Search results for: construction site safety
8564 Price Promotions and Inventory Decisions
Authors: George Hadjinicola, Andreas Soteriou
Abstract:
This paper examines the relationship between the number of price promotions that a firm should conduct per year and the level of safety stocks that the firm should maintain. Price promotions result in temporary sales increases, which affect the operations function through (1) an increase in the quantities demanded and (2) an increase in safety stocks required to maintain the desired service level. We propose a modeling framework where both price promotions and improved service levels, operationalized through higher safety stocks, can affect sales. We treat the annual number of promotions as a decision variable. We identify market conditions where the operations function, through improved safety stocks, can complement price promotions or even play the leading role in sales increases.Keywords: price promotions, safety stocks, marketing/operations interface, mathematical model
Procedia PDF Downloads 1008563 Implementation of ISO 26262: Issues and Challenges
Authors: Won Jung, Azianti Ismail
Abstract:
Functional safety is about electrical, electronics, and programmable electronic safety-related system focuses on the potential risk of malfunction which may have a significant impact on the safety of humans and/or the environment based on IEC 61508. In November 2011, the automotive industry has been introduced to automotive functional safety ISO 26262 which addresses the complete safety installation from sensor to actuator with its technical as well as management issues. Nowadays, most of the modern automobiles are equipped with embedded electronic systems which include many Electronic Controller Units (ECUs), electronic sensors, signals, bus systems and coding. Due to upcoming more sophisticated systems installed in automobiles, the need to carry out detailed safety is very crucial. Assimilation of existing practices with this new standard is a major challenge for the automotive industry in reducing redundancy, time and resources. Therefore, this paper will analyze the research trends on pre and post introduction of ISO 26262 through publications as well as to take a glimpse in the activities for implementing this standard by the automotive manufacturers around the world. It is going to highlight issues and challenges which have been discussed among the experts in this field. Even though it will take some time for this standard to be fully implemented, the benefits from this implementation will raise the competitiveness in the global automotive market.Keywords: ISO 26262, automotive, functional safety, implementation, standard, challenges
Procedia PDF Downloads 4058562 Causality between the Construction Industry and the GDP in the United Arab Emirates
Authors: Hasan S. Mahmoud, Salwa M. Beheiry, Vian Ahmed
Abstract:
In light of the repercussions of the 2008 global economic crisis, the response of the United Arab Emirates economy and growth, and the vast construction activities that are undergoing, there is a need to investigate the relationship between construction activities and the Gross Domestic Product (GDP). This study aims to investigate the causality relationship between the construction industry in the United Arab Emirates and the GDP of the country in the last decade. For that, this study will investigate the relationship between the growth of the GDP and the growth of construction activities and their value addition to the economy. To ascertain this relationship, Granger Causality method is used to identify the causality between the time-dependent series.Keywords: construction value addition, Granger causality, growth of gross domestic product, United Arab Emirates
Procedia PDF Downloads 1488561 A Study on Utilizing Temporary Water Treatment Facilities to Tackle Century-Long Drought and Emergency Water Supply
Authors: Yu-Che Cheng, Min-Lih Chang, Ke-Hao Cheng, Chuan-Cheng Wang
Abstract:
Taiwan is an island located along the southeastern coast of the Asian continent, located between Japan and the Philippines. It is surrounded by the sea on all sides. However, due to the presence of the Central Mountain Range, the rivers on the east and west coasts of Taiwan are relatively short. This geographical feature results in a phenomenon where, despite having rainfall that is 2.6 times the world average, 58.5% of the rainwater flows into the ocean. Moreover, approximately 80% of the annual rainfall occurs between May and October, leading to distinct wet and dry periods. To address these challenges, Taiwan relies on large reservoirs, storage ponds, and groundwater extraction for water resource allocation. It is necessary to construct water treatment facilities at suitable locations to provide the population with a stable and reliable water supply. In general, the construction of a new water treatment plant requires careful planning and evaluation. The process involves acquiring land and issuing contracts for construction in a sequential manner. With the increasing severity of global warming and climate change, there is a heightened risk of extreme hydrological events and severe water situations in the future. In cases of urgent water supply needs in a region, relying on traditional lengthy processes for constructing water treatment plants might not be sufficient to meet the urgent demand. Therefore, this study aims to explore the use of simplified water treatment procedures and the construction of rapid "temporary water treatment plants" to tackle the challenges posed by extreme climate conditions (such as a century-long drought) and situations where water treatment plant construction cannot keep up with the pace of water source development.Keywords: temporary water treatment plant, emergency water supply, construction site groundwater, drought
Procedia PDF Downloads 938560 Assessment of Impact of Manpower Training and Development in the Construction Industry
Authors: Olalekan Bamidele Aruleba
Abstract:
This research assessed the impact of manpower training and development in the construction industry. The aim is to determine the effect of training and development on employees for effective organizational growth in the construction industry to identify the training method for each category of employee in the construction industry, challenges to training and development of workers in the construction industry and impact of manpower training and development on employees and employers. Data for the study were obtained through a well-structured questionnaire administered to building professionals in Nigeria construction firm. Eighty (80) questionnaires were distributed among building professionals in three selected local governments within Ondo State and sixty-four (64) were returned. Data collected were analysed using descriptive statistics and ranking. Findings of the study revealed that in house training and in-service training methods were preferred by most construction industry. It concluded that the attitude of top management and lack of fund was seen as the significant challenges militating against training of employees. The study recommended that manpower training and development must be sustained by all stakeholders in the industry in order to improve workers' productivity; the organization should adopt the right method in training each category of employees and carry out the need assessment for training to avoid training wrong employees.Keywords: construction, development, manpower, training
Procedia PDF Downloads 2408559 Daily Stand-up Meetings - Relationships with Psychological Safety and Well-being in Teams
Authors: Sarah Rietze, Hannes Zacher
Abstract:
Daily stand-up meetings are the most commonly used method in agile teams. In daily stand-ups, team members gather to coordinate and align their efforts, typically for a predefined period of no more than 15 minutes. The primary purpose is to ask and answer the following three questions: What was accomplished yesterday? What will be done today? What obstacles are impeding my progress? Daily stand-ups aim to enhance communication, mutual understanding, and support within the team, as well as promote collective learning from mistakes through daily synchronization and transparency. The use of daily stand-ups is intended to positively influence psychological safety within teams, which is the belief that it is safe to show oneself and take personal risks. Two studies will be presented, which explore the relationships between daily stand-ups, psychological safety, and psychological well-being. In a first study, based on survey results (n = 318), we demonstrated that daily stand-ups have a positive indirect effect on job satisfaction and a negative indirect effect on turnover intention through their impact on psychological safety. In a second study, we investigate, using an experimental design, how the use of daily stand-ups in teams enhances psychological safety and well-being compared to a control group that does not use daily stand-ups. Psychological safety is considered one of the most crucial cultural factors for a sustainable, agile organization. Agile approaches, such as daily stand-ups, are a critical part of the evolving work environment and offer a proactive means to shape and foster psychological safety within teams.Keywords: occupational wellbeing, agile work practices, psychological safety, daily stand-ups
Procedia PDF Downloads 688558 Apps Reduce the Cost of Construction
Authors: Ali Mohammadi
Abstract:
Every construction that is done, the most important part of attention for employers and contractors is its cost, and they always try to reduce costs so that they can compete in the market, so they estimate the cost of construction before starting their activities. The costs can be generally divided into four parts: the materials used, the equipment used, the manpower required, and the time required. In this article, we are trying to talk about the three items of equipment, manpower, and time, and examine how the use of apps can reduce the cost of construction, while due to various reasons, it has received less attention in the field of app design. Also, because we intend to use these apps in construction and they are used by engineers and experts, we define these apps as engineering apps because the idea of their design must be by an engineer who works in that field. Also, considering that most engineers are familiar with programming during their studies, they can design the apps they need using simple programming software.Keywords: layout, as-bilt, monitoring, maps
Procedia PDF Downloads 698557 Determining the Awareness Level of Chefs and Students on Food Safety and Allergens in Kano State, Nigeria and Ankara City in Turkey
Authors: Balarabe Bilyaminu Ismail, Osman Cavus, Fügen Durlu Özkaya
Abstract:
This study is aimed at determining the level of awareness of chefs and students of food science and technology on food safety in general and allergens in particular. To get appropriate data, a questionnaire comprising of 19 questions covering many food safety issues and allergens in foods were used to collect information for the study through face to face interviews. Interviews were conducted for 284 people in Nigeria and Turkey. Sixty-eight percent of respondents from Turkey; 31.3% were students and 68.7% were chefs. Thirty-one percent of respondents from Nigeria include 33.7% students and 66.3% chefs. The result of the study indicated that most of the findings of scientific studies on food safety issues have not been directly applied by the people working in the food sector. Additionally, the knowledge level of the gastronomy and culinary arts students on food safety and allergens are significantly higher than the restaurant chefs that prepare the food and serve it to the public. The study, therefore, concluded that proper training of food business operators is critical to ensuring the safety of foods and control of allergens.Keywords: allergens, food safety, questionnaire survey, training
Procedia PDF Downloads 3648556 Heading for Modern Construction Management: Recommendation for Employers
Authors: Robin Becker, Maike Eilers, Nane Roetmann, Manfred Helmus
Abstract:
The shortage of junior staff in the construction industry is a problem that will be further exacerbated in the coming years by the retirement of the baby-boom generations (1955-1969) from employment. In addition, the current working conditions in the field of construction management are not attractive for young professionals. A survey of students revealed a desire for an increase in flexibility and an improved work-life balance in everyday working life. Students of civil engineering and architecture are basically interested in a career in construction management but have reservations due to the image of the profession and the current working conditions. A survey among experts from the construction industry shows that the profession can become more attractive. This report provides recommendations for action in the form of working modules to improve the working conditions of employees. If these are taken into account, graduates can be attracted to the profession of construction management, and existing staff can be retained more effectively. The aim of this report is to show incentives for employers to respond to the wishes and needs of their current and future employees to the extent that can be implemented.Keywords: modern construction management, construction industry, work modules, shortage of junior staff, sustainable personnel management, making construction management more attractive, working time model
