5576 Economic Evaluation Offshore Wind Project under Uncertainly and Risk Circumstances

Authors: Sayed Amir Hamzeh Mirkheshti

Abstract:

Offshore wind energy as a strategic renewable energy, has been growing rapidly due to availability, abundance and clean nature of it. On the other hand, budget of this project is incredibly higher in comparison with other renewable energies and it takes more duration. Accordingly, precise estimation of time and cost is needed in order to promote awareness in the developers and society and to convince them to develop this kind of energy despite its difficulties. Occurrence risks during on project would cause its duration and cost constantly changed. Therefore, to develop offshore wind power, it is critical to consider all potential risks which impacted project and to simulate their impact. Hence, knowing about these risks could be useful for the selection of most influencing strategies such as avoidance, transition, and act in order to decrease their probability and impact. This paper presents an evaluation of the feasibility of 500 MV offshore wind project in the Persian Gulf and compares its situation with uncertainty resources and risk. The purpose of this study is to evaluate time and cost of offshore wind project under risk circumstances and uncertain resources by using Monte Carlo simulation. We analyzed each risk and activity along with their distribution function and their effect on the project.

Keywords: wind energy project, uncertain resources, risks, Monte Carlo simulation

Procedia PDF Downloads 334
5575 Futuristic Black Box Design Considerations and Global Networking for Real Time Monitoring of Flight Performance Parameters

Authors: K. Parandhama Gowd

Abstract:

The aim of this research paper is to conceptualize, discuss, analyze and propose alternate design methodologies for futuristic Black Box for flight safety. The proposal also includes global networking concepts for real time surveillance and monitoring of flight performance parameters including GPS parameters. It is expected that this proposal will serve as a failsafe real time diagnostic tool for accident investigation and location of debris in real time. In this paper, an attempt is made to improve the existing methods of flight data recording techniques and improve upon design considerations for futuristic FDR to overcome the trauma of not able to locate the block box. Since modern day communications and information technologies with large bandwidth are available coupled with faster computer processing techniques, the attempt made in this paper to develop a failsafe recording technique is feasible. Further data fusion/data warehousing technologies are available for exploitation.

Keywords: flight data recorder (FDR), black box, diagnostic tool, global networking, cockpit voice and data recorder (CVDR), air traffic control (ATC), air traffic, telemetry, tracking and control centers ATTTCC)

Procedia PDF Downloads 551
5574 Leading Virtual Project Teams in the Post Pandemic Era: Trust and Conflict Management Strategies

Authors: Vidya Badrinarayanan, Appa Iyer Sivakumar

Abstract:

The coronavirus pandemic has sent an important message that future project teams need to be trained to work under virtual conditions, which has already become the new norm in organizations across the world. As organizations increasingly rely on virtual teams to achieve project objectives, it is essential to comprehend how leadership functions in virtual project teams. The purpose of this research is to analyze the leadership behaviors exhibited by project managers for building trust and managing conflicts effectively in virtual project teams. This convergent parallel mixed method research was conducted by surveying 185 virtual leaders and conducting a semi-structured interview with 13 senior virtual leaders involved in managing projects across the industry sectors. The research findings indicate that establishing trust and managing conflicts were ranked as significant challenges in leading virtual project teams in the post-pandemic era. In contrast to earlier findings, our research findings suggest that productivity was not ranked as a significant challenge in leading virtual project teams. This indeed is a positive finding for organizations to consider adopting virtual project teams in the long run. Additionally, the research findings recommend that virtual leaders need to strive to build a high-trust environment and develop effective conflict resolution skills to improve the effectiveness of virtual project teams. As the project management profession struggles with low project success rates, mixed-method research aims to contribute to the knowledge in the growing research area of virtual project leadership. This research contributes to the knowledge by offering first-person accounts from senior virtual leaders on the innovative strategies they had implemented for building trust and resolving conflicts effectively in the virtual project when there were limited opportunities for face-to-face interaction on account of the pandemic. In addition, the leadership framework created as a part of this research for trust development and conflict management in virtual project teams will guide project managers to improve virtual project team effectiveness.

