6211 Mediterranean Urbanism: Migration, Tourism and Public Space in the Mediterranean City

Authors: Smoki Musaraj

Abstract:

Classic studies of the Mediterranean as a cultural and geographic unit of analysis have emphasized the theme of cosmopolitan urbanism as a key feature of the Mediterranean city. This paper explores the Mediterranean city today, considering continuities and ruptures from images of the Mediterranean of the past. The paper seeks to address the following questions: What are some defining characteristics of Mediterranean cities today? What are some of the shared challenges? The paper focuses on two interrelated themes: public space and tourism management. Several examples of protest and contestation in Mediterranean cities will be analyzed. These examples include cities where tourism presents opportunities and challenges to city planning and management; and where new private and public developments threaten the management of public space. The paper draws on ethnographic research in the city of Saranda, Albania, a small attractive tourist destination on the border with Greece, and Barcelona, Spain, a leading example of urban transformation and tourism massification. While different in size and popularity, both cities share some similar developments and contestations. In both cities, authorities have taken up different strategies to manage tourism and restore public space. The comparison will focus on social movements in the respective cities that target tourism and urban development in the name of preserving theirMediterraneaness. These examples are used to reflect more broadly on what are some features of the Mediterranean city today and how they can be preserved in the current climate of tourism expansion of urban development boom.

Keywords: mediterranean, urbanism, tourism, public space, anthropology, human geography, sustainability

Procedia PDF Downloads 91
6210 Installation of an Inflatable Bladder and Sill Walls for Riverbank Erosion Protection and Improved Water Intake Zone Smokey Hill River – Salina, Kansas

Authors: Jeffrey A. Humenik

Abstract:

Environmental, Limited Liability Corporation (EMR) provided civil construction services to the U.S. Army Corps of Engineers, Kansas City District, for the placement of a protective riprap blanket on the west bank of the Smoky Hill River, construction of 2 shore abutments and the construction of a 140 foot long sill wall spanning the Smoky Hill River in Salina, Kansas. The purpose of the project was to protect the riverbank from erosion and hold back water to a specified elevation, creating a pool to ensure adequate water intake for the municipal water supply. Geotextile matting and riprap were installed for streambank erosion protection. An inflatable bladder (AquaDam®) was designed to the specific river dimension and installed to divert the river and allow for dewatering during the construction of the sill walls and cofferdam. AquaDam® consists of water filled polyethylene tubes to create aqua barriers and divert water flow or prevent flooding. A challenge of the project was the fact that 100% of the sill wall was constructed within an active river channel. The threat of flooding of the work area, damage to the aqua dam by debris, and potential difficulty of water removal presented a unique set of challenges to the construction team. Upon completion of the West Sill Wall, floating debris punctured the AquaDam®. The manufacturing and delivery of a new AquaDam® would delay project completion by at least 6 weeks. To keep the project ahead of schedule, the decision was made to construct an earthen cofferdam reinforced with rip rap for the construction of the East Abutment and East Sill Wall section. During construction of the west sill wall section, a deep scour hole was encountered in the wall alignment that prevented EMR from using the natural rock formation as a concrete form for the lower section of the sill wall. A formwork system was constructed, that allowed the west sill wall section to be placed in two horizontal lifts of concrete poured on separate occasions. The first sectional lift was poured to fill in the scour hole and act as a footing for the second sectional lift. Concrete wall forms were set on the first lift and anchored to the surrounding riverbed in a manner that the second lift was poured in a similar fashion as a basement wall. EMR’s timely decision to keep the project moving toward completion in the face of changing conditions enabled project completion two (2) months ahead of schedule. The use of inflatable bladders is an effective and cost-efficient technology to divert river flow during construction. However, a secondary plan should be part of project design in the event debris transported by river punctures or damages the bladders.

Keywords: abutment, AquaDam®, riverbed, scour

Procedia PDF Downloads 133
6209 Evaluation of Environmental Management System Implementation of Construction Projects in Turkey

Authors: Aydemir Akyürek, Osman Nuri Ağdağ

Abstract:

Construction industry is in a rapid development for many years around the world and especially in Turkey. In the last three years sector has 10% growth and provides significant support on Turkey’s national economy. Many construction projects are on-going at urban and rural areas of Turkey which have substantial environmental impacts. Environmental impacts during construction phase are quite diversified and widespread. Environmental impacts of construction industry cannot be inspected properly in all cases and negative impacts may occur frequently in many projects in Turkey. In this study, implementation of ISO 14001 Environmental Management System (EMS) in construction plants is evaluated. In the beginning stage quality management systems generally reviewed and ISO 14001 EMS is selected for implementation. Standard requirements are examined first and implementation of every standard requirement is elaborated for the selected construction plant in the following stage. Key issues and common problems, gained benefits by execution of this type of international EMS standard are examined. As can be seen in sample projects, construction projects are being completed very fast and contractors are working in a highly competitive environment with low profit ratios in our country and mostly qualified work force cannot be accessible. Addition to this there are deficits on waste handling and environmental infrastructure. Besides construction companies which have substantial investments on EMSs can be faced with difficulties on competitiveness in domestic market, however professional Turkish contractors which implementing managements systems in larger scale at international projects are gaining successful results. Also the concept of ‘construction project management’ which is being implemented in successful projects worldwide cannot be implemented except larger projects in Turkey. In case of nonexistence of main management system (quality) implementation of EMSs cannot be managed. Despite all constraints, EMSs that will be implemented in this industry with commitment of top managements and demand of customers will be an enabling, facilitating tool to determine environmental aspects and impacts of construction sites, will provide higher compliance levels for environmental legislation, to establish best available methods for operational control on waste management, chemicals management etc. and to plan monitoring and measurement, to prioritize environmental aspects for investment schedules and waste management.

