16903 Exploring Exposed Political Economy in Disaster Risk Reduction Efforts in Bangladesh

Authors: Shafiqul Islam, Cordia Chu

Abstract:

Bangladesh is one of the most vulnerable countries to climate related disasters such as flood and cyclone. Exploring from the semi-structured in-depth interviews of 38 stakeholders and literature review, this study examined the public spending distribution process in DRR. This paper demonstrates how the processes of political economy-enclosure, exclusion, encroachment, and entrenchment hinder the Disaster Risk Reduction (DRR) efforts of Department of Disaster Management (DDM) such as distribution of flood centres, cyclone centres and 40 days employment generation programs. Enclosure refers to when DRR projects allocated to less vulnerable areas or expand the roles of influencing actors into the public sphere. Exclusion refers to when DRR projects limit affected people’s access to resources or marginalize particular stakeholders in decision-making activities. Encroachment refers to when allocation of DRR projects and selection of location and issues degrade the environmental affect or contribute to other forms of disaster risk. Entrenchment refers to when DRR projects aggravate the disempowerment of common people worsen the concentrations of wealth and income inequality within a community. In line with United Nations (UN) Sustainable Development Goals (SDGs), Hyogo and Sendai Frameworks, in the case of Bangladesh, DRR policies implemented under the country’s national five-year plan, disaster-related acts and rules. These policies and practices have somehow enabled influential-elites to mobilize and distribute resources through bureaucracies. Exclusionary forms of fund distribution of DRR exist at both the national and local scales. DRR related allocations have encroached through the low land areas development project without consulting local needs. Most severely, DRR related unequal allocations have entrenched social class trapping the backward communities vulnerable to climate related disasters. Planners and practitioners of DRR need to take necessary steps to eliminate the potential risks from the processes of enclosure, exclusion, encroachment, and entrenchment happens in project fund allocations.

Keywords: Bangladesh, disaster risk reduction, fund distribution, political economy

Procedia PDF Downloads 111
16902 Power Transformer Risk-Based Maintenance by Optimization of Transformer Condition and Transformer Importance

Authors: Kitti Leangkrua

Abstract:

This paper presents a risk-based maintenance strategy of a power transformer in order to optimize operating and maintenance costs. The methodology involves the study and preparation of a database for the collection the technical data and test data of a power transformer. An evaluation of the overall condition of each transformer is performed by a program developed as a result of the measured results; in addition, the calculation of the main equipment separation to the overall condition of the transformer (% HI) and the criteria for evaluating the importance (% ImI) of each location where the transformer is installed. The condition assessment is performed by analysis test data such as electrical test, insulating oil test and visual inspection. The condition of the power transformer will be classified from very poor to very good condition. The importance is evaluated from load criticality, importance of load and failure consequence. The risk matrix is developed for evaluating the risk of each power transformer. The high risk power transformer will be focused firstly. The computerized program is developed for practical use, and the maintenance strategy of a power transformer can be effectively managed.

Keywords: asset management, risk-based maintenance, power transformer, health index

Procedia PDF Downloads 282
16901 Islamic Financial Engineering: An Overview

Authors: Mahfoud Djebbar

Abstract:

The past two decades or so have witnessed phenomenal growth of the Islamic financial services industry. The whole industry has been thriving at about 15 percent per annum. This development entails the Islamic financial engineering, IFE, to some kind of crossroads, lagging behind its conventional counterpart. Therefore, IFE, and particularly traded products development, and in order to achieve its goals, two approaches are available, i.e., replicating engineering and innovative engineering. We also try to emphasis the innovative strategy since it guards the Islamic identity of different financial products and processes, and thereby, improves the creativity in the Islamic financial industry. The attempt also centers on sukukization (Islamic securitization), innovation, liquidity management, and risk management and hedging in the Islamic financial system. Finally, the challenges facing IFE are also addressed.

Keywords: islamic financial engineering, hedging and risk management, innovation, securitization, money market instruments, islamic capital markets

Procedia PDF Downloads 533
16900 Review of Innovation Management Frameworks and Assessment Tools

Authors: Qiang Fu, Abu Saleh

Abstract:

Research studies are highly fragmented when an innovation management framework is being discussed. With the aim to identify an innovation management framework/assessment tool suitable for small & medium enterprises (SMEs) in the service industry, this researcher critically reviewed existing innovation management frameworks and assessment models/tools and discovered a number of literature gaps. It is established that existing literature lacks generally agreed innovation management dimensions, commonly accepted knowledge creation through empirical studies on innovation management in SMEs, effective innovation management performance measurements, and studies on innovation management in the service industry, in particular in retail SMEs. As such, there is a dire need to develop an appropriate firm-level innovation management framework suitable for SMEs in the service industry for a future research project and further study. In addition, this researcher also discussed the significance of establishing such an innovation management framework.

Keywords: innovation management, innovation management framework, innovation management assessment tools, SMEs, service industry

Procedia PDF Downloads 173
16899 Conflict Causes within Construction Projects; Conflict Interaction across Project Phases

Authors: Abdullah Mohammed Alshehri

Abstract:

The projects in the construction industry have significantly increased, given its contribution to the overall Gross Domestic Product (GDP) of the countries. Reflecting upon the complex nature and involvement of various agents, the study aims to analyze the conflicts cause within construction projects. Therefore, the study strived to come out with understanding the levels of conflict interaction across project phases. However, this conducted by investigating the association between antecedents and apparent conflicts inherent in. The study used a qualitative approach for collecting the data through a quantitative, semi-structured method. Formation of a questionnaire survey has been conducted for over 30 respondents. However, the survey came out with the identification of 25 conflict cause categories, which can take place in different construction project phases, including pre-design phase, pre-construction phase, construction phase, commissioning, and completion phase. For example, conflicts associated with inconsistencies or discrepancies within or between project documents, which took place at tendering time in the pre-construction phase were relatable with the selection of material specifications that should be supplied or used in the construction projects at the construction phase. Its analysis can provide comprehensive understanding, trace the root of the problem, which offers a roadmap to deepen the understanding of the conflict conditions and ‘course of action’ necessary for project management strategy actions toward avoiding or minimizing conflict causes at project life.