Keywords: conflict management, trust building, virtual leadership, virtual teams

Procedia PDF Downloads 156
5573 Protecting Physicochemical Properties of Black Cumin Seed (Nigella sativa) Oil and Developing Value Added Products

Authors: Zeliha Ustun, Mustafa Ersoz

Abstract:

In the study, a traditional herbal supplement black cumin seed (Nigella sativa) oil properties has been studied to protect the main quality parameters by a new supplement application. Black cumin seed and its oil is used as a dietary supplement and preferred traditional remedy in Africa, Asia and Middle East for centuries. Now it has been consuming by millions of people in America and Europe as natural supplements and/or phytotherapeutic agents to support immune system, asthma, allergic rinnitis etc. by the scientists’ advices. With the study, it is aimed to prove that soft gelatin capsules are a new and more practical way of usage for Nigella sativa oil that has a longer stability. With the study soft gelatin capsules formulation has been developed to protect cold pressed black cumin seed oil physicochemical properties for a longer period. The product design has been developed in laboratory and implemented in pilot scale soft gelatin capsule manufacturing. Physicochemical properties (peroxide value, free fatty acids, fatty acid composition, refractive index, iodine value, saponification value, unsaponifiable matters) of Nigella sativa oil soft gelatin capsules and Nigella sativa oil in liquid form in amber glass bottles have been compared and followed for 8 months. The main parameters for capsules and liquid form found that for free fatty acids 2.29±0.03, 3.92±0.11 % oleic acid, peroxide 23.11±1.18, 27.85±2.50 meqO2/kg, refractive index at 20 0C 1.4738±0.00, 1.4737±0.00, soap 0 ppm, moisture and volatility 0.32±0.01, 0.36±0.01 %, iodine value 123.00±0.00, 122.00±0.00 wijs, saponification value 196.25±0.46, 194.13±0.35 mg KOH/g and unsaponifiable matter 7.72±0.13, 6.88±0.36 g/kg respectively. The main fatty acids are found that linoleic acid 56.17%, oleic acid 24.64%, palmitic acid 11,94 %. As a result, it is found that cold pressed Nigella sativa oil soft gelatin capsules physicochemical properties are more stable than the Nigella sativa oil stored in glass bottles.

Keywords: black cumin seed (Nigella sativa) oil, cold press, nutritional supplements, soft gelatin capsule

Procedia PDF Downloads 345
5572 The Relationship of Building Information Modeling (BIM) Capability in Quantity Surveying Practice and Project Performance

Authors: P. F. Wong, H. Salleh, F. A. Rahim

Abstract:

The adoption of building information modeling (BIM) is increasing in the construction industry. However, quantity surveyors are slow in adoption compared to other professions due to lack of awareness of the BIM’s potential in their profession. It is still unclear on how BIM application can enhance quantity surveyors’ work performance and project performance. The aim of this research is to identify the capabilities of BIM in quantity surveying practices and examine the relationship between BIM capabilities and project performance. Questionnaire survey and interviews were adopted for data collection. Literature reviews identified there are eleven BIM capabilities in quantity surveying practice. Questionnaire results showed that there are several BIM capabilities significantly correlated with project performance in time, cost and quality aspects and the results were validated through interviews. These findings show that BIM has the capabilities to enhance quantity surveyors’ performances and subsequently improved project performance.

Keywords: Building Information Modeling (BIM), quantity surveyors, capability, project performance

Procedia PDF Downloads 345
5571 The Views of Teachers, Students and Parents on the FATIH Project

Authors: Şemsettin Şahin, Ahmet Oğuz Aktürk, İsmail Çelik

Abstract:

This study investigated the views of teachers, students and students' parents on the FATIH (Movement of Enhancing Opportunities and Improving Technology) Project, which was put into service by the Ministry of National Education in cooperation with the Ministry of Transportation in Turkey in November 2010 for the purpose of increasing students' success and planned to be completed within 5 years. The study group consisted of teachers employed in a pilot school in the province of Karaman in central Turkey included within the scope of the FATIH Project, students attending this school and parents whose children are students in that school. The research data were collected through forms developed by the researchers to determine the views of teachers, students and students' parents on the FATIH Project. The descriptive analysis method, one of the qualitative research methods, was used in the study. An analysis of the data revealed that a large majority of the teachers and the students believed that if computers were used to serve their set purpose, then they could make considerable contributions to education. A large majority of the students' parents, on the other hand, regard the use of computers in education as a great opportunity for the students. The views of the teachers, students and students' parents on the FATIH Project usually overlap. Most of the participants in the study pointed out that the FATIH Project was intended to use technology effectively in education. Moreover, each individual participant described their role in the FATIH Project in accordance with their relative position and stated that they could perform whatever was expected of them for the effective and efficient use and progress of the project. The views of the participants regarding the FATİH Project vary according to the kind of the participants.