Keywords: environmental management system, construction projects, ISO 14001, quality

Procedia PDF Downloads 340
6208 A Framework for Improving Trade Contractors’ Productivity Tracking Methods

Authors: Sophia Hayes, Kenny L. Liang, Sahil Sharma, Austin Shema, Mahmoud Bader, Mohamed Elbarkouky

Abstract:

Despite being one of the most significant economic contributors of the country, Canada’s construction industry is lagging behind other sectors when it comes to labor productivity improvements. The construction industry is very collaborative as a general contractor, will hire trade contractors to perform most of a project’s work; meaning low productivity from one contractor can have a domino effect on the shared success of a project. To address this issue and encourage trade contractors to improve their productivity tracking methods, an investigative study was done on the productivity views and tracking methods of various trade contractors. Additionally, an in-depth review was done on four standard tracking methods used in the construction industry: cost codes, benchmarking, the job productivity measurement (JPM) standard, and WorkFace Planning (WFP). The four tracking methods were used as a baseline in comparing the trade contractors’ responses, determining gaps within their current tracking methods, and for making improvement recommendations. 15 interviews were conducted with different trades to analyze how contractors value productivity. The results of these analyses indicated that there seem to be gaps within the construction industry when it comes to an understanding of the purpose and value in productivity tracking. The trade contractors also shared their current productivity tracking systems; which were then compared to the four standard tracking methods used in the construction industry. Gaps were identified in their various tracking methods and using a framework; recommendations were made based on the type of trade on how to improve how they track productivity.

Keywords: labor productivity, productivity tracking methods, trade contractors, construction

Procedia PDF Downloads 171
6207 Construction of India’s Largest Blast Furnace (4554 cum) Foundation at JSPL, Angul, Odisha: A Qualitative Approach

Authors: N. S. S. Rao, Tapan Kumar Das, Latiful Pasha

Abstract:

Tata Projects Limited (TPL) located in Hyderabad, India has taken up the challenging venture of executing the entire civil works for India’s largest Blast Furnace with a capacity of 4554 cum at Jindal Steel and Power Limited (JSPL), Angul, Odisha, India. The following write-up briefly elaborates the various steps and methodologies involved in the construction of the foundation for this India’s largest blast furnace.

Keywords: blast furnace, construction, qualitative, approach

Procedia PDF Downloads 553
6206 Adoption of Proactive and Reactive Supply Chain Resilience Strategies: A Comparison between Apparel and Construction Industries in Sri Lanka

Authors: Anuradha Ranawakage, Chathurani Silva

Abstract:

With the growing expansion of global businesses, supply chains are increasingly exposed to numerous disruptions. Organizations adopt various strategies to mitigate the impact of these disruptions. Depending on the variations in the conditions and characteristics of supply chains, the adoption of resilience strategies may vary across industries. However, these differences are largely unexplored in the existing literature. Hence, this study aims to evaluate the adoption of three proactive strategies: proactive collaboration, digital connectivity, integrated SC risk management, and three reactive strategies: reactive collaboration, inventory and reserve capacity, and lifeline maintenance in the apparel and construction industries in Sri Lanka. An online questionnaire was used to collect data on the implementation of resilience strategies from a sample of 162 apparel and 185 construction companies operating in Sri Lanka. This research makes a significant contribution to the field of supply chain management by assessing the extent to which different resilience strategies are functioned within the apparel and construction industries in Sri Lanka, particularly in an era after a global pandemic that significantly disrupted supply chains all around the world.

Keywords: apparel, construction, proactive strategies, reactive strategies, supply chain resilience

Procedia PDF Downloads 29
6205 Conceptualising Project Complexity in Ghana’s Construction Industry: A Qualitative Study

Authors: Kwasi Dartey-Baah, Mias De Klerk

Abstract:

Project complexity has been cited as one of the essential areas of project management. It can be observed from environmental, social, technological, and organisational viewpoints, and its handling is critical to project success. Conceptualised in varied industries, this paper seeks to ascertain the meaning and understanding of project complexity within the Ghanaian construction industry based on the three dimensions of complexities (faith, fact, and interaction) using experts' opinions. Taking the form of a focus group discussion, the paper sought to gain an in-depth understanding of project complexity issues in Ghana’s construction industry. The method use obtained data from experts (a purposely selected group) comprising project leaders and project management academics. The findings indicated that the experts broadly agreed with the complexity items but offered varied reasons for their agreement. In the composite assessment of the complexity dimensions of (faith, fact, and interaction), it emerged that there was some agreement with the complexity dimensions of fact and interaction within Ghana’s construction industry. On the other hand, with the dimension for complexity by faith, it was noted that the experts in Ghana’s construction construed complexity by faith, not as the absence of evidence but the evidence that hinges on at least a member of the project team. It is expected that other researches on project complexity will focus on other industries to enhance the knowledge of the same within the field of project management.

Keywords: project complexity, complexity by faith, complexity by fact, complexity by interaction, construction industry, Ghana

Procedia PDF Downloads 139
6204 Traffic Congestion Analysis and Modeling for Urban Roads of Srinagar City

Authors: Adinarayana Badveeti, Mohammad Shafi Mir

Abstract:

In Srinagar City, in India, traffic congestion is a condition on transport networks that occurs as use increases and is characterized by slower speeds, longer trip times, and increased vehicular queuing. Traffic congestion is conventionally measured using indicators such as roadway level-of-service, the Travel Time Index and their variants. Several measures have been taken in order to counteract congestion like road pricing, car pooling, improved traffic management, etc. While new road construction can temporarily relieve congestion in the longer term, it simply encourages further growth in car traffic through increased travel and a switch away from public transport. The full paper report, on which this abstract is based, aims to provide policymakers and technical staff with the real-time data, conceptual framework and guidance on some of the engineering tools necessary to manage congestion in such a way as to reduce its overall impact on individuals, families, communities, and societies dynamic, affordable, liveable and attractive urban regions will never be free of congestion. Road transport policies, however, should seek to manage congestion on a cost-effective basis with the aim of reducing the burden that excessive congestion imposes upon travellers and urban dwellers throughout the urban road network.

