Search results for: building construction activity
12290 Application of Griddization Management to Construction Hazard Management
Authors: Lingzhi Li, Jiankun Zhang, Tiantian Gu
Abstract:
Hazard management that can prevent fatal accidents and property losses is a fundamental process during the buildings’ construction stage. However, due to lack of safety supervision resources and operational pressures, the conduction of hazard management is poor and ineffective in China. In order to improve the quality of construction safety management, it is critical to explore the use of information technologies to ensure that the process of hazard management is efficient and effective. After exploring the existing problems of construction hazard management in China, this paper develops the griddization management model for construction hazard management. First, following the knowledge grid infrastructure, the griddization computing infrastructure for construction hazards management is designed which includes five layers: resource entity layer, information management layer, task management layer, knowledge transformation layer and application layer. This infrastructure will be as the technical support for realizing grid management. Second, this study divides the construction hazards into grids through city level, district level and construction site level according to grid principles. Last, a griddization management process including hazard identification, assessment and control is developed. Meanwhile, all stakeholders of construction safety management, such as owners, contractors, supervision organizations and government departments, should take the corresponding responsibilities in this process. Finally, a case study based on actual construction hazard identification, assessment and control is used to validate the effectiveness and efficiency of the proposed griddization management model. The advantage of this designed model is to realize information sharing and cooperative management between various safety management departments.Keywords: construction hazard, griddization computing, grid management, process
Procedia PDF Downloads 27812289 Impacts and Implications: Exploring the Long-Term Health Benefits of Regular Physical Activity
Authors: Muhammad Wahb
Abstract:
Physical activity is increasingly recognized as a significant factor in maintaining optimal health and preventing chronic diseases. This research scrutinizes the long-term health benefits of sustained physical activity, employing a systematic review of epidemiological studies and randomized control trials conducted over the past decade. The study illuminates the protective effects of regular physical activity against cardiovascular disease, obesity, diabetes, and mental health disorders, with a special focus on the mechanisms involved. Furthermore, the paper provides insights into how public health initiatives can effectively promote physical activity among diverse populations, contributing to improved community health outcomes.Keywords: physical activity, long-term health benefits, chronic disease prevention, public health
Procedia PDF Downloads 9812288 Modern Construction Methods and Technologies and Their Impacts on Construction Projects
Authors: Michael Anthony Doherty
Abstract:
Modern Methods of Construction (MMC) is a significant topic in the construction industry; while reviewing (MMC) over different fields that are significant in the modern construction world, the following areas were assessed where (MMC) is developing, supply chain management, automation, digital technology, and new construction technologies. Different methods were considered as an approach to research and exploring areas highlighted within the construction industry that are making advancements using Modern Methods of Construction Methods and Technologies (MCMTs). The research was conducted using the following methodologies, literature review of academic sources, primary and secondary data sources, questionaries, and interviews. The paper is composed of two parts, firstly a literature review and secondly a questionnaire used as the basis for interviews were utilised to achieve the following key objectives: to identify (MCMTs) being implemented in the construction industry, research and compile information with regards to these methods, determine their purpose and their application in the industry, establishing what (MCMTs) are being used in the industry while also determining the success of the methods. The research considers the evolution and development of these methods in projects and within the industry itself. Major findings were as follows; automation technologies such as robotics, offsite fabrication utilising automated production lines are increasingly part of project execution, digital technologies such as AR and VR are increasingly utilised in project co-ordination, (MMCTs) are proving to be a solution to the construction industry problems such as a lack of skilled workforce, hazardous work tasks, and situations, new construction technologies are available and finding their place in mainstream construction, (SCM) and (GSCM) are evolving to new levels using new systems and technologies such as block chain technology as well as Company Size and Project size influence the use of (MMCTs) and the adoption of (MMCTS). In summary the paper endeavours to identify and detail how areas of (MMCTs) are developing and are gaining traction within mainstream construction.Keywords: automation, digital technology, new construction technologies, supply chain management
Procedia PDF Downloads 6412287 Carbon Footprint of Educational Establishments: The Case of the University of Alicante
Authors: Maria R. Mula-Molina, Juan A. Ferriz-Papi
Abstract:
Environmental concerns are increasingly obtaining higher priority in sustainability agenda of educational establishments. This is important not only for its environmental performance in its own right as an organization, but also to present a model for its students. On the other hand, universities play an important role on research and innovative solutions for measuring, analyzing and reducing environmental impacts for different activities. The assessment and decision-making process during the activity of educational establishments is linked to the application of robust indicators. In this way, the carbon footprint is a developing indicator for sustainability that helps understand the direct impact on climate change. But it is not easy to implement. There is a large amount of considering factors involved that increases its complexity, such as different uses at the same time (research, lecturing, administration), different users (students, staff) or different levels of activity (lecturing, exam or holidays periods). The aim of this research is to develop a simplified methodology for calculating and comparing carbon emissions per user at university campus considering two main aspects for carbon accountings: Building operations and transport. Different methodologies applied in other Spanish university campuses are analyzed and compared to obtain a final proposal to be developed in this type of establishments. First, building operation calculation considers the different uses and energy sources consumed. Second, for transport calculation, the different users and working hours are calculated separately, as well as their origin and traveling preferences. For every transport, a different conversion factor is used depending on carbon emissions produced. The final result is obtained as an average of carbon emissions produced per user. A case study is applied to the University of Alicante campus in San Vicente del Raspeig (Spain), where the carbon footprint is calculated. While the building operation consumptions are known per building and month, it does not happen with transport. Only one survey about the habit of transport for users was developed in 2009/2010, so no evolution of results can be shown in this case. Besides, building operations are not split per use, as building services are not monitored separately. These results are analyzed in depth considering all factors and limitations. Besides, they are compared to other estimations in other campuses. Finally, the application of the presented methodology is also studied. The recommendations concluded in this study try to enhance carbon emission monitoring and control. A Carbon Action Plan is then a primary solution to be developed. On the other hand, the application developed in the University of Alicante campus cannot only further enhance the methodology itself, but also render the adoption by other educational establishments more readily possible and yet with a considerable degree of flexibility to cater for their specific requirements.Keywords: building operations, built environment, carbon footprint, climate change, transport
Procedia PDF Downloads 29712286 Holding the Stick from the Middle: The European Union's Attempt to Balance Between Its Inward and Outward Building Resilience Approach in Response to the Syrian Refugee Crisis
Authors: Lina Aleassa
Abstract:
When the EU launched the European Union Global strategy in 2016, state and societal resilience to the EU's East and South was a main priority, and it was a ‘Governing Principle’ when responding to crises, including its migration crisis of 2015. Yet, with the launching of the EU strategic compass in 2022, after the return of high-intensity war, namely the Ukrainian war, the emphasis became on the EU’s own resilience. Consequently, this can be interpreted as a shift from outward building resilience into inward-building resilience. However, this paper argues that the EU effort is not a shift but rather an attempt to balance between building the EU's own resilience and its neighbors’ resilience. Thus, the main question of this paper is about the EU’s balance between building its own resilience and building the resilience of its neighbors in the case of Jordan in response to crises. To answer this question, this article attempts an in-depth analysis considering the case of displacement from Syria and the Ukrainian war focuses on the EU’s approach to building its own resilience and building resilience in its neighborhood through the EU’s refugee cooperation with Jordan, one of the key regional hosts of Syrian refugees. Textual analysis of secondary data of various texts from official European and Jordanian websites, news reports, and scholarly literature on resilience, as well as document analysis of different EU and the EU-Jordan policies, including their bilateral and multilateral agreements, will be examined to trace the EU's effort to maintain a balance between building its own resilience in its neighbor’s resilience.Keywords: inward approach, outward approach, resilience, Syrian refugee crisis
Procedia PDF Downloads 212285 The Role of Piaget's Theory in Conjecture via Analogical Reasoning
Authors: Supratman Ahman Maedi
Abstract:
The construction of knowledge is the goal of learning. The purpose of this research is to know how the role of Piaget theory in allegation via analogy reasoning. This study uses Think out loads when troubleshooting. To explore conjecturing via analogical reasoning is given the question of open analogy. The result: conjecture via analogical reasoning has been done by students in the construction of knowledge, in conjecture there are differences in thinking flow depending on the basic knowledge of the students, in the construction of knowledge occurs assimilation and accommodation problems, strategies and relationships.Keywords: analogical reasoning, conjecturing, knowledge construction, Piaget's theory
Procedia PDF Downloads 32412284 A Proposal of Advanced Key Performance Indicators for Assessing Six Performances of Construction Projects
Authors: Wi Sung Yoo, Seung Woo Lee, Youn Kyoung Hur, Sung Hwan Kim
Abstract:
Large-scale construction projects are continuously increasing, and the need for tools to monitor and evaluate the project success is emphasized. At the construction industry level, there are limitations in deriving performance evaluation factors that reflect the diversity of construction sites and systems that can objectively evaluate and manage performance. Additionally, there are difficulties in integrating structured and unstructured data generated at construction sites and deriving improvements. In this study, we propose the Key Performance Indicators (KPIs) to enable performance evaluation that reflects the increased diversity of construction sites and the unstructured data generated, and present a model for measuring performance by the derived indicators. The comprehensive performance of a unit construction site is assessed based on 6 areas (Time, Cost, Quality, Safety, Environment, Productivity) and 26 indicators. We collect performance indicator information from 30 construction sites that meet legal standards and have been successfully performed. And We apply data augmentation and optimization techniques into establishing measurement standards for each indicator. In other words, the KPI for construction site performance evaluation presented in this study provides standards for evaluating performance in six areas using institutional requirement data and document data. This can be expanded to establish a performance evaluation system considering the scale and type of construction project. Also, they are expected to be used as a comprehensive indicator of the construction industry and used as basic data for tracking competitiveness at the national level and establishing policies.Keywords: key performance indicator, performance measurement, structured and unstructured data, data augmentation
Procedia PDF Downloads 4512283 Impact of Construction Risk Factors into Actual Construction Price in PPP Projects
Authors: Saleh Alzahrani, Halim Boussabaine
Abstract:
The majority of Public Private Partnership (PPP) are developed based on the rationale that the design, construction, operation, and financing of a public project is to be awarded to a private party within a single contractual framework. PPP project risks normally include the development and construction of a new asset as well as its operation for decades. Undoubtedly the most serious consequences of risks during the construction period are price and time overruns. These events are amongst the most broadly used scenarios in value for money analysis risks. The sources of risk change over the life cycle of a PPP project. In traditional procurement, the public sector normally has to cover all price distress from these risks. At least there is plenty evidence to suggest that price distress is a norm in some of the projects that are delivered under traditional procurement. This paper will find the impact of construction risk factors into actual construction price into PPP projects. The paper will present a brief literature review on PPP risk pricing strategies, and then using system dynamics (SD) to analyses of the risks associated with the estimated project price. Based on the finding from these analyses a risk pricing association model is presented and discussed. The paper concludes with thoughts for future research.Keywords: Public Private Partnership (PPP), Risk, Risk Pricing, System Dynamics (SD), construction price
Procedia PDF Downloads 56712282 Life-Saving Design Strategies for Nursing Homes and Long-Term Care Facilities
Authors: Jason M. Hegenauer, Nicholas Fucci
Abstract:
In the late 1990s, a major deinstitutionalization movement of elderly patients took place, since which, the design of long-term care facilities has not been adequately analyzed in the United States. Over the course of the last 25 years, major innovations in construction methods, technology, and medicine have been developed, drastically changing the landscape of healthcare architecture. In light of recent events, and the expected increase in elderly populations with the aging of the baby-boomer generation, it is evident that reconsideration of these facilities is essential for the proper care of aging populations. The global response has been effective in stifling this pandemic; however, widespread disease still poses an imminent threat to the human race. Having witnessed the devastation Covid-19 has reaped throughout nursing homes and long-term care facilities, it is evident that the current strategies for protecting our most vulnerable populations are not enough. Light renovation of existing facilities and previously overlooked considerations for new construction projects can drastically lower the risk at nursing homes and long-term care facilities. A reconfigured entry sequence supplements several of the features which have been long-standing essentials of the design of these facilities. This research focuses on several aspects identified as needing improvement, including indoor environment quality, security measures incorporated into healthcare architecture and design, and architectural mitigation strategies for sick building syndrome. The results of this study have been compiled as 'best practices' for the design of future healthcare construction projects focused on the health, safety, and quality of life of the residents of these facilities. These design strategies, which can easily be implemented through renovation of existing facilities and new construction projects, minimize risk of infection and spread of disease while allowing routine functions to continue with minimal impact, should the need for future lockdowns arise. Through the current lockdown procedures, which were implemented during the Covid-19 pandemic, isolation of residents has caused great unrest and worry for family members and friends as they are cut off from their loved ones. At this time, data is still being reported, leaving infection and death rates inconclusive; however, recent projections in some states list long-term care facility deaths as high as 60% of all deaths in the state. The population of these facilities consists of residents who are elderly, immunocompromised, and have underlying chronic medical conditions. According to the Centers for Disease Control, these populations are particularly susceptible to infection and serious illness. The obligation to protect our most vulnerable population cannot be overlooked, and the harsh measures recently taken as a response to the Covid-19 pandemic prove that the design strategies currently utilized for doing so are inadequate.Keywords: building security, healthcare architecture and design, indoor environment quality, new construction, sick building syndrome, renovation
Procedia PDF Downloads 10012281 Potential of Dredged Material for CSEB in Building Structure
Authors: BoSheng Liu
Abstract:
The research goal is to re-image a locally-sourced waste product as abuilding material. The author aims to contribute to the compressed stabilized earth block (CSEB) by investigating the promising role of dredged material as an alternative building ingredient in the production of bricks and tiles. Dredged material comes from the sediment deposited near the shore or downstream, where the water current velocity decreases. This sediment needs to be dredged to provide water transportation; thus, there are mounds of the dredged material stored at bay. It is the interest of this research to reduce the filtered un-organic soil in the production of CSEB and replace it with locally dredged material from the Atchafalaya River in Morgan City, Louisiana. Technology and mechanical innovations have evolved the traditional adobe production method, which mixes the soil and natural fiber into molded bricks, into chemically stabilized CSEB made by compressing the clay mixture and stabilizer in a compression chamber with particular loads. In the case of dredged material CSEB (DM-CSEB), cement plays an essential role as the bending agent contributing to the unit strength while sustaining the filtered un-organic soil. Each DM-CSEB unit is made in a compression chamber with 580 PSI (i.e., 4 MPa) force. The research studied the cement content from 5% to 10% along with the range of dredged material mixtures, which differed from 20% to 80%. The material mixture content affected the DM-CSEB's strength and workability during and after its compression. Results indicated two optimal workabilities of the mixture: 27% fine clay content and 63% dredged material with 10% cement, or 28% fine clay content, and 67% dredged material with 5% cement. The final product of DM-CSEB emitted between 10 to 13 times fewer carbon emissions compared to the conventional fired masonry structure. DM-CSEB satisfied the strength requirement given by the ASTM C62 and ASTM C34 standards for construction material. One of the final evaluations tested and validated the material performance by designing and constructing an architectural, conical tile-vault prototype that was 28" by 40" by 24." The vault utilized a computational form-finding approach to generate the form's geometry, which optimized the correlation between the vault geometry and structural load distribution. A series of scaffolding was deployed to create the framework for the tile-vault construction. The final tile-vault structure was made from 2 layers of DM-CSEB tiles jointed by mortar, and the construction of the structure used over 110 tiles. The tile-vault prototype was capable of carrying over 400 lbs of live loads, which further demonstrated the dredged material feasibility as a construction material. The presented case study of Dredged Material Compressed Stabilized Earth Block (DM-CSEB) provides the first impression of dredged material in the clayey mixture process, structural performance, and construction practice. Overall, the approach of integrating dredged material in building material can be feasible, regionally sourced, cost-effective, and environment-friendly.Keywords: dredged material, compressed stabilized earth block, tile-vault, regionally sourced, environment-friendly
Procedia PDF Downloads 11612280 Level of Physical Activity and Physical Fitness, and Attitudes towards Physical Activity among Senior Medical Students of Sultan Qaboos University, Sultanate of Oman
Authors: Hajar Al Rajaibi, Kawla Al Toubi, Saeed Al Jaadi, Deepali Jaju, Sanjay Jaju
Abstract:
Background: The available evidence in Oman on lack of physical activity call for immediate intervention. Physical activity counseling by doctors to their patients is influenced by their attitudes and personal physical fitness. To our best knowledge, the physical activity status of Omani medical students has not been addressed before. These future doctors will have a critical role in improving physical activity in patients and thus their overall health. Objective: The aim of the study is to assess the physical activity level, physical fitness level, and attitudes towards physical activity among Sultan Qaboos University senior medical students. Methods: In this cross-sectional study (N=110; males 55), physical activity level was assessed using International Physical Activity Questionnaire (IPAQ ) short form and attitudes towards physical activity using a fifty-four-items Kenyon questionnaire. The physical fitness level was assessed by estimating maximal oxygen uptake (VO₂max) using Chester step test. Results: Female students reported more sitting time more than 7hr/day (85.5%) compared to male students (40%; p < 0.05). The IPAQ revealed moderate level of physical activity in 58% of students. Students showed a high positive attitude towards physical activity for health and fitness and low attitude for physical activity as tension and risk. Both female and male students had a similar level and attitude towards physical activity. Physical fitness level was excellent (VO₂max > 55ml O₂/kg/min) in 11% of students, good (VO₂max>44-54ml O₂/kg/min) in 49% and average to below-average in 40%. Objectively measured physical fitness level, subjectively reported physical activity level or attitudes towards physical activity were not correlated. Conclusion: Omani medical students have a positive attitude towards physical activity but moderate physical activity level. Longer sitting time in females need further evaluation. Efforts are required to understand reasons for present physical activity level and to promote good physical activity among medical students by creating more awareness and facilities.Keywords: Chester step test, Kenyon scale, medical students, physical activity, physical fitness
Procedia PDF Downloads 15312279 The Pangs of Unemployment and Its Impediment to Nation Building
Authors: Vitalis Okwuchukwu Opara
Abstract:
The task of nation building primarily consist in welding together, diverse cultural groups into a united nation state, which develops a centripetal political culture that makes its people see themselves as members of one nation linked together by more reliable ties than the coercion offered by the state. Comparatively on the contrary, most countries in the world today are comprised of diverse nationalities, each with its unique set of norms and values, which often come into conflict with others. As such, the task of nation building is in uniting these diverse cultural groups into a united nation state and various human elements that make up its geopolitical zone. The most outstanding impediment to achieving this task is unemployment. Unemployment is like a peril against the nation building. Unemployment is an obstacle for growth of a nation. Often it is said that the wise see obstacles as stepping-stones to advance further. The pangs of unemployment impede nation building such that sometimes it takes very long time to do away with the problem. In recent times, there has been a revolutionary wind blowing across the world. This wind is bound to wake up nations leaders to sit up to their responsibility. Unemployment causes youth restiveness, brings leaders to their knees. It breeds problem. This work is intended to expose the pangs of unemployment and its impending peril to nation building.Keywords: pangs, unemployment, obstacles, nation-building
Procedia PDF Downloads 35612278 3rd Generation Modular Execution: A Global Breakthrough in Modular Facility Construction System
Authors: Sean Bryner S. Rey, Eric Tanjutco
Abstract:
Modular execution strategies are performed to address the various challenges of any projects and are implemented on each project phase that covers Engineering, Procurement, Fabrication and Construction. It was until the recent years that the intent to surpass mechanical modularization approach were conceptualized to give solution to much greater demands of project components such as site location and adverse weather condition, material sourcing, construction schedule, safety risks and overall plot layout and allocation. The intent of this paper is to introduce the 3rd Generation Modular Execution with an overview of its advantages on project execution and will give emphasis on Engineering, Construction, Operation and Maintenance. Most importantly, the paper will present the key differentiator of 3rd Gen modular execution against other conventional project execution and the merits it bears for the industry.Keywords: 3rd generation modular, process block, construction, operation & maintenance
Procedia PDF Downloads 47512277 Performance of Bimetallic Catalyst in the Oxidation of Volatile Organic Compounds
Authors: Faezeh Aghazadeh
Abstract:
The catalytic activity of Pt/γ-Al₂O₃ and Pt-Fe/γ-Al₂O₃ catalysts was investigated to bring about the complete oxidation of 2-Propanol. Among them, Pt-Fe/γ-Al₂O₃ was found to be the most promising catalyst based on activity. The catalysts were characterized by (XRD), (SEM), (TEM) and ICP-AES techniques. Iron loadings on Pt/γ-Al₂O₃ had a great effect on catalytic activity, and Pt-Fe/γ-Al₂O₃ (1.75 wt% Fe) catalyst at calcination temperature 300°C was observed to be the most active, which might be contributed to the favorable synergetic effects between Pt and Fe, high activity and the well-dispersed bimetallic phase. The combustion of 2-Propanol in the vapor phase was carried out in a conventional flow U-shape glass reactor used in the differential mode at atmospheric pressure. 2-Propanol was analyzed by a gas chromatograph VARIAN 3800 CX equipped with an FID. As observed, better performance and activity were observed for Pt-Fe/Al₂O₃ bimetallic catalyst. These results indicate that the high dispersion on support gives a positive effect on catalytic activity.Keywords: volatile organic compounds, bimetallic catalyst, catalytic activity, low temperature
Procedia PDF Downloads 14612276 Integrated Teaching of Hardware Courses for the Undergraduates of Computer Science and Engineering to Attain Focused Outcomes
Authors: Namrata D. Hiremath, Mahalaxmi Bhille, P. G. Sunitha Hiremath
Abstract:
Computer systems play an integral role in all facets of the engineering profession. This calls for an understanding of the processor-level components of computer systems, their design and operation, and their impact on the overall performance of the systems. Systems users are always in need of faster, more powerful, yet cheaper computer systems. The focus of Computer Science engineering graduates is inclined towards software oriented base. To be an efficient programmer there is a need to understand the role of hardware architecture towards the same. It is essential for the students of Computer Science and Engineering to know the basic building blocks of any computing device and how the digital principles can be used to build them. Hence two courses Digital Electronics of 3 credits, which is associated with lab of 1.5 credits and Computer Organization of 5 credits, were introduced at the sophomore level. Activity was introduced with the objective to teach the hardware concepts to the students of Computer science engineering through structured lab. The students were asked to design and implement a component of a computing device using MultiSim simulation tool and build the same using hardware components. The experience of the activity helped the students to understand the real time applications of the SSI and MSI components. The impact of the activity was evaluated and the performance was measured. The paper explains the achievement of the ABET outcomes a, c and k.Keywords: digital, computer organization, ABET, structured enquiry, course activity
Procedia PDF Downloads 50112275 Application of Knowledge Discovery in Database Techniques in Cost Overruns of Construction Projects
Authors: Mai Ghazal, Ahmed Hammad
Abstract:
Cost overruns in construction projects are considered as worldwide challenges since the cost performance is one of the main measures of success along with schedule performance. To overcome this problem, studies were conducted to investigate the cost overruns' factors, also projects' historical data were analyzed to extract new and useful knowledge from it. This research is studying and analyzing the effect of some factors causing cost overruns using the historical data from completed construction projects. Then, using these factors to estimate the probability of cost overrun occurrence and predict its percentage for future projects. First, an intensive literature review was done to study all the factors that cause cost overrun in construction projects, then another review was done for previous researcher papers about mining process in dealing with cost overruns. Second, a proposed data warehouse was structured which can be used by organizations to store their future data in a well-organized way so it can be easily analyzed later. Third twelve quantitative factors which their data are frequently available at construction projects were selected to be the analyzed factors and suggested predictors for the proposed model.Keywords: construction management, construction projects, cost overrun, cost performance, data mining, data warehousing, knowledge discovery, knowledge management
Procedia PDF Downloads 37212274 In Vitro Antifungal Activity of Essential Oil Artemisia Absinthium
Authors: Bouchenak Fatima, Lmegharbi Abdelbaki, Houssem Degaichia, Benrebiha Fatima
Abstract:
The essential oil composition of the leaf of Artemisia absinthium from region of Cherchell (The south of Algeria) was investigated by GC, GC-MS. 27 constituents were identified correspond to 84, 63% of the total oil. The major components are Thujone (60, 82%), Chamazulènel (16, 62%), ρ-cymène (4, 29%) and 2-carène (4.25%). The antimicrobial activity of oil was tested in vitro by two methods (agar diffusion and microdilution) on three plant pathogenic fungi. This oil has been tested for antimicrobial activity against three pathogenic fungi (Botrytis cinerea, Fusarium culmorum and Helminthosporium Sp.).The study of activity was evaluated by two methods: Method of diffusion in gelose and the minimum inhibitory concentration MIC. This oil exhibited an interesting antimicrobial activity. A preliminary study showed that this oil presented high toxicity against this fungus. These results, although preliminary show a good antifungal activity, to limit and inhibit stop the development of those pathogen agent.Keywords: artemisia absinthian, extraction process, chemical study, antifungal activity
Procedia PDF Downloads 48512273 Evaluation of the Architect-Friendliness of LCA-Based Environmental Impact Assessment Tools
Authors: Elke Meex, Elke Knapen, Griet Verbeeck
Abstract:
The focus of sustainable building is gradually shifting from energy efficiency towards the more global environmental impact of building design during all life-cycle stages. In this context, many tools have been developed that use a LCA-approach to assess the environmental impact on a whole building level. Since the building design strongly influences the final environmental performance and the architect plays a key role in the design process, it is important that these tools are adapted to his work method and support the decision making from the early design phase on. Therefore, a comparative evaluation of the degree of architect-friendliness of some LCA tools on building level is made, based on an evaluation framework specifically developed for the architect’s viewpoint. In order to allow comparison of the results, a reference building has been designed, documented for different design phases and entered in all software tools. The evaluation according to the framework shows that the existing tools are not very architect-friendly. Suggestions for improvement are formulated.Keywords: architect-friendliness, design supportive value, evaluation framework, tool comparison
Procedia PDF Downloads 54212272 Comparison between Mental Toughness and Level of Physical Activity between Staff and Students in University of Tabriz
Authors: Mahta Eskandarnejad
Abstract:
The aim of this paper was to compare physical activity and mental toughness in the staff and students of the University of Tabriz. 615 people participated in this study and filled demographic questionnaire, mental thoughness48 (MTQ48) questionnaire and habitual physical activity questionnaire (Baecke physical activity questionnaire). The research sample included 355 students and 260 staff (615 questionnaires). For analyzing hypotheses MANOVA, correlation and independent t-test were used. Based on the result; some subscales of mental toughness and physical activity were significantly related. The result showed the significant correlation between mental toughness and physical activity in student and no significant correlation in staff. Students were significantly physically more active than staff, and mental toughness was higher in staff. There was no difference in mental toughness variable between active participants (active staff and student). The results of this study showed that mental toughness could influence the way a person cope with living conditions. It is expected that mental toughness changes can lead to changing in levels of physical activity. It should be noted that the other variables should not be ignored.Keywords: Baecke physical activity questionnaire, mental toughness, physical activity, university staff, university student
Procedia PDF Downloads 39212271 Evaluation of UI for 3D Visualization-Based Building Information Applications
Authors: Monisha Pattanaik
Abstract:
In scenarios where users have to work with large amounts of hierarchical data structures combined with visualizations (For example, Construction 3d Models, Manufacturing equipment's models, Gantt charts, Building Plans), the data structures have a high density in terms of consisting multiple parent nodes up to 50 levels and their siblings to descendants, therefore convey an immediate feeling of complexity. With customers moving to consumer-grade enterprise software, it is crucial to make sophisticated features made available to touch devices or smaller screen sizes. This paper evaluates the UI component that allows users to scroll through all deep density levels using a slider overlay on top of the hierarchy table, performing several actions to focus on one set of objects at any point in time. This overlay component also solves the problem of excessive horizontal scrolling of the entire table on a fixed pane for a hierarchical table. This component can be customized to navigate through parents, only siblings, or a specific component of the hierarchy only. The evaluation of the UI component was done by End Users of application and Human-Computer Interaction (HCI) experts to test the UI component's usability with statistical results and recommendations to handle complex hierarchical data visualizations.Keywords: building information modeling, digital twin, navigation, UI component, user interface, usability, visualization
Procedia PDF Downloads 13912270 Decision-Making Tool for Planning the Construction of Infrastructure Projects
Authors: Rolla Monib, Chris I. Goodier, Alistair Gibbs
Abstract:
The aim of this paper is to investigate the key drivers in planning the construction phase for infrastructure projects to reduce project delays. To achieve this aim, the research conducted three case studies using semi-structured and unstructured interviews (n=36). The results conclude that a lack of modularisation awareness is among the key factors attributed to project delays. The current emotive and ill-informed approach to decision-making, coupled with the lack of knowledge regarding appropriate construction method selection, prevents the potential benefits of modularisation being fully realised. To assist with decision-making for the best construction method, the research presents project management tools to help decision makers to choose the most appropriate construction approach through optimising the use of modularisation in EC. A decision-making checklist and diagram are presented in this paper. These checklist tools and diagrams assist the project team in determining the best construction method, taking into consideration the module type.Keywords: infrastructure, modularization, decision support, decision-making
Procedia PDF Downloads 6312269 Retrofitting Residential Buildings for Energy Efficiency: An Experimental Investigation
Authors: Naseer M. A.
Abstract:
Buildings are major consumers of energy in both their construction and operation. They account for 40% of World’s energy use. It is estimated that 40-60% of this goes for conditioning the indoor environment. In India, like many other countries, the residential buildings have a major share (more than 50%) in the building sector. Of these, single-family units take a mammoth share. The single-family dwelling units in the urban and fringe areas are built in two stories to minimize the building foot print on small land parcels. And quite often, the bedrooms are located in the first floors. The modern buildings are provided with reinforced concrete (RC) roofs that absorb heat throughout the day and radiate the heat into the interiors during the night. The rooms that are occupied in the night, like bedrooms, are having their indoors uncomfortable. This has resulted in the use of active systems like air-conditioners and air coolers, thereby increasing the energy use. An investigation conducted by monitoring the thermal comfort condition in the residential building with RC roofs have proved that the indoors are really uncomfortable in the night hours. A sustainable solution to improve the thermal performance of the RC roofs was developed by an experimental study by continuously monitoring the thermal comfort parameters during summer (the period that is most uncomfortable in temperate climate). The study conducted in the southern peninsular India, prove that retrofitting of existing residential building can give a sustainable solution in abating the ever increasing energy demand especially when it is a fact that these residential buildings that are built for a normal life span of 40 years would continue to consume the energy for the rest of its useful life.Keywords: energy efficiency, thermal comfort, retrofitting, residential buildings
Procedia PDF Downloads 25212268 Theatrical Architecture in Bologna at the Beginning of the Twentieth Century: The Renaissance of Modernissimo Cinema
Authors: Giorgia Predari, Riccardo Gulli
Abstract:
The paper describes the history and the stylistic choices adopted in the construction of Palazzo Ronzani in Bologna, which was the first building to rise after the heavy demolitions carried out in the historical center of the city at the beginning of the twentieth century. In 1910, the local administration adopted a detailed plan to change the aspect of the city, as it was already happening in the main European capitals. In this context, starting from 1911, the architect and scenographer Gualtiero Pontoni designed for Alessandro Ronzani -the owner of a well-known Bolognese beer company- his Palazzo, which is listed among the first multifunctional buildings in Bologna, containing offices, commercial activities, and entertainment spaces. In an area of about 2000 m², the architect was able to propose a theatre with a capacity of 2000 seats at the basement, shops, a cafè-chantant and a restaurant on the ground floor, clubs, studios and commercial stores on the mezzanine and the first plan, and a hotel on the upper floors. The whole core of the building, at the underground levels, consisted of a reinforced concrete frame (one of the first examples of this type of construction in the city), which allowed the hall to have a free span of 11 x 12 meters, and a height of about 9 meters. Used until 2007 as a cinema, the hall has remained then in disuse for almost 10 years, but now an important functional restoration project with a strong architectural and scenographic value is taking place. It will bring the spaces back to the original geometries, in a historical and artistic condition inspired by the styles of the early Twentieth century.Keywords: Modernissimo, Palazzo Ronzani, liberty, Bologna
Procedia PDF Downloads 12112267 Antımıcrobıal Actıvıty of Gırardınıa Heterophılla
Authors: P. S. BEDI* , Neavty Thakur, Balvınder Sıngh
Abstract:
In the present study an attempt has been made to prepare the crude extracts of leaves and stem of ‘Girardinia heterophylla’ by using various solvents like petroleum ether, ethanol and double distilled water. The samples were given the code NGLS 1, NGLS 2, NGLS 3, NGSS 1, NGSS 2 and NGSS 3 respectively. All the extracts were used to study their antimicrobial activity against gram positive bacteria eg. Bacillus subtilis, Gram negative bacteria eg. E. coli, K. pneumonia and antifungal activity against Aspergillus niger. The results of the antimicrobial activity showed that all the crude extracts of the plant posseses antibacterial activity. Maximum antibacterial activity was shown by NGLS 2, NGLS 3 and NGSS 3 against K. pneumonia. The growth of fungus A. niger was also inhibited by all the crude extracts. Maximum inhibition was shown by NGSS 2 followed by NGSS 1.Keywords: Girardinia heterophylla, leaves and stem extracts, Antibacterial activity, antifungal activity.
Procedia PDF Downloads 34612266 A Fuzzy Analytic Hierarchy Process Approach for the Decision of Maintenance Priorities of Building Entities: A Case Study in a Facilities Management Company
Authors: Wai Ho Darrell Kwok
Abstract:
Building entities are valuable assets of a society, however, all of them are suffered from the ravages of weather and time. Facilitating onerous maintenance activities is the only way to either maintain or enhance the value and contemporary standard of the premises. By the way, maintenance budget is always bounded by the corresponding threshold limit. In order to optimize the limited resources allocation in carrying out maintenance, there is a substantial need to prioritize maintenance work. This paper reveals the application of Fuzzy AHP in a Facilities Management Company determining the maintenance priorities on the basis of predetermined criteria, viz., Building Status (BS), Effects on Fabrics (EF), Effects on Sustainability (ES), Effects on Users (EU), Importance of Usage (IU) and Physical Condition (PC) in dealing with categorized 8 predominant building components maintenance aspects for building premises. From the case study, it is found that ‘building exterior repainting or re-tiling’, ‘spalling concrete repair works among exterior area’ and ‘lobby renovation’ are the top three maintenance priorities from facilities manager and maintenance expertise personnel. Through the application of the Fuzzy AHP for maintenance priorities decision algorithm, a more systemic and easier comparing scalar linearity factors being explored even in considering other multiple criteria decision scenarios of building maintenance issue.Keywords: building maintenance, fuzzy AHP, maintenance priority, multi-criteria decision making
Procedia PDF Downloads 24312265 Assessing the Gap between the Policies and Existing Living Conditions of Migrant Construction Workers: A Case Study of Vijayawada
Authors: Ayushi Mishra
Abstract:
Migrant construction workers or construction labors are one of the majority of the working population in our urban and rural areas. Even after being the majority, their involvement in the upbringing of the economy is hardly ever documented or recognized. Non-permanent or migrant workers face loads of exploitations and susceptibilities than other informal sector workers in India which in turn has affected the productivity of the labors. The relation of their employment and migration and the links of these dynamics to their housing and other basic needs in the city are mostly unstated. Even the urban planning and housing policies do not make thoughtful provision for them, they forcing them to live in extremely wretched conditions. And even if the policies are made, it frequently happens that they are not implemented. As the issue is very much prevalent in today’s time in India with so many large-scale and labor extensive projects going on, this study focuses on the assessment of the gap between the existing government policies and the current scenario of the construction workers in ongoing projects of Vijayawada, Andhra Pradesh. A few of the policies for construction workers conditions a lot of things, out of which only a few are functional which makes this study to assess the reason behind the unorganized living condition and poor physical, the social and mental health of construction workers of Vijayawada. In present, the dignity of construction labors is compromised every day on construction sites, in terms of work and basic rights which leads to many other problems in future. So to work for the betterment of this community, knowledge on the differences is very much required and hence this study is a little effort to replenish the difference and compare the policies with the existing conditions of construction labors in Vijayawada.Keywords: construction, labours, policy, productivity
Procedia PDF Downloads 33112264 The Requirements of Developing a Framework for Successful Adoption of Quality Management Systems in the Construction Industry
Authors: Mohammed Ali Ahmed, Vaughan Coffey, Bo Xia
Abstract:
Quality management systems (QMSs) in the construction industry are often implemented to ensure that sufficient effort is made by companies to achieve the required levels of quality for clients. Attainment of these quality levels can result in greater customer satisfaction, which is fundamental to ensure long-term competitiveness for construction companies. However, the construction sector is still lagging behind other industries in terms of its successful adoption of QMSs, due to the relative lack of acceptance of the benefits of these systems among industry stakeholders, as well as from other barriers related to implementing them. Thus, there is a critical need to undertake a detailed and comprehensive exploration of adoption of QMSs in the construction sector. This paper comprehensively investigates in the construction sector setting, the impacts of all the salient factors surrounding successful implementation of QMSs in building organizations, especially those of external factors. This study is part of an ongoing PhD project, which aims to develop a new framework that integrates both internal and external factors affecting QMS implementation. To achieve the paper aim and objectives, interviews will be conducted to define the external factors influencing the adoption of QMSs, and to obtain holistic critical success factors (CSFs) for implementing these systems. In the next stage of data collection, a questionnaire survey will be developed to investigate the prime barriers facing the adoption of QMSs, the CSFs for their implementation, and the external factors affecting the adoption of these systems. Following the survey, case studies will be undertaken to validate and explain in greater detail the real effects of these factors on QMSs adoption. Specifically, this paper evaluates the effects of the external factors in terms of their impact on implementation success within the selected case studies. Using findings drawn from analyzing the data obtained from these various approaches, specific recommendations for the successful implementation of QMSs will be presented, and an operational framework will be developed. Finally, through a focus group, the findings of the study and the new developed framework will be validated. Ultimately, this framework will be made available to the construction industry to facilitate the greater adoption and implementation of QMSs. In addition, deployment of the applicable recommendations suggested by the study will be shared with the construction industry to more effectively help construction companies to implement QMSs, and overcome the barriers experienced by businesses, thus promoting the achievement of higher levels of quality and customer satisfaction.Keywords: barriers, critical success factors, external factors, internal factors, quality management systems
Procedia PDF Downloads 18812263 Factors Influencing Site Overhead Cost of Construction Projects in Egypt: A Comparative Analysis
Authors: Aya Effat, Ossama A. Hosny, Elkhayam M. Dorra
Abstract:
Estimating costs is a crucial step in construction management and should be completed at the beginning of every project to establish the project's budget. The precision of the cost estimate plays a significant role in the success of construction projects as it allows project managers to effectively manage the project's costs. Site overhead costs constitute a significant portion of construction project budgets, necessitating accurate prediction and management. These costs are influenced by a multitude of factors, requiring a thorough examination and analysis to understand their relative importance and impact. Thus, the main aim of this research is to enhance the contractor’s ability to predict and manage site overheads by identifying and analyzing the main factors influencing the site overheads costs in the Egyptian construction industry. Through a comprehensive literature review, key factors were first identified and subsequently validated using a thorough comparative analysis of data from 55 real-life construction projects. Through this comparative analysis, the relationship between each factor and site overheads percentage as well as each site overheads subcategory and each project construction phase was identified and examined. Furthermore, correlation analysis was done to check for multicollinearity and identify factors with the highest impact. The findings of this research offer valuable insights into the key drivers of site overhead costs in the Egyptian construction industry. By understanding these factors, construction professionals can make informed decisions regarding the estimation and management of site overhead costs.Keywords: comparative analysis, cost estimation, construction management, site overheads
Procedia PDF Downloads 2212262 Daily Site Risks Associated with Construction Projects and On-spot Corrective Measurements: Case Study of Revamping Projects in Kuwait Oil Company Fields Area
Authors: Yousef S. Al-Othman
Abstract:
The growth and expansion of the industrial facilities comes proportional to the market increasing demand of products and services. Furthermore, raw material producers such as oil companies usually undergo massive revamping projects to maintain a synchronized supply. These revamping projects are usually delivered through challenging construction projects held and associated with daily site risks related to the construction process. Henceforth, a case study related to these risks and corresponding on-spot corrective measurements has been made on a certain number of construction project contractors at Kuwait Oil Company (KOC) to derive the benefits and overall effectiveness of the on-spot corrective measurements during the construction phase of a project, and how would the same help in avoiding major incidents, ensuring a smooth, cost effective and on time delivery of the project. Findings of this case study shall have an added value to the overall risk management process by minimizing the daily site risks that may affect the project lead time, resulting in an undisturbed on-site construction process.Keywords: oil and gas, risk management, construction projects, project lead time
Procedia PDF Downloads 10712261 South Atlantic Architects Validation of the Construction Decision Making Inventory
Authors: Tulio Sulbaran, Sandeep Langar
Abstract:
Architects are an integral part of the construction industry and are continuously incorporating decisions that influence projects during their life cycle. These decisions aim at selecting best alternative from the ones available. Unfortunately, this decision making process is mainly unexplored in the construction industry. No instrument to measure construction decision, based on knowledgebase of decision-makers, has existed. Additionally, limited literature is available on the topic. Recently, an instrument to gain an understanding of the construction decision-making process was developed by Dr. Tulio Sulbaran from the University of Texas, San Antonio. The instrument’s name is 'Construction Decision Making Inventory (CDMI)'. The CDMI is an innovative idea to measure the 'What? When? How? Moreover, Who?' of the construction decision-making process. As an innovative idea, its statistical validity (accuracy of the assessment) is yet to be assessed. Thus, the purpose of this paper is to describe the results of a case study with architects in the south-east of the United States aimed to determine the CDMI validity. The results of the case study are important because they assess the validity of the tool. Furthermore, as the architects evaluated each question within the measurements, this study is also guiding the enhancement of the CDMI.Keywords: decision, support, inventory, architect
Procedia PDF Downloads 329