Keywords: education, FATIH project, technology, students

Procedia PDF Downloads 416
5570 Social Networks And Social Complexity: The Southern Italian Drive For Trade Exchange During The Late Bronze Age

Authors: Sara Fioretti

Abstract:

During the Middle Bronze Age, southern Italy underwent a reorganisation of social structures where local cultures, such as the sub-Apennine and Nuragic, flourished and participated in maritime trade. This paper explores the socio-economic relationships, in both cross-cultural and potentially inter-regional settings, present within the archaeological repertoire of the southern Italian Late Bronze Age (LBA 1600 -1050 BCE). The emergence of economic relations within the connectivity of the regional settlements is explored through ceramic contexts found in the case studies Punta di Zambrone, Broglio di Trebisacce, and Nuraghe Antigori. This paper discusses the findings of a statistical and theoretical approach from an ongoing study in relation to the Mediterranean’s characterisation as a period dominated by Mycenaean influence. This study engages with a theoretical bricolage of Social Networks Entanglement, and Assertive Objects Theory to address the selective and assertive dynamics evident in the cross-cultural trade exchanges as well as consider inter-regional dynamics. Through this intersection of theory and statistical analysis, the case studies establish a small percentage of pottery as imported, whilst assertive productions have a relatively higher quantity. Overall, the majority still adheres to regional Italian traditions. Therefore, we can dissect the rhizomatic relationships cultivated by the Italian coasts and Mycenaeans and their roles within their networks through the intersection of theoretical and statistical analysis. This research offers a new perspective on the complex nature of the Late Bronze Age relational structures.

Keywords: late bronze age, mediterranean archaeology, exchanges and trade, frequency distribution of ceramic assemblages, social network theory, rhizomatic exchanges

Procedia PDF Downloads 31
5569 Project Design Deliverables Sequence (PDD)

Authors: Nahed Al-Hajeri

Abstract:

There are several reasons which lead to a delay in project completion, out of all, one main reason is the delay in deliverable processing, i.e. submission and review of documents. Most of the project cycles start with a list of deliverables but without a sequence of submission of the same, means without a direction to move, leading to overlapping of activities and more interdependencies. Hence Project Design Deliverables (PDD) is developed as a solution to Organize Transmittals (Documents/Drawings) received from contractors/consultants during different phases of an EPC (Engineering, Procurement, and Construction) projects, which gives proper direction to the stakeholders from the beginning, to reduce inter-discipline dependency, avoid overlapping of activities, provide a list of deliverables, sequence of activities, etc. PDD attempts to provide a list and sequencing of the engineering documents/drawings required during different phases of a Project which will benefit both client and Contractor in performing planned activities through timely submission and review of deliverables. This helps in ensuring improved quality and completion of Project in time. The successful implementation begins with a detailed understanding the specific challenges and requirements of the project. PDD will help to learn about vendor document submissions including general workflow, sequence and monitor the submission and review of the deliverables from the early stages of Project. This will provide an overview for the Submission of deliverables by the concerned during the projects in proper sequence. The goal of PDD is also to hold responsible and accountability of all stakeholders during complete project cycle. We believe that successful implementation of PDD with a detailed list of documents and their sequence will help organizations to achieve the project target.

