Search results for: conventional construction methods
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 20613

Search results for: conventional construction methods

20163 Effect of Mineral Additives on Improving the Geotechnical Properties of Soils in Chief

Authors: Rabah Younes

Abstract:

The reduction of available land resources and the increased cout associated with the use of high quality materials have led to the need for local soils to be used in geotechnical construction, however; poor engineering properties of these soils pose difficulties for constructions project and need to be stabilized to improve their properties in other works unsuitable soils with low bearing capacity , high plasticity coupled with high instability are frequently encountered hence, there is a need to improve the physical and mechanical characteristics of these soils to make theme more suitable for construction this can be done by using different mechanical and chemical methods clayey soil stabilization has been practiced for sometime but mixing additives, such us cement, lime and fly ash to the soil to increase its strength.

Keywords: clay, soil stabilization, naturaln pozzolana, atterberg limits, compaction, compressive strength shear strength, curing

Procedia PDF Downloads 302
20162 Using Construction Wastes and Recyclable Materials in Sustainable Concrete Manufacture

Authors: Mohamed T. El-Hawary, Carsten Koenke, Amr M. El-Nemr, Nagy F. Hanna

Abstract:

Sustainable construction materials using solid construction wastes are of great environmental and economic significance. Construction wastes, demolishing wastes, and wastes coming out from the preparation of traditional materials could be used in sustainable concrete manufacture, which is the main scope of this paper. Ceramics, clay bricks, marble, recycled concrete, and many other materials should be tested and validated for use in the manufacture of green concrete. Introducing waste materials in concrete helps in reducing the required landfills, leaving more space for land investments, and decrease the environmental impact of the concrete buildings industry in both stages -construction and demolition-. In this paper, marble aggregate is used as a replacement for the natural aggregate in sustainable green concrete production. The results showed that marble aggregates can be used as a full replacement for the natural aggregates in eco-friendly green concrete.

Keywords: coarse aggregate replacement, economical designs, green concrete, marble aggregates, sustainability, waste management

Procedia PDF Downloads 142
20161 The Environmental Damages Related to Urban Sites

Authors: Kherbache Radhwane

Abstract:

We currently live in the world pressed by technological developments necessary for the construction, where the concept of sustainable development is truly rooted in recent years. Construction or demolitions of buildings necessarily generate environmental pollution, both inside and outside the site. Depending on the size and nature of work and the context surrounding these problems can be more or less important as is the case here in Algeria. They may affect the smooth running of the site. Moreover, there are regulations exist or are under development and should be taken into account by the various players in the act of building. This is, for example, the case of new obligations in terms of sorting and recycling of construction waste. Given this situation, it appears increasingly necessary to integrate the building sites in an effort to better respect the environment and its regulation. Several operations were performed according to this principle. The success of a project is that respects its environment through the involvement of each actor of the operation of the site with a low nuisance. As such, the client assisted by his driver and its operating contractor and the company plays a central role as an initiator of the process. It must ensure the establishment of appropriate means of organizational plans and contract.

Keywords: evolution, sustainable development, construction, demolition, building, nuisance, environmental, tailings, construction, regulations

Procedia PDF Downloads 258
20160 Enhance Construction Visual As-Built Schedule Management Using BIM Technology

Authors: Shu-Hui Jan, Hui-Ping Tserng, Shih-Ping Ho

Abstract:

Construction project control attempts to obtain real-time as-built schedule information and to eliminate project delays by effectively enhancing dynamic schedule control and management. Suitable platforms for enhancing an as-built schedule visually during the construction phase are necessary and important for general contractors. As the application of building information modeling (BIM) becomes more common, schedule management integrated with the BIM approach becomes essential to enhance visual construction management implementation for the general contractor during the construction phase. To enhance visualization of the updated as-built schedule for the general contractor, this study presents a novel system called the Construction BIM-assisted Schedule Management (ConBIM-SM) system for general contractors in Taiwan. The primary purpose of this study is to develop a web ConBIM-SM system for the general contractor to enhance visual as-built schedule information sharing and efficiency in tracking construction as-built schedule. Finally, the ConBIM-SM system is applied to a case study of a commerce building project in Taiwan to verify its efficacy and demonstrate its effectiveness during the construction phase. The advantages of the ConBIM-SM system lie in improved project control and management efficiency for general contractors, and in providing BIM-assisted as-built schedule tracking and management, to access the most current as-built schedule information through a web browser. The case study results show that the ConBIM-SM system is an effective visual as-built schedule management platform integrated with the BIM approach for general contractors in a construction project.

Keywords: building information modeling (BIM), construction schedule management, as-built schedule management, BIM schedule updating mechanism

Procedia PDF Downloads 367
20159 Petra: Simplified, Scalable Verification Using an Object-Oriented, Compositional Process Calculus

Authors: Aran Hakki, Corina Cirstea, Julian Rathke

Abstract:

Formal methods are yet to be utilized in mainstream software development due to issues in scaling and implementation costs. This work is about developing a scalable, simplified, pragmatic, formal software development method with strong correctness properties and guarantees that are easy prove. The method aims to be easy to learn, use and apply without extensive training and experience in formal methods. Petra is proposed as an object-oriented, process calculus with composable data types and sequential/parallel processes. Petra has a simple denotational semantics, which includes a definition of Correct by Construction. The aim is for Petra is to be standard which can be implemented to execute on various mainstream programming platforms such as Java. Work towards an implementation of Petra as a Java EDSL (Embedded Domain Specific Language) is also discussed.

