1772 Application of Bim Model Data to Estimate ROI for Robots and Automation in Construction Projects

Authors: Brian Romansky

Abstract:

There are many practical, commercially available robots and semi-autonomous systems that are currently available for use in a wide variety of construction tasks. Adoption of these technologies has the potential to reduce the time and cost to deliver a project, reduce variability and risk in delivery time, increase quality, and improve safety on the job site. These benefits come with a cost for equipment rental or contract fees, access to specialists to configure the system, and time needed for set-up and support of the machines while in use. Calculation of the net ROI (Return on Investment) requires detailed information about the geometry of the site, the volume of work to be done, the overall project schedule, as well as data on the capabilities and past performance of available robotic systems. Assembling the required data and comparing the ROI for several options is complex and tedious. Many project managers will only consider the use of a robot in targeted applications where the benefits are obvious, resulting in low levels of adoption of automation in the construction industry. This work demonstrates how data already resident in many BIM (Building Information Model) projects can be used to automate ROI estimation for a sample set of commercially available construction robots. Calculations account for set-up and operating time along with scheduling support tasks required while the automated technology is in use. Configuration parameters allow for prioritization of time, cost, or safety as the primary benefit of the technology. A path toward integration and use of automatic ROI calculation with a database of available robots in a BIM platform is described.

Keywords: automation, BIM, robot, ROI.

Procedia PDF Downloads 88
1771 Visualizing the Future of New York’s Southern Tier: Engaging Students to Help Create Sustainable Communities

Authors: William C. Dean

Abstract:

In the pedagogical sequence of the four- and five-year architectural programs at Alfred State, the fourth-year Urban Design Studio constitutes the first course where students directly explore design issues in the urban context. It is the first large-scale, community-based service learning project for most of the participating students. The students learn key lessons that include the benefits of working both individually and in groups of different sizes toward a common goal, accepting - and responding creatively too - criticism from stakeholders at different points in the project, and recognizing the role that local politics and activism can play in planning for community development. Above all, students are exposed to the importance of good planning in relation to preservation and community revitalization. The purpose of this paper is to discuss the use of community-based service-learning projects in undergraduate architectural education to promote student civic engagement as a means of helping communities visualize potential solutions for revitalizing their neighborhoods and business districts. A series of case studies will be presented in terms of challenges that were encountered, opportunities for student engagement and leadership, and the feasibility of sustainable community development resulting from those projects. The reader will be encouraged to consider how they can recognize needs within their own communities that could benefit from the assistance of architecture students and faculty.

Keywords: urban design, service-learning, civic engagement, community revitalization

Procedia PDF Downloads 95
1770 Stochastic Approach for Technical-Economic Viability Analysis of Electricity Generation Projects with Natural Gas Pressure Reduction Turbines

Authors: Roberto M. G. Velásquez, Jonas R. Gazoli, Nelson Ponce Jr, Valério L. Borges, Alessandro Sete, Fernanda M. C. Tomé, Julian D. Hunt, Heitor C. Lira, Cristiano L. de Souza, Fabio T. Bindemann, Wilmar Wounnsoscky

Abstract:

Nowadays, society is working toward reducing energy losses and greenhouse gas emissions, as well as seeking clean energy sources, as a result of the constant increase in energy demand and emissions. Energy loss occurs in the gas pressure reduction stations at the delivery points in natural gas distribution systems (city gates). Installing pressure reduction turbines (PRT) parallel to the static reduction valves at the city gates enhances the energy efficiency of the system by recovering the enthalpy of the pressurized natural gas, obtaining in the pressure-lowering process shaft work and generating electrical power. Currently, the Brazilian natural gas transportation network has 9,409 km in extension, while the system has 16 national and 3 international natural gas processing plants, including more than 143 delivery points to final consumers. Thus, the potential of installing PRT in Brazil is 66 MW of power, which could yearly avoid the emission of 235,800 tons of CO2 and generate 333 GWh/year of electricity. On the other hand, an economic viability analysis of these energy efficiency projects is commonly carried out based on estimates of the project's cash flow obtained from several variables forecast. Usually, the cash flow analysis is performed using representative values of these variables, obtaining a deterministic set of financial indicators associated with the project. However, in most cases, these variables cannot be predicted with sufficient accuracy, resulting in the need to consider, to a greater or lesser degree, the risk associated with the calculated financial return. This paper presents an approach applied to the technical-economic viability analysis of PRTs projects that explicitly considers the uncertainties associated with the input parameters for the financial model, such as gas pressure at the delivery point, amount of energy generated by TRP, the future price of energy, among others, using sensitivity analysis techniques, scenario analysis, and Monte Carlo methods. In the latter case, estimates of several financial risk indicators, as well as their empirical probability distributions, can be obtained. This is a methodology for the financial risk analysis of PRT projects. The results of this paper allow a more accurate assessment of the potential PRT project's financial feasibility in Brazil. This methodology will be tested at the Cuiabá thermoelectric plant, located in the state of Mato Grosso, Brazil, and can be applied to study the potential in other countries.

