-disciplinary
Procedia PDF Downloads 784882 Enhancing Project Success: A Case Study of Investment Strategies and Planning Practices in Rwanda’s Housing Projects Managed by Rwanda Social Security Board
Authors: Amina Umulisa
Abstract:
Background: Despite efforts to enhance profitability and project planning, Rwanda has experienced a decline in project success rates, notably in housing projects managed by the Rwanda Social Security Board (RSSB). This study aims to assess the impact of investment strategies and project planning practices on the performance of pension funds projects in Rwanda, focusing on housing projects by RSSB. Methods: Using descriptive and correlational research designs, this study surveyed 109 randomly selected respondents from a pool of 148 workers. Data analysis was conducted using descriptive and inferential statistics in STATA version 18. Results: Findings revealed that 54% of respondents acknowledged the importance of personnel generation. Additionally, 61% agreed with the effectiveness of training programs, and 79% supported the cost of human resource utilization. In terms of project management practices, 65.7% could determine when a project needed adjustments, 65.7% agreed with the approved budget, and 73% supported forecasted expenses. Furthermore, 68% agreed with order placement, 76.0% with using the right materials, and 64.4% with defining project scope. The study found significant associations between order placement and project quality outcomes (r=0.711, P-value <0.001), as well as with time management (Pearson was 0.701 and sing was 0.00) and cost management (r=0.885, P-value <0.001). Moreover, project time targets were found to significantly affect quality management (Pearson was 0.798, sing was 0.000), time management, and cost management (r=0.740, P-value <0.001). Conclusion: The findings highlight the positive association between the project implementation stage and quality management, indicating effective project planning practices among senior staff. However, there is a need to enhance project team collaboration and coordination to improve the performance of constructed houses.Keywords: project success rates, investment strategies, training programs, cost management
Procedia PDF Downloads 524881 A Review of the Major Factors of Cost Overrun in Construction Projects
Authors: Hassan Abdelgadir
Abstract:
Cost overruns have harmed the economies and reputations of several construction companies around the world. Many project management systems have been developed to keep track of a project's budget. However, due to several cost overrun difficulties in the construction industry, cost management is still deemed inadequate. As a result, the goal of this term paper is to identify and group prospective construction project cost overrun reasons based on their origin groups.Basically, all potential cost overrun elements were rigorously checked through 1iterature analysis before being divided into seven (7) groups of originating components, including project, contract, client, contractor, consultant, labor, and external. Each potential factor was completely defined with examples.Keywords: construction projects, cost overruns, construction company, factors effect costoverruns
Procedia PDF Downloads 754880 A Knowledge-Based Development of Risk Management Approaches for Construction Projects
Authors: Masoud Ghahvechi Pour
Abstract:
Risk management is a systematic and regular process of identifying, analyzing and responding to risks throughout the project's life cycle in order to achieve the optimal level of elimination, reduction or control of risk. The purpose of project risk management is to increase the probability and effect of positive events and reduce the probability and effect of unpleasant events on the project. Risk management is one of the most fundamental parts of project management, so that unmanaged or untransmitted risks can be one of the primary factors of failure in a project. Effective risk management does not apply to risk regression, which is apparently the cheapest option of the activity. However, the main problem with this option is the economic sensitivity, because what is potentially profitable is by definition risky, and what does not pose a risk is economically interesting and does not bring tangible benefits. Therefore, in relation to the implemented project, effective risk management is finding a "middle ground" in its management, which includes, on the one hand, protection against risk from a negative direction by means of accurate identification and classification of risk, which leads to analysis And it becomes a comprehensive analysis. On the other hand, management using all mathematical and analytical tools should be based on checking the maximum benefits of these decisions. Detailed analysis, taking into account all aspects of the company, including stakeholder analysis, will allow us to add what will become tangible benefits for our project in the future to effective risk management. Identifying the risk of the project is based on the theory that which type of risk may affect the project, and also refers to specific parameters and estimating the probability of their occurrence in the project. These conditions can be divided into three groups: certainty, uncertainty, and risk, which in turn support three types of investment: risk preference, risk neutrality, specific risk deviation, and its measurement. The result of risk identification and project analysis is a list of events that indicate the cause and probability of an event, and a final assessment of its impact on the environment.Keywords: risk, management, knowledge, risk management