Keywords: compositionality, formal method, software verification, Java, denotational semantics, rewriting systems, rewriting semantics, parallel processing, object-oriented programming, OOP, programming language, correct by construction

Procedia PDF Downloads 136
20158 An Empirical Study of Barriers to Total Quality Management Implementation in Construction Industries

Authors: Dhafer Alqahtani

Abstract:

Total quality management (TQM) has become a widely accepted approach in the modern industry over recent years. There is a general consensus that by adopting TQM, the overall effectiveness and performance of an industry can be improved. It is also proved that as long as TQM is adopted fully and practiced effectively in the industry, potential benefits of TQM will be delivered. But despite the benefits of TQM as articulated by many quality gurus and academicians, these benefits are not achieved in practice. Many service industries have found it difficult to implement TQM successfully. This paper, therefore, explores the barriers to TQM’s successful implementation in construction firms. The aim is to identify and rank the barriers to successful TQM implementation in order to make them know and get a better understanding by the managers and practitioners of the Construction Industries. The research methodology adopted in this study was an extensive literature review on barriers to TQM implementation followed by a survey of selected construction firms using the self-administered instrument. The results also showed that only lack of effective communication and lack of top management support were not significantly associated with the level of implementation of TQM.

Keywords: total quality management, construction firms, barriers, successful implementation

Procedia PDF Downloads 88
20157 Seismic Vulnerability of Structures Designed in Accordance with the Allowable Stress Design and Load Resistant Factor Design Methods

Authors: Mohammadreza Vafaei, Amirali Moradi, Sophia C. Alih

Abstract:

The method selected for the design of structures not only can affect their seismic vulnerability but also can affect their construction cost. For the design of steel structures, two distinct methods have been introduced by existing codes, namely allowable stress design (ASD) and load resistant factor design (LRFD). This study investigates the effect of using the aforementioned design methods on the seismic vulnerability and construction cost of steel structures. Specifically, a 20-story building equipped with special moment resisting frame and an eccentrically braced system was selected for this study. The building was designed for three different intensities of peak ground acceleration including 0.2 g, 0.25 g, and 0.3 g using the ASD and LRFD methods. The required sizes of beams, columns, and braces were obtained using response spectrum analysis. Then, the designed frames were subjected to nine natural earthquake records which were scaled to the designed response spectrum. For each frame, the base shear, story shears, and inter-story drifts were calculated and then were compared. Results indicated that the LRFD method led to a more economical design for the frames. In addition, the LRFD method resulted in lower base shears and larger inter-story drifts when compared with the ASD method. It was concluded that the application of the LRFD method not only reduced the weights of structural elements but also provided a higher safety margin against seismic actions when compared with the ASD method.

Keywords: allowable stress design, load resistant factor design, nonlinear time history analysis, seismic vulnerability, steel structures

Procedia PDF Downloads 263
20156 Lean: A Sustainable Approach to Design and Construction for Environmental Sustainability

Authors: Evelyn Lami Ashelo Allu, Fidelis A. Emuze

Abstract:

This study aims to contribute to the pursuit of environmental sustainability through the built environment practices of design and construction. Activities within the built environment and particularly within the construction industry have a significant role in ensuring environmental sustainability. The adoption of Lean principles and approaches would ensure that project deliverables are sustainable. This is because the processes that integrate lean principles reduce waste, add value to productivity, ensures customer satisfaction and are mindful of future productivity. Additionally, the lean principles for development are sustainable in themselves and thus promotes environmental sustainability. The study encourages further research with other methodologies and recommends the development of monitoring and evaluation mechanisms in order to promote the global concern for environmental sustainability.

Keywords: built environment, construction, design, lean, sustainability

Procedia PDF Downloads 257
20155 Barriers to E-Tendering Adoption and Implementation in the Ghanaian Construction Industry

Authors: Aynur Kazaz, Yusif Inusah

Abstract:

In the bid to improve transparency and efficiency as well as to reduce the cost of the public procurement process, Ghana started implementing an electronic Government Procurement System, known as the Ghana Electronic Procurement System (GHANEPS) in November 2019. The implementation of e-tendering technology is new to the stakeholders. Therefore, this research is aimed to identify the critical barriers to e-tendering implementation in the Ghanaian construction industry. Examples of barriers to e-tendering implementation were first identified through a literature review, and questionnaires and interview questions were prepared to gather the data. This study contributes to the in-depth understanding of global e-tendering barriers in the Ghanaian construction industry. The findings could help researchers, practitioners, and governments make strategic investment decisions and overcome e-tendering challenges.

