7687 Factors Contributing to Building Construction Project’s Cost Overrun in Jordan

Authors: Ghaleb Y. Abbasi, Sufyan Al-Mrayat

Abstract:

This study examined the contribution of thirty-six factors to building construction project’s cost overrun in Jordan. A questionnaire was distributed to a random sample of 350 stakeholders comprised of owners, consultants, and contractors, of which 285 responded. SPSS analysis was conducted to identify the top five causes of cost overrun, which were a large number of variation orders, inadequate quantities provided in the contract, misunderstanding of the project plan, incomplete bid documents, and choosing the lowest price in the contract bidding. There was an agreement among the study participants in ranking the factors contributing to cost overrun, which indicated that these factors were very commonly encountered in most construction projects in Jordan. Thus, it is crucial to enhance the collaboration among the different project stakeholders to understand the project’s objectives and set a realistic plan that takes into consideration all the factors that might influence the project cost, which might eventually prevent cost overrun.

Keywords: cost, overrun, building construction projects, Jordan

Procedia PDF Downloads 107
7686 2D Numerical Analysis for Determination of the Effect of Bored Piles Constructed against the Landslide near Karabuk University Stadium

Authors: Dogan Cetin, Burak Turk, Mahmut Candan

Abstract:

Landslides cause remarkable damage and loss of human life every year around the world. They may be made more likely by factors such as earthquakes, heavy precipitation, and incorrect construction activities near or on slopes. The stadium of Karabük University is located at the bottom of a very high slope. After construction of the stadium, severe deformations were observed on the social activity area surrounding the stadium. Some inclinometers were placed behind the stadium to detect the possible landslide activity. According to measurements of the inclinometers, irregular soil movements were detected at depths between 20 m and 45 m. Also, significant heaves and settlements were observed behind the stadium walls located at the toe of the slope. The heaves indicate that the stadium walls were under threat of a significant landslide. After inclinometer readings and field observations, the potential failure geometry was estimated. The protection system was designed based on numerous numerical analysis performed by 2-D Plaxis software. After the design was completed, protective geotechnical work was started. Before the geotechnical work began, new inclinometers were installed to monitor earth movement during the work and afterward. The total horizontal length of the possible failure surface is 220 m. Geotechnical work included two-row-pile construction and three-row-pile construction on the slope. The bored piles were 120 cm in diameter for two-row-pile construction, and 150 cm in diameter for three-row-pile construction. Pile length is 31.30 m for two-row-pile construction and 31.40 m for three-row-pile construction. The distance between two-row-pile and three-row-pile construction is 60 m. With these bored piles, the landslide was divided into three parts. In this way, the earth's pressure was reduced. After a number of inclinometer readings, it was seen that deformation continued during the work, but after the work was done, the movement reversed, and total deformation stayed in mm dimension. It can be said that the protection work eliminated the possible landslide.

Keywords: landslide, landslide protection, inclinometer measurement, bored piles

Procedia PDF Downloads 145
7685 Examining the Links between Established Principles, Iranian Teachers' Perceptions of Reading Comprehension, and Their Actual Practice in English for Specific Purposes Courses

Authors: Zahra Alimorad

Abstract:

There is a strong belief that language teachers' actual practices in the classroom context are largely determined by the underlying perceptions they hold about the nature of language and language learning. That being so, it can be envisaged that teaching procedures of ESP (English for Specific Purposes) teachers teaching reading comprehension will mainly be driven by their perceptions about the nature of reading. To examine this issue, four Iranian university professors holding Ph.D. in either TEFL (Teaching English as a Foreign Language) or English Literature who were teaching English to Engineering and Sciences students were recruited to participate in this study. To collect the necessary data, classroom observations and follow-up semi-structured interviews were used. Furthermore, the materials utilized by the teachers such as textbooks, syllabuses, and tests were also examined. Although it can be argued that their perceptions were partially compatible with the established principles, results of the study pointed to a lack of congruence between these teachers' perceptions and their practices, on the one hand, and between the established principles and the practices, on the other. While the literature mostly supports a metacognitive-strategy approach to reading comprehension, the teachers were mainly adopting a skills-based approach to the teaching of reading. That is, they primarily focused on translation as the core activity in the classroom followed by reading aloud, defining words, and explaining grammatical structures. This divergence was partly attributed to the contextual constraints and partly to students' lack of motivation by the teachers.

Keywords: English teachers, perceptions, practice, principles, reading comprehension

Procedia PDF Downloads 262
7684 Earthquake Hazards in Manipur: Casual Factors and Remedial Measures

Authors: Kangujam Monika, Kiranbala Devi Thokchom, Soibam Sandhyarani Devi

Abstract:

Earthquake is a major natural hazard in India. Manipur, located in the North-Eastern Region of India, is one of the most affected location in the region prone to earthquakes since it lies in an area where Indian and Eurasian tectonic plates meet and is in seismic Zone V which is the most severe intensity zone, according to IS Code. Some recent earthquakes recorded in Manipur are M 6.7 epicenter at Tamenglong (January 4, 2016), M 5.2 epicenter at Churachandpur (February 24, 2017) and most recent M 4.4 epicenter at Thoubal (June 19, 2017). In these recent earthquakes, some houses and buildings were damaged, landslides were also occurred. A field study was carried out. An overview of the various causal factors involved in triggering of earthquake in Manipur has been discussed. It is found that improper planning, poor design, negligence, structural irregularities, poor quality materials, construction of foundation without proper site soil investigation and non-implementation of remedial measures, etc., are possibly the main causal factors for damage in Manipur during earthquake. The study also suggests, though the proper design of structure and foundation along with soil investigation, ground improvement methods, use of modern techniques of construction, counseling with engineer, mass awareness, etc., might be effective solution to control the hazard in many locations. An overview on the analysis pertaining to earthquake in Manipur together with on-going detailed site specific geotechnical investigation were presented.

Keywords: Manipur, earthquake, hazard, structure, soil

Procedia PDF Downloads 210
7683 Proposal of Design Method in the Semi-Acausal System Model

Authors: Shigeyuki Haruyama, Ken Kaminishi, Junji Kaneko, Tadayuki Kyoutani, Siti Ruhana Omar, Oke Oktavianty

Abstract:

This study is used as a definition method to the value and function in manufacturing sector. In concurrence of discussion about present condition of modeling method, until now definition of 1D-CAE is ambiguity and not conceptual. Across all the physics fields, those methods are defined with the formulation of differential algebraic equation which only applied time derivation and simulation. At the same time, we propose semi-acausal modeling concept and differential algebraic equation method as a newly modeling method which the efficiency has been verified through the comparison of numerical analysis result between the semi-acausal modeling calculation and FEM theory calculation.

Keywords: system model, physical models, empirical models, conservation law, differential algebraic equation, object-oriented

Procedia PDF Downloads 485
7682 Community Opinions on Cable Car System Construction at Upper Esaan Wild Animal Adventure Park (Khon Kaen – Udon Thani) in Khao Suan Kwang District, Khon Kaen Province (Khon Kaen Zoo), Thailand

Authors: Ruchirat Patanathabutr

Abstract:

This applied research has adopted descriptive social science research methodology to interpret, analyze and assess the data and used descriptive analysis to present the research results. The objective of this research is to investigate the behaviors and opinions on the service and construction of cable car system at the Upper Esaan Wild Animal Adventure Park (Khon Kaen – Udon Thani) in Khao Suan Kwang District, Khon Kaen Province (Khon Kaen Zoo) of people in the local and distant communities as well as the service users. The research results have revealed that the main target group is the residents in the upper northeastern region of Thailand, especially those who have resided in the immediate vicinity of the cable car project and in nearby districts for more than 10 years. They are men and women at the age of 20-60 with high school diploma and higher levels of education, working as traders/entrepreneurs, government officers/state enterprise employees, and freelancers/self-employed, with the average monthly income of no more than 30,000 baht. Khon Kaen Zoo should improve its 4 organizational images as a tourist attraction, an animal display enclosure, an educational institution and as a provincial symbol; however, the zoo should mainly be presented as an important tourist attraction. The service should focus on maintaining the service standards in both the animal display area and the ocean park. The attention should also be directed at the types and numbers of animals, service quality, service fee, convenient access and transportation, promotions and the standards of other services. Regarding the community involvement in the cable car system construction project, it is strongly agreed that there should be a cable car service between the animal display area and the ocean park and a round-trip ticket should cost 20 baht, 50 baht or 100 baht, respectively. Khon Kaen Zoo or responsible entity must provide related groups of people, such as people in the local and distant communities as well as the service users, with accurate information about the community management guidelines. This is because the community opinions have showed the uncertainty about the cable car system construction at Khon Kaen Zoo and the 4 principles of management, including planning, organizing, leading and controlling, are indicated as uncertain as there is no statistically significant difference at 0.05. In addition, the social, economic, and environmental impacts of the cable car system construction at Khon Kaen Zoo on the communities must be considered carefully.

Keywords: community opinion, cable car system, Khon Kaen Zoo, Thailand

Procedia PDF Downloads 360
7681 Factors Affecting the Formation of Architectural Space and Construction Systems in the Jordanian Vernacular Architecture

Authors: Mohannad Tarrad

Abstract:

The research deals with the beginnings of the vernacular Jordanian architecture since the establishment of the Jordanian state in the early nineteenth century until now, where the Jordanian architecture was based on the interactions of the Jordanian society with the surrounding environment, where the local materials available in the construction area were used, and the construction systems inherited from previous civilizations were used. The builders in Jordan relied on exchanging knowledge and transferring it from one generation to another, where they were able to formulate a construction style capable of responding to the requirement of architectural spaces, and each region of Jordan has its own way of building, as there are various geographical areas in Jordan, including agricultural, mountainous and desert areas. Then the research touched on a historical study of the architectural space and identifying the value of the architectural space in the Jordanian social life, which is related to the customs and traditions of a society influenced by the Arab Islamic civilization, and then the construction, the structural structure, its characteristics and the constituent elements of the building were defined in the vernacular l Jordanian architecture. From the structural point of view, and then to identify the structural materials used in the structural structure and the impact of the structural structure on the design from several aspects, leading to the interior space and the factors affecting it. The research aims to explain and clarify the interconnected design and construction solutions in the vernacular Jordanian architecture in a manner that respects the environmental context, taking into account the material cost of the building, where the financial situation of the home owner plays an important role in choosing the building material and construction method. Case studies from heritage buildings from several Jordanian regions will be analyzed to illustrate the idea of the research.

Keywords: construction systems, architectural space, environmental context, Jordanian architecture

Procedia PDF Downloads 203
7680 Analyzing Sociocultural Factors Shaping Architects’ Construction Material Choices: The Case of Jordan

Authors: Maiss Razem

Abstract:

The construction sector is considered a major consumer of materials that undergoes processes of extraction, processing, transportation, and maintaining when used in buildings. Several metrics have been devised to capture the environmental impact of the materials consumed during construction using lifecycle thinking. Rarely has the materiality of this sector been explored qualitatively and systemically. This paper aims to explore socio-cultural forces that drive the use of certain materials in the Jordanian construction industry, using practice theory as a heuristic method of analysis, more specifically Shove et al. three-element model. By conducting semi-structured interviews with architects, the results unravel contextually embedded routines when determining qualities of three materialities highlighted herein; stone, glass and spatial openness. The study highlights the inadequacy of only using efficiency as a quantitative metric of sustainable materials and argues for the need to link material consumption with socio-economic, cultural, and aesthetic driving forces. The operationalization of practice theory by tracing materials’ lifetimes as they integrate with competencies and meanings captures dynamic engagements through the analyzed routines of actors in the construction practice. This study can offer policymakers better-nuanced representation to green this sector beyond efficiency rhetoric and quantitative metrics.

Keywords: architects' practices, construction materials, Jordan, practice theory

Procedia PDF Downloads 169
7679 Construction Technology of Modified Vacuum Pre-Loading Method for Slurry Dredged Soil

Authors: Ali H. Mahfouz, Gao Ming-Jun, Mohamad Sharif

Abstract:

Slurry dredged soil at coastal area has a high water content, poor permeability, and low surface intensity. Hence, it is infeasible to use vacuum preloading method to treat this type of soil foundation. For the special case of super soft ground, a floating bridge is first constructed on muddy soil and used as a service road and platform for implementing the modified vacuum preloading method. The modified technique of vacuum preloading and its construction process for the super soft soil foundation improvement is then studied. Application of modified vacuum preloading method shows that the technology and its construction process are highly suitable for improving the super soft soil foundation in coastal areas.

Keywords: super soft foundation, dredger fill, vacuum preloading, foundation treatment, construction technology

Procedia PDF Downloads 609
7678 Factors Associated with Self-Reported Pregnancies among Secondary School Teenagers in South Africa: Evidence from General Household Surveys

Authors: Sathiya Susuman Appunni

Abstract:

Background: This article reviews the self-reported pregnancies among teenage girls currently attending secondary school in South Africa. The study aim is to examine the demographic and socio-economic factors associated with self-reported pregnancies among teenage girls currently attending secondary school in the study area. Data and Methods: Secondary data drawn from the General Household Surveys 2016 and Community Survey 2016 as well as 10 % sample data from the 2011 South African census were used. Bivariate, and Multivariate analyses were carried in order to meet the aims of the study. Results: The independent variable identified was the number of economically active people in the household, which indicated 3.3% in 2011 and 3.6% in 2016 for the household with no economically active member. Among the provinces, Limpopo has been leading by 5.2% of self-reported pregnancies among the girls currently attending secondary school in South Africa. Conclusion: It is recommended that the needs to be special health policies and strategies in place to address this epidemic and such policies need to be targeted to the different needs of teenagers in the different demarcations of the country.

Keywords: pregnancy prevalence, demographic, household, teenage girls, socio-economic

Procedia PDF Downloads 161
7677 Effect of Highway Construction on Soil Properties and Soil Organic Carbon (Soc) Along Lagos-Badagry Expressway, Lagos, Nigeria

Authors: Fatai Olakunle Ogundele

Abstract:

Road construction is increasingly common in today's world as human development expands and people increasingly rely on cars for transportation on a daily basis. The construction of a large network of roads has dramatically altered the landscape and impacted well-being in a number of deleterious ways. In addition, the road can also shift population demographics and be a source of pollution into the environment. Road construction activities normally result in changes in alteration of the soil's physical properties through soil compaction on the road itself and on adjacent areas and chemical and biological properties, among other effects. Understanding roadside soil properties that are influenced by road construction activities can serve as a basis for formulating conservation-based management strategies. Therefore, this study examined the effects of road construction on soil properties and soil organic carbon along Lagos Badagry Expressway, Lagos, Nigeria. The study adopted purposive sampling techniques and 40 soil samples were collected at a depth of 0 – 30cm from each of the identified road intersections and infrastructures using a soil auger. The soil samples collected were taken to the laboratory for soil properties and carbon stock analysis using standard methods. Both descriptive and inferential statistical techniques were applied to analyze the data obtained. The results revealed that soil compaction inhibits ecological succession on roadsides in that increased compaction suppresses plant growth as well as causes changes in soil quality.

Keywords: highway, soil properties, organic carbon, road construction, land degradation

Procedia PDF Downloads 80
7676 A Study on FWD Deflection Bowl Parameters for Condition Assessment of Flexible Pavement

Authors: Ujjval J. Solanki, Prof.(Dr.) P.J. Gundaliya, Prof.M.D. Barasara

Abstract:

The application of Falling Weight Deflectometer is to evaluate structural performance of the flexible pavement. The exercise of back calculation is required to know the modulus of elasticity of existing in-service pavement. The process of back calculation needs in-depth field experience for the input of range of modulus of elasticity of bituminous, granular and subgrade layer, and its required number of trial to find such matching moduli with the observed FWD deflection on the field. The study carried out at Barnala-Mansa State Highway Punjab-India using FWD before and after overlay; the deflections obtained at 0 on the load cell, 300, 600, 900,1200, 1500 and 1800 mm interval from the load cell these seven deflection results used to calculate Surface Curvature Index (SCI), Base damage Index (BDI), Base curvature index (BCI). This SCI, BCI and BDI indices are useful to predict the structural performance of in-service pavement and also useful to identify homogeneous section for condition assessment. The SCI, BCI and BDI range are determined for before and after overlay the range of SCI 520 to 51 BDI 294 to 63 BCI 83 to 0.27 for old pavement and SCI 272 to 23 BDI 228 to 28, BCI 25.85 to 4.60 for new pavement. It also shows good correlation with back calculated modulus of elasticity of all the three layer.

Keywords: back calculation, base damage index, base curvature index, FWD (Falling Weight Deflectometer), surface curvature index

Procedia PDF Downloads 332
7675 The Efficacy of Contractual Governance on Task and Relationship Conflict in Construction Projects

Authors: Jingya You, Yongqiang Chen, Yuanyuan Hua, Wenqian Wang

Abstract:

Conflict is commonplace in construction projects, and construction projects always involve designing contracts between the owner and the contractor. However, how the contract affects the level of conflict between the owner and the contractor has not been elaborated. The purpose of this paper is to explain the effects of contractual complexity on the level of conflict, including task conflict and relationship conflict, and then to demonstrate the moderating role played by the interdependence between the owner and the contractor. Using data from owners and general contractors in the Chinese construction industry, this research reveals that contractual control will reduce relationship conflict. Contractual coordination will also reduce relationship conflict by the mediating effect of task conflict. Besides, under high joint interdependence, the positive relationship between task conflict and relationship conflict is strengthened, while high interdependence asymmetry has effects on weakening the relationship between task conflict and relationship conflict. The findings provide guidance for contract designers to draft suitable contracts in order to effectively deal with conflict. Additionally, this research implies that project managers should highlight the importance of contract in conflict management.

Keywords: construction projects, contract governance, interdependence, relationship conflict, task conflict

Procedia PDF Downloads 218
7674 Learning from the Positive to Encourage Compliance with Workplace Health and Safety

Authors: Amy Williamson, Kerry Armstrong, Jason Edwards, Patricia Obst

Abstract:

Australian national policy endorses a responsive approach to work health and safety (WHS) regulation, combining positive motivators (education and guidance), with compliance monitoring and enforcement to encourage and secure compliance with legislation. Despite theoretical support for responsive regulation, there is limited evidence regarding how to achieve best results in practice. Using positive psychology as a novel paradigm, this study aims to investigate how non-punitive regulatory interactions can be improved to further encourage regulatory compliance in the construction industry. As part of a larger project, semi-structured interviews were conducted with 35 inspectorate staff and 11 managers in the Australian (Queensland) construction industry. Using an inductive, grounded approach, an in-depth qualitative investigation was conducted to identify the positive psychological principles which underpin effective use of the non-punitive aspects of responsive regulation. Results highlighted the importance of effective engagement between inspectors and industry managers. This involved the need to interact cooperatively and encourage compliance with WHS legislation. Several strategies were identified that assisted regulatory interactions and the ability of inspectors to engage. The importance of communication and interpersonal skills was reported to be critical to any interaction, regardless of the nature of the visit and regulatory tools used. In particular, the use of clear and open communication fostered trust and rapport which facilitated more positive interactions. The importance of respect and empathy was also highlighted. The need for provision of guidance and direction on how to achieve compliance was also reported. This related to ensuring companies understand their WHS obligations, providing specific advice regarding how to rectify a breach and meet compliance requirements, and ensuring sufficient follow up to confirm that compliance is successfully achieved. In the absence of imminent risk, allowing companies the opportunity to comply before further action is taken was also highlighted. Increased proactive engagement with industry to educate and promote the vision of safety at work was also reported. Finally, provision of praise and positive feedback was reported to assist interactions and encourage the continuation of good practices. Evidence from positive psychology and organisational psychology was obtained to support the use of each strategy in practice. In particular, the area of positive leadership provided a useful framework to consider the factors and conditions that drive positive interactions within the context of work health and safety and the specific relationship between inspectors and industry managers. This study provides fresh insight into key psychological principles which support non-punitive regulatory interactions in the area of workplace health and safety. The findings of this research contribute to a better understanding of how inspectors can enhance the efficacy of their regulatory interactions to improve compliance with legislation. Encouraging and assisting compliance through effective non-punitive activity offers a sustainable pathway for promoting safety and preventing fatalities and injuries in the construction industry.

Keywords: engagement, non-punitive approaches to compliance, positive interactions in the workplace, work health and safety compliance

Procedia PDF Downloads 151
7673 Decision Making during the Project Management Life Cycle of Infrastructure Projects

Authors: Karrar Raoof Kareem Kamoona, Enas Fathi Taher AlHares, Zeynep Isik

Abstract:

The various disciplines in the construction industry and the co-existence of the people in the various disciplines are what builds well-developed, closely-knit interpersonal skills at various hierarchical levels thus leading to a varied way of leadership. The varied decision making aspects during the lifecycle of a project include: autocratic, participatory and last but not least, free-rein. We can classify some of the decision makers in the construction industry in a hierarchical manner as follows: project executive, project manager, superintendent, office engineer and finally the field engineer. This survey looked at how decisions are made during the construction period by the key stakeholders in the project. From the paper it is evident that the three decision making aspects can be used at different times or at times together in order to bring out the best leadership decision. A blend of different leadership styles should be used to enhance the success rate during the project lifecycle.

Keywords: leadership style, construction, decision-making, built environment

Procedia PDF Downloads 359
7672 Approach for the Mathematical Calculation of the Damping Factor of Railway Bridges with Ballasted Track

Authors: Andreas Stollwitzer, Lara Bettinelli, Josef Fink

Abstract:

The expansion of the high-speed rail network over the past decades has resulted in new challenges for engineers, including traffic-induced resonance vibrations of railway bridges. Excessive resonance-induced speed-dependent accelerations of railway bridges during high-speed traffic can lead to negative consequences such as fatigue symptoms, distortion of the track, destabilisation of the ballast bed, and potentially even derailment. A realistic prognosis of bridge vibrations during high-speed traffic must not only rely on the right choice of an adequate calculation model for both bridge and train but first and foremost on the use of dynamic model parameters which reflect reality appropriately. However, comparisons between measured and calculated bridge vibrations are often characterised by considerable discrepancies, whereas dynamic calculations overestimate the actual responses and therefore lead to uneconomical results. This gap between measurement and calculation constitutes a complex research issue and can be traced to several causes. One major cause is found in the dynamic properties of the ballasted track, more specifically in the persisting, substantial uncertainties regarding the consideration of the ballasted track (mechanical model and input parameters) in dynamic calculations. Furthermore, the discrepancy is particularly pronounced concerning the damping values of the bridge, as conservative values have to be used in the calculations due to normative specifications and lack of knowledge. By using a large-scale test facility, the analysis of the dynamic behaviour of ballasted track has been a major research topic at the Institute of Structural Engineering/Steel Construction at TU Wien in recent years. This highly specialised test facility is designed for isolated research of the ballasted track's dynamic stiffness and damping properties – independent of the bearing structure. Several mechanical models for the ballasted track consisting of one or more continuous spring-damper elements were developed based on the knowledge gained. These mechanical models can subsequently be integrated into bridge models for dynamic calculations. Furthermore, based on measurements at the test facility, model-dependent stiffness and damping parameters were determined for these mechanical models. As a result, realistic mechanical models of the railway bridge with different levels of detail and sufficiently precise characteristic values are available for bridge engineers. Besides that, this contribution also presents another practical application of such a bridge model: Based on the bridge model, determination equations for the damping factor (as Lehr's damping factor) can be derived. This approach constitutes a first-time method that makes the damping factor of a railway bridge calculable. A comparison of this mathematical approach with measured dynamic parameters of existing railway bridges illustrates, on the one hand, the apparent deviation between normatively prescribed and in-situ measured damping factors. On the other hand, it is also shown that a new approach, which makes it possible to calculate the damping factor, provides results that are close to reality and thus raises potentials for minimising the discrepancy between measurement and calculation.

Keywords: ballasted track, bridge dynamics, damping, model design, railway bridges

Procedia PDF Downloads 164
7671 Evaluation of Environmental Management System Implementation of Construction Projects in Turkey

Authors: Aydemir Akyürek, Osman Nuri Ağdağ

Abstract:

Construction industry is in a rapid development for many years around the world and especially in Turkey. In the last three years sector has 10% growth and provides significant support on Turkey’s national economy. Many construction projects are on-going at urban and rural areas of Turkey which have substantial environmental impacts. Environmental impacts during construction phase are quite diversified and widespread. Environmental impacts of construction industry cannot be inspected properly in all cases and negative impacts may occur frequently in many projects in Turkey. In this study, implementation of ISO 14001 Environmental Management System (EMS) in construction plants is evaluated. In the beginning stage quality management systems generally reviewed and ISO 14001 EMS is selected for implementation. Standard requirements are examined first and implementation of every standard requirement is elaborated for the selected construction plant in the following stage. Key issues and common problems, gained benefits by execution of this type of international EMS standard are examined. As can be seen in sample projects, construction projects are being completed very fast and contractors are working in a highly competitive environment with low profit ratios in our country and mostly qualified work force cannot be accessible. Addition to this there are deficits on waste handling and environmental infrastructure. Besides construction companies which have substantial investments on EMSs can be faced with difficulties on competitiveness in domestic market, however professional Turkish contractors which implementing managements systems in larger scale at international projects are gaining successful results. Also the concept of ‘construction project management’ which is being implemented in successful projects worldwide cannot be implemented except larger projects in Turkey. In case of nonexistence of main management system (quality) implementation of EMSs cannot be managed. Despite all constraints, EMSs that will be implemented in this industry with commitment of top managements and demand of customers will be an enabling, facilitating tool to determine environmental aspects and impacts of construction sites, will provide higher compliance levels for environmental legislation, to establish best available methods for operational control on waste management, chemicals management etc. and to plan monitoring and measurement, to prioritize environmental aspects for investment schedules and waste management.

Keywords: environmental management system, construction projects, ISO 14001, quality

Procedia PDF Downloads 362
7670 A Framework for Improving Trade Contractors’ Productivity Tracking Methods

Authors: Sophia Hayes, Kenny L. Liang, Sahil Sharma, Austin Shema, Mahmoud Bader, Mohamed Elbarkouky

Abstract:

Despite being one of the most significant economic contributors of the country, Canada’s construction industry is lagging behind other sectors when it comes to labor productivity improvements. The construction industry is very collaborative as a general contractor, will hire trade contractors to perform most of a project’s work; meaning low productivity from one contractor can have a domino effect on the shared success of a project. To address this issue and encourage trade contractors to improve their productivity tracking methods, an investigative study was done on the productivity views and tracking methods of various trade contractors. Additionally, an in-depth review was done on four standard tracking methods used in the construction industry: cost codes, benchmarking, the job productivity measurement (JPM) standard, and WorkFace Planning (WFP). The four tracking methods were used as a baseline in comparing the trade contractors’ responses, determining gaps within their current tracking methods, and for making improvement recommendations. 15 interviews were conducted with different trades to analyze how contractors value productivity. The results of these analyses indicated that there seem to be gaps within the construction industry when it comes to an understanding of the purpose and value in productivity tracking. The trade contractors also shared their current productivity tracking systems; which were then compared to the four standard tracking methods used in the construction industry. Gaps were identified in their various tracking methods and using a framework; recommendations were made based on the type of trade on how to improve how they track productivity.

Keywords: labor productivity, productivity tracking methods, trade contractors, construction

Procedia PDF Downloads 192
7669 A Study on Strategy of Coordinative Symbiosis between New and Old Buildings: Case Study of Shanghai Citic Plaza and Surroundings

Authors: Tianyi Qin

Abstract:

Along with the acceleration of Chinese urbanization, the expansion, renovation and demolition of old buildings is on the stage together with the design and construction of new buildings every day in downtown of the old city area. The coordinative symbiosis between new and old buildings is an important problem which needs to be solved in the process of urban development. By studying and analyzing the case of Shanghai Citic Plaza and surroundings, this paper contributes to discussing the concept, value and problems to be solved of the coordination of new and old buildings, meanwhile, striking the balance between new and old buildings from the aspects of architectural form, space, function and local context. As a result, the strategy of the coordinative symbiosis between new and old buildings is summarized, which can offer some guiding principles to urban development from now on.

Keywords: coordinative symbiosis, new and old buildings, Shanghai Citic Plaza, strategy

Procedia PDF Downloads 348
7668 Validation of Modern Work Modules and Their Impact on Sustainable Human Resource Management in the Construction Industry

Authors: Robin Becker, Nane Roetmann, Manfred Helmus

Abstract:

The construction industry faces a significant challenge due to a shortage of skilled work-ers, especially in construction management, despite an increase in graduates. This is main-ly because the job is associated with high stress, long hours, and poor work-life balance. A survey revealed that the profession is unattractive to students, who prioritize personal growth, flexibility, and digitalization in their careers. To address this issue, companies can consider implementing various work modules like "working time documentation," "home office," "job sharing," and "time off." These modules can improve control, work-life bal-ance, and efficiency if tailored to the company's framework. They offer a way to make the field more appealing to future employees while benefiting existing staff, provided that both employers and employees are flexible and considerate of project-specific conditions and teams. The feasibility of these models depends on the company's overall framework, with potential for cost-neutral implementation and positive effects on efficiency and men-tal health. However, their success also relies on the specific context of the company, and more data is needed to assess their full impact.

Keywords: modern construction management, construction industry, work modules, shortage of junior staff, sustainable personnel management, making construction management more attractive, working time model

Procedia PDF Downloads 40
7667 A comparative Analysis of the Good Faith Principle in Construction Contracts

Authors: Nadine Rashed, A. Samer Ezeldin, Engy Serag

Abstract:

The principle of good faith plays a critical role in shaping contractual relationships, yet its application varies significantly across different types of construction contracts and legal systems. This paper presents a comparative analysis of how various construction contracts perceive the principle of good faith, a fundamental aspect that influences contractual relationships and project outcomes. The primary objective of this analysis is to examine the differences in the application and interpretation of good faith across key construction contracts, including JCT (Joint Contracts Tribunal), FIDIC (Fédération Internationale des Ingénieurs-Conseils), NEC (New Engineering Contract), and ICE (Institution of Civil Engineers) Contracts. To accomplish this, a mixed-methods approach will be employed, integrating a thorough literature review of current legal frameworks and academic publications with primary data gathered from a structured questionnaire aimed at industry professionals such as contract managers, legal advisors, and project stakeholders. This combined strategy will enable a holistic understanding of the theoretical foundations of good faith in construction contracts and its practical effects in real-world contexts. The findings of this analysis are expected to yield valuable insights into how varying interpretations of good faith can impact project performance, dispute resolution, and collaborative practices within the construction industry. This paper contributes to a deeper understanding of how the principle of good faith is evolving in the construction industry, providing insights for contract drafters, legal practitioners, and project managers seeking to navigate the complexities of contractual obligations across different legal systems.

Keywords: construction contracts, contractual obligations, ethical practices, good faith

Procedia PDF Downloads 22
7666 Construction of India’s Largest Blast Furnace (4554 cum) Foundation at JSPL, Angul, Odisha: A Qualitative Approach

Authors: N. S. S. Rao, Tapan Kumar Das, Latiful Pasha

Abstract:

Tata Projects Limited (TPL) located in Hyderabad, India has taken up the challenging venture of executing the entire civil works for India’s largest Blast Furnace with a capacity of 4554 cum at Jindal Steel and Power Limited (JSPL), Angul, Odisha, India. The following write-up briefly elaborates the various steps and methodologies involved in the construction of the foundation for this India’s largest blast furnace.

Keywords: blast furnace, construction, qualitative, approach

Procedia PDF Downloads 572
7665 Adoption of Proactive and Reactive Supply Chain Resilience Strategies: A Comparison between Apparel and Construction Industries in Sri Lanka

Authors: Anuradha Ranawakage, Chathurani Silva

Abstract:

With the growing expansion of global businesses, supply chains are increasingly exposed to numerous disruptions. Organizations adopt various strategies to mitigate the impact of these disruptions. Depending on the variations in the conditions and characteristics of supply chains, the adoption of resilience strategies may vary across industries. However, these differences are largely unexplored in the existing literature. Hence, this study aims to evaluate the adoption of three proactive strategies: proactive collaboration, digital connectivity, integrated SC risk management, and three reactive strategies: reactive collaboration, inventory and reserve capacity, and lifeline maintenance in the apparel and construction industries in Sri Lanka. An online questionnaire was used to collect data on the implementation of resilience strategies from a sample of 162 apparel and 185 construction companies operating in Sri Lanka. This research makes a significant contribution to the field of supply chain management by assessing the extent to which different resilience strategies are functioned within the apparel and construction industries in Sri Lanka, particularly in an era after a global pandemic that significantly disrupted supply chains all around the world.

Keywords: apparel, construction, proactive strategies, reactive strategies, supply chain resilience

Procedia PDF Downloads 55
7664 Conceptualising Project Complexity in Ghana’s Construction Industry: A Qualitative Study

Authors: Kwasi Dartey-Baah, Mias De Klerk

Abstract:

Project complexity has been cited as one of the essential areas of project management. It can be observed from environmental, social, technological, and organisational viewpoints, and its handling is critical to project success. Conceptualised in varied industries, this paper seeks to ascertain the meaning and understanding of project complexity within the Ghanaian construction industry based on the three dimensions of complexities (faith, fact, and interaction) using experts' opinions. Taking the form of a focus group discussion, the paper sought to gain an in-depth understanding of project complexity issues in Ghana’s construction industry. The method use obtained data from experts (a purposely selected group) comprising project leaders and project management academics. The findings indicated that the experts broadly agreed with the complexity items but offered varied reasons for their agreement. In the composite assessment of the complexity dimensions of (faith, fact, and interaction), it emerged that there was some agreement with the complexity dimensions of fact and interaction within Ghana’s construction industry. On the other hand, with the dimension for complexity by faith, it was noted that the experts in Ghana’s construction construed complexity by faith, not as the absence of evidence but the evidence that hinges on at least a member of the project team. It is expected that other researches on project complexity will focus on other industries to enhance the knowledge of the same within the field of project management.

Keywords: project complexity, complexity by faith, complexity by fact, complexity by interaction, construction industry, Ghana

Procedia PDF Downloads 159
7663 Multiple-Material Flow Control in Construction Supply Chain with External Storage Site

Authors: Fatmah Almathkour

Abstract:

Managing and controlling the construction supply chain (CSC) are very important components of effective construction project execution. The goals of managing the CSC are to reduce uncertainty and optimize the performance of a construction project by improving efficiency and reducing project costs. The heart of much SC activity is addressing risk, and the CSC is no different. The delivery and consumption of construction materials is highly variable due to the complexity of construction operations, rapidly changing demand for certain components, lead time variability from suppliers, transportation time variability, and disruptions at the job site. Current notions of managing and controlling CSC, involve focusing on one project at a time with a push-based material ordering system based on the initial construction schedule and, then, holding a tremendous amount of inventory. A two-stage methodology was proposed to coordinate the feed-forward control of advanced order placement with a supplier to a feedback local control in the form of adding the ability to transship materials between projects to improve efficiency and reduce costs. It focused on the single supplier integrated production and transshipment problem with multiple products. The methodology is used as a design tool for the CSC because it includes an external storage site not associated with one of the projects. The idea is to add this feature to a highly constrained environment to explore its effectiveness in buffering the impact of variability and maintaining project schedule at low cost. The methodology uses deterministic optimization models with objectives that minimizing the total cost of the CSC. To illustrate how this methodology can be used in practice and the types of information that can be gleaned, it is tested on a number of cases based on the real example of multiple construction projects in Kuwait.

Keywords: construction supply chain, inventory control supply chain, transshipment

Procedia PDF Downloads 122
7662 Investigation and Research on Construction Technology of Tenon and Mortise in Traditional Chinese Architecture

Authors: Liang Zhang

Abstract:

Chinese traditional architecture has developed a school of its own in the world. It has a different structure and construction technology from western architecture. Tenon and mortise structure and construction technology, as the key to the construction of traditional Chinese architecture, have been inherited for thousands of years by traditional craftsmen in various regions of China. However, the traditional architecture varies greatly in different times and regional cultures in China. It is still a lack of research whether this difference extends to mortise and tenon technology. In this study, we measured the mortise and tenon of traditional buildings in Fujian province, Yunnan province, and Northern China; Interviewed some old craftsmen about their traditional construction methods, And compared the today's traditional mortise and tenon technology with that of Song and Qing Dynasties. The results showed that although Chinese traditional architecture has the same origin, the mortise and tenon construction technology systems have been developed at different times, regions, and cultures. For example, tenon and mortise technology in Yunnan Province needs to ensure the ability of buildings to resist earthquakes, while that in Fujian Province needs to ensure the ability of buildings to withstand typhoons. People in different regions, cultures, and times have a different understanding of architectural aesthetics, and the evolution of tools also has different effects on mortise and tenon technology. This study explains the manifestations and causes of these differences. At the same time, due to the impact of modern architectural technology, mortise, and tenon, traditional technology is also rapidly disappearing. As a sorting and collection of mortise and tenon techniques of traditional Chinese architecture, this paper puts forward the corresponding traditional technology protection strategy, to guide the protection and maintenance of local traditional buildings.

