Search results for: project radio-television
4923 The Relationship of Building Information Modeling (BIM) Capability in Quantity Surveying Practice and Project Performance
Authors: P. F. Wong, H. Salleh, F. A. Rahim
Abstract:
The adoption of building information modeling (BIM) is increasing in the construction industry. However, quantity surveyors are slow in adoption compared to other professions due to lack of awareness of the BIM’s potential in their profession. It is still unclear on how BIM application can enhance quantity surveyors’ work performance and project performance. The aim of this research is to identify the capabilities of BIM in quantity surveying practices and examine the relationship between BIM capabilities and project performance. Questionnaire survey and interviews were adopted for data collection. Literature reviews identified there are eleven BIM capabilities in quantity surveying practice. Questionnaire results showed that there are several BIM capabilities significantly correlated with project performance in time, cost and quality aspects and the results were validated through interviews. These findings show that BIM has the capabilities to enhance quantity surveyors’ performances and subsequently improved project performance.Keywords: Building Information Modeling (BIM), quantity surveyors, capability, project performance
Procedia PDF Downloads 3674922 The Views of Teachers, Students and Parents on the FATIH Project
Authors: Şemsettin Şahin, Ahmet Oğuz Aktürk, İsmail Çelik
Abstract:
This study investigated the views of teachers, students and students' parents on the FATIH (Movement of Enhancing Opportunities and Improving Technology) Project, which was put into service by the Ministry of National Education in cooperation with the Ministry of Transportation in Turkey in November 2010 for the purpose of increasing students' success and planned to be completed within 5 years. The study group consisted of teachers employed in a pilot school in the province of Karaman in central Turkey included within the scope of the FATIH Project, students attending this school and parents whose children are students in that school. The research data were collected through forms developed by the researchers to determine the views of teachers, students and students' parents on the FATIH Project. The descriptive analysis method, one of the qualitative research methods, was used in the study. An analysis of the data revealed that a large majority of the teachers and the students believed that if computers were used to serve their set purpose, then they could make considerable contributions to education. A large majority of the students' parents, on the other hand, regard the use of computers in education as a great opportunity for the students. The views of the teachers, students and students' parents on the FATIH Project usually overlap. Most of the participants in the study pointed out that the FATIH Project was intended to use technology effectively in education. Moreover, each individual participant described their role in the FATIH Project in accordance with their relative position and stated that they could perform whatever was expected of them for the effective and efficient use and progress of the project. The views of the participants regarding the FATİH Project vary according to the kind of the participants.Keywords: education, FATIH project, technology, students
Procedia PDF Downloads 4414921 Project Design Deliverables Sequence (PDD)
Authors: Nahed Al-Hajeri
Abstract:
There are several reasons which lead to a delay in project completion, out of all, one main reason is the delay in deliverable processing, i.e. submission and review of documents. Most of the project cycles start with a list of deliverables but without a sequence of submission of the same, means without a direction to move, leading to overlapping of activities and more interdependencies. Hence Project Design Deliverables (PDD) is developed as a solution to Organize Transmittals (Documents/Drawings) received from contractors/consultants during different phases of an EPC (Engineering, Procurement, and Construction) projects, which gives proper direction to the stakeholders from the beginning, to reduce inter-discipline dependency, avoid overlapping of activities, provide a list of deliverables, sequence of activities, etc. PDD attempts to provide a list and sequencing of the engineering documents/drawings required during different phases of a Project which will benefit both client and Contractor in performing planned activities through timely submission and review of deliverables. This helps in ensuring improved quality and completion of Project in time. The successful implementation begins with a detailed understanding the specific challenges and requirements of the project. PDD will help to learn about vendor document submissions including general workflow, sequence and monitor the submission and review of the deliverables from the early stages of Project. This will provide an overview for the Submission of deliverables by the concerned during the projects in proper sequence. The goal of PDD is also to hold responsible and accountability of all stakeholders during complete project cycle. We believe that successful implementation of PDD with a detailed list of documents and their sequence will help organizations to achieve the project target.Keywords: EPC (Engineering, Procurement, and Construction), project design deliverables (PDD), econometrics sciences, management sciences
Procedia PDF Downloads 4004920 Mobile Cloud Application in Design Build Bridge Construction
Abstract:
In the past decades, design-build has become a more popular project delivery system especially for the large scaled infrastructure project in North America. It provides a one-stop shopping system for the client therefore improves the efficiency of construction, and reduces the risks and overall cost for the clients. Compared to the project with traditional delivery method, design-build project requires contractor and designer to work together efficiently to deliver the best-value solutions through the construction process. How to facilitate a solid integration and efficient interaction between contractor and designer often affects the schedule, budget and quality of the construction therefore becomes a key factor to the success of a design-build project. This paper presents a concept of using modern mobile cloud technology to provide an integrated solution during the design-build construction. It uses mobile cloud architecture to provide a platform for real-time field progress, change request approval, job progress log, and project time entry with devices integration for field information and communications. The paper uses a real filed change notice as an example to demonstrate how mobile cloud technology applies in a design-build project and how it can improve the project efficiency.Keywords: cloud, design-build, field change notice, mobile application
Procedia PDF Downloads 2484919 Managing Early Stakeholder Involvement at the Early Stages of a Building Project Life Cycle
Authors: Theophilus O. Odunlami, Hasan Haroglu, Nader Saleh-Matter
Abstract:
The challenges facing the construction industry are often worsened by the compounded nature of projects coupled with the complexity of key stakeholders involved at different stages of the project. Projects are planned to achieve outlined benefits in line with the business case; however, a lack of effective management of key stakeholders can result in unrealistic delivery aspirations, unnecessary re-works, and overruns. The aim of this study is to examine the early stages of a project lifecycle and investigate the stakeholder management and involvement processes and their impact on the successful delivery of the project. The research engaged with conventional construction organisations and project personnel and stakeholders on diverse projects, using a research strategy to analyse existing project case studies, narrative enquiries, interviews, and surveys using a combined qualitative, quantitative, and mixed method of analysis. Research findings have shown that the involvement of stakeholders at different levels during the early stages has pronounced effects on project delivery; it helps to forge synergy and promotes a clear understanding of individual responsibilities, strengths, and weaknesses. This has often fostered a positive sense of productive collaboration right through the early stages of the project. These research findings intend to contribute to the development of a process framework for stakeholder and project team involvement in the early stages of a project. This framework will align with the selection criteria for stakeholders, contractors, and resources, ultimately contributing to the successful completion of projects. The primary question addressed in this study is stakeholder involvement and management of the early stages of a building project life cycle impacts project delivery. Findings showed that early-stage stakeholder involvement and collaboration between project teams and contractors significantly contribute to project success. However, a strong and healthy communication strategy would be required to maintain the flow of value-added ideas among stakeholders at the early stages to benefit the project at the execution stage.Keywords: early stages, project lifecycle, stakeholders, decision-making strategy, project framework
Procedia PDF Downloads 1004918 Effect of Building Construction Sizes on Project Delivery Methods in Nigeria
Authors: Nuruddeen Usman, Mohammad Sani
Abstract:
The performance of project delivery methods has been an issue of concern to various stakeholders in the construction industry. The contracting system of project delivery is the traditional system used in the delivery of most public projects in Nigeria. The direct labor system is used most times as an alternative to the traditional system. There were so many complain about the performance of contracting system and the suitability of direct labor as an alternative to the delivery of public projects. Therefore, this paper is aimed at investigating the effect of project size on the project delivery methods in the completed public buildings. Questionnaires were self-administered to managerial staff in the study area and analyzed using descriptive statistics. The findings reveals that contracting system was choosing for large size building construction project delivery with higher frequency (F) of 40 (76.9%) against direct labor with 12 (23.1%). While the small size project, the result revealed a frequency (F) of 26 (50%) for contracting system and direct labor system respectively. Base on the research findings, the contracting system, was recommended for all sizes of building construction project delivery while direct labor system can only use as an alternative for small size building construction projects delivery.Keywords: construction size, contracting system, direct labour, effect
Procedia PDF Downloads 4574917 Critical Activity Effect on Project Duration in Precedence Diagram Method
Authors: Salman Ali Nisar, Koshi Suzuki
Abstract:
Precedence Diagram Method (PDM) with its additional relationships i.e., start-to-start, finish-to-finish, and start-to-finish, between activities provides more flexible schedule than traditional Critical Path Method (CPM). But, changing the duration of critical activities in PDM network will have anomalous effect on critical path. Researchers have proposed some classification of critical activity effects. In this paper, we do further study on classifications of critical activity effect and provide more information in detailed. Furthermore, we determine the maximum amount of time for each class of critical activity effect by which the project managers can control the dynamic feature (shortening/lengthening) of critical activities and project duration more efficiently.Keywords: construction project management, critical path method, project scheduling, precedence diagram method
Procedia PDF Downloads 5114916 Development of Verification System of Workspace Clashes Between Construction Activities
Authors: Hyeon-Seung Kim, Sang-Mi Park, Min-Seo Kim, Jong-Myeung Shin, Leen-Seok Kang
Abstract:
Recently, the use of Building Information Modeling (BIM) in public construction works has become mandatory in some countries and it is anticipated that BIM will be applied to the actual field of civil engineering projects. However, the BIM system is still focused on the architectural project and the design phase. Because the civil engineering project is linear type project and is focused on the construction phase comparing with architectural project, 3D simulation is difficult to visualize them. This study suggests a method and a prototype system to solve workspace conflictions among construction activities using BIM simulation tool.Keywords: BIM, workspace, confliction, visualization
Procedia PDF Downloads 4084915 Macroeconomic Measure of Projectification: An Empirical Study of Pakistani Economy
Authors: Shafaq Rana, Hina Ansar
Abstract:
Projectification is an emerging phenomenon in Western economies. The projects have become the key driver of the economic actions. The impact of projectification is understudy for over a decade. A methodology was developed to measure the degree of projectification at economical level, which was later adapted to measure the degree of projectification in Germany, Norway, and Iceland; and compared the differences in these project societies, considering their industrial structure, organizational size, and the share of project work. Using the same methodology, this study aims to provide empirical evidence of the project work in the context of Pakistan –a developing nation, keeping into consideration the macroeconomic measures, qualitative and quantitative measures of the project i/c GDP, monetary measures, and project success. The research includes a qualitative pre-study to define these macro-measures in the country-specific context and a quantitative study to measure the project work w.r.t hours working in the organizations on projects. The outcome of this study provides the key data on the projectification in a developing economy, which will help industry practitioners and decision-makers to examine the consequences of projectification and strategize, respectively. This study also provides a foundation for further research in individual sectors of the country while exploring different macroeconomic questions, including the effect of projectification on project productivity, income effects, and labor market.Keywords: developing economy, Pakistan, project work, projectification
Procedia PDF Downloads 1154914 A Risk Management Framework for Selling a Mega Power Plant Project in a New Market
Authors: Negar Ganjouhaghighi, Amirali Dolatshahi
Abstract:
The origin of most risks of a mega project usually takes place in the phases before closing the contract. As a practical point of view, using project risk management techniques for preparing a proposal is not a total solution for managing the risks of a contract. The objective of this paper is to cover all those activities associated with risk management of a mega project sale’s processes; from entrance to a new market to awarding activities and the review of contract performance. In this study, the risk management happens in six consecutive steps that are divided into three distinct but interdependent phases upstream of the award of the contract: pre-tendering, tendering and closing. In the first step, by preparing standard market risk report, risks of the new market are identified. The next step is the bid or no bid decision making based on the previous gathered data. During the next three steps in tendering phase, project risk management techniques are applied for determining how much contingency reserve must be added or reduced to the estimated cost in order to put the residual risk to an acceptable level. Finally, the last step which happens in closing phase would be an overview of the project risks and final clarification of residual risks. The sales experience of more than 20,000 MW turn-key power plant projects alongside this framework, are used to develop a software that assists the sales team to have a better project risk management.Keywords: project marketing, risk management, tendering, project management, turn-key projects
Procedia PDF Downloads 3294913 Integrated Information System on Human Resource Management in Project-Based Organizations
Authors: Akbar Farahani, Afsaneh Hassani, Peyman M. Farkhondeh
Abstract:
Human Resource Management as one of the core processes of the project-based companies, despite its key role in the success and competitive advantage, is relatively unknown. In the project-based companies, due to the accelerated movement of knowledge in the work activities and the temporary nature of the project, the need to develop mechanisms for achieving optimal management of this issues is very challenging. Approach to human resource management in these companies evolves with goals, strategies, and operational processes. Therefore, the need for appropriate tools to facilitate implementation of the optimized human resource management in the project is more than before,Which currently with the development of information technology and modern communication, appropriate to address the optimal approach for dynamic management of human resources in the project have been provided.This is done by using the referral system implemented in Mahab GCE that provides 1: the ability to use humans in projects without geographic limitation and 2:information on the activities and outcomes of referrals.Furthermore, by using this system, recording the lessons learned after any particular activity on projects,accessing quantitative information, procedures, documentation of learned practices that have been stored in the data base as well as using them in future projects is provided.Keywords: human resource management, project base company, ERP, referrals system
Procedia PDF Downloads 4774912 Critical Success Factors for Sustainable Smart City Project in India
Authors: Debasis Sarkar
Abstract:
Development of a Smart City would depend upon the development of its infrastructure in a smart way. Primarily based on the ideology of the fourth industrial revolution a Smart City project should have Smart governance, smart health care, smart building, smart transportation, smart mobility, smart energy, smart technology and smart citizen. Considering the Indian scenario of current state of cities in India, it has become very essential to decide the specific parameters which would govern the development of a Smart City project. It has been observed that there are significant parameters beyond Information and Communication Technology (ICT), which govern the development of a Smart City project. This paper is an attempt to identify the Critical Success Factors (CSF) which are significantly responsible for the development of a Smart City project in Western India. Responses to questionnaire survey were analyzed on basis of Likert scale. They were further critically evaluated with help of Factor Comparison Method (FCM) and Analytical Hierarchy Process (AHP). The project authorities need to incorporate Building Information Modeling (BIM) to make the smart city project more collaborative. To make the project more sustainable, use of flyash in the concrete used, reduced usage of cement and steel, use of alternate fuels like biodiesel is recommended.Keywords: analytical hierarchical process, building information modeling, critical success factors, factor comparison method
Procedia PDF Downloads 2524911 Engaging Mature Learners through Video Case Studies
Authors: Jacqueline Mary Jepson
Abstract:
This article provides a case study centred on the development of 13 video episodes which have been created to enhance student engagement with a post graduate online course in Project Management. The student group was unique as their online course needed to provide for asynchronistic learning and an adult learning pedagogy. In addition, students had come from a wide range professional backgrounds, with some having no Project Management experience, while others had 20 years or more. Students had to gain an understanding of an advanced body of knowledge and the course needed to achieve the academic requirements to qualify individuals to apply their learning in a range of contexts for professional practice and scholarship. To achieve this, a 13 episode case study was developed along with supportive learning materials based on the relocation of a zoo. This unique project provided a learning environment where the project could evolve over each video episode demonstrating the application of Project Management methodology which was then tied into the learning outcomes for the course and the assessment tasks. Discussion forums provided a way for students to converse and demonstrate their own understanding of content and how Project Management methodology can be applied.Keywords: project management, adult learning, video case study, asynchronistic education
Procedia PDF Downloads 3384910 BIM Application and Construction Schedule Simulation for the Horizontal Work Area
Authors: Hyeon-Seong Kim, Sang-Mi Park, Seul-Gi Kim, Seon-Ju Han, Leen-Seok Kang
Abstract:
The use of BIM, including 4D CAD system, in a construction project is gradually increasing. Since the building construction works repeatedly in the vertical space, it is relatively easy to confirm the interference effect when applying the BIM, but the interference effect for the civil engineering project is relatively small because the civil works perform non-repetitive processes in the horizontal space. For this reason, it is desirable to apply BIM to the construction phase when applying BIM to the civil engineering project, and the most active BIM tool applied to the construction phase is the 4D CAD function for the schedule management. This paper proposes the application procedure of BIM by the construction phase of civil engineering project and a linear 4D CAD construction methodology suitable for the civil engineering project in which linear work is performed.Keywords: BIM, 4D CAD, linear 4D simulation, VR
Procedia PDF Downloads 4004909 Enhancing Project Performance Forecasting using Machine Learning Techniques
Authors: Soheila Sadeghi
Abstract:
Accurate forecasting of project performance metrics is crucial for successfully managing and delivering urban road reconstruction projects. Traditional methods often rely on static baseline plans and fail to consider the dynamic nature of project progress and external factors. This research proposes a machine learning-based approach to forecast project performance metrics, such as cost variance and earned value, for each Work Breakdown Structure (WBS) category in an urban road reconstruction project. The proposed model utilizes time series forecasting techniques, including Autoregressive Integrated Moving Average (ARIMA) and Long Short-Term Memory (LSTM) networks, to predict future performance based on historical data and project progress. The model also incorporates external factors, such as weather patterns and resource availability, as features to enhance the accuracy of forecasts. By applying the predictive power of machine learning, the performance forecasting model enables proactive identification of potential deviations from the baseline plan, which allows project managers to take timely corrective actions. The research aims to validate the effectiveness of the proposed approach using a case study of an urban road reconstruction project, comparing the model's forecasts with actual project performance data. The findings of this research contribute to the advancement of project management practices in the construction industry, offering a data-driven solution for improving project performance monitoring and control.Keywords: project performance forecasting, machine learning, time series forecasting, cost variance, earned value management
Procedia PDF Downloads 494908 Understanding Complexity at Pre-Construction Stage in Project Planning of Construction Projects
Authors: Mehran Barani Shikhrobat, Roger Flanagan
Abstract:
The construction planning and scheduling based on using the current tools and techniques is resulted deterministic in nature (Gantt chart, CPM) or applying a very little probability of completion (PERT) for each task. However, every project embodies assumptions and influences and should start with a complete set of clearly defined goals and constraints that remain constant throughout the duration of the project. Construction planners continue to apply the traditional methods and tools of “hard” project management that were developed for “ideal projects,” neglecting the potential influence of complexity on the design and construction process. The aim of this research is to investigate the emergence and growth of complexity in project planning and to provide a model to consider the influence of complexity on the total project duration at the post-contract award pre-construction stage of a project. The literature review showed that complexity originates from different sources of environment, technical, and workflow interactions. They can be divided into two categories of complexity factors, first, project tasks, and second, project organisation management. Project tasks may originate from performance, lack of resources, or environmental changes for a specific task. Complexity factors that relate to organisation and management refer to workflow and interdependence of different parts. The literature review highlighted the ineffectiveness of traditional tools and techniques in planning for complexity. However, this research focus on understanding the fundamental causes of the complexity of construction projects were investigated through a questionnaire with industry experts. The results were used to develop a model that considers the core complexity factors and their interactions. System dynamics were used to investigate the model to consider the influence of complexity on project planning. Feedback from experts revealed 20 major complexity factors that impact project planning. The factors are divided into five categories known as core complexity factors. To understand the weight of each factor in comparison, the Analytical Hierarchy Process (AHP) analysis method is used. The comparison showed that externalities are ranked as the biggest influence across the complexity factors. The research underlines that there are many internal and external factors that impact project activities and the project overall. This research shows the importance of considering the influence of complexity on the project master plan undertaken at the post-contract award pre-construction phase of a project.Keywords: project planning, project complexity measurement, planning uncertainty management, project risk management, strategic project scheduling
Procedia PDF Downloads 1384907 Familiarity with Engineering Project Management And Their Duties In Projects
Authors: Mokhtar Nikgoo
Abstract:
Today's industrial world has undergone tremendous changes in certain periods. These changes are called environmental changes. And they have a direct impact on organizations and bodies. Therefore, the importance of knowing these changes is clear. This importance has caused the manufacturing organizations to move towards multiple products and constantly change and expand their system. This research tries to show how the organization moves in this category by defining the basic steps of implementing a project. One of the most important features of a hard-to-order production organization is the definition of different production projects from different customers. Therefore, the lack of sufficient understanding of the type of work causes the project to be defined for the organization in question, and the managers of the organization (in every organizational level) are constantly involved with different projects. In the implementation of the production project of the aforementioned organizations, directing the facilities and people of the organization towards the implementation of the project is of particular importance. Therefore, it is felt necessary to define the project manager and his basic duties. Considering the importance of this topic, the project chapter deals with project management and its importance and examines all the different issues in that category from the perspective of implementation. A project includes certain activities of the organization that require the use of different resources and all the activities of the organization in order to implement the project with defined facilities and at the designated times. Project management is planning, organizing and controlling the organization's resources for a short-term goal that has been created for short-term and medium-term goals and objectives. Project management has the important task of centering and integrating (coordinating) task and line managers. In other words, project management requires having a strong and appropriate relationship with the internal people of the system to carry out the assigned activities and must have a general and technical knowledge related to various activities in the project environment. It seems that everything with project management in It is communication. One of the characteristics of production organizations under the order is the relationship between the customer (customers) and the organization until the completion of the defined project. Due to the nature of the work, it is necessary for a person to establish this relationship between the client and the organization's people and to establish this relationship in such a way that it does not cause a lack of coordination in the organization's activities. Therefore, project management has a very important role at this stage, because the relationship between the client and his organization will be any problems and problems and points of view that the client has, he must inform the management so that he can implement the cases with its analysis and special processes. To be transferred to other departments and line managers.Keywords: project management, crisis management, project delays bill, project duration
Procedia PDF Downloads 574906 Analyzing the Effectiveness of Communication Practices and Processes within Project-Based Firms
Authors: Paul Saah, Charles Mbohwa, Nelson Sizwe Madonsela
Abstract:
The capacity to deliver projects on schedule, within budget, and to the pleasure of the client depends on effective communication, which is the lifeblood of project-based businesses. In order to pinpoint areas for development and shed light on the crucial role that communication plays in project success, the aim of this study is to evaluate the efficacy of communication practises and processes inside project-based organisations. In order to analyse concepts and get a greater grasp of their theoretical basis, this study's methodology combines a careful review of the relevant literature with a conceptual analysis of the subject. Data from a varied sample of project-based businesses spanning all industries and sizes were collected via document analysis. The relationship between communication practises, and processes were investigated in connection to key performance measures such as project outcomes, client satisfaction, and team dynamics. According to the study's findings, project-based businesses that adopt effective communication practises, and procedures experience a reduction in unfavourable experiences, stronger integration, and coordination, clarity of purpose, and practises that can hasten problem resolution. However, failing to adopt effective communication practises and procedures in project-based company result in counter issues, including project derailment from the schedule, failure to meet goals, inefficient use of existing resources, and failure to meet organisational goals. Therefore, optimising their communication practises, and procedures are crucial for sustainable growth and competitive advantage as project-based enterprises continue to play a crucial part in today's dynamic business scene.Keywords: effective communication, project-based firms, communication practices, project success, communication strategies
Procedia PDF Downloads 704905 The Role of Risk Management Practices in the Relationship between Risks Factors and Construction Project Performance
Authors: Ali Abdullah Albezaghi
Abstract:
This article aims to introduce a conceptual framework that can facilitate investigations concerning the role of risk management practices in the relationship between construction risks and the construction project's performance. This article is structured based on the extant literature; it reviews theoretical perspectives, highlights the gaps, and illustrates the significance of developing a framework of suggested relationships. Despite growing interest in the role of risks in construction project performance, previous studies have paid little attention to investigating the moderating role of risk management practices on the risk-performance link. This has left researchers and construction project managers with minimal information to explain the conditions under which risk management practices can reduce the impact of project-related risks and improve performance. In this context, this article suggests a viable research model with propositions that assess risk-performance relationships and discusses the potential moderating effects on the domain relationship. This paper adds to the risk management literature by focusing on risk variables that directly impact performance. Further, it also considers the moderating role of risk management practices in such relationships.Keywords: risk management practices, external risks, internal risks, project risks, project performance
Procedia PDF Downloads 1374904 Create a Dynamic Model in Project Control and Management
Authors: Hamed Saremi, Shahla Saremi
Abstract:
In this study, control and management of construction projects is evaluated through developing a dynamic model in which some means are used in order to evaluating planning assumptions and reviewing the effectiveness of some project control policies based on previous researches about time, cost, project schedule pressure management, source management, project control, adding elements and sub-systems from cost management such as estimating consumption budget from budget due to costs, budget shortage effects and etc. using sensitivity analysis, researcher has evaluated introduced model that during model simulation by VENSIM software and assuming optimistic times and adding information about doing job and changes rate and project is forecasted with 373 days (2 days sooner than forecasted) and final profit $ 1,960,670 (23% amount of contract) assuming 15% inflation rate in year and costs rate accordance with planned amounts and other input information and final profit.Keywords: dynamic planning, cost, time, performance, project management
Procedia PDF Downloads 4784903 Effect of Institutional Structure on Project Managers Performance in Construction Projects: A Case Study in Nigeria
Authors: Ebuka Valentine Iroha, Tsunemi Watanabe, Satoshi Tsuchiya
Abstract:
Project management practices play an important role in construction project performance and are one of project managers' essential key performance indicators. Previous studies have explored the poor performance of the construction industry, with project delays and cost overruns identified to contribute largely to numerous abandoned projects. These challenges are attributed to insufficient project management practices and a lack of utilization of project managers. The actual causes of inadequate project management practices and underutilization of project managers have been rarely discussed. This study tends to bridge the gap by identifying and assessing the actual causes of insufficient project management practices and underutilization of project managers. This study differs from past studies investigating the causes of poor performance by using institutional analysis methods to identify and analyze the factors influencing project management practices and proper utilization of project managers. Based on a comprehensive literature review, this study identified some factors embedded in the construction industry that influence the institutional environment and weaken the laws and regulations. These factors were used as the basis for semi-structured interview questions to investigate their impacts on project management practices and project managers. The data collected were coded into a four-level framework for institutional analysis. This method was used to analyze the interrelationships between the identified embedded factors, institutional laws and regulations, and construction organizations to understand how these influences result in the underutilization of project managers. The study found that the underutilization of project managers consists of two subsystems, including underutilization and lowering commitment. The first subsystem, corruption, political influence, religious and tribal discrimination, and organizational culture, were found to affect the institutional structure. These embedded factors weaken the industry’s governance mechanism, forcing project managers to prioritize corrupt practices over project demands. The ineffectiveness of the existing laws and regulations worsens the situation, supporting unfair working conditions and contributing to the underperformance of project managers. This situation leads to the development of the second subsystem, which is characterized by a lack of opportunities for career development and minimal incentives within construction organizations. The findings provide significant potential for addressing systemic challenges in the construction industry, particularly the underutilization of project managers and enhancing organizational support measures to improve project management practices and mitigate the adverse effects of corruption.Keywords: construction industry, project management, poor performance, embedded factors, project managers underutilization
Procedia PDF Downloads 364902 Project Progress Prediction in Software Devlopment Integrating Time Prediction Algorithms and Large Language Modeling
Authors: Dong Wu, Michael Grenn
Abstract:
Managing software projects effectively is crucial for meeting deadlines, ensuring quality, and managing resources well. Traditional methods often struggle with predicting project timelines accurately due to uncertain schedules and complex data. This study addresses these challenges by combining time prediction algorithms with Large Language Models (LLMs). It makes use of real-world software project data to construct and validate a model. The model takes detailed project progress data such as task completion dynamic, team Interaction and development metrics as its input and outputs predictions of project timelines. To evaluate the effectiveness of this model, a comprehensive methodology is employed, involving simulations and practical applications in a variety of real-world software project scenarios. This multifaceted evaluation strategy is designed to validate the model's significant role in enhancing forecast accuracy and elevating overall management efficiency, particularly in complex software project environments. The results indicate that the integration of time prediction algorithms with LLMs has the potential to optimize software project progress management. These quantitative results suggest the effectiveness of the method in practical applications. In conclusion, this study demonstrates that integrating time prediction algorithms with LLMs can significantly improve the predictive accuracy and efficiency of software project management. This offers an advanced project management tool for the industry, with the potential to improve operational efficiency, optimize resource allocation, and ensure timely project completion.Keywords: software project management, time prediction algorithms, large language models (LLMS), forecast accuracy, project progress prediction
Procedia PDF Downloads 794901 The Urban Project: Metropolization Tool and Sustainability Vector - Case of Constantine
Authors: Mouhoubi Nedjima, Sassi Boudemagh Souad, Chouabbia Khedidja
Abstract:
Cities grow, large or small; they seek to gain a place in the market competition, which talks to sell a product that is the city itself. The metropolis are large cities enjoying a legal status and assets providing their dominions elements on a territory larger than their range, do not escape this situation. Thus, the search for promising tool metropolises better development and durability meet the challenges as economic, social and environmental is timely. The urban project is a new way to build the city; it is involved in the metropolises of two ways, either to manage the crisis and to meet the internal needs of the metropolis, or by creating a regional attractiveness with their potential. This communication will address the issue of urban project as a tool that has and should find a place in the panoply of existing institutional tools. Based on the example of the modernization project of the metropolis of eastern Algeria "Constantine", we will examine what the urban project can bring to a city, the extent of its impact but also the relationship between the visions actors so metropolization a success.Keywords: urban project, metropolis, institutional tools, Constantine
Procedia PDF Downloads 4034900 Concept to Enhance the Project Success and Promote the Implementation of Success Factors in Infrastructure Projects
Abstract:
Infrastructure projects are often subjected to delays and cost overruns and mistakenly described as unsuccessful projects. These projects have many peculiarities such as public attention, impact on the environment, subjected to special regulations, etc. They also deal with several stakeholders with different motivations and face unique risks. With this in mind we need to reconsider our approach to manage them, define their success factors and implement these success factors. Infrastructure projects are not only lacking a unified meaning of project success or a definition of success factors, but also a clear method to implement these factors. This paper investigates this gap and introduces a concept to implement success factors in an efficient way, taking into consideration the specific characteristics of infrastructure projects. This concept consists of six enablers such as project organization, project team, project management workflow, contract management, communication and knowledge transfer and project documentations. These enablers allow other success factors to be efficiently implemented in projects. In conclusion, this paper provides project managers as well as company managers with a tool to define and implement success factors efficiently in their projects, along with upgrading their assets for the coming projects. This tool consists of processes and validated checklists to ensure the best use of company resources and knowledge. Due to the special features of infrastructure projects this tool will be tested in the German infrastructure market. However, it is meant to be adaptable to other markets and industries.Keywords: infrastructure projects, operative success factors, project success, success factors, transportation projects
Procedia PDF Downloads 1284899 Building Information Modelling (BIM) and Unmanned Aerial Vehicles (UAV) Technologies in Road Construction Project Monitoring and Management: Case Study of a Project in Cyprus
Authors: Yiannis Vacanas, Kyriacos Themistocleous, Athos Agapiou, Diofantos Hadjimitsis
Abstract:
Building Information Modelling (BIM) technology is considered by construction professionals as a very valuable process in modern design, procurement and project management. Construction professionals of all disciplines can use a single 3D model which BIM technology provides, to design a project accurately and furthermore monitor the progress of construction works effectively and efficiently. Unmanned Aerial Vehicles (UAVs), a technology initially developed for military applications, is now without any difficulty accessible and has already been used by commercial industries, including the construction industry. UAV technology has mainly been used for collection of images that allow visual monitoring of building and civil engineering projects conditions in various circumstances. UAVs, nevertheless, have undergone significant advances in equipment capabilities and now have the capacity to acquire high-resolution imagery from many angles in a cost effective manner, and by using photogrammetry methods, someone can determine characteristics such as distances, angles, areas, volumes and elevations of an area within overlapping images. In order to examine the potential of using a combination of BIM and UAV technologies in construction project management, this paper presents the results of a case study of a typical road construction project where the combined use of the two technologies was used in order to achieve efficient and accurate as-built data collection of the works progress, with outcomes such as volumes, and production of sections and 3D models, information necessary in project progress monitoring and efficient project management.Keywords: BIM, project management, project monitoring, UAV
Procedia PDF Downloads 3034898 Appraisal of Transaction Cost in South African Construction Projects
Authors: Kenneth O. Otasowie, Matthew Ikuabe, Clinton Aigbavboa, Ayodeji Oke
Abstract:
Construction project cost are not only made up of production costs. This cost comprises of many other elements such as the preparation of a bidding document, cost estimations, drafting contractual agreements and monitoring that contractual obligations are met. Several studies have stressed the need for transaction costs (TC) to be defined in a way that covers all phases of a project and not only the pre-contract phase. Hence, this study aims to appraise transaction cost in South African (SA) construction projects by assessing what constitutes transaction cost, influencing factors and possible optimisation measures. A survey design was adopted. A total number of eighty (80) questionnaires were administered to quantity surveyors, procurement managers and project managers in Guateng Province, SA and seventy-two (72) were returned and found suitable for analysis. Collected data was analysed using percentage, mean item score, standard deviation, one-sample t-test. The findings show that external technical interaction, uncertainty, human factors are the most significant constituents of TC in SA, while technical competency, experience in similar project type and project characteristics are the leading influencing factors. Furthermore, understanding project characteristics, clear communication and technically competent project teams are most of the significant measures for optimising TC in SA construction projects. Therefore, this study recommends that a competent project team and a clear communication are fundamental to proper management of TC in SA construction projects.Keywords: construction projects, project cost, South Africa, transaction cost
Procedia PDF Downloads 984897 Effect of Pre-Construction on Construction Schedule and Client Loyalty
Authors: Jong Hoon Kim, Hyun-Soo Lee, Moonseo Park, Min Jeong, Inbeom Lee
Abstract:
Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client satisfaction. A total of 65 construction projects and 93 clients were investigated for this research in an attempt to identify (a) the relationship between pre-construction and schedule reduction, and (b) pre-construction and client loyalty. Based on the quantitative analysis, this research was able to establish a negative correlation based on 65 construction projects between pre-construction and project schedule existed. This finding represents that the more pre-construction is performed for a certain project, the overall construction schedule decreased. Then, to determine the relationship between pre-construction and client satisfaction, Net Promoter Score (NPS) of 93 clients from the 65 projects was utilized. Pre-construction and NPS was further analyzed and a positive correlation was found between the two. This infers that clients tend to be more satisfied with projects with higher ratio of pre-construction than those projects with less pre-construction.Keywords: client loyalty, NPS, pre-construction, schedule reduction
Procedia PDF Downloads 3604896 Pavement Quality Evaluation Using Intelligent Compaction Technology: Overview of Some Case Studies in Oklahoma
Authors: Sagar Ghos, Andrew E. Elaryan, Syed Ashik Ali, Musharraf Zaman, Mohammed Ashiqur Rahman
Abstract:
Achieving desired density during construction is an important indicator of pavement quality. Insufficient compaction often compromises pavement performance and service life. Intelligent compaction (IC) is an emerging technology for monitoring compaction quality during the construction of asphalt pavements. This paper aims to provide an overview of findings from four case studies in Oklahoma involving the compaction quality of asphalt pavements, namely SE 44th St project (Project 1) and EOC Turnpike project (Project 2), Highway 92 project (Project 3), and 108th Avenue project (Project 4). For this purpose, an IC technology, the intelligent compaction analyzer (ICA), developed at the University of Oklahoma, was used to evaluate compaction quality. Collected data include GPS locations, roller vibrations, roller speed, the direction of movement, and temperature of the asphalt mat. The collected data were analyzed using a widely used software, VETA. The average densities for Projects 1, 2, 3 and 4, were found as 89.8%, 91.50%, 90.7% and 87.5%, respectively. The maximum densities were found as 94.6%, 95.8%, 95.9%, and 89.7% for Projects 1, 2, 3, and 4, respectively. It was observed that the ICA estimated densities correlated well with the field core densities. The ICA results indicated that at least 90% of the asphalt mats were subjected to at least two roller passes. However, the number of passes required to achieve the desired density (94% to 97%) differed from project to project depending on the underlying layer. The results of these case studies show both opportunities and challenges in using IC for monitoring compaction quality during construction in real-time.Keywords: asphalt pavement construction, density, intelligent compaction, intelligent compaction analyzer, intelligent compaction measure value
Procedia PDF Downloads 1574895 A Case Study on Machine Learning-Based Project Performance Forecasting for an Urban Road Reconstruction Project
Authors: Soheila Sadeghi
Abstract:
In construction projects, predicting project performance metrics accurately is essential for effective management and successful delivery. However, conventional methods often depend on fixed baseline plans, disregarding the evolving nature of project progress and external influences. To address this issue, we introduce a distinct approach based on machine learning to forecast key performance indicators, such as cost variance and earned value, for each Work Breakdown Structure (WBS) category within an urban road reconstruction project. Our proposed model leverages time series forecasting techniques, namely Autoregressive Integrated Moving Average (ARIMA) and Long Short-Term Memory (LSTM) networks, to predict future performance by analyzing historical data and project progress. Additionally, the model incorporates external factors, including weather patterns and resource availability, as features to improve forecast accuracy. By harnessing the predictive capabilities of machine learning, our performance forecasting model enables project managers to proactively identify potential deviations from the baseline plan and take timely corrective measures. To validate the effectiveness of the proposed approach, we conduct a case study on an urban road reconstruction project, comparing the model's predictions with actual project performance data. The outcomes of this research contribute to the advancement of project management practices in the construction industry by providing a data-driven solution for enhancing project performance monitoring and control.Keywords: project performance forecasting, machine learning, time series forecasting, cost variance, schedule variance, earned value management
Procedia PDF Downloads 394894 Questionnaire for the Evaluation of Entrepreneurship Project Psychopedagogical Practices: Construction Proceedings and Validation
Authors: Cristina Costa-Lobo, Sandra Fernandes, Miguel Magalhães, José Dinis-Carvalho, Alfredo Regueiro, Ana Carvalho
Abstract:
This paper is a report on the findings of the construction and the validation of a questionnaire monetized in a portuguese higher education context with undergraduate students. The Questionnaire for the Evaluation of Entrepreneurship Project Psychopedagogical Practices consists of six scales: Critical appraisal of the project, Developed Learning and Skills, Teamwork, Teacher and Tutor Roles, Evaluation of Student Performance, and Project Effectiveness as a Teaching-Learning Methodology. The proceedings of its construction are analyzed, and the validity and internal consistency analysis are described. Findings indicate good indicators of validity, good fidelity and an interpretable factorial structure.Keywords: entrepreneurship project, higher education, psychopedagogical practices, teacher and tutor roles
Procedia PDF Downloads 381