Keywords: barriers, challenges, construction industry, e-procurement, e-tendering

Procedia PDF Downloads 115
20154 Understanding Complexity at Pre-Construction Stage in Project Planning of Construction Projects

Authors: Mehran Barani Shikhrobat, Roger Flanagan

Abstract:

The construction planning and scheduling based on using the current tools and techniques is resulted deterministic in nature (Gantt chart, CPM) or applying a very little probability of completion (PERT) for each task. However, every project embodies assumptions and influences and should start with a complete set of clearly defined goals and constraints that remain constant throughout the duration of the project. Construction planners continue to apply the traditional methods and tools of “hard” project management that were developed for “ideal projects,” neglecting the potential influence of complexity on the design and construction process. The aim of this research is to investigate the emergence and growth of complexity in project planning and to provide a model to consider the influence of complexity on the total project duration at the post-contract award pre-construction stage of a project. The literature review showed that complexity originates from different sources of environment, technical, and workflow interactions. They can be divided into two categories of complexity factors, first, project tasks, and second, project organisation management. Project tasks may originate from performance, lack of resources, or environmental changes for a specific task. Complexity factors that relate to organisation and management refer to workflow and interdependence of different parts. The literature review highlighted the ineffectiveness of traditional tools and techniques in planning for complexity. However, this research focus on understanding the fundamental causes of the complexity of construction projects were investigated through a questionnaire with industry experts. The results were used to develop a model that considers the core complexity factors and their interactions. System dynamics were used to investigate the model to consider the influence of complexity on project planning. Feedback from experts revealed 20 major complexity factors that impact project planning. The factors are divided into five categories known as core complexity factors. To understand the weight of each factor in comparison, the Analytical Hierarchy Process (AHP) analysis method is used. The comparison showed that externalities are ranked as the biggest influence across the complexity factors. The research underlines that there are many internal and external factors that impact project activities and the project overall. This research shows the importance of considering the influence of complexity on the project master plan undertaken at the post-contract award pre-construction phase of a project.

Keywords: project planning, project complexity measurement, planning uncertainty management, project risk management, strategic project scheduling

Procedia PDF Downloads 114
20153 Evaluation of the Effectiveness of a Sewage Treatment Plant in Oman: Samail Case Study

Authors: Azza Mohsin Al-Hashami, Reginald Victor

Abstract:

Treatment of wastewater involves physical, chemical, and biological processes to remove the pollutants from wastewater. This study evaluates of the effectiveness of sewage treatment plants (STP) in Samail, Oman. Samail STP has tertiary treatment using conventional activated sludge with surface aeration. The collection of wastewater is through a network with a total length of about 60 km and also by tankers for the areas outside the network. Treated wastewater from this STP is used for the irrigation of vegetation in the STP premises and as a backwash for sand filters. Some treated water is supplied to the Samail municipality, which uses it for the landscaping, road construction, and 'the Million Date Palms' project. In this study, homogenous samples were taken from eight different treatment stages along the treatment continuum for one year, at a frequency of once a month, to evaluate the physical, chemical, and biological parameters. All samples were analyzed using the standard methods for the examination of water and wastewater. The spatial variations in water quality along the continuum are discussed. Despite these variations, the treated wastewater from Samail STP was of good quality, and most of the parameters are within class A category in Oman Standards for wastewater reuse and discharge.

Keywords: wastewater, STP, treatment, processes

Procedia PDF Downloads 176
20152 Risk Analysis in Off-Site Construction Manufacturing in Small to Medium-Sized Projects

Authors: Atousa Khodadadyan, Ali Rostami

Abstract:

The objective of off-site construction manufacturing is to utilise the workforce and machinery in a controlled environment without external interference for higher productivity and quality. The usage of prefabricated components can save up to 14% of the total energy consumption in comparison with the equivalent number of cast-in-place ones. Despite the benefits of prefabrication construction, its current project practices encompass technical and managerial issues. Building design, precast components’ production, logistics, and prefabrication installation processes are still mostly discontinued and fragmented. Furthermore, collaboration among prefabrication manufacturers, transportation parties, and on-site assemblers rely on real-time information such as the status of precast components, delivery progress, and the location of components. From the technical point of view, in this industry, geometric variability is still prevalent, which can be caused during the transportation or production of components. These issues indicate that there are still many aspects of prefabricated construction that can be developed using disruptive technologies. Practical real-time risk analysis can be used to address these issues as well as the management of safety, quality, and construction environment issues. On the other hand, the lack of research about risk assessment and the absence of standards and tools hinder risk management modeling in prefabricated construction. It is essential to note that no risk management standard has been established explicitly for prefabricated construction projects, and most software packages do not provide tailor-made functions for this type of projects.