Procedia PDF Downloads 858555 Associated Factors the Safety of the Patient in Hemodialysis Clinics of a Brazilian Municipality: Cross-Sectional Study
Authors: Magda Milleyde de Sousa Lima, Letícia Lima Aguiar, Marina Guerra Martins, Erika Veríssimo Dias Sousa, Lizandra Sampaio de Oliveira, Lívia Moreira Barros, Joselany Áfio Caetano
Abstract:
Patients with chronic kidney disease are vulnerable to episodes which make the safety of their health vulnerable, mainly due to the treatment process that exposes them to high rates of interventions during hemodialysis sessions. Some factors associated with health care contribute to the risk of death and complications. However, there are a small number of scientific studies evaluating the level of safety of hemodialysis clinics, and the sociodemographic characteristics of patients and professionals associated with this safety. Therefore, the present study aims to examine the level of patient safety in hemodialysis clinics in the Brazilian capital, to identify the sociodemographic and clinical factors of patients and nursing staff associated with the level of safety. This is an observational, descriptive and quantitative research conducted in three hemodialysis clinics placed in the city of Fortaleza-CE, Brazil, from September to November 2019. The sample was formed after a sample calculation for finite inhabitants of correlation with 200 chronic renal patients, 30 nursing technicians and seven nurses. Conventional sampling was used based on the inclusion criteria: being present at the hemodialysis session on the day the researcher performed the data collection and being 18 years of age or older. Participants who presented communication difficulties to listen to and/or answer the sociodemographic and clinical questionnaire were excluded. Two instruments were applied: sociodemographic and clinical characterization form and Chronic Renal Patient Safety Assessment Scale on Hemodialysis (EASPRCH). The data were analyzed using the Kruskal Walls Test for categorical variables and Spearman correlation coefficient for non-categorical variables, using the Statistical Package SPSS version 20.0. The present study respected the ethical and legal principles determined by resolution 466/2012 of the National Health Council, under the approval of the Ethics and Research Committee with an opinion number: 3,255,635. The results showed that a hemodialysis clinic presented unsafe care practices of 32 points in the EASPRCH (p=0.001). A statistical association was identified between the level of safety and the variables of the patients: level of education (p=0.018), family income (p=0.049), type of employment (p=0.012), venous access site (p=0.009), use of medication during the session (p=0.008) and time of hemodialysis (p=0.002). When evaluating the profile of nurses, a statistical association was evidenced between the level of safety with the variables: marital status (p=0.000), race (p=0.017), schooling (p= 0.000), income (p=0.013), age (p=0.000), clinic workload (p=0.000), time working with hemodialysis (p=0.000), time working in the clinic (p= 0.007) and clinic sizing (p=0.000). In order, the sociodemographic factors of nursing technicians associated with the level of patient safety were: race (p= 0.001) and weekly workload at (p=0.010). Therefore, it is concluded that there is a non-conformity in the level of patient safety in one of the clinics studied and, that sociodemographic and clinical factors of patients and health professionals corroborate the level of safety of the health unit.Keywords: hemodialysis, nursing, patient safety, quality improvement
Procedia PDF Downloads 1978554 Techniques of Construction Management in Civil Engineering
Authors: Mamoon M. Atout
Abstract:
The Middle East Gulf region has witnessed rapid growth and development in many areas over the last two decades. The development of the real-estate sector, construction industry and infrastructure projects are a major share of the development that has participated in the civilization of the countries of the Gulf. Construction industry projects were planned and managed by different types of experts, who came from all over the world having different types of experiences in construction management and industry. Some of these projects were completed on time, while many were not, due to many accumulating factors. Many accumulated factors are considered as the principle reason for the problem experienced at the project construction stage, which reflected negatively on the project success. Specific causes of delay have been identified by construction managers to avoid any unexpected delays through proper analysis and considerations to some implications such as risk assessment and analysis for many potential problems to ensure that projects will be delivered on time. Construction management implications were adopted and considered by project managers who have experience and knowledge in applying the techniques of the system of engineering construction management. The aim of this research is to determine the benefits of the implications of construction management by the construction team and level of considerations of the techniques and processes during the project development and construction phases to avoid any delay in the projects. It also aims to determine the factors that participate to project completion delays in case project managers are not well committed to their roles and responsibilities. The results of the analysis will determine the necessity of the applications required by the project team to avoid the causes of delays that help them deliver projects on time, e.g. verifying tender documents, quantities and preparing the construction method of the project.Keywords: construction management, control process, cost control, planning and scheduling
Procedia PDF Downloads 2508553 Study on the Model Predicting Post-Construction Settlement of Soft Ground
Authors: Pingshan Chen, Zhiliang Dong
Abstract:
In order to estimate the post-construction settlement more objectively, the power-polynomial model is proposed, which can reflect the trend of settlement development based on the observed settlement data. It was demonstrated by an actual case history of an embankment, and during the prediction. Compared with the other three prediction models, the power-polynomial model can estimate the post-construction settlement more accurately with more simple calculation.Keywords: prediction, model, post-construction settlement, soft ground