Keywords: construction, conflict causes, levels, interaction, phases

Procedia PDF Downloads 155
16898 Final Account Closing in Construction Project: The Use of Supply Chain Management to Reduce the Delays

Authors: Zarabizan Zakaria, Syuhaida Ismail, Aminah Md. Yusof

Abstract:

Project management process starts from the planning stage up to the stage of completion (handover of buildings, preparation of the final accounts and the closing balance). This process is not easy to implement efficiently and effectively. The issue of delays in construction is a major problem for construction projects. These delays have been blamed mainly on inefficient traditional construction practices that continue to dominate the current industry. This is due to several factors, such as environments of construction technology, sophisticated design and customer demands that are constantly changing and influencing, either directly or indirectly, the practice of management. Among the identified influences are physical environment, social environment, information environment, political and moral atmosphere. Therefore, this paper is emerged to determine the problem and issues in the final account closing in construction projects, and it establishes the need to embrace Supply Chain Management (SCM) and then elucidates the need and strategies for the development of a delay reduction framework. At the same time, this paper provides effective measures to avoid or at least reduce the delay to the optimum level. Allowing problems in the closure declaration to occur without proper monitoring and control can leave negative impact on the cost and time of delivery to the end user. Besides, it can also affect the reputation or image of the agency/department that manages the implementation of a contract and consequently may reduce customer's trust towards the agencies/departments. It is anticipated that the findings reported in this paper could address root delay contributors and apply SCM tools for their mitigation for the better development of construction project.

Keywords: final account closing, construction project, construction delay, supply chain management

Procedia PDF Downloads 338
16897 A Construction Scheduling Model by Applying Pedestrian and Vehicle Simulation

Authors: Akhmad F. K. Khitam, Yi Tai, Hsin-Yun Lee

Abstract:

In the modern research of construction management, the goals of scheduling are not only to finish the project within the limited duration, but also to improve the impact of people and environment. Especially for the impact to the pedestrian and vehicles, the considerable social cost should be estimated in the total performance of a construction project. However, the site environment has many differences between projects. These interactions affect the requirement and goal of scheduling. It is difficult for schedule planners to quantify these interactions. Therefore, this study use 3D dynamic simulation technology to plan the schedule of the construction engineering projects that affect the current space users (i.e., the pedestrians and vehicles). The proposed model can help the project manager find out the optimal schedule to minimize the inconvenience brought to the space users. Besides, a roadwork project and a building renovation project were analyzed for the practical situation of engineering and operations. Then this study integrates the proper optimization algorithms and computer technology to establish a decision support model. The proposed model can generate a near-optimal schedule solution for project planners.

Keywords: scheduling, simulation, optimization, pedestrian and vehicle behavior

Procedia PDF Downloads 117
16896 Enhancing Project Management Performance in Prefabricated Building Construction under Uncertainty: A Comprehensive Approach

Authors: Niyongabo Elyse

Abstract:

Prefabricated building construction is a pioneering approach that combines design, production, and assembly to attain energy efficiency, environmental sustainability, and economic feasibility. Despite continuous development in the industry in China, the low technical maturity of standardized design, factory production, and construction assembly introduces uncertainties affecting prefabricated component production and on-site assembly processes. This research focuses on enhancing project management performance under uncertainty to help enterprises navigate these challenges and optimize project resources. The study introduces a perspective on how uncertain factors influence the implementation of prefabricated building construction projects. It proposes a theoretical model considering project process management ability, adaptability to uncertain environments, and collaboration ability of project participants. The impact of uncertain factors is demonstrated through case studies and quantitative analysis, revealing constraints on implementation time, cost, quality, and safety. To address uncertainties in prefabricated component production scheduling, a fuzzy model is presented, expressing processing times in interval values. The model utilizes a cooperative co-evolution evolution algorithm (CCEA) to optimize scheduling, demonstrated through a real case study showcasing reduced project duration and minimized effects of processing time disturbances. Additionally, the research addresses on-site assembly construction scheduling, considering the relationship between task processing times and assigned resources. A multi-objective model with fuzzy activity durations is proposed, employing a hybrid cooperative co-evolution evolution algorithm (HCCEA) to optimize project scheduling. Results from real case studies indicate improved project performance in terms of duration, cost, and resilience to processing time delays and resource changes. The study also introduces a multistage dynamic process control model, utilizing IoT technology for real-time monitoring during component production and construction assembly. This approach dynamically adjusts schedules when constraints arise, leading to enhanced project management performance, as demonstrated in a real prefabricated housing project. Key contributions include a fuzzy prefabricated components production scheduling model, a multi-objective multi-mode resource-constrained construction project scheduling model with fuzzy activity durations, a multi-stage dynamic process control model, and a cooperative co-evolution evolution algorithm. The integrated mathematical model addresses the complexity of prefabricated building construction project management, providing a theoretical foundation for practical decision-making in the field.