Keywords: traffic congestion, modeling, traffic management, travel time index

Procedia PDF Downloads 293
6203 The Risks of 'Techtopia': Reviewing the Negative Lessons of Smart City Development

Authors: Amanda Grace Ahl, Matthew Brummer

Abstract:

‘Smart cities’ are not always as ‘smart’ as the term suggests, which is not often covered in the associated academic and public policy literatures. In what has become known as the smart city approach to urban planning, governments around the world are seeking to harness the power of information and communications technology with increasingly advanced data analytics to address major social, economic, and environmental issues reshaping the ways people live. The definitional and theoretical boundaries of the smart city framework are broad and at times ambiguous, as is empirical treatment of the topic. However, and for all the disparity, in investigating any number of institutional and policy prescriptions to the challenges faced by current and emerging metropoles, scholarly thought has hinged overwhelmingly on value-positive conceptions of informatics-centered design. From enhanced quality of services, to increased efficiency of resources, to improved communication between societal stakeholders, the smart city design is championed as a technological wellspring capable of providing answers to the systemic issues stymying a utopian image of the city. However, it is argued that this ‘techtopia’, has resulted in myopia within the discipline as to value-negative implications of such planning, such as weaknesses in practicality, scalability, social equity and affordability of solutions. In order to more carefully examine this observation - that ‘stupid’ represents an omitted variable bias in the study of ‘smart’ - this paper reviews critical cases of unsuccessful smart city developments. It is argued that also understanding the negative factors affiliated with the development processes is imperative for the advancement of theoretical foundations, policies, and strategies to further the smart city as an equitable, holistic urban innovation. What emerges from the process-tracing carried out in this study are distinctly negative lessons of smart city projects, the significance of which are vital for understanding how best to conceive smart urban planning in the 21st century.

Keywords: case study, city management, innovation system, negative lessons, smart city development

Procedia PDF Downloads 394
6202 Multiple-Material Flow Control in Construction Supply Chain with External Storage Site

Authors: Fatmah Almathkour

Abstract:

Managing and controlling the construction supply chain (CSC) are very important components of effective construction project execution. The goals of managing the CSC are to reduce uncertainty and optimize the performance of a construction project by improving efficiency and reducing project costs. The heart of much SC activity is addressing risk, and the CSC is no different. The delivery and consumption of construction materials is highly variable due to the complexity of construction operations, rapidly changing demand for certain components, lead time variability from suppliers, transportation time variability, and disruptions at the job site. Current notions of managing and controlling CSC, involve focusing on one project at a time with a push-based material ordering system based on the initial construction schedule and, then, holding a tremendous amount of inventory. A two-stage methodology was proposed to coordinate the feed-forward control of advanced order placement with a supplier to a feedback local control in the form of adding the ability to transship materials between projects to improve efficiency and reduce costs. It focused on the single supplier integrated production and transshipment problem with multiple products. The methodology is used as a design tool for the CSC because it includes an external storage site not associated with one of the projects. The idea is to add this feature to a highly constrained environment to explore its effectiveness in buffering the impact of variability and maintaining project schedule at low cost. The methodology uses deterministic optimization models with objectives that minimizing the total cost of the CSC. To illustrate how this methodology can be used in practice and the types of information that can be gleaned, it is tested on a number of cases based on the real example of multiple construction projects in Kuwait.

Keywords: construction supply chain, inventory control supply chain, transshipment

Procedia PDF Downloads 108
6201 Safe Disposal of Pyrite Rich Waste Rock Using Alkali Phosphate Treatment

Authors: Jae Gon Kim, Yongchan Cho, Jungwha Lee

Abstract:

Acid rock drainage (ARD) is generated by the oxidation of pyrite (FeS₂) contained in the excavated rocks upon its exposure to atmosphere and is an environmental concern at construction site due to its high acidity and high concentration of toxic elements. We developed the safe disposal method with the reduction of ARD generation by an alkali phosphate treatment. A pyrite rich andesite was collected from a railway construction site. The collected rock sample was crushed to be less than 3/8 inches in diameter using a jaw crusher. The crushed rock was filled in an acryl tube with 20 cm in diameter and 40 cm in height. Two treatments for the ARD reduction were conducted with duplicates: 1) the addition of 10mM KH₂PO₄_3% NaHCO₃ and 2) the addition of 10mM KH₂PO₄_3% NaHCO₃ and ordinary portland cement (OPC) on the top of the column. After the treatments, 500 ml of distilled water added to each column for every week for 3 weeks and then the column was flushed with 1,500 ml of distilled water in the 4th week. The pH, electrical conductivity (EC), concentrations of anions and cations of the leachates were monitored for 10 months. The pH of the leachates from the untreated column showed 2.1-3.7, but the leachates from the columns treated with the alkali phosphate solution with or without the OPC addition showed pH 6.7–8.9. The leachates from the treated columns had much lower concentrations of SO₄²⁻ and toxic elements such as Al, Mn, Fe and heavy metals than those from the untreated columns. However, the leachates from the treated columns had a higher As concentration than those from the untreated columns. There was no significant difference in chemical property between the leachates from the treated columns with and without the OPC addition. The chemistry of leachates indicates that the alkali phosphate treatment decreased the oxidation of sulfide and neutralized the acidic pore water. No significant effect of the OPC addition on the leachate chemistry has shown during 10-month experiment. However, we expect a positive effect of the OPC addition on the reduction of ARD generation in terms of long period. According to the results of this experiment, the alkali phosphate treatment of sulfide rich rock can be a promising technology for the safe disposal method with the ARD reduction.

Keywords: acid rock drainage, alkali phosphate treatment, pyrite rich rock, safe disposal

Procedia PDF Downloads 131
6200 System Devices to Reduce Particulate Matter Concentrations in Railway Metro Systems

Authors: Armando Cartenì

Abstract:

Within the design of sustainable transportation engineering, the problem of reducing particulate matter (PM) concentrations in railways metro system was not much discussed. It is well known that PM levels in railways metro system are mainly produced by mechanical friction at the rail-wheel-brake interactions and by the PM re-suspension caused by the turbulence generated by the train passage, which causes dangerous problems for passenger health. Starting from these considerations, the aim of this research was twofold: i) to investigate the particulate matter concentrations in a ‘traditional’ railways metro system; ii) to investigate the particulate matter concentrations of a ‘high quality’ metro system equipped with design devices useful for reducing PM concentrations: platform screen doors, rubber-tyred and an advanced ventilation system. Two measurement surveys were performed: one in the ‘traditional’ metro system of Naples (Italy) and onother in the ‘high quality’ rubber-tyred metro system of Turin (Italy). Experimental results regarding the ‘traditional’ metro system of Naples, show that the average PM10 concentrations measured in the underground station platforms are very high and range between 172 and 262 µg/m3 whilst the average PM2,5 concentrations range between 45 and 60 µg/m3, with dangerous problems for passenger health. By contrast the measurements results regarding the ‘high quality’ metro system of Turin show that: i) the average PM10 (PM2.5) concentrations measured in the underground station platform is 22.7 µg/m3 (16.0 µg/m3) with a standard deviation of 9.6 µg/m3 (7.6 µg/m3); ii) the indoor concentrations (both for PM10 and for PM2.5) are statistically lower from those measured in outdoors (with a ratio equal to 0.9-0.8), meaning that the indoor air quality is greater than those in urban ambient; iii) that PM concentrations in underground stations are correlated to the trains passage; iv) the inside trains concentrations (both for PM10 and for PM2.5) are statistically lower from those measured at station platform (with a ratio equal to 0.7-0.8), meaning that inside trains the use of air conditioning system could promote a greater circulation that clean the air. The comparison among the two case studies allow to conclude that the metro system designed with PM reduction devices allow to reduce PM concentration up to 11 times against a ‘traditional’ one. From these results, it is possible to conclude that PM concentrations measured in a ‘high quality’ metro system are significantly lower than the ones measured in a ‘traditional’ railway metro systems. This result allows possessing the bases for the design of useful devices for retrofitting metro systems all around the world.

Keywords: air quality, pollutant emission, quality in public transport, underground railway, external cost reduction, transportation planning

Procedia PDF Downloads 191
6199 Growth and Development of Autorickshaws in Kolkata Municipal Corporation Area: Enigma to Planners

Authors: Lopamudra Bakshi Basu

Abstract:

Transport is one of the most important characteristic features of Indian cities. The physical and societal requirements determine the selection of a particular transport system along with the uniqueness of road networks. Kolkata has a mixed traffic of which Paratransit system plays a crucial role. It is an indispensable transport system in Kolkata mainly because of its size and service flexibility which has led to a unique network character. The paratransit system, mainly the autorickshaws, is the most favoured mode of transport in the city. Its fast movement and comfortability make it a vital transport system of the city. Since the inception of the autorickshaws in Kolkata in 1981, this mode has gained popularity and presently serves nearly 80 to 90 percent of the total passenger trips. This employment generating mode of transport has increased its number rapidly affecting the city’s traffic. Minimal check on their growth by the authority has led to traffic snarls along many streets of Kolkata. Indiscipline behavior, violation of traffic rules and rash driving make situations even worse. The rise in the number and increasing popularity of the autorickshaws make it an interesting study area. Autorickshaws as a paratransit mode play its role as a leader or a follower. However, it is informal in its planning and operations, which makes it a problem area for the city. The entire research work deals with the growth and expansion of the number of vehicles and the routes within the city. The development of transport system has been interesting in the city, which has been studied. The growth of the paratransit modes in the city has been rapid. The network pattern of the paratransit mode within Kolkata has been analysed.

Keywords: growth, informal, network characteristics, paratransit, service flexibility

Procedia PDF Downloads 214
6198 Investigation and Research on Construction Technology of Tenon and Mortise in Traditional Chinese Architecture

Authors: Liang Zhang

Abstract:

Chinese traditional architecture has developed a school of its own in the world. It has a different structure and construction technology from western architecture. Tenon and mortise structure and construction technology, as the key to the construction of traditional Chinese architecture, have been inherited for thousands of years by traditional craftsmen in various regions of China. However, the traditional architecture varies greatly in different times and regional cultures in China. It is still a lack of research whether this difference extends to mortise and tenon technology. In this study, we measured the mortise and tenon of traditional buildings in Fujian province, Yunnan province, and Northern China; Interviewed some old craftsmen about their traditional construction methods, And compared the today's traditional mortise and tenon technology with that of Song and Qing Dynasties. The results showed that although Chinese traditional architecture has the same origin, the mortise and tenon construction technology systems have been developed at different times, regions, and cultures. For example, tenon and mortise technology in Yunnan Province needs to ensure the ability of buildings to resist earthquakes, while that in Fujian Province needs to ensure the ability of buildings to withstand typhoons. People in different regions, cultures, and times have a different understanding of architectural aesthetics, and the evolution of tools also has different effects on mortise and tenon technology. This study explains the manifestations and causes of these differences. At the same time, due to the impact of modern architectural technology, mortise, and tenon, traditional technology is also rapidly disappearing. As a sorting and collection of mortise and tenon techniques of traditional Chinese architecture, this paper puts forward the corresponding traditional technology protection strategy, to guide the protection and maintenance of local traditional buildings.

Keywords: tenon and mortise, traditional Chinese architecture, traditional craftsmen, construction technology

Procedia PDF Downloads 132
6197 Developing a Shadow Port: A Case Study of Bangkok Port and Laem Chabang Port, Thailand

Authors: C. Bamrungbutr, J. Sillitoe

Abstract:

Maritime transportation has been a crucial part of world economics. Recently, researchers have put effort into studying the mechanisms of how a regional port, in the shadow of a nearby predominant port, can compete and grow. However, limited research has focused on the competition issues for a shadow port which is a capital city port. This study will thus focus on this question of the growth of a capital city port which is under the shadow of the adjacent capital city port by using the two capital city ports of Thailand; Bangkok port (the former main port) and Laem Chabang port (the current main port). For this work, a framework of opportunity capture will be used, and five groups of port development experts (government, council, logistics provider, academia and industry) will be interviewed. The responses will be analysed using the noticing, collecting and thinking model. The resulting analysis will be appropriate for use in developing guidelines for the future management of a range of shadow ports established in a capital city, enabling them to operate in a competitive environment more effectively. The resultant growth of these ports will be a significant factor in increasing the competitiveness of a nation’s maritime transport industry and eventually lead to a boost in the national economy.

Keywords: shadow port, Bangkok Port, Laem Chabang Port, port competition

Procedia PDF Downloads 155
6196 Big Data in Construction Project Management: The Colombian Northeast Case

Authors: Sergio Zabala-Vargas, Miguel Jiménez-Barrera, Luz VArgas-Sánchez

Abstract:

In recent years, information related to project management in organizations has been increasing exponentially. Performance data, management statistics, indicator results have forced the collection, analysis, traceability, and dissemination of project managers to be essential. In this sense, there are current trends to facilitate efficient decision-making in emerging technology projects, such as: Machine Learning, Data Analytics, Data Mining, and Big Data. The latter is the most interesting in this project. This research is part of the thematic line Construction methods and project management. Many authors present the relevance that the use of emerging technologies, such as Big Data, has taken in recent years in project management in the construction sector. The main focus is the optimization of time, scope, budget, and in general mitigating risks. This research was developed in the northeastern region of Colombia-South America. The first phase was aimed at diagnosing the use of emerging technologies (Big-Data) in the construction sector. In Colombia, the construction sector represents more than 50% of the productive system, and more than 2 million people participate in this economic segment. The quantitative approach was used. A survey was applied to a sample of 91 companies in the construction sector. Preliminary results indicate that the use of Big Data and other emerging technologies is very low and also that there is interest in modernizing project management. There is evidence of a correlation between the interest in using new data management technologies and the incorporation of Building Information Modeling BIM. The next phase of the research will allow the generation of guidelines and strategies for the incorporation of technological tools in the construction sector in Colombia.

Keywords: big data, building information modeling, tecnology, project manamegent

Procedia PDF Downloads 111
6195 Sewer Culvert Installation Method to Accommodate Underground Construction in an Urban Area with Narrow Streets

Authors: Osamu Igawa, Hiroshi Kouchiwa, Yuji Ito

Abstract:

In recent years, a reconstruction project for sewer pipelines has been progressing in Japan with the aim of renewing old sewer culverts. However, it is difficult to secure a sufficient base area for shafts in an urban area because many streets are narrow with a complex layout. As a result, construction in such urban areas is generally very demanding. In urban areas, there is a strong requirement for a safe, reliable and economical construction method that does not disturb the public’s daily life and urban activities. With this in mind, we developed a new construction method called the 'shield switching type micro-tunneling method' which integrates the micro-tunneling method and shield method. In this method, pipeline is constructed first for sections that are gently curved or straight using the economical micro-tunneling method, and then the method is switched to the shield method for sections with a sharp curve or a series of curves without establishing an intermediate shaft. This paper provides the information, features and construction examples of this newly developed method.

Keywords: micro-tunneling method, secondary lining applied RC segment, sharp curve, shield method, switching type

Procedia PDF Downloads 380
6194 Importance of Occupational Safety and Health in Dam Construction Site

Authors: Naci Büyükkaraciğan, Yildirim Akyol

Abstract:

Large plants that covering the back and accumulate water of a river valley for energy production, drinking, irrigation water supply, economic benefits that serve many purposes, such as regulation of flood protection, are called dams. Place, in which unites in order to achieve an optimum balance between manpower for Lowest cost and economic as belonging to that structure to create machines, materials and construction of the project, is called as the site. Dam construction sites are combined sites in together in many businesses. Therefore, there can be found in the many workers and machines are many accidents in this type of construction sites. The necessity of systematic and scientific studies due to various reasons arises in order to be protected from conditions that could damage the health, During the execution of the work on construction sites. Occupational health and safety of the study, called the case, also in the European Union has begun to be addressed by weight since the 1980s. In particular, issued in 1989 89/391/EEC on occupational health and safety directive, occupational health and adopted the Directive within the framework of the security field, and then exposed to a large number of individual directive within this framework on the basis of the directive. Turkey's Law No. 6331 entered into force in June 2012 on the subject. In this study, measures related to the construction site of the dam should be taken with occupational safety and health have been examined and tried to put forward recommendations on the subject.

Keywords: civil engineering, dam, occupational safety and health, site organizations

Procedia PDF Downloads 314
6193 Revitalization of Industrial Brownfields in Historical Districts

Authors: Adel Menchawy, Noha Labib

Abstract:

Many cities have quarters that confer on them sense of identity and place through its cultural history. They are often vital part of the cities charm and appeal, their functional and visual qualities are important to the city’s image and identity. Brownfield sites present an important part of our built landscape. They provide tangible and intangible links to our past and have great potential to play significant roles in the future of our cities, towns and rural environments. Brownfield sites are places that were previously industrial factories or areas that might have had waste kept at that location or been exposed to many types of hazards. Thus its redevelopment revitalizes and strengthens towns and communities as it helps in economic growth, builds community pride and protects public health and the environment Three case studies are discussed in this paper; the first one is the city of Sterling which was developed and revitalized entirely and became a city with identity after it was derelict, the Second is the city of Castlefield with was a place no one was eager to visit now it became a touristic area. And finally the city of Cleveland which adopted a strategy that transferred it from being a polluted, derelict place into a mixed use development city Brownfield revitalization offers a great opportunity to transfer the city from being derelict, useless and contaminated into a place where tourists would love to come. Also it will increase the economy of the place, increase the social level, it can improve energy efficiency, reduce natural consumption, clean air, water and land and take advantage of existing buildings and sites and transfers them into an adaptive reuse after being remediated

