2163 An Introduction to Critical Chain Project Management Methodology

Authors: Ranjini Ramanath, Nanjunda P. Swamy

Abstract:

Construction has existed in our lives since time immemorial. However, unlike any other industry, construction projects have their own unique challenges – project type, purpose and end use of the project, geographical conditions, logistic arrangements, largely unorganized manpower and requirement of diverse skill sets, etc. These unique characteristics bring in their own level of risk and uncertainties to the project, which cause the project to deviate from its planned objectives of time, cost, quality, etc. over the many years, there have been significant developments in the way construction projects are conceptualized, planned, and managed. With the rapid increase in the population, increased rate of urbanization, there is a growing demand for infrastructure development, and it is required that the projects are delivered timely, and efficiently. In an age where ‘Time is Money,' implementation of new techniques of project management is required in leading to successful projects. This paper proposes a different approach to project management, which if applied in construction projects, can help in the accomplishment of the project objectives in a faster manner.

Keywords: critical chain project management methodology, critical chain, project management, construction management

Procedia PDF Downloads 402
2162 Identification of Social Responsibility Factors within Mega Construction Projects

Authors: Ali Alotaibi, Francis Edum-Fotwe, Andrew Price /

Abstract:

Mega construction projects create buildings and major infrastructure to respond to work and life requirements while playing a vital role in promoting any nation’s economy. However, the industry is often criticised for not balancing economic, environmental and social dimensions of their projects, with emphasis typically on one aspect to the detriment of the others. This has resulted in many negative impacts including environmental pollution, waste throughout the project lifecycle, low productivity, and avoidable accidents. The identification of comprehensive Social Responsibility (SR) indicators, which combine social, environmental and economic aspects, is urgently needed. This is particularly the case in the context of the Kingdom of Saudi Arabia (KSA), which often has mega public construction projects. The aim of this paper is to develop a set of wide-ranging SR indicators which encompass social, economic and environmental aspects unique to the KSA. A qualitative approach was applied to explore relevant indicators through a review of the existing literature, international standards and reports. A list of appropriate indicators was developed, and its comprehensiveness was corroborated by interviews with experts on mega construction projects working with SR concepts in the KSA. The findings present 39 indicators and their metrics, covering 10 economic, 12 environmental and 17 social aspects of SR mapped against their references. These indicators are a valuable reference for decision-makers and academics in the KSA to understand factors related to SR in mega construction projects. The indicators are related to mega construction projects within the KSA and require validation in a real case scenario or within a different industry to demonstrate their generalisability.

Keywords: social responsibility, construction projects, economic, social, environmental, indicators

Procedia PDF Downloads 141
2161 Factors Affecting Time Performance in Building Construction Projects

Authors: Ibraheem A. K. Mahameed

Abstract:

The aim of this study is to identify the risks affecting time performance of building construction projects in the West Bank in Palestine from contractors’ viewpoint. 38 risks that might affect time performance of building construction projects were defined through a detailed literature review. These risks have been classified into 6 groups: project, managerial, consultant, financial, external, and construction items. A questionnaire survey was performed to rank the considered risks in terms of severity and frequency. The analysis of the survey indicated that the top five risks affecting time performance of building construction projects in Palestine are: award project to the lowest price, political situation, poor communication and coordination between construction parties, change orders, and financial status of contractor.

Keywords: delay, time performance, construction, building

Procedia PDF Downloads 442
2160 Examination of the Impact of Projects Based on Reggio Emilia Approach on the Creative Thinking Skills of Preschool Children: A Qualitative Study

Authors: Arzu Akar Gençer, Mübeccel Gönen

Abstract:

The objective of the study is to investigate the impact of the projects based on Reggio Emilia Approach, on the creative thinking skills of preschool children. The study is carried out with eighteen 6 years old children in a class of a preschool, and entailed the development of projects based on Reggio Emilia approach with the children, for a period of 3 months. The study employs qualitative model. The children were analyzed with reference to the creative thinking aspects (rationality, originality, flexibility, and applicability) of the projects applied. As the projects based on Reggio Emilia approach arose out of the interests and curiosity of the children, and had their roots in the existing class culture, it is possible to conclude that they have an impact on the creativity of the children with reference to the aspects of creative thinking.