Keywords: prefabricated construction, project management performance, uncertainty, fuzzy scheduling

Procedia PDF Downloads 30
16895 Software Development and Team Diversity

Authors: J. Congalton, K. Logan, B. Crump

Abstract:

Software is a critical aspect of modern life. However it is costly to develop and industry initiatives have focused on reducing costs and improving the productivity. Increasing, software is being developed in teams, and with greater globalization and migration, the teams are becoming more ethnically diverse. This study investigated whether diversity in terms of ethnicity impacted on the productivity of software development. Project managers of software development teams were interviewed. The study found that while some issues did exist due to language problems, when project managers created an environment of trust and friendliness, diversity made a positive contribution to productivity.

Keywords: diversity, project management, software development, team work

Procedia PDF Downloads 349
16894 Critical Factors Influencing Effective Communication Among Stakeholders on Construction Project Delivery in Jigawa State, Nigeria

Authors: Shazali Abdulahi

Abstract:

Project planning is the first phase in project life cycle which relates to the use of schedules such as Gantt charts to plan and subsequently report the project progress within the project environment. Likewise, project execution is the third phase in project lifecycle, is the phase where the work of the project must get done correctly and it’s the longest phase in the project lifecycle therefore, they must be effectively communicated, now today Communication has become the crucial element of every organization. During construction project delivery, information needs to be accurately and timely communicating among project stakeholders in order to realize the project objective. Effective communication among stakeholders during construction project delivery is one of the major factors that impact construction project delivery. Therefore, the aim of the research work is to examine the critical factors influencing effective communication among stakeholders on construction project delivery from the perspective of construction professionals (Architects, Builders, Quantity surveyors, and Civil engineers). A quantitative approach was adopted. This entailed the used of structured questionnaire to one (108) construction professionals in public and private organization within dutse metropolis. Frequency, mean, ranking and multiple linear regression using SPSS vision 25 software were used to analyses the data. The results show that Leadership, Trust, Communication tools, Communication skills, Stakeholders involvement, Cultural differences, and Communication technology were the most critical factors influencing effective communication among stakeholders on construction project delivery. The hypothesis revealed that, effective communication among stakeholders has significant effects on construction project delivery. This research work will profit the construction stakeholders in construction industry, by providing adequate knowledge regarding the factors influencing effective communication among stakeholders, so that necessary steps to be taken to improve project performance. Also, it will provide knowledge about the appropriate strategies to employ in order to improve communication among stakeholders.

Keywords: effetive communication, ineffective communication, stakeholders, project delivery

Procedia PDF Downloads 27
16893 Evaluating Performance of Value at Risk Models for the MENA Islamic Stock Market Portfolios

Authors: Abderrazek Ben Maatoug, Ibrahim Fatnassi, Wassim Ben Ayed

Abstract:

In this paper we investigate the issue of market risk quantification for Middle East and North Africa (MENA) Islamic market equity. We use Value-at-Risk (VaR) as a measure of potential risk in Islamic stock market, for long and short position, based on Riskmetrics model and the conditional parametric ARCH class model volatility with normal, student and skewed student distribution. The sample consist of daily data for the 2006-2014 of 11 Islamic stock markets indices. We conduct Kupiec and Engle and Manganelli tests to evaluate the performance for each model. The main finding of our empirical results show that (i) the superior performance of VaR models based on the Student and skewed Student distribution, for the significance level of α=1% , for all Islamic stock market indices, and for both long and short trading positions (ii) Risk Metrics model, and VaR model based on conditional volatility with normal distribution provides the best accurate VaR estimations for both long and short trading positions for a significance level of α=5%.

Keywords: value-at-risk, risk management, islamic finance, GARCH models

Procedia PDF Downloads 566
16892 The Effect of Technology in Improving Tourism Cluster Competitiveness

Authors: Michael Safwat Kotit Istemalek

Abstract:

In this study, a project on a small project called Zeytinseli, which plays an important role from the beginning to the end of olive oil and olive oil production, is presented with the help of tourism companies that play an important role in the tourism sector. In the study, first of all, a framework of ideas about travel agency, tourism, specific tourism agency and rural tourism was created and tourism knowledge in the modern world was emphasized. After this, the "olive", which had an important place in both mythology and the religion of God, disappeared in the field of rural tourism. Since Didim Zeytinseli is the Aydın district, accommodation prices were calculated within the scope of the project and a 15-day factory tour was given at the end of the project. It can be said that the study is an original study as it covers not only environmental and agricultural tourism but also cultural tourism and non-traditional tourism98.

Keywords: financial problems, the problems of tourism businesses, tourism businesses, internet, marketing, tourism, tourism management economic competitiveness, enhancing competitiveness

Procedia PDF Downloads 5
16891 Risk-Sharing Financing of Islamic Banks: Better Shielded against Interest Rate Risk

Authors: Mirzet SeHo, Alaa Alaabed, Mansur Masih

Abstract:

In theory, risk-sharing-based financing (RSF) is considered a corner stone of Islamic finance. It is argued to render Islamic banks more resilient to shocks. In practice, however, this feature of Islamic financial products is almost negligible. Instead, debt-based instruments, with conventional like features, have overwhelmed the nascent industry. In addition, the framework of present-day economic, regulatory and financial reality inevitably exposes Islamic banks in dual banking systems to problems of conventional banks. This includes, but is not limited to, interest rate risk. Empirical evidence has, thus far, confirmed such exposures, despite Islamic banks’ interest-free operations. This study applies system GMM in modeling the determinants of RSF, and finds that RSF is insensitive to changes in interest rates. Hence, our results provide support to the “stability” view of risk-sharing-based financing. This suggests RSF as the way forward for risk management at Islamic banks, in the absence of widely acceptable Shariah compliant hedging instruments. Further support to the stability view is given by evidence of counter-cyclicality. Unlike debt-based lending that inflates artificial asset bubbles through credit expansion during the upswing of business cycles, RSF is negatively related to GDP growth. Our results also imply a significantly strong relationship between risk-sharing deposits and RSF. However, the pass-through of these deposits to RSF is economically low. Only about 40% of risk-sharing deposits are channeled to risk-sharing financing. This raises questions on the validity of the industry’s claim that depositors accustomed to conventional banking shun away from risk sharing and signals potential for better balance sheet management at Islamic banks. Overall, our findings suggest that, on the one hand, Islamic banks can gain ‘independence’ from conventional banks and interest rates through risk-sharing products, the potential for which is enormous. On the other hand, RSF could enable policy makers to improve systemic stability and restrain excessive credit expansion through its countercyclical features.

Keywords: Islamic banks, risk-sharing, financing, interest rate, dynamic system GMM

Procedia PDF Downloads 300
16890 [Keynote Speech]: Risk Management during the Rendition Process: Use of Screen-Voice Recordings in Translator Training

Authors: Maggie Hui

Abstract:

Risk management is not a new concept; however, it is an uncharted area as applied to the translation process and translator training. Serving as one of the self-discovery activities in their practicum course, a two-cycle experiment was carried out with a class of 13 MA translation students with an attempt to explore their risk management while translating in a simulated setting that involves translator-client relations. To test the effects of the main variable of translators’ interaction with the simulated clients, the researcher employed control-group translators and two experiment groups (with Group A being the translator in Cycle 1 and the client in Cycle 2, and Group B on the client position in Cycle 1 and the translator position in Cycle 2). Experiment cycle 1 aims to explore if there would be any behavioral difference in risk management between translators with interaction with the simulated clients, i.e. experiment group A, and their counterparts without such interaction, i.e. control group. Design of Cycle 2 concerns the order of playing different roles of the translator and client in the experiment, and provides information to compare behavior of translators of the two experiment groups. Since this is process-oriented research, it is necessary to hypothesize what was happening in the translators’ minds. The researcher made use of a user-friendly screen-voice recording freeware to record subjects’ screen activities, including every word the translator typed and every change they made to the rendition, the websites they browsed and the reference tools they used, in addition to the verbalization of their thoughts throughout the process. The research observes the translation procedures subjects considered and finally adopted, and looks into the justifications for their procedures, in order to interpret their risk management. The qualitative and quantitative results of this study have some implications for translator training: (a) the experience of being a client seems to reinforce the translator’s risk aversion; (b) the use of role-playing simulation can empower students’ learning by enhancing their attitudinal or psycho-physiological competence, interpersonal competence and strategic competence; and (c) the screen-voice recordings serve as a helpful tool for learners to reflect on their rendition processes, i.e. what they performed satisfactorily and unsatisfactorily while translating and what they could do for improvement in future translation tasks.

Keywords: risk management, screen-voice recordings, simulated translator-client relations, translation pedagogy, translation process-oriented research

Procedia PDF Downloads 247
16889 Adopted Method of Information System Strategy for Knowledge Management System: A Literature Review

Authors: Elin Cahyaningsih, Dana Indra Sensuse, Wahyu Catur Wibowo, Sofiyanti Indriasari

Abstract:

Bureaucracy reform program drives Indonesian government to change their management and supporting unit in order to enhance their organization performance. Information technology as one of supporting unit became one of strategic plan that organization tried to improve, because IT can automate and speed up process, reduce business process life cycle become more effective and efficient. Knowledge management system is a technology application for supporting knowledge management implementation in government which is requirement based on problem and potential functionality of each knowledge management process. Define knowledge management that suitable for each organization it is difficult, that why we should make the knowledge management system strategy as an alignment of knowledge management process in the organization. Knowledge management system is one of information system development in people perspective, because this system has high dependency in human interaction and participation. Strategic plan for developing knowledge management system can be determine using some of information system strategic methods. This research conducted to define type of strategic method of information system, stage of activity each method, the strategic method strength and weakness. The author use literature review methods for identify and classify strategic methods of information system for differentiate method type, categorize common activities, strength and weakness. Result of this research are determine and compare six strategic information system methods, there are Balanced Scorecard, Five Force Porter, SWOT analysis, Value Chain Analysis, Risk Analysis and Gap Analysis. Balanced Scorecard and Risk Analysis believe as common strategic method that usually used and have the highest excellence strength.