Procedia PDF Downloads 4268552 Application of Sustainable Agriculture Based on LEISA in Landscape Design of Integrated Farming
Authors: Eduwin Eko Franjaya, Andi Gunawan, Wahju Qamara Mugnisjah
Abstract:
Sustainable agriculture in the form of integrated farming with its LEISA (Low External Input Sustainable Agriculture) concept has brought a positive impact on agriculture development and ambient amelioration. But, most of the small farmers in Indonesia did not know how to put the concept of it and how to combine agricultural commodities on the site effectively and efficiently. This research has an aim to promote integrated farming (agrofisheries, etc) to the farmers by designing the agricultural landscape to become integrated farming landscape as medium of education for the farmers. The method used in this research is closely related with the rule of design in the landscape architecture science. The first step is inventarization for the existing condition on the research site. The second step is analysis. Then, the third step is concept-making that consists of base concept, design concept, and developing concept. The base concept used in this research is sustainable agriculture with LEISA. The concept design is related with activity base on site. The developing concept consists of space concept, circulation, vegetation and commodity, production system, etc. The fourth step as the final step is planning and design. This step produces site plan of integrated farming based on LEISA. The result of this research is site plan of integrated farming with its explanation, including the energy flow of integrated farming system on site and the production calendar of integrated farming commodities for education and agri-tourism opportunity. This research become the right way to promote the integrated farming and also as a medium for the farmers to learn and to develop it.Keywords: integrated farming, LEISA, planning and design, site plan
Procedia PDF Downloads 5178551 Building Information Models Utilization for Design Improvement of Infrastructure
Authors: Keisuke Fujioka, Yuta Itoh, Masaru Minagawa, Shunji Kusayanagi
Abstract:
In this study, building information models of the underground temporary structures and adjacent embedded pipes were constructed to show the importance of the information on underground pipes adjacent to the structures to enhance the productivity of execution of construction. Next, the bar chart used in actual construction process were employed to make the Gantt chart, and the critical pass analysis was carried out to show that accurate information on the arrangement of underground existing pipes can be used for the enhancement of the productivity of the construction of underground structures. In the analyzed project, significant construction delay was not caused by unforeseeable existence of underground pipes by the management ability of the construction manager. However, in many cases of construction executions in the developing countries, the existence of unforeseeable embedded pipes often causes substantial delay of construction. Design change based on uncertainty on the position information of embedded pipe can be also important risk for contractors in domestic construction. So CPM analyses were performed by a project-management-software to the situation that influence of the tasks causing construction delay was assumed more significant. Through the analyses, the efficiency of information management on underground pipes and BIM analysis in the design stage for workability improvement was indirectly confirmed.Keywords: building-information modelling, construction information modelling, design improvement, infrastructure
Procedia PDF Downloads 3128550 Evaluation of Spatial Distribution Prediction for Site-Scale Soil Contaminants Based on Partition Interpolation
Authors: Pengwei Qiao, Sucai Yang, Wenxia Wei
Abstract:
Soil pollution has become an important issue in China. Accurate spatial distribution prediction of pollutants with interpolation methods is the basis for soil remediation in the site. However, a relatively strong variability of pollutants would decrease the prediction accuracy. Theoretically, partition interpolation can result in accurate prediction results. In order to verify the applicability of partition interpolation for a site, benzo (b) fluoranthene (BbF) in four soil layers was adopted as the research object in this paper. IDW (inverse distance weighting)-, RBF (radial basis function)-and OK (ordinary kriging)-based partition interpolation accuracies were evaluated, and their influential factors were analyzed; then, the uncertainty and applicability of partition interpolation were determined. Three conclusions were drawn. (1) The prediction error of partitioned interpolation decreased by 70% compared to unpartitioned interpolation. (2) Partition interpolation reduced the impact of high CV (coefficient of variation) and high concentration value on the prediction accuracy. (3) The prediction accuracy of IDW-based partition interpolation was higher than that of RBF- and OK-based partition interpolation, and it was suitable for the identification of highly polluted areas at a contaminated site. These results provide a useful method to obtain relatively accurate spatial distribution information of pollutants and to identify highly polluted areas, which is important for soil pollution remediation in the site.Keywords: accuracy, applicability, partition interpolation, site, soil pollution, uncertainty
Procedia PDF Downloads 1478549 Application of Support Vector Machines in Forecasting Non-Residential
Authors: Wiwat Kittinaraporn, Napat Harnpornchai, Sutja Boonyachut
Abstract:
This paper deals with the application of a novel neural network technique, so-called Support Vector Machine (SVM). The objective of this study is to explore the variable and parameter of forecasting factors in the construction industry to build up forecasting model for construction quantity in Thailand. The scope of the research is to study the non-residential construction quantity in Thailand. There are 44 sets of yearly data available, ranging from 1965 to 2009. The correlation between economic indicators and construction demand with the lag of one year was developed by Apichat Buakla. The selected variables are used to develop SVM models to forecast the non-residential construction quantity in Thailand. The parameters are selected by using ten-fold cross-validation method. The results are indicated in term of Mean Absolute Percentage Error (MAPE). The MAPE value for the non-residential construction quantity predicted by Epsilon-SVR in corporation with Radial Basis Function (RBF) of kernel function type is 5.90. Analysis of the experimental results show that the support vector machine modelling technique can be applied to forecast construction quantity time series which is useful for decision planning and management purpose.Keywords: forecasting, non-residential, construction, support vector machines