Keywords: Reggio Emilia approach, project, creativity, preschool children

Procedia PDF Downloads 551
2159 Problems in Establishing Alliances to Comply with SDG 17 in the Successful Execution of Environmental Conservation Projects

Authors: Elena Bulmer

Abstract:

The research for this study has found that the formation of alliances for the successful revitalization of the global partnership for sustainable development, as defined by UN Sustainable Development Goal 17, entails considerable difficulty. This study uses for its empirical work marine environmental conservation projects and analyses the potential involvement of nonhuman actors as primordial stakeholders in these types of projects. The idea is to extend the scope of SDG 17 for it to also consider nonhuman subjects in order for it to better achieve its goal. The results of this study may be extrapolated to the business and management fields, which depend on natural resources for the development of their products. In the same way, in these areas, natural resources as nonhuman actors are not present in the stakeholder maps of these projects. Environmental Conservation projects are thus especially interesting to study with regards to their stakeholder context and have been used as the experimental setting for the empirical work of this study. The primordial stakeholders of these projects are not social objects and therefore go beyond the present limits of present stakeholder theory. The study that has been used to analyse this concept is a marine conservation project based in Spain, and to shed light in potential extending the role of the 17th Sustainable Development Goal to include nonhuman beings to be able to better achieve the rest of the SDGs, in this case, SDG 14 whose aim is to promote the conservation and sustainability of the world´s oceans.

Keywords: SDG 17, sustainability, stakeholder management, environmental conservation projects

Procedia PDF Downloads 189
2158 Partner Selection for Innovation Projects Related to New Product Concept Design

Authors: Odd Jarl Borch, Marina Z. Solesvik

Abstract:

The paper analyses partner selection approaches related to large scale R&D-based innovation projects at the different stages of development. We emphasize innovation projects in the maritime value chain and how partners are selected to improve quality according to high spec customer demands, and to reduce investment costs on new production technology such as advanced offshore service vessels. We elaborate on the differences in innovation approach and especially the role that purposive inflows and outflows of knowledge from external partners may be used to accelerate internal innovation. We present three cases related to different projects in terms of specificity and scope. We explore how the partner selection criteria change over time when the goals move from wide scope to a very specific R&D tasks.

Keywords: partner selection, innovation, offshore industry, concept design

Procedia PDF Downloads 494
2157 Analysis of Delay Causes in Construction Projects in Saudi Arabia

Authors: Ibrahim Mahamid, A. Al-Ghonamy, M. Aichouni

Abstract:

This study aims at identifying the risk matrix for delay causes in construction projects in Saudi Arabia from consultants’ viewpoint. A questionnaire survey was undertaken of 51 consultants working on construction projects in the Northern Province of Saudi Arabia. 35 delay causes were identified through a literature review. The study concluded that the top delay causes in construction projects in Saudi Arabia from consultants’ perspective are: bid award for lowest price, changes in material types and specifications during construction, contract management, duration of contract period, fluctuation of prices of materials, frequent changes in design, improper planning, inflationary pressure, lack of adequate manpower, long period of design and time of implementation, payments delay, poor labor productivity, and rework.

Keywords: delays, construction, consultants, contributors, risk map

Procedia PDF Downloads 516
2156 Major Causes of Delay in Construction Projects

Authors: Y. Gholipour, E. Rezazadeh

Abstract:

Delay is one of the most serious and common problems of construction project that can affect project delivery unfavorably. This research presents the most important causes of delay in large dam projects based on a survey on some executed dam construction in Iran. In this survey a randomly selected samples of owners, consultants and contractors have been involved. The outcome of this survey revealed that scheduled payments, site management, shop drawing review process, unforeseen ground conditions and contractor experience as the most important factors affecting on delay in dam construction projects.

Keywords: delay, dam construction, project management, Iran

Procedia PDF Downloads 420
2155 The Study of Strength and Weakness Points of Various Techniques for Calculating the Volume of Done Work in Civil Projects

Authors: Ali Fazeli Moslehabadi

Abstract:

One of the topics discussed in civil projects, during the execution of the project, which the continuous change of work volumes is usually the characteristics of these types of projects, is how to calculate the volume of done work. The difference in volumes announced by the execution unit with the estimated volume by the technical office unit, has direct effect on the announced progress of the project. This issue can show the progress of the project more or less than actual value and as a result making mistakes for stakeholders and project managers and misleading them. This article intends to introduce some practical methods for calculating the volume of done work in civil projects. It then reviews the strengths and weaknesses of each of them, in order to resolve these contradictions and conflicts.