Keywords: knowledge management system, balanced scorecard, five force, risk analysis, gap analysis, value chain analysis, SWOT analysis

Procedia PDF Downloads 437
16888 Effects of the Quality Construction of Public Construction in Taiwan to Implementation Three Levels Quality Management Institution

Authors: Hsin-Hung Lai, Wei Lo

Abstract:

Whether it is in virtue or vice for a construction quality of public construction project, it is one of the important indicators for national economic development and overall construction, the impact on the quality of national life is very deep. In recent years, a number of scandal of public construction project occurred, the requirements of the government agencies and the public require the quality of construction of public construction project are getting stricter than ever, the three-level public construction project construction quality of quality control system implemented by the government has a profound impact. This study mainly aggregated the evolution of ISO 9000 quality control system, the difference between the practice of implementing management of construction quality by many countries and three-level quality control of our country, so we explored and found that almost all projects of enhancing construction quality are dominated by civil organizations in foreign countries, whereas, it is induced by the national power in our country and develop our three-level quality control system and audit mechanism based on IOS system and implement the works by legislation, we also explored its enhancement and relevance with construction quality of public construction project that are intervened by such system and national power, and it really presents the effectiveness of construction quality been enhanced by the audited result. The three-level quality control system of our country to promote the policy of public construction project is almost same with the quality control system of many developed countries; however our country mainly implements such system on public construction project only, we promote the three-level quality control system is for enhancing the quality of public construction project, for establishing effective quality management system, so as to urge, correct and prevent the defects of quality management by manufacturers, whereas, those developed countries is comprehensively promoting (both public construction project and civil construction) such system. Therefore, this study is to explore the scope for public construction project only; the most important is the quality recognition by the executor, either good quality or deterioration is not a single event, there is a certain procedure extends from the demand and feasibility analysis, design, tendering, contracting, construction performance, inspection, continuous improvement, completion and acceptance, transferring and meeting the needs of the users, all of mentioned above have a causal relationship and it is a systemic problems. So the best construction quality would be manufactured and managed by reasonable cost if it is by extensive thinking and be preventive. We aggregated the implemented results in the past 10 years (2005 to 2015), the audited results of both in central units and local ones were slightly increased in A-grade while those listed in B-grade were decreased, although the levels were not evidently upgraded, yet, such result presents that the construction quality of concept of manufacturers are improving, and the construction quality has been established in the design stage, thus it is relatively beneficial to the enhancement of construction quality of overall public construction project.

Keywords: ISO 9000, three-level quality control system, audit and review mechanism for construction implementation, quality of construction implementation

Procedia PDF Downloads 316
16887 Risk Identification of Investment Feasibility in Indonesia’s Toll Road Infrastructure Investment

Authors: Christo Februanto Putra

Abstract:

This paper presents risk identification that affects investment feasibility on toll road infrastructure in Indonesia using qualitative methods survey based on the expert practitioner in investor, contractor, and state officials. The problems on infrastructure investment in Indonesia, especially on KPBU model contract, is many risk factors in the investment plan is not calculated in detail thoroughly. Risk factor is a value used to provide an overview of the risk level assessment of an event which is a function of the probability of the occurrence and the consequences of the risks that arise. As results of the survey which is to show which risk factors impacts directly to the investment feasibility and rank them by their impacts on the investment.

Keywords: risk identification, indonesia toll road, investment feasibility

Procedia PDF Downloads 253
16886 The Impact of Bim Technology on the Whole Process Cost Management of Civil Engineering Projects in Kenya

Authors: Nsimbe Allan

Abstract:

The study examines the impact of Building Information Modeling (BIM) on the cost management of engineering projects, focusing specifically on the Mombasa Port Area Development Project. The objective of this research venture is to determine the mechanisms through which Building Information Modeling (BIM) facilitates stakeholder collaboration, reduces construction-related expenses, and enhances the precision of cost estimation. Furthermore, the study investigates barriers to execution, assesses the impact on the project's transparency, and suggests approaches to maximize resource utilization. The study, selected for its practical significance and intricate nature, conducted a Systematic Literature Review (SLR) using credible databases, including ScienceDirect and IEEE Xplore. To constitute the diverse sample, 69 individuals, including project managers, cost estimators, and BIM administrators, were selected via stratified random sampling. The data were obtained using a mixed-methods approach, which prioritized ethical considerations. SPSS and Microsoft Excel were applied to the analysis. The research emphasizes the crucial role that project managers, architects, and engineers play in the decision-making process (47% of respondents). Furthermore, a significant improvement in cost estimation accuracy was reported by 70% of the participants. It was found that the implementation of BIM resulted in enhanced project visibility, which in turn optimized resource allocation and facilitated the process of budgeting. In brief, the study highlights the positive impacts of Building Information Modeling (BIM) on collaborative decision-making and cost estimation, addresses challenges related to implementation, and provides solutions for the efficient assimilation and understanding of BIM principles.

Keywords: cost management, resource utilization, stakeholder collaboration, project transparency

Procedia PDF Downloads 32
16885 The Successful in Construction Project via Effectiveness of Project Team

Authors: Zarabizan Zakaria, Hayati Zainal

Abstract:

The construction industry is one of the most important sectors that contribute to the nation’s economy and catalyze towards the growth of other industries. However, some construction projects have not been completed on its stipulated time and duration, scope and budget due to several factors. This problem arises due to the weaknesses of human factors, especially from ineffective leadership quality practiced by project managers and contractors in managing project teams. Therefore, a construction project should impose the element of Project Team. The project team is formed in the implementation of the project which includes the project brief, project scope, customer requirements and provided designs. Many organizations in the construction sector use teams to meet today's global competition and customer expectations, however, team effectiveness evaluation is required. In insuring the construction team is successful and effectiveness, the construction department must encourage, measure, set up, and evaluate or review the effectiveness of project team that was formed. In order to produce a better outcome for a high-end project, an effective and efficient project team is required which also help in increasing overall productivity. The purpose of this study is to determine the role of team effectiveness in the construction project team based on the overall construction project performance. It examines several different factors which related to team effectiveness. It also examines the relationship between team effectiveness factor and project performance aspect. Team Effect Review and Project Performance Review are developed to be used for data collection. Data collected were analyzed using several statistical tests. Results obtained from data analysis are validated using semi-structured interviews. Besides that, a comprehensive survey were developed to assess the way construction project teams in order to maintain its effectiveness throughout the project phase. In order to determine a project successful it has been found that Project Team Leadership is the most important factor. In addition, the definition of team effectiveness in the construction project team is developed based on the perspective of project clients and project team members. The results of this study are expected to provide an idea on the factors that are needed to be focused on improving the team's effectiveness towards project performance aspects. At the same time, the definition of team effectiveness from team members and owner views has been developed in order to provide a better understanding of the word team's effectiveness in construction projects.

Keywords: project team, leadership, construction project, project successful

Procedia PDF Downloads 149
16884 Using Collaborative Planning to Develop a Guideline for Integrating Biodiversity into Land Use Schemes

Authors: Sagwata A. Manyike, Hulisani Magada

Abstract:

The South African National Biodiversity Institute is in the process of developing a guideline which sets out how biodiversity can be incorporated into land use (zoning) schemes. South Africa promulgated its Spatial Planning and Land Use Management Act in 2015 and the act seeks, amongst other things, to bridge the gap between spatial planning and land use management within the country. In addition, the act requires local governments to develop wall-to-wall land use schemes for their entire jurisdictions as they had previously only developed them for their urban areas. At the same time, South Africa has a rich history of systematic conservation planning whereby Critical Biodiversity Areas and Ecological Support Areas have been spatially delineated at a scale appropriate for spatial planning and land use management at the scale of local government. South Africa is also in the process of spatially delineating ecological infrastructure which is defined as naturally occurring ecosystems which provide valuable services to people such as water and climate regulation, soil formation, disaster risk reduction, etc. The Biodiversity and Land Use Project, which is funded by the Global Environmental Facility through the United Nations Development Programme is seeking to explore ways in which biodiversity information and ecological infrastructure can be incorporated into the spatial planning and land use management systems of local governments. Towards this end, the Biodiversity and Land Use Project have developed a guideline which sets out how local governments can integrate biodiversity into their land-use schemes as a way of not only ensuring sustainable development but also as a way helping them prepare for climate change. In addition, by incorporating biodiversity into land-use schemes, the project is exploring new ways of protecting biodiversity through land use schemes. The Guideline for Incorporating Biodiversity into Land Use Schemes was developed as a response to the fact that the National Land Use Scheme Guidelines only indicates that local governments needed to incorporate biodiversity without explaining how this could be achieved. The Natioanl Guideline also failed to specify which biodiversity-related layers are compatible with which land uses or what the benefits of incorporating biodiversity into the schemes will be for that local government. The guideline, therefore, sets out an argument for why biodiversity is important in land management processes and proceeds to provide a step by step guideline for how schemes can integrate priority biodiversity layers. This guideline will further be added as an addendum to the National Land Use Guidelines. Although the planning act calls for local government to have wall to wall schemes within 5 years of its enactment, many municipalities will not meet this deadline and so this guideline will support them in the development of their new schemes.

Keywords: biodiversity, climate change, land use schemes, local government

Procedia PDF Downloads 142
16883 A Multilevel Approach for Stroke Prediction Combining Risk Factors and Retinal Images

Authors: Jeena R. S., Sukesh Kumar A.

Abstract:

Stroke is one of the major reasons of adult disability and morbidity in many of the developing countries like India. Early diagnosis of stroke is essential for timely prevention and cure. Various conventional statistical methods and computational intelligent models have been developed for predicting the risk and outcome of stroke. This research work focuses on a multilevel approach for predicting the occurrence of stroke based on various risk factors and invasive techniques like retinal imaging. This risk prediction model can aid in clinical decision making and help patients to have an improved and reliable risk prediction.

Keywords: prediction, retinal imaging, risk factors, stroke

Procedia PDF Downloads 276
16882 Building Information Modeling Implementation for Managing an Extra Large Governmental Building Renovation Project

Authors: Pornpote Nusen, Manop Kaewmoracharoen

Abstract:

In recent years, there was an observable shift in fully developed countries from constructing new buildings to modifying existing buildings. The issue was that although an effective instrument like BIM (Building Information Modeling) was well developed for constructing new buildings, it was not widely used to renovate old buildings. BIM was accepted as an effective means to overcome common managerial problems such as project delay, cost overrun, and poor quality of the project life cycle. It was recently introduced in Thailand and rarely used in a renovation project. Today, in Thailand, BIM is mostly used for creating aesthetic 3D models and quantity takeoff purposes, though it can be an effective tool to use as a project management tool in planning and scheduling. Now the governmental sector in Thailand begins to recognize the uses of using BIM to manage a construction project, but the knowledge about the BIM implementation to governmental construction projects is underdeveloped. Further studies need to be conducted to maximize its advantages for the governmental sector. An educational extra large governmental building of 17,000 square-meters was used in this research. It is currently under construction for a two-year renovation project. BIM models of the building for the exterior and interior areas were created for the whole five floors. Then 4D BIM with combination of 3D BIM plus time was created for planning and scheduling. Three focus groups had been done with executive committee, contractors, and officers of the building to discuss the possibility of usage and usefulness of BIM approach over the traditional process. Several aspects were discussed in the positive sides, especially several foreseen problems, such as the inadequate accessibility of ways, the altered ceiling levels, the impractical construction plan created through a traditional approach, and the lack of constructability information. However, for some parties, the cost of BIM implementation was a concern, though, this study believes, its uses outweigh the cost.