Keywords: project risk management, risk analysis, risk modelling, prefabricated construction projects

Procedia PDF Downloads 166
20151 A Study on the Interlaminar Shear Strength of Carbon Fiber Reinforced Plastics Depending on the Lamination Methods

Authors: Min Sang Lee, Hee Jae Shin, In Pyo Cha, Sun Ho Ko, Hyun Kyung Yoon, Hong Gun Kim, Lee Ku Kwac

Abstract:

The prepreg process among the CFRP (Carbon Fiber Reinforced Plastic) forming methods is the short term of ‘Pre-impregnation’, which is widely used for aerospace composites that require a high quality property such as a fiber-reinforced woven fabric, in which an epoxy hardening resin is impregnated. the reality is, however, that this process requires continuous researches and developments for its commercialization because the delamination characteristically develops between the layers when a great weight is loaded from outside. to supplement such demerit, three lamination methods among the prepreg lamination methods of CFRP were designed to minimize the delamination between the layers due to external impacts. Further, the newly designed methods and the existing lamination methods were analyzed through a mechanical characteristic test, Interlaminar Shear Strength test. The Interlaminar Shear Strength test result confirmed that the newly proposed three lamination methods, i.e. the Roll, Half and Zigzag laminations, presented more excellent strengths compared to the conventional Ply lamination. The interlaminar shear strength in the roll method with relatively dense fiber distribution was approximately 1.75% higher than that in the existing ply lamination method, and in the half method, it was approximately 0.78% higher.

Keywords: carbon fiber reinforced plastic(CFRP), pre-impregnation, laminating method, interlaminar shear strength (ILSS)

Procedia PDF Downloads 367
20150 Influence of CO₂ on the Curing of Permeable Concrete

Authors: A. M. Merino-Lechuga, A. González-Caro, D. Suescum-Morales, E. Fernández-Ledesma, J. R. Jiménez, J. M. Fernández-Rodriguez

Abstract:

Since the mid-19th century, the boom in the economy and industry has grown exponentially. This has led to an increase in pollution due to rising Greenhouse Gas (GHG) emissions and the accumulation of waste, leading to an increasingly imminent future scarcity of raw materials and natural resources. Carbon dioxide (CO₂) is one of the primary greenhouse gases, accounting for up to 55% of Greenhouse Gas (GHG) emissions. The manufacturing of construction materials generates approximately 73% of CO₂ emissions, with Portland cement production contributing to 41% of this figure. Hence, there is scientific and social alarm regarding the carbon footprint of construction materials and their influence on climate change. Carbonation of concrete is a natural process whereby CO₂ from the environment penetrates the material, primarily through pores and microcracks. Once inside, carbon dioxide reacts with calcium hydroxide (Ca(OH)2) and/or CSH, yielding calcium carbonates (CaCO3) and silica gel. Consequently, construction materials act as carbon sinks. This research investigated the effect of accelerated carbonation on the physical, mechanical, and chemical properties of two types of non-structural vibrated concrete pavers (conventional and draining) made from natural aggregates and two types of recycled aggregates from construction and demolition waste (CDW). Natural aggregates were replaced by recycled aggregates using a volumetric substitution method, and the CO₂ capture capacity was calculated. Two curing environments were utilized: a carbonation chamber with 5% CO₂ and a standard climatic chamber with atmospheric CO₂ concentration. Additionally, the effect of curing times of 1, 3, 7, 14, and 28 days on concrete properties was analyzed. Accelerated carbonation in-creased the apparent dry density, reduced water-accessible porosity, improved compressive strength, and decreased setting time to achieve greater mechanical strength. The maximum CO₂ capture ratio was achieved with the use of recycled concrete aggregate (52.52 kg/t) in the draining paver. Accelerated carbonation conditions led to a 525% increase in carbon capture compared to curing under atmospheric conditions. Accelerated carbonation of cement-based products containing recycled aggregates from construction and demolition waste is a promising technology for CO₂ capture and utilization, offering a means to mitigate the effects of climate change and promote the new paradigm of circular economy.

Keywords: accelerated carbonation, CO₂ curing, CO₂ uptake and construction and demolition waste., circular economy

Procedia PDF Downloads 60
20149 Genomic Prediction Reliability Using Haplotypes Defined by Different Methods

Authors: Sohyoung Won, Heebal Kim, Dajeong Lim

Abstract:

Genomic prediction is an effective way to measure the abilities of livestock for breeding based on genomic estimated breeding values, statistically predicted values from genotype data using best linear unbiased prediction (BLUP). Using haplotypes, clusters of linked single nucleotide polymorphisms (SNPs), as markers instead of individual SNPs can improve the reliability of genomic prediction since the probability of a quantitative trait loci to be in strong linkage disequilibrium (LD) with markers is higher. To efficiently use haplotypes in genomic prediction, finding optimal ways to define haplotypes is needed. In this study, 770K SNP chip data was collected from Hanwoo (Korean cattle) population consisted of 2506 cattle. Haplotypes were first defined in three different ways using 770K SNP chip data: haplotypes were defined based on 1) length of haplotypes (bp), 2) the number of SNPs, and 3) k-medoids clustering by LD. To compare the methods in parallel, haplotypes defined by all methods were set to have comparable sizes; in each method, haplotypes defined to have an average number of 5, 10, 20 or 50 SNPs were tested respectively. A modified GBLUP method using haplotype alleles as predictor variables was implemented for testing the prediction reliability of each haplotype set. Also, conventional genomic BLUP (GBLUP) method, which uses individual SNPs were tested to evaluate the performance of the haplotype sets on genomic prediction. Carcass weight was used as the phenotype for testing. As a result, using haplotypes defined by all three methods showed increased reliability compared to conventional GBLUP. There were not many differences in the reliability between different haplotype defining methods. The reliability of genomic prediction was highest when the average number of SNPs per haplotype was 20 in all three methods, implying that haplotypes including around 20 SNPs can be optimal to use as markers for genomic prediction. When the number of alleles generated by each haplotype defining methods was compared, clustering by LD generated the least number of alleles. Using haplotype alleles for genomic prediction showed better performance, suggesting improved accuracy in genomic selection. The number of predictor variables was decreased when the LD-based method was used while all three haplotype defining methods showed similar performances. This suggests that defining haplotypes based on LD can reduce computational costs and allows efficient prediction. Finding optimal ways to define haplotypes and using the haplotype alleles as markers can provide improved performance and efficiency in genomic prediction.

Keywords: best linear unbiased predictor, genomic prediction, haplotype, linkage disequilibrium

Procedia PDF Downloads 137
20148 Shaft Friction of Bored Pile Socketed in Weathered Limestone in Qatar

Authors: Thanawat Chuleekiat

Abstract:

Socketing of bored piles in rock is always seen as a matter of debate on construction sites between consultants and contractors. The socketing depth normally depends on the type of rock, depth at which the rock is available below the pile cap and load carrying capacity of the pile. In this paper, the review of field load test data of drilled shaft socketed in weathered limestone conducted using conventional static pile load test and dynamic pile load test was made to evaluate a unit shaft friction for the bored piles socketed in weathered limestone (weak rock). The borehole drilling data were also reviewed in conjunction with the pile test result. In addition, the back-calculated unit shaft friction was reviewed against various empirical methods for bored piles socketed in weak rock. The paper concludes with an estimated ultimate unit shaft friction from the case study in Qatar for preliminary design.

Keywords: piled foundation, weathered limestone, shaft friction, rock socket, pile load test

Procedia PDF Downloads 171
20147 Bioremediation as a Treatment of Aromatic Hydrocarbons in Wastewater

Authors: Hen Friman, Alex Schechter, Yeshayahu Nitzan, Rivka Cahan

Abstract:

The treatment of aromatic hydrocarbons in wastewater resulting from oil spills and chemical manufactories is becoming a key concern in many modern countries. Benzene, ethylbenzene, toluene and xylene (BETX) contaminate groundwater as well as soil. These compounds have an acute effect on human health and are known to be carcinogenic. Conventional removal of these toxic materials involves separation and burning of the wastes, however, the cost of chemical treatment is very high and energy consuming. Bioremediation methods for removal of toxic organic compounds constitute an attractive alternative to the conventional chemical or physical techniques. Bioremediation methods use microorganisms to reduce the concentration and toxicity of various chemical pollutants Toluene is biodegradable both aerobically and anaerobically, it can be growth inhibitory to microorganisms at elevated concentrations, even to those species that can use it as a substrate. In this research culture of Pseudomonas putida was grown in bath bio-reactor (BBR) with toluene 100 mg/l as a single carbon source under constant voltage of 125 mV, 250 mV and 500 mV. The culture grown in BBR reached to 0.8 OD660nm while the control culture that grown without external voltage reached only to 0.6 OD660nm. The residual toluene concentration after 147 h, in the BBR operated under external voltage (125 mV) was 22 % on average, while in the control BBR it was 81 % on average.

Keywords: bioremediation, aromatic hydrocarbons, BETX, toluene, pseudomonas putida

Procedia PDF Downloads 310
20146 Formalizing a Procedure for Generating Uncertain Resource Availability Assumptions Based on Real Time Logistic Data Capturing with Auto-ID Systems for Reactive Scheduling

Authors: Lars Laußat, Manfred Helmus, Kamil Szczesny, Markus König

Abstract:

As one result of the project “Reactive Construction Project Scheduling using Real Time Construction Logistic Data and Simulation”, a procedure for using data about uncertain resource availability assumptions in reactive scheduling processes has been developed. Prediction data about resource availability is generated in a formalized way using real-time monitoring data e.g. from auto-ID systems on the construction site and in the supply chains. The paper focuses on the formalization of the procedure for monitoring construction logistic processes, for the detection of disturbance and for generating of new and uncertain scheduling assumptions for the reactive resource constrained simulation procedure that is and will be further described in other papers.

