7991 The Walkway Project: An Exploration of Informal Public Space Upgrading in Gugulethu, Cape Town

Authors: Kathryn Ewing

Abstract:

Safe and accessible public spaces are vital elements of our South African cities. Public spaces hold the potential to act as important, vibrant places for learning, exchange, and practice. Public walkways, however, are some of the most neglected and extremely dangerous public spaces experienced in the local neighborhood of Gugulethu in Cape Town. Walkways feel insignificant, being recognized as informal and undetermined or retain complex fragments of formal erven. They are generally out of sight connecting minor streets and informal settlements. Community residents refer to the walkways as unsafe and dirty spaces. Local authorities allocate minimal to no municipal budgets nor maintenance plans resulting in a lack of basic services, particularly lighting and green infrastructure. ‘The Walkway Project’ presents a series of urban stories collected from co-design workshops, emotional mapping exercises, and fieldwork, including urban walks and urban talks. The narrative interprets the socio-spatial practice and complexity of informal public space in Gugulethu, Cape Town. The Walkway Project research, interrelated to the Master of Urban Design teaching and design-research studio, has a strong focus on participatory and engaged learning and action research methodology within a deliberate pedagogy. A consolidated urban design implementation plan exposes the impact and challenges of waste and water, opening the debate on relevant local solutions for resilience and safety in Cape Town. A small and neglected passage connecting two streets, commonly referred to as iThemba Walkway, is presented as a case study to show-case strategic urban design intervention strategies for urban upgrading. The iThemba walkway is a community-driven project that demonstrates active and responsible co-design and participatory development opportunities. In March 2021, when visited on an urban walk, the public space was covered by rubble and solid waste. By April 2021, the community cleaned the walkway and created an accessible passage for the school children to pass. Numerous co-design workshops have taken place over the past year. The walkway has emerged as a public space upgrading project facilitated, motivated, and implemented by multiple local partners and residents. Social maps from urban walks and talks illustrate the transformation of iThemba Walkway into an inclusive, safe, resilient, and sustainable urban space, linked to Sustainable Development Goal number 11, sustainable cities and communities. The outcomes of the upgrading project facilitate a deeper understanding of co-design methods, urban upgrading processes, and monitoring of public space and informal urbanism.

Keywords: informal, public space, resilience, safety, upgrade, walkways

Procedia PDF Downloads 93
7990 Strength Analysis of RCC Dams Subject to the Layer-by-Layer Construction Method

Authors: Archil Motsonelidze, Vitaly Dvalishvili

Abstract:

Existing roller compacted concrete (RCC) dams indicate that the layer-by-layer construction method gives considerable economies as compared with the conventional methods. RCC dams have also gained acceptance in the regions of high seismic activity. Earthquake resistance analysis of RCC gravity dams based on nonlinear finite element technique is presented. An elastic-plastic approach is used to describe the material of a dam while it is under static conditions (period of construction). Seismic force, as an acceleration equivalent to that produced by a real earthquake, is supposed to act when the dam is completed. The materials of the dam and foundation may be nonhomogeneous and anisotropic. The “dam-foundation” system is idealized as a plain strain problem.

Keywords: finite element method, layer-by-layer construction, RCC dams, strength analysis

Procedia PDF Downloads 549
7989 The Impact of Using Building Information Modeling Technology in Construction Projects Management

Authors: Mohammad Ashraf

Abstract:

This research links the use of Building Information Modeling technology in constructions and infrastructure projects, starting from the moment when considering the establishment of a project to demolishing or renovating it, going through the design work, planning, procurement and implementation. BIM Software's which used are Revit, Navisworks and Asta Project in the case study for the Atletico Madrid Stadium project (Wanda Stadium). Also, the project improves through various phases of construction (planning - implementation - management). Besides, the level of the details managed within this project advances gradually. In addition, the construction process problems become about 30 % less than before, resulting from high coordination between designing, implementation and follow through that is done by the project management office (PMO). The current disposition in the industry is to tightly manage the detail contained within the planning and coordination phases of construction, but we miss the opportunity to manage that data as it matures and grows into the execution and commissioning phases.

Keywords: construction management, BIM technology, planning, design, procurements, critical path method

Procedia PDF Downloads 280
7988 A Lightweight Interlock Block from Foamed Concrete with Construction and Agriculture Waste in Malaysia

Authors: Nor Azian Binti Aziz, Muhammad Afiq Bin Tambichik, Zamri Bin Hashim

Abstract:

The rapid development of the construction industry has contributed to increased construction waste, with concrete waste being among the most abundant. This waste is generated from ready-mix batching plants after the concrete cube testing process is completed and disposed of in landfills, leading to increased solid waste management costs. This study aims to evaluate the engineering characteristics of foamed concrete with waste mixtures construction and agricultural waste to determine the usability of recycled materials in the construction of non-load-bearing walls. This study involves the collection of construction wastes, such as recycled aggregates (RCA) obtained from the remains of finished concrete cubes, which are then tested in the laboratory. Additionally, agricultural waste, such as rice husk ash, is mixed into foamed concrete interlock blocks to enhance their strength. The optimal density of foamed concrete for this study was determined by mixing mortar and foam-backed agents to achieve the minimum targeted compressive strength required for non-load-bearing walls. The tests conducted in this study involved two phases. In Phase 1, elemental analysis using an X-ray fluorescence spectrometer (XRF) was conducted on the materials used in the production of interlock blocks such as sand, recycled aggregate/recycled concrete aggregate (RCA), and husk ash paddy/rice husk ash (RHA), Phase 2 involved physical and thermal tests, such as compressive strength test, heat conductivity test, and fire resistance test, on foamed concrete mixtures. The results showed that foamed concrete can produce lightweight interlock blocks. X-ray fluorescence spectrometry plays a crucial role in the characterization, quality control, and optimization of foamed concrete mixes containing construction and agriculture waste. The unique composition mixer of foamed concrete and the resulting chemical and physical properties, as well as the nature of replacement (either as cement or fine aggregate replacement), the waste contributes differently to the performance of foamed concrete. Interlocking blocks made from foamed concrete can be advantageous due to their reduced weight, which makes them easier to handle and transport compared to traditional concrete blocks. Additionally, foamed concrete typically offers good thermal and acoustic insulation properties, making it suitable for a variety of building projects. Using foamed concrete to produce lightweight interlock blocks could contribute to more efficient and sustainable construction practices. Additionally, RCA derived from concrete cube waste can serve as a substitute for sand in producing lightweight interlock blocks.

Keywords: construction waste, recycled aggregates (RCA), sustainable concrete, structure material

Procedia PDF Downloads 54
7987 The Traditional Roles and Place of Indigenous Musical Practices in Contemporary African Society

Authors: Benjamin Obeghare Izu

Abstract:

In Africa, indigenous musical practices are the focal point in which most cultural practices revolve, and they are the conduit mainly used in transmitting Indigenous knowledge and values. They serve as a means of documenting, preserving, transmitting indigenous knowledge, and re-enacting their historical, social, and cultural affinity. Indigenous musical practices also serve as a repository for indigenous knowledge and artistic traditions. However, these indigenous musical practices and the resulting cultural ideals are confronted with substantial challenges in the twenty-first century from contemporary cultural influence. Additionally, indigenous musical practices' educational and cultural purposes have been impacted by the broad monetisation of the arts in contemporary society. They are seen as objects of entertainment. Some young people are today unaware of their cultural roots and are losing their cultural identity due to these influences and challenges. In order to help policymakers raise awareness of and encourage the use of indigenous knowledge and musical practices among African youth and scholars, this study is in response to the need to explore the components and functions of the indigenous knowledge system, values, and musical tradition in Africa. The study employed qualitative research methods, utilising interviews, participant observation, and conducting related literature as data collection methods. It examines the indigenous musical practices in the Oba of Benin Royal Igue festival among the Benin people in Edo state, Nigeria, and the Ovwuwve festival observed by the Abraka people in Delta state, Nigeria. The extent to which the indigenous musical practices convey and protect indigenous knowledge and cultural values are reflected in the musical practices of the cultural festivals. The study looks at how indigenous musical arts are related to one another and how that affects how indigenous knowledge is transmitted and preserved. It makes recommendations for how to increase the use of indigenous knowledge and values and their fusion with contemporary culture. The study contributes significantly to ethnomusicology by showing how African traditional music traditions support other facets of culture and how indigenous knowledge might be helpful in contemporary society.

Keywords: African musical practices, African music and dance, African society, indigenous musical practices

Procedia PDF Downloads 115
7986 The Way of the English Use of Businessmen for the ASEAN Economic Community in Chonburi Province

Authors: Kittivate Boonyopakorn

Abstract:

The purposes of this study were to investigate the method of the English use of the businessmen and to study their behavior of the utilization for the ASEAN economic community. The participants were divided into the three types of the merchants including the construction contractors, the construction material traders, and SME entrepreneurs. Survey questionnaires and interviews were used in this study. The findings showed that in the type of traders, 23 of the participants are construction contractors, 121 are construction material traders, and 206 are SME entrepreneurs. The study of English in language institute is highly 51.4%. The use of Google in translating English into Thai is 41.7%. Learning English themselves is 41.1% respectively. The businessmen study English for readiness for their trade.

Keywords: way of rnglish use, businessmen, ASEAN economic community, Chonburi province

Procedia PDF Downloads 241
7985 An Interpretative Phenomenological Analysis of the Death Practices and Rituals of the Isneg People in Apayao

Authors: Ivy Angelique Malit, Marion Nicole Dela Vega, Marjorie Mae Mendoza

Abstract:

Death practices and rituals of the Philippines is rich with facts about our history mostly on our beliefs of the afterlife before the arrival of the western culture which is still being practiced by the indigenous people of the Philippines. The death practices and rituals are acts of showing the inner thoughts, and feelings towards the person who died. The meanings behind those practices and rituals become the reason why the indigenous people still treasure these death practices and rituals as a part of their culture. This study seeks to know the experiences of the death practices and rituals of one of the Indigenous groups in Apayao, the Isnegs and the meaning of those experiences. The researchers aimed to look at it on a psychological lens. In which the researchers aim (1) to know their experiences of their death practices from the perspective of their thoughts, feelings and actions, and (2) to seek the meaning behind their death rituals. The design used in the research is a qualitative design and Interpretative Phenomenological Analysis. The participants were gathered by using purposive sampling. The researchers gathered the data from a form of a semi-structured interview with guide questions. The researchers used Thematic Analysis to analyze the verbatim transcriptions from the interview. The experiences of death practices and rituals of the Isneg people have been presented in the aspects of their thoughts, feelings and behavior. The experiences were presented with 7 superordinate themes namely, (1) Refusal of Reality (2) Feelings of mixed emotions (3) Oblivious Acts of the participants (4) Conflict with self and culture (5) Negative thinking of the participants (6) Process of Acceptance (8) Act of Love. The make meaning behind the death practices and rituals of the Isneg people have been presented with 2 superordinate themes, (1) Act of Respect and (2) Act of Loyalty. The results of the research show that the experiences and meaning behind their death practices and burials were being based more by their own beliefs. In their culture, which has been passed through by their ancestors and becomes the foundation of their beliefs and their newly found religion which was introduced by the travelling missionaries. Doing those death practices and rituals is their way to show their affections, like respect and loyalty towards the person who died.

Keywords: death practices, interpretative phenomenological analysis, isneg people, rituals, theory of grieving

Procedia PDF Downloads 254
7984 Regional Identity Construction of Acehnese English Teachers in Professional Practice

Authors: Ugahara Bin Mahyuddin Yunus

Abstract:

In English Language Teaching, it cannot be denied that the backgrounds of English teachers do affect the way they teach English to their students, which in turn will affect their students’ English learning itself. Thus, it is very important to understand who the English teachers are so that how they teach English to their students can be understood. One of their backgrounds that is essential to be highlighted is their culture. Certainly, they wittingly or not will bring the perspectives and values of their culture into their daily teaching practices. In other words, their cultural identities do shape how they teach their students. Cultural identities themselves actually consist of some elements, one of which is regional identity. Indeed, the culture of the region in which English teachers identify with has impact on their beliefs and actions during teaching. For this reason, this study aims to understand how the regional identity of English teachers influence the way they teach English to their students. This study is a qualitative study conducted in a multilingual and multicultural setting, namely Aceh, Indonesia. Here, four Acehnese English teachers were involved as the research participants. In addition, this study adopted poststructuralist perspective to identity as the theoretical framework. Three research instruments were used in this study, namely semi-structured interviews, classroom observation, and teacher journal. The data gained from these instruments were then analyzed by using thematic analysis. Obviously, the research about the regional identity of English teachers in English Language Teaching has been studied worldwide. However, little is still known about it in Indonesian context, let alone Indonesia itself is a super diverse country with 34 regions. As a result, this study presents a good opportunity to advance the knowledge of how the regional identity construction of English teachers in this setting is. The findings of the study revealed that their regional identity construction in teaching was highly influenced by their indigenous language and religious faith. Even, how they teach English in classroom, in fact, is related to these two things. The conclusion that can be drawn from this study is for these English teachers, in fact, their regional identity itself constitutes their use of local language and religious identity, which are considered by them as their core identity.

Keywords: English language teaching, English teachers, identity construction, regional identity

Procedia PDF Downloads 244
7983 GIS Based Project Management Information System for Infrastructure Projects

Authors: Riki Panchal, Debasis Sarkar

Abstract:

This paper describes the work done for the GIS-based project management for different infrastructure projects. It is a review paper which gives the idea of the trends in the construction project management and various models adopted for the betterment of the project planning and execution. Traditional scheduling and progress control techniques such as bar charts and the critical path method fail to provide information pertaining to the spatial aspects of a construction project. An integrated system was developed to represent construction progress not only in terms of a CPM schedule but also in terms of a graphical representation of the construction that is synchronized with the work schedule. Hence, it is suggested to work on the common platform from where all the data can be shared and analyzed.

Keywords: GIS, project management, integrated model, infrastructure project

Procedia PDF Downloads 519
7982 A Study on the Construction Process and Sustainable Renewal Development of High-Rise Residential Areas in Chongqing (1978-2023)

Authors: Xiaoting Jing, Ling Huang

Abstract:

After the reform and opening up, Chongqing has formed far more high-rise residential areas than other cities in its more than 40 years of urban construction. High-rise residential areas have become one of the main modern living models in Chongqing and an important carrier reflecting the city's high quality of life. Reviewing the construction process and renewal work helps understand the characteristics of high-rise residential areas in Chongqing at different stages, clarify current development demands, and look forward to the focus of future renewal work. Based on socio-economic development and policy background, the article sorts the construction process of high-rise residential areas in Chongqing into four stages: the early experimental construction period of high-rise residential areas (1978-1996), the rapid start-up period of high-rise commodity housing construction (1997-2006), the large-scale construction period of high-rise commodity housing and public rental housing (2007-2014), and the period of renewal and renovation of high-rise residential areas and step-by-step construction of quality commodity housing (2015-present). Based on the construction demands and main construction types of each stage, the article summarizes that the construction of high-rise residential areas in Chongqing features large scale, high speed, and high density. It points out that a large number of high-rise residential areas built after 2000 will become important objects of renewal and renovation in the future. Based on existing renewal work experience, it is urgent to explore a path for sustainable renewal and development in terms of policy mechanisms, digital supervision, and renewal and renovation models, leading the high-rise living in Chongqing toward high-quality development.