Keywords: technical skills, systemic skills, communication skills, done work volume calculation techniques

Procedia PDF Downloads 136
2154 The Importance of Adopting Sustainable Practices in Power Projects

Authors: Sikander Ali Abbassi, Wazir Muhmmad Laghari, Bashir Ahmed Laghari

Abstract:

Attaining sustainable development is one of the greatest challenges facing Pakistan today. A challenge that can only be met by developing and deploying confidence among the people. Transparency in project activities at all stages and other measures will also enhance its social and economic growth. Adopting sustainable practices and sensible policies, we mean that project activity should be economically viable, socially acceptable and environment friendly. In order to achieve this objective, there must be a continued commitment to encourage and ensure the public participation in development of power projects. Since Pakistan is an energy deficient country, it has to initiate power projects on a large scale in the near future. Therefore, it is the need of the hour to tackle these projects in a sustainable way, so that it can be benefited to the maximum possible level and have the least adverse effects on people and the environment. In order to get desirable results, careful planning, efficient implementation, standardized operational practices and community participation are the key parameters which ensure the positive impacts on economy, prosperity and the well being of our people. This paper pinpoints the potential environmental hazards due to project activity and emphasizes to adopt sustainable approaches in power projects.

Keywords: environmental hazards, sustainable practices, environment friendly, power projects

Procedia PDF Downloads 363
2153 Contextualizing Household Food Security: A Comparison of Two Villages, Ambros and Maramanzhi, South Africa

Authors: Felicity Aphiwe Mkhongi, Walter Musakwa

Abstract:

Smallholder crop production is a defining factor in achieving food security, particularly at the household level. However, the number of abandoned arable fields is increasing in communal areas of South Africa. While substantial efforts have been devoted to addressing food insecurity in the country, ownership of arable land has not been supplemented with sustainable food production for households. This paper analyses household food security in the context of deagrarianization in two villages, Ambros (Eastern Cape) and Maramanzhi (Limpopo). Semi-structured questionnaires were administered to acquire both qualitative and quantitative data from 106 heads of households. The IBM SPSS Statistics 28.0 computer program was applied to complete data analysis. From the findings of the study, it was evident that compared to arable fields, a greater proportion of households own home-gardens with an average size of 2100m in Ambros and 3400m in Maramanzhi village. The majority of arable fields were abandoned, particularly in Ambros village. Household food access challenges were measured using the Household Food Insecurity Access Scale (HFIAS). This food security indicator revealed that the majority of households were mildly food insecure owing to food shortages emanating from insufficient monthly income and waning household crop production. Food was rated as a very important reason for engaging in cultivation in both villages of the study, but deagrarianization has eroded opportunities for increasing household crop production. Among other possible solutions, this study recommends that the government invest more in agriculture to allow for sustainable strategies that revive abandoned arable land, such as arable fields in communal areas of South Africa, as this could increase food production for households.

Keywords: cultivation, deagrarianization, food security, rural households, smallholder farmers

Procedia PDF Downloads 31
2152 Risk Prioritization in Tunneling Construction Projects

Authors: David Nantes, George Gilbert

Abstract:

There are a lot of risks that might crop up as a tunneling project develops, and it's crucial to be aware of them. Due to the unexpected nature of tunneling projects and the interconnectedness of risk occurrences, the risk assessment approach presents a significant challenge. The purpose of this study is to provide a hybrid FDEMATEL-ANP model to help prioritize risks during tunnel construction projects. The ambiguity in expert judgments and the relative severity of interdependencies across risk occurrences are both taken into consideration by this model, thanks to the Fuzzy Decision-Making Trial and Evaluation Laboratory (FDEMATEL). The Analytic Network Process (ANP) method is used to rank priorities and assess project risks. The authors provide a case study of a subway tunneling construction project to back up the validity of their methodology. The results showed that the proposed method successfully isolated key risk factors and elucidated their interplay in the case study. The proposed method has the potential to become a helpful resource for evaluating dangers associated with tunnel construction projects.

Keywords: risk, prioritization, FDEMATEL, ANP, tunneling construction projects

Procedia PDF Downloads 67
2151 Feasibility Studies in Public Construction Projects in South Africa: Barriers and Implications

Authors: Kenneth O. Otasowie, Matthew Ikuabe, Clinton Aigbavboa, Ayodeji Oke

Abstract:

The practice of feasibility studies plays a huge role in the success of construction projects. Feasibility studies according to several research should be the reason for embarking on any project. However, it has been discovered that in South Africa (SA), feasibility studies are mainly done in the private sector construction but skipped in the construction of most public projects. Hence, this study aims to evaluate the barriers to feasibility studies practice in public projects and the implications. A survey design was adopted. A total number of One hundred and fifty (150) questionnaires were administered to Quantity Surveyors, Construction managers, Construction project managers, Project managers, Architects and Civil and Structural engineers in Guateng Province, SA and ninety (90) were returned and found suitable for analysis. Collected data was analysed using percentage, mean item score, standard deviation, one-sample t-test. The findings show that political interference and corruption are the most significant barriers to feasibility studies practice in the public construction projects in SA, while late project completion, poor quality infrastructure are among the implication of not conducting feasibility studies in SA public projects. Therefore, the study recommends the development of a framework for public projects execution that will reduce the interference of the political class in the country, that way the risk of late project completion and poor quality infrastructure will be mitigated.

Keywords: arriers, feasibility studies, public construction, South Africa.

Procedia PDF Downloads 67
2150 An Exploratory Study on Challenges of Public Private Partnership Projects in Oman

Authors: Omar Amoudi, Mariya Khalid

Abstract:

The limitation of the public funds for the infrastructure projects and with the deterioration of international oil prices and the negative consequences on the economies of oil producing and exporting countries, Oman has encouraged the partnership between the public and private sectors. As the private sector has a role in planning, financing, designing, operating and the maintenance of the public services. There is no doubt that, the adoption of Public Private Partnership (PPP) strategy faces many challenges which might affect the project seriously if it is not overcome in earlier time. These challenges depend on the level of understanding of the strategy, the roles and regulations and the availability of resources as well. This research aims at identifying the challenges facing the PPP infrastructure projects in Oman based on the similar previous studies supported by questionnaire survey and semi structured interviews. It also seeks to discuss the rationale for adoption in Oman and uncover the current status of PPP strategy. The identified challenges were ranked according to the importance index of each challenge. After analysis of data, it has observed that, the main challenges facing PPPs projects in Oman are high participation cost, high projects cost and regulation changes. The PPP strategy has to be adopted well and with a high level of experience in order to ensure a successful implementation of PPP projects in Oman.

Keywords: public private partnership (PPP), challenges, infrastructure, Oman

Procedia PDF Downloads 271
2149 A Study of Possible Approach to Facilitate Social Sustainability of Industrial Land Redevelopment-Led Urban Regeneration

Authors: Hung Hing Chan, Tai-Shan Hu

Abstract:

Kaohsiung has been an industrial city of Taiwan for over a hundred year. Consequently, there are several abandoned industrial lands left when the process of deindustrialization has started, resulting in the decay of the adjacent urban communities. These industrial lands, which are brownfields that are potentially or already contaminated by hazardous substances, have created social injustice to the surrounding communities. The redevelopments of industrial lands bring a sustainable development to the communities, while the redevelopments can be in different forms, depending on the natural conditions. This research studies the possible approaches to facilitate social sustainability of urban regeneration resulted from the industrial land redevelopment projects, which has always been ignored. The aim of the research is to find out the best western practices of brownfield redevelopment to facilitate social aspect of sustainable urban regeneration and make a contribution to the industrial land redevelopment of Taiwan. The research is conducted via literature review and case study. Industrial land redevelopment has been a social focus in the blighted communities to promote urban regeneration after the post-industrial age. The tendency of this kind of redevelopment is towards constructing the built environment, as a result the environmental and economic aspect of sustainability of the redeveloped industrial land will be boosted, while the social aspect will not be necessarily better since the local communities affected are rarely engaged in the decision-making process and inadequate resource allocation to the projects is not guaranteed. To ensure the improvement of social sustainability is reached, the recommendations of this research, such as civic engagement, a formation of dedicated brownfield regeneration agency and resource allocation to employ brownfield process manager and to strategic communication, should be incorporated into the real practices of industrial land-led urban regeneration. Besides, the case study also shows that the social sustainability of industrial land-led urban regeneration can be promoted by (1) upholding the local feature and public participation in the regeneration process, (2) allocating resources and enforcing responsibility system, and (3) assuring financial resource for the urban regeneration projects and residents. Subsequent research will involve in-depth interviews with the chiefs of the village of related communities in Kaohsiung and questionnaire with the community members to comprehend their opinions regarding social sustainability, aiming at evaluating the social sustainability and finding out which kind of redevelopment project tends to support the social dimension of sustainable development more.