Procedia PDF Downloads 4378548 Health and Safety Practices of Midsayapenos in Relation to The Governance of the Local Government Unit of Midsayap in Responding to the COVID-19 Pandemic
Authors: Jolai R. Garca, Sergio Mahinay Jr., Fathma Dubpaleg, Rhea Jaberina, Jovanne Mabit II
Abstract:
The COVID-19 pandemic has still been going on for almost two years now, but because of the health and safety practices of the citizens, together with the action of the Local Government Unit, it has slowly dissipated. This study investigated the relationship between the health and safety protocols as well as the status of governance of the Local Government Unit of Midsayap using the evidence-based key indicators of Good Governance aggregated from the Organisation for Economic Co-operation and Development (OECD). A quantitative research design was employed to determine the relationship of the variables under study. Findings showed that the residents of Midsayap often practice the necessary health and safety measures against COVID-19 and that the Local Government Unit of Midsayap is effective in responding to the pandemic.Keywords: governance, health and safety practices, covid-19, local government unit
Procedia PDF Downloads 1788547 Exploring the Critical Success Factors of Construction Stakeholders Team Effectiveness
Authors: Olusegun Akinsiku, Olukayode Oyediran, Koleola Odusami
Abstract:
A construction project is usually made up of a variety of stakeholders whose interests may positively or negatively impact on the outcome of the project execution. The variability of project stakeholders is apparent in their cultural differences, professional background and ethics, and differences in ideas. The need for the effectiveness of construction teams has been investigated as this is an important aspect to meeting client’s expectations in the construction industry. This study adopts a cross-sectional descriptive survey with the purpose of identifying the critical success factors (CSFs) associated with the team effectiveness of construction projects stakeholders, their relationship and the effects on construction project performance. The instrument for data collection was a designed questionnaire which was administered to construction professionals in the construction industry in Lagos State, Nigeria using proportionate stratified sampling. The highest ranked identified CSFs include “team trust”, “esprit de corps among members” and “team cohesiveness”. Using factor analysis and considering the effects of team cohesiveness on project performance, the identified CSFs were categorized into three groups namely cognitive attributes, behavior and processes attributes and affective attributes. All the three groups were observed to have a strong correlation with project performance. The findings of this study are useful in helping construction stakeholders benchmark the team effectiveness factors that will guarantee project success.Keywords: construction, critical success factors, performance, stakeholders, team effectiveness
Procedia PDF Downloads 1328546 Heritage Management Planning, Stakeholders and Legal Problematic: The Case of the Archeological Site of Jarash in Jordan
Authors: Abdelkader Ababneh
Abstract:
Heritage management planning is increasingly important throughout the international context, particularly in the developing countries. Jordan has important and unique heritage resources due to its natural topography and climate, but also to its history and old sites. A high number of these archaeological sites are in very good state of preservation. Most natural sites and resources are privately managed while archaeological heritage sites are publicly managed within national legal texts and with some referencing to international legal documents. This study examines the development of cultural heritage management in Jarash, and questions if this heritage has been managed in an appropriate manner. The purpose of this paper is to define and review the stakeholders in charge of the management of the archaeological site of Jarash, the legal texts, laws and documents adopted to apply the site management. Relations and coordination between stakeholders and the challenge of the planning process is also the focus of this paper. A review of pertinent academic, technical studies, reports and projects literature pertaining to the heritage management planning in general and related to the site of Jarash in particular coupled with field study of the site served as the background of the information base for the study. Current context of actors, legislative framework, planning policies and initiatives for the site of Jarash reveal important and continuous challenge for managing the site. Recommendations suggest reviewing and restructuring the entity responsible of the sites management. It is also recommended to review their applied policies and a redevelopment of the legislative frame work.Keywords: heritage management, stakeholders, legal protection, Jarash
Procedia PDF Downloads 3808545 Safety Profile of Human Papillomavirus Vaccines: A Post-Licensure Analysis of the Vaccine Adverse Events Reporting System, 2007-2017
Authors: Giulia Bonaldo, Alberto Vaccheri, Ottavio D'Annibali, Domenico Motola
Abstract:
The Human Papilloma Virus (HPV) was shown to be the cause of different types of carcinomas, first of all of the cervical intraepithelial neoplasia. Since the early 80s to today, thanks first to the preventive screening campaigns (pap-test) and following to the introduction of HPV vaccines on the market; the number of new cases of cervical cancer has decreased significantly. The HPV vaccines currently approved are three: Cervarix® (HPV2 - virus type: 16 and 18), Gardasil® (HPV4 - 6, 11, 16, 18) and Gardasil 9® (HPV9 - 6, 11, 16, 18, 31, 33, 45, 52, 58), which all protect against the two high-risk HPVs (6, 11) that are mainly involved in cervical cancers. Despite the remarkable effectiveness of these vaccines has been demonstrated, in the recent years, there have been many complaints about their risk-benefit profile due to Adverse Events Following Immunization (AEFI). The purpose of this study is to provide a support about the ongoing discussion on the safety profile of HPV vaccines based on real life data deriving from spontaneous reports of suspected AEFIs collected in the Vaccine Adverse Events Reporting System (VAERS). VAERS is a freely-available national vaccine safety surveillance