Keywords: pressure reduction turbine, natural gas pressure drop station, energy efficiency, electricity generation, monte carlo methods

Procedia PDF Downloads 113
1769 Achieving Design-Stage Elemental Cost Planning Accuracy: Case Study of New Zealand

Authors: Johnson Adafin, James O. B. Rotimi, Suzanne Wilkinson, Abimbola O. Windapo

Abstract:

An aspect of client expenditure management that requires attention is the level of accuracy achievable in design-stage elemental cost planning. This has been a major concern for construction clients and practitioners in New Zealand (NZ). Pre-tender estimating inaccuracies are significantly influenced by the level of risk information available to estimators. Proper cost planning activities should ensure the production of a project’s likely construction costs (initial and final), and subsequent cost control activities should prevent unpleasant consequences of cost overruns, disputes and project abandonment. If risks were properly identified and priced at the design stage, observed variance between design-stage elemental cost plans (ECPs) and final tender sums (FTS) (initial contract sums) could be reduced. This study investigates the variations between design-stage ECPs and FTS of construction projects, with a view to identifying risk factors that are responsible for the observed variance. Data were sourced through interviews, and risk factors were identified by using thematic analysis. Access was obtained to project files from the records of study participants (consultant quantity surveyors), and document analysis was employed in complementing the responses from the interviews. Study findings revealed the discrepancies between ECPs and FTS in the region of -14% and +16%. It is opined in this study that the identified risk factors were responsible for the variability observed. The values obtained from the analysis would enable greater accuracy in the forecast of FTS by Quantity Surveyors. Further, whilst inherent risks in construction project developments are observed globally, these findings have important ramifications for construction projects by expanding existing knowledge on what is needed for reasonable budgetary performance and successful delivery of construction projects. The findings contribute significantly to the study by providing quantitative confirmation to justify the theoretical conclusions generated in the literature from around the world. This therefore adds to and consolidates existing knowledge.

Keywords: accuracy, design-stage, elemental cost plan, final tender sum

Procedia PDF Downloads 270
1768 Decision Framework for Cross-Border Railway Infrastructure Projects

Authors: Dimitrios J. Dimitriou, Maria F. Sartzetaki

Abstract:

Transport infrastructure assets are key components of the national asset portfolio. The decision to invest in a new infrastructure in transports could take from a few years to some decades. This is mainly because of the need to reserve and spent many capitals, the long payback period, the number of the stakeholders involved in decision process and –many times- the investment and business risks are high. Therefore, the decision assessment framework is an essential challenge linked with the key decision factors meet the stakeholder expectations highlighting project trade-offs, financial risks, business uncertainties and market limitations. This paper examines the decision process for new transport infrastructure projects in cross border regions, where a wide range of stakeholders with different expectation is involved. According to a consequences analysis systemic approach, the relationship of transport infrastructure development, economic system development and stakeholder expectation is analyzed. Adopting the on system of system methodological approach, the decision making framework, variables, inputs and outputs are defined, highlighting the key shareholder’s role and expectations. The application provides the methodology outputs presenting the proposed decision framework for a strategic railway project in north Greece deals with the upgrade of the existing railway corridor connecting Greece, Turkey and Bulgaria.

Keywords: decision making, system of system, cross-border, infrastructure project

Procedia PDF Downloads 314
1767 Enhancing Dispute Resolution in Construction: The Potential Contributions of Dispute Boards and the Roadblock to Vaster Adoption

Authors: Zeyad M. Abdelgawad, A. Samer Ezeldin, Waleed El Nemr

Abstract:

The Egyptian construction industry has evolved significantly over the past decade, driven by enhanced economic sectors and the need for industrial development. This complexity requires diverse and flexible alternative dispute resolution (ADR) techniques. Dispute boards (DB) are globally recognized as effective ADR methods, especially since their introduction to World Bank projects in 1995. Despite their advantages, dispute boards remain underutilized in Egypt aside from the World Bank-financed projects due to several misconceptions. The study reveals the perceptions hindering the wider adoption of dispute boards in the Egyptian construction industry through detailed literature review and interviews with the experts. The perceptions encompassed the lack of awareness and understanding of dispute boards and implementation procedures, misconceptions about the costs associated with implementing dispute boards and the impact on the bid prices, the common orientation of resolving disputes internally and avoid resorting to external parties to preserve the long-term relationship, and lack of trust in the ability of the dispute boards to positively affect the project performance. In response to these identified misconceptions, a proposed alternative draft to the FIDIC 2017 clause twenty-one “Disputes and Arbitration” is provided, offering a way for a practical application of the dispute boards within the Egyptian context.

Keywords: alternative dispute resolution, claim management system, dispute boards, Egyptian construction industry, FIDIC

Procedia PDF Downloads 23
1766 Integrating Microcontroller-Based Projects in a Human-Computer Interaction Course

Authors: Miguel Angel Garcia-Ruiz, Pedro Cesar Santana-Mancilla, Laura Sanely Gaytan-Lugo

Abstract:

This paper describes the design and application of a short in-class project conducted in Algoma University’s Human-Computer Interaction (HCI) course taught at the Bachelor of Computer Science. The project was based on the Maker Movement (people using and reusing electronic components and everyday materials to tinker with technology and make interactive applications), where students applied low-cost and easy-to-use electronic components, the Arduino Uno microcontroller board, software tools, and everyday objects. Students collaborated in small teams by completing hands-on activities with them, making an interactive walking cane for blind people. At the end of the course, students filled out a Technology Acceptance Model version 2 (TAM2) questionnaire where they evaluated microcontroller boards’ applications in HCI classes. We also asked them about applying the Maker Movement in HCI classes. Results showed overall students’ positive opinions and response about using microcontroller boards in HCI classes. We strongly suggest that every HCI course should include practical activities related to tinkering with technology such as applying microcontroller boards, where students actively and constructively participate in teams for achieving learning objectives.

Keywords: maker movement, microcontrollers, learning, projects, course, technology acceptance

Procedia PDF Downloads 174
1765 Assessment of the Impact of Road Transportation Improvement on Rural Development

Authors: Mohammad Mirwais Arghandiwal, Fujita Motohiro, Wisinee Wisetjindawat

Abstract:

Since 2001, the new government of Afghanistan addressed the improvement of transportation in rural areas as one of the key issues for the country development. This paper thus, aims to show the impotency of transportation in the rural area of Kabul province. A field survey in Kabul Province capital of Afghanistan has been conducted during March, 2015, and 201 questionnaires were collected from four districts named Shakar Dara, Paghman, Char Asyab, and Khak Jabar to investigate the impacts of road transportation on the people’s daily life. The districts had their road projects constructed during the last 3-5 years. The interviewees are chosen randomly from a different category of districts residences. As transportation is one of the most important factors for the development of the communities, during the survey it was very easily to observe a positive effect on the life of people. The improvement on the accessibility has had a positive impact on the land and land price. In this paper, a model is created to show the relationship between different factors and the land price improvement. In the end, a recommendation is presented on the establishment of the community council for a better use and maintenance of road projects. We emphasize on a public and private partnership at a community level in the districts during the construction period too. In addition, the communities should be encouraged on their positive role in the improvement of transportation through their participation and collaboration with the local government.