Keywords: building information modeling, extra large building, governmental building renovation, project management, renovation, 4D BIM

Procedia PDF Downloads 128
16881 Integrated Formulation of Project Scheduling and Material Procurement Considering Different Discount Options

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

On-time availability of materials in the construction sites plays an outstanding role in successful achievement of project’s deliverables. Thus, this paper has investigated formulation of project scheduling and material procurement at the same time, by a mixed-integer programming model, aiming to minimize/maximize penalty/reward to deliver the project and minimize material holding, ordering, and procurement costs, respectively. We have taken both all-units and incremental discount possibilities into consideration to address more flexibility from the procurement side with regard to real world conditions. Finally, the applicability and efficiency of the mathematical model is tested by different numerical examples.

Keywords: discount strategies, material purchasing, project planning, project scheduling

Procedia PDF Downloads 236
16880 Management of Diabetics on Hemodialysis

Authors: Souheila Zemmouchi

Abstract:

Introduction: Diabetes is currently the leading cause of end-stage chronic kidney disease and dialysis, so it adds additional complexity to the management of chronic hemodialysis patients. These patients are extremely fragile because of their multiple cardiovascular and metabolic comorbidities. Clear and complete description of the experience: the management of a diabetic on hemodialysis is particularly difficult due to frequent hypoglycaemia and significant inter and perdialyticglycemic variability that is difficult to predict. The aim of our study is to describe the clinical-biological profile and to assess the cardiovascular risk of diabetics undergoing chronic hemodialysis, and compare them with non-diabetic hemodialysis patients. Methods: This cross-sectional, descriptive, and analytical study was carried out between January 01 and December 31, 2018, involving 309 hemodialysis patients spread over 4 centersThe data were collected prospectively then compiled and analyzed by the SPSS Version 10 software The FRAMINGHAM RISK SCORE has been used to assess cardiovascular risk in all hemodialysis patients Results: The survey involved 309 hemodialysis patients, including 83 diabetics, for a prevalence of 27% The average age 53 ± 10.2 years. The sex ratio is 1.5. 50% of diabetic hemodialysis patients retained residual diuresis against 32% in non-diabetics. In the group of diabetics, we noted more hypertension (70% versus 38% non-diabetics P 0.004), more intradialytichypoglycemia (15% versus 3% non-diabetics P 0.007), initially, vascular exhaustion was found in 4 diabetics versus 2 non-diabetics. 70% of diabetics with anuria had postdialytichyperglycemia. The study found a statistically significant difference between the different levels of cardiovascular risk according to the diabetic status. Conclusion: There are many challenges in the management of diabetics on hemodialysis, both to optimize glycemic control according to an individualized target and to coordinate comprehensive and effective care.

Keywords: hemodialysis, diabetes, chronic renal failure, glycemic control

Procedia PDF Downloads 138
16879 Supply Chain Optimization through Vulnerability Control and Risk Prevention in Chicken Meat Use

Authors: Moise A.E., State G., Tudorache M., Custură I., Enea D.N., Osman (Defta) A., Drăgotoiu D.

Abstract:

This scientific paper explores risk management strategies in the food supply chain, with a focus on chicken raw materials, in the context of a company sourcing from the EU and non-EU. The aim of the paper is to adapt the requirements of international standards (IFS, BRC, QS, ITW, FSSC, ISO), proposing efficient methods to identify and remediate non-conformities and corrective and preventive actions. Defining the supply flow and acceptance steps promotes collaboration with suppliers to ensure the quality and safety of raw materials. To assess the risks of suppliers and raw materials, objective criteria are developed and vulnerabilities in the supply chain are analyzed, including the risk of fraud. Active monitoring of international alerts through RASFF helps to identify emerging risks quickly, and regular analysis of international trends and company performance enables continuous adaptation of risk management strategies. Implementing these measures strengthens food safety and consumer confidence in the final products supplied.

Keywords: food supply chain, international standards, quality and safety of raw materials, RASFF

Procedia PDF Downloads 28
16878 Following the Caravans: Interdisciplinary Study to Integrate Chinese and African Relations in Ethiopia

Authors: E. Mattio

Abstract:

The aim of this project is to study the Chinese presence in Ethiopia, following the path of the last salt caravans from Danakil to Tigray region. Official estimates of the number of Chinese in Africa vary widely; on the continent, there are increasingly diverse groups of Chinese migrants in terms of language, dialect, class, education, and employment. Based on this and on a very general state of the art, it was decided to increase the studies on this phenomenon, documenting the extraction of salt and following the sellers in the north of the country. The project is unique and allows you to admire a landscape that will soon change, due to the construction of infrastructure that is changing the dynamics of movement and sales. To carry out this study, interdisciplinary investigation methods were integrated, such as landscape archeology, historiographic research, participatory anthropology, geopolitics, and cultural anthropology and ethnology. There are two main objectives of the research. The first was an analysis of risk perceptions to predict what will happen to these populations and how the territory will be modified, trying to monitor the growth of infrastructure in the country and the effects it will have on the population. Thanks to the use of GIS, some roads created by Chinese companies that worked in the area have been georeferenced. The second point was to document the life and rituals of Ethiopian populations, in order not to lose the aspects of uniqueness that risk being lost. The local interviews have garnered impressions and criticisms from the local population to understand whether the Chinese presence is perceived as a threat or a solution. Among the most exclusive interviews, there are those made to Afar leaders in the Logya area and some Coptic representatives in the Wukro area. To make this project even more unique, the Coptic rituals of Gennà and Timkat have been documented, unique expressions of a millennial tradition. The aim was to understand whether the Maoist presence began to influence the religious rites and forms of belief present in the country.