Keywords: Brownfield Revitalization, Sustainable Brownfield, Historical conservation, Adaptive reuse

Procedia PDF Downloads 241
6192 Safeguarding the Construction Industry: Interrogating and Mitigating Emerging Risks from AI in Construction

Authors: Abdelrhman Elagez, Rolla Monib

Abstract:

This empirical study investigates the observed risks associated with adopting Artificial Intelligence (AI) technologies in the construction industry and proposes potential mitigation strategies. While AI has transformed several industries, the construction industry is slowly adopting advanced technologies like AI, introducing new risks that lack critical analysis in the current literature. A comprehensive literature review identified a research gap, highlighting the lack of critical analysis of risks and the need for a framework to measure and mitigate the risks of AI implementation in the construction industry. Consequently, an online survey was conducted with 24 project managers and construction professionals, possessing experience ranging from 1 to 30 years (with an average of 6.38 years), to gather industry perspectives and concerns relating to AI integration. The survey results yielded several significant findings. Firstly, respondents exhibited a moderate level of familiarity (66.67%) with AI technologies, while the industry's readiness for AI deployment and current usage rates remained low at 2.72 out of 5. Secondly, the top-ranked barriers to AI adoption were identified as lack of awareness, insufficient knowledge and skills, data quality concerns, high implementation costs, absence of prior case studies, and the uncertainty of outcomes. Thirdly, the most significant risks associated with AI use in construction were perceived to be a lack of human control (decision-making), accountability, algorithm bias, data security/privacy, and lack of legislation and regulations. Additionally, the participants acknowledged the value of factors such as education, training, organizational support, and communication in facilitating AI integration within the industry. These findings emphasize the necessity for tailored risk assessment frameworks, guidelines, and governance principles to address the identified risks and promote the responsible adoption of AI technologies in the construction sector.

Keywords: risk management, construction, artificial intelligence, technology

Procedia PDF Downloads 25
6191 Key External Causes of Poor Performance of Engineering and Technical Departments within Governmental Construction Projects in Saudi Arabia

Authors: Alaa A. Al-Harthi, Abdulrahman S. Bageis, Bingunath Ingirige

Abstract:

Poor levels of performance and low productivity were highlighted by many previous studies as a major cause of failure in the Saudi construction industry. This paper provides recommendations to address key external indicators that led to poor levels of performance and low productivity in Engineering and Technical Departments (ETDs) within the Saudi governmental agencies. The ETDs are client’s representative on behalf of the Saudi Ministries. This paper represents a part of an investigation which contained external and internal challenges that led to occurrence of the research problem. The paper is focusing on the external challenges which contain 14 indicators. These 14 external indicators had been examined carefully through comprehensive review of the literature then have been tested through quantitative and qualitative methods. 400 questionnaires were distributed to dozens of different bodies. The actual response rate was 47% completed responses. Four semi-structured interviews were conducted with senior practitioners from the Public Construction Sector. The finding showed that the 14 external indicators directly and/or indirectly influence the Public Construction Sector. It was noticed significantly that these indicators have prevented the ETDs from performing properly. It was also found that the 14 external indicators were constant with all kinds of Government Construction Projects in the Saudi context. Addressing the 14 external indicators requires to be planned over the long run which is responsible by relevant Saudi governmental authorities under the umbrella of the Saudi Council of Ministers. The study recommends that Project Management Office (PMO) should be considered in order to improve the performance of the ETDs.

Keywords: construction projects' performance, low engineering productivity, public construction sector

Procedia PDF Downloads 578
6190 Social Vulnerability Mapping in New York City to Discuss Current Adaptation Practice

Authors: Diana Reckien

Abstract:

Vulnerability assessments are increasingly used to support policy-making in complex environments, like urban areas. Usually, vulnerability studies include the construction of aggregate (sub-) indices and the subsequent mapping of indices across an area of interest. Vulnerability studies show a couple of advantages: they are great communication tools, can inform a wider general debate about environmental issues, and can help allocating and efficiently targeting scarce resources for adaptation policy and planning. However, they also have a number of challenges: Vulnerability assessments are constructed on the basis of a wide range of methodologies and there is no single framework or methodology that has proven to serve best in certain environments, indicators vary highly according to the spatial scale used, different variables and metrics produce different results, and aggregate or composite vulnerability indicators that are mapped easily distort or bias the picture of vulnerability as they hide the underlying causes of vulnerability and level out conflicting reasons of vulnerability in space. So, there is urgent need to further develop the methodology of vulnerability studies towards a common framework, which is one reason of the paper. We introduce a social vulnerability approach, which is compared with other approaches of bio-physical or sectoral vulnerability studies relatively developed in terms of a common methodology for index construction, guidelines for mapping, assessment of sensitivity, and verification of variables. Two approaches are commonly pursued in the literature. The first one is an additive approach, in which all potentially influential variables are weighted according to their importance for the vulnerability aspect, and then added to form a composite vulnerability index per unit area. The second approach includes variable reduction, mostly Principal Component Analysis (PCA) that reduces the number of variables that are interrelated into a smaller number of less correlating components, which are also added to form a composite index. We test these two approaches of constructing indices on the area of New York City as well as two different metrics of variables used as input and compare the outcome for the 5 boroughs of NY. Our analysis yields that the mapping exercise yields particularly different results in the outer regions and parts of the boroughs, such as Outer Queens and Staten Island. However, some of these parts, particularly the coastal areas receive the highest attention in the current adaptation policy. We imply from this that the current adaptation policy and practice in NY might need to be discussed, as these outer urban areas show relatively low social vulnerability as compared with the more central parts, i.e. the high dense areas of Manhattan, Central Brooklyn, Central Queens and the Southern Bronx. The inner urban parts receive lesser adaptation attention, but bear a higher risk of damage in case of hazards in those areas. This is conceivable, e.g., during large heatwaves, which would more affect more the inner and poorer parts of the city as compared with the outer urban areas. In light of the recent planning practice of NY one needs to question and discuss who in NY makes adaptation policy for whom, but the presented analyses points towards an under representation of the needs of the socially vulnerable population, such as the poor, the elderly, and ethnic minorities, in the current adaptation practice in New York City.