Procedia PDF Downloads 664879 Project Management Tools within SAP S/4 Hana Program Environment
Authors: Jagoda Bruni, Jan Müller-Lucanus, Gernot Stöger-Knes
Abstract:
The purpose of this article is to demonstrate modern project management approaches in the SAP S/R Hana surrounding a programming environment composed of multiple focus-diversified projects. We would like to propose innovative and goal-oriented management standards based on the specificity of the SAP transformations and customer-driven expectations. Due to the regular sprint-based controlling and management tools' application, it has been data-proven that extensive analysis of productive hours of the employees as much as a thorough review of the project progress (per GAP, per business process, and per Lot) within the whole program, can have a positive impact on customer satisfaction and improvement for projects' budget. This has been a collaborative study based on real-life experience and measurements in collaboration with our customers.Keywords: project management, program management, SAP, controlling
Procedia PDF Downloads 914878 A Strategic Partner Evaluation Model for the Project Based Enterprises
Authors: Woosik Jang, Seung H. Han
Abstract:
The optimal partner selection is one of the most important factors to pursue the project’s success. However, in practice, there is a gaps in perception of success depending on the role of the enterprises for the projects. This frequently makes a relations between the partner evaluation results and the project’s final performances, insufficiently. To meet this challenges, this study proposes a strategic partner evaluation model considering the perception gaps between enterprises. A total 3 times of survey was performed; factor selection, perception gap analysis, and case application. After then total 8 factors are extracted from independent sample t-test and Borich model to set-up the evaluation model. Finally, through the case applications, only 16 enterprises are re-evaluated to “Good” grade among the 22 “Good” grade from existing model. On the contrary, 12 enterprises are re-evaluated to “Good” grade among the 19 “Bad” grade from existing model. Consequently, the perception gaps based evaluation model is expected to improve the decision making quality and also enhance the probability of project’s success.Keywords: partner evaluation model, project based enterprise, decision making, perception gap, project performance
Procedia PDF Downloads 1574877 An Investigation of Project-Based Learning: A Case Study of Tourism Students
Authors: Benjaporn Yaemjamuang
Abstract:
The purposes of this study were to investigate the success of project-based learning and to evaluate the performance and level of satisfaction of tourism students who participated in the study. This paper drew upon a data collection from a senior tourism students survey conducted in Rajamangala University during summer 2013. The purposive sampling was utilized to obtain the sample which included 45 tourism students. The pretest and posttest method was utilized. The findings revealed that the majority of respondents had gained higher knowledge after the posttest significantly. The respondents’ knowledge increased about 53.33 percent from pretest to posttest. Also, the findings revealed the top three highest level of satisfaction as follows: 1) the role of teacher and students, 2) the research activities of the project-based learning, 3) the learning methods of the project-based learning. Moreover, the mean score of all categories was 3.98 with a standard deviation of 0.88 which indicated that the average level of satisfaction was high.Keywords: performance, project-based learning, satisfaction, tourism
Procedia PDF Downloads 2914876 Cross Project Software Fault Prediction at Design Phase
Authors: Pradeep Singh, Shrish Verma
Abstract:
Software fault prediction models are created by using the source code, processed metrics from the same or previous version of code and related fault data. Some company do not store and keep track of all artifacts which are required for software fault prediction. To construct fault prediction model for such company, the training data from the other projects can be one potential solution. The earlier we predict the fault the less cost it requires to correct. The training data consists of metrics data and related fault data at function/module level. This paper investigates fault predictions at early stage using the cross-project data focusing on the design metrics. In this study, empirical analysis is carried out to validate design metrics for cross project fault prediction. The machine learning techniques used for evaluation is Naïve Bayes. The design phase metrics of other projects can be used as initial guideline for the projects where no previous fault data is available. We analyze seven data sets from NASA Metrics Data Program which offer design as well as code metrics. Overall, the results of cross project is comparable to the within company data learning.Keywords: software metrics, fault prediction, cross project, within project.