Keywords: high-rise residential areas, construction process, renewal and renovation, Chongqing

Procedia PDF Downloads 67
7981 An Analysis of Prefabricated Construction Waste: A Case Study Approach

Authors: H. Hakim, C. Kibert, C. Fabre, S. Monadizadeh

Abstract:

Construction industry is an industry saddled with chronic problems of high waste generation. Waste management that is to ensure materials are utilized in an efficient manner would make a major contribution to mitigating the negative environmental impacts of construction waste including finite resources depletion and growing occupied landfill areas to name a few. Furthermore, ‘material resource efficiency’ has been found an economically smart approach specially when considered during the design phase. One effective strategy is to utilizing off-site construction process which includes a series of prefabricated systems such as mobile, modular, and HUD construction (Department of Housing and Urban Development manufactured buildings). These types of buildings are by nature material and resource-efficient. Despite conventional construction that is exposed to adverse weather conditions, manufactured construction production line is capable of creating repetitive units in a factory controlled environment. A factory can have several parallel projects underway with a high speed and in a timely manner which simplifies the storage of excess materials and re-allocating to the next projects. The literature reports that prefabricated construction significantly helps reduce errors, site theft, rework, and delayed problems and can ultimately lead to a considerable waste reduction. However, there is not sufficient data to quantify this reduction when it comes to a regular modular house in the U.S. Therefore, this manuscript aims to provide an analysis of waste originated from a manufactured factory trend. The analysis was made possible with several visits and data collection of Homes of Merits, a Florida Manufactured and Modular Homebuilder. The results quantify and verify a noticeable construction waste reduction.

Keywords: construction waste, modular construction, prefabricated buildings, waste management

Procedia PDF Downloads 267
7980 Causes of Cost Overrun in Building Construction Projects: Case Study from Al Madinah, Saudi Arabia

Authors: Z. Hamed, K. Sa'deya, E. Abdelrasheed, I. Mahamid

Abstract:

The construction industry is one of the main sectors that play basic role in the urban and rural development of a society. It provides important ingredients for the development of an economy. However, many construction projects experience extensive cost overrun. This study was conducted to identify the causes of cost overrun in building construction contracts in Al Madinah, Saudi Arabia and test the importance of these causes from contractors' perspective. To achieve the study objectives, a questionnaire survey was conducted to identify and rank cost overrun causes from the perspective of contractors. The findings found that the top five cost overrun causes are: lack of experience in the line of work, lack of labor productivity, delay in payments, rework and material waste. It is hoped that the findings will guide efforts to improve the performance of construction industry in Saudi Arabia and other developing countries.

Keywords: building, contractor, cost increase, cost overrun

Procedia PDF Downloads 156
7979 Circular Economy: Development of Quantitative Material Wastage Management Plan for Effective Waste Reduction in Building Construction Industry

Authors: Kwok Tak Kit

Abstract:

Combating climate change is becoming a hot topic in various sectors. Building construction and infrastructure sectors contributed a significant proportion of waste and GHGs emissions in the economy of different countries and cities. Many types of research had conducted and discussed the topic of waste management and waste management being a macro-level control is well developed in the building and construction industry. However, there is little research and studies on the micro-level of waste management, “building construction material wastage management,” and fewer reviews about regulatory control in the building construction sector. In this paper, we will focus on the potentialities and importance of material wastage management and review the deficiencies of the current standard to take into account the reduction of material wastage in a systematic and quantitative approach.

Keywords: quantitative measurement, material wastage management plan, waste management, uncalculated waste, circular economy

Procedia PDF Downloads 153
7978 A Comparative Study on the Impact of Global Warming of Applying Low Carbon Factor Concrete Products

Authors: Su-Hyun Cho, Chang-U Chae

Abstract:

Environmental impact assessment techniques have been developed as a result of the worldwide efforts to reduce the environmental impact of global warming. By using the quantification method in the construction industry, it is now possible to manage the greenhouse gas is to systematically evaluate the impact on the environment over the entire construction process. In particular, the proportion of greenhouse gas emissions at the production stage of construction material occupied is high, and efforts are needed in particular in the construction field. In this study, intended for concrete products for the construction materials, by using the LCA evaluation method, we compared the results of environmental impact assessment and carbon emissions of developing products that have been applied low-carbon technologies compared to existing products. As a results, by introducing a raw material of industrial waste, showed carbon reduction. Through a comparison of the carbon emission reduction effect of low-carbon technologies, it is intended to provide academic data for the evaluation of greenhouse gases in the construction sector and the development of low-carbon technologies of the future.