Keywords: EPC (Engineering, Procurement, and Construction), project design deliverables (PDD), econometrics sciences, management sciences

Procedia PDF Downloads 377
5568 The Influence of Substrate and Temperature on the Growth of Phytophthora palmivora of Cocoa Black Pod Disease

Authors: Suhaida Salleh, Tee Yei Kheng

Abstract:

Black pod is the most commonly destructive disease of cacao (Theobroma cacao) which cause major losses to global production of cocoa beans. The genus of Phytophthora is the important pathogen of this disease worldwide. The species of P. megakarya causes black pod disease in West Africa, whereas P. capsici and P. citrophthora cause the incident in Central and South America. In Malaysia, this disease is caused by P. palmivora which infect all stages of pod development including flower cushion, cherelle, immature and mature pods. This pathogen destroys up to 10% of trees yearly through stem cankers and causes 20 to 30% pod damages through black pod rot. Since P. palmivora has a high impact on cocoa yield, it is crucial to identify some of the abiotic factors that can constrain their growth. In an effort to evaluate the effect of different substrates and temperatures to the growth of P. palmivora, a laboratory study was done under a different range of temperatures. Different substrate for the growth of P. palmivora were used which are corn meal agar (CMA) media and detached pod of cocoa. An agar plug of seven days old of P. palmivora growth was transferred on both substrates and incubated at 24, 27, 30, 33 and 36ᵒC, respectively. The diameter of lesion on pod and the cultural growth of pathogen was recorded for 7 consecutive days. The optimum incubation temperature of P. palmivora on both substrates is at 27ᵒC. However, the growth tends to be inhibited as the temperature increases. No lesion developed on pod surface incubated at 36ᵒC and only a small lesion observed at 33ᵒC. The sporulation with the formation of white mycelial growth on pod surface was only visible at optimum temperature, 27ᵒC. On CMA, the pathogen grew over the entire range of temperatures tested. The study is, therefore, concluded that P. palmivora grow the best at temperature of 27ᵒC on both substrates and their growth begin to inhibit when the temperature rises to more than 27ᵒC. The growth pattern of this pathogen is similar on both pod surface and cultural media.

Keywords: cocoa, Phytophthora palmivora, substrate, temperature

Procedia PDF Downloads 171
5567 Mobile Cloud Application in Design Build Bridge Construction

Authors: Meng Sun, Bin Wei

Abstract:

In the past decades, design-build has become a more popular project delivery system especially for the large scaled infrastructure project in North America. It provides a one-stop shopping system for the client therefore improves the efficiency of construction, and reduces the risks and overall cost for the clients. Compared to the project with traditional delivery method, design-build project requires contractor and designer to work together efficiently to deliver the best-value solutions through the construction process. How to facilitate a solid integration and efficient interaction between contractor and designer often affects the schedule, budget and quality of the construction therefore becomes a key factor to the success of a design-build project. This paper presents a concept of using modern mobile cloud technology to provide an integrated solution during the design-build construction. It uses mobile cloud architecture to provide a platform for real-time field progress, change request approval, job progress log, and project time entry with devices integration for field information and communications. The paper uses a real filed change notice as an example to demonstrate how mobile cloud technology applies in a design-build project and how it can improve the project efficiency.

Keywords: cloud, design-build, field change notice, mobile application

Procedia PDF Downloads 222
5566 Managing Early Stakeholder Involvement at the Early Stages of a Building Project Life Cycle

Authors: Theophilus O. Odunlami, Hasan Haroglu, Nader Saleh-Matter

Abstract:

The challenges facing the construction industry are often worsened by the compounded nature of projects coupled with the complexity of key stakeholders involved at different stages of the project. Projects are planned to achieve outlined benefits in line with the business case; however, a lack of effective management of key stakeholders can result in unrealistic delivery aspirations, unnecessary re-works, and overruns. The aim of this study is to examine the early stages of a project lifecycle and investigate the stakeholder management and involvement processes and their impact on the successful delivery of the project. The research engaged with conventional construction organisations and project personnel and stakeholders on diverse projects, using a research strategy to analyse existing project case studies, narrative enquiries, interviews, and surveys using a combined qualitative, quantitative, and mixed method of analysis. Research findings have shown that the involvement of stakeholders at different levels during the early stages has pronounced effects on project delivery; it helps to forge synergy and promotes a clear understanding of individual responsibilities, strengths, and weaknesses. This has often fostered a positive sense of productive collaboration right through the early stages of the project. These research findings intend to contribute to the development of a process framework for stakeholder and project team involvement in the early stages of a project. This framework will align with the selection criteria for stakeholders, contractors, and resources, ultimately contributing to the successful completion of projects. The primary question addressed in this study is stakeholder involvement and management of the early stages of a building project life cycle impacts project delivery. Findings showed that early-stage stakeholder involvement and collaboration between project teams and contractors significantly contribute to project success. However, a strong and healthy communication strategy would be required to maintain the flow of value-added ideas among stakeholders at the early stages to benefit the project at the execution stage.