Keywords: vulnerability mapping, social vulnerability, additive approach, Principal Component Analysis (PCA), New York City, United States, adaptation, social sensitivity

Procedia PDF Downloads 379
6189 Identification of Factors Affecting Labor Productivity in Construction Projects of Iran

Authors: Elham Dehghan, A. Shirzadi Javid, Mohsen Tadayon

Abstract:

Labor productivity is very important and gained special concerns among professionals in the construction industry, worldwide. Productivity improvements on labors achieve higher cost savings with minimal investment. Due to the fact that profit margins are small on construction projects, cost savings associated with productivity are crucial to become a successful contractor. This research program studies and highlights the factors affecting labor productivity in Iranian construction industry. A questionnaire was used to gather the relevant data from respondents who involve in managing various types of projects in wide areas in Iran. It involved ranking 57 predefined factors divided into 5 categories: Human/Labor; Financial; Management; Equipments/Materials and Environmental. Total 62 feedbacks were analyzed through the Relative Importance Index (RII) technique. The top ten factors affecting construction labor productivity in Iran are: 1) Professional capability of contractor project manager, 2) skills of contractor’s project management team, 3) professional capability of owner project manager, 4) professional capability of Consulting Project manager, 5) discipline working, 6) delay payments by the owner, 7) material shortages, 8) delays in delivery of materials, 9) turnover power of the owner, 10) poor site management. Recommendations have been made in the study to address these factors. The research has direct benefits to key stakeholders in Iranian construction industry.

Keywords: Iranian construction projects, labor, productivity, relative importance index

Procedia PDF Downloads 249
6188 Key Drivers for Nighttime Construction under the EPC Contract

Authors: Aditya Pal, S. Z. S. Tabish, Kumar Neeraj Jha

Abstract:

In the construction industry, engineering procurement and construction (EPC) projects are becoming increasingly prevalent; they provide clients with benefits such as decreased workload, streamlined execution, and a singular point of accountability. EPC projects entail round-the-clock operations, which calls for an analysis of the variables that impact productivity during nocturnal hours. The current body of research on the distinctions between daytime and nighttime construction lacks a comprehensive examination of nocturnal attributes. The objective of this research is to ascertain the critical factors that influence the productivity of nighttime construction by conducting site investigations and reviewing relevant literature. The influence of factors such as illumination conditions, equipment deployment, quality procedures, and government regulations on productivity is subject to careful examination. The studies rank the significance of these factors in accordance with the relative importance index (RII) and entropy weighted method (EWM). The primary determinants identified in the study are temperature (RII: 0.8444), weather conditions (RII: 0.8222), and material and apparatus maintenance (RII: 0.8222). The findings function as recommendations for project managers and EPC contractors to reduce setbacks and increase efficiency. By comparing the outcomes of EWM and RII, the most effective approach to resolving the most crucial characteristics is achieved.

Keywords: productivity, nighttime work, statistical methods, construction, entropy weighted method, relative importance indexing

Procedia PDF Downloads 19
6187 Interior Noise Reduction of Construction Equipment Vehicle

Authors: Pradeep Jawale, Sharad Supare, Sachin Kumar Jain, Nagesh Walke

Abstract:

One can witness the constant development and redevelopment of cities throughout the world. Construction equipment vehicles (CEVs) are commonly used on the construction site. However, noise pollution from construction sites due to the use of CEV has become a major problem for many cities. The construction equipment employed, which includes excavators and bulldozers, is one of the main causes of these elevated noise levels. The construction workers possibly will face a potential risk to their auditory health and well-being due to the noise levels they are exposed to. Different countries have imposed exterior and operator noise limits for construction equipment vehicles, enabling them to control noise pollution from CEVs. In this study, the operator ear level noise of the identified vehicle is higher than the benchmark vehicle by 8 dB(A). It was a tough time for the NVH engineer to beat the interior noise level of the benchmark vehicle. Initially, the noise source identification technique was used to identify the dominant sources for increasing the interior noise of the test vehicle. It was observed that the transfer of structure-borne and air-borne noise to the cabin was the major issue with the vehicle. It was foremost required to address the issue without compromising the overall performance of the vehicle. Surprisingly, the steering pump and radiator fan were identified as the major dominant sources than typical conventional sources like powertrain, intake, and exhaust. Individual sources of noise were analyzed in detail, and optimizations were made to minimize the noise at the source. As a result, the significant noise reduction achieved inside the vehicle and the overall in-cab noise level for the vehicle became a new benchmark in the market.

Keywords: interior noise, noise reduction, CEV, noise source identification

Procedia PDF Downloads 23
6186 Evaluating Environmental Impact of End-of-Life Cycle Cases for Brick Walls and Aerated Autoclave Concrete Walls

Authors: Ann Mariya Jose, Ashfina T.

Abstract:

Construction and demolition waste is one of the rising concerns globally due to the amount of waste generated annually, the area taken up by landfills, and the adverse environmental impacts that follow. One of the primary causes of the rise in construction and demolition waste is a lack of facilities and knowledge for incorporating recycled materials into new construction. Bricks are a conventional material that has been used for construction for centuries, and Autoclave Aerated Concrete (AAC) blocks are a new emergent material in the market. This study evaluates the impact brick walls, and AAC block walls have on the environment using the tool One Click LCA, considering three End of Life (EoL) scenarios: the materials are landfilled, recycled, and reused in a new building. The final objective of the study is to evaluate the environmental impact caused by these two different walls on the environmental factors such as Global Warming Potential (GWP), Acidification Potential (AP), Eutrophication Potential (EP), Ozone Depletion Potential (ODP), and Photochemical Ozone Creation Potential (POCP). The findings revealed that the GWP caused by landfilling is 16 times higher in bricks and 22 times higher in AAC blocks when compared to the reuse of materials. The study recommends the effective use of AAC blocks in construction and reuse of the same to reduce the overall emissions to the environment.

Keywords: construction and demolition waste, environmental impact, life cycle impact assessment, material recycling

Procedia PDF Downloads 86
6185 Ranking of the Main Criteria for Contractor Selection Procedures on Major Construction Projects in Libya Using the Delphi Method

Authors: Othoman Elsayah, Naren Gupta, Binsheng Zhang

Abstract:

The construction sector constitutes one of the most important sectors in the economy of any country. Contractor selection is a critical decision that is undertaken by client organizations and is central to the success of any construction project. Contractor selection (CS) is a process which involves investigating, screening and determining whether candidate contractors have the technical and financial capability to be accepted to formally tender for construction work. The process should be conducted prior to the award of contract, characterized by many factors such as: contactor’s skills, experience on similar projects, track- record in the industry, and financial stability. However, this paper evaluates the current state of knowledge in relation to contractor selection process and demonstrates the findings from the analysis of the data collected from the Delphi questionnaire survey. The survey was conducted with a group of 12 experts working in the Libyan construction industry (LCI). The paper starts by briefly explaining the general outline of the questionnaire including the survey participation rate, the different fields the experts came from, and the business titles of the participants. Then, the paper describes the tests used to determine when the experts had reached consensus. The paper is based on research which aims to develop rank contractor selection criteria with specific application to make construction projects in the Libyan context. The findings of this study will be utilized to establish the scope of work that will be used as part of a PhD research.

Keywords: contractor selection, Libyan construction industry, decision experts, Delphi technique

Procedia PDF Downloads 313
6184 Smart City Solutions for Enhancing the Cultural and Historic Value of Urban Heritage Sites

Authors: Farnoosh Faal

Abstract:

The trend among smart cities is to incorporate technological advancements to better manage and protect their cultural heritage sites. This study investigates how smart city solutions can improve the cultural and historical significance of urban heritage sites and assesses present practices and potential for the future. The paper delves into the literature to examine how smart city technologies can be utilized to increase knowledge and respect for cultural heritage, as well as promote sustainable tourism and economic growth. The article reviews various instances of smart city initiatives across different regions of the world, pinpointing innovative tactics and best practices in improving the cultural and historical worth of urban heritage sites. Additionally, it analyzes the difficulties and limitations associated with implementing these solutions, including community involvement, privacy concerns, and data management issues. The conclusions drawn from this paper propose that smart city solutions offer a substantial opportunity to augment the cultural and historical value of urban heritage sites. By effectively integrating technology into heritage management, there can be greater comprehension and admiration for cultural heritage, enhanced visitor experience, and support for sustainable tourism. However, to fully exploit the potential of smart city solutions in this context, it is crucial to prioritize community engagement and participation, as well as ensure that data management practices are transparent, responsible, and respectful of privacy. In summary, this paper offers guidance and advice to policymakers, urban planners, and heritage management professionals who want to increase the cultural and historical significance of urban heritage sites through the application of smart city solutions. It emphasizes the significance of creating comprehensive and cooperative strategies, as well as ensuring that efforts to preserve heritage are sustainable, fair, and efficient.

Keywords: smart city, Urban heritage, sustainable tourism, heritage preservation

Procedia PDF Downloads 73
6183 The HSBC Building in Shanghai: Diverse Styles of Ornament and the Construction of a Financial Empire

Authors: Lin Ji

Abstract:

The 1923 HSBC Building is one of the landmarks of Shanghai's Bund complex and is described as "one of the finest buildings from the Suez Canal to the Bering Strait". Mr George Leopold Wilson of Palmer&Turner and his design team combine the latest British design taste with Chinese elements and bring the high standard of London manufacturing to Shanghai. This paper reviews the establishment background and construction process of the Hongkong and Shanghai Bank Corporation in Shanghai, and analyzes the characteristics of various styles and ornament of HSBC. At the same time, using the research method of iconography, compared with Britain's exploration of modern design mode in the early 20th century, we can deeply understand how this "monument of world commerce and prosperity" realizes the identity construction of its financial empire in the Far East in the perfect combination of practicality and artistry.

Keywords: early 20-century Shanghai, the bund, the HSBC building, classical styles, ornament, identity construction

Procedia PDF Downloads 124
6182 Designing Bird-Friendly Kolkata city

Authors: Madhumita Roy

Abstract:

Kolkata, the city of joy, is an organic city with 45 lakhs of people till date. The increasing population stress is creating a constant pressure on the ground surface which in turn reducing the possible area for plantation. Humans, plants, and birds have a mutualistic relationship, and all are dependent on each other for their survival. Vegetation structure is very important for a bird life because it can be used as a residence, foraging, life cycle, and shelter from predators. On the other hand, in urban areas, buildings and structures also plays a major role for birds habitat w.r.t, nesting, resting, etc. City birds are constantly upgrading their adaptative mechanism with changing urban pattern with modern architectural designs. Urbanisation and unplanned development lead to environmental degradation and bird habitat fragmentation, which have impacts on the degradation of the quality and quantity of bird habitat. Declining green cover and habitat loss affects the diversity and population structure of birds. Their reducing number is an increasing threat not only to the bird community but also to the city as birds are considered as one of the most important environmental indicator. This study aims to check the present avian status like species richness, relative abundance, and diversity of bird species in the context of changing urban pattern in Kolkata city. Nesting strategy in the urban habitat of the avian community is another avenue of interest.

Keywords: urbanisation, avian species, kolkata metropolis, planning

Procedia PDF Downloads 85