Search results for: construction supply-chain management
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 12824

Search results for: construction supply-chain management

12434 Identifying Strategies and Techniques for the Egyptian Medium and Large Size Contractors to Respond to Economic Hardship

Authors: Michael Salib, Samer Ezeldin, Ahmed Waly

Abstract:

There are numerous challenges and problems facing the construction industry in several countries in the Middle East, as a result of numerous economic and political effects. As an example in Egypt, several construction companies have shut down and left the market since 2016. The closure of these companies occurred, as they did not respond with the suitable techniques and strategies that will enable them to survive during this economic turmoil period. A research is conducted in order to identify adequate strategies to be implemented by the Egyptian contractors that could allow them survive and keep competing during such economic hardship period. Two different techniques were used in order to identify these startegies. First, a deep research were conducted on the companies located in countries that suffered similar economic harship to identify the strategies they used in order to survive. Second, interviews were conducted with experts in the construction field in order to list the effective strategies they used that allowed them to survive. Moreover, at the end of each interview, the experts were asked to rate the applicability of the previously identified strategies used in the foreign countries, then the efficiency of each strategy if used in Egypt. A framework model is developed in order to assist the construction companies in choosing the suitable techniques to their company size, through identifying the top ranked strategies and techniques that should be adopted by the company based on the parameters given to the model. In order to verify this framework, the financial statements of two leading companies in the Egyptian construction market were studied. The first Contractor has applied nearly all the top ranked strategies identified in this paper, while the other contractor has applied only few of the identified top ranked strategies. Finally, another expert interviews were conducted in order to validate the framework. These experts were asked to test the model and rate through a questionnaire its applicability and effectiveness.

Keywords: construction management, economic hardship, recession, survive

Procedia PDF Downloads 126
12433 Reliability Analysis of Construction Schedule Plan Based on Building Information Modelling

Authors: Lu Ren, You-Liang Fang, Yan-Gang Zhao

Abstract:

In recent years, the application of BIM (Building Information Modelling) to construction schedule plan has been the focus of more and more researchers. In order to assess the reasonable level of the BIM-based construction schedule plan, that is whether the schedule can be completed on time, some researchers have introduced reliability theory to evaluate. In the process of evaluation, the uncertain factors affecting the construction schedule plan are regarded as random variables, and probability distributions of the random variables are assumed to be normal distribution, which is determined using two parameters evaluated from the mean and standard deviation of statistical data. However, in practical engineering, most of the uncertain influence factors are not normal random variables. So the evaluation results of the construction schedule plan will be unreasonable under the assumption that probability distributions of random variables submitted to the normal distribution. Therefore, in order to get a more reasonable evaluation result, it is necessary to describe the distribution of random variables more comprehensively. For this purpose, cubic normal distribution is introduced in this paper to describe the distribution of arbitrary random variables, which is determined by the first four moments (mean, standard deviation, skewness and kurtosis). In this paper, building the BIM model firstly according to the design messages of the structure and making the construction schedule plan based on BIM, then the cubic normal distribution is used to describe the distribution of the random variables due to the collecting statistical data of the random factors influencing construction schedule plan. Next the reliability analysis of the construction schedule plan based on BIM can be carried out more reasonably. Finally, the more accurate evaluation results can be given providing reference for the implementation of the actual construction schedule plan. In the last part of this paper, the more efficiency and accuracy of the proposed methodology for the reliability analysis of the construction schedule plan based on BIM are conducted through practical engineering case.

Keywords: BIM, construction schedule plan, cubic normal distribution, reliability analysis

Procedia PDF Downloads 147
12432 Smart Construction Sites in KSA: Challenges and Prospects

Authors: Ahmad Mohammad Sharqi, Mohamed Hechmi El Ouni, Saleh Alsulamy

Abstract:

Due to the emerging technologies revolution worldwide, the need to exploit and employ innovative technologies for other functions and purposes in different aspects has become a remarkable matter. Saudi Arabia is considered one of the most powerful economic countries in the world, where the construction sector participates effectively in its economy. Thus, the construction sector in KSA should convoy the rapid digital revolution and transformation and implement smart devices on sites. A Smart Construction Site (SCS) includes smart devices, artificial intelligence, the internet of things, augmented reality, building information modeling, geographical information systems, and cloud information. This paper aims to study the level of implementation of SCS in KSA, analyze the obstacles and challenges of adopting SCS and find out critical success factors for its implementation. A survey of close-ended questions (scale and multi-choices) has been conducted on professionals in the construction sector of Saudi Arabia. A total number of twenty-nine questions has been prepared for respondents. Twenty-four scale questions were established, and those questions were categorized into several themes: quality, scheduling, cost, occupational safety and health, technologies and applications, and general perception. Consequently, the 5-point Likert scale tool (very low to very high) was adopted for this survey. In addition, five close-ended questions with multi-choice types have also been prepared; these questions have been derived from a previous study implemented in the United Kingdom (UK) and the Dominic Republic (DR), these questions have been rearranged and organized to fit the structured survey in order to place the Kingdom of Saudi Arabia in comparison with the United Kingdom (UK) as well as the Dominican Republic (DR). A total number of one hundred respondents have participated in this survey from all regions of the Kingdom of Saudi Arabia: southern, central, western, eastern, and northern regions. The drivers, obstacles, and success factors for implementing smart devices and technologies in KSA’s construction sector have been investigated and analyzed. Besides, it has been concluded that KSA is on the right path toward adopting smart construction sites with attractive results comparable to and even better than the UK in some factors.

Keywords: artificial intelligence, construction projects management, internet of things, smart construction sites, smart devices

Procedia PDF Downloads 156
12431 Deviations and Defects of the Sub-Task’s Requirements in Construction Projects

Authors: Abdullah Almusharraf, Andrew Whyte

Abstract:

The sub-task pattern in terms of the deviations and defects should be identified and understand in order to improve the quality practices in construction projects. Therefore, the sub-task susceptibility to exposure to deviations and defects have been evaluated and classified via six classifications that have proposed in this study. 34 case studies on specific sub-task (from compression member in construction concrete structure) have been collected from seven construction projects in order to examined study’s classifications. The study revealed that the sub-task has high sensitive to deviation where (91%) of the cases recorded as deviations, however, only (19%) of cases recorded as defects. Another findings were that the actual work during the execution process has high source of deviation for this sub-task (74%) while only (26%) of the deviation source was due to both design documentations with the actual work. These findings significantly imply that it could be used the study’s classifications to determine the pattern of each sub-task and develop the proactive actions to overcome issues of the sub-task deviations and defects.

Keywords: sub-tasks, deviations, defects, quality, construction projects

Procedia PDF Downloads 444
12430 A Machine Learning Approach for Efficient Resource Management in Construction Projects

Authors: Soheila Sadeghi

Abstract:

Construction projects are complex and often subject to significant cost overruns due to the multifaceted nature of the activities involved. Accurate cost estimation is crucial for effective budget planning and resource allocation. Traditional methods for predicting overruns often rely on expert judgment or analysis of historical data, which can be time-consuming, subjective, and may fail to consider important factors. However, with the increasing availability of data from construction projects, machine learning techniques can be leveraged to improve the accuracy of overrun predictions. This study applied machine learning algorithms to enhance the prediction of cost overruns in a case study of a construction project. The methodology involved the development and evaluation of two machine learning models: Random Forest and Neural Networks. Random Forest can handle high-dimensional data, capture complex relationships, and provide feature importance estimates. Neural Networks, particularly Deep Neural Networks (DNNs), are capable of automatically learning and modeling complex, non-linear relationships between input features and the target variable. These models can adapt to new data, reduce human bias, and uncover hidden patterns in the dataset. The findings of this study demonstrate that both Random Forest and Neural Networks can significantly improve the accuracy of cost overrun predictions compared to traditional methods. The Random Forest model also identified key cost drivers and risk factors, such as changes in the scope of work and delays in material delivery, which can inform better project risk management. However, the study acknowledges several limitations. First, the findings are based on a single construction project, which may limit the generalizability of the results to other projects or contexts. Second, the dataset, although comprehensive, may not capture all relevant factors influencing cost overruns, such as external economic conditions or political factors. Third, the study focuses primarily on cost overruns, while schedule overruns are not explicitly addressed. Future research should explore the application of machine learning techniques to a broader range of projects, incorporate additional data sources, and investigate the prediction of both cost and schedule overruns simultaneously.

Keywords: resource allocation, machine learning, optimization, data-driven decision-making, project management

Procedia PDF Downloads 40
12429 The Utilization of Recycled Construction and Demolition Waste Aggregate in Asphaltic Concrete

Authors: Inas Kamel, Noor Z. Habib

Abstract:

Utilizing construction and demolition wastes in hotmix asphalt (HMA) pavement construction can reduce the adverse environmental effect of its inadequate disposal and reduce the pressure of extracting and processing mineral aggregates (MA). This study aims to examine the viability of replacing MA by recycled construction and demolition waste aggregates (RCDWA) in the wearing course of asphaltic concrete (AC) pavements without compromising its loadbearing capacity. The Marshall Method was used to evaluate the performance of AC wearing course specimens by replacing MA by 10%, 20% and 30% RCDWA. Grade 60/70 bitumen was used in the range 3.0-5.5%, with 05% increments, to generate the optimum bitumen content (OBC). From the volumetric analysis and test property curves, the mixture containing 20% RCDWA was chosen as the preferred mix at 5.1% OBC. It possessed a 10% increase in Marshall Stability compared to the reference specimen, containing 100% MA, and a 6% increase in Marshall flow.

Keywords: aggregate, asphaltic concrete, Marshall method, optimum bitumen content, recycled construction and demolition waste

Procedia PDF Downloads 156
12428 A Systematic Review on Development of a Cost Estimation Framework: A Case Study of Nigeria

Authors: Babatunde Dosumu, Obuks Ejohwomu, Akilu Yunusa-Kaltungo

Abstract:

Cost estimation in construction is often difficult, particularly when dealing with risks and uncertainties, which are inevitable and peculiar to developing countries like Nigeria. Direct consequences of these are major deviations in cost, duration, and quality. The fundamental aim of this study is to develop a framework for assessing the impacts of risk on cost estimation, which in turn causes variabilities between contract sum and final account. This is very important, as initial estimates given to clients should reflect the certain magnitude of consistency and accuracy, which the client builds other planning-related activities upon, and also enhance the capabilities of construction industry professionals by enabling better prediction of the final account from the contract sum. In achieving this, a systematic literature review was conducted with cost variability and construction projects as search string within three databases: Scopus, Web of science, and Ebsco (Business source premium), which are further analyzed and gap(s) in knowledge or research discovered. From the extensive review, it was found that factors causing deviation between final accounts and contract sum ranged between 1 and 45. Besides, it was discovered that a cost estimation framework similar to Building Cost Information Services (BCIS) is unavailable in Nigeria, which is a major reason why initial estimates are very often inconsistent, leading to project delay, abandonment, or determination at the expense of the huge sum of money invested. It was concluded that the development of a cost estimation framework that is adjudged an important tool in risk shedding rather than risk-sharing in project risk management would be a panacea to cost estimation problems, leading to cost variability in the Nigerian construction industry by the time this ongoing Ph.D. research is completed. It was recommended that practitioners in the construction industry should always take into account risk in order to facilitate the rapid development of the construction industry in Nigeria, which should give stakeholders a more in-depth understanding of the estimation effectiveness and efficiency to be adopted by stakeholders in both the private and public sectors.

Keywords: cost variability, construction projects, future studies, Nigeria

Procedia PDF Downloads 210
12427 Integrating Sustainable Construction Principles into Curriculum Design for Built Environment Professional Programs in Nigeria

Authors: M. Yakubu, M. B. Isah, S. Bako

Abstract:

This paper presents the findings of a research which sought to investigate the readiness to integrate sustainable construction principles into curriculum design for built environment professional programs in the Nigerian Universities. Developing the knowledge and understanding that construction professionals acquire of sustainable construction practice leads to considerable improvement in the environmental performance of the construction sector. Integrating sustainable environmental issues within the built environment education curricula provide the basis of this research. An integration of sustainable development principles into the universities built environment professional programmes are carried out with a view of finding solutions to the key issues identified. The perspectives of academia have been assessed and findings tested for validity through the analysis of primary quantitative data that has been collected. The secondary data generated has shown that there are significant differences in the approach to curriculum design within the built environment professional programmes, and this reveals that there is no ‘best practice’ that is clearly identifiable. Sequel to the above, this research reveals that engaging all stakeholders would be a useful component of built environment curriculum development, and that the curriculum be negotiated with interested parties. These parties have been identified as academia, government, construction industry and built environment professionals.

Keywords: built environment, curriculum development, sustainable construction, sustainable development

Procedia PDF Downloads 420
12426 The Successful in Construction Project via Effectiveness of Project Team

Authors: Zarabizan Zakaria, Hayati Zainal

Abstract:

The construction industry is one of the most important sectors that contribute to the nation’s economy and catalyze towards the growth of other industries. However, some construction projects have not been completed on its stipulated time and duration, scope and budget due to several factors. This problem arises due to the weaknesses of human factors, especially from ineffective leadership quality practiced by project managers and contractors in managing project teams. Therefore, a construction project should impose the element of Project Team. The project team is formed in the implementation of the project which includes the project brief, project scope, customer requirements and provided designs. Many organizations in the construction sector use teams to meet today's global competition and customer expectations, however, team effectiveness evaluation is required. In insuring the construction team is successful and effectiveness, the construction department must encourage, measure, set up, and evaluate or review the effectiveness of project team that was formed. In order to produce a better outcome for a high-end project, an effective and efficient project team is required which also help in increasing overall productivity. The purpose of this study is to determine the role of team effectiveness in the construction project team based on the overall construction project performance. It examines several different factors which related to team effectiveness. It also examines the relationship between team effectiveness factor and project performance aspect. Team Effect Review and Project Performance Review are developed to be used for data collection. Data collected were analyzed using several statistical tests. Results obtained from data analysis are validated using semi-structured interviews. Besides that, a comprehensive survey were developed to assess the way construction project teams in order to maintain its effectiveness throughout the project phase. In order to determine a project successful it has been found that Project Team Leadership is the most important factor. In addition, the definition of team effectiveness in the construction project team is developed based on the perspective of project clients and project team members. The results of this study are expected to provide an idea on the factors that are needed to be focused on improving the team's effectiveness towards project performance aspects. At the same time, the definition of team effectiveness from team members and owner views has been developed in order to provide a better understanding of the word team's effectiveness in construction projects.

Keywords: project team, leadership, construction project, project successful

Procedia PDF Downloads 177
12425 An Exploratory Study to Appraise the Current Challenges and Limitations Faced in Applying and Integrating the Historic Building Information Modelling Concept for the Management of Historic Buildings

Authors: Oluwatosin Adewale

Abstract:

The sustainability of built heritage has become a relevant issue in recent years due to the social and economic values associated with these buildings. Heritage buildings provide a means for human perception of culture and represent a legacy of long-existing history; they define the local character of the social world and provide a vital connection to the past with their associated aesthetical and communal benefits. The identified values of heritage buildings have increased the importance of conservation and the lifecycle management of these buildings. The recent developments of digital design technology in engineering and the built environment have led to the adoption of Building Information Modelling (BIM) by the Architecture, Engineering, Construction, and Operations (AECO) industry. BIM provides a platform for the lifecycle management of a construction project through effective collaboration among stakeholders and the analysis of a digital information model. This growth in digital design technology has also made its way into the field of architectural heritage management in the form of Historic Building Information Modelling (HBIM). A reverse engineering process for digital documentation of heritage assets that draws upon similar information management processes as the BIM process. However, despite the several scientific and technical contributions made to the development of the HBIM process, it doesn't remain easy to integrate at the most practical level of heritage asset management. The main objective identified under the scope of the study is to review the limitations and challenges faced by heritage management professionals in adopting an HBIM-based asset management procedure for historic building projects. This paper uses an exploratory study in the form of semi-structured interviews to investigate the research problem. A purposive sample of heritage industry experts and professionals were selected to take part in a semi-structured interview to appraise some of the limitations and challenges they have faced with the integration of HBIM into their project workflows. The findings from this study will present the challenges and limitations faced in applying and integrating the HBIM concept for the management of historic buildings.

Keywords: building information modelling, built heritage, heritage asset management, historic building information modelling, lifecycle management

Procedia PDF Downloads 98
12424 Development of Building Information Modeling in Property Industry: Beginning with Building Information Modeling Construction

Authors: B. Godefroy, D. Beladjine, K. Beddiar

Abstract:

In France, construction BIM actors commonly evoke the BIM gains for exploitation by integrating of the life cycle of a building. The standardization of level 7 of development would achieve this stage of the digital model. The householders include local public authorities, social landlords, public institutions (health and education), enterprises, facilities management companies. They have a dual role: owner and manager of their housing complex. In a context of financial constraint, the BIM of exploitation aims to control costs, make long-term investment choices, renew the portfolio and enable environmental standards to be met. It assumes a knowledge of the existing buildings, marked by its size and complexity. The information sought must be synthetic and structured, it concerns, in general, a real estate complex. We conducted a study with professionals about their concerns and ways to use it to see how householders could benefit from this development. To obtain results, we had in mind the recurring interrogation of the project management, on the needs of the operators, we tested the following stages: 1) Inculcate a minimal culture of BIM with multidisciplinary teams of the operator then by business, 2) Learn by BIM tools, the adaptation of their trade in operations, 3) Understand the place and creation of a graphic and technical database management system, determine the components of its library so their needs, 4) Identify the cross-functional interventions of its managers by business (operations, technical, information system, purchasing and legal aspects), 5) Set an internal protocol and define the BIM impact in their digital strategy. In addition, continuity of management by the integration of construction models in the operation phase raises the question of interoperability in the control of the production of IFC files in the operator’s proprietary format and the export and import processes, a solution rivaled by the traditional method of vectorization of paper plans. Companies that digitize housing complex and those in FM produce a file IFC, directly, according to their needs without recourse to the model of construction, they produce models business for the exploitation. They standardize components, equipment that are useful for coding. We observed the consequences resulting from the use of the BIM in the property industry and, made the following observations: a) The value of data prevail over the graphics, 3D is little used b) The owner must, through his organization, promote the feedback of technical management information during the design phase c) The operator's reflection on outsourcing concerns the acquisition of its information system and these services, observing the risks and costs related to their internal or external developments. This study allows us to highlight: i) The need for an internal organization of operators prior to a response to the construction management ii) The evolution towards automated methods for creating models dedicated to the exploitation, a specialization would be required iii) A review of the communication of the project management, management continuity not articulating around his building model, it must take into account the environment of the operator and reflect on its scope of action.

Keywords: information system, interoperability, models for exploitation, property industry

Procedia PDF Downloads 144
12423 An Analysis of Employee Attitudes to Organisational Change Management Practices When Adopting New Technologies Within the Architectural, Engineering, and Construction Industry: A Case Study

Authors: Hannah O'Sullivan, Esther Quinn

Abstract:

Purpose: The Architectural, Engineering, and Construction (AEC) industry has historically struggled to adapt to change. Although the ability to innovate and successfully implement organizational change has been demonstrated to be critical in achieving a sustainable competitive advantage in the industry, many AEC organizations continue to struggle when affecting organizational change. One prominent area of organizational change that presents many challenges in the industry is the adoption of new forms of technology, for example, Building Information Modelling (BIM). Certain Organisational Change Management (OCM) practices have been proven to be effective in supporting organizations to adopt change, but little research has been carried out on diverging employee attitudes to change relative to their roles within the organization. The purpose of this research study is to examine how OCM practices influence employee attitudes to change when adopting new forms of technology and to analyze the diverging employee perspectives within an organization on the importance of different OCM strategies. Methodology: Adopting an interview-based approach, a case study was carried out on a large-sized, prominent Irish construction organization who are currently adopting a new technology platform for its projects. Qualitative methods were used to gain insight into differing perspectives on the utilization of various OCM practices and their efficacy when adopting a new form of technology on projects. Change agents implementing the organizational change gave insight into their intentions with the technology rollout strategy, while other employees were interviewed to understand how this rollout strategy was received and the challenges that were encountered. Findings: The results of this research study are currently being finalized. However, it is expected that employees in different roles will value different OCM practices above others. Findings and conclusions will be determined within the coming weeks. Value: This study will contribute to the body of knowledge relating to the introduction of new technologies, including BIM, to AEC organizations. It will also contribute to the field of organizational change management, providing insight into methods of introducing change that will be most effective for different employees based on their roles and levels of experience within the industry. The focus of this study steers away from traditional studies of the barriers to adopting BIM in its first instance at an organizational level and centers on the direct effect on employees when a company changes the technology platform being used.

Keywords: architectural, engineering, and construction (AEC) industry, Building Information Modelling, case study, challenges, employee perspectives, organisational change management.

Procedia PDF Downloads 69
12422 Carbon Footprint of Road Project for Sustainable Development: Lessons Learnt from Traffic Management of a Developing Urban Centre

Authors: Sajjad Shukur Ullah, Syed Shujaa Safdar Gardezi

Abstract:

Road infrastructure plays a vital role in the economic activities of any economy. Besides derived benefits from these facilities, the utilization of extensive energy resources, fuels, and materials results in a negative impact on the environment in terms of carbon footprint; carbon footprint is the overall amount of greenhouse gas (GHG) generated from any action. However, this aspect of environmental impact from road structure is not seriously considered during such developments, thus undermining a critical factor of sustainable development, which usually remains unaddressed, especially in developing countries. The current work investigates the carbon footprint impact of a small road project (0.8 km, dual carriageway) initiated for traffic management in an urban centre. Life cycle assessment (LCA) with boundary conditions of cradle to the site has been adopted. The only construction phase of the life cycle has been assessed at this stage. An impact of 10 ktons-CO2 (6260 ton-CO2/km) has been assessed. The rigid pavement dominated the contributions as compared to a flexible component. Among the structural elements, the underpass works shared the major portion. Among the materials, the concrete and steel utilized for various structural elements resulted in more than 90% of the impact. The earth-moving equipment was dominant in operational carbon. The results have highlighted that road infrastructure projects pose serious threats to the environment during their construction and which need to be considered during the approval stages. This work provides a guideline for supporting sustainable development that could only be ensured when such endeavours are properly assessed by industry professionals and decide various alternative environmental conscious solutions for the future.

Keywords: construction waste management, kiloton, life cycle assessment, rigid pavement

Procedia PDF Downloads 100
12421 Impact of Individual Resilience on Organizational Resilience: An Exploratory Study

Authors: Mitansha, Suzanne Wilkinson, Regan Potangaroa

Abstract:

The built environment is designed, maintained, operated, and decommissioned by construction organisations, which play a significant role in providing physical resources and rebuilding infrastructures during major crises and disasters. It is evident that enhancing the resilience of construction organisations allows better responding ability and speedy recovery from disasters and acts as a boon for the nation in the face of significant disruptions. As individuals are the integral component of any organisation, hence, individual resilience is considered a critical aspect, which may boost organisational resilience of construction sector. It has been observed that individual resilience is indirectly supported by organisation’s citizenship behaviour, job performance, and career success. Not only this, it also tends to hold a directly proportional relation with job satisfaction, physical and emotional well-being affected by organisation’s work culture, whereas the resilience of organisation increases as a result of positive adaption, growth and collective learning of the employees as an entity. Moreover, indicators like Situation awareness in staff and crisis related issues, effective vulnerability management, organisational leadership and culture ensured by approachable, encouraging and people-oriented leaders, are prominent for achieving organisational resilience. It, thus, becomes perceptible that both, organisational and individual resiliencies have the potential to influence each other. Consequently, it arises a major question that how these characteristics are associated and tend to behave with respect to each other The study, thus, aims to explore the overlapping dimensions of organisational and individual resilience to determine the impact boundaries. The research methodology of the paper would be based on systematic literature review specifically focused on the resilience of construction industry. This would provide a direct comparison of characteristics influencing individual and organisational resilience and will present the most significant indicators of individual resilience, that can eventually help to enhance the resilience of construction organisations amidst any disaster or crisis.

Keywords: construction industry, individual resilience, organizational resilience, overlapping dimension

Procedia PDF Downloads 102
12420 Towards Optimising Building Information Modelling and Building Management System in Higher Education Institutions Facility Management: A Review

Authors: Zhuoqun Sun, Francisco Sierra, A. Booth

Abstract:

With BIM rapidly implemented in the design and construction stage of a project, researchers begin to focus on improving the operation and maintenance stage with the aid of BIM. Since the increasing amount of electronic equipment installed in the building, building management system becomes mainstream for controlling a building, especially in higher education institutions that can play an important role in terms of reducing carbon emission and improving energy efficiency. Currently, an approach to integrate BIM and BMS to improve HEIs facility management has not been established yet. Thus, this paper aims to analyse the benefits, issues, and trends of BIM and BMS integration and their application in HEIs. A systematic literature review was carried out on SCOPUS by applying the PRISMA methodology. 73 articles have been chosen based on keywords, abstracts, and the full content of the articles. The benefit and existed issues from the articles are analysed. The review shows the need to develop a tool to improve facility management through BIM BMS integration.

Keywords: BIM, BMS, HEIs, review

Procedia PDF Downloads 162
12419 Unstructured Learning: Development of Free Form Construction in Waldorf and Normative Preschools

Authors: Salam Kodsi

Abstract:

In this research, we sought to focus on constructive play and examine its components in the context of two different educational approaches: Waldorf and normative schools. When they are free to choose, construction is one of the forms of play most favored by children. Its short-term and long-term cognitive contributions are apparent in various areas of development. The lack of empirical studies about play in Waldorf schools, which addresses the possibility of this incidental learning inspired the need to enrich the body of existing knowledge. 90 children (4-6 yrs.old) four preschools ( two normative, two Waldorf) participated in a small homogeneous city. Naturalistic observations documented the time frame, physical space, and construction materials related to the freeform building; processes of construction among focal representative children and its products. The study’s main finding with respect to the construction output points to a connection between educational approach and level of construction sophistication. Higher levels of sophistication were found at the Waldorf preschools than at the mainstream preschools. This finding emerged due to the differences in the level of sophistication among the older children in the two types of preschools, while practically no differences emerged among the younger children. Discussion of the research findings considered the differences between the play environments in terms of time, physical space, and construction materials. The construction processes were characterized according to the design model stages. The construction output was characterized according to the sophistication scale dimensions and the connections between approach, age and gender, and sophistication level.

Keywords: constructive play, preschool, design process model, complexity

Procedia PDF Downloads 118
12418 Contributing Factors to Building Failures and Defects in the Nigerian Construction Industry

Authors: Ndibarafinia Tobin

Abstract:

Building defect and failure are common phenomena in the Nigerian construction industry. The activities of the inexperienced labor force in the Nigerian construction industry have tarnished the image of practicing construction professionals in recent past. Defects and collapse can cause unnecessary expenditure, delays, loss of lives, property and left many people injured. They are also generating controversies among parties involved. Also, if this situation is left unanswered and untreated, it will lead to more serious problems in the future upcoming construction projects in Nigeria. Quite a number of factors are responsible for collapse of high-rise, reinforced concrete buildings in Nigeria. Government, professional bodies and stakeholders are asking countless questions as to who should be responsible and how solutions could be proffered. Therefore this study is aimed to identify the contributing factors to high-rise buildings defects and failures in Nigeria, which frequently occur in construction project in order to minimize time and cost and also the roles of professionals and other participants play in the industry in terms of the use of building materials, placement and curing of concrete, modification in the use of a building, collapse of building induced by fire and other causes. The data is collected from questionnaire from various players in construction industry in Nigeria. This study is succeeds in identifying the causes of building failure and also suggesting possible measures to be taken by government and other regulatory bodies in the building industry to avert this and also improve the effectiveness of managing appraisal process of failures and defects in the future.

Keywords: building defects, building failures, Nigerian construction industry, professionals

Procedia PDF Downloads 298
12417 An Empirical Investigation of Factors Influencing Construction Project Selection Processes within the Nigeria Public Sector

Authors: Emmanuel U. Unuafe, Oyegoke T. Bukoye, Sandhya Sastry, Yanqing Duan

Abstract:

Globally, there is increasing interest in project management due to a shortage in infrastructure services supply capability. Hence, it is of utmost importance that organisations understand that choosing a particular project over another is an opportunity cost – tying up the organisations resources. In order to devise constructive ways to bring direction, structure, and oversight to the process of project selection has led to the development of tools and techniques by researchers and practitioners. However, despite the development of various frameworks to assist in the appraisal and selection of government projects, failures are still being recorded with government projects. In developing countries, where frameworks are rarely used, the problems are compounded. To improve the situation, this study will investigate the current practice of construction project selection processes within the Nigeria public sector in order to inform theories of decision making from the perspective of developing nations and project management practice. Unlike other research around construction projects in Nigeria this research concentrate on factors influencing the selection process within the Nigeria public sector, which has received limited study. The authors report the findings of semi-structured interviews of top management in the Nigerian public sector and draw conclusions in terms of decision making extant theory and current practice. Preliminary results from the data analysis show that groups make project selection decisions and this forces sub-optimal decisions due to pressure on time, clashes of interest, lack of standardised framework for selecting projects, lack of accountability and poor leadership. Consequently, because decision maker is usually drawn from different fields, religious beliefs, ethnic group and with different languages. The choice of a project by an individual will be greatly influence by experience, political precedence than by realistic investigation as well as his understanding of the desired outcome of the project, in other words, the individual’s ideology and their level of fairness.

Keywords: factors influencing project selection, public sector construction project selection, projects portfolio selection, strategic decision-making

Procedia PDF Downloads 328
12416 The Learning Impact of a 4-Dimensional Digital Construction Learning Environment

Authors: Chris Landorf, Stephen Ward

Abstract:

This paper addresses a virtual environment approach to work integrated learning for students in construction-related disciplines. The virtual approach provides a safe and pedagogically rigorous environment where students can apply theoretical knowledge in a simulated real-world context. The paper describes the development of a 4-dimensional digital construction environment and associated learning activities funded by the Australian Office for Learning and Teaching. The environment was trialled with over 1,300 students and evaluated through questionnaires, observational studies and coursework analysis. Results demonstrate a positive impact on students’ technical learning and collaboration skills, but there is need for further research in relation to critical thinking skills and work-readiness.

Keywords: architectural education, construction industry, digital learning environments, immersive learning

Procedia PDF Downloads 411
12415 The Environmental Damages Related to Urban Sites

Authors: Kherbache Radhwane

Abstract:

We currently live in the world pressed by technological developments necessary for the construction, where the concept of sustainable development is truly rooted in recent years. Construction or demolitions of buildings necessarily generate environmental pollution, both inside and outside the site. Depending on the size and nature of work and the context surrounding these problems can be more or less important as is the case here in Algeria. They may affect the smooth running of the site. Moreover, there are regulations exist or are under development and should be taken into account by the various players in the act of building. This is, for example, the case of new obligations in terms of sorting and recycling of construction waste. Given this situation, it appears increasingly necessary to integrate the building sites in an effort to better respect the environment and its regulation. Several operations were performed according to this principle. The success of a project is that respects its environment through the involvement of each actor of the operation of the site with a low nuisance. As such, the client assisted by his driver and its operating contractor and the company plays a central role as an initiator of the process. It must ensure the establishment of appropriate means of organizational plans and contract.

Keywords: evolution, sustainable development, construction, demolition, building, nuisance, environmental, tailings, construction, regulations

Procedia PDF Downloads 264
12414 The Modified WBS Based on LEED Rating System in Decreasing Energy Consumption and Cost of Buildings

Authors: Mehrab Gholami Zangalani, Siavash Rajabpour

Abstract:

In compliance with the Statistical Centre of Iran (SCI)’s results, construction and housing section in Iran is consuming 40% of energy, which is 5 times more than the world average consumption. By considering the climate in Iran, the solutions in terms of design, construction and exploitation of the buildings by utilizing the LEED rating system (LRS) is presented, regarding to the reasons for the high levels of energy consumption during construction and housing in Iran. As a solution, innovative Work Break Structure (WBS) in accordance with LRS and Iranian construction’s methods is unveiled in this research. Also, by amending laws pertaining to the construction in Iran, the huge amount of energy and cost can be saved. Furthermore, with a scale-up of these results to the scale of big cities such as Tehran (one of the largest metropolitan areas in the middle east) in which the license to build more than two hundred and fifty units each day is issued, the amount of energy and cost that can be saved is estimated.

Keywords: costs reduction, energy statistics, leed rating system (LRS), work brake structure (WBS)

Procedia PDF Downloads 528
12413 Enhancing Dispute Resolution in Construction: The Potential Contributions of Dispute Boards and the Roadblock to Vaster Adoption

Authors: Zeyad M. Abdelgawad, A. Samer Ezeldin, Waleed El Nemr

Abstract:

The Egyptian construction industry has evolved significantly over the past decade, driven by enhanced economic sectors and the need for industrial development. This complexity requires diverse and flexible alternative dispute resolution (ADR) techniques. Dispute boards (DB) are globally recognized as effective ADR methods, especially since their introduction to World Bank projects in 1995. Despite their advantages, dispute boards remain underutilized in Egypt aside from the World Bank-financed projects due to several misconceptions. The study reveals the perceptions hindering the wider adoption of dispute boards in the Egyptian construction industry through detailed literature review and interviews with the experts. The perceptions encompassed the lack of awareness and understanding of dispute boards and implementation procedures, misconceptions about the costs associated with implementing dispute boards and the impact on the bid prices, the common orientation of resolving disputes internally and avoid resorting to external parties to preserve the long-term relationship, and lack of trust in the ability of the dispute boards to positively affect the project performance. In response to these identified misconceptions, a proposed alternative draft to the FIDIC 2017 clause twenty-one “Disputes and Arbitration” is provided, offering a way for a practical application of the dispute boards within the Egyptian context.

Keywords: alternative dispute resolution, claim management system, dispute boards, Egyptian construction industry, FIDIC

Procedia PDF Downloads 21
12412 Assessing Project Performance through Work Sampling and Earned Value Analysis

Authors: Shobha Ramalingam

Abstract:

The majority of the infrastructure projects are affected by time overrun, resulting in project delays and subsequently cost overruns. Time overrun may vary from a few months to as high as five or more years, placing the project viability at risk. One of the probable reasons noted in the literature for this outcome in projects is due to poor productivity. Researchers contend that productivity in construction has only marginally increased over the years. While studies in the literature have extensively focused on time and cost parameters in projects, there are limited studies that integrate time and cost with productivity to assess project performance. To this end, a study was conducted to understand the project delay factors concerning cost, time and productivity. A case-study approach was adopted to collect rich data from a nuclear power plant project site for two months through observation, interviews and document review. The data were analyzed using three different approaches for a comprehensive understanding. Foremost, a root-cause analysis was performed on the data using Ishikawa’s fish-bone diagram technique to identify the various factors impacting the delay concerning time. Based on it, a questionnaire was designed and circulated to concerned executives, including project engineers and contractors to determine the frequency of occurrence of the delay, which was then compiled and presented to the management for a possible solution to mitigate. Second, a productivity analysis was performed on select activities, including rebar bending and concreting through a time-motion study to analyze product performance. Third, data on cost of construction for three years allowed analyzing the cost performance using earned value management technique. All three techniques allowed to systematically and comprehensively identify the key factors that deter project performance and productivity loss in the construction of the nuclear power plant project. The findings showed that improper planning and coordination between multiple trades, concurrent operations, improper workforce and material management, fatigue due to overtime were some of the key factors that led to delays and poor productivity. The findings are expected to act as a stepping stone for further research and have implications for practitioners.

Keywords: earned value analysis, time performance, project costs, project delays, construction productivity

Procedia PDF Downloads 97
12411 Lean: A Sustainable Approach to Design and Construction for Environmental Sustainability

Authors: Evelyn Lami Ashelo Allu, Fidelis A. Emuze

Abstract:

This study aims to contribute to the pursuit of environmental sustainability through the built environment practices of design and construction. Activities within the built environment and particularly within the construction industry have a significant role in ensuring environmental sustainability. The adoption of Lean principles and approaches would ensure that project deliverables are sustainable. This is because the processes that integrate lean principles reduce waste, add value to productivity, ensures customer satisfaction and are mindful of future productivity. Additionally, the lean principles for development are sustainable in themselves and thus promotes environmental sustainability. The study encourages further research with other methodologies and recommends the development of monitoring and evaluation mechanisms in order to promote the global concern for environmental sustainability.

Keywords: built environment, construction, design, lean, sustainability

Procedia PDF Downloads 265
12410 Barriers to E-Tendering Adoption and Implementation in the Ghanaian Construction Industry

Authors: Aynur Kazaz, Yusif Inusah

Abstract:

In the bid to improve transparency and efficiency as well as to reduce the cost of the public procurement process, Ghana started implementing an electronic Government Procurement System, known as the Ghana Electronic Procurement System (GHANEPS) in November 2019. The implementation of e-tendering technology is new to the stakeholders. Therefore, this research is aimed to identify the critical barriers to e-tendering implementation in the Ghanaian construction industry. Examples of barriers to e-tendering implementation were first identified through a literature review, and questionnaires and interview questions were prepared to gather the data. This study contributes to the in-depth understanding of global e-tendering barriers in the Ghanaian construction industry. The findings could help researchers, practitioners, and governments make strategic investment decisions and overcome e-tendering challenges.

Keywords: barriers, challenges, construction industry, e-procurement, e-tendering

Procedia PDF Downloads 132
12409 Formalizing a Procedure for Generating Uncertain Resource Availability Assumptions Based on Real Time Logistic Data Capturing with Auto-ID Systems for Reactive Scheduling

Authors: Lars Laußat, Manfred Helmus, Kamil Szczesny, Markus König

Abstract:

As one result of the project “Reactive Construction Project Scheduling using Real Time Construction Logistic Data and Simulation”, a procedure for using data about uncertain resource availability assumptions in reactive scheduling processes has been developed. Prediction data about resource availability is generated in a formalized way using real-time monitoring data e.g. from auto-ID systems on the construction site and in the supply chains. The paper focuses on the formalization of the procedure for monitoring construction logistic processes, for the detection of disturbance and for generating of new and uncertain scheduling assumptions for the reactive resource constrained simulation procedure that is and will be further described in other papers.

Keywords: auto-ID, construction logistic, fuzzy, monitoring, RFID, scheduling

Procedia PDF Downloads 514
12408 Barriers to Health and Safety Practices in South African Construction Industry: Subcontractors Perspective

Authors: Kenneth O. Otasowie, Matthew Ikuabe, Clinton Aigbavboa, Ayodeji Oke

Abstract:

Subcontracting has become a fundamental feature in the construction industry, particularly as most projects in South Africa (SA) are executed by subcontractors. However, the sector in SA contributes to the high level of occupational hazards and injuries recorded, despite Health and Safety (H&S) regulations being enforced in the industry. Hence, this study aims to evaluate the barriers to health and safety practices by subcontractors in SA Construction Industry. A survey design was adopted. A total number of one hundred and forty-four (144) questionnaires were administered to quantity surveyors, construction managers, construction project managers, project managers, architects, and civil and structural engineers, who are owners or work in small and medium enterprises in Guateng Province, SA and eighty-three (83) were returned and found suitable for analysis. Collected data were analysed using percentage, mean item score, standard deviation, and one-sample t-test. The findings show that lack of skilled workers, lack of safety training, and insufficient safety awareness are the most significant barriers to health and safety practices in SA Construction Industry. Therefore, the study recommends the improvement in skills of staff and adequate training for the safe execution of work be provided to all employees and supervisors in these subcontracting firms. These will mitigate the rate of accident occurrence on construction sites.

Keywords: barriers, health and safety, subcontractors, South Africa

Procedia PDF Downloads 103
12407 Risk Prioritization in Tunneling Construction Projects

Authors: David Nantes, George Gilbert

Abstract:

There are a lot of risks that might crop up as a tunneling project develops, and it's crucial to be aware of them. Due to the unexpected nature of tunneling projects and the interconnectedness of risk occurrences, the risk assessment approach presents a significant challenge. The purpose of this study is to provide a hybrid FDEMATEL-ANP model to help prioritize risks during tunnel construction projects. The ambiguity in expert judgments and the relative severity of interdependencies across risk occurrences are both taken into consideration by this model, thanks to the Fuzzy Decision-Making Trial and Evaluation Laboratory (FDEMATEL). The Analytic Network Process (ANP) method is used to rank priorities and assess project risks. The authors provide a case study of a subway tunneling construction project to back up the validity of their methodology. The results showed that the proposed method successfully isolated key risk factors and elucidated their interplay in the case study. The proposed method has the potential to become a helpful resource for evaluating dangers associated with tunnel construction projects.

Keywords: risk, prioritization, FDEMATEL, ANP, tunneling construction projects

Procedia PDF Downloads 92
12406 Developing a Machine Learning-based Cost Prediction Model for Construction Projects using Particle Swarm Optimization

Authors: Soheila Sadeghi

Abstract:

Accurate cost prediction is essential for effective project management and decision-making in the construction industry. This study aims to develop a cost prediction model for construction projects using Machine Learning techniques and Particle Swarm Optimization (PSO). The research utilizes a comprehensive dataset containing project cost estimates, actual costs, resource details, and project performance metrics from a road reconstruction project. The methodology involves data preprocessing, feature selection, and the development of an Artificial Neural Network (ANN) model optimized using PSO. The study investigates the impact of various input features, including cost estimates, resource allocation, and project progress, on the accuracy of cost predictions. The performance of the optimized ANN model is evaluated using metrics such as Mean Squared Error (MSE), Root Mean Squared Error (RMSE), Mean Absolute Error (MAE), and R-squared. The results demonstrate the effectiveness of the proposed approach in predicting project costs, outperforming traditional benchmark models. The feature selection process identifies the most influential variables contributing to cost variations, providing valuable insights for project managers. However, this study has several limitations. Firstly, the model's performance may be influenced by the quality and quantity of the dataset used. A larger and more diverse dataset covering different types of construction projects would enhance the model's generalizability. Secondly, the study focuses on a specific optimization technique (PSO) and a single Machine Learning algorithm (ANN). Exploring other optimization methods and comparing the performance of various ML algorithms could provide a more comprehensive understanding of the cost prediction problem. Future research should focus on several key areas. Firstly, expanding the dataset to include a wider range of construction projects, such as residential buildings, commercial complexes, and infrastructure projects, would improve the model's applicability. Secondly, investigating the integration of additional data sources, such as economic indicators, weather data, and supplier information, could enhance the predictive power of the model. Thirdly, exploring the potential of ensemble learning techniques, which combine multiple ML algorithms, may further improve cost prediction accuracy. Additionally, developing user-friendly interfaces and tools to facilitate the adoption of the proposed cost prediction model in real-world construction projects would be a valuable contribution to the industry. The findings of this study have significant implications for construction project management, enabling proactive cost estimation, resource allocation, budget planning, and risk assessment, ultimately leading to improved project performance and cost control. This research contributes to the advancement of cost prediction techniques in the construction industry and highlights the potential of Machine Learning and PSO in addressing this critical challenge. However, further research is needed to address the limitations and explore the identified future research directions to fully realize the potential of ML-based cost prediction models in the construction domain.

Keywords: cost prediction, construction projects, machine learning, artificial neural networks, particle swarm optimization, project management, feature selection, road reconstruction

Procedia PDF Downloads 60
12405 A Review on the Necessities of Green Building in Bangladesh and Its Construction Process

Authors: Syeda Afsana Azad

Abstract:

Climate change, due to the release of greenhouse gases into the atmosphere has been recognized as one of the biggest threats to the present world. The condition of the earth is getting worse day by day due to climate change. Bangladesh is considered to be one of the most vulnerable countries to climate change due to large population, sharp urbanization, etc. Construction of green building is a very good solution to reduce the greenhouse effect. Green building technology refers to that kind of structures which are environmentally friendly and resource-efficient throughout a building’s service life. This technology can provide at least 50% energy saving opportunity to the nation. The necessity of the construction of structures in an environment-friendly way is increasing now. This study shows the scenario of rapid population growth, urbanization, necessity of green building in Bangladesh and also discusses the construction process of green building. As the present climate condition of Bangladesh is not friendly, construction of green building is very much needed. To battle climate change, it is mandatory to construct green building.

Keywords: Bangladesh, climate change, green building, green house effect

Procedia PDF Downloads 379