Keywords: China, Ethiopia, GIS, risk perceptions

Procedia PDF Downloads 132
16877 Text2Time: Transformer-Based Article Time Period Prediction

Authors: Karthick Prasad Gunasekaran, B. Chase Babrich, Saurabh Shirodkar, Hee Hwang

Abstract:

Construction preparation is crucial for the success of a construction project. By involving project participants early in the construction phase, project managers can plan ahead and resolve issues early, resulting in project success and satisfaction. This study uses quantitative data from construction management projects to determine the relationship between the pre-construction phase, construction schedule, and customer satisfaction. This study examined a total of 65 construction projects and 93 clients per job to (a) identify the relationship between the pre-construction phase and program reduction and (b) the pre-construction phase and customer retention. Based on a quantitative analysis, this study found a negative correlation between pre-construction status and project schedule in 65 construction projects. This finding means that the more preparatory work done on a particular project, the shorter the total construction time. The Net Promoter Score of 93 clients from 65 projects was then used to determine the relationship between construction preparation and client satisfaction. The pre-construction status and the projects were further analyzed, and a positive correlation between them was found. This shows that customers are happier with projects with a higher ready-to-build ratio than projects with less ready-to-build.

Keywords: NLP, BERT, LLM, deep learning, classification

Procedia PDF Downloads 70
16876 Automated Manual Handling Risk Assessments: Practitioner Experienced Determinants of Automated Risk Analysis and Reporting Being a Benefit or Distraction

Authors: S. Cowley, M. Lawrance, D. Bick, R. McCord

Abstract:

Technology that automates manual handling (musculoskeletal disorder or MSD) risk assessments is increasingly available to ergonomists, engineers, generalist health and safety practitioners alike. The risk assessment process is generally based on the use of wearable motion sensors that capture information about worker movements for real-time or for posthoc analysis. Traditionally, MSD risk assessment is undertaken with the assistance of a checklist such as that from the SafeWork Australia code of practice, the expert assessor observing the task and ideally engaging with the worker in a discussion about the detail. Automation enables the non-expert to complete assessments and does not always require the assessor to be there. This clearly has cost and time benefits for the practitioner but is it an improvement on the assessment by the human. Human risk assessments draw on the knowledge and expertise of the assessor but, like all risk assessments, are highly subjective. The complexity of the checklists and models used in the process can be off-putting and sometimes will lead to the assessment becoming the focus and the end rather than a means to an end; the focus on risk control is lost. Automated risk assessment handles the complexity of the assessment for the assessor and delivers a simple risk score that enables decision-making regarding risk control. Being machine-based, they are objective and will deliver the same each time they assess an identical task. However, the WHS professional needs to know that this emergent technology asks the right questions and delivers the right answers. Whether it improves the risk assessment process and results or simply distances the professional from the task and the worker. They need clarity as to whether automation of manual task risk analysis and reporting leads to risk control or to a focus on the worker. Critically, they need evidence as to whether automation in this area of hazard management leads to better risk control or just a bigger collection of assessments. Practitioner experienced determinants of this automated manual task risk analysis and reporting being a benefit or distraction will address an understanding of emergent risk assessment technology, its use and things to consider when making decisions about adopting and applying these technologies.

Keywords: automated, manual-handling, risk-assessment, machine-based

Procedia PDF Downloads 97
16875 Bayesian Value at Risk Forecast Using Realized Conditional Autoregressive Expectiel Mdodel with an Application of Cryptocurrency

Authors: Niya Chen, Jennifer Chan

Abstract:

In the financial market, risk management helps to minimize potential loss and maximize profit. There are two ways to assess risks; the first way is to calculate the risk directly based on the volatility. The most common risk measurements are Value at Risk (VaR), sharp ratio, and beta. Alternatively, we could look at the quantile of the return to assess the risk. Popular return models such as GARCH and stochastic volatility (SV) focus on modeling the mean of the return distribution via capturing the volatility dynamics; however, the quantile/expectile method will give us an idea of the distribution with the extreme return value. It will allow us to forecast VaR using return which is direct information. The advantage of using these non-parametric methods is that it is not bounded by the distribution assumptions from the parametric method. But the difference between them is that expectile uses a second-order loss function while quantile regression uses a first-order loss function. We consider several quantile functions, different volatility measures, and estimates from some volatility models. To estimate the expectile of the model, we use Realized Conditional Autoregressive Expectile (CARE) model with the bayesian method to achieve this. We would like to see if our proposed models outperform existing models in cryptocurrency, and we will test it by using Bitcoin mainly as well as Ethereum.

Keywords: expectile, CARE Model, CARR Model, quantile, cryptocurrency, Value at Risk

Procedia PDF Downloads 88
16874 Identifying Project Delay Factors in the Australian Construction Industry

Authors: Syed Sohaib Bin Hasib, Hiyam Al-Kilidar

Abstract:

Meeting project deadlines is a major challenge for most construction projects. In this study, perceptions of contractors, clients, and consultants are compared relative to a list of factors derived from the review of the extant literature on project delay. 59 causes (categorized into 8 groups) of project delays were identified from the literature. A survey was devised to get insights and ranking of these factors from clients, consultants & contractors in the Australian construction industry. Findings showed that project delays in the Australian construction industry are mainly the result of skill shortages, interference in execution, and poor coordination and communication between the project stakeholders.

Keywords: construction, delay factors, time delay, australian construction industry

Procedia PDF Downloads 147