Search results for: project budget and gain or loss
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 10252

Search results for: project budget and gain or loss

9922 Newborn Hearing Screening: Experience from a Center in South part of Iran

Authors: Marzieh Amiri, Zahra Iranpour Mobarakeh, Fatemeh Mehrbakhsh, Mehran Amiri

Abstract:

Introduction: Early diagnosis and intervention of congenital hearing loss is necessary to minimize the adverse effects of hearing loss. The aim of the present study was to report the results of newborn hearing screening in a centerin the south part of Iran, Fasa. Material and methods: In this study, the data related to 6,144 newbornsduring September 2018 up to September2021, was analyzed. Hearing screening was performed using transient evoked otoacoustic emissions (TEOAEs) and automated auditory brainstem response (AABR) tests. Results: From all 6144 newborns,3752 and 2392referred to the center from urban and rural part of Fasa, respectively. There were 2958 female and 3186 male in this study. Of 6144 newborns, 6098 ones passed the screening tests, and 46 neonates were referred to a diagnostic audiology clinic. Finally, nine neonates were diagnosed with congenital hearing loss (seven with sensorineural hearing loss and two with conductive hearing loss). The severity of all the hearing impaired neonates was moderate and above. The most important risk factors were family history of hearing loss, low gestational age, NICU hospitalization, and hyperbilirubinemia. Conclusion: Our results showed that the prevalence of hearing loss was 1.46 per 1000 infants. Boosting public knowledge by providing families with proper education appears to be helpful in preventing the negative effects of delayed implementation of health screening programs.

Keywords: newborn hearing screening, hearing loss, risk factor, prevalence

Procedia PDF Downloads 164
9921 Affective Ambivalence in Informal Caregivers of Older Adults in the Face of Loss and Grief Processes

Authors: Ivannys Cappas Perez

Abstract:

Worldwide the population of older adults is increasing. The World Health Organization (2022) estimates that it will double by 2050. Informal caregivers of older adults may experience contradictory impulses, overload, and multiple losses before the death of the older adult in their care. The general purpose of research was to identify and describe the affective ambivalence in informal caregivers of older adults in the face of loss and grief processes. The dimensions under study were affective ambivalence, informal caregivers of older adults, loss processes and the grieving process. A qualitative approach methodology and an empirical phenomenological design were used through Clark Moustakas' Multiangulation Model to describe, categorize and interpret, intentionality, temporality and intersubjectivity a problem never studied. Among the findings was the feminization of the role. Affective ambivalence is manifested through emotions, feelings, thoughts and behavior, including non-verbal language. The assumption of the role is highly influenced by an affective and moral factor, where a minimum of 35 hours per week are invested in without family and financial support. It was found that the participants experience objective and subjective overload. Furthermore, because of the role, they experienced loss of life, loss of aspects of themselves, loss of objects, emotional losses, and losses linked to development. On the other hand, up to two types of grief were found simultaneously. Finally, the presence of affective ambivalence was found with the same intensity 13 years after the loss of the older adult under care.

Keywords: affective ambivalence, informal caregivers of older adults, loss processes, grief processes

Procedia PDF Downloads 40
9920 Nimbus Radiance Gate Project: Media Architecture in Sacred Space

Authors: Jorge Duarte de Sá

Abstract:

The project presented in this investigation is part of the multidisciplinary field of Architecture and explores an experience in media architecture, integrated in Arts, Science and Technology. The objective of this work is to create a visual experience comprehending Architecture, Media and Art. It is intended to specifically explore the sacred spaces that are losing social, cultural or religious dynamics and insert new Media technologies to create a new generate momentum, testing tools, techniques and methods of implementation. Given an architectural project methodology, it seems essential that 'the location' should be the starting point for the development of this technological apparatus: the church of Santa Clara in Santarém, Portugal emerged as an experimental space for apparatus, presenting itself as both temple and museum. We also aim to address the concept of rehabilitation through media technologies, directed at interventions that may have an impact on energizing spaces. The idea is emphasized on the rehabilitation of spaces that, one way or another, may gain new dynamics after a media intervention. Thus, we intend to affect the play with a sensitive and spiritual character which endemically, sacred spaces have, by exploring a sensitive aspect of the subject and drawing up new ideas for meditation and spiritual reflection. The work is designed primarily as a visual experience that encompasses the space, the object and the subject. It is a media project supported by a dual structure with two transparent screens operating in a holographic screen which will be projecting two images that complement the translucent overlay film, thus making the merger of two projections. The digitally created content reacts to the presence of observers through infrared cameras, placed strategically. The object revives the memory of the altarpiece as an architectural surface, promoting the expansion of messages through the media technologies.

Keywords: architecture, media, sacred, technology

Procedia PDF Downloads 279
9919 Benefits of Construction Management Implications and Processes by Projects Managers on Project Completion

Authors: Mamoon Mousa Atout

Abstract:

Projects managers in construction industry usually face a difficult organizational environment especially if the project is unique. The organization lacks the processes to practice construction management correctly, and the executive’s technical managers who have lack of experience in playing their role and responsibilities correctly. Project managers need to adopt best practices that allow them to do things effectively to make sure that the project can be delivered without any delay even though the executive’s technical managers should follow a certain process to avoid any factor might cause any delay during the project life cycle. The purpose of the paper is to examine the awareness level of projects managers about construction management processes, tools, techniques and implications to complete projects on time. The outcome and the results of the study are prepared based on the designed questionnaires and interviews conducted with many project managers. The method used in this paper is a quantitative study. A survey with a sample of 100 respondents was prepared and distributed in a construction company in Dubai, which includes nine questions to examine the level of their awareness. This research will also identify the necessary benefits of processes of construction management that has to be adopted by projects managers to mitigate the maximum potential problems which might cause any delay to the project life cycle.

Keywords: construction management, project objectives, resource planing and scheduling, project completion

Procedia PDF Downloads 402
9918 Estimating Soil Erosion Using Universal Soil Loss Equation and Gis in Algash Basin

Authors: Issamaldin Mohammed, Ahmed Abdalla, Hatim Elobied

Abstract:

Soil erosion is globally known for adverse effects on social, environmental and economical aspects which directly or indirectly influence the human life. The area under study suffers from problems like water quality, river and agricultural canals bed rise due to high sediment load brought by Algash River from upstream (Eritrea high land), the current study utilized from remote sensing and Geographical Information System (GIS) to estimate the annual soil loss using Universal Soil Loss Equation (USLE). The USLE is widely used over the world which basically relies on rainfall erosivity factor (R), soil erodibility factor (K), topographic factor (LS), cover management factor (C) and support practice factor (P). The result of the study showed high soil loss in the study area, this result was illustrated in a form of map presenting the spatial distribution of soil loss amounts which classified into seven zones ranging from very slight zone (less than 2 ton/ha.year) to very severe (100-500 ton/ha.year), also the total soil loss from the whole study area was found to be 32,916,840.87 ton/ha.year. These kinds of results will help the experts of land management to give a priority for the severely affected zones to be tackled in an appropriate way.

Keywords: Geographical Information System, remote sensing, sedimentation, soil loss

Procedia PDF Downloads 291
9917 Optimal Beam for Accelerator Driven Systems

Authors: M. Paraipan, V. M. Javadova, S. I. Tyutyunnikov

Abstract:

The concept of energy amplifier or accelerator driven system (ADS) involves the use of a particle accelerator coupled with a nuclear reactor. The accelerated particle beam generates a supplementary source of neutrons, which allows the subcritical functioning of the reactor, and consequently a safe exploitation. The harder neutron spectrum realized ensures a better incineration of the actinides. The almost generalized opinion is that the optimal beam for ADS is represented by protons with energy around 1 GeV (gigaelectronvolt). In the present work, a systematic analysis of the energy gain for proton beams with energy from 0.5 to 3 GeV and ion beams from deuteron to neon with energies between 0.25 and 2 AGeV is performed. The target is an assembly of metallic U-Pu-Zr fuel rods in a bath of lead-bismuth eutectic coolant. The rods length is 150 cm. A beryllium converter with length 110 cm is used in order to maximize the energy released in the target. The case of a linear accelerator is considered, with a beam intensity of 1.25‧10¹⁶ p/s, and a total accelerator efficiency of 0.18 for proton beam. These values are planned to be achieved in the European Spallation Source project. The energy gain G is calculated as the ratio between the energy released in the target to the energy spent to accelerate the beam. The energy released is obtained through simulation with the code Geant4. The energy spent is calculating by scaling from the data about the accelerator efficiency for the reference particle (proton). The analysis concerns the G values, the net power produce, the accelerator length, and the period between refueling. The optimal energy for proton is 1.5 GeV. At this energy, G reaches a plateau around a value of 8 and a net power production of 120 MW (megawatt). Starting with alpha, ion beams have a higher G than 1.5 GeV protons. A beam of 0.25 AGeV(gigaelectronvolt per nucleon) ⁷Li realizes the same net power production as 1.5 GeV protons, has a G of 15, and needs an accelerator length 2.6 times lower than for protons, representing the best solution for ADS. Beams of ¹⁶O or ²⁰Ne with energy 0.75 AGeV, accelerated in an accelerator with the same length as 1.5 GeV protons produce approximately 900 MW net power, with a gain of 23-25. The study of the evolution of the isotopes composition during irradiation shows that the increase in power production diminishes the period between refueling. For a net power produced of 120 MW, the target can be irradiated approximately 5000 days without refueling, but only 600 days when the net power reaches 1 GW (gigawatt).

Keywords: accelerator driven system, ion beam, electrical power, energy gain

Procedia PDF Downloads 143
9916 Factors Contributing to Building Construction Project’s Cost Overrun in Jordan

Authors: Ghaleb Y. Abbasi, Sufyan Al-Mrayat

Abstract:

This study examined the contribution of thirty-six factors to building construction project’s cost overrun in Jordan. A questionnaire was distributed to a random sample of 350 stakeholders comprised of owners, consultants, and contractors, of which 285 responded. SPSS analysis was conducted to identify the top five causes of cost overrun, which were a large number of variation orders, inadequate quantities provided in the contract, misunderstanding of the project plan, incomplete bid documents, and choosing the lowest price in the contract bidding. There was an agreement among the study participants in ranking the factors contributing to cost overrun, which indicated that these factors were very commonly encountered in most construction projects in Jordan. Thus, it is crucial to enhance the collaboration among the different project stakeholders to understand the project’s objectives and set a realistic plan that takes into consideration all the factors that might influence the project cost, which might eventually prevent cost overrun.

Keywords: cost, overrun, building construction projects, Jordan

Procedia PDF Downloads 109
9915 Modeling Metrics for Monitoring Software Project Performance Based on the GQM Model

Authors: Mariayee Doraisamy, Suhaimi bin Ibrahim, Mohd Naz’ri Mahrin

Abstract:

There are several methods to monitor software projects and the objective for monitoring is to ensure that the software projects are developed and delivered successfully. A performance measurement is a method that is closely associated with monitoring and it can be scrutinized by looking at two important attributes which are efficiency and effectiveness both of which are factors that are important for the success of a software project. Consequently, a successful steering is achieved by monitoring and controlling a software project via the performance measurement criteria and metrics. Hence, this paper is aimed at identifying the performance measurement criteria and the metrics for monitoring the performance of a software project by using the Goal Question Metrics (GQM) approach. The GQM approach is utilized to ensure that the identified metrics are reliable and useful. These identified metrics are useful guidelines for project managers to monitor the performance of their software projects.

Keywords: component, software project performance, goal question metrics, performance measurement criteria, metrics

Procedia PDF Downloads 357
9914 Evaluation of the Urban Regeneration Project: Land Use Transformation and SNS Big Data Analysis

Authors: Ju-Young Kim, Tae-Heon Moon, Jung-Hun Cho

Abstract:

Urban regeneration projects have been actively promoted in Korea. In particular, Jeonju Hanok Village is evaluated as one of representative cases in terms of utilizing local cultural heritage sits in the urban regeneration project. However, recently, there has been a growing concern in this area, due to the ‘gentrification’, caused by the excessive commercialization and surging tourists. This trend was changing land and building use and resulted in the loss of identity of the region. In this regard, this study analyzed the land use transformation between 2010 and 2016 to identify the commercialization trend in Jeonju Hanok Village. In addition, it conducted SNS big data analysis on Jeonju Hanok Village from February 14th, 2016 to March 31st, 2016 to identify visitors’ awareness of the village. The study results demonstrate that rapid commercialization was underway, unlikely the initial intention, so that planners and officials in city government should reconsider the project direction and rebuild deliberate management strategies. This study is meaningful in that it analyzed the land use transformation and SNS big data to identify the current situation in urban regeneration area. Furthermore, it is expected that the study results will contribute to the vitalization of regeneration area.

Keywords: land use, SNS, text mining, urban regeneration

Procedia PDF Downloads 294
9913 The Effect of the Construction Contract System by Simulating the Comparative Costs of Capital to the Financial Feasibility of the Construction of Toll Bali Mandara

Authors: Mas Pertiwi I. G. AG Istri, Sri Kristinayanti Wayan, Oka Aryawan I. Gede Made

Abstract:

Ability of government to meet the needs of infrastructure investment constrained by the size of the budget commitments for other sectors. Another barrier is the complexity of the process of land acquisition. Public Private Partnership can help bridge the investment gap by including the amount of funding from the private sector, shifted the responsibility of financing, construction of the asset, and the operation and post-project design and care to them. In principle, a construction project implementation always requires the investor as a party to provide resources in the form of funding which it must be contained in a successor agreement in the form of a contract. In general, construction contracts consist of contracts which passed in Indonesia and contract International. One source of funding used in the implementation of construction projects comes from funding that comes from the collaboration between the government and the private sector, for example with the system: BLT (Build Lease Transfer), BOT (Build Operate Transfer), BTO (Build Transfer Operate) and BOO (Build Operate Own). And form of payment under a construction contract can be distinguished several ways: monthly payment, payments based on progress and payment after completed projects (Turn Key). One of the tools used to analyze the feasibility of the investment is to use financial models. The financial model describes the relationship between different variables and assumptions used. From a financial model will be known how the cash flow structure of the project, which includes revenues, expenses, liabilities to creditors and the payment of taxes to the government. Net cash flow generated from the project will be used as a basis for analyzing the feasibility of investment source of project financing Public Private Partnership could come from equity or debt. The proportion of funding according to its source is a comparison of a number of investment funds originating from each source of financing for a total investment cost during the construction period by selected the contract system and several alternative financing percentage ratio determined according to sources will generate cash flow structure that is different. Of the various possibilities for the structure of the cash flow generated will be analyzed by software is to test T Paired to compared the contract system used by various alternatives comparison of financing to determine the effect of the contract system and the comparison of such financing for the feasibility of investment toll road construction project for the economic life of 20 (twenty) years. In this use case studies of toll road contruction project Bali Mandara. And in this analysis only covered two systems contracts, namely Build Operate Transfer and Turn Key. Based on the results obtained by analysis of the variable investment feasibility of the NPV, BCR and IRR between the contract system Build Operate Transfer and contract system Turn Key on the interest rate of 9%, 12% and 15%.

Keywords: contract system, financing, internal rate of return, net present value

Procedia PDF Downloads 229
9912 The Use of Empirical Models to Estimate Soil Erosion in Arid Ecosystems and the Importance of Native Vegetation

Authors: Meshal M. Abdullah, Rusty A. Feagin, Layla Musawi

Abstract:

When humans mismanage arid landscapes, soil erosion can become a primary mechanism that leads to desertification. This study focuses on applying soil erosion models to a disturbed landscape in Umm Nigga, Kuwait, and identifying its predicted change under restoration plans, The northern portion of Umm Nigga, containing both coastal and desert ecosystems, falls within the boundaries of the Demilitarized Zone (DMZ) adjacent to Iraq, and has been fenced off to restrict public access since 1994. The central objective of this project was to utilize GIS and remote sensing to compare the MPSIAC (Modified Pacific South West Inter Agency Committee), EMP (Erosion Potential Method), and USLE (Universal Soil Loss Equation) soil erosion models and determine their applicability for arid regions such as Kuwait. Spatial analysis was used to develop the necessary datasets for factors such as soil characteristics, vegetation cover, runoff, climate, and topography. Results showed that the MPSIAC and EMP models produced a similar spatial distribution of erosion, though the MPSIAC had more variability. For the MPSIAC model, approximately 45% of the land surface ranged from moderate to high soil loss, while 35% ranged from moderate to high for the EMP model. The USLE model had contrasting results and a different spatial distribution of the soil loss, with 25% of area ranging from moderate to high erosion, and 75% ranging from low to very low. We concluded that MPSIAC and EMP were the most suitable models for arid regions in general, with the MPSIAC model best. We then applied the MPSIAC model to identify the amount of soil loss between coastal and desert areas, and fenced and unfenced sites. In the desert area, soil loss was different between fenced and unfenced sites. In these desert fenced sites, 88% of the surface was covered with vegetation and soil loss was very low, while at the desert unfenced sites it was 3% and correspondingly higher. In the coastal areas, the amount of soil loss was nearly similar between fenced and unfenced sites. These results implied that vegetation cover played an important role in reducing soil erosion, and that fencing is much more important in the desert ecosystems to protect against overgrazing. When applying the MPSIAC model predictively, we found that vegetation cover could be increased from 3% to 37% in unfenced areas, and soil erosion could then decrease by 39%. We conclude that the MPSIAC model is best to predict soil erosion for arid regions such as Kuwait.

Keywords: soil erosion, GIS, modified pacific South west inter agency committee model (MPSIAC), erosion potential method (EMP), Universal soil loss equation (USLE)

Procedia PDF Downloads 298
9911 Lessons Learnt from Industry: Achieving Net Gain Outcomes for Biodiversity

Authors: Julia Baker

Abstract:

Development plays a major role in stopping biodiversity loss. But the ‘silo species’ protection of legislation (where certain species are protected while many are not) means that development can be ‘legally compliant’ and result in biodiversity loss. ‘Net Gain’ (NG) policies can help overcome this by making it an absolute requirement that development causes no overall loss of biodiversity and brings a benefit. However, offsetting biodiversity losses in one location with gains elsewhere is controversial because people suspect ‘offsetting’ to be an easy way for developers to buy their way out of conservation requirements. Yet the good practice principles (GPP) of offsetting provide several advantages over existing legislation for protecting biodiversity from development. This presentation describes the learning from implementing NG approaches based on GPP. It regards major upgrades of the UK’s transport networks, which involved removing vegetation in order to construct and safely operate new infrastructure. While low-lying habitats were retained, trees and other habitats disrupting the running or safety of transport networks could not. Consequently, achieving NG within the transport corridor was not possible and offsetting was required. The first ‘lessons learnt’ were on obtaining a commitment from business leaders to go beyond legislative requirements and deliver NG, and on the institutional change necessary to embed GPP within daily operations. These issues can only be addressed when the challenges that biodiversity poses for business are overcome. These challenges included: biodiversity cannot be measured easily unlike other sustainability factors like carbon and water that have metrics for target-setting and measuring progress; and, the mindset that biodiversity costs money and does not generate cash in return, which is the opposite of carbon or waste for example, where people can see how ‘sustainability’ actions save money. The challenges were overcome by presenting the GPP of NG as a cost-efficient solution to specific, critical risks facing the business that also boost industry recognition, and by using government-issued NG metrics to develop business-specific toolkits charting their NG progress whilst ensuring that NG decision-making was based on rich ecological data. An institutional change was best achieved by supporting, mentoring and training sustainability/environmental managers for these ‘frontline’ staff to embed GPP within the business. The second learning was from implementing the GPP where business partnered with local governments, wildlife groups and land owners to support their priorities for nature conservation, and where these partners had a say in decisions about where and how best to achieve NG. From this inclusive approach, offsetting contributed towards conservation priorities when all collaborated to manage trade-offs between: -Delivering ecologically equivalent offsets or compensating for losses of one type of biodiversity by providing another. -Achieving NG locally to the development whilst contributing towards national conservation priorities through landscape-level planning. -Not just protecting the extent and condition of existing biodiversity but ‘doing more’. -The multi-sector collaborations identified practical, workable solutions to ‘in perpetuity’. But key was strengthening linkages between biodiversity measures implemented for development and conservation work undertaken by local organizations so that developers support NG initiatives that really count.

Keywords: biodiversity offsetting, development, nature conservation planning, net gain

Procedia PDF Downloads 196
9910 Collaborative Research between Malaysian and Australian Universities on Learning Analytics: Challenges and Strategies

Authors: Z. Tasir, S. N. Kew, D. West, Z. Abdullah, D. Toohey

Abstract:

Research on Learning Analytics is progressively developing in the higher education field by concentrating on the process of students' learning. Therefore, a research project between Malaysian and Australian Universities was initiated in 2015 to look at the use of Learning Analytics to support the development of teaching practice. The focal point of this article is to discuss and share the experiences of Malaysian and Australian universities in the process of developing the collaborative research on Learning Analytics. Three aspects of this will be discussed: 1) Establishing an international research project and team members, 2) cross-cultural understandings, and 3) ways of working in relation to the practicalities of the project. This article is intended to benefit other researchers by highlighting the challenges as well as the strategies used in this project to ensure such collaborative research succeeds.

Keywords: academic research project, collaborative research, cross-cultural understanding, international research project

Procedia PDF Downloads 243
9909 Effects of the Exit from Budget Support on Good Governance: Findings from Four Sub-Saharan Countries

Authors: Magdalena Orth, Gunnar Gotz

Abstract:

Background: Domestic accountability, budget transparency and public financial management (PFM) are considered vital components of good governance in developing countries. The aid modality budget support (BS) promotes these governance functions in developing countries. BS engages in political decision-making and provides financial and technical support to poverty reduction strategies of the partner countries. Nevertheless, many donors have withdrawn their support from this modality due to cases of corruption, fraud or human rights violations. This exit from BS is leaving a finance and governance vacuum in the countries. The evaluation team analyzed the consequences of terminating the use of this modality and found particularly negative effects for good governance outcomes. Methodology: The evaluation uses a qualitative (theory-based) approach consisting of a comparative case study design, which is complemented by a process-tracing approach. For the case studies, the team conducted over 100 semi-structured interviews in Malawi, Uganda, Rwanda and Zambia and used four country-specific, tailor-made budget analysis. In combination with a previous DEval evaluation synthesis on the effects of BS, the team was able to create a before-and-after comparison that yields causal effects. Main Findings: In all four countries domestic accountability and budget transparency declined if other forms of pressure are not replacing BS´s mutual accountability mechanisms. In Malawi a fraud scandal created pressure from the society and from donors so that accountability was improved. In the other countries, these pressure mechanisms were absent so that domestic accountability declined. BS enables donors to actively participate in political processes of the partner country as donors transfer funds into the treasury of the partner country and conduct a high-level political dialogue. The results confirm that the exit from BS created a governance vacuum that, if not compensated through external/internal pressure, leads to a deterioration of good governance. For example, in the case of highly aid dependent Malawi did the possibility of a relaunch of BS provide sufficient incentives to push for governance reforms. Overall the results show that the three good governance areas are negatively affected by the exit from BS. This stands in contrast to positive effects found before the exit. The team concludes that the relationship is causal, because the before-and-after comparison coherently shows that the presence of BS correlates with positive effects and the absence with negative effects. Conclusion: These findings strongly suggest that BS is an effective modality to promote governance and its abolishment is likely to cause governance disruptions. Donors and partner governments should find ways to re-engage in closely coordinated policy-based aid modalities. In addition, a coordinated and carefully managed exit-strategy should be in place before an exit from similar modalities is considered. Particularly a continued framework of mutual accountability and a high-level political dialogue should be aspired to maintain pressure and oversight that is required to achieve good governance.

Keywords: budget support, domestic accountability, public financial management and budget transparency, Sub-Sahara Africa

Procedia PDF Downloads 155
9908 The Effects of Signal Level of the Microwave Generator on the Brillouin Gain Spectrum in BOTDA and BOTDR

Authors: Murat Yucel, Murat Yucel, Nail Ferhat Ozturk, Halim Haldun Goktas, Cemal Gemci, Fatih Vehbi Celebi

Abstract:

In this study, Brillouin gain spectrum (BGS) is experimentally analyzed in the Brillouin optical time domain reflectometry (BOTDR) and Brillouin optical time domain analyzer (BOTDA). For this purpose, the signal level of the microwave generator is varied and the effects of BGS are investigated. In the setups, 20 km conventional single mode fiber is used to both setups and laser wavelengths are selected around 1550 nm. To achieve best results, it can be used between 5 dBm to 15 dBm signal level of microwave generator for BOTDA and BOTDR setups.

Keywords: microwave signal level, Brillouin gain spectrum, BOTDA, BOTDR

Procedia PDF Downloads 689
9907 A Neural Network Classifier for Identifying Duplicate Image Entries in Real-Estate Databases

Authors: Sergey Ermolin, Olga Ermolin

Abstract:

A Deep Convolution Neural Network with Triplet Loss is used to identify duplicate images in real-estate advertisements in the presence of image artifacts such as watermarking, cropping, hue/brightness adjustment, and others. The effects of batch normalization, spatial dropout, and various convergence methodologies on the resulting detection accuracy are discussed. For comparative Return-on-Investment study (per industry request), end-2-end performance is benchmarked on both Nvidia Titan GPUs and Intel’s Xeon CPUs. A new real-estate dataset from San Francisco Bay Area is used for this work. Sufficient duplicate detection accuracy is achieved to supplement other database-grounded methods of duplicate removal. The implemented method is used in a Proof-of-Concept project in the real-estate industry.

Keywords: visual recognition, convolutional neural networks, triplet loss, spatial batch normalization with dropout, duplicate removal, advertisement technologies, performance benchmarking

Procedia PDF Downloads 340
9906 Decision Making during the Project Management Life Cycle of Infrastructure Projects

Authors: Karrar Raoof Kareem Kamoona, Enas Fathi Taher AlHares, Zeynep Isik

Abstract:

The various disciplines in the construction industry and the co-existence of the people in the various disciplines are what builds well-developed, closely-knit interpersonal skills at various hierarchical levels thus leading to a varied way of leadership. The varied decision making aspects during the lifecycle of a project include: autocratic, participatory and last but not least, free-rein. We can classify some of the decision makers in the construction industry in a hierarchical manner as follows: project executive, project manager, superintendent, office engineer and finally the field engineer. This survey looked at how decisions are made during the construction period by the key stakeholders in the project. From the paper it is evident that the three decision making aspects can be used at different times or at times together in order to bring out the best leadership decision. A blend of different leadership styles should be used to enhance the success rate during the project lifecycle.

Keywords: leadership style, construction, decision-making, built environment

Procedia PDF Downloads 360
9905 Determination of the Gain in Learning the Free-Fall Motion of Bodies by Applying the Resource of Previous Concepts

Authors: Ricardo Merlo

Abstract:

In this paper, we analyzed the different didactic proposals for teaching about the free fall motion of bodies available online. An important aspect was the interpretation of the direction and sense of the acceleration of gravity and of the falling velocity of a body, which is why we found different applications of the Cartesian reference system used and also different graphical presentations of the velocity as a function of time and of the distance traveled vertically by the body in the period of time that it was dropped from a height h0. In this framework, a survey of previous concepts was applied to a voluntary group of first-year university students of an Engineering degree before and after the development of the class of the subject in question. Then, Hake's index (0.52) was determined, which resulted in an average learning gain from the meaningful use of the reference system and the respective graphs of v=ƒ (t) and h=ƒ (t).

Keywords: didactic gain, free–fall, physics teaching, previous knowledge

Procedia PDF Downloads 163
9904 Analysis of the Interference from Risk-Determining Factors of Cooperative and Conventional Construction Contracts

Authors: E. Harrer, M. Mauerhofer, T. Werginz

Abstract:

As a result of intensive competition, the building sector is suffering from a high degree of rivalry. Furthermore, there can be observed an unbalanced distribution of project risks. Clients are aimed to shift their own risks into the sphere of the constructors or planners. The consequence of this is that the number of conflicts between the involved parties is inordinately high or even increasing; an alternative approach to counter on that developments are cooperative project forms in the construction sector. This research compares conventional contract models and models with partnering agreements to examine the influence on project risks by an early integration of the involved parties. The goal is to show up deviations in different project stages from the design phase to the project transfer phase. These deviations are evaluated by a survey of experts from the three spheres: clients, contractors and planners. By rating the influence of the participants on specific risk factors it is possible to identify factors which are relevant for a smooth project execution.

Keywords: building projects, contract models, partnering, project risks

Procedia PDF Downloads 276
9903 Sedimentation and Morphology of the Kura River-Deltaic System in the Southern Caucasus under Anthropogenic and Sea-Level Controls

Authors: Elmira Aliyeva, Dadash Huseynov, Robert Hoogendoorn, Salomon Kroonenberg

Abstract:

The Kura River is the major water artery in the Southern Caucasus; it is a third river in the Caspian Sea basin in terms of length and size of the catchment area, the second in terms of the water budget, and the first in the volume of sediment load. Understanding of major controls on the Kura fluvial- deltaic system is valuable for efficient management of the highly populated river basin and coastal zone. We have studied grain size of sediments accumulated in the river channels and delta and dated by 210Pb method, astrophotographs, old topographic and geological maps, and archive data. At present time sediments are supplied by the Kura River to the Caspian Sea through three distributary channels oriented north-east, south-east, and south-west. The river is dominated by the suspended load - mud, silt, very fine sand. Coarse sediments are accumulated in the distributaries, levees, point bar, and delta front. The annual suspended sediment budget in the time period 1934-1952 before construction of the Mingechavir water reservoir in 1953 in the Kura River midstream area was 36 mln.t/yr. From 1953 to 1964, the suspended load has dropped to 12 mln.t/yr. After regulation of the Kura River discharge the volume of suspended load transported via north-eastern channel reduced from 35% of the total sediment amount to 4%, and through the main south-eastern channel increased from 65% to 96% with further fall to 56% due to creation of new south-western channel in 1964. Between 1967-1976 the annual sediment budget of the Kura River reached 22,5 mln. t/yr. From 1977 to 1986, the sediment load carried by the Kura River dropped to 17,6 mln.t/yr. The historical data show that between 1860 and 1907, during relatively stable Caspian Sea level two channels - N and SE, appear to have distributed an equal amount of sediments as seen from the bilateral geometry of the delta. In the time period 1907-1929, two new channels - E and NE, appeared. The growth of three delta lobes - N, NE, and SE, and rapid progradation of the delta has occurred on the background of the Caspian Sea level rise as a result of very high sediment supply. Since 1929 the Caspian Sea level decline was followed by the progradation of the delta occurring along the SE channel. The eastern and northern channels have been silted up. The slow rate of progradation at its initial stage was caused by the artificial reduction in the sediment budget. However, the continuous sea-level fall has brought to this river bed gradient increase, high erosional rate, increase in the sediment supply, and more rapid progradation. During the subsequent sea-level rise after 1977 accompanied by the decrease in the sediment budget, the southern part of the delta has turned into a complex of small, shallow channels oriented to the south. The data demonstrate that behaviour of the Kura fluvial – deltaic system and variations in the sediment budget besides anthropogenic regulation are strongly governed by the Caspian Sea level very rapid changes.

Keywords: anthropogenic control on sediment budget, Caspian sea-level variations, Kura river sediment load, morphology of the Kura river delta, sedimentation in the Kura river delta

Procedia PDF Downloads 156
9902 Cross-Cultural Analysis of the Impact of Project Atmosphere on Project Success and Failure

Authors: Omer Livvarcin, Mary Kay Park, Michael Miles

Abstract:

The current literature includes a few studies that mention the impact of relations between teams, the business environment, and experiences from previous projects. There is, however, limited research that treats the phenomenon of project atmosphere (PA) as a whole. This is especially true of research identifying parameters and sub-parameters, which allow project management (PM) teams to build a project culture that ultimately imbues project success. This study’s findings identify a number of key project atmosphere parameters and sub-parameters that affect project management success. One key parameter identified in the study is a cluster related to cultural concurrence, including artifacts such as policies and mores, values, perceptions, and assumptions. A second cluster centers on motivational concurrence, including such elements as project goals and team-member expectations, moods, morale, motivation, and organizational support. A third parameter cluster relates to experiential concurrence, with a focus on project and organizational memory, previous internal PM experience, and external environmental PM history and experience). A final cluster of parameters is comprised of those falling in the area of relational concurrence, including inter/intragroup relationships, role conflicts, and trust. International and intercultural project management data was collected and analyzed from the following countries: Canada, China, Nigeria, South Korea and Turkey. The cross-cultural nature of the data set suggests increased confidence that the findings will be generalizable across cultures and thus applicable for future international project management success. The intent of the identification of project atmosphere as a critical project management element is that a clear understanding of the dynamics of its sub-parameters upon projects may significantly improve the odds of success of future international and intercultural projects.

Keywords: project management, project atmosphere, cultural concurrence, motivational concurrence, relational concurrence

Procedia PDF Downloads 318
9901 Sports Business Services Model: A Research Model Study in Reginal Sport Authority of Thailand

Authors: Siriraks Khawchaimaha, Sangwian Boonto

Abstract:

Sport Authority of Thailand (SAT) is the state enterprise, promotes and supports all sports kind both professional and athletes for competitions, and administer under government policy and government officers and therefore, all financial supports whether cash inflows and cash outflows are strictly committed to government budget and limited to the planned projects at least 12 to 16 months ahead of reality, as results of ineffective in sport events, administration and competitions. In order to retain in the sports challenges around the world, SAT need to has its own sports business services model by each stadium, region and athletes’ competencies. Based on the HMK model of Khawchaimaha, S. (2007), this research study is formalized into each 10 regional stadiums to details into the characteristics root of fans, athletes, coaches, equipments and facilities, and stadiums. The research designed is firstly the evaluation of external factors: hardware whereby competition or practice of stadiums, playground, facilities, and equipments. Secondly, to understand the software of the organization structure, staffs and management, administrative model, rules and practices. In addition, budget allocation and budget administration with operating plan and expenditure plan. As results for the third step, issues and limitations which require action plan for further development and support, or to cease that unskilled sports kind. The final step, based on the HMK model and modeling canvas by Alexander O and Yves P (2010) are those of template generating Sports Business Services Model for each 10 SAT’s regional stadiums.

Keywords: HMK model, not for profit organization, sport business model, sport services model

Procedia PDF Downloads 307
9900 Walking the Tightrope: Balancing Project Governance, Complexity, and Servant Leadership for Megaproject Success

Authors: Muhammad Shoaib Iqbal, Shih Ping Ho

Abstract:

Megaprojects are large-scale, complex ventures with significant financial investments, numerous stakeholders, and extended timelines, requiring meticulous management for successful completion. This study explores the interplay between project governance, project complexity, and servant leadership and their combined effects on project success, specifically within the context of Pakistani megaprojects. The primary objectives are to examine the direct impact of project governance on project success, understand the negative influence of project complexity, assess the positive role of servant leadership, explore the moderating effect of servant leadership on the relationship between governance and success, and investigate how servant leadership mitigates the adverse effects of complexity. Using a quantitative approach, survey data were collected from project managers and team members involved in Pakistani megaprojects. Using a Comprehensive empirical model, 257 Valid responses were analyzed. Multiple regression analysis tested the hypothesized relationships and interaction effects using PLS-SEM. Findings reveal that project governance significantly enhances project success, emphasizing the need for robust governance structures. Conversely, project complexity negatively impacts success, highlighting the challenges of managing complex projects. Servant leadership significantly boosts project success by prioritizing team support and empowerment. Although the interaction between governance and servant leadership is not significant, suggesting no significant change in project success, servant leadership significantly mitigates the negative effects of project complexity, enhancing team resilience and adaptability. These results underscore the necessity for a balanced approach integrating strong governance with flexible, supportive leadership. The study offers valuable insights for practitioners, recommending adaptive governance frameworks and promoting servant leadership to improve the management and success rates of megaprojects. This research contributes to the broader understanding of effective project management practices in complex environments.

Keywords: project governance, project complexity, servant leadership, project success, megaprojects, Pakistan

Procedia PDF Downloads 38
9899 Promoting Innovation Pedagogy in a Capacity Building Project in Indonesia

Authors: Juha Kettunen

Abstract:

This study presents a project that tests and adjusts active European learning and teaching methods in Indonesian universities to increase their external impact on enterprises and other organizations; it also assesses the implementation of the Erasmus+ projects funded by the European Union. The project is based on the approach of innovation pedagogy that responds to regional development needs and integrates applied research and development projects into education to create capabilities for students to participate in development work after graduation. The assessment of the Erasmus+ project resulted in many improvements that can be made to achieve higher quality and innovativeness. The results of this study are useful for those who want to improve the applied research and development projects of higher education institutions.

Keywords: higher education, innovations, social network, project management

Procedia PDF Downloads 286
9898 Exploration of Abuse of Position for Sexual Gain by UK Police

Authors: Terri Cole, Fay Sweeting

Abstract:

Abuse of position for sexual gain by police is defined as behavior involving individuals taking advantage of their role to pursue a sexual or improper relationship. Previous research has considered whether it involves ‘bad apples’ - individuals with poor moral ethos or ‘bad barrels’ – broader organizational flaws which may unconsciously allow, minimize, or do not effectively deal with such behavior. Low level sexual misconduct (e.g., consensual sex on duty) is more common than more serious offences (e.g., rape), yet the impact of such behavior can have severe implications not only for those involved but can also negatively undermine public confidence in the police. This ongoing, collaborative research project has identified variables from 514 historic case files from 35 UK police forces in order to identify potential risk indicators which may lead to such behavior. Quantitative analysis using logistic regression and the Cox proportion hazard model has resulted in the identification of specific risk factors of significance in prediction. Factors relating to both perpetrator background such as a history of intimate partner violence, debt, and substance misuse coupled with in work behavior such as misusing police systems increase the risk. Findings are able to provide pragmatic recommendations for those tasked with identifying potential or investigating suspected perpetrators of misconduct.

Keywords: abuse of position, forensic psychology, misconduct, sexual abuse

Procedia PDF Downloads 196
9897 Effect of Fortification of Expressed Human Breast Milk with Olive Oil and Skimmed Milk in Improving Weight Gain in Very Low Birth Weight Neonates and Shortening Their Length of Hospital Stay

Authors: Sumrina Kousar

Abstract:

Objective: The aim of this study was to observe the effect of fortification of expressed human breast milk with olive oil and skimmed milk in improving weight gain in very low birth weight neonates and shortening their length of hospital stay. Study Design and place: A randomized controlled trial was carried out at the Combined Military Hospital Lahore from March 2018 to March 2019. Methods: Neonates admitted with very low birth weight and gestational age of < 34 weeks were included in the study. Sixty babies were enrolled using non-probability consecutive sampling; a random number table was used to allocate them into a fortification group and a control group. The control group received expressed milk alone, while olive oil 1 ml twice daily and skimmed milk 1 gram in every third feed were added to expressed milk in the fortification group. Data was analyzed on SPSS 20. Proportions were compared by applying the chi-square test. An independent sample t-test was applied for comparing means. A p-value of ≤ 0.05 was considered significant. Results: The study comprised of 60 neonates, with 30 in each of the groups. Weight gain was 24.83±5.63 in the fortification group and 11.72±3.95 in the control group (p =< 0.001). Mean hospital stay was 20.5716.511 in the fortification group and 27.678.89 in the control group (p =< 0.043). Conclusion: Olive oil and skimmed milk fortification of breast milk was effective for weight gain and reducing the length of hospital stay in very low birth weight neonates.