Keywords: early stages, project lifecycle, stakeholders, decision-making strategy, project framework

Procedia PDF Downloads 75
5565 Effect of Building Construction Sizes on Project Delivery Methods in Nigeria

Authors: Nuruddeen Usman, Mohammad Sani

Abstract:

The performance of project delivery methods has been an issue of concern to various stakeholders in the construction industry. The contracting system of project delivery is the traditional system used in the delivery of most public projects in Nigeria. The direct labor system is used most times as an alternative to the traditional system. There were so many complain about the performance of contracting system and the suitability of direct labor as an alternative to the delivery of public projects. Therefore, this paper is aimed at investigating the effect of project size on the project delivery methods in the completed public buildings. Questionnaires were self-administered to managerial staff in the study area and analyzed using descriptive statistics. The findings reveals that contracting system was choosing for large size building construction project delivery with higher frequency (F) of 40 (76.9%) against direct labor with 12 (23.1%). While the small size project, the result revealed a frequency (F) of 26 (50%) for contracting system and direct labor system respectively. Base on the research findings, the contracting system, was recommended for all sizes of building construction project delivery while direct labor system can only use as an alternative for small size building construction projects delivery.

Keywords: construction size, contracting system, direct labour, effect

Procedia PDF Downloads 436
5564 Archaeology Study of Soul Houses in Ancient Egypt on Five Models in the Grand Egyptian Museum

Authors: Ayman Aboelkassem, Mahmoud Ali

Abstract:

Introduction: The models of soul houses have appeared in the prehistory, old kingdom and middle kingdom period. These soul houses represented the imagination of the deceased about his house in the afterlife, some of these soul houses were two floors and the study will examine five models of soul houses which were discovered near Saqqara site by an Egyptian mission. These models had been transferred to The Grand Egyptian Museum (GEM) to be ready to display at the new museum. We focus on models of soul houses (GEM Numbers, 1276, 1280, 1281, 1282, 8711) these models of soul houses were related to the old kingdom period. These models were all made of pottery, the five models have an oval shape and were decorated with relief. Methodology: The study will focus on the development of soul houses during the different periods in ancient Egypt, the function of soul houses, the kind of offerings which were put in it and the symbolism of the offerings colors in ancient Egyptian believe. Conclusion: This study is useful for the heritage and ancient civilizations especially when we talk about opening new museums like The Grand Egyptian Museum which will display a new collection of soul houses. The study of soul houses and The kinds of offerings which put in it reflect the economic situation in the Egyptian society and kinds of oils which were famous in ancient Egypt.

Keywords: archaeology study, Grand Egyptian Museum, relief, soul houses

Procedia PDF Downloads 230
5563 Diet and Exercise Intervention and Bio–Atherogenic Markers for Obesity Classes of Black South Africans with Type 2 Diabetes Mellitus Using Discriminant Analysis

Authors: Oladele V. Adeniyi, B. Longo-Mbenza, Daniel T. Goon

Abstract:

Background: Lipids are often low or in the normal ranges and controversial in the atherogenesis among Black Africans. The effect of the severity of obesity on some traditional and novel cardiovascular disease risk factors is unclear before and after a diet and exercise maintenance programme among obese black South Africans with type 2 diabetes mellitus (T2DM). Therefore, this study aimed to identify the risk factors to discriminate obesity classes among patients with T2DM before and after a diet and exercise programme. Methods: This interventional cohort of Black South Africans with T2DM was followed by a very – low calorie diet and exercise programme in Mthatha, between August and November 2013. Gender, age, and the levels of body mass index (BMI), blood pressure, monthly income, daily frequency of meals, blood random plasma glucose (RPG), serum creatinine, total cholesterol (TC), triglycerides (TG), LDL –C, HDL – C, Non-HDL, ratios of TC/HDL, TG/HDL, and LDL/HDL were recorded. Univariate analysis (ANOVA) and multivariate discriminant analysis were performed to separate obesity classes: normal weight (BMI = 18.5 – 24.9 kg/m2), overweight (BMI = 25 – 29.9 kg/m2), obesity Class 1 (BMI = 30 – 34.9 kg/m2), obesity Class 2 (BMI = 35 – 39.9 kg/m2), and obesity Class 3 (BMI ≥ 40 kg/m2). Results: At the baseline (1st Month September), all 327 patients were overweight/obese: 19.6% overweight, 42.8% obese class 1, 22.3% obese class 2, and 15.3% obese class 3. In discriminant analysis, only systolic blood pressure (SBP with positive association) and LDL/HDL ratio (negative association) significantly separated increasing obesity classes. At the post – evaluation (3rd Month November), out of all 327 patients, 19.9%, 19.3%, 37.6%, 15%, and 8.3% had normal weight, overweight, obesity class 1, obesity class 2, and obesity class 3, respectively. There was a significant negative association between serum creatinine and increase in BMI. In discriminant analysis, only age (positive association), SBP (U – shaped relationship), monthly income (inverted U – shaped association), daily frequency of meals (positive association), and LDL/HDL ratio (positive association) classified significantly increasing obesity classes. Conclusion: There is an epidemic of diabesity (Obesity + T2DM) in this Black South Africans with some weight loss. Further studies are needed to understand positive or negative linear correlations and paradoxical curvilinear correlations between these markers and increase in BMI among black South African T2DM patients.

Keywords: atherogenic dyslipidaemia, dietary interventions, obesity, south africans

Procedia PDF Downloads 340
5562 Impact of Ship Traffic to PM 2.5 and Particle Number Concentrations in Three Port-Cities of the Adriatic/Ionian Area

Authors: Daniele Contini, Antonio Donateo, Andrea Gambaro, Athanasios Argiriou, Dimitrios Melas, Daniela Cesari, Anastasia Poupkou, Athanasios Karagiannidis, Apostolos Tsakis, Eva Merico, Rita Cesari, Adelaide Dinoi

Abstract:

Emissions of atmospheric pollutants from ships and harbour activities are a growing concern at International level given their potential impacts on air quality and climate. These close-to-land emissions have potential impact on local communities in terms of air quality and health. Recent studies show that the impact of maritime traffic to atmospheric particulate matter concentrations in several coastal urban areas is comparable with the impact of road traffic of a medium size town. However, several different approaches have been used for these estimates making difficult a direct comparison of results. In this work an integrated approach based on emission inventories and dedicated measurement campaigns has been applied to give a comparable estimate of the impact of maritime traffic to PM2.5 and particle number concentrations in three major harbours of the Adriatic/Ionian Seas. The influences of local meteorology and of the logistic layout of the harbours are discussed.

Keywords: ship emissions, PM2.5, particle number concentrations, impact of shipping to atmospheric aerosol

Procedia PDF Downloads 730
5561 Critical Activity Effect on Project Duration in Precedence Diagram Method

Authors: Salman Ali Nisar, Koshi Suzuki

Abstract:

Precedence Diagram Method (PDM) with its additional relationships i.e., start-to-start, finish-to-finish, and start-to-finish, between activities provides more flexible schedule than traditional Critical Path Method (CPM). But, changing the duration of critical activities in PDM network will have anomalous effect on critical path. Researchers have proposed some classification of critical activity effects. In this paper, we do further study on classifications of critical activity effect and provide more information in detailed. Furthermore, we determine the maximum amount of time for each class of critical activity effect by which the project managers can control the dynamic feature (shortening/lengthening) of critical activities and project duration more efficiently.

Keywords: construction project management, critical path method, project scheduling, precedence diagram method

Procedia PDF Downloads 484
5560 Development of Verification System of Workspace Clashes Between Construction Activities

Authors: Hyeon-Seung Kim, Sang-Mi Park, Min-Seo Kim, Jong-Myeung Shin, Leen-Seok Kang

Abstract:

Recently, the use of Building Information Modeling (BIM) in public construction works has become mandatory in some countries and it is anticipated that BIM will be applied to the actual field of civil engineering projects. However, the BIM system is still focused on the architectural project and the design phase. Because the civil engineering project is linear type project and is focused on the construction phase comparing with architectural project, 3D simulation is difficult to visualize them. This study suggests a method and a prototype system to solve workspace conflictions among construction activities using BIM simulation tool.

