28401 Promoting Innovation Pedagogy in a Capacity Building Project in Indonesia

Authors: Juha Kettunen

Abstract:

This study presents a project that tests and adjusts active European learning and teaching methods in Indonesian universities to increase their external impact on enterprises and other organizations; it also assesses the implementation of the Erasmus+ projects funded by the European Union. The project is based on the approach of innovation pedagogy that responds to regional development needs and integrates applied research and development projects into education to create capabilities for students to participate in development work after graduation. The assessment of the Erasmus+ project resulted in many improvements that can be made to achieve higher quality and innovativeness. The results of this study are useful for those who want to improve the applied research and development projects of higher education institutions.

Keywords: higher education, innovations, social network, project management

Procedia PDF Downloads 261
28400 International E-Learning for Assuring Ergonomic Working Conditions of Orthopaedic Surgeons: First Research Outcomes from Train4OrthoMIS

Authors: J. Bartnicka, J. A. Piedrabuena, R. Portilla, L. Moyano - Cuevas, J. B. Pagador, P. Augat, J. Tokarczyk, F. M. Sánchez Margallo

Abstract:

Orthopaedic surgeries are characterized by a high degree of complexity. This is reflected by four main groups of resources: 1) surgical team which is consisted of people with different competencies, educational backgrounds and positions; 2) information and knowledge about medical and technical aspects of surgery; 3) medical equipment including surgical tools and materials; 4) space infrastructure which is important from an operating room layout point of view. These all components must be integrated and build a homogeneous organism for achieving an efficient and ergonomically correct surgical workflow. Taking this as a background, there was formulated a concept of international project, called “Online Vocational Training course on ergonomics for orthopaedic Minimally Invasive” (Train4OrthoMIS), which aim is to develop an e-learning tool available in 4 languages (English, Spanish, Polish and German). In the article, there is presented the first project research outcomes focused on three aspects: 1) ergonomic needs of surgeons who work in hospitals around different European countries, 2) the concept of structure of e-learning course, 3) the definition of tools and methods for knowledge assessment adjusted to users’ expectation. The methodology was based on the expert panels and two types of surveys: 1) on training needs, 2) on evaluation and self-assessment preferences. The major findings of the study allowed describing the subjects of four training modules and learning sessions. According to peoples’ opinion there were defined most expected test methods which are single choice test and right after quizzes: “True or False” and “Link elements”. The first project outcomes confirmed the necessity of creating a universal training tool for orthopaedic surgeons regardless of the country in which they work. Because of limited time that surgeons have, the e-learning course should be strictly adjusted to their expectation in order to be useful.

Keywords: international e-learning, ergonomics, orthopaedic surgery, Train4OrthoMIS

Procedia PDF Downloads 159
28399 Systems Engineering and Project Management Process Modeling in the Aeronautics Context: Case Study of SMEs

Authors: S. Lemoussu, J. C. Chaudemar, R. A. Vingerhoeds

Abstract:

The aeronautics sector is currently living an unprecedented growth largely due to innovative projects. In several cases, such innovative developments are being carried out by Small and Medium sized-Enterprises (SMEs). For instance, in Europe, a handful of SMEs are leading projects like airships, large civil drones, or flying cars. These SMEs have all limited resources, must make strategic decisions, take considerable financial risks and in the same time must take into account the constraints of safety, cost, time and performance as any commercial organization in this industry. Moreover, today, no international regulations fully exist for the development and certification of this kind of projects. The absence of such a precise and sufficiently detailed regulatory framework requires a very close contact with regulatory instances. But, SMEs do not always have sufficient resources and internal knowledge to handle this complexity and to discuss these issues. This poses additional challenges for those SMEs that have system integration responsibilities and that must provide all the necessary means of compliance to demonstrate their ability to design, produce, and operate airships with the expected level of safety and reliability. The final objective of our research is thus to provide a methodological framework supporting SMEs in their development taking into account recent innovation and institutional rules of the sector. We aim to provide a contribution to the problematic by developing a specific Model-Based Systems Engineering (MBSE) approach. Airspace regulation, aeronautics standards and international norms on systems engineering are taken on board to be formalized in a set of models. This paper presents the on-going research project combining Systems Engineering and Project Management process modeling and taking into account the metamodeling problematic.

Keywords: aeronautics, certification, process modeling, project management, SME, systems engineering

Procedia PDF Downloads 146
28398 Design of a Multidisciplinary Project-Oriented Capstone Course for Mechanical Engineering Education

Authors: Chi-Cheng Cheng, Che-Hsin Lin, Yu-Jen Wang, Chua-Chin Wang

Abstract:

The project-oriented capstone course has become a required element for most engineering educational units. It is not only because the capstone course is an important criterion for international accreditation of engineering degree programs under Washington Accord, but also the capstone course provides an opportunity for students to apply what they have learned in their school years to actual engineering problems. Nevertheless, most project-oriented capstone courses are conducted with one single project for all students or teams. In other words, students work to reach the same or similar goals by coming up with different layouts and approaches. It appears not suitable for a multidisciplinary engineering department. Therefore, a one-year multidisciplinary project-oriented capstone course was designed for the junior year of the undergraduate program. About one-half of faculty members in the department needs to be involved in generating as many projects as possible to meet different students' interests and specialties. Project achievement has to be displayed and demonstrated in the annual exposition and competition at the end of this course. Significant success in attracting attention and hardworking of students on projects was witnessed for the past two pilot years. Analysis of course evaluation demonstrates positive impact on all perspectives despite of slightly negative influence due to poor communication and collaboration between students and their project supervisors.

Keywords: Capstone course, CDIO, engineering education, project-oriented learning

Procedia PDF Downloads 425
28397 Development of Regional Cooperation to Sustainable Implementation of Customary Refugee Solutions in International Arena

Authors: Md. Reduanul Haque

Abstract:

In recent time, more and more refugees are emerging in the international arena than the times ever that has come into the notice of world scholars. The prevailing customary solutions such as voluntary repatriation, local integration, and resettlement of refugee problem have been reflected unsustainable one for the lack of regional cooperation. In the international arena, the protraction of refugee problems is seen, and refugees are suffering due to the outrageous process of customary refugee solutions. If the regional cooperation can be developed, then the suffering of the refugees can be mitigated by the contribution of neighboring country and international and regional organizations. Data collected from the various secondary sources have been used throughout the research. It has been discussing in the refugee academia for a long time to develop regional cooperation mechanisms to ensure the sustainability of this solution and to make the environment of the country of origin for suitable voluntary repatriation as well as a durable solution. It is mainly qualitative research based on primary and secondary data will be studied on library-based project. Data collected by such methodology on this study indicates to make a bridge between the gaps of the cooperation mechanism and to make a more regional approach to share the burden and to strengthen the customary refugee solution. Hence, the importance of questing for a regional mechanism is to ensure the responsible countries to be more responsible towards refugees, their human rights, and durable solution under the mandate of the UNHCR. To implement effectively all the customary durable solutions, country to country or regional organization to organization based regional cooperation can be developed where the countries and regional organizations will work together to draw a sustainable solution to this problem in international context.

Keywords: refugee, regional cooperation, sustainable implementation, customary solutions, international arena

Procedia PDF Downloads 116
28396 Entrants’ Knowledge of the Host Country’s Institutional Environments: A Critical Success Factor of International Projects in Emerging Least Developed Countries

Authors: Rameshwar Dahal, S. Ping Ho

Abstract:

Although the demand for infrastructure development forms a promising market opportunity for international firms, the dominance of informal institutions over formal ones, investors are facing extraordinary institutional challenges when investing in emerging Least Developed Countries (LDCs). We believe that, in emerging LDCs, the project performance heavily depends on how well the entrants respond to the challenges exerted by the host institutional environments. Which primarily depends on how much they learn about the host institution and what strategy they apply in response. In Nepal, almost all international or global infrastructure projects are financed by international financers, so the procurement process of the infrastructure projects financed by foreign agencies is guided by the policies and regulations of the financer. Because of limited resources and the financers’ demand, contractors and consults are procured internationally. Moreover, the resources, including but not limited to construction material, manpower, and equipment, also need to be imported. Therefore, the involvement of international companies as an entrant in global infrastructure projects of LDCs is obvious. In a global project (GP), participants from different geographical and institutional environments hold different beliefs and have disparate interests. Therefore, the entrants face the challenges exerted by the host institutional environments. The entrants must either adapt to the institutions prevailing in the environment or resist the institutional pressures. It is hypothesized that, in emerging LDCs, the project performance heavily depends on how much the entrants learn about the host institutional knowledge and how well they respond to the institutional environments. While it is impossible to generalize the phenomenon and contextual conditions because of their vast diversity, this study has answered why and how participants’ level of institutional knowledge impacts the project's implementation performance. To draw that conclusion, firstly, we explored two typical GPs from Nepal. For this study, the data were collected by conducting interviews and examining the secondary data, such as the project reports published by the financers, project data provided by interviewees, and news reports. In an event analysis, firstly, we identify the sources, causes, or nature of the institutional challenges; secondly, we analyze the entrant’s responses to the exerted challenges and evaluate the impacts of the responses on the overall project performance. In this study, at first, the events occurred during the project implementation process have a causal link with the local institutions that demand the entrants’ response are extracted. Secondly, each event is scrutinized as the critical success factor of the case project. Finally, it is crucially examined whether and what institutional knowledge in these events played a critical role in project success or failure. The results also provide insights into the crucial institutional knowledge in LDCs and the subsequent strategy implications for undertaking projects in LDCs.

Keywords: emerging countries, LDC, project management, project performance, institutional knowledge, institutional theory

Procedia PDF Downloads 38
28395 Correlation between Funding and Publications: A Pre-Step towards Future Research Prediction

Authors: Ning Kang, Marius Doornenbal

Abstract:

Funding is a very important – if not crucial – resource for research projects. Usually, funding organizations will publish a description of the funded research to describe the scope of the funding award. Logically, we would expect research outcomes to align with this funding award. For that reason, we might be able to predict future research topics based on present funding award data. That said, it remains to be shown if and how future research topics can be predicted by using the funding information. In this paper, we extract funding project information and their generated paper abstracts from the Gateway to Research database as a group, and use the papers from the same domains and publication years in the Scopus database as a baseline comparison group. We annotate both the project awards and the papers resulting from the funded projects with linguistic features (noun phrases), and then calculate tf-idf and cosine similarity between these two set of features. We show that the cosine similarity between the project-generated papers group is bigger than the project-baseline group, and also that these two groups of similarities are significantly different. Based on this result, we conclude that the funding information actually correlates with the content of future research output for the funded project on the topical level. How funding really changes the course of science or of scientific careers remains an elusive question.

Keywords: natural language processing, noun phrase, tf-idf, cosine similarity

Procedia PDF Downloads 222
28394 Development Project, Land Acquisition and Rehabilitation: A Study of Navi Mumbai International Airport Project, India

Authors: Rahul Rajak, Archana Kumari Roy

Abstract:

Purpose: Development brings about structural change in the society. It is essential for socio-economic progress of the society, but it also causes pain to the people who are forced to displace from their motherland. Most of the people who are displaced due to development are poor and tribes. Development and displacement are interlinked with each other in the sense development sometimes leads to displacement of people. These studies mainly focus on socio-economic profile of villages and villagers likely to be affected by the Airport Project and they examine the issues of compensation and people’s level of satisfaction. Methodology: The study is based on Descriptive design; it is basically observational and correlation study. Primary data is used in this study. Considering the time and resource constrains, 100 people were interviewed covering socio-economic and demographic diversities from 6 out of 10 affected villages. Due to Navi Mumbai International Airport Project ten villages have to be displaced. Out of ten villages, this study is based on only six villages. These are Ulwe, Ganeshpuri, Targhar Komberbuje, Chincpada and Kopar. All six villages situated in Raigarh district under the Taluka Panvel in Maharashtra. Findings: It is revealed from the survey that there are three main castes of affected villages that are Agri, Koli, and Kradi. Entire village population of migrated person is very negligible. All three caste have main occupation are agricultural and fishing activities. People’s perception revealed that due to the establishment of the airport project, they may have more opportunities and scope of development rather than the adverse effect, but vigorously leave a motherland is psychological effect of the villagers. Research Limitation: This study is based on only six villages, the scenario of the entire ten affected villages is not explained by this research. Practical implication: The scenario of displacement and resettlement signifies more than a mere physical relocation. Compensation is not only hope for villagers, is it only give short time relief. There is a need to evolve institutions to protect and strengthen the right of Individuals. The development induced displacement exposed them to a new reality, the reality of their legality and illegality of stay on the land which belongs to the state. Originality: Mumbai has large population and high industrialized city have put land at the center of any policy implication. This paper demonstrates through the actual picture gathered from the field that how seriously the affected people suffered and are still suffering because of the land acquisition for the Navi Mumbai International Airport Project. The whole picture arise the question which is how long the government can deny the rights to farmers and agricultural laborers and remain unwilling to establish the balance between democracy and development.

Keywords: compensation, displacement, land acquisition, project affected person (PAPs), rehabilitation

Procedia PDF Downloads 284
28393 Effect of Pre-Construction on Construction Schedule and Client Loyalty

Authors: Jong Hoon Kim, Hyun-Soo Lee, Moonseo Park, Min Jeong, Inbeom Lee

Abstract:

Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client satisfaction. A total of 65 construction projects and 93 clients were investigated for this research in an attempt to identify (a) the relationship between pre-construction and schedule reduction, and (b) pre-construction and client loyalty. Based on the quantitative analysis, this research was able to establish a negative correlation based on 65 construction projects between pre-construction and project schedule existed. This finding represents that the more pre-construction is performed for a certain project, the overall construction schedule decreased. Then, to determine the relationship between pre-construction and client satisfaction, Net Promoter Score (NPS) of 93 clients from the 65 projects was utilized. Pre-construction and NPS was further analyzed and a positive correlation was found between the two. This infers that clients tend to be more satisfied with projects with higher ratio of pre-construction than those projects with less pre-construction.

Keywords: client loyalty, NPS, pre-construction, schedule reduction

Procedia PDF Downloads 333
28392 Understanding Indigenous Perspectives and Critical Knowledge in International Law

Authors: Radhika Jagtap

Abstract:

Contemporary scholarship in international legal theory is investigating new avenues of providing alternatives to dominant concepts. Indigenous peoples’ philosophies and perspectives developed through them provide a fertile ground to explore similar alternative ideas. This review paper evaluates the theorized accounts of indigenous scholarships which have contributed towards a rich body of knowledge generating alternative visions on dominant notions of ‘post coloniality’, ‘resistance’ and ‘globalization’. Further, it shall assess the relevance of such a project in shaping contemporary international legal thought. Traditional or classical international law has been opined to be highly influenced by the colonial and imperialist history which also left a mark on the way dominant discourses of resistance and globalization are read in mainstream international law. The paper shall first define what do we mean by indigenous philosophy and what kind of indigeneity is that inclusive of. Second, the paper defines the dominant discourse and then counters the same with the alternative indigenous perspective in the case of each concept that is in question. Finally, the paper shall conclude with certain theoretical findings – that the post coloniality, from indigenous perspective, lead to the further marginalization of indigeneity, especially in the third world; that human rights as the sole means of representing resistance in international law ends up making it a very state-centric discipline and last, that globalization from an indigenous, marginalised perspective is not as celebrated as it is in mainstream international law. Major scholarly works that shall be central to the discussion are those of Linda Tuiwahi Smith, Ella Shohat and David Harvey. The nature of the research shall be inductive and involve mostly theoretical review of scholarly works.