Keywords: CO₂ emissions, CO₂ reduction, ready-mixed concrete, environmental impact assessment

Procedia PDF Downloads 479
7977 A Study of Different Retail Models That Penetrates South African Townships

Authors: Beaula, M. Kruger, Silindisipho, T. Belot

Abstract:

Small informal retailers are considered one of the most important features of developing countries around the world. Those small informal retailers form part of the local communities in South African townships and are estimated to be more than 100,000 across the country. The township economic landscape has changed over time in South Africa. The traditional small informal retailers in South African Townships have been faced with numerous challenges of increasing competition; an increase in the number of local retail shops and foreign-owned shops. There is evidence that the South African personal and disposable income has increased amongst black African consumers. Historically, people residing in townships were restricted to informal retail shops; however, this has changed due to the growing number of formal large retail chains entering into the township market. The larger retail chains are aware of the improved income levels of the middle-income townships residence and as a result, larger retailers have followed certain strategies such as; (1) retail format development; (2) diversification growth strategy; (3) market penetration growth strategy and (4) market expansion. This research did a comparative analysis between the different retail models developed by Pick n Pay, Spar and Shoprite. The research methodology employed for this study was of a qualitative nature and made use of a case study to conduct a comparative analysis between larger retailers. A questionnaire was also designed to obtain data from existing smaller retailers. The study found that larger retailers have developed smaller retail formats to compete with the traditional smaller retailers operating in South African townships. Only one out of the two large retailers offers entrepreneurs a franchise model. One of the big retailers offers the opportunity to employ between 15 to 20 employees while the others are subject to the outcome of a feasibility study. The response obtained from the entrepreneurs in the townships were mixed, while some found their presence as having a “negative impact,” which has increased competition; others saw them as a means to obtain a variety of products. This research found that the most beneficial retail model for both bigger retail and existing and new entrepreneurs are from Pick n Pay. The other retail format models are more beneficial for the bigger retailers and not to new and existing entrepreneurs.

Keywords: Pick n Pay, retailers, shoprite, spar, townships

Procedia PDF Downloads 195
7976 Project Time and Quality Management during Construction

Authors: Nahed Al-Hajeri

Abstract:

Time and cost is an integral part of every construction plan and can affect each party’s contractual obligations. The performance of both time and cost are usually important to the client and contractor during the project. Almost all construction projects are experiencing time overrun. These time overruns always contributed as expensive to both client and contractor. Construction of any project inside the gathering centers involves complex management skills related to work force, materials, plant, machineries, new technologies etc. It also involves many agencies interdependent on each other like the vendors, structural and functional designers including various types of specialized engineers and it includes support of contractors and specialized contractors. This paper mainly highlights the types of construction delays due to which project suffer time and cost overrun. This paper also speaks about the delay causes and factors that contribute to the construction sequence delay for the oil and gas projects. Construction delay is supposed to be one of the repeated problems in the construction projects and it has an opposing effect on project success in terms of time, cost and quality. Some effective methods are identified to minimize delays in construction projects such as: 1. Site management and supervision, 2. Effective strategic planning, 3. Clear information and communication channel. Our research paper studies the types of delay with some real examples with statistic results and suggests solutions to overcome this problem.

Keywords: non-compensable delay, delays caused by force majeure, compensable delay, delays caused by the owner or the owner’s representative, non-excusable delay, delay caused by the contractor or the contractor’s representative, concurrent delay, delays resulting from two separate causes at the same time

Procedia PDF Downloads 242
7975 Developing a Total Quality Management Model Using Structural Equation Modeling for Indonesian Healthcare Industry

Authors: Jonny, T. Yuri M. Zagloel

Abstract:

This paper is made to present an Indonesian Healthcare model. Currently, there are nine TQM (Total Quality Management) practices in healthcare industry. However, these practices are not integrated yet. Therefore, this paper aims to integrate these practices as a model by using Structural Equation Modeling (SEM). After administering about 210 questionnaires to various stakeholders of this industry, a LISREL program was used to evaluate the model's fitness. The result confirmed that the model is fit because the p-value was about 0.45 or above required 0.05. This has signified that previously mentioned of nine TQM practices are able to be integrated as an Indonesian healthcare model.

Keywords: healthcare, total quality management (TQM), structural equation modeling (SEM), linear structural relations (LISREL)

Procedia PDF Downloads 292
7974 Identifying Barriers of Implementing Building Information Modelling in Construction

Authors: Kasra HosseinMostofi, Mohamadamin Oyar Hossein, Reza Mehdizadeh Anvigh

Abstract:

BIM is an innovative concept for the majority of firms operating in industry. BIM offers a new paradigm to design, construct, operate, and maintain a facility. However, even with the most conscientious use, stakeholders can run into trouble during its implementation on a project or within an organization. At times, project stakeholders are unaware of the challenges that they can face with the implementation at the project level or an organizational level. Therefore, the study aimed to identify and compile barriers associated with the BIM implementation at the project and organizational level, as per the literature. Despite the fact that innumerable advantageous involved in exploiting BIM, there are some barriers to implement it properly. These barriers have been proved as impediments for academicians and members of construction team project to take the maximum advantage of its utilization. Although some research has been conducted to identify these barriers regarding BIM implementation in construction industry, more research is needed to be carried out among academicians to identify these barriers in institutions, and most importantly, to make suggestions for eliminating these obstacles.