database of AEFI, co-administered by the Centers for Disease Control and Prevention (CDC) and Food and Drug Administration (FDA). We collected all the reports between January 2007 to December 2017 related to the HPV vaccines with a brand name (HPV2, HPV4, HPV9) or without (HPVX). A disproportionality analysis using Reporting Odds Ratio (ROR) with 95% confidence interval and p value ≤ 0.05 was performed. Over the 10-year period, 54889 reports of AEFI related to HPV vaccines reported in VAERS, corresponding to 224863 vaccine-event pairs, were retrieved. The highest number of reports was related to Gardasil (n = 42244), followed by Gardasil 9 (7212) and Cervarix (3904). The brand name of the HPV vaccine was not reported in 1529 cases. The two events more frequently reported and statistically significant for each vaccine were: dizziness (n = 5053) ROR = 1.28 (CI95% 1.24 – 1.31) and syncope (4808) ROR = 1.21 (1.17 – 1.25) for Gardasil. For Gardasil 9, injection site pain (305) ROR = 1.40 (1.25 – 1.57) and injection site erythema (297) ROR = 1.88 (1.67 – 2.10) and for Cervarix, headache (672) ROR = 1.14 (1.06 – 1.23) and loss of consciousness (528) ROR = 1.71 (1.57 – 1.87). In total, we collected 406 reports of death and 2461 cases of permanent disability in the ten-year period. The events consisting of incorrect vaccine storage or incorrect administration were not considered. The AEFI analysis showed that the most frequently reported events are non-serious and listed in the corresponding SmPCs. In addition to these, potential safety signals arose regarding less frequent and severe AEFIs that would deserve further investigation. This already happened with the referral of the European Medicines Agency (EMA) for the adverse events POTS (Postural Orthostatic Tachycardia Syndrome) and CRPS (Complex Regional Pain Syndrome) associated with anti-papillomavirus vaccines.Keywords: adverse drug reactions, pharmacovigilance, safety, vaccines
Procedia PDF Downloads 1668544 Measuring the Embodied Energy of Construction Materials and Their Associated Cost Through Building Information Modelling
Authors: Ahmad Odeh, Ahmad Jrade
Abstract:
Energy assessment is an evidently significant factor when evaluating the sustainability of structures especially at the early design stage. Today design practices revolve around the selection of material that reduces the operational energy and yet meets their displinary need. Operational energy represents a substantial part of the building lifecycle energy usage but the fact remains that embodied energy is an important aspect unaccounted for in the carbon footprint. At the moment, little or no consideration is given to embodied energy mainly due to the complexity of calculation and the various factors involved. The equipment used, the fuel needed, and electricity required for each material vary with location and thus the embodied energy will differ for each project. Moreover, the method and the technique used in manufacturing, transporting and putting in place will have a significant influence on the materials’ embodied energy. This anomaly has made it difficult to calculate or even bench mark the usage of such energies. This paper presents a model aimed at helping designers select the construction materials based on their embodied energy. Moreover, this paper presents a systematic approach that uses an efficient method of calculation and ultimately provides new insight into construction material selection. The model is developed in a BIM environment targeting the quantification of embodied energy for construction materials through the three main stages of their life: manufacturing, transportation and placement. The model contains three major databases each of which contains a set of the most commonly used construction materials. The first dataset holds information about the energy required to manufacture any type of materials, the second includes information about the energy required for transporting the materials while the third stores information about the energy required by tools and cranes needed to place an item in its intended location. The model provides designers with sets of all available construction materials and their associated embodied energies to use for the selection during the design process. Through geospatial data and dimensional material analysis, the model will also be able to automatically calculate the distance between the factories and the construction site. To remain within the sustainability criteria set by LEED, a final database is created and used to calculate the overall construction cost based on R.M.S. means cost data and then automatically recalculate the costs for any modifications. Design criteria including both operational and embodied energies will cause designers to revaluate the current material selection for cost, energy, and most importantly sustainability.Keywords: building information modelling, energy, life cycle analysis, sustainablity
Procedia PDF Downloads 2728543 Influence of the Reliability Index on the Safety Factor of the Concrete Contribution to Shear Strength of HSC Beams
Authors: Ali Sagiroglu, Sema Noyan Alacali, Guray Arslan
Abstract:
This paper presents a study on the influence of the safety factor in the concrete contribution to shear strength of high-strength concrete (HSC) beams according to TS500. In TS500, the contribution of concrete to shear strength is obtained by reducing diagonal cracking strength with a safety factor of 0.8. It was investigated that the coefficient of 0.8 considered in determining the contribution of concrete to the shear strength corresponds to which value of failure probability. Also, the changes in the reduction factor depending on different coefficients of variation of concrete were examined.Keywords: reinforced concrete, beam, shear strength, failure probability, safety factor
Procedia PDF Downloads 8338542 Determining the Information Technologies Usage and Learning Preferences of Construction
Authors: Naci Büyükkaracığan, Yıldırım Akyol
Abstract:
Information technology is called the technology which provides transmission of information elsewhere regardless of time, location, distance. Today, information technology is providing the occurrence of ground breaking changes in all areas of our daily lives. Information can be reached quickly to millions of people with help of information technology. In this Study, effects of information technology on students for educations and their learning preferences were demonstrated with using data obtained from questionnaires administered to students of 2015-2016 academic year at Selcuk University Kadınhanı Faik İçil Vocational School Construction Department. The data was obtained by questionnaire consisting of 30 questions that was prepared by the researchers. SPSS 21.00 package programme was used for statistical analysis of data. Chi-square tests, Mann-Whitney U test, Kruskal-Wallis and Kolmogorov-Smirnov tests were used in the data analysis for Descriptiving statistics. In a study conducted with the participation of 61 students, 93.4% of students' reputation of their own information communication device (computer, smart phone, etc.) That have been shown to be at the same rate and to the internet. These are just a computer of itself, then 45.90% of the students. The main reasons for the students' use of the Internet, social networking sites are 85.24%, 13.11% following the news of the site, as seen. All student assignments in information technology, have stated that they use in the preparation of the project. When students acquire scientific knowledge in the profession regarding their preferred sources evaluated were seen exactly when their preferred internet. Male students showed that daily use of information technology while compared to female students was statistically significantly less. Construction Package program where students are eager to learn about the reputation of 72.13% and 91.80% identified in the well which they agreed that an indispensable element in the professional advancement of information technology.Keywords: information technologies, computer, construction, internet, learning systems
Procedia PDF Downloads 3018541 Genetic Algorithms Based ACPS Safety
Authors: Emine Laarouchi, Daniela Cancila, Laurent Soulier, Hakima Chaouchi
Abstract:
Cyber-Physical Systems as drones proved their efficiency for supporting emergency applications. For these particular applications, travel time and autonomous navigation algorithms are of paramount importance, especially when missions are performed in urban environments with high obstacle density. In this context, however, safety properties are not properly addressed. Our ambition is to optimize the system safety level under autonomous navigation systems, by preserving performance of the CPS. At this aim, we introduce genetic algorithms in the autonomous navigation process of the drone to better infer its trajectory considering the possible obstacles. We first model the wished safety requirements through a cost function and then seek to optimize it though genetics algorithms (GA). The main advantage in the use of GA is to consider different parameters together, for example, the level of battery for navigation system selection. Our tests show that the GA introduction in the autonomous navigation systems minimize the risk of safety lossless. Finally, although our simulation has been tested for autonomous drones, our approach and results could be extended for other autonomous navigation systems such as autonomous cars, robots, etc.Keywords: safety, unmanned aerial vehicles , CPS, ACPS, drones, path planning, genetic algorithms
Procedia PDF Downloads 1838540 Historiography of Wood Construction in Portugal
Authors: João Gago dos Santos, Paulo Pereira Almeida
Abstract:
The present study intends to deepen and understand the reasons that led to the decline and disappearance of wooden construction systems in Portugal, for that reason, its use in history must be analyzed. It is observed that this material was an integral part of the construction systems in Europe and Portugal for centuries, and it is possible to conclude that its decline happens with the appearance of hybrid construction and later with the emergence and development of reinforced concrete technology. It is also verified that wood as a constructive element, and for that reason, an element of development had great importance in national construction, with its peak being the Pombaline period, after the 1755 earthquake. In this period, the great scarcity of materials in the metropolis led to the import wood from Brazil for the reconstruction of Lisbon. This period is linked to an accentuated exploitation of forests, resulting in laws and royal decrees aimed at protecting them, guaranteeing the continued existence of profitable forests, crucial to the reconstruction effort. The following period, with the gradual loss of memory of the catastrophe, resulted in a construction that was weakened structurally as a response to a time of real estate speculation and great urban expansion. This was the moment that precluded the inexistence of the use of wood in construction. At the beginning of the 20th century and in the 30s and 40s, with the appearance and development of reinforced concrete, it became part of the great structures of the state, and it is considered a versatile material capable of resolving issues throughout the national territory. It is at this point that the wood falls into disuse and practically disappears from the new works produced.Keywords: construction history, construction in portugal, construction systems, wood construction
Procedia PDF Downloads 1268539 Analysing Implementation of Best Practices in Construction Contracts for Dispute Avoidance
Authors: K. C. Iyer, Yogita Manan Bindal, Sumit Kumar Bakshi
Abstract:
Disputes and litigation are becoming inherent to the construction industry in India, and despite construction being one of the major drivers of growth, there have not been many reforms in the government construction contracts. Many of the disputes arising from the government contracts, can be avoided by the proper drafting of contracts and their administration. This study aims to 1) identify the best practices in the construction contract as reviewed from the research papers and additional literature on contract management, 2) obtain perspectives from the industry experts on the implementation of these best practices with regards to likely challenges and relative benefits for implementing the best practices in construction contracts. The best practices for disputes arising due to delay events have been identified through extensive literature survey. The industry perspective is gathered by way of a questionnaire survey to understand the applicability of the identified best practices, the benefits that are likely to be obtained and the challenges that are likely to be faced in the implementation of these practices. The study concludes with the recommended best practices that can be implemented based on the perspectives obtained from the survey. The findings of the study can be used by the industry professionals while drafting construction contracts with a view to avoid disputes related to delay events.Keywords: best practices, construction contract, delay, dispute avoidance
Procedia PDF Downloads 1988538 Determination of Safety Distance Around Gas Pipelines Using Numerical Methods