Keywords: indigenous, post colonial, globalization, perspectives

Procedia PDF Downloads 304
28391 Empirical Study on Causes of Project Delays

Authors: Khan Farhan Rafat, Riaz Ahmed

Abstract:

Renowned offshore organizations are drifting towards collaborative exertion to win and implement international projects for business gains. However, devoid of financial constraints, with the availability of skilled professionals, and despite improved project management practices through state-of-the-art tools and techniques, project delays have become a norm these days. This situation calls for exploring the factor(s) affecting the bonding between project management performance and project success. In the context of the well-known 3M’s of project management (that is, manpower, machinery, and materials), machinery and materials are dependent upon manpower. Because the body of knowledge inveterate on the influence of national culture on men, hence, the realization of the impact on the link between project management performance and project success need to be investigated in detail to arrive at the possible cause(s) of project delays. This research initiative was, therefore, undertaken to fill the research gap. The unit of analysis for the proposed research excretion was the individuals who had worked on skyscraper construction projects. In reverent studies, project management is best described using construction examples. It is due to this reason that the project oriented city of Dubai was chosen to reconnoiter on causes of project delays. A structured questionnaire survey was disseminated online with the courtesy of the Project Management Institute local chapter to carry out the cross-sectional study. The Construction Industry Institute, Austin, of the United States of America along with 23 high-rise builders in Dubai were also contacted by email requesting for their contribution to the study and providing them with the online link to the survey questionnaire. The reliability of the instrument was warranted using Cronbach’s alpha coefficient of 0.70. The appropriateness of sampling adequacy and homogeneity in variance was ensured by keeping Kaiser–Meyer–Olkin (KMO) and Bartlett’s test of sphericity in the range ≥ 0.60 and < 0.05, respectively. Factor analysis was used to verify construct validity. During exploratory factor analysis, all items were loaded using a threshold of 0.4. Four hundred and seventeen respondents, including members from top management, project managers, and project staff, contributed to the study. The link between project management performance and project success was significant at 0.01 level (2-tailed), and 0.05 level (2-tailed) for Pearson’s correlation. Before initiating the moderator analysis test for linearity, multicollinearity, outliers, leverage points and influential cases, test for homoscedasticity and normality were carried out which are prerequisites for conducting moderator review. The moderator analysis, using a macro named PROCESS, was performed to verify the hypothesis that national culture has an influence on the said link. The empirical findings, when compared with Hofstede's results, showed high power distance as the cause of construction project delays in Dubai. The research outcome calls for the project sponsors and top management to reshape their project management strategy and allow for low power distance between management and project personnel for timely completion of projects.

Keywords: causes of construction project delays, construction industry, construction management, power distance

Procedia PDF Downloads 187
28390 The Management of the Urban Project between Challenge and Need: The Case of the Modernization Project of Constantine

Authors: Mouhoubi Nedjima, Sassi Boudemagh Souad

Abstract:

In this article, and through the modernization project of metropolis of Constantine (PMMC) experience in Algeria, discussed to highlight the importance of management in an urban project at various levels: strategic and operational. The statement we attended to reach is to evaluate the modernization project of metropolis of Constantine in the light of management and prove the relation between a good urban management and the success of an urban project.

Keywords: urban project, strategic management, operational management, the modernization project of constantine

Procedia PDF Downloads 489
28389 Shipboard Power Plant Design as Senior Design Project

Authors: Hesham Shaalan

Abstract:

Senior design projects teach students many important skills. One of the major goals is to prepare students to apply effective problem-solving techniques to a problem that represents a real-world situation. This includes the ability to define the problem, compare alternative solutions, identify the best solution, and design the system. This paper describes the design of a shipboard power plant as a senior project in the Marine Engineering program at the U.S. Merchant Marine Academy. The design project was supervised by faculty members who guided a multidisciplinary group of seniors. The research project was sponsored by the Office of Naval Research. Each group of seniors focused on one of the main design aspects of the project, including the electric power system, nuclear power plant, ship hull design, and economics.

Keywords: senior design project, shipboard power system, engineering education, marine engineering

Procedia PDF Downloads 54
28388 Impacts of International Training Program in Pedagogy in Higher Education in the United States on Visiting Scholars in China

Authors: Yuliang Liu, Thomas Lavallee, Mary Weishaar, Gretchen Fricke, Huaibo Xin

Abstract:

The longitudinal study was designed to investigate the impacts of the International Training Program in Pedagogy (ITPP) at a midwestern institution in the United States on the visiting scholars from China from 2012-18. The study used the survey research method and involved 48 visiting scholars from Northwest Normal University in China in those eight ITPP cohorts. The results of both quantitative and qualitative data were critically examined and indicated both types of data sources revealed similar findings. It was found that the ITPP has significantly affected all scholars' instruction in China. International implications resulted from the study.

Keywords: international training program in pedagogy, visiting scholars, survey research method, International implications

Procedia PDF Downloads 183
28387 Re-Defining Academic Literacy: An Information Literacy Approach to Helping Chinese International Students Succeed in American Colleges

Authors: Yi Ding

Abstract:

With the upsurge of Chinese international students in American higher education, serious academic problems Chinese international students are suffering from are also striking. While most practices and research in higher education focus on the role of professors, writing centers, and tutoring centers to help international students succeed in college, this research study focuses on a more fundamental skill that is neglected in most conversations: information literacy, which is usually addressed by academic librarians. Transitioning from an East-Asian, developing educational system that values authority, set knowledge more than independent thinking, scholarly conversation, Chinese international students need support from academic librarians to acquire information literacy, which is crucial to understand expectations of a Western academic setting and thus to succeed in college. This research study illustrates how academic librarians can play an integral role in helping Chinese international students acclimate to the expectations of American higher education by teaching information literacy as academic literacy unique to the Western academic setting. Six keys of information literacy put forward by Association of College and Research Libraries, which are 'Authority Is Constructed and Contextual', 'Information Creation as a Process', 'Information Has Value', 'Research as Inquiry', 'Scholarship as Conversation', and 'Searching as Strategic Exploration', are analyzed through the lens of Chinese educational system and students’ backgrounds. Based on the analysis as well as results from surveys and interviews among academic librarians, professors, and international students, this research further examines current practices from a wide range of academic libraries and finally, provides evidence-based recommendations for academic librarians to use information literacy instruction to help Chinese international students succeed in American higher education.

Keywords: academic librarians, Chinese international students, information literacy, student success

Procedia PDF Downloads 215
28386 Ranking the Factors That Influence the Construction Project Success: The Jordanian Perspective

Authors: Ghanim A. Bekr

Abstract:

Project success is what must be done for the project to be acceptable to the client, stakeholders and end-users who will be affected by the project. The study of project success and the critical success factors (CSFs) are the means adopted to improve the effectiveness of project. This research is conducted to make an attempt to identify which variables influence the success of project implementation. This study has selected, through an extensive literature review and interviews, (83) factors categorized in (7) groups that the questionnaire respondents were asked to score. The responses from 66 professionals with an average of 15 years of experience in different types of construction projects in Jordan were collected and analyzed using SPSS and most important factors for success for various success criteria are presented depending on the relative importance index to rank the categories. The research revealed the significant groups of factors are: Client related factors, Contractor’s related factors, Project Manager (PM) related factors, and Project management related factors. In addition the top ten sub factors are: Assertion of the client towards short time of the project, availability of skilled labor, Assertion of the client towards high level of the quality, capability of the client in taking risk, previous experience of the PM in similar projects, previous experience of the contractor in similar projects, decision making by the client/ the client’s representative at the right time, assertion of client towards low cost of project, experience in project management in previous projects, and flow of the information among parties. The results would be helpful to construction project professionals in taking proactive measures for successful completion of construction projects in Jordan.

Keywords: construction projects, critical success factors, Jordan, project success

Procedia PDF Downloads 132
28385 Support for Refugee Entrepreneurs Through International Aid

Authors: Julien Benomar

Abstract:

The World Bank report published in April 2023 called “Migrants, Refugees and Society” allows us to first distinguish migrants in search of economic opportunities and refugees that flee a situation of danger and choose their destination based on their immediate need for safety. Amongst those two categories, the report distinguished people having professional skills adapted to the labor market of the host country and those who have not. Out of that distinction of four categories, we choose to focus our research on refugees that do not have professional skills adapted to the labor market of the host country. Given that refugees generally have no recourse to public assistance schemes and cannot count on the support of their entourage or support network, we propose to examine the extent to which external assistance, such as international humanitarian action, is likely to accompany refugees' transition to financial empowerment through entrepreneurship. To this end, we propose to carry out a case study structured in three stages: (i) an exchange with a Non-Governmental Organisation (NGO) active in supporting refugee populations from Congo and Burundi to Rwanda, enabling us to (i.i) define together a financial empowerment income, and (i. ii) learn about the content of the support measures taken for the beneficiaries of the humanitarian project; (ii) monitor the population of 118 beneficiaries, including 73 refugees and 45 Rwandans (reference population); (iii) conduct a participatory analysis to identify the level of performance of the project and areas for improvement. The case study thus involved the staff of an international NGO active in helping refugees from Rwanda since 2015 and the staff of a Luxembourg NGO that has been funding this economic aid project through entrepreneurship since 2021. The case study thus involved the staff of an international NGO active in helping refugees from Rwanda since 2015 and the staff of a Luxembourg NGO, which has been funding this economic aid through an entrepreneurship project since 2021, and took place over a 48-day period between April and May 2023. The main results are of two types: (i) the need to associate indicators for monitoring the impact of the project on the indirect beneficiaries of the project (refugee community) and (ii) the identification of success factors making it possible to bring concrete and relevant responses to the constraints encountered. The first result thus made it possible to identify the following indicators: Indicator of community potential ((jobs, training or mentoring) promoted by the activity of the entrepreneur), Indicator of social contribution (tax paid by the entrepreneur), Indicator of resilience (savings and loan capacity generated, and finally impact on social cohesion. The second result made it possible to identify that among the 7 success factors tested, the sector of activity chosen and the level of experience in the sector of the future activity are those that stand out the most clearly.

Keywords: entrepreuneurship, refugees, financial empowerment, international aid

Procedia PDF Downloads 50
28384 Multi-Objective Multi-Mode Resource-Constrained Project Scheduling Problem by Preemptive Fuzzy Goal Programming

Authors: Busaba Phurksaphanrat

Abstract:

This research proposes a pre-emptive fuzzy goal programming model for multi-objective multi-mode resource constrained project scheduling problem. The objectives of the problem are minimization of the total time and the total cost of the project. Objective in a multi-mode resource-constrained project scheduling problem is often a minimization of make-span. However, both time and cost should be considered at the same time with different level of important priorities. Moreover, all elements of cost functions in a project are not included in the conventional cost objective function. Incomplete total project cost causes an error in finding the project scheduling time. In this research, pre-emptive fuzzy goal programming is presented to solve the multi-objective multi-mode resource constrained project scheduling problem. It can find the compromise solution of the problem. Moreover, it is also flexible in adjusting to find a variety of alternative solutions.

Keywords: multi-mode resource constrained project scheduling problem, fuzzy set, goal programming, pre-emptive fuzzy goal programming

Procedia PDF Downloads 406
28383 Demystifying the Legitimacy of the International Court of Justice

Authors: Roger-Claude Liwanga

Abstract:

Over the last seven decades, there has been a proliferation of international tribunals. Yet, they have not received unanimous approval, raising a question about their legitimacy. A legitimate international tribunal is one whose authority to adjudicate international disputes is perceived as justified. Using the case study of the International Court of Justice (ICJ), this article highlights the three criteria that should be considered in assessing the legitimacy of an international tribunal, which include legal, sociological, and moral elements. It also contends that the ICJ cannot claim 'full' legitimacy if any of these components of legitimacy is missing in its decisions. The article further suggests that the legitimacy of the ICJ has a dynamic nature, as litigating parties may constantly change their perception of the court’s authority at any time before, during, or after the judicial process. The article equally describes other factors that can contribute to maintaining the international court’s legitimacy, including fairness and unbiasedness, sound interpretation of international legal norms, and transparency.

Keywords: international tribunals, legitimacy, human rights, international law

Procedia PDF Downloads 349
28382 Genetic Algorithms Multi-Objective Model for Project Scheduling

Authors: Elsheikh Asser

Abstract:

Time and cost are the main goals of the construction project management. The first schedule developed may not be a suitable schedule for beginning or completing the project to achieve the target completion time at a minimum total cost. In general, there are trade-offs between time and cost (TCT) to complete the activities of a project. This research presents genetic algorithms (GAs) multi-objective model for project scheduling considering different scenarios such as least cost, least time, and target time.

Keywords: genetic algorithms, time-cost trade-off, multi-objective model, project scheduling

Procedia PDF Downloads 395
28381 The International Labor Organization and the Formulation of International Labor Standards

Authors: Tahraoui Boualem

Abstract:

The International Labor Organization is one of the specialized agencies of the United Nations, and it is the only organization within the United Nations system that is distinguished by its tripartite legitimacy and which simultaneously includes governments, workers' and employers' organizations of its member states in a joint effort to set standards and policies Work to promote decent work in various parts of the world, and the expression of international labor standards basically means two types of documents, namely international labor agreements and international labor recommendations, and so far its general conference, which is held annually, has set a number of standards, the number of which has reached 184 agreements and 192 recommendations so far. For this reason, it is decided to clarify the International Labor Organization and the formulation of international labor standards within two sections. In the first topic, the researcher discusses the concept of the International Labor Organization, and in the second topic, it highlights the legal basis for the authority of the International Labor Organization in protecting the rights of workers.

Keywords: international labor, international labor standards, rights of workers, nation’s system

Procedia PDF Downloads 48
28380 The Artificial Intelligence (AI) Impact on Project Management: A Destructive or Transformative Agent

Authors: Kwame Amoah

Abstract:

Artificial intelligence (AI) has the prospect of transforming project management, significantly improving efficiency and accuracy. By automating specific tasks with defined guidelines, AI can assist project managers in making better decisions and allocating resources efficiently, with possible risk mitigation. This study explores how AI is already impacting project management and likely future AI's impact on the field. The AI's reaction has been a divided opinion; while others picture it as a destroyer of jobs, some welcome it as an innovation advocate. Both sides agree that AI will be disruptive and revolutionize PM's functions. If current research is to go by, AI or some form will replace one-third of all learning graduate PM jobs by as early as 2030. A recent survey indicates AI spending will reach $97.9 billion by the end of 2023. Considering such a profound impact, the project management profession will also see a paradigm shift driven by AI. The study examines what the project management profession will look like in the next 5-10 years after this technological disruption. The research methods incorporate existing literature, develop trend analysis, and conduct structured interviews with project management stakeholders from North America to gauge the trend. PM professionals can harness the power of AI, ensuring a smooth transition and positive outcomes. AI adoption will maximize benefits, minimize adverse consequences, and uphold ethical standards, leading to improved project performance.

Keywords: project management, disruptive teacnologies, project management function, AL applications, artificial intelligence

Procedia PDF Downloads 52
28379 Transformation of the Institutionality of International Cooperation in Ecuador from 2007 to 2017: 2017: A Case of State Identity Affirmation through Role Performance

Authors: Natalia Carolina Encalada Castillo

Abstract:

As part of an intended radical policy change compared to former administrations in Ecuador, the transformation of the institutionality of international cooperation during the period of President Rafael Correa was considered as a key element for the construction of the state of 'Good Living'. This intention led to several regulatory changes in the reception of cooperation for development, and even the departure of some foreign cooperation agencies. Moreover, Ecuador launched the initiative to become a donor of cooperation towards other developing countries through the ‘South-South Cooperation’ approach. All these changes were institutionalized through the Ecuadorian System of International Cooperation as a new framework to establish rules and policies that guarantee a sovereign management of foreign aid. Therefore, this research project has been guided by two questions: What were the factors that motivated the transformation of the institutionality of international cooperation in Ecuador from 2007 to 2017? and, what were the implications of this transformation in terms of the international role of the country? This paper seeks to answer these questions through Role Theory within a Constructivist meta-theoretical perspective, considering that in this case, changes at the institutional level in the field of cooperation, responded not only to material motivations but also to interests built on the basis of a specific state identity. The latter was only possible to affirm through specific roles such as ‘sovereign recipient of cooperation’ as well as ‘donor of international cooperation’. However, the performance of these roles was problematic as they were not easily accepted by the other actors in the international arena or in the domestic level. In terms of methodology, these dynamics are analyzed in a qualitative way mainly through interpretive analysis of the discourse of high-level decision-makers from Ecuador and other cooperation actors. Complementary to this, document-based research of relevant information as well as interviews have been conducted. Finally, it is concluded that even if material factors such as infrastructure needs, trade and investment interests, as well as reinforcement of state control and monitoring of cooperation flows, motivated the institutional transformation of international cooperation in Ecuador; the essential basis of these changes was the search for a new identity for the country to be projected in the international arena. This identity started to be built but continues to be unstable. Therefore, it is important to potentiate the achievements of the new international cooperation policies, and review their weaknesses, so that non-reimbursable cooperation funds received as well as ‘South-South cooperation’ actions, contribute effectively to national objectives.

Keywords: Ecuador, international cooperation, Role Theory, state identity

Procedia PDF Downloads 173
28378 Agile Project Management: A Real Application in a Multi-Project Research and Development Center

Authors: Aysegul Sarac

Abstract:

The aim of this study is to analyze the impacts of integrating agile development principles and practices, in particular to reduce project lead time in a multi-project environment. We analyze Arçelik Washing Machine R&D Center in which multiple projects are conducted by shared resources. In the first part of the study, we illustrate the current waterfall model system by using a value stream map. We define all activities starting from the first idea of the project to the customer and measure process time and lead time of projects. In the second part of the study we estimate potential improvements and select a set of these improvements to integrate agile principles. We aim to develop a future state map and analyze the impacts of integrating lean principles on project lead time. The main contribution of this study is that we analyze and integrate agile product development principles in a real multi-project system.

Keywords: agile project management, multi project system, project lead time, product development

Procedia PDF Downloads 278
28377 The Need for Implementing Building Information Modelling (BIM) and Integrated Project Delivery (IPD) in the Construction Project: A Case Study in UAE

Authors: C. W. F. Che Wan Putra, M. Alshawi, M. S. Al Ahbabi, M. Jabakhanji

Abstract:

Much of the waste that is generated throughout the life-cycle of a building is mainly related to project stakeholders not having access to information that others have created. This results in waste and high costs. Over the past decade, however, the industry reacted to these challenges by adopting effective procurement approaches, such as partnering and design and build, to improve collaboration and communication among projects’ stakeholders. Most recently, there is a focus on creating and reusing digital project information of stakeholders throughout the life-cycle to facilitate the exchange of information among partners. This shift is based around BIM (Building Information Modelling) and collaborative environment (IPD). The power of collaborative BIM goes beyond improving efficiency. Sustainability, perhaps the most important challenge for the design and construction community, is at the intersection of BIM and collaborative project delivery, drawing strength from both. Due to these benefits, a research study has been carried out to investigate the need of BIM and IPD, on a large scale construction project which is procured on a traditional approach, i.e. design-bid-build. A qualitative research work including a semi-structured interview with project partners was conducted on a typical project in the UAE, whereby the selected project suffered from severe delays and cost overrun. This paper aims to bring about clear evidence to what most likely to happen to a typical construction project in spite of employing very good consultants, project manager and contractors and how these problems could have been avoided if BIM and IPD were deployed.

Keywords: building information modelling (BIM), integrated project delivery (IPD), collaborative environment, case study

Procedia PDF Downloads 377
28376 Managing Early Stakeholder Involvement at the Early Stages of a Building Project Life Cycle

Authors: Theophilus O. Odunlami, Hasan Haroglu, Nader Saleh-Matter

Abstract:

The challenges facing the construction industry are often worsened by the compounded nature of projects coupled with the complexity of key stakeholders involved at different stages of the project. Projects are planned to achieve outlined benefits in line with the business case; however, a lack of effective management of key stakeholders can result in unrealistic delivery aspirations, unnecessary re-works, and overruns. The aim of this study is to examine the early stages of a project lifecycle and investigate the stakeholder management and involvement processes and their impact on the successful delivery of the project. The research engaged with conventional construction organisations and project personnel and stakeholders on diverse projects, using a research strategy to analyse existing project case studies, narrative enquiries, interviews, and surveys using a combined qualitative, quantitative, and mixed method of analysis. Research findings have shown that the involvement of stakeholders at different levels during the early stages has pronounced effects on project delivery; it helps to forge synergy and promotes a clear understanding of individual responsibilities, strengths, and weaknesses. This has often fostered a positive sense of productive collaboration right through the early stages of the project. These research findings intend to contribute to the development of a process framework for stakeholder and project team involvement in the early stages of a project. This framework will align with the selection criteria for stakeholders, contractors, and resources, ultimately contributing to the successful completion of projects. The primary question addressed in this study is stakeholder involvement and management of the early stages of a building project life cycle impacts project delivery. Findings showed that early-stage stakeholder involvement and collaboration between project teams and contractors significantly contribute to project success. However, a strong and healthy communication strategy would be required to maintain the flow of value-added ideas among stakeholders at the early stages to benefit the project at the execution stage.