Keywords: building information modelling, construction, design and construction, designers

Procedia PDF Downloads 184
7973 Towards an Intelligent Ontology Construction Cost Estimation System: Using BIM and New Rules of Measurement Techniques

Authors: F. H. Abanda, B. Kamsu-Foguem, J. H. M. Tah

Abstract:

Construction cost estimation is one of the most important aspects of construction project design. For generations, the process of cost estimating has been manual, time-consuming and error-prone. This has partly led to most cost estimates to be unclear and riddled with inaccuracies that at times lead to over- or under-estimation of construction cost. The development of standard set of measurement rules that are understandable by all those involved in a construction project, have not totally solved the challenges. Emerging Building Information Modelling (BIM) technologies can exploit standard measurement methods to automate cost estimation process and improves accuracies. This requires standard measurement methods to be structured in ontologically and machine readable format; so that BIM software packages can easily read them. Most standard measurement methods are still text-based in textbooks and require manual editing into tables or Spreadsheet during cost estimation. The aim of this study is to explore the development of an ontology based on New Rules of Measurement (NRM) commonly used in the UK for cost estimation. The methodology adopted is Methontology, one of the most widely used ontology engineering methodologies. The challenges in this exploratory study are also reported and recommendations for future studies proposed.

Keywords: BIM, construction projects, cost estimation, NRM, ontology

Procedia PDF Downloads 551
7972 Risk Management Practices In The Construction Industry In Malawi

Authors: Taonga Temwani Chibaka

Abstract:

This qualitative research study was conducted to identify the common risk factors that affect the construction industry in Malawi in the building and infrastructure (civil works) projects. The study then evaluates the possible risk responses that are done to mitigate the various risk factors that were identified. I addition the research also established the barriers to risk management implementation with lastly mapping out as where the identified risk factors fall on which stage of the project and then also map out the knowledge areas that need to be worked on the cases on Malawian construction industry in order to mitigate most of the identified risk factors. The study involved the interviewing the professionals from the construction industry in Malawi where insights and ideas were collected, analysed and interpreted. The key study findings show that risks related to clients group are perceived as most critical followed by the contractor related, consultant related and then external group related factors respectively where preventive measures are the most applied risk response technique where the aim to avoid most of the risk factors from happening. Most of the risk factors identified were internal risks and in managerial category which suggested that risk planning was to be emphasized at pre-contract stage to minimize these risks since a bigger percentage of the risk factors were mapped out at implementation stage. Furthermore, barriers to risk management were identified and the key barriers were lack of awareness; lack of knowledge; lack of formal policies in place; regarded as costly and limited time which resulted in proposing that regulating authorities to purposefully introduce intense training on risk management to make known of this new knowledge area. The study then recommends that organisation should formally implement risk management where policies should be introduced to enforce all parties to undertake this. Risk planning was regarded as paramount and this to be done from pre-contract phase so as to mitigate 80% of the risk factors. Finally, training should be done on all project management knowledge areas.

Keywords: risk management, risk factors, risks, malawi

Procedia PDF Downloads 322
7971 Agroforestry Systems and Practices and Its Adoption in Kilombero Cluster of Sagcot, Tanzania

Authors: Lazaro E. Nnko, Japhet J. Kashaigili, Gerald C. Monela, Pantaleo K. T. Munishi

Abstract:

Agroforestry systems and practices are perceived to improve livelihood and sustainable management of natural resources. However, their adoption in various regions differs with the biophysical conditions and societal characteristics. This study was conducted in Kilombero District to investigate the factors influencing the adoption of different agroforestry systems and practices in agro-ecosystems and farming systems. A household survey, key informant interviews, and focus group discussion was used for data collection in three villages. Descriptive statistics and multinomial logistic regression in SPSS were applied for analysis. Results show that Igima and Ngajengwa villages had home garden practices dominated, as revealed by 63.3% and 66.7%, respectively, while Mbingu village had mixed intercropping practice with 56.67%. Agrosilvopasture systems were dominant in Igima and Ngajengwa villages with 56.7% and 66.7%, respectively, while in Mbingu village, the dominant system was agrosilviculture with 66.7%. The results from multinomial logistic regression show that different explanatory variable was statistical significance as predictors of the adoption of agroforestry systems and practices. Residence type and sex were the most dominant factor influencing the adoption of agroforestry systems. Duration of stay in the village, availability of extension education, residence, and sex were the dominant factor influencing the adoption of agroforestry practices. The most important and statistically significant factors among these were residence type and sex. The study concludes that agroforestry will be more successful if the local priorities, which include social-economic need characteristics of the society, will be considered in designing systems and practices. The socio-economic need of the community should be addressed in the process of expanding the adoption of agroforestry systems and practices.