Keywords: brownfield, industrial land, redevelopment, social sustainability, urban regeneration

Procedia PDF Downloads 195
2148 A New Mathematical Model for Scheduling Preventive Maintenance and Renewal Projects of Multi-Unit Systems; Application to Railway Track

Authors: Farzad Pargar

Abstract:

We introduce the preventive maintenance and renewal scheduling problem for a multi-unit system over a finite and discretized time horizon. Given the latest possible time for carrying out the next maintenance and renewal projects after the previous ones and considering several common set-up costs, the introduced scheduling model tries to minimize the cost of projects by grouping them and simultaneously finding the optimal balance between doing maintenance and renewal. We present a 0-1 pure integer linear programming that determines which projects should be performed together on which location and in which period (e.g., week or month). We consider railway track as a case for our study and test the performance of the proposed model on a set of test problems. The experimental results show that the proposed approach performs well.

Keywords: maintenance, renewal, scheduling, mathematical programming model

Procedia PDF Downloads 669
2147 An Assessment on the Effect of Participation of Rural Woman on Sustainable Rural Water Supply in Yemen

Authors: Afrah Saad Mohsen Al-Mahfadi

Abstract:

In rural areas of developing countries, participation of all stakeholders in water supply projects is an important step towards further development. As most of the beneficiaries are women, it is important that they should be involved to achieve successful and sustainable water supply projects. Women are responsible for the management of water both inside and outside home, and often spend more than six-hours a day fetching drinking water from distant water sources. The problem is that rural women play a role of little importance in the water supply projects’ phases in rural Yemen. Therefore, this research aimed at analyzing the different reasons of their lack of participation in projects and in what way a full participation -if achieved- could contribute to sustainable water supply projects in the rural mountainous areas in Yemen. Four water supply projects were selected as a case study in Al-Della'a Alaala sub-district in the Al-Mahweet governorate, two of them were implemented by the Social Fund and Development (SFD), while others were implemented by the General Authority for Rural Water Supply Projects (GARWSSP). Furthermore, the successful Al-Galba project, which is located in Badan district in Ibb governorate, was selected for comparison. The rural women's active participation in water projects have potential consequences including continuity and maintenance improvement, equipment security, and improvement in the overall health and education status of these areas. The majority of respondents taking part in GARWSSP projects estimated that there is no reason to involve women in the project activities. In the comparison project - in which a woman worked as a supervisor and implemented the project – all respondents indicated that the participation of women is vital for sustainability. Therefore, the results of this research are intended to stimulate rural women's participation in the mountainous areas of Yemen.

Keywords: assessment, rural woman, sustainability, water management

Procedia PDF Downloads 660
2146 Cooperative Robot Application in a Never Explored or an Abandoned Sub-Surface Mine

Authors: Michael K. O. Ayomoh, Oyindamola A. Omotuyi

Abstract:

Autonomous mobile robots deployed to explore or operate in a never explored or an abandoned sub-surface mine requires extreme effectiveness in coordination and communication. In a bid to transmit information from the depth of the mine to the external surface in real-time and amidst diverse physical, chemical and virtual impediments, the concept of unified cooperative robots is seen to be a proficient approach. This paper presents an effective [human → robot → task] coordination framework for effective exploration of an abandoned underground mine. The problem addressed in this research is basically the development of a globalized optimization model premised on time series differentiation and geometrical configurations for effective positioning of the two classes of robots in the cooperation namely the outermost stationary master (OSM) robots and the innermost dynamic task (IDT) robots for effective bi-directional signal transmission. In addition, the synchronization of a vision system and wireless communication system for both categories of robots, fiber optics system for the OSM robots in cases of highly sloppy or vertical mine channels and an autonomous battery recharging capability for the IDT robots further enhanced the proposed concept. The OSM robots are the master robots which are positioned at strategic locations starting from the mine open surface down to its base using a fiber-optic cable or a wireless communication medium all subject to the identified mine geometrical configuration. The OSM robots are usually stationary and function by coordinating the transmission of signals from the IDT robots at the base of the mine to the surface and in a reverse order based on human decisions at the surface control station. The proposed scheme also presents an optimized number of robots required to form the cooperation in a bid to reduce overall operational cost and system complexity.