Keywords: BIM, workspace, confliction, visualization

Procedia PDF Downloads 379
5559 Vocal Advocacy: A Case Study at the First Black College Regarding Students Experiencing an Empowerment Workshop

Authors: Denise F. Brown, Melina McConatha

Abstract:

African Americans utilizing the art of vocal expressions, particularly for self-expression, has been a historical avenue of advocating for social justice and human rights. Vocal expressions can take many forms, such as singing, poetry, storytelling, and acting. Many well-known artists, politicians, leaders, and teachers used their voices to promote the causes and concerns of the African American community as well as the expression of their own experiences of being 'black' in America. The purpose of this project was to evaluate the perceptions of African American students in utilizing their voices for self-awareness, interview skills, and social change after attending a three-part workshop on vocal advocacy. This research utilized the framework of black feminism to understand empowerment in advocacy and self-expression. Students participated in learning about the power of their voices, and what purpose presence, and passion they discovered through the Immersive Voice workshop. There were three areas covered in the workshop. The first area was the power of the voice, the second area was the application of vocal passion, and the third area was applying the vocal power to express personal interest, interests of advocating for others, and confidence and speaking to others to further careers, i.e., using vocal power for job interviewing skills. The students were instructed to prepare for the workshops by completing a pre-workshop open-ended survey. There were a total of 15 students that participated. After the workshop ended, the students were instructed to complete a post-workshop survey. The surveys were assessed by evaluating both themes and codes from student's written feedback. From the pre-workshop survey, students were given a survey for them to provide feedback regarding the power of voice prior to participating in the workshops. From the student's responses, the theme (advocating for self and others) emerged as it related to student's feedback on what it means to advocate. There were three codes that led to the theme, having knowledge about advocating for self and others, gaining knowledge to advocate for self and others, and using that knowledge to advocate for self and others. After the students completed participation in the workshops, a post workshop- survey was given to the students. Students' feedback was assessed, and the same theme emerged, 'advocating for self and others.' The codes related to the theme, however, were different and included using vocal power (a term students learned during the workshop) to represent self, represent others, and obtain a job/career. In conclusion, the results of the survey showed that students still perceived advocating as speaking up for themselves and other people. After the workshop, students still continued to associate advocacy with helping themselves and helping others but were able to be more specific about how the sound of their voice could help in advocating, and how they could use their voice to represent themselves in getting a job or starting a career.

Keywords: advocacy, command, self-expression, voice

Procedia PDF Downloads 96
5558 Macroeconomic Measure of Projectification: An Empirical Study of Pakistani Economy

Authors: Shafaq Rana, Hina Ansar

Abstract:

Projectification is an emerging phenomenon in Western economies. The projects have become the key driver of the economic actions. The impact of projectification is understudy for over a decade. A methodology was developed to measure the degree of projectification at economical level, which was later adapted to measure the degree of projectification in Germany, Norway, and Iceland; and compared the differences in these project societies, considering their industrial structure, organizational size, and the share of project work. Using the same methodology, this study aims to provide empirical evidence of the project work in the context of Pakistan –a developing nation, keeping into consideration the macroeconomic measures, qualitative and quantitative measures of the project i/c GDP, monetary measures, and project success. The research includes a qualitative pre-study to define these macro-measures in the country-specific context and a quantitative study to measure the project work w.r.t hours working in the organizations on projects. The outcome of this study provides the key data on the projectification in a developing economy, which will help industry practitioners and decision-makers to examine the consequences of projectification and strategize, respectively. This study also provides a foundation for further research in individual sectors of the country while exploring different macroeconomic questions, including the effect of projectification on project productivity, income effects, and labor market.

Keywords: developing economy, Pakistan, project work, projectification

Procedia PDF Downloads 97
5557 A Risk Management Framework for Selling a Mega Power Plant Project in a New Market

Authors: Negar Ganjouhaghighi, Amirali Dolatshahi

Abstract:

The origin of most risks of a mega project usually takes place in the phases before closing the contract. As a practