Search results for: projects funding
2135 Coping with Geological Hazards during Construction of Hydroelectric Projects in Himalaya
Authors: B. D. Patni, Ashwani Jain, Arindom Chakraborty
Abstract:
The world’s highest mountain range has been forming since the collision of Indian Plate with Asian Plate 40-50 million years ago. The Indian subcontinent has been deeper and deeper in to the rest of Asia resulting upliftment of Himalaya & Tibetan Plateau. The complex domain has become a major challenge for construction of hydro electric projects. The Himalayas are geologically complex & seismically active. Shifting of Indian Plate northwardly and increasing the amount of stresses in the fragile domain which leads to deformation in the form of several fold, faults and upliftment. It is difficult to undergo extensive geological investigation to ascertain the geological problems to be encountered during construction. Inaccessibility of the terrain, high rock cover, unpredictable ground water condition etc. are the main constraints. The hydroelectric projects located in Himalayas have faced many geological and geo-hydrological problems while construction of surface and subsurface works. Based on the experience, efforts have been made to identify the expected geological problems during and after construction of the projects. These have been classified into surface and subsurface problems which include existence of inhomogeneous deep overburden in the river bed or buried valley, abrupt change in bed rock profile, Occurrences of fault zones/shear zones/fractured rock in dam foundation and slope instability in the abutments. The tunneling difficulties are many such as squeezing ground condition, popping, rock bursting, high temperature gradient, heavy ingress of water, existence of shear seams/shear zones and emission of obnoxious gases. However, these problems were mitigated by adopting suitable remedial measures as per site requirement. The support system includes shotcrete, wire mesh, rock bolts, steel ribs, fore-poling, pre-grouting, pipe-roofing, MAI anchors, toe wall, retaining walls, reinforced concrete dowels, drainage drifts, anchorage cum drainage shafts, soil nails, concrete cladding and shear keys. Controlled drilling & blasting, heading & benching, proper drainage network and ventilation system are other remedial measures adopted to overcome such adverse situations. The paper highlights the geological uncertainties and its remedial measures in Himalaya, based on the analysis and evaluation of 20 hydroelectric projects during construction.Keywords: geological problems, shear seams, slope, drilling & blasting, shear zones
Procedia PDF Downloads 4032134 Agile Project Management: A Real Application in a Multi-Project Research and Development Center
Authors: Aysegul Sarac
Abstract:
The aim of this study is to analyze the impacts of integrating agile development principles and practices, in particular to reduce project lead time in a multi-project environment. We analyze Arçelik Washing Machine R&D Center in which multiple projects are conducted by shared resources. In the first part of the study, we illustrate the current waterfall model system by using a value stream map. We define all activities starting from the first idea of the project to the customer and measure process time and lead time of projects. In the second part of the study we estimate potential improvements and select a set of these improvements to integrate agile principles. We aim to develop a future state map and analyze the impacts of integrating lean principles on project lead time. The main contribution of this study is that we analyze and integrate agile product development principles in a real multi-project system.Keywords: agile project management, multi project system, project lead time, product development
Procedia PDF Downloads 3062133 Research on Teachers’ Perceptions on the Usability of Classroom Space: Analysis of a Nation-Wide Questionnaire Survey in Japan
Authors: Masayuki Mori
Abstract:
This study investigates the relationship between teachers’ perceptions of the usability of classroom space and various elements, including both physical and non-physical, of classroom environments. With the introduction of the GIGA School funding program in Japan in 2019, understanding its impact on learning in classroom space is crucial. The program enabled local educational authorities (LEA) to make it possible to provide one PC/tablet for each student of both elementary and junior high schools. Moreover, at the same time, the program also supported LEA to purchase other electronic devices for educational purposes such as electronic whiteboards, large displays, and real image projectors. A nationwide survey was conducted using random sampling methodology among 100 junior high schools to collect data on classroom space. Of those, 60 schools responded to the survey. The survey covered approximately fifty items, including classroom space size, class size, and educational electronic devices owned. After the data compilation, statistical analysis was used to identify correlations between the variables and to explore the extent to which classroom environment elements influenced teachers’ perceptions. Furthermore, decision tree analysis was applied to visualize the causal relationships between the variables. The findings indicate a significant negative correlation between class size and teachers’ evaluation of usability. In addition to the class size, the way students stored their belongings also influenced teachers’ perceptions. As for the placement of educational electronic devices, the installation of a projector produced a small negative correlation with teachers’ perceptions. The study suggests that while the GIGA School funding program is not significantly influential, traditional educational conditions such as class size have a greater impact on teachers’ perceptions of the usability of classroom space. These results highlight the need for awareness and strategies to integrate various elements in designing the learning environment of the classroom for teachers and students to improve their learning experience.Keywords: classroom space, GIGA School, questionnaire survey, teachers’ perceptions
Procedia PDF Downloads 262132 Architecture of Contemporary Museums Located in the Historic Center of Cracow: One City, One Architect, Three Projects
Authors: A. Brach
Abstract:
The architecture of modern museums in the historical center should refer to a place in a cultural, historical, urban and architectural sense, using adequate and contemporary forms of architecture. The research and architectural analysis of selected museums in Cracow were conducted to illustrate which elements were decisive for the choice of architectural form. The evaluation of selected objects took into the consideration the following aspects: continuation of the historical form, contemporary form referring to the place, the individual-author form omitting the cultural aspect of the place. The presented projects showed the compromise as positive solutions rejecting both the direct imitation or 'historical continuation' as well as an individual form focused on an abstract form. In order to carry out research and confirm the thesis, three designs of Assoc. Prof. Eng. Arch. Krzysztof Ingarden in the historic city of Cracow were selected. Despite being constructed in one city, the neighborhood and cultural contexts of the locations are completely different. The neighborhood of the historical Royal Road and gothic church with unique decorations from the Polish Art Nouveau, artist Stanislaw Wyspianski (Wyspianski Pavilion), the bend of the Vistula hosting the Japanese culture (Museum of Japanese Art and Technology Manggha) and finally the old area of a horse riding school from the Austrian Empire times (Malopolska Garden of Art). All three buildings are dedicated to the culture of Japan, Polish artist Stanislaw Wyspianski, contemporary achievements and the promotion of art at its widest sense. Important fact for this research is that there is one author of all presented projects.Keywords: adaptation of existing buildings, architecture in cracow, modern architecture, museums located in historic center
Procedia PDF Downloads 1652131 Tectonics Theory and an Example of Its Application in Sustainable Contemporary Architecture
Authors: Mafalda Fabiene Ferreira Pantoja, Luciana Lins Do Amaral Sobreira
Abstract:
The present work seeks to exemplify the precepts of the sustainable tectonics, through a built work. This is the architectural group ‘Chácara dos Professores’ in Brasília, Federal District, Brazil. Such an architectural ensemble allows elucidating vernacular constructive techniques that can still be used in contemporary times, on the way to more sustainable constructions. It seeks to show the principles of sustainable tectonics as a design tool, seeking an architecture that can give answers to contemporary issues and that concern caring for the planet. Firstly, a brief investigation will be made about sustainable tectonics, its application in architecture, and later, to correlate such precepts as a tool for reflections and sustainable projects in the contemporary world. For this, will be exemplified, by means of a visit in loco, the construction methods used in the ‘Chácara dos Professores’ project and its results in the constructed work. The goal is to draw a theoretical reflection on the precepts of tectonics, and to show if such precepts are able to enhance contemporary architecture and help it move towards sustainability, seeking projects increasingly consistent with the reality of today.Keywords: contemporary architecture, constructive techniques, sustainability, tectonics
Procedia PDF Downloads 2512130 Ways for University to Conduct Research Evaluation: Based on National Research University Higher School of Economics Example
Authors: Svetlana Petrikova, Alexander Yu Kostinskiy
Abstract:
Management of research evaluation in the Higher School of Economics (HSE) originates from the HSE Academic Fund created in 2004 to facilitate and support academic research and presents its results to international academic community. As the means to inspire the applicants, science projects went through competitive selection process evaluated by the group of experts. Drastic development of HSE, quantity of applied projects for each Academic Fund competition and the need to coordinate the conduct of expert evaluation resulted in founding of the Office for Research Evaluation in 2013. The Office’s primary objective is management of research evaluation of science projects. The standards to conduct the evaluation are defined as follows: - The exercise of the process approach, the unification of the functioning of department. - The uniformity of regulatory, organizational and methodological framework. - The development of proper on-line evaluation system. - The broad involvement of external Russian and international experts, the renouncement of the usage of own employees. - The development of an algorithm to make a correspondence between experts and science projects. - The methodical usage of opened/closed international and Russian databases to extend the expert database. - The transparency of evaluation results – free access to assessment while keeping experts confidentiality. The management of research evaluation of projects is based on the sole standard, organization and financing. The standard way of conducting research evaluation at HSE is based upon Regulations on basic principles for research evaluation at HSE. These Regulations have been developed from the moment of establishment of the Office for Research Evaluation and are based on conventional corporate standards for regulatory document management. The management system of research evaluation is implemented on the process approach basis. Process approach means deployment of work as a process, which is the aggregation of interrelated and interacting activities processing inputs into outputs. Inputs are firstly client asking for the assessment to be conducted, defining the conditions for organizing and carrying of the assessment and secondly the applicant with proper for the competition application; output is assessment given to the client. While exercising process approach to clarify interrelation and interacting main parties or subjects of the assessment are determined and the way for interaction between them forms up. Parties to expert assessment are: - Ordering Party – The department of the university taking the decision to subject a project to expert assessment; - Providing Party – The department of the university authorized to provide such assessment by the Ordering Party; - Performing Party – The legal and natural entities that have expertise in the area of research evaluation. Experts assess projects in accordance with criteria and states of expert opinions approved by the Ordering Party. Objects of assessment generally are applications or HSE competition project reports. Mainly assessments are deployed for internal needs, i.e. the most ordering parties are HSE branches and departments, but assessment can also be conducted for external clients. The financing of research evaluation at HSE is based on the established corporate culture and traditions of HSE.Keywords: expert assessment, management of research evaluation, process approach, research evaluation
Procedia PDF Downloads 2552129 Evaluation of Access to Finance for Local Oil Fields Companies in Ghana
Authors: Gordon Newlove Asamoah, Wendy Ama Oti
Abstract:
This study focused on evaluating access to finance for local oil field companies in Ghana. The study adopted a census survey design in evaluating access to finance for local oil field companies in Ghana. The respondents of this study were 30 management members of three oil field companies in Ghana. The data collected was analysed using Statistical Package for Social Scientists (SPSS) to generate tables and graphs for interpretation. The results show that most companies use equity financing in combination with other forms of financing to finance their business activities. This research has shown the various challenges bordering on the financing of local oil and gas projects, with emphasis on the challenges of raising funds by indigenous oil companies. Financing of the projects by indigenous oil field companies in Ghana is preferably achieved through equity finance mainly because it is the easiest to get compared to all the other forms of financing available. Other sources of financing available are debt financing, joint venture, and retained earnings from the profits generated from their operations. The study made recommendations to local oil field companies as to how they can make good use of the capital market to raise financing.Keywords: access, financing, oil fields, Ghana
Procedia PDF Downloads 1102128 Role of Islamic Economic System for Sustainabe Development
Authors: Yahaya Sulaiman, Ibrahim Muhammad Yakuba, Abubakar Usman
Abstract:
In this paper, we discuss that Sustainable Development Goals are in consonance with Islamic ethos and philosophy. Islam made emphasize on human well-being from spiritual, physiological, intellectual and economic perspectives. Islamic worldview and values framework strengthens moral consciousness, urge pro-social behaviour and engender environmental ethics which can help in influencing our attitudes towards meeting sustainable development challenges. Islamic social finance institutions like Zakat and Waqf can contribute towards scaling up efforts in commercially non-viable, but socially vital projects and programs. There is much potential for Islamic finance to promote sustainable economic development through such approaches as widening access to finance, financing infrastructure projects, and expanding the reach of Takaful. Real sector based productive enterprise in Islamic finance has positive implications for the ecosystem. Risk-sharing shifts the emphasis from credit-worthiness of the borrower to be placed on the value creation and economic viability of investments that create new wealth. Islamic social finance package can cater to the financially excluded households.Keywords: assessment, Islamic, economic, sustainable, development
Procedia PDF Downloads 682127 Ways for Improving Citation of the Cyrillic Publications
Authors: Victoria Y. Garnova, Vladimir G. Merzlikin, Denis G. Yakovlev, Andrei А. Amelenkov, Sergey V. Khudyakov
Abstract:
Assessment of novelty of studies submitted in Russian publications is given by the method citation analysis to identify scientific research with a high degree of innovation. This may be the basis of recommendations for subjects new joint projects setting of the RF and the EU. Apart from not the best rating of Russian publications (may even its lack) current IT ensure open access to the WEB-sites of these journals that make possible own expertise selective rapid assessment of the advanced developments in Russia by interested foreign investors. Cited foreign literature in Russian journals can become the subject of study to determine the innovative attractiveness of scientific research on the background a specific future-proof abroad. Authors introduced: (1) linguistic impact factor Li-f of journals for describing the share of publications in the majority language; (2) linguistic citation index Lact characterizing the significance of scientific research and linguistic top ones Ltop for evaluation of the spectral width of citing of foreign journals.Keywords: citation analysis, linguistic citation indexes, linguistic impact factor, innovative projects
Procedia PDF Downloads 3192126 Determinants of Financial Structure in the Economic Institution
Authors: Abdous Noureddine
Abstract:
The problem of funding in Algeria emerged as a problem you need to study after many Algerians researchers pointed out that the faltering Algerian public economic institution due to the imbalance in the financial structures and lower steering and marketing efficiency, as well as a result of severe expansion of borrowing because of inadequate own resources, and the consequent inability This institution to repay loans and interest payments, in addition to increasing reliance on overdraft so used to finance fixed assets, no doubt that this deterioration requires research and study of the causes and aspects of treatment, which addresses the current study, aside from it.Keywords: financial structure, financial capital, equity, debt, firm’s value, return, leverage
Procedia PDF Downloads 3132125 Numerical Simulation of Different Enhanced Oil Recovery (EOR) Scenarios on a Volatile Oil Reservoir
Authors: Soheil Tavakolpour
Abstract:
Enhance Oil Recovery (EOR) can be considered as an undeniable action in reservoirs life period. Different kind of EOR methods are available, but suitable EOR method depends on reservoir properties, like rock and fluid properties. In this paper, we nominated fifth SPE’s Comparative Solution Projects (CSP) for testing different scenarios. We used seven EOR scenarios for this reservoir and we simulated it for 10 years after 2 years production without any injection. The first scenario is waterflooding for whole of the 10 years period. The second scenario is gas injection for ten years. The third scenario is Water-Alternation-Gas (WAG). In the next scenario, water injected for 4 years before starting WAG injection for the next 6 years. In the fifth scenario, water injected after 6 years WAG injection for 4 years. For sixth and last scenarios, all the things are similar to fourth and fifth scenarios, but gas injected instead of water. Results show that fourth scenario was the most efficient method for 10 years EOR, but it resulted very high water production. Fifth scenario was efficient too, with little water production in comparison to the fourth scenario. Gas injection was not economically attractive. In addition to high gas production, it produced less oil in comparison to other scenarios.Keywords: WAG, SPE’s comparative solution projects, numerical simulation, EOR scenarios
Procedia PDF Downloads 4342124 Depollution of the Pinheiros River in the City of São Paulo: Mapping the Dynamics of Conflicts and Coalitions between Actors in Two Recent Depollution Projects
Authors: Adalberto Gregorio Back
Abstract:
Historically, the Pinheiros River, which crosses the urban area of the largest South American metropolis, the city of São Paulo, has been the subject of several interventions involving different interests and multiple demands, including the implementation of road axes and industrial occupation in the city, following its floodplains. the dilution of sewers; generation of electricity, with the reversal of its waters to the Billings Dam; and urban drainage. These processes, together with the exclusionary and peripheral urban sprawl with high population density in the peripheries, result in difficulties for the collection and treatment of household sewage, which flow into the tributaries and the Pinheiros River itself. In the last 20 years, two separate projects have been undertaken to clean up its waters. The first one between 2001-2011 was the flotation system, aimed at cleaning the river in its own gutter with equipment installed near the Bilings Dam; and, more recently, from 2019 to 2022, the proposal to connect about 74 thousand dwellings to the sewage collection and treatment system, as well as to install treatment plants in the tributaries of Pinheiros where the connection to the system is impracticable, given the irregular occupations. The purpose of this paper is to make a comparative analysis on the dynamics of conflicts, interests and opportunities of coalitions between the actors involved in the two referred projects of pollution of the Pinheiros River. For this, we use the analysis of documents produced by the state government; as well as documents related to the legal disputes that occurred in the first attempt of decontamination involving the sanitation company; the Billings Dam management company interested in power generation; the city hall and regular and irregular dwellings not linked to the sanitation system.Keywords: depollution of the Pinheiros River, interests groups, São Paulo, water energy nexus
Procedia PDF Downloads 1062123 An Integrated Framework for Wind-Wave Study in Lakes
Authors: Moien Mojabi, Aurelien Hospital, Daniel Potts, Chris Young, Albert Leung
Abstract:
The wave analysis is an integral part of the hydrotechnical assessment carried out during the permitting and design phases for coastal structures, such as marinas. This analysis aims in quantifying: i) the Suitability of the coastal structure design against Small Craft Harbour wave tranquility safety criterion; ii) Potential environmental impacts of the structure (e.g., effect on wave, flow, and sediment transport); iii) Mooring and dock design and iv) Requirements set by regulatory agency’s (e.g., WSA section 11 application). While a complex three-dimensional hydrodynamic modelling approach can be applied on large-scale projects, the need for an efficient and reliable wave analysis method suitable for smaller scale marina projects was identified. As a result, Tetra Tech has developed and applied an integrated analysis framework (hereafter TT approach), which takes the advantage of the state-of-the-art numerical models while preserving the level of simplicity that fits smaller scale projects. The present paper aims to describe the TT approach and highlight the key advantages of using this integrated framework in lake marina projects. The core of this methodology is made by integrating wind, water level, bathymetry, and structure geometry data. To respond to the needs of specific projects, several add-on modules have been added to the core of the TT approach. The main advantages of this method over the simplified analytical approaches are i) Accounting for the proper physics of the lake through the modelling of the entire lake (capturing real lake geometry) instead of a simplified fetch approach; ii) Providing a more realistic representation of the waves by modelling random waves instead of monochromatic waves; iii) Modelling wave-structure interaction (e.g. wave transmission/reflection application for floating structures and piles amongst others); iv) Accounting for wave interaction with the lakebed (e.g. bottom friction, refraction, and breaking); v) Providing the inputs for flow and sediment transport assessment at the project site; vi) Taking in consideration historical and geographical variations of the wind field; and vii) Independence of the scale of the reservoir under study. Overall, in comparison with simplified analytical approaches, this integrated framework provides a more realistic and reliable estimation of wave parameters (and its spatial distribution) in lake marinas, leading to a realistic hydrotechnical assessment accessible to any project size, from the development of a new marina to marina expansion and pile replacement. Tetra Tech has successfully utilized this approach since many years in the Okanagan area.Keywords: wave modelling, wind-wave, extreme value analysis, marina
Procedia PDF Downloads 842122 Four-dimensional (4D) Decoding Information Presented in Reports of Project Progress in Developing Countries
Authors: Vahid Khadjeh Anvary, Hamideh Karimi Yazdi
Abstract:
Generally, the tool of comparison between performance of each stage in the life of a project, is the number of project progress during that period, which in most cases is only determined as one-dimensional with referring to one of three factors (physical, time, and financial). In many projects in developing countries there are controversies on accuracy and the way of analyzing progress report of projects that hinders getting definitive and engineering conclusions on the status of project.Identifying weakness points of this kind of one-dimensional look on project and determining a reliable and engineering approach for multi-dimensional decoding information receivable from project is of great importance in project management.This can be a tool to help identification of hidden diseases of project before appearing irreversible symptoms that are usually delays or increased costs of execution. The method used in this paper is defining and evaluating a hypothetical project as an example analyzing different scenarios and numerical comparison of them along with related graphs and tables. Finally, by analyzing different possible scenarios in the project, possibility or impossibility of predicting their occurrence is examine through the evidence.Keywords: physical progress, time progress, financial progress, delays, critical path
Procedia PDF Downloads 3742121 The Penetration of Urban Mobility Multi-Modality Enablers in a Vehicle-Dependent City
Authors: Lama Yaseen, Nourah Al-Hosain
Abstract:
A Multi-modal system in urban mobility is an essential framework for an optimized urban transport network. Many cities are still heavily dependent on vehicle transportation, dominantly using conventional fuel-based cars for daily travel. With the reliance on motorized vehicles in large cities such as Riyadh, the capital city of Saudi Arabia, traffic congestion is eminent, which ultimately results in an increase in road emissions and loss of time. Saudi Arabia plans to undergo a massive transformation in mobility infrastructure and urban greening projects, including introducing public transport and other massive urban greening infrastructures that enable alternative mobility options. This paper uses a Geographic Information System (GIS) approach that analyzes the accessibility of current and planned public transport stations and how they intertwine with massive urban greening projects that may play a role as an enabler of micro-mobility and walk-ability options in the city.Keywords: urban development, urban mobility, sustainable mobility, Middle East
Procedia PDF Downloads 1022120 Research on Contract's Explicit Incentive and Reputation's Implicit Incentive Mechanism towards Construction Contractors
Authors: Li Ma, Meishuang Ma, Mengying Huang
Abstract:
The quality of construction projects reflects the credit and responsibilities of construction contractors for the owners and the whole society. Because the construction contractors master more relevant information about the entrusted engineering project under construction while the owners are in unfavorable position of gaining information, asymmetric information may lead the contractors act against the owners in order to pursue their own interests. Building a powerful motivation mechanism is the key to guarantee investor economic interests and the life and property of users in construction projects. Based on principal-agent theory and game theory, the authors develop relevant mathematical models to analyze and compare the contractor’s utility functions under different combinations of contracts’ explicit incentive mechanism and reputation’s implicit incentive mechanism aiming at finding out the conditions for incentive validity. The research concludes that the most rational motivation way is to combine the explicit and implicit incentive effects of both contracts and reputation mechanism, and puts forth some measures for problems on account of China’s current situation.Keywords: construction contractors, contract, reputation, incentive mechanism
Procedia PDF Downloads 5102119 Promoting the Contructor's Reputation in the Nigerian Construction Industry
Authors: Abdulkadir Adamu Shehu
Abstract:
Company’s reputation is an elusive asset. The reputation gained by companies must be preserved for sustainability of the company. However, the construction project is still suffering from declination of character due to the factors that affect their reputation. The problem led to the loss of projects, abandoning of the projects and many more. This contributed to negative impact on the contractors in the construction industry. As for today, previous studies have not investigated in this regards yet. For that reason, this paper examines the factors which could promote contractor’s reputation in the construction industry in Nigeria. To achieve this aim, 140 questionnaires were distributed to the Nigerian contractors. Based on the 67% response rate, descriptive analysis and analysis of variance (ANOVA) were the tools applied for the data obtained to be analysed. The result shows that, good communication system and improve quality of output of products are the most significant variables that can promote contractor’s reputation. The homogenous analyses indicate that there are significant different perceptions of respondents in term of the significant effects. The research concluded that contractor’s reputation in construction industry must be maintained and further research was suggested to focus on the qualitative method to have in-depth knowledge on contractor’s reputation in the construction industry.Keywords: construction industry, contractor’s reputation, effects of delay, Nigeria
Procedia PDF Downloads 4352118 Aiming at Optimization of Tracking Technology through Seasonally Tilted Sun Trackers: An Indian Perspective
Authors: Sanjoy Mukherjee
Abstract:
Discussions on concepts of Single Axis Tracker (SAT) are becoming more and more apt for developing countries like India not just as an advancement in racking technology but due to the utmost necessity of reaching at the lowest Levelized Cost of Energy (LCOE) targets. With this increasing competition and significant fall in feed-in tariffs of solar PV projects, developers are under constant pressure to secure investment for their projects and eventually earn profits from them. Moreover, being the second largest populated country, India suffers from scarcity of land because of higher average population density. So, to mitigate the risk of this dual edged sword with reducing trend of unit (kWh) cost at one side and utilization of land on the other, tracking evolved as the call of the hour. Therefore, the prime objectives of this paper are not only to showcase how STT proves to be an effective mechanism to get more gain in Global Incidence in collector plane (Ginc) with respect to traditional mounting systems but also to introduce Seasonally Tilted Tracker (STT) technology as a possible option for high latitude locations.Keywords: tracking system, grid connected solar PV plant, CAPEX reduction, levelized cost of energy
Procedia PDF Downloads 2582117 Utilization of Municipal Solid Waste in Thermal Power Production: A Techno-Economic Study of Kasur City, Punjab, Pakistan
Authors: Hafiz Muhammad Umer Aslam, Mohammad Rafiq Khan
Abstract:
This techno-economic study reports the feasibility of generating thermoelectric power from municipal solid waste (MSW) of Kasur City by incineration process. The data was gathered from different establishments of Kasur, through appropriate permission from their heads, and processed to design different alternative projects for installation of a thermal power plant in the city of Kasur. A technique of discounted cash flow was used to evaluate alternative projects so that their Benefit to Cost Ratio, Net Present Value, Internal Rate of Return and Payback Period can be determined. The study revealed that Kasur City currently consumes 18MWh electricity and generates 179 tons/day MSW. The generated waste has the ability to produce 2.1MWh electricity at the cost of USD 0.0581/unit with an expenditure of USD 3,907,692 as initial fixed investment of forming about 1/7th of consumption of Kasur. The cost from this source, when compared to current rate of electricity in Pakistan (USD 0.1346), is roughly half.Keywords: Kasur City, resource recovery, thermoelectric power, waste management
Procedia PDF Downloads 1722116 Auditing of Building Information Modeling Application in Decoration Engineering Projects in China
Authors: Lan Luo
Abstract:
In China’s construction industry, it is a normal practice to separately subcontract the decoration engineering part from construction engineering, and Building Information Modeling (BIM) is also done separately. Application of BIM in decoration engineering should be integrated with other disciplines, but Chinese current practice makes this very difficult and complicated. Currently, there are three barriers in the auditing of BIM application in decoration engineering in China: heavy workload; scarcity of qualified professionals; and lack of literature concerning audit contents, standards, and methods. Therefore, it is significant to perform research on what (contents) should be evaluated, in which phase, and by whom (professional qualifications) in BIM application in decoration construction so that the application of BIM can be promoted in a better manner. Based on this consideration, four principles of BIM auditing are proposed: Comprehensiveness of information, accuracy of data, aesthetic attractiveness of appearance, and scheme optimization. In the model audit, three methods should be used: Collision, observation, and contrast. In addition, BIM auditing at six stages is discussed and a checklist for work items and results to be submitted is proposed. This checklist can be used for reference by decoration project participants.Keywords: audit, evaluation, dimensions, methods, standards, BIM application in decoration engineering projects
Procedia PDF Downloads 3432115 Software Engineering Inspired Cost Estimation for Process Modelling
Authors: Felix Baumann, Aleksandar Milutinovic, Dieter Roller
Abstract:
Up to this point business process management projects in general and business process modelling projects in particular could not rely on a practical and scientifically validated method to estimate cost and effort. Especially the model development phase is not covered by a cost estimation method or model. Further phases of business process modelling starting with implementation are covered by initial solutions which are discussed in the literature. This article proposes a method of filling this gap by deriving a cost estimation method from available methods in similar domains namely software development or software engineering. Software development is regarded as closely similar to process modelling as we show. After the proposition of this method different ideas for further analysis and validation of the method are proposed. We derive this method from COCOMO II and Function Point which are established methods of effort estimation in the domain of software development. For this we lay out similarities of the software development rocess and the process of process modelling which is a phase of the Business Process Management life-cycle.Keywords: COCOMO II, busines process modeling, cost estimation method, BPM COCOMO
Procedia PDF Downloads 4412114 Change Management as a Critical Success Factor In E-Government initiatives
Authors: Mohammed Alassim
Abstract:
In 2014, a UN survey stated that: "The greatest challenge to the adoption of whole-of government, which fundamentally rests on increased collaboration, is resistance to change among government actors". Change management has experienced both theoretically and practically many transformation over the years. When organizations have to implement radical changes, they have to encounter a plethora of issues which leads to ineffective or inefficient implementation of change in most cases. 70% of change projects fail because of human issues. It has been cited that” most studies still show a 60-70% failure rate for organizational change projects — a statistic that has stayed constant from the 1970’s to the present.”. E-government involves not just technical change but cultural, policy, social and organizational evolution. Managing change and overcoming resistance to change is seen as crucial in the success of E-government projects. Resistance can be from different levels in the organization (top management, middle management or employees at operational levels). There can be many reasons for resistance including fear of change and insecurity, lack of knowledge and absence of commitment from management to implement the change. The purpose of this study is to conduct in-depth research to understand the process of change and to identify the critical factors that have led to resistance from employees at different levels (top management, Middle management and operational employees) during e-government initiatives in the public sector in Saudi Arabia. The study is based on qualitative and empirical research methods conducted in the public sector in the Kingdom of Saudi Arabia. This research will use triangulation in data method (interview, group discussion and document review). This research will contribute significantly to knowledge in this field and will identify the measures that can be taken to reduce resistance to change, Upon analysis recommendations or model will be offered which can enable decision makers in public sector in Saudi Arabia how to plan, implement and evaluate change in e-government initiatives via change management strategy.Keywords: change management, e-government, managing change, resistance to change
Procedia PDF Downloads 3182113 Clients’ Priorities in Delivery of Green Projects: South African Perspective
Authors: C. Mothobiso, D. Root
Abstract:
Purpose: This study attempts to identify the clients’ main priorities when delivering green projects. The aim is to compare if the clients have the same interest that are similar in delivery of convectional buildings as compared to green buildings. The main purpose is to find why other clients are investing in green buildings while others are reluctant and adopting green building at a slow pace. Design/methodology/approach: A sample of construction professional accredited by the Green Building Council of South Africa (GBCSA) was sent a questionnaire to participate in the research. Since GBSCSA accredited professionals have knowledge and experience about the green buildings, they are chosen as the sample. The research is qualitative because it evaluates the perceptions and knowledge around the subject matter. Research limitations: The research focuses only on the South African construction clients. Findings: Findings reveal that private clients invest more on green buildings as compared to government and parastatal entities. Private clients prioritise on maximising returns on investments and they mainly invest on buildings that save energies and have low life cycle costs. Private clients are perceived to be more knowledgeable about the benefits of green building project as compared to government and Parastatals clients. Shortage of expertise and managerial skill leads to low adaptation of green buildings in the government and parastatal projects. Other factors, which seem to disintegrate the adoption of green buildings, are the readiness of supply chain within the industry and inappropriate procurements strategies adopted by clients. The evaluation of the clients’ priorities will enable the design team to come up with innovative ways to approach the design process so that clients’ priorities and needs are identified and met. Practical implications: The findings are indicating that clients’ needs and priorities have a huge impact on the delivery of the project in terms of time, quality and cost of the project.Keywords: construction clients, design team, green construction and project deliver
Procedia PDF Downloads 2702112 The Effects of Training Load on Some Selected Fitness Variables in the Case of U-17 Female Volleyball Project Players, Central Ethiopia
Authors: Behailu Shigute Habtemariam
Abstract:
The aim of the study was to examine the effects of training load on some selected fitness performance variables of volleyball players in the case of U-17 female volleyball project players in the central Ethiopia region. Methods: In this study, quasi-experimental design was used. For the purpose of this study, twenty-three volleyball players were used as a subject from the two projects. The data collected through fitness performance assessment were analyzed and interpreted into a meaningful idea using manually as well as with computer in order to compare physical fitness variables and changes observed among participants. Those are taking part in the effects of training load on some selected physical fitness variables. The collected data were analyzed by means of the Statistical Package for Social Science version (SPSS V 20). The independent t-test was used to show the mean differences between the groups, and the paired T-test was used to compare the mean differences of the pre and post-training within each group. The level of significance will be set at Alfa 0.05. Results: The results are displayed using tables and figures. A significant difference was found in the mean differences of pre-test values (19.7 cm) and post-test values (37.5 cm) of the Durame city project on the flexibility test (MD =17.8 cm, P = 0.00). On the other hand, there was a significant difference in the mean difference of pre-test values of (18 cm) and post-test values (26.3 cm) of the Hosana city project on the flexibility test ( MD = 8.3 cm, P = 0.00). Conclusion: According to the results of the present studies, there were significant improvements from pre to post-test at Durame City and Hosana City projects on agility, flexibility, power, and speed fitness tests. On the other hand, a significant difference was not found before beginning the exercise between the two projects; however, a significant difference was found after 12 weeks of training.Keywords: overload, performance, training, volleyball
Procedia PDF Downloads 992111 Construction of a Supply Chain Model Using the PREVA Method: The Case of Innovative Sargasso Recovery Projects in Ther Lesser Antilles
Authors: Maurice Bilioniere, Katie Lanneau
Abstract:
Suddenly appeared in 2011, invasions of sargasso seaweeds Fluitans and Natans are a climatic hazard which causes many problems in the Caribbean. Faced with the growth and frequency of the phenomenon of massive sargasso stranding on their coasts, the French West Indies are moving towards the path of industrial recovery. In this context of innovative projects, we will analyze the necessary requirements for the management and performance of the supply chain, taking into account the observed volatility of the sargasso input. Our prospective approach will consist in studying the theoretical framework of modeling a hybrid supply chain by coupling the discreet event simulation (DES) with a valuation of the process costs according to the "activity-based costing" method (ABC). The PREVA approach (PRocess EVAluation) chosen for our modeling has the advantage of evaluating the financial flows of the logistic process using an analytical model chained with an action model for the evaluation or optimization of physical flows.Keywords: sargasso, PREVA modeling, supply chain, ABC method, discreet event simulation (DES)
Procedia PDF Downloads 1772110 Project Management and International Development: Competencies for International Assignment
Authors: M. P. Leroux, C. Coulombe
Abstract:
Projects are popular vehicles through which international aid is delivered in developing countries. To achieve their objectives, many northern organizations develop projects with local partner organizations in the developing countries through technical assistance projects. International aid and international development projects precisely have long been criticized for poor results although billions are spent every year. Little empirical research in the field of project management has the focus on knowledge transfer in international development context. This paper focuses particularly on personal dimensions of international assignees participating in project within local team members in the host country. We propose to explore the possible links with a human resource management perspective in order to shed light on the less research problematic of knowledge transfer in development cooperation projects. The process leading to capacity building being far complex, involving multiple dimensions and far from being linear, we propose here to assess if traditional research on expatriate in multinational corporations pertain to the field of project management in developing countries. The following question is addressed: in the context of international development project cooperation, what personal determinants should the selection process focus when looking to fill a technical assistance position in a developing country? To answer that question, we first reviewed the literature on expatriate in the context of inter organizational knowledge transfer. Second, we proposed a theoretical framework combining perspectives of development studies and management to explore if parallels can be draw between traditional international assignment and technical assistance project assignment in developing countries. We conducted an exploratory study using case studies from technical assistance initiatives led in Haiti, a country in Central America. Data were collected from multiple sources following qualitative study research methods. Direct observations in the field were allowed by local leaders of six organization; individual interviews with present and past international assignees, individual interview with local team members, and focus groups were organized in order to triangulate information collected. Contrary from empirical research on knowledge transfer in multinational corporations, results tend to show that technical expertise rank well behind many others characteristics. Results tend to show the importance of soft skills, as a prerequisite to succeed in projects where local team have to collaborate. More importantly, international assignees who were talking knowledge sharing instead of knowledge transfer seemed to feel more satisfied at the end of their mandate than the others. Reciprocally, local team members who perceived to have participated in a project with an expat looking to share instead of aiming to transfer knowledge seemed to describe the results of project in more positive terms than the others. Results obtained from this exploratory study open the way for a promising research agenda in the field of project management. It emphasises the urgent need to achieve a better understanding on the complex set of soft skills project managers or project chiefs would benefit to develop, in particular, the ability to absorb knowledge and the willingness to share one’s knowledge.Keywords: international assignee, international project cooperation, knowledge transfer, soft skills
Procedia PDF Downloads 1422109 Multiple-Material Flow Control in Construction Supply Chain with External Storage Site
Authors: Fatmah Almathkour
Abstract:
Managing and controlling the construction supply chain (CSC) are very important components of effective construction project execution. The goals of managing the CSC are to reduce uncertainty and optimize the performance of a construction project by improving efficiency and reducing project costs. The heart of much SC activity is addressing risk, and the CSC is no different. The delivery and consumption of construction materials is highly variable due to the complexity of construction operations, rapidly changing demand for certain components, lead time variability from suppliers, transportation time variability, and disruptions at the job site. Current notions of managing and controlling CSC, involve focusing on one project at a time with a push-based material ordering system based on the initial construction schedule and, then, holding a tremendous amount of inventory. A two-stage methodology was proposed to coordinate the feed-forward control of advanced order placement with a supplier to a feedback local control in the form of adding the ability to transship materials between projects to improve efficiency and reduce costs. It focused on the single supplier integrated production and transshipment problem with multiple products. The methodology is used as a design tool for the CSC because it includes an external storage site not associated with one of the projects. The idea is to add this feature to a highly constrained environment to explore its effectiveness in buffering the impact of variability and maintaining project schedule at low cost. The methodology uses deterministic optimization models with objectives that minimizing the total cost of the CSC. To illustrate how this methodology can be used in practice and the types of information that can be gleaned, it is tested on a number of cases based on the real example of multiple construction projects in Kuwait.Keywords: construction supply chain, inventory control supply chain, transshipment
Procedia PDF Downloads 1222108 Evaluation of Academic Research Projects Using the AHP and TOPSIS Methods
Authors: Murat Arıbaş, Uğur Özcan
Abstract:
Due to the increasing number of universities and academics, the fund of the universities for research activities and grants/supports given by government institutions have increased number and quality of academic research projects. Although every academic research project has a specific purpose and importance, limited resources (money, time, manpower etc.) require choosing the best ones from all (Amiri, 2010). It is a pretty hard process to compare and determine which project is better such that the projects serve different purposes. In addition, the evaluation process has become complicated since there are more than one evaluator and multiple criteria for the evaluation (Dodangeh, Mojahed and Yusuff, 2009). Mehrez and Sinuany-Stern (1983) determined project selection problem as a Multi Criteria Decision Making (MCDM) problem. If a decision problem involves multiple criteria and objectives, it is called as a Multi Attribute Decision Making problem (Ömürbek & Kınay, 2013). There are many MCDM methods in the literature for the solution of such problems. These methods are AHP (Analytic Hierarchy Process), ANP (Analytic Network Process), TOPSIS (Technique for Order Preference by Similarity to Ideal Solution), PROMETHEE (Preference Ranking Organization Method for Enrichment Evaluation), UTADIS (Utilities Additives Discriminantes), ELECTRE (Elimination et Choix Traduisant la Realite), MAUT (Multiattribute Utility Theory), GRA (Grey Relational Analysis) etc. Teach method has some advantages compared with others (Ömürbek, Blacksmith & Akalın, 2013). Hence, to decide which MCDM method will be used for solution of the problem, factors like the nature of the problem, types of choices, measurement scales, type of uncertainty, dependency among the attributes, expectations of decision maker, and quantity and quality of the data should be considered (Tavana & Hatami-Marbini, 2011). By this study, it is aimed to develop a systematic decision process for the grant support applications that are expected to be evaluated according to their scientific adequacy by multiple evaluators under certain criteria. In this context, project evaluation process applied by The Scientific and Technological Research Council of Turkey (TÜBİTAK) the leading institutions in our country, was investigated. Firstly in the study, criteria that will be used on the project evaluation were decided. The main criteria were selected among TÜBİTAK evaluation criteria. These criteria were originality of project, methodology, project management/team and research opportunities and extensive impact of project. Moreover, for each main criteria, 2-4 sub criteria were defined, hence it was decided to evaluate projects over 13 sub-criterion in total. Due to superiority of determination criteria weights AHP method and provided opportunity ranking great number of alternatives TOPSIS method, they are used together. AHP method, developed by Saaty (1977), is based on selection by pairwise comparisons. Because of its simple structure and being easy to understand, AHP is the very popular method in the literature for determining criteria weights in MCDM problems. Besides, the TOPSIS method developed by Hwang and Yoon (1981) as a MCDM technique is an alternative to ELECTRE method and it is used in many areas. In the method, distance from each decision point to ideal and to negative ideal solution point was calculated by using Euclidian Distance Approach. In the study, main criteria and sub-criteria were compared on their own merits by using questionnaires that were developed based on an importance scale by four relative groups of people (i.e. TUBITAK specialists, TUBITAK managers, academics and individuals from business world ) After these pairwise comparisons, weight of the each main criteria and sub-criteria were calculated by using AHP method. Then these calculated criteria’ weights used as an input in TOPSİS method, a sample consisting 200 projects were ranked on their own merits. This new system supported to opportunity to get views of the people that take part of project process including preparation, evaluation and implementation on the evaluation of academic research projects. Moreover, instead of using four main criteria in equal weight to evaluate projects, by using weighted 13 sub-criteria and decision point’s distance from the ideal solution, systematic decision making process was developed. By this evaluation process, new approach was created to determine importance of academic research projects.Keywords: Academic projects, Ahp method, Research projects evaluation, Topsis method.
Procedia PDF Downloads 5912107 Critical Path Segments Method for Scheduling Technique
Authors: Sherif M. Hafez, Remon F. Aziz, May S. A. Elalim
Abstract:
Project managers today rely on scheduling tools based on the Critical Path Method (CPM) to determine the overall project duration and the activities’ float times which lead to greater efficiency in planning and control of projects. CPM was useful for scheduling construction projects, but researchers had highlighted a number of serious drawbacks that limit its use as a decision support tool and lacks the ability to clearly record and represent detailed information. This paper discusses the drawbacks of CPM as a scheduling technique and presents a modified critical path method (CPM) model which is called critical path segments (CPS). The CPS scheduling mechanism addresses the problems of CPM in three ways: decomposing the activity duration of separated but connected time segments; all relationships among activities are converted into finish–to–start relationship; and analysis and calculations are made with forward path. Sample cases are included to illustrate the shortages in CPM, CPS full analysis and calculations are explained in details, and how schedules can be handled better with the CPS technique.Keywords: construction management, scheduling, critical path method, critical path segments, forward pass, float, project control
Procedia PDF Downloads 3532106 Public-Private Partnership Projects in Canada: A Case Study Approach
Authors: Samuel Carpintero
Abstract:
Public-private partnerships (PPP) arrangements have emerged all around the world as a response to infrastructure deficits and the need to refurbish existing infrastructure. The motivations of governments for embarking on PPPs for the delivery of public infrastructure are manifold, and include on-time and on-budget delivery as well as access to private project management expertise. The PPP formula has been used by some State governments in United States and Canada, where the participation of private companies in financing and managing infrastructure projects has increased significantly in the last decade, particularly in the transport sector. On the one hand, this paper examines the various ways used in these two countries in the implementation of PPP arrangements, with a particular focus on risk transfer. The examination of risk transfer in this paper is carried out with reference to the following key PPP risk categories: construction risk, revenue risk, operating risk and availability risk. The main difference between both countries is that in Canada the demand risk remains usually within the public sector whereas in the United States this risk is usually transferred to the private concessionaire. The aim is to explore which lessons can be learnt from both models than might be useful for other countries. On the other hand, the paper also analyzes why the Spanish companies have been so successful in winning PPP contracts in North America during the past decade. Contrary to the Latin American PPP market, the Spanish companies do not have any cultural advantage in the case of the United States and Canada. Arguably, some relevant reasons for the success of the Spanish groups are their extensive experience in PPP projects (that dates back to the late 1960s in some cases), their high technical level (that allows them to be aggressive in their bids), and their good position and track-record in the financial markets. The article’s empirical base consists of data provided by official sources of both countries as well as information collected through face-to-face interviews with public and private representatives of the stakeholders participating in some of the PPP schemes. Interviewees include private project managers of the concessionaires, representatives of banks involved as financiers in the projects, and experts in the PPP industry with close knowledge of the North American market. Unstructured in-depth interviews have been adopted as a means of investigation for this study because of its powers to achieve honest and robust responses and to ensure realism in the collection of an overall impression of stakeholders’ perspectives.Keywords: PPP, concession, infrastructure, construction
Procedia PDF Downloads 301