Keywords: auto-ID, construction logistic, fuzzy, monitoring, RFID, scheduling

Procedia PDF Downloads 507
20145 Barriers to Health and Safety Practices in South African Construction Industry: Subcontractors Perspective

Authors: Kenneth O. Otasowie, Matthew Ikuabe, Clinton Aigbavboa, Ayodeji Oke

Abstract:

Subcontracting has become a fundamental feature in the construction industry, particularly as most projects in South Africa (SA) are executed by subcontractors. However, the sector in SA contributes to the high level of occupational hazards and injuries recorded, despite Health and Safety (H&S) regulations being enforced in the industry. Hence, this study aims to evaluate the barriers to health and safety practices by subcontractors in SA Construction Industry. A survey design was adopted. A total number of one hundred and forty-four (144) questionnaires were administered to quantity surveyors, construction managers, construction project managers, project managers, architects, and civil and structural engineers, who are owners or work in small and medium enterprises in Guateng Province, SA and eighty-three (83) were returned and found suitable for analysis. Collected data were analysed using percentage, mean item score, standard deviation, and one-sample t-test. The findings show that lack of skilled workers, lack of safety training, and insufficient safety awareness are the most significant barriers to health and safety practices in SA Construction Industry. Therefore, the study recommends the improvement in skills of staff and adequate training for the safe execution of work be provided to all employees and supervisors in these subcontracting firms. These will mitigate the rate of accident occurrence on construction sites.

Keywords: barriers, health and safety, subcontractors, South Africa

Procedia PDF Downloads 95
20144 Risk Prioritization in Tunneling Construction Projects

Authors: David Nantes, George Gilbert

Abstract:

There are a lot of risks that might crop up as a tunneling project develops, and it's crucial to be aware of them. Due to the unexpected nature of tunneling projects and the interconnectedness of risk occurrences, the risk assessment approach presents a significant challenge. The purpose of this study is to provide a hybrid FDEMATEL-ANP model to help prioritize risks during tunnel construction projects. The ambiguity in expert judgments and the relative severity of interdependencies across risk occurrences are both taken into consideration by this model, thanks to the Fuzzy Decision-Making Trial and Evaluation Laboratory (FDEMATEL). The Analytic Network Process (ANP) method is used to rank priorities and assess project risks. The authors provide a case study of a subway tunneling construction project to back up the validity of their methodology. The results showed that the proposed method successfully isolated key risk factors and elucidated their interplay in the case study. The proposed method has the potential to become a helpful resource for evaluating dangers associated with tunnel construction projects.

Keywords: risk, prioritization, FDEMATEL, ANP, tunneling construction projects

Procedia PDF Downloads 82
20143 Shoreline Variation with Construction of a Pair of Training Walls, Ponnani Inlet, Kerala, India

Authors: Jhoga Parth, T. Nasar, K. V. Anand

Abstract:

An idealized definition of shoreline is that it is the zone of coincidence of three spheres such as atmosphere, lithosphere, and hydrosphere. Despite its apparent simplicity, this definition in practice a challenge to apply. In reality, the shoreline location deviates continually through time, because of various dynamic factors such as wave characteristics, currents, coastal orientation and the bathymetry, which makes the shoreline volatile. This necessitates us to monitor the shoreline in a temporal basis. If shoreline’s nature is understood at particular coastal stretch, it need not be the same trend at the other location, though belonging to the same sea front. Shoreline change is hence a local phenomenon and has to be studied with great intensity considering as many factors involved as possible. Erosion and accretion of sediment are such natures of a shoreline, which needs to be quantified by comparing with its predeceasing variations and understood before implementing any coastal projects. In recent years, advent of Global Positioning System (GPS) and Geographic Information System (GIS) acts as an emerging tool to quantify the intra and inter annual sediment rate getting accreted or deposited compared to other conventional methods in regards with time was taken and man power. Remote sensing data, on the other hand, paves way to acquire historical sets of data where field data is unavailable with a higher resolution. Short term and long term period shoreline change can be accurately tracked and monitored using a software residing in GIS - Digital Shoreline Analysis System (DSAS) developed by United States Geological Survey (USGS). In the present study, using DSAS, End Point Rate (EPR) is calculated analyze the intra-annual changes, and Linear Rate Regression (LRR) is adopted to study inter annual changes of shoreline. The shoreline changes are quantified for the scenario during the construction of breakwater in Ponnani river inlet along Kerala coast, India. Ponnani is a major fishing and landing center located 10°47’12.81”N and 75°54’38.62”E in Malappuram district of Kerala, India. The rate of erosion and accretion is explored using satellite and field data. The full paper contains the rate of change of shoreline, and its analysis would provide us understanding the behavior of the inlet at the study area during the construction of the training walls.

Keywords: DSAS, end point rate, field measurements, geo-informatics, shoreline variation

Procedia PDF Downloads 248
20142 Advancing Sustainable Development in the Construction Industry: A Theoretical Framework for Integrating Sustainable Project Management

Authors: Francis Kwesi Bondinuba, Seidu Abdullah, Nelly Bondinuba

Abstract:

Purpose: The study proposes a theoretical framework for integrating sustainable project management in the construction sector, addressing the need for sustainable development practices. Methodology: The study adopts a theoretical approach by reviewing existing literature on sustainable development and project management in the construction industry. It analyses various concepts, theories, and frameworks to develop a comprehensive theoretical framework for integrating sustainable project management. Findings: The study emphasizes the importance of incorporating sustainable development practices into construction project management, focusing on collaboration, stakeholder engagement, and continuous improvement to achieve environmental conservation, social responsibility, and economic viability. Conclusion: Sustainable Project Management (SPM) in Ghana's construction industry is challenging due to lack of awareness, regulatory frameworks, financial constraints, and skill shortages, despite its benefits in promoting social inclusivity, job creation, and environmental resilience. Recommendation: The construction industry in Ghana should adopt a comprehensive approach involving local communities, government bodies, and environmental organizations. It should utilize green materials and technologies and effectively manage waste. Originality: This study presents a theoretical framework for sustainable project management in construction. It emphasizes collaboration and stakeholder engagement for long-term sustainable outcomes and considers environmental, social, and economic aspects.