Keywords: agroforestry adoption, agroforestry systems, agroforestry practices, agroforestry, Kilombero

Procedia PDF Downloads 118
7970 Stakeholder Management for Successful Software Projects

Authors: Kassem Saleh

Abstract:

An alarming number of software projects fail to deliver the required functionalities within the provided budget and timeframe and with the required qualities. Some of the main reasons for this problem include bad stakeholder management, poor communications and informal change management. Informal processes to identify, engage and control stakeholders lead to these reasons. Recently, to emphasize its importance, the Project Management Institute (PMI) updated the Project Management Body of Knowledge (PMBoK) to explicitly include the stakeholder management knowledge area. This knowledge area consists of four processes to identify stakeholders, plan stakeholder management, and manage and control stakeholder engagement. The use of appropriate techniques for stakeholder management in software projects will definitely lead to higher quality and successful software. In this paper, we describe some of the proven techniques that can be used during the execution of the four processes for stakeholder management. Development of collaboration tools for automating these processes are recommended and need to be integrated in available software project management tools.

Keywords: project management, stakeholder management, software development, project management body of knowledge

Procedia PDF Downloads 311
7969 Recycling Strategies of Construction Waste in Egypt

Authors: Hanan Anwar

Abstract:

All systems recycle. The construction industry has not only become a major consumer of natural materials along with a source of pollution. Environmental integrated production, reusing and recycling is of great importance in Egypt nowadays. Governments should ensure that the technical, environmental and economic feasibility of alternative systems is considered and is taken into account before construction starts. Hereby this paper focuses on the recycle of building materials as a way for environment protection and sustainable development. Environmental management integrates the requirements of sustainable development. There are many methods used to reduce waste and increase profits through salvage, reuse, and the recycling of construction waste. Sustainable development as a tool to continual improvement cycle processes innovations to save money.

Keywords: environment, management, reuse, recycling, sustainable development

Procedia PDF Downloads 314
7968 An Introduction to Critical Chain Project Management Methodology

Authors: Ranjini Ramanath, Nanjunda P. Swamy

Abstract:

Construction has existed in our lives since time immemorial. However, unlike any other industry, construction projects have their own unique challenges – project type, purpose and end use of the project, geographical conditions, logistic arrangements, largely unorganized manpower and requirement of diverse skill sets, etc. These unique characteristics bring in their own level of risk and uncertainties to the project, which cause the project to deviate from its planned objectives of time, cost, quality, etc. over the many years, there have been significant developments in the way construction projects are conceptualized, planned, and managed. With the rapid increase in the population, increased rate of urbanization, there is a growing demand for infrastructure development, and it is required that the projects are delivered timely, and efficiently. In an age where ‘Time is Money,' implementation of new techniques of project management is required in leading to successful projects. This paper proposes a different approach to project management, which if applied in construction projects, can help in the accomplishment of the project objectives in a faster manner.

Keywords: critical chain project management methodology, critical chain, project management, construction management

Procedia PDF Downloads 423
7967 Identifying the Hidden Curriculum Components in the Nursing Education

Authors: Alice Khachian, Shoaleh Bigdeli, Azita Shoghie, Leili Borimnejad

Abstract:

Background and aim: The hidden curriculum is crucial in nursing education and can determine professionalism and professional competence. It has a significant effect on their moral performance in relation to patients. The present study was conducted with the aim of identifying the hidden curriculum components in the nursing and midwifery faculty. Methodology: The ethnographic study was conducted over two years using the Spradley method in one of the nursing schools located in Tehran. In this focused ethnographic research, the approach of Lincoln and Goba, i.e., transferability, confirmability, and dependability, was used. To increase the validity of the data, they were collected from different sources, such as participatory observation, formal and informal interviews, and document review. Two hundred days of participatory observation, fifty informal interviews, and fifteen formal interviews from the maximum opportunities and conditions available to obtain multiple and multilateral information added to the validity of the data. Due to the situation of COVID, some interviews were conducted virtually, and the activity of professors and students in the virtual space was also monitored. Findings: The components of the hidden curriculum of the faculty are: the atmosphere (physical environment, organizational structure, rules and regulations, hospital environment), the interaction between activists, and teaching-learning activities, which ultimately lead to “A disconnection between goals, speech, behavior, and result” had revealed. Conclusion: The mutual effects of the atmosphere and various actors and activities on the process of student development, since the students have the most contact with their peers first, which leads to the most learning, and secondly with the teachers. Clinicians who have close and person-to-person contact with students can have very important effects on students. Students who meet capable and satisfied professors on their way become interested in their field and hope for their future by following the mentor of these professors. On the other hand, weak and dissatisfied professors lead students to feel abandoned, and by forming a colony of peers with different backgrounds, they distort the personality of a group of students and move away from family values, which necessitates a change in some cultural practices at the faculty level.

Keywords: hidden curriculum, nursing education, ethnography, nursing

Procedia PDF Downloads 109
7966 The Impact of Artificial Intelligence on Construction Projects

Authors: Muller Salah Zaky Toudry

Abstract:

The complexity arises in defining the development great due to its notion, based on inherent market situations and their requirements, the diverse stakeholders itself and their desired output. An quantitative survey based totally approach was adopted in this optimistic examine. A questionnaire-primarily based survey was performed for the assessment of production fine belief and expectations within the context of excellent development technique. The survey feedback of experts of the leading creation corporations/companies of Pakistan production industry have been analyzed. The monetary ability, organizational shape, and production revel in of the construction companies shaped basis for their selection. The great belief become located to be venture-scope-orientated and taken into consideration as an extra cost for a production assignment. Any excellent improvement technique changed into expected to maximize the profit for the employer, via enhancing the productiveness in a creation project. The look at is beneficial for the construction specialists to evaluate the prevailing creation great perception and the expectations from implementation of any pleasant improvement approach in production projects.

Keywords: correlation analysis, lean construction tools, lean construction, logistic regression analysis, risk management, safety construction quality, expectation, improvement, perception client loyalty, NPS, pre-construction, schedule reduction

Procedia PDF Downloads 15
7965 Linearization and Process Standardization of Construction Design Engineering Workflows

Authors: T. R. Sreeram, S. Natarajan, C. Jena

Abstract:

Civil engineering construction is a network of tasks involving varying degree of complexity and streamlining, and standardization is the only way to establish a systemic approach to design. While there are off the shelf tools such as AutoCAD that play a role in the realization of design, the repeatable process in which these tools are deployed often is ignored. The present paper addresses this challenge through a sustainable design process and effective standardizations at all stages in the design workflow. The same is demonstrated through a case study in the context of construction, and further improvement points are highlighted.

Keywords: syste, lean, value stream, process improvement

Procedia PDF Downloads 123
7964 The Porsche Pavilion in Wolfsburg, Germany

Authors: H. Pasternak, T. Krausche

Abstract:

The Porsche Pavilion is an innovative stainless steel construction using the principle, often used in ship and car design, as an advantage for building a light but stiff structure. The Pavilion is a one of a kind and outstanding construction that you can find. It fits right in the existing parts of the Autostadt within the lagoon landscape and was built in only eight months. With its curving lines and exiting bends the structure is an extraordinary work which was designed by Henn architects, Munich. The monocoque has a good balance between material and support structure. The stiffness is achieved by the upper and lower side sheathing plates and the intermediate formers. Also the roof shell has no joints and a smooth surface. The assembling of the structure requires a large time and effort cost due to many welds which are necessary to connect all section to one large shell.

Keywords: construction welding, exhibition building, light steel construction, monocoque

Procedia PDF Downloads 523
7963 Sustainability Adoption Barriers in Small and Mid-size Enterprises (SEMs)

Authors: L.Vaz, L. Ferreira, R. Aparício, J. Pedro, M. Franco

Abstract:

This article concerns a qualitative analysis, through an interview, regarding “Sustainability Adoption Barriers in SMEs.” To begin with, the article provides a state-of-the-art overview through fifty-seven articles initially extracted from the Scopus database. The articles were analyzed, and four main clusters emerged in the literature: 1) sustainability and small and medium-sized companies; 2) sustainable business models; 3) sustainability practices adoption procedures, and 4) adoption difficulties on sustainability practices. Utilizing interviews as a methodology, the article seeks to strengthen knowledge regarding sustainability practices, their barriers and the sustainable procedures adopted by SMEs in a Portuguese context. The results demonstrate that the literature agrees with this case study, where there are numerous sustainable practices, yet, due to financial, political, cultural, and technological factors, barriers emerge in the adoption process. By comparing the literature findings with the conducted interviews of interior Portuguese SMEs, this article develops a contribution to the scientific community through a captivating, intuitive and motivating way.

Keywords: barriers, practices, business model, green

Procedia PDF Downloads 182
7962 Reliability Analysis of Construction Schedule Plan Based on Building Information Modelling

Authors: Lu Ren, You-Liang Fang, Yan-Gang Zhao

Abstract:

In recent years, the application of BIM (Building Information Modelling) to construction schedule plan has been the focus of more and more researchers. In order to assess the reasonable level of the BIM-based construction schedule plan, that is whether the schedule can be completed on time, some researchers have introduced reliability theory to evaluate. In the process of evaluation, the uncertain factors affecting the construction schedule plan are regarded as random variables, and probability distributions of the random variables are assumed to be normal distribution, which is determined using two parameters evaluated from the mean and standard deviation of statistical data. However, in practical engineering, most of the uncertain influence factors are not normal random variables. So the evaluation results of the construction schedule plan will be unreasonable under the assumption that probability distributions of random variables submitted to the normal distribution. Therefore, in order to get a more reasonable evaluation result, it is necessary to describe the distribution of random variables more comprehensively. For this purpose, cubic normal distribution is introduced in this paper to describe the distribution of arbitrary random variables, which is determined by the first four moments (mean, standard deviation, skewness and kurtosis). In this paper, building the BIM model firstly according to the design messages of the structure and making the construction schedule plan based on BIM, then the cubic normal distribution is used to describe the distribution of the random variables due to the collecting statistical data of the random factors influencing construction schedule plan. Next the reliability analysis of the construction schedule plan based on BIM can be carried out more reasonably. Finally, the more accurate evaluation results can be given providing reference for the implementation of the actual construction schedule plan. In the last part of this paper, the more efficiency and accuracy of the proposed methodology for the reliability analysis of the construction schedule plan based on BIM are conducted through practical engineering case.

Keywords: BIM, construction schedule plan, cubic normal distribution, reliability analysis

Procedia PDF Downloads 146