Keywords: tenon and mortise, traditional Chinese architecture, traditional craftsmen, construction technology

Procedia PDF Downloads 147
7661 Big Data in Construction Project Management: The Colombian Northeast Case

Authors: Sergio Zabala-Vargas, Miguel Jiménez-Barrera, Luz VArgas-Sánchez

Abstract:

In recent years, information related to project management in organizations has been increasing exponentially. Performance data, management statistics, indicator results have forced the collection, analysis, traceability, and dissemination of project managers to be essential. In this sense, there are current trends to facilitate efficient decision-making in emerging technology projects, such as: Machine Learning, Data Analytics, Data Mining, and Big Data. The latter is the most interesting in this project. This research is part of the thematic line Construction methods and project management. Many authors present the relevance that the use of emerging technologies, such as Big Data, has taken in recent years in project management in the construction sector. The main focus is the optimization of time, scope, budget, and in general mitigating risks. This research was developed in the northeastern region of Colombia-South America. The first phase was aimed at diagnosing the use of emerging technologies (Big-Data) in the construction sector. In Colombia, the construction sector represents more than 50% of the productive system, and more than 2 million people participate in this economic segment. The quantitative approach was used. A survey was applied to a sample of 91 companies in the construction sector. Preliminary results indicate that the use of Big Data and other emerging technologies is very low and also that there is interest in modernizing project management. There is evidence of a correlation between the interest in using new data management technologies and the incorporation of Building Information Modeling BIM. The next phase of the research will allow the generation of guidelines and strategies for the incorporation of technological tools in the construction sector in Colombia.

Keywords: big data, building information modeling, tecnology, project manamegent

Procedia PDF Downloads 128
7660 Sewer Culvert Installation Method to Accommodate Underground Construction in an Urban Area with Narrow Streets

Authors: Osamu Igawa, Hiroshi Kouchiwa, Yuji Ito

Abstract:

In recent years, a reconstruction project for sewer pipelines has been progressing in Japan with the aim of renewing old sewer culverts. However, it is difficult to secure a sufficient base area for shafts in an urban area because many streets are narrow with a complex layout. As a result, construction in such urban areas is generally very demanding. In urban areas, there is a strong requirement for a safe, reliable and economical construction method that does not disturb the public’s daily life and urban activities. With this in mind, we developed a new construction method called the 'shield switching type micro-tunneling method' which integrates the micro-tunneling method and shield method. In this method, pipeline is constructed first for sections that are gently curved or straight using the economical micro-tunneling method, and then the method is switched to the shield method for sections with a sharp curve or a series of curves without establishing an intermediate shaft. This paper provides the information, features and construction examples of this newly developed method.

Keywords: micro-tunneling method, secondary lining applied RC segment, sharp curve, shield method, switching type

Procedia PDF Downloads 403
7659 Importance of Occupational Safety and Health in Dam Construction Site

Authors: Naci Büyükkaraciğan, Yildirim Akyol

Abstract:

Large plants that covering the back and accumulate water of a river valley for energy production, drinking, irrigation water supply, economic benefits that serve many purposes, such as regulation of flood protection, are called dams. Place, in which unites in order to achieve an optimum balance between manpower for Lowest cost and economic as belonging to that structure to create machines, materials and construction of the project, is called as the site. Dam construction sites are combined sites in together in many businesses. Therefore, there can be found in the many workers and machines are many accidents in this type of construction sites. The necessity of systematic and scientific studies due to various reasons arises in order to be protected from conditions that could damage the health, During the execution of the work on construction sites. Occupational health and safety of the study, called the case, also in the European Union has begun to be addressed by weight since the 1980s. In particular, issued in 1989 89/391/EEC on occupational health and safety directive, occupational health and adopted the Directive within the framework of the security field, and then exposed to a large number of individual directive within this framework on the basis of the directive. Turkey's Law No. 6331 entered into force in June 2012 on the subject. In this study, measures related to the construction site of the dam should be taken with occupational safety and health have been examined and tried to put forward recommendations on the subject.

Keywords: civil engineering, dam, occupational safety and health, site organizations

Procedia PDF Downloads 333
7658 The Dark Side of Tourism's Implications: A Structural Equation Modeling Study of the 2016 Earthquake in Central Italy

Authors: B. Kulaga, A. Cinti, F. J. Mazzocchini

Abstract:

Despite the fact that growing academic attention on dark tourism is a fairly recent phenomenon, among the various reasons for travelling death-related ones, are very ancient. Furthermore, the darker side of human nature has always been fascinated and curious regarding death, or at least, man has always tried to learn lessons from death. This study proposes to describe the phenomenon of dark tourism related to the 2016 earthquake in Central Italy, deadly for 302 people and highly destructive for the rural areas of Lazio, Marche, and Umbria Regions. The primary objective is to examine the motivation-experience relationship in a dark tourism site, using the structural equation model, applied for the first time to a dark tourism research in 2016, in a study conducted after the Beichuan earthquake. The findings of the current study are derived from the calculations conducted on primary data compiled from 350 tourists in the areas mostly affected by the 2016 earthquake, including the town of Amatrice, near the epicenter, Castelluccio, Norcia, Ussita and Visso, through conducting a Likert scale survey. Furthermore, we use the structural equation model to examine the motivation behind dark travel and how this experience can influence the motivation and emotional reaction of tourists. Expected findings are in line with the previous study mentioned above, indicating that: not all tourists visit the thanatourism sites for dark tourism purpose, tourists’ emotional reactions influence more heavily the emotional tourist experience than cognitive experiences do, and curious visitors are likely to engage cognitively by learning about the incident or related issues.

Keywords: dark tourism, emotional reaction, experience, motivation, structural equation model

Procedia PDF Downloads 144