Keywords: construction industry, theoretical framework, integration, project management, sustainable development

Procedia PDF Downloads 22
20141 A Review on the Necessities of Green Building in Bangladesh and Its Construction Process

Authors: Syeda Afsana Azad

Abstract:

Climate change, due to the release of greenhouse gases into the atmosphere has been recognized as one of the biggest threats to the present world. The condition of the earth is getting worse day by day due to climate change. Bangladesh is considered to be one of the most vulnerable countries to climate change due to large population, sharp urbanization, etc. Construction of green building is a very good solution to reduce the greenhouse effect. Green building technology refers to that kind of structures which are environmentally friendly and resource-efficient throughout a building’s service life. This technology can provide at least 50% energy saving opportunity to the nation. The necessity of the construction of structures in an environment-friendly way is increasing now. This study shows the scenario of rapid population growth, urbanization, necessity of green building in Bangladesh and also discusses the construction process of green building. As the present climate condition of Bangladesh is not friendly, construction of green building is very much needed. To battle climate change, it is mandatory to construct green building.

Keywords: Bangladesh, climate change, green building, green house effect

Procedia PDF Downloads 371
20140 The Fire Performance of Exposed Timber Panels

Authors: Bernice V. Y. Wong, Kong Fah Tee

Abstract:

Cross-laminated timber is increasingly being used in the construction of high-rise buildings due to its simple manufacturing system. In term of fire resistance, cross-laminated timber panels are promoted as having excellent fire resistance, comparable to that of non-combustible materials and to heavy timber construction, due to the ability of thick wood assemblies to char slowly at a predictable rate while maintaining most of their strength during the fire exposure. This paper presents an overview of fire performance of cross-laminated timber and evaluation of its resistance to elevated temperature in comparison to homogeneous timber panels. Charring rates for cross-laminated timber panels of those obtained experimentally were compared with those provided by Eurocode simplified calculation methods.

Keywords: timber structure, cross-laminated timber, charring rate, timber fire resistance

Procedia PDF Downloads 403
20139 The Impact of Collaborative Writing through Wikis and Blogs on Iranian EFL Learners’ Writing Achievement

Authors: Farhad Ghorbandordinejad, Shamsoddin Aref

Abstract:

Wikis and blogs, defined as educational tools in line with the objectives of collaborative writing, are regarded as innovative ways of writing addressing the problems of conventional types of writing. Although writing in wikis and blogs step in different contexts, they are both aiming at betterment of collaborative writing procedures. It is believed that due to certain reasons bringing in wikis and blogs to learners' life can lead to better performance of writing. This study aimed at dipping into pedagogical aspects of wikis and blogs in the hope of eliminating prior traditional mistakes and bringing students together in a more constructive L2 context. To this end, three groups of intermediate students were experimented in three settings of wiki-group, blog-group and conventional (control) group. Despite conventional group learners, participants in both experimental groups experienced L2 writing in a new telecollaborative context. An achievement test was administered after the treatment to check learners’ degree of improvement in EFL writing. The results of this study provide a deep insight towards the effectiveness of writing in the contexts of wikis and blogs compared with conventional writing procedures. The overall conclusion drawn from the distinction of conventional writing, on one hand, and wikis and blogs, on the other hand, indicates that the latter channels of writing are more constructive for learners’ writing improvements.

Keywords: collaborative writing, wikis, blogs, writing achievement

Procedia PDF Downloads 386
20138 Reinforced Concrete Design Construction Issues and Earthquake Failure-Damage Responses

Authors: Hasan Husnu Korkmaz, Serra Zerrin Korkmaz

Abstract:

Earthquakes are the natural disasters that threat several countries. Turkey is situated on a very active earthquake zone. During the recent earthquakes, thousands of people died due to failure of reinforced concrete structures. Although Turkey has a very sufficient earthquake code, the design and construction mistakes were repeated for old structures. Lack of the control mechanism during the construction process may be the most important reason of failure. The quality of the concrete and poor detailing of steel or reinforcement is the most important headings. In this paper, the reasons of failure of reinforced concrete structures were summarized with relevant photos. The paper is beneficial for civil engineers as well as architect who are in the process of construction and design of structures in earthquake zones.