Keywords: fortification, olive oil, skimmed milk, weight gain

Procedia PDF Downloads 169
9896 The Project Management for Quality Services in Special Education Schools

Authors: Aysegul Salikutluk, Zehra Altinay, Gokmen Dagli, Fahriye Altinay

Abstract:

The aim of the study is to reveal the performance of special education schools as regards the service quality and management within the school culture. The project management and school climate are the fundamental elements for the quality in organisations. Having strategic plans, activities and funded projects improve service quality and satisfaction for the families who have children with disabilities. The research has qualitative nature, self-reports were used to examine the perceptions of teachers upon project management and school climate for service quality. The results show that special education schools' teachers are aware of essence of school climate and flow of communication for service quality and project management.

Keywords: disability, education, service quality, project management

Procedia PDF Downloads 272
9895 Comparison of Budgeting Reforms: A Case Study of Thailand and OECD Member Countries

Authors: Nattapol Pourprasert, Siriwan Manowan

Abstract:

This study aims to find out what budget problems Thailand is facing with and how the results from the comparison between the budgeting reform by Thailand and the reforms by OECD member countries can be used for carrying out budgeting reform of Thailand. The findings from the study on the budget problems that Thailand is facing with reveal that the budgeting system of Thailand lacks of the assessment for the cost-effectiveness of the expenditure of borrowed money and budgets in order to determine whether the expenses are worth the taxes collected from people or not. This is because most popularity policies have unlimited budgets which can lead to the financial risks. Also, these policies create great tax burdens for the descendants in the future and affect the fair distribution of incomes but the Parliament of Thailand never considers these facts. The findings from the comparison between Thai budgeting reform and those by OECD member countries manifest that the traditional budgeting system of Thailand is the department-based budgeting, which is still used without being changed or adjusted in order to fit the new administrative regimes. This traditional budgeting system suggests that a department is responsible for budgeting tasks. Meanwhile, in OECD member countries, budgeting reforms are carried out simultaneously with the reforms of civil service systems so that they are driven in the same directions. The budgeting reforms that rely only on the analyses on economic or technical dimension can hardly lead to success. The budgeting systems of OECD member countries are designed to deal with the unique problems that each of the member countries is facing with rather than adopting the modern system developed by other countries. The budgeting system that has a complicated concept and practice has to be implemented under a flexible strategy so that the departments that implement it can learn about and adjust itself to the system. Continuous and consistent development and training for staff members are also necessary.

Keywords: budgeting reforms, Thailand, OECD member countries, budget problems

Procedia PDF Downloads 287
9894 The Causes and Effects of Housing Project Abandonment in Malaysia

Authors: Abdul Aziz Abdullah, Anuar Alias, Khor Hooi Ting, Guan Ngah Mei

Abstract:

One of the major sectors which contribute significant growth to socio-economic development is the construction and development industry. This industry is most badly hurt during the 1997 and 2008 economic crisis thus causing many government and private projects to be deferred and abandoned. The purpose of this study is to examine the causes and effects of housing project abandonment in Malaysia. This objective is achieved through rigorous review of literatures and documents related to housing and abandoned housing project. The finding revealed there are several causes of housing project abandonment. The significant causes are: economic recession, inadequacy of finance, poor marketing and sales strategies, technical problems faced during construction, problems caused by compensations demanded by squatters for resettlement, insolvency of contractor, cost overrun and currency fluctuation amongst others. However the alarming effect of housing project is: house buyers of abandoned project have the monthly payment although the house is delivered to house buy. In other case house buyers have to entangle in many legal action with the financial institution. This finding provides the various ministries in the Government some insights on real causes and effects of abandoned project. Perhaps this finding can enhance the current solution the Ministry of Housing Local Government on addressing the prevailing issue of reviving existing abandoned project in the country.

Keywords: abandoned project, abandonment, housing project, ministry of housing and local government, causes and effect

Procedia PDF Downloads 541
9893 On Exploring Search Heuristics for improving the efficiency in Web Information Extraction

Authors: Patricia Jiménez, Rafael Corchuelo

Abstract:

Nowadays the World Wide Web is the most popular source of information that relies on billions of on-line documents. Web mining is used to crawl through these documents, collect the information of interest and process it by applying data mining tools in order to use the gathered information in the best interest of a business, what enables companies to promote theirs. Unfortunately, it is not easy to extract the information a web site provides automatically when it lacks an API that allows to transform the user-friendly data provided in web documents into a structured format that is machine-readable. Rule-based information extractors are the tools intended to extract the information of interest automatically and offer it in a structured format that allow mining tools to process it. However, the performance of an information extractor strongly depends on the search heuristic employed since bad choices regarding how to learn a rule may easily result in loss of effectiveness and/or efficiency. Improving search heuristics regarding efficiency is of uttermost importance in the field of Web Information Extraction since typical datasets are very large. In this paper, we employ an information extractor based on a classical top-down algorithm that uses the so-called Information Gain heuristic introduced by Quinlan and Cameron-Jones. Unfortunately, the Information Gain relies on some well-known problems so we analyse an intuitive alternative, Termini, that is clearly more efficient; we also analyse other proposals in the literature and conclude that none of them outperforms the previous alternative.

Keywords: information extraction, search heuristics, semi-structured documents, web mining.

Procedia PDF Downloads 338