Procedia PDF Downloads 3444875 Cultural Snapshot: A Reflection on Project-Based Model of Cross-Cultural Understanding in Teaching and Learning
Authors: Kunto Nurcahyoko
Abstract:
The fundamental perception used in this study is that teaching and learning activities in Indonesian classroom have potentially generated individual’s sensitivity on cross-cultural understanding. This study aims at investigating Indonesian university students’ perception on cross-cultural understanding after doing Cultural Snapshot Project. The data was critically analyzed through multicultural ideology and diversity theories. The subjects were 30 EFL college students in one of colleges in Indonesia. Each student was assigned to capture a photo which depicted the existence of any cultural manifestation in their surrounding such as discrimination, prejudice and stereotype. Students were then requested asked to reflect on the picture by writing a short description on the picture and make an exhibition using their pictures. In the end of the project, students were instructed to fill in questionnaires to show their perception before and after the project. The result reveals that Cultural Snapshot Project has given the opportunity for the students to better realize cross-cultural understanding in their environment. In conclusion, the study shows that Cultural Snapshot Project has specifically enhanced students’ perception of multiculturalism in three major areas: cultural sensitivity and empathy, social tolerance, and understanding of diversity.Keywords: cultural snapshot, cross-cultural understanding, students’ perception, multiculturalism
Procedia PDF Downloads 3134874 Strategic Leadership and Sustainable Project Management in Enugu, Nigeria
Authors: Nnadi Ezekiel Ejiofor
Abstract:
In Enugu, Nigeria, this study investigates the connection between strategic leadership and project management sustainability, with an emphasis on building projects in the State. The study set out to accomplish two specific goals: first, it sought to establish a link between creative project management and resource efficiency in construction projects in Enugu State, Nigeria; and second, it sought to establish a link between innovative thinking and waste minimization in those same projects. A structured questionnaire was used to collect primary data from 45 registered construction enterprises in the study area as part of the study's descriptive research approach. Due to the nonparametric nature of the data, Spearman Rank Order Correlation was used to evaluate the acquired data. The findings demonstrate that creative project management had a significant positive impact on resource efficiency in construction projects carried out by architecture firms in Enugu State, Nigeria (r =.849; p.001), and that innovative thinking had a significant impact on waste reduction in those same projects (r =.849; p.001). It was determined that strategic leadership had a significant impact on the sustainability of project management, and it was thus advised that project managers should foresee, prepare for, and effectively communicate present and future developments to project staff in order to ensure that the objective of sustainable initiatives, such as recycling and reuse, is implemented in construction projects.Keywords: construction, project management, strategic leadership, sustainability, waste reduction
Procedia PDF Downloads 504873 Identifying Barriers of Implementing Building Information Modelling in Construction
Authors: Kasra HosseinMostofi, Mohamadamin Oyar Hossein, Reza Mehdizadeh Anvigh
Abstract:
BIM is an innovative concept for the majority of firms operating in industry. BIM offers a new paradigm to design, construct, operate, and maintain a facility. However, even with the most conscientious use, stakeholders can run into trouble during its implementation on a project or within an organization. At times, project stakeholders are unaware of the challenges that they can face with the implementation at the project level or an organizational level. Therefore, the study aimed to identify and compile barriers associated with the BIM implementation at the project and organizational level, as per the literature. Despite the fact that innumerable advantageous involved in exploiting BIM, there are some barriers to implement it properly. These barriers have been proved as impediments for academicians and members of construction team project to take the maximum advantage of its utilization. Although some research has been conducted to identify these barriers regarding BIM implementation in construction industry, more research is needed to be carried out among academicians to identify these barriers in institutions, and most importantly, to make suggestions for eliminating these obstacles.Keywords: building information modelling, construction, design and construction, designers
Procedia PDF Downloads 1844872 Projectification: Using Project Management Methodology to Manage the Academic Program Review
Authors: Adam Marks, Munir Majdalawieh, Maytha Al Ali
Abstract:
While research is rich with what criteria could be included in the academic program review processes, there is rarely any mention of how this significant and complex process should be managed. This paper proposes using project management methodology in alignment with the program review criteria of the Dickeson’s Prioritizing Academic Programs model. Project management and academic program review share two distinct characteristics; one is their life cycle, and the second is the core knowledge areas they use. This aligned and structured approach offers academic administrators a step-by-step guide that can help them manage this process and effectively assess academic programs.Keywords: project management, academic program, program review, education, higher education institution, strategic management
Procedia PDF Downloads 3674871 Project and Module Based Teaching and Learning
Authors: Jingyu Hou
Abstract:
This paper proposes a new teaching and learning approach-project and Module Based Teaching and Learning (PMBTL). The PMBTL approach incorporates the merits of project/problem based and module based learning methods, and overcomes the limitations of these methods. The correlation between teaching, learning, practice, and assessment is emphasized in this approach, and new methods have been proposed accordingly. The distinct features of these new methods differentiate the PMBTL approach from conventional teaching approaches. Evaluation of this approach on practical teaching and learning activities demonstrates the effectiveness and stability of the approach in improving the performance and quality of teaching and learning. The approach proposed in this paper is also intuitive to the design of other teaching units.Keywords: computer science education, project and module based, software engineering, module based teaching and learning
Procedia PDF Downloads 4934870 Relationship among Teams' Information Processing Capacity and Performance in Information System Projects: The Effects of Uncertainty and Equivocality
Authors: Ouafa Sakka, Henri Barki, Louise Cote
Abstract:
Uncertainty and equivocality are defined in the information processing literature as two task characteristics that require different information processing responses from managers. As uncertainty often stems from a lack of information, addressing it is thought to require the collection of additional data. On the other hand, as equivocality stems from ambiguity and a lack of understanding of the task at hand, addressing it is thought to require rich communication between those involved. Past research has provided weak to moderate empirical support to these hypotheses. The present study contributes to this literature by defining uncertainty and equivocality at the project level and investigating their moderating effects on the association between several project information processing constructs and project performance. The information processing constructs considered are the amount of information collected by the project team, and the richness and frequency of formal communications among the team members to discuss the project’s follow-up reports. Data on 93 information system development (ISD) project managers was collected in a questionnaire survey and analyzed it via the Fisher Test for correlation differences. The results indicate that the highest project performance levels were observed in projects characterized by high uncertainty and low equivocality in which project managers were provided with detailed and updated information on project costs and schedules. In addition, our findings show that information about user needs and technical aspects of the project is less useful to managing projects where uncertainty and equivocality are high. Further, while the strongest positive effect of interactive use of follow-up reports on performance occurred in projects where both uncertainty and equivocality levels were high, its weakest effect occurred when both of these were low.Keywords: uncertainty, equivocality, information processing model, management control systems, project control, interactive use, diagnostic use, information system development
Procedia PDF Downloads 2944869 Conflict Causes within Construction Projects; Conflict Interaction across Project Phases
Authors: Abdullah Mohammed Alshehri
Abstract:
The projects in the construction industry have significantly increased, given its contribution to the overall Gross Domestic Product (GDP) of the countries. Reflecting upon the complex nature and involvement of various agents, the study aims to analyze the conflicts cause within construction projects. Therefore, the study strived to come out with understanding the levels of conflict interaction across project phases. However, this conducted by investigating the association between antecedents and apparent conflicts inherent in. The study used a qualitative approach for collecting the data through a quantitative, semi-structured method. Formation of a questionnaire survey has been conducted for over 30 respondents. However, the survey came out with the identification of 25 conflict cause categories, which can take place in different construction project phases, including pre-design phase, pre-construction phase, construction phase, commissioning, and completion phase. For example, conflicts associated with inconsistencies or discrepancies within or between project documents, which took place at tendering time in the pre-construction phase were relatable with the selection of material specifications that should be supplied or used in the construction projects at the construction phase. Its analysis can provide comprehensive understanding, trace the root of the problem, which offers a roadmap to deepen the understanding of the conflict conditions and ‘course of action’ necessary for project management strategy actions toward avoiding or minimizing conflict causes at project life.Keywords: construction, conflict causes, levels, interaction, phases
Procedia PDF Downloads 1794868 A Construction Scheduling Model by Applying Pedestrian and Vehicle Simulation
Authors: Akhmad F. K. Khitam, Yi Tai, Hsin-Yun Lee
Abstract:
In the modern research of construction management, the goals of scheduling are not only to finish the project within the limited duration, but also to improve the impact of people and environment. Especially for the impact to the pedestrian and vehicles, the considerable social cost should be estimated in the total performance of a construction project. However, the site environment has many differences between projects. These interactions affect the requirement and goal of scheduling. It is difficult for schedule planners to quantify these interactions. Therefore, this study use 3D dynamic simulation technology to plan the schedule of the construction engineering projects that affect the current space users (i.e., the pedestrians and vehicles). The proposed model can help the project manager find out the optimal schedule to minimize the inconvenience brought to the space users. Besides, a roadwork project and a building renovation project were analyzed for the practical situation of engineering and operations. Then this study integrates the proper optimization algorithms and computer technology to establish a decision support model. The proposed model can generate a near-optimal schedule solution for project planners.Keywords: scheduling, simulation, optimization, pedestrian and vehicle behavior
Procedia PDF Downloads 1414867 A Project Screening System for Energy Enterprise Based on Dempster-Shafer Theory
Authors: Woosik Jang, Seung Heon Han, Seung Won Baek
Abstract:
Natural gas (NG) is an energy resource in a few countries, and most NG producers do business in politically unstable countries. In addition, as 90% of the LNG market is controlled by a small number of international oil companies (IOCs) and national oil companies (NOCs), entry of latecomers into the market is extremely limited. To meet these challenges, project viability needs to be assessed based on limited information from a project screening perspective. However, the early stages of the project have the following difficulties: (1) What are the factors to consider? (2) How many professionals do you need to decide? (3) How to make the best decision with limited information? To address this problem, this study proposes a model for evaluating LNG project viability based on the Dempster-Shafer theory (DST). A total of 11 indicators for analyzing the gas field, reflecting the characteristics of the LNG industry, and 23 indicators for analyzing the market environment, were identified. The proposed model also evaluates the LNG project based on the survey and provides uncertainty of the results based on DST as well as quantified results. Thus, the proposed model is expected to be able to support the decision-making process of the gas field project using quantitative results as a systematic framework, and it was developed as a stand-alone system to improve its usefulness in practice. Consequently, the amount of information and the mathematical approach are expected to improve the quality and opportunity of decision making for LNG projects for enterprises.Keywords: project screen, energy enterprise, decision support system, Dempster-Shafer theory
Procedia PDF Downloads 3414866 Implementation of an Economic – Probabilistic Model to Risk Analysis of ERP Project in Technological Innovation Firms – A Case Study of ICT Industry in Iran
Authors: Reza Heidari, Maryam Amiri
Abstract:
In a technological world, many countries have a tendency to fortifying their companies and technological infrastructures. Also, one of the most important requirements for developing technology is innovation, and then, all companies are struggling to consider innovation as a basic principle. Since, the expansion of a product need to combine different technologies, therefore, different innovative projects would be run in the firms as a base of technology development. In such an environment, enterprise resource planning (ERP) has special significance in order to develop and strengthen of innovations. In this article, an economic-probabilistic analysis was provided to perform an implementation project of ERP in the technological innovation (TI) based firms. The used model in this article assesses simultaneously both risk and economic analysis in view of the probability of each event that is jointly between economical approach and risk investigation approach. To provide an economic-probabilistic analysis of risk of the project, activities and milestones in the cash flow were