Keywords: sub-surface mine, wireless communication, outermost stationary master robots, inner-most dynamic robots, fiber optic

Procedia PDF Downloads 194
2145 An Explorative Study of the Application of Project Management in German Research Projects

Authors: Marcel Randermann, Roland Jochem

Abstract:

Research activities are mostly conducted in form of projects. In fact, research projects take the highest share of all project forms combined. However, project management is very rarely applied purposefully by researchers and scientists. More specifically no project management frameworks, methods or tools are not being used to plan, execute or control research project to ensure research success or improve project quality. In this qualitative study, several interviews were conducted with scientists and research managers from German institutions to gain insights into project management activities, to determine challenges and barriers, and to evaluate premises for successful project management. The analyses show that conventional project management is not easily applicable in scientific environments and researchers’ mindsets prevent a reasonable application.

Keywords: academics, project management methods, research and science projects, scientist's mindset

Procedia PDF Downloads 175
2144 Development of Risk Assessment and Occupational Safety Management Model for Building Construction Projects

Authors: Preeda Sansakorn, Min An

Abstract:

In order to be capable of dealing with uncertainties, subjectivities, including vagueness arising in building construction projects, the application of fuzzy reasoning technique based on fuzzy set theory is proposed. This study contributes significantly to the development of a fuzzy reasoning safety risk assessment model for building construction projects that could be employed to assess the risk magnitude of each hazardous event identified during construction, and a third parameter of probability of consequence is incorporated in the model. By using the proposed safety risk analysis methodology, more reliable and less ambiguities, which provide the safety risk management project team for decision-making purposes.

Keywords: safety risk assessment, building construction safety, fuzzy reasoning, construction risk assessment model, building construction projects

Procedia PDF Downloads 461
2143 A Development of a Conceptual Framework for Safety Culture and Safety Risk Assessment: The Case of Chinese International Construction Projects under the “New Belt and Road” Initiative in Africa

Authors: Bouba Oumarou Aboubakar, HongXia Li, Sardar Annes Farooq

Abstract:

The Belt and Road Initiative’s success strongly depends on the safety of all the million workers on construction projects sites. As the new BRI is directed toward Africa and meets a completely different culture from the Chinese project managers, maintaining low risk for workers risks shall be closely related to cultural sharing and mutual understanding. This is why this work introduces a cultural-wise safety management framework for Chinese Construction projects in Africa. The theoretical contribution of this paper is an improved risk assessment framework that integrates language, culture and difficulty of controlling risk factors into one approach. Practically, this study provides not only a useful tool for project safety management practitioners but the full understanding of all risks that may arise in the BRI projects in Africa.

Keywords: cultural-wise, safety culture, risk assessment, Chinese construction, BRI projects, Africa

Procedia PDF Downloads 71
2142 Airport Investment Risk Assessment under Uncertainty

Authors: Elena M. Capitanul, Carlos A. Nunes Cosenza, Walid El Moudani, Felix Mora Camino

Abstract:

The construction of a new airport or the extension of an existing one requires massive investments and many times public private partnerships were considered in order to make feasible such projects. One characteristic of these projects is uncertainty with respect to financial and environmental impacts on the medium to long term. Another one is the multistage nature of these types of projects. While many airport development projects have been a success, some others have turned into a nightmare for their promoters. This communication puts forward a new approach for airport investment risk assessment. The approach takes explicitly into account the degree of uncertainty in activity levels prediction and proposes milestones for the different stages of the project for minimizing risk. Uncertainty is represented through fuzzy dual theory and risk management is performed using dynamic programming. An illustration of the proposed approach is provided.

Keywords: airports, fuzzy logic, risk, uncertainty

Procedia PDF Downloads 383
2141 Identifying and Ranking Environmental Risks of Oil and Gas Projects Using the VIKOR Method for Multi-Criteria Decision Making

Authors: Sasan Aryaee, Mahdi Ravanshadnia

Abstract:

Naturally, any activity is associated with risk, and humans have understood this concept from very long times ago and seek to identify its factors and sources. On the one hand, proper risk management can cause problems such as delays and unforeseen costs in the development projects, temporary or permanent loss of services, getting lost or information theft, complexity and limitations in processes, unreliable information caused by rework, holes in the systems and many such problems. In the present study, a model has been presented to rank the environmental risks of oil and gas projects. The statistical population of the study consists of all executives active in the oil and gas fields, that the statistical sample is selected randomly. In the framework of the proposed method, environmental risks of oil and gas projects were first extracted, then a questionnaire based on these indicators was designed based on Likert scale and distributed among the statistical sample. After assessing the validity and reliability of the questionnaire, environmental risks of oil and gas projects were ranked using the VIKOR method of multiple-criteria decision-making. The results showed that the best options for HSE planning of oil and gas projects that caused the reduction of risks and personal injury and casualties and less than other options is costly for the project and it will add less time to the duration of implementing the project is the entering of dye to the environment when painting the generator pond and the presence of the rigger near the crane.