Keywords: earthquake, reinforced concrete structure, failure, material

Procedia PDF Downloads 357
20137 Accurate Positioning Method of Indoor Plastering Robot Based on Line Laser

Authors: Guanqiao Wang, Hongyang Yu

Abstract:

There is a lot of repetitive work in the traditional construction industry. These repetitive tasks can significantly improve production efficiency by replacing manual tasks with robots. There- fore, robots appear more and more frequently in the construction industry. Navigation and positioning are very important tasks for construction robots, and the requirements for accuracy of positioning are very high. Traditional indoor robots mainly use radiofrequency or vision methods for positioning. Compared with ordinary robots, the indoor plastering robot needs to be positioned closer to the wall for wall plastering, so the requirements for construction positioning accuracy are higher, and the traditional navigation positioning method has a large error, which will cause the robot to move. Without the exact position, the wall cannot be plastered, or the error of plastering the wall is large. A new positioning method is proposed, which is assisted by line lasers and uses image processing-based positioning to perform more accurate positioning on the traditional positioning work. In actual work, filter, edge detection, Hough transform and other operations are performed on the images captured by the camera. Each time the position of the laser line is found, it is compared with the standard value, and the position of the robot is moved or rotated to complete the positioning work. The experimental results show that the actual positioning error is reduced to less than 0.5 mm by this accurate positioning method.

Keywords: indoor plastering robot, navigation, precise positioning, line laser, image processing

Procedia PDF Downloads 141
20136 Evaluation and Selection of Construction Contractors by Polish Public Clients

Authors: Kozik Renata, Leśniak Agnieszka, Plebankiewicz Edyta

Abstract:

Contracting authorities in the public sector are obligated to apply the principles provided for in the Polish law for the evaluation and selection of contractors. To analyze the methods of contractors, applied in practice by public clients, the notices of contract award results for construction works were analyzed. The analysis shows that the procedure selected more and more often is open to competitive bidding, where the assessment of the competence of contractors is not very precise, as well as non-competitive bidding, i.e. single source procurement. The share of procurement procedures, where the only criterion is price, is increasing. The solution to the problems existing here might be the introduction of one of the forms of pre-selection of contractors. The article also briefly discusses verification systems for companies applying for public contracts used in EU countries.

Keywords: certification, contractors selection, open tendering, public investors

Procedia PDF Downloads 280
20135 External Networking for Innovation in Construction Industry in Malaysia

Authors: Megat Zuhairy, Megat Tajuddin, Hadijah Iberahim, Noraini Ismail

Abstract:

This paper aims to discuss the impact of external networking on innovation and organizational performance in the construction industry. In Malaysia, the construction industry is known to be one of the industries that contribute significantly towards her economic growth. The construction industry is described as a fragmented and complex product system as construction projects implementation requires involvement of varying combination of large and small organizations across the supply chain spectrum. The innovation and performance of Malaysian construction industry are reported to be at underachieving and efforts for its improvement have inspired this study initiative. External networking among industry players is capable in bringing them to work together as a team, reducing the adversarial relationships among them for innovation effort and greater performance. The instrument in measuring innovation and organizational performance specific to the construction industry was developed by adapting measures introduced by several scholars in these fields. Contractors and consulting companies were the sampling frames of this study representing the construction industry in Malaysia. The population lists were developed from the lists provided by CIDB, BEM, BOA and BQSM. The samples were selected based on a stratified sampling method to gauge representation of the different groups in the population. Regression analysis was performed in this quantitative study to assess relationships amongst variables. The results revealed that principally, external networking is significant in influencing both innovation and organizational performance. Nevertheless, external networking with different industry players has a different impact on innovation and organizational performance. The study revealed that external networking with project players is significant on project performance but not on innovation. On the other hand, external networking with government agencies, academic institutions and professional bodies is significant in influencing innovation but not on organizational performance.

Keywords: innovation, external networking, organizational performance, construction industry

Procedia PDF Downloads 297
20134 A Preparatory Method for Building Construction Implemented in a Case Study in Brazil

Authors: Aline Valverde Arroteia, Tatiana Gondim do Amaral, Silvio Burrattino Melhado

Abstract:

During the last twenty years, the construction field in Brazil has evolved significantly in response to its market growing and competitiveness. However, this evolving path has faced many obstacles such as cultural barriers and the lack of efforts to achieve quality at the construction site. At the same time, the greatest amount of information generated on the designing or construction phases is lost due to the lack of an effective coordination of these activities. Face this problem, the aim of this research was to implement a French method named PEO which means preparation for building construction (in Portuguese) seeking to understand the design management process and its interface with the building construction phase. The research method applied was qualitative, and it was carried out through two case studies in the city of Goiania, in Goias, Brazil. The research was divided into two stages called pilot study at Company A and implementation of PEO at Company B. After the implementation; the results demonstrated the PEO method's effectiveness and feasibility while a booster on the quality improvement of design management. The analysis showed that the method has a purpose to improve the design and allow the reduction of failures, errors and rework commonly found in the production of buildings. Therefore, it can be concluded that the PEO is feasible to be applied to real estate and building companies. But, companies need to believe in the contribution they can make to the discovery of design failures in conjunction with other stakeholders forming a construction team. The result of PEO can be maximized when adopting the principles of simultaneous engineering and insertion of new computer technologies, which use a three-dimensional model of the building with BIM process.

Keywords: communication, design and construction interface management, preparation for building construction (PEO), proactive coordination (CPA)

Procedia PDF Downloads 153