Keywords: early stages, project lifecycle, stakeholders, decision-making strategy, project framework

Procedia PDF Downloads 64
28375 The Role of International Organizations in the Implementation of Return Migration Policy in Cameroon

Authors: Charles Simplice Mbatsogo Mebo

Abstract:

With growth picking up again, Africa seems increasingly attractive for its own nationals who return home through new opportunities available for them. The purpose of our research paper is to understand the role of the international partners in Cameroon, with regards to their support for the return and reintegration of migrants. We, therefore, questioned the relevance and effectiveness and efficacy of international instruments in reintegrating returnees to Cameroon. After our analysis that was conducted on the basis of a documentary exploration, interviews, and field surveys, it appears that the contribution of the international partners in Cameroon is proven in relation to their participation in the financing and placement of returned experts. However, their contribution remains insufficient due to their low level of deployment and the insignificant impact of their investments on the reintegration of Cameroonian Diasporas. The research also reveals some exogenous and endogenous constraints that hinder international institutions' actions in terms of accompanying migrants returning to Cameroon. Finally, for a better management of the returnees' issue, it is necessary to set up a mechanism to raise awareness and a coordination system of all international actors involved. It is also relevant to reform the migration policy, build institutional capacities, and improve the juridical-administrative and economic environment so as to favor co-development in Cameroon.

Keywords: international partners, returnees, diaspora, migration policy, co-development

Procedia PDF Downloads 124
28374 Designing and Making Sustainable Architectural Clothing Inspired by Reconstruction of Bam’s Bazaar

Authors: Marzieh Khaleghi Baygi, Maryam Khaleghy Baygy

Abstract:

The main aim of this project was designing and making sustainable architectural wearable dress inspired by reconstruction project of Bam’s Bazar in Iran. To achieve the goals of this project, Bam Bazar became the architectural reference. A mixed research method (including applied, qualitative and case studies methods) was used. After research, data gathering and considering related intellectual, mental and cultural background, the garment was modeled by using 3ds Max's modeling tools and Marvelous. After making the pattern, the wearable architecture was built and an architectural and historical building converted to a clothing. The implementation of sustainable architectural clothing, took seventeen months. The result of this project was a cloth in a new form that had been worn on its architect body. The comparison between present project and previous research were focusing on the same subjects (architectural clothing) shows some dramatic differentiations, including, the architect, designer and executive of this project was the same person who was the main researcher. Also, in this research, special attention was paid to the sustainability, volume and forms. Most projects in this subject (especially pervious related Iranian research) relied on painting and not on the volumes and forms. The sustainable immovable architecture had worn on its architect, became a cloth on a human's body that was moving.

Keywords: wearable architecture, clothing, bam bazar, space, sustainability

Procedia PDF Downloads 41
28373 Connecting Students and Faculty Research Efforts through the Research and Projects Portal

Authors: Havish Nalapareddy, Mark V. Albert, Ranak Bansal, Avi Udash, Lin Lin

Abstract:

Students engage in many course projects during their degree programs. However, impactful projects often need a time frame longer than a single semester. Ideally, projects are documented and structured to be readily accessible to future students who may choose to continue the project, with features that emphasize the local community, university, or course structure. The Research and Project Portal (RAPP) is a place where students can post both their completed and ongoing projects with all the resources and tools used. This portal allows students to see what other students have done in the past, in the same university environment, related to their domain of interest. Computer science instructors or students selecting projects can use this portal to assign or choose an incomplete project. Additionally, this portal allows non-computer science faculty and industry collaborators to document their project ideas for students in courses to prototype directly, rather than directly soliciting the help of instructors in engaging students. RAPP serves as a platform linking students across classes and faculty both in and out of computer science courses on joint projects to encourage long-term project efforts across semesters or years.

Keywords: education, technology, research, academic portal

Procedia PDF Downloads 118
28372 Risk Assessment for International Investment: A Standardized Approach to Identify Risk, Risk Appetite, Risk Rating, Risk Treatment and Mitigation Plans

Authors: Pui Yong Leo, Normy Maziah Mohd Said

Abstract:

Change of global economy landscape and business environment has led to companies’ decision to go global and enter international markets. As the companies go beyond the comfort zone (i.e. investing in the home country), it is important to ensure a comprehensive risk assessment is carried out. This paper describes a standardized approach for international investment, ensuring identification of risk, risk appetite, risk rating, risk treatment and mitigation plans for respective international investment proposal. The standardized approach is divided into three (3) stages as follows: Stage 1 – Preliminary Risk profiling; with the objective to gauge exposure to countries and high level risk factors as first level assessment. Stage 2 – Risk Parameters; with the objective to define risk appetite for the international investment from the perspective of likelihood and impact. Stage 3 – Detailed Risk Assessments; with the objectives to assess in detail any triggered elements from Stage 1, and project specific risks. The final output will include the mitigation plans for the identified risks for the total investment. Example will be given in this paper to show how comprehensive risk assessment is carried out for an international investment in power energy sector.

Keywords: international investment, mitigation plans, risk appetite, risk assessment

Procedia PDF Downloads 351