Keywords: accessibility, Afghanistan, poverty, rural area, transportation development

Procedia PDF Downloads 439
1764 Use of Socially Assistive Robots in Early Rehabilitation to Promote Mobility for Infants with Motor Delays

Authors: Elena Kokkoni, Prasanna Kannappan, Ashkan Zehfroosh, Effrosyni Mavroudi, Kristina Strother-Garcia, James C. Galloway, Jeffrey Heinz, Rene Vidal, Herbert G. Tanner

Abstract:

Early immobility affects the motor, cognitive, and social development. Current pediatric rehabilitation lacks the technology that will provide the dosage needed to promote mobility for young children at risk. The addition of socially assistive robots in early interventions may help increase the mobility dosage. The aim of this study is to examine the feasibility of an early intervention paradigm where non-walking infants experience independent mobility while socially interacting with robots. A dynamic environment is developed where both the child and the robot interact and learn from each other. The environment involves: 1) a range of physical activities that are goal-oriented, age-appropriate, and ability-matched for the child to perform, 2) the automatic functions that perceive the child’s actions through novel activity recognition algorithms, and decide appropriate actions for the robot, and 3) a networked visual data acquisition system that enables real-time assessment and provides the means to connect child behavior with robot decision-making in real-time. The environment was tested by bringing a two-year old boy with Down syndrome for eight sessions. The child presented delays throughout his motor development with the current being on the acquisition of walking. During the sessions, the child performed physical activities that required complex motor actions (e.g. climbing an inclined platform and/or staircase). During these activities, a (wheeled or humanoid) robot was either performing the action or was at its end point 'signaling' for interaction. From these sessions, information was gathered to develop algorithms to automate the perception of activities which the robot bases its actions on. A Markov Decision Process (MDP) is used to model the intentions of the child. A 'smoothing' technique is used to help identify the model’s parameters which are a critical step when dealing with small data sets such in this paradigm. The child engaged in all activities and socially interacted with the robot across sessions. With time, the child’s mobility was increased, and the frequency and duration of complex and independent motor actions were also increased (e.g. taking independent steps). Simulation results on the combination of the MDP and smoothing support the use of this model in human-robot interaction. Smoothing facilitates learning MDP parameters from small data sets. This paradigm is feasible and provides an insight on how social interaction may elicit mobility actions suggesting a new early intervention paradigm for very young children with motor disabilities. Acknowledgment: This work has been supported by NIH under grant #5R01HD87133.

Keywords: activity recognition, human-robot interaction, machine learning, pediatric rehabilitation

Procedia PDF Downloads 294
1763 Performance Evaluation and Planning for Road Safety Measures Using Data Envelopment Analysis and Fuzzy Decision Making

Authors: Hamid Reza Behnood, Esmaeel Ayati, Tom Brijs, Mohammadali Pirayesh Neghab

Abstract:

Investment projects in road safety planning can benefit from an effectiveness evaluation regarding their expected safety outcomes. The objective of this study is to develop a decision support system (DSS) to support policymakers in taking the right choice in road safety planning based on the efficiency of previously implemented safety measures in a set of regions in Iran. The measures considered for each region in the study include performance indicators about (1) police operations, (2) treated black spots, (3) freeway and highway facility supplies, (4) speed control cameras, (5) emergency medical services, and (6) road lighting projects. To this end, inefficiency measure is calculated, defined by the proportion of fatality rates in relation to the combined measure of road safety performance indicators (i.e., road safety measures) which should be minimized. The relative inefficiency for each region is modeled by the Data Envelopment Analysis (DEA) technique. In a next step, a fuzzy decision-making system is constructed to convert the information obtained from the DEA analysis into a rule-based system that can be used by policy makers to evaluate the expected outcomes of certain alternative investment strategies in road safety.

Keywords: performance indicators, road safety, decision support system, data envelopment analysis, fuzzy reasoning

Procedia PDF Downloads 354
1762 Enhancing Project Management Performance in Prefabricated Building Construction under Uncertainty: A Comprehensive Approach

Authors: Niyongabo Elyse

Abstract:

Prefabricated building construction is a pioneering approach that combines design, production, and assembly to attain energy efficiency, environmental sustainability, and economic feasibility. Despite continuous development in the industry in China, the low technical maturity of standardized design, factory production, and construction assembly introduces uncertainties affecting prefabricated component production and on-site assembly processes. This research focuses on enhancing project management performance under uncertainty to help enterprises navigate these challenges and optimize project resources. The study introduces a perspective on how uncertain factors influence the implementation of prefabricated building construction projects. It proposes a theoretical model considering project process management ability, adaptability to uncertain environments, and collaboration ability of project participants. The impact of uncertain factors is demonstrated through case studies and quantitative analysis, revealing constraints on implementation time, cost, quality, and safety. To address uncertainties in prefabricated component production scheduling, a fuzzy model is presented, expressing processing times in interval values. The model utilizes a cooperative co-evolution evolution algorithm (CCEA) to optimize scheduling, demonstrated through a real case study showcasing reduced project duration and minimized effects of processing time disturbances. Additionally, the research addresses on-site assembly construction scheduling, considering the relationship between task processing times and assigned resources. A multi-objective model with fuzzy activity durations is proposed, employing a hybrid cooperative co-evolution evolution algorithm (HCCEA) to optimize project scheduling. Results from real case studies indicate improved project performance in terms of duration, cost, and resilience to processing time delays and resource changes. The study also introduces a multistage dynamic process control model, utilizing IoT technology for real-time monitoring during component production and construction assembly. This approach dynamically adjusts schedules when constraints arise, leading to enhanced project management performance, as demonstrated in a real prefabricated housing project. Key contributions include a fuzzy prefabricated components production scheduling model, a multi-objective multi-mode resource-constrained construction project scheduling model with fuzzy activity durations, a multi-stage dynamic process control model, and a cooperative co-evolution evolution algorithm. The integrated mathematical model addresses the complexity of prefabricated building construction project management, providing a theoretical foundation for practical decision-making in the field.

Keywords: prefabricated construction, project management performance, uncertainty, fuzzy scheduling

Procedia PDF Downloads 51
1761 Understanding Complexity at Pre-Construction Stage in Project Planning of Construction Projects

Authors: Mehran Barani Shikhrobat, Roger Flanagan

Abstract:

The construction planning and scheduling based on using the current tools and techniques is resulted deterministic in nature (Gantt chart, CPM) or applying a very little probability of completion (PERT) for each task. However, every project embodies assumptions and influences and should start with a complete set of clearly defined goals and constraints that remain constant throughout the duration of the project. Construction planners continue to apply the traditional methods and tools of “hard” project management that were developed for “ideal projects,” neglecting the potential influence of complexity on the design and construction process. The aim of this research is to investigate the emergence and growth of complexity in project planning and to provide a model to consider the influence of complexity on the total project duration at the post-contract award pre-construction stage of a project. The literature review showed that complexity originates from different sources of environment, technical, and workflow interactions. They can be divided into two categories of complexity factors, first, project tasks, and second, project organisation management. Project tasks may originate from performance, lack of resources, or environmental changes for a specific task. Complexity factors that relate to organisation and management refer to workflow and interdependence of different parts. The literature review highlighted the ineffectiveness of traditional tools and techniques in planning for complexity. However, this research focus on understanding the fundamental causes of the complexity of construction projects were investigated through a questionnaire with industry experts. The results were used to develop a model that considers the core complexity factors and their interactions. System dynamics were used to investigate the model to consider the influence of complexity on project planning. Feedback from experts revealed 20 major complexity factors that impact project planning. The factors are divided into five categories known as core complexity factors. To understand the weight of each factor in comparison, the Analytical Hierarchy Process (AHP) analysis method is used. The comparison showed that externalities are ranked as the biggest influence across the complexity factors. The research underlines that there are many internal and external factors that impact project activities and the project overall. This research shows the importance of considering the influence of complexity on the project master plan undertaken at the post-contract award pre-construction phase of a project.

Keywords: project planning, project complexity measurement, planning uncertainty management, project risk management, strategic project scheduling

Procedia PDF Downloads 141
1760 The Impact of Structural Empowerment on Risk Management Practices: A Case Study of Saudi Arabia Construction Small and Medium-Sized Enterprises

Authors: S. Alyami, S. Mohammad

Abstract:

These Risk management practices have a significant impact on construction SMEs. The effective utilisation of these practices depends on culture change in order to optimise decision making for critical activities within construction projects. Thus, successful implementation of empowerment strategies would enhance operational employees to participate in effective decision making. However, there remain many barriers to individuals and organisations within empowerment strategies that require empirical investigation before the industry can benefit from their implementation. Gaps in understanding the relationship between employee empowerment and risk management practices still exist. This research paper aims to examine the impact of the structural empowerment on risk management practices in construction SMEs. The questionnaire has been distributed to participants (162 employees) that involve projects and civil engineers within a case study from Saudi construction SMEs. Partial least squares based structural equation modeling (PLS-SEM) was utilised to perform analysis. The results reveal a positive relationship between empowerment and risk management practices. The study shows how structural empowerment contributes to operational employees in risk management practices through involving activities such as decision making, self-efficiency, and autonomy. The findings of this study will contribute to close the current gaps in the construction SMEs context.

Keywords: construction SMEs, culture, decision making, empowerment, risk management

Procedia PDF Downloads 119
1759 Portfolio Management for Construction Company during Covid-19 Using AHP Technique

Authors: Sareh Rajabi, Salwa Bheiry

Abstract:

In general, Covid-19 created many financial and non-financial damages to the economy and community. Level and severity of covid-19 as pandemic case varies over the region and due to different types of the projects. Covid-19 virus emerged as one of the most imperative risk management factors word-wide recently. Therefore, as part of portfolio management assessment, it is essential to evaluate severity of such risk on the project and program in portfolio management level to avoid any risky portfolio. Covid-19 appeared very effectively in South America, part of Europe and Middle East. Such pandemic infection affected the whole universe, due to lock down, interruption in supply chain management, health and safety requirements, transportations and commercial impacts. Therefore, this research proposes Analytical Hierarchy Process (AHP) to analyze and assess such pandemic case like Covid-19 and its impacts on the construction projects. The AHP technique uses four sub-criteria: Health and safety, commercial risk, completion risk and contractual risk to evaluate the project and program. The result will provide the decision makers with information which project has higher or lower risk in case of Covid-19 and pandemic scenario. Therefore, the decision makers can have most feasible solution based on effective weighted criteria for project selection within their portfolio to match with the organization’s strategies.

Keywords: portfolio management, risk management, COVID-19, analytical hierarchy process technique

Procedia PDF Downloads 110
1758 A Study of Possible Approach to Facilitate Social Sustainability of Industrial Land Redevelopment-Led Urban Regeneration

Authors: Hung Hing Chan, Tai-Shan Hu

Abstract:

Kaohsiung has been an industrial city of Taiwan for over a hundred year. Consequently, there are several abandoned industrial lands left when the process of deindustrialization has started, resulting in the decay of the adjacent urban communities. These industrial lands, which are brownfields that are potentially or already contaminated by hazardous substances, have created social injustice to the surrounding communities. The redevelopments of industrial lands bring a sustainable development to the communities, while the redevelopments can be in different forms, depending on the natural conditions. This research studies the possible approaches to facilitate social sustainability of urban regeneration resulted from the industrial land redevelopment projects, which has always been ignored. The aim of the research is to find out the best western practices of brownfield redevelopment to facilitate social aspect of sustainable urban regeneration and make a contribution to the industrial land redevelopment of Taiwan. The research is conducted via literature review and case study. Industrial land redevelopment has been a social focus in the blighted communities to promote urban regeneration after the post-industrial age. The tendency of this kind of redevelopment is towards constructing the built environment, as a result the environmental and economic aspect of sustainability of the redeveloped industrial land will be boosted, while the social aspect will not be necessarily better since the local communities affected are rarely engaged in the decision-making process and inadequate resource allocation to the projects is not guaranteed. To ensure the improvement of social sustainability is reached, the recommendations of this research, such as civic engagement, a formation of dedicated brownfield regeneration agency and resource allocation to employ brownfield process manager and to strategic communication, should be incorporated into the real practices of industrial land-led urban regeneration. Besides, the case study also shows that the social sustainability of industrial land-led urban regeneration can be promoted by (1) upholding the local feature and public participation in the regeneration process, (2) allocating resources and enforcing responsibility system, and (3) assuring financial resource for the urban regeneration projects and residents. Subsequent research will involve in-depth interviews with the chiefs of the village of related communities in Kaohsiung and questionnaire with the community members to comprehend their opinions regarding social sustainability, aiming at evaluating the social sustainability and finding out which kind of redevelopment project tends to support the social dimension of sustainable development more.

Keywords: brownfield, industrial land, redevelopment, social sustainability, urban regeneration

Procedia PDF Downloads 219
1757 An Approach for Determining and Reducing Vehicle Turnaround Time for Outbound Logistics by Using Critical Path Method

Authors: Prajakta M. Wazat, D. N. Raut

Abstract:

The study consists of a fast moving consumer goods (FMCG) beverage company wherein a portion of the supply chain which deals with outbound logistics is taken for improvement in order to reduce its logistics cost by using critical path method (CPM) method. Logistics is a major portion of the supply chain where customers are not willing to pay as it adds cost to product without adding value. In this study, it is necessary to ensure that products are delivered to clients at the right time while preserving high-quality standards from the beginning to the end of the supply chain. CPM is a logical sequencing method where in the most efficient route is achieved by arranging the series of events. CPM enables to identify a critical factor in order to minimize the delays and interruption by providing a feasible solution.

Keywords: FMCG, supply chain, outbound logistics, vehicle turnaround time, critical path method, cost reduction

Procedia PDF Downloads 167
1756 A Review of Sustainable Energy-Saving Solutions in Active and Passive Solar Systems of Zero Energy Buildings Based on the Internet of Things

Authors: Hanieh Sadat Jannesari, Hoori Jannesar, Alireza Hajian HosseinAbadi

Abstract:

In general, buildings are responsible for a considerable share of consumed energy and carbon emissions worldwide and play a significant role in formulating sustainable development strategies. Therefore, a lot of effort is put into the design and construction of zero-energy buildings (ZEBs) to help eliminate the problems associated with the reduction of energy resources and environmental degradation. Two strategies are significant in designing ZEBs: minimizing the need for energy utilization in buildings (particularly for cooling and heating) through highly energy-efficient designs and using renewable energies and other technologies to meet the remaining energy needs. This paper reviews the works related to these two strategies concerning sustainable energy-saving solutions using renewable energy technologies and the Internet of Things in ZEBs. Drawing on the theories and recently implemented projects of energy engineers in ZEBs, we have reported the required technologies within the framework of this paper’s objectives. Overall, solutions based on renewable and sustainable technologies such as photovoltaic (PV) modules, thermal collectors, Phase Change Material (PCM) techniques, etc., are used in active and passive systems designed for various applications in such buildings as cooling, heating, lighting, cooking, etc. The results obtained from examining these projects show that it is possible to minimize the amount of energy required to be produced for and consumed by these buildings.

Keywords: active and passive renewable energy systems, internet of things, storage, zero energy buildings

Procedia PDF Downloads 34
1755 Branding Tourism Destinations; The Trending Initiatives for Edifice Image Choices of Foreign Policy

Authors: Mehtab Alam, Mudiarasan Kuppusamy, Puvaneswaran Kunaserkaran

Abstract:

The purpose of this paper is to bridge the gap and complete the relationship between tourism destinations and image branding as a choice of edifice foreign policy. Such options became a crucial component for individuals interested in leisure and travel activities. The destination management factors have been evaluated and analyzed using the primary and secondary data in a mixed-methods approach (quantitative sample of 384 and qualitative 8 semi-structured interviews at saturated point). The study chose the Environmental Management Accounting (EMA) and Image Restoration (IR) theories, along with a schematic diagram and an analytical framework supported by NVivo software 12, for two locations in Abbottabad, KPK, Pakistan: Shimla Hill and Thandiani. This incorporates the use of PLS-SEM model for assessing validity of data while SPSS for data screening of descriptive statistics. The results show that destination management's promotion of tourism has significantly improved Pakistan's state image. The use of institutional setup, environmental drivers, immigration, security, and hospitality as well as recreational initiatives on destination management is encouraged. The practical ramifications direct the heads of tourism projects, diplomats, directors, and policymakers to complete destination projects before inviting people to Pakistan. The paper provides the extent of knowledge for academic tourism circles to use tourism destinations as brand ambassadors.

Keywords: tourism, management, state image, foreign policy, image branding

Procedia PDF Downloads 69
1754 Local Residents' Perceptions of Economic Impacts of Urban Riverfront Development: Case of Sabarmati Riverfront Development

Authors: Smriti Mishra, Jaydip Barman, Shashi Kant Pandey

Abstract:

Many scholars suggest that waterfront development projects have an all round impact on cities. However, their research stops short of considering the perception of local residents, of what they think about the impact of such developments and the kind of waterfront development which they would prefer to support. Therefore, this paper attempts to address this imbalance in the literature by analysing a survey of residents' perceptions of such developments. The paper discusses the issue in the Indian context by considering Sabarmati Riverfront Development Project (SRFD) of Ahmadabad. It gives an overview of the project components of the SRFD; discusses its development issues and concerns associated with it. It further examines the structural relationship between socio-economic and demographic attributes of local residents and their attitudes and perception towards the economic impact of such developments. The study suggests that the economic component that riverfront development will attract more investment in their community and that riverfront development will increase real estate tax revenue emerged as strong components. While the economic component of substantial premiums to developers, land owners and local government and the other of cost of developing riverfront facilities are too much of a burden on government and public sector agencies appear to be weaker economic components of the perceived economic impacts of urban riverfront development. This paper also gives an overview of the urban waterfront development in the global scenario. It highlights the need to consider residents perception in the development of such projects.

Keywords: urban waterfront development, riverfront, economic impact, resident perception, SRFD

Procedia PDF Downloads 532
1753 Service Quality Improvement in Ghana's Healthcare Supply Chain

Authors: Ammatu Alhassan

Abstract:

Quality healthcare delivery is a crucial indicator in assessing the overall developmental status of a country. There are many limitations in the Ghanaian healthcare supply chain due to the lack of studies about the correlation between quality health service and the healthcare supply chain. Patients who visit various healthcare providers face unpleasant experiences such as delays in the availability of their medications. In this study, an assessment of the quality of services provided to Ghanaian outpatients who visit public healthcare providers was investigated to establish its effect on the healthcare supply chain using a conceptual model. The Donabedian’s structure, process, and outcome theory for service quality evaluation were used to analyse 20 Ghanaian hospitals. The data obtained was tested using the structural equation model (SEM). The findings from this research will help us to improve the overall quality of the Ghanaian healthcare supply chain. The model which will be developed will help us to understand better the linkage between quality healthcare and the healthcare supply chain as well as serving as a reference tool for future healthcare research in Ghana.

Keywords: Ghana, healthcare, outpatients, supply chain

Procedia PDF Downloads 188
1752 Aspects on the Problems of Road Asset Management and Maintenance in Albania

Authors: Diana Bardhi

Abstract:

Road safety is an essential part of the economic and social development of any industrialized country. Decisions to maintain and improve the reliability, functionality of infrastructure structures can only be achieved through integrated road life cycle planning and management. There has always been a tendency to review road maintenance strategies, but there is still no serious and reliable administration due to not only insufficient funds but also problems in the proper reorganization of this system. The safety and performance of the road system depend on the ongoing activity of road maintenance management. For it to be effective, it is necessary to intervene before the degradation has caused irreparable damage or damage with a high economic cost of repairs. Investments in road infrastructure during 2006-2014 show that the life of these projects presents problems related to the maintenance and management of life cycle performance in a wide range of constituent elements. Maintenance planning includes various problems that depend on the degree of degradation of asphalt layers, the degree of damage to road structures (bridges, tunnels, culverts, and the economic planning of resources for their repair). The purpose of this study is first to provide a brief overview of the problems in the field of maintenance and life cycle management of road infrastructure investments, proposing ways to reorganize the sector of administration and maintenance of ongoing roads and secondly testing and evaluating the work and nature of standards of different types of road infrastructure projects, through a methodology consisting of a) development, b) data collection, and c) analysis.

Keywords: infrastructure, maintenance, depreciation, efficiency

Procedia PDF Downloads 161
1751 Student Project on Using a Spreadsheet for Solving Differential Equations by Euler's Method

Authors: Andriy Didenko, Zanin Kavazovic

Abstract:

Engineering students often have certain difficulties in mastering major theoretical concepts in mathematical courses such as differential equations. Student projects were proposed to motivate students’ learning and can be used as a tool to promote students’ interest in the material. Authors propose a student project that includes the use of Microsoft Excel. This instructional tool is often overlooked by both educators and students. An integral component of the experimental part of such a project is the exploration of an interactive spreadsheet. The aim is to assist engineering students in better understanding of Euler’s method. This method is employed to numerically solve first order differential equations. At first, students are invited to select classic equations from a list presented in a form of a drop-down menu. For each of these equations, students can select and modify certain key parameters and observe the influence of initial condition on the solution. This will give students an insight into the behavior of the method in different configurations as solutions to equations are given in numerical and graphical forms. Further, students could also create their own equations by providing functions of their own choice and a variety of initial conditions. Moreover, they can visualize and explore the impact of the length of the time step on the convergence of a sequence of numerical solutions to the exact solution of the equation. As a final stage of the project, students are encouraged to develop their own spreadsheets for other numerical methods and other types of equations. Such projects promote students’ interest in mathematical applications and further improve their mathematical and programming skills.

Keywords: student project, Euler's method, spreadsheet, engineering education

Procedia PDF Downloads 135
1750 Performance Evaluation of Al Jame’s Roundabout Using SIDRA

Authors: D. Muley, H. S. Al-Mandhari

Abstract:

This paper evaluates the performance of a multi-lane four-legged modern roundabout operating in Muscat using SIDRA model. The performance measures include Degree of Saturation (DOS), average delay, and queue lengths. The geometric and traffic data were used for model preparation. Gap acceptance parameters, critical gap, and follow-up headway were used for calibration of SIDRA model. The results from the analysis showed that currently the roundabout is experiencing delays up to 610 seconds with DOS 1.67 during peak hour. Further, sensitivity analysis for general and roundabout parameters was performed, amongst lane width, cruise speed, inscribed diameter, entry radius, and entry angle showed that inscribed diameter is the most crucial factor affecting delay and DOS. Upgradation of the roundabout to the fully signalized junction was found as the suitable solution which will serve for future years with LOS C for design year having DOS of 0.9 with average control delay of 51.9 seconds per vehicle.

Keywords: performance analysis, roundabout, sensitivity analysis, SIDRA

Procedia PDF Downloads 384
1749 Public Art and Public Space in an Emerging Knowledge Economy: The Case of Doha

Authors: Grichting Anna, Al Sada Sara, Caccayam Angelica, Khan Urshi

Abstract:

The Qatar Museums Authority recently announced a series of public art initiatives in Doha with the purpose of 'bringing art out of the walls of the museum' to make it accessible to the public on a daily basis and to encourage discussion and debate. While the installation of sculptures in public spaces is not new in Doha, the practice of integrating art in public spaces and architectural projects is reaching a new dimension as internationally renowned artists – such as Damien Hirst and Richard Serra - are being commissioned to install their works in the public spaces and buildings of the city of Doha as well as in more remote desert locations. This research discusses the changing presence, role and context of public art in Doha, both from a historical and cultural overview, and the different forms and media as well as the typologies of urban and public spaces in which the art is installed. It examines the process of implementing site-specific artworks, looking at questions of scale, history, social meaning and formal aesthetics. The methodologies combine theoretical research on the understanding of public art and its role and placement in public space, as well as empirical research on contemporary public art projects in Doha, based on documentation and interviews and as well as site and context analysis of the urban or architectural spaces within which the art is situated. Surveys and interviews – using social media - in different segments of the contemporary Qatari society, including all nationalities and social groups, are used to measure and qualify the impacts and effects on the population.

Keywords: public space, public art, urban design, knowledge economy

Procedia PDF Downloads 524
1748 An Improved Parameter Identification Method for Three Phase Induction Motor

Authors: Liang Zhao, Chong-quan Zhong

Abstract:

In order to improve the control performance of vector inverter, an improved parameter identification solution for induction motor is proposed in this paper. Dc or AC voltage is applied to the induction motor using the SVPWM through the inverter. Then stator resistance, stator leakage inductance, rotor resistance, rotor leakage inductance and mutual inductance are obtained according to the signal response. The discrete Fourier transform (DFT) is used to deal with the noise and harmonic. The impact on parameter identification caused by delays in the inverter switch tube, tube voltage drop and dead-time is avoided by effective compensation measures. Finally, the parameter identification experiment is conducted based on the vector inverter which using TMS320F2808 DSP as the core processor and results show that the strategy is verified.

Keywords: vector inverter, parameter identification, SVPWM; DFT, dead-time compensation

Procedia PDF Downloads 464
1747 Tackling Exclusion and Radicalization through Islamic Practices and Discourses: Case Study of Muslim Organizations in Switzerland

Authors: Baptiste Brodard

Abstract:

In Switzerland, as well as in other European countries, specific social issues related to Muslims have recently emerged in public debates. In addition to the question of terrorism and radicalization, Muslim migrant populations are highly affected by social problems such as crime, poverty, marginalization, and overrepresentation in prisons. This situation has drawn the state’s attention to the need for implementing new responses to the challenges of religious extremism, crime, and social exclusion particularly involving Muslims. While local authorities have begun to implement trainings and projects to tackle these new social issues, Muslim grassroots associations have developed some initiatives to address the needs of the population, mainly focusing on problems related to Islam and Muslims but also addressing the rest of the population. Finally, some local authorities have acknowledged the need for these alternative initiatives as well as their positive contributions to society. The study is based on a Ph.D. research grounded on a case study of three Islamic networks in Switzerland, including various local organizations tackling social exclusion and religious radicalization through innovative grassroots projects. Using an ethnographic approach, it highlights, on the one hand, the specificities of such organizations by exploring the role of Islamic norms within the social work practices. On the other hand, it focuses on the inclusion of such faith-based projects within the mainstream society, observing the relationships between Islamic organisations and both the state and other civil society organizations. Finally, the research study aims to identify some innovative ways and trends of social work involving the inclusion of community key actors within the process. Results showed similar trends with Islamic social work developed in other European countries such as France and the United Kingdom, but also indicate a range of specificities linked to the Swiss socio-political context, which shapes the involvement of religious actors in different ways. By exploring faith-based commitment to addressing concrete social issues, the study finally contributes to shedding light on the link between Islam, social work and activism within the European context.

Keywords: exclusion, Islam, Muslims, social work, Switzerland

Procedia PDF Downloads 129
1746 Factor Analysis Based on Semantic Differential of the Public Perception of Public Art: A Case Study of the Malaysia National Monument

Authors: Yuhanis Ibrahim, Sung-Pil Lee

Abstract:

This study attempts to address factors that contribute to outline public art factors assessment, memorial monument specifically. Memorial monuments hold significant and rich message whether the intention of the art is to mark and commemorate important event or to inform younger generation about the past. Public monument should relate to the public and raise awareness about the significant issue. Therefore, by investigating the impact of the existing public memorial art will hopefully shed some lights to the upcoming public art projects’ stakeholders to ensure the lucid memorial message is delivered to the public directly. Public is the main actor as public is the fundamental purpose that the art was created. Perception is framed as one of the reliable evaluation tools to assess the public art impact factors. The Malaysia National Monument was selected to be the case study for the investigation. The public’s perceptions were gathered using a questionnaire that involved (n-115) participants to attain keywords, and next Semantical Differential Methodology (SDM) was adopted to evaluate the perceptions about the memorial monument. These perceptions were then measured with Reliability Factor and then were factorised using Factor Analysis of Principal Component Analysis (PCA) method to acquire concise factors for the monument assessment. The result revealed that there are four factors that influence public’s perception on the monument which are aesthetic, audience, topology, and public reception. The study concludes by proposing the factors for public memorial art assessment for the next future public memorial projects especially in Malaysia.

Keywords: factor analysis, public art, public perception, semantical differential methodology

Procedia PDF Downloads 502
1745 Design of a Professional Development Framework in Teaching and Learning for Engineering Educators

Authors: Orla McConnell, Cormac MacMahon, Jen Harvey

Abstract:

Ireland’s national professional development framework for those who teach in higher education, aims to provide guidance and leadership in the planning, developing and engaging in professional development practices. A series of pilot projects have been initiated to help explore the framework’s likely utility and acceptance by educators and their institutions. These projects require engagement with staff in the interpretation and adaption of the framework within their working contexts. The purpose of this paper is to outline the development of one such project with engineering educators at three Institutes of Technology seeking designation as a technological university. The initiative aims to gain traction in the acceptance of the framework with the engineering education community by linking core and discipline-specific teaching and learning competencies with professional development activities most valued by engineering educators. Informed by three strands of literature: professional development in higher education; engineering education; and teaching and learning training provisions, the project begins with a survey of all those involved in teaching and learning in engineering across the three institutes. Based on engagement with key stakeholders, subsequent qualitative research informs the contextualization of the national framework for discipline-specific and institutional piloting. The paper concludes by exploring engineering educator perceptions of the national framework’s utility based on their engagement with the pilot process. Feedback from the pilot indicates that there is a significant gap between the professional development needs of engineering educators and the current professional development provision in teaching and learning.

Keywords: engineering education, pilot, professional development, teaching and learning

Procedia PDF Downloads 333
1744 An Interior Design Project Interventions about Changing Student Beliefs about Poverty, Homelessness, and Community Service

Authors: Alireza Derambakhsh

Abstract:

The reason for this study was to inspect undergraduate interior design student state of mind toward destitution, vagrancy, and group administration. An auxiliary intention was to figure out whether introduction to plan ventures for the individuals who have encountered hardship would change student convictions. All first year recruits (n = 18), sophomore (n = 26), junior (n = 17), and senior (n = 25) interior design undergraduate students at a public university completed a questionnaire in light of a few current scales. Amid the semester, the sophomores dealt with assignments that were intended to provide exposure to different socio-economic groups. Students finished three projects. Initially, the outline of a makeshift destitute asylum. Second, a re-model of a childcare focus office and gathering region that gives administrations to low-salary families, and third, the outline of a low-wage, private home. In these ventures, students were obliged to direct broad data assembling so they could better comprehend the issues connected with destitution. Toward the end of the semester, the sophomores finished the survey again and were asked extra inquiries in regards to the class and projects. Students’ sentiments towards the poor were more individualistic when contrasted with the white collar class, yet when the working class correlation was uprooted, some of their mentality gave a more unpredictable comprehension of destitution and vagrancy. The semester-long intercession fundamentally moved students' understanding that underscored auxiliary and multifaceted reason.

Keywords: interior design, destitution, vagrancy, group administration

Procedia PDF Downloads 433
1743 Residential Building Facade Retrofit

Authors: Galit Shiff, Yael Gilad

Abstract:

The need to retrofit old buildings lies in the fact that buildings are responsible for the main energy use and CO₂ emission. Existing old structures are more dominant in their effect than new energy-efficient buildings. Nevertheless not every case of urban renewal that aims to replace old buildings with new neighbourhoods necessarily has a financial or sustainable justification. Façade design plays a vital role in the building's energy performance and the unit's comfort conditions. A retrofit façade residential methodology and feasibility applicative study has been carried out for the past four years, with two projects already fully renovated. The intention of this study is to serve as a case study for limited budget façade retrofit in Mediterranean climate urban areas. The two case study buildings are set in Israel. However, they are set in different local climatic conditions. One is in 'Sderot' in the south of the country, and one is in' Migdal Hahemek' in the north of the country. The building typology is similar. The budget of the projects is around $14,000 per unit and includes interventions at the buildings' envelope while tenants are living in. Extensive research and analysis of the existing conditions have been done. The building's components, materials and envelope sections were mapped, examined and compared to relevant updated standards. Solar radiation simulations for the buildings in their surroundings during winter and summer days were done. The energy rate of each unit, as well as the building as a whole, was calculated according to the Israeli Energy Code. The buildings’ facades were documented with the use of a thermal camera during different hours of the day. This information was superimposed with data about the electricity use and the thermal comfort that was collected from the residential units. Later in the process, similar tools were further used in order to compare the effectiveness of different design options and to evaluate the chosen solutions. Both projects showed that the most problematic units were the ones below the roof and the ones on top of the elevated entrance floor (pilotis). Old buildings tend to have poor insulation on those two horizontal surfaces which require treatment. Different radiation levels and wall sections in the two projects influenced the design strategies: In the southern project, there was an extreme difference in solar radiations levels between the main façade and the back elevation. Eventually, it was decided to invest in insulating the main south-west façade and the side façades, leaving the back north-east façade almost untouched. Lower levels of radiation in the northern project led to a different tactic: a combination of basic insulation on all façades, together with intense treatment on areas with problematic thermal behavior. While poor execution of construction details and bad installation of windows in the northern project required replacing them all, in the southern project it was found that it is more essential to shade the windows than replace them. Although the buildings and the construction typology was chosen for this study are similar, the research shows that there are large differences due to the location in different climatic zones and variation in local conditions. Therefore, in order to reach a systematic and cost-effective method of work, a more extensive catalogue database is needed. Such a catalogue will enable public housing companies in the Mediterranean climate to promote massive projects of renovating existing old buildings, drawing on minimal analysis and planning processes.

Keywords: facade, low budget, residential, retrofit

Procedia PDF Downloads 211