Authors: Omid Adibi, Nategheh Najafpour, Bijan Farhanieh, Hossein Afshin
Abstract:
Energy transmission pipelines are one of the most vital parts of each country which several strict laws have been conducted to enhance the safety of these lines and their vicinity. One of these laws is the safety distance around high pressure gas pipelines. Safety distance refers to the minimum distance from the pipeline where people and equipment do not confront with serious damages. In the present study, safety distance around high pressure gas transmission pipelines were determined by using numerical methods. For this purpose, gas leakages from cracked pipeline and created jet fires were simulated as continuous ignition, three dimensional, unsteady and turbulent cases. Numerical simulations were based on finite volume method and turbulence of flow was considered using k-ω SST model. Also, the combustion of natural gas and air mixture was applied using the eddy dissipation method. The results show that, due to the high pressure difference between pipeline and environment, flow chocks in the cracked area and velocity of the exhausted gas reaches to sound speed. Also, analysis of the incident radiation results shows that safety distances around 42 inches high pressure natural gas pipeline based on 5 and 15 kW/m2 criteria are 205 and 272 meters, respectively.Keywords: gas pipelines, incident radiation, numerical simulation, safety distance
Procedia PDF Downloads 3358537 An Archaeological Approach to Dating Polities and Architectural Ingenuity in Ijebu, South Western Nigeria
Authors: Olanrewaju B. Lasisi
Abstract:
The position of Ijebu-Ode, the historical capital of the Ijebu Kingdom, at the center of gravity of Ijebu land is enclosed by the 180-km-long earthwork and suggests a centrally controlled project. This paper reflects on the first stratigraphic drawing of the banks and ditches of this earthwork, and place its construction mechanism in a chronological framework. Nine radiocarbon dates obtained at the site suggest that the earthwork was built in the late 14th or early 15th century. This suggests a relationship with the Ijebu Kingdom, which pre-existed the opening of the Atlantic trade but first became visible only in the Portuguese records in the 1480s. In June 2017, more earthworks were found but within the core of Ijebu Land. This most recent finding points to an extension of territory from the center to the outlying villages. One central question about this discovery of monumental architectures that was functional around the 14th century or before is in its mode of construction. Apparently, iron tools must have been used in the construction of ‘a 20m deep ditch that runs 180km in circumference.’ Thus, the discovery of iron-working sites around the vicinity of the earthwork is a pointer to this building process that is up till now shrouded in mystery. By comparing the chronology of Ijebu earthworks with the evidence of Iron working in south western Nigeria around the first half of the first millennium AD, it can be thought that the rise in polity triggered the knowledge of metallurgy in the region.Keywords: archaeology, earthworks, Ijebu, metallurgy
Procedia PDF Downloads 2498536 Using Data Mining in Automotive Safety
Authors: Carine Cridelich, Pablo Juesas Cano, Emmanuel Ramasso, Noureddine Zerhouni, Bernd Weiler
Abstract:
Safety is one of the most important considerations when buying a new car. While active safety aims at avoiding accidents, passive safety systems such as airbags and seat belts protect the occupant in case of an accident. In addition to legal regulations, organizations like Euro NCAP provide consumers with an independent assessment of the safety performance of cars and drive the development of safety systems in automobile industry. Those ratings are mainly based on injury assessment reference values derived from physical parameters measured in dummies during a car crash test. The components and sub-systems of a safety system are designed to achieve the required restraint performance. Sled tests and other types of tests are then carried out by car makers and their suppliers to confirm the protection level of the safety system. A Knowledge Discovery in Databases (KDD) process is proposed in order to minimize the number of tests. The KDD process is based on the data emerging from sled tests according to Euro NCAP specifications. About 30 parameters of the passive safety systems from different data sources (crash data, dummy protocol) are first analysed together with experts opinions. A procedure is proposed to manage missing data and validated on real data sets. Finally, a procedure is developed to estimate a set of rough initial parameters of the passive system before testing aiming at reducing the number of tests.Keywords: KDD process, passive safety systems, sled test, dummy injury assessment reference values, frontal impact
Procedia PDF Downloads 3848535 Optimizing Design Works in Construction Consultant Company: A Knowledge-Based Application
Authors: Phan Nghiem Vu, Le Tuan Vu, Ta Quang Tai
Abstract:
The optimal construction design used during the execution of a construction project is a key factor in determining high productivity and customer satisfaction, however, this management process sometimes is carried out without care and the systematic method that it deserves, bringing negative consequences. This study proposes a knowledge management (KM) approach that will enable the intelligent use of experienced and acknowledged engineers to improve the management of construction design works for a project. Then a knowledge-based application to support this decision-making process is proposed and described. To define and design the system for the application, semi-structured interviews were conducted within five construction consulting organizations with the purpose of studying the way that the method’ optimizing process is implemented in practice and the knowledge supported with it. A system of an optimizing construction design works (OCDW) based on knowledge was developed then validated with construction experts. The OCDW was liked as a valuable tool for construction design works’ optimization, by supporting organizations to generate a corporate memory on this issue, reducing the reliance on individual knowledge and also the subjectivity of the decision-making process. The benefits are described as provided by the performance support system, reducing costs and time, improving product design quality, satisfying customer requirements, expanding the brand organization.Keywords: optimizing construction design work, construction consultant organization, knowledge management, knowledge-based application
Procedia PDF Downloads 131