extracted. Also, probability of occurrence of each of them was assessed. Since, Resources planning in an innovative firm is the object of this project. Therefore, we extracted various risks that are in relation with innovative project and then they were evaluated in the form of cash flow. This model, by considering risks affecting the project and the probability of each of them and assign them to the project's cash flow categories, presents an adjusted cash flow based on Net Present Value (NPV) and with probabilistic simulation approach. Indeed, this model presented economic analysis of the project based on risks-adjusted. Then, it measures NPV of the project, by concerning that these risks which have the most effect on technological innovation projects, and in the following measures probability associated with the NPV for each category. As a result of application of presented model in the information and communication technology (ICT) industry, provided an appropriate analysis of feasibility of the project from the point of view of cash flow based on risk impact on the project. Obtained results can be given to decision makers until they can practically have a systematically analysis of the possibility of the project with an economic approach and as moderated.Keywords: cash flow categorization, economic evaluation, probabilistic, risk assessment, technological innovation
Procedia PDF Downloads 4034865 Environmental Impact Assessment Methodology of the Tirana–Elbasan Road Project
Authors: Aurora Cerri, Niko Pollojani
Abstract:
The Tirana – Elbasan Road project is the most important highway project in Albania, constructed in the period May 2011 - ongoing. This project included construction of 38 km highway category road including 2.6 km of tunnel. It serves as a corridor connecting the Tirana, Capital of Albania and South-East area, and in the near future it is expected to continue in the direction of Macedonian border. Environmental Impact Assesment procedure for this project is provided by the Albanian Environmental Law No. 10431. This law establishes the regulation of procedures for identifying, assessment and reporting on the effects of certain projects on the environment, and the associated administrative procedures, during the decision-making process by the Ministry of Environment and Tourism for issuing environmental permit, and ensures that all relevant information concerning the environment are provided and considered. Due to the nature and size of the project, during the environmental impact assessment process, the European Union legislation, namely the EIA Directive 85/337 / EEC is considered. Moreover, in some cases, due to the lack of national standards and practical guidelines, when necessary those of EU member countries are considered. This paper presents an analysis of the EIA procedure followed on ‘Tirana – Elbasan’ Road project, with a focus on the application of the main stages of the procedure such as: screening, scoping, review, the EIA report; and consideration of alternatives, measures for impact prevention and reduction, and the public hearing T/discussion.Keywords: highway, environmental impact assesment, Tirana, prevention
Procedia PDF Downloads 3214864 Synchronous Versus Asynchronous Telecollaboration in Intercultural Communication
Authors: Vita Kalnberzina, Lauren Miller Anderson
Abstract:
The aim of the paper is to report on the results of the telecollaboration project results carried out between the students of the University of Latvia, National Louis University in the US, and Austral University in Chili during the Intercultural Communication course. The objectives of the study are 1) to compare different forms of student telecollaboration and virtual exchange, 2) to collect and analyse the student feedback on the telecollaboration project, 3) to evaluate the products (films) produced during the telecollaboration project. The methods of research used are as follows: Survey of the student feedback after the project, video text analysis of the films produced by the students, and interview of the students participating in the project. We would like to compare the results of a three-year collaboration project, where we tried out synchronous telecollaboration and asynchronous collaboration. The different variables that were observed were the impact of the different time zones, different language proficiency levels of students, and different curricula developed for collaboration. The main findings suggest that the effort spent by students to organize meetings in different time zones and to get to know each other diminishes the quality of the product developed and thus reduces the students' feeling of accomplishment. Therefore, we would like to propose that asynchronous collaboration where the national teams work on a film project specifically developed by the students of one university for the students of another university ends up with a better quality film, which in its turn appeals more to the students of the other university and creates a deeper intercultural bond between the collaborating students.Keywords: telecollaboration, intercultural communication, synchronous collaboration, asynchronous collaboration
Procedia PDF Downloads 101