Keywords: ranking, multi-criteria decision making, oil and gas projects, HSEmanagement, environmental risks

Procedia PDF Downloads 137
2140 Analysis Mechanized Boring (TBM) of Tehran Subway Line 7

Authors: Shahin Shabani, Pouya Pourmadadi

Abstract:

Tunnel boring machines (TBMs) have been used for the construction of various tunnels for mining projects for the purpose of access, conveyance of ore and waste, drainage, exploration, water supply and water diversion. Several mining projects have seen the successful and economic beneficial use of TBMs, and there is an increasing awareness of the benefits of TBMs for mining projects. Key technical considerations for the use of TBMs for the construction of tunnels for mining projects include geological issues (rock type, rock alteration, rock strength, rock abrasivity, durability, ground water inflows), depth of cover and the potential for overstressing/rockbursts, site access and terrain, portal locations, TBM constraints, minimum tunnel size, tunnel support requirements, contractor and labor experience, and project schedule demands. This study focuses on tunnelling mining, with the goal to develop methods and tools to be used to gain understanding of these processes, and to analyze metro of Tehran. The Metro Line 7 of Tehran is one of the Longest (26 Km) and deepest (27m) of projects that’s under implementation. Because of major differences like passing under all geotechnical layers of the town and encountering part of it with underground water table and also using mechanized excavation system, is one of special metro projects.

Keywords: TBM, tunnel boring machines economic, metro, line 7

Procedia PDF Downloads 366
2139 Healthy and Smart Building Projects

Authors: Ali A. Karakhan

Abstract:

Stakeholders in the architecture, engineering, and construction (AEC) industry have been always searching for strategies to develop, design, and construct healthy and smart building projects. Healthy and smart building projects require that the building process including design and construction be altered and carefully implemented in order to bring about sustainable outcomes throughout the facility lifecycle. Healthy and smart building projects are expected to positively influence organizational success and facility performance across the project lifecycle leading to superior outcomes in terms of people, economy, and the environment. The present study aims to identify potential strategies that AEC organizations can implement to achieve healthy and smart building projects. Drivers and barriers for healthy and smart building features are also examined. The study findings indicate that there are three strategies to advance the development of healthy and smart building projects: (1) the incorporation of high-quality products and low chemical-emitting materials, (2) the integration of innovative designs, methods, and practices, and (3) the adoption of smart technology throughout the facility lifecycle. Satisfying external demands, achievement of a third-party certification, obtaining financial incentives, and a desire to fulfill professional duty are identified as the key drivers for developing healthy and smart building features; whereas, lack of knowledge and training, time/cost constrains, preference for/adherence to customary practices, and unclear business case for why healthy buildings are advantageous are recognized as the primary barriers toward a wider diffusion of healthy and smart building projects. The present study grounded in previous engineering, medical, and public health research provides valuable technical and practical recommendations for facility owners and industry professionals interested in pursuing sustainable, yet healthy and smart building projects.

Keywords: healthy buildings, smart construction, innovative designs, sustainable projects

Procedia PDF Downloads 137
2138 The Importance of Localization in Large Constraction Projects

Authors: Ali Mohammadi

Abstract:

The basis for the construction of any project is a map, a map where the surveyor can determine the coordinates of the points on the ground by using the coordinates and using the total station, projects such as dams, roads, tunnels and pipelines, if the base points are determined using GPS prepared can create challenges for the surveyor to control. First, we will examine some map projection on which the maps are designed, and a summary of their differences and the challenges that surveyors face in order to control them, because in order to build projects, we need real lengths and angles, so we have to use coordinates that provide us with the results of the calculations. We will examine some examples to understand the concept of localization so that the surveyor knows if he is facing a challenge or not and if he is faced with this challenge, how should he solve this problem.

Keywords: UTM, scale factor, cartesian, traverse

Procedia PDF Downloads 54
2137 A Comparative Study of Insurance Policies Worldwide in Public Private Partnerships

Authors: Guanqun Shi, Xueqing Zhang

Abstract:

The frequent occurrence of failures in PPP projects which caused great loss has raised attention from the government as well as the concessionaire. PPPs are complex arrangements for its long operation period and multiple players. Many types of risks in PPP projects may cause the project fail. The insurance is an important tool to transfer the risks. Through a comparison and analysis of international government PPP guidelines and contracts as well as the case studies worldwide, we have identified eight main insurance principles, discussed thirteen insurance types in different stages. An overall procedure would be established to improve the practices in PPP projects.

Keywords: public private partnerships, insurance, contract, risk

Procedia PDF Downloads 262
2136 Sustainability and Promotion of Inland Waterway Transportation Projects in Colombia: Case of the Magdalena River

Authors: David Julian Bernal Melgarejo

Abstract:

Inland Waterway Transportation (IWT) is playing an important role in national transport systems, water transportation is considered to be safe, energy efficient and environmentally friendly mode of transport, considering all the benefits of IWT the Colombian government is planning to restore the Magdalena’s River navigability, embrace waterway transportation in Colombia could strength competitiveness while reduce most of the transport externalities. However, the current situation of the Magdalena deplorable, the most important river of Colombia has been abandoned for decades and the solution is beyond of a single administrative entity. This paper analyzes the outcomes of the Navigation And Inland Waterway Action and Development in Europe (NAIADES) program as a prospective to develop a sustainable program in Colombia. In order to guarantee the long-term future, and the adaptability of the program a research based on individual interviews with stakeholders and policy experts were carried out, findings support the idea of lack of integration within governmental institution, develop marketing strategies and human resources.

Keywords: inland waterway transportation, logistics, sustainability, multimodal transport systems, water transportation

Procedia PDF Downloads 459
2135 Contractors Perspective on Causes of Delays in Power Transmission Projects

Authors: Goutom K. Pall

Abstract:

At the very heart of the power system, power transmission (PT) acts as an essential link between power generation and distribution. Timely completion of PT infrastructures is therefore crucial to support the development of power system as a whole. Yet despite the importance, studies on PT infrastructure development projects are embryonic and, hence, PT projects undergoing widespread delays worldwide. These delay factors are idiosyncratic and identifying the critical delay factors is essential if the PT industry professionals are to complete their projects efficiently and within the expected timeframes. This study identifies and categorizes 46 causes of PT project delay under ten major groups using six sector expert’s recommendations studied by a preliminary questionnaire survey. Based on the experts’ strong recommendations, two new groups are introduced in the final questionnaire survey: sector specific factors (SSF) and general factors (GF). SSF pertain to delay factors applicable only to the PT projects, while GF represents less biased samples with shared responsibilities of all project parties involved in a project. The study then uses 112 data samples from the contractors to rank the delay factors using relative importance index (RII). The results reveal that SSF, GF and external factors are the most critical groups, while the highest ranked delay factors include the right of way (RoW) problems of transmission lines (TL), delay in payments, frequent changes in TL routes, poor communication and coordination among the project parties and accessibility to TL tower locations. Finally, recommendations are made to minimize the identified delay. The findings are expected to be of substantial benefit to professionals in minimizing time overrun in PT projects implementation, as well as power generation, power distribution, and non-power linear construction projects worldwide.

Keywords: delay, project delay, power transmission projects, time-overruns

Procedia PDF Downloads 159
2134 Clients’ Priorities in Design and Delivery of Green Projects: South African Perspective

Authors: Charles Mothobiso

Abstract:

This study attempts to identify the client’s main priority when delivering green projects. The aim is to compare whether clients’ interests are similar when delivering conventional buildings as compared to green buildings. Private clients invest more in green buildings as compared to government and parastatal entities. Private clients prioritize on maximizing a return on investment and they mainly invest in energy-saving buildings that have low life cycle costs. Private clients are perceived to be more knowledgeable about the benefits of green building projects as compared to government and parastatal clients. A shortage of expertise and managerial skill leads to the low adaptation of green buildings in government and parastatal projects. Other factors that seem to prevent the adoption of green buildings are the preparedness of the supply chain within the industry and inappropriate procurement strategies adopted by clients.

Keywords: construction clients, design team, green buildings, procurement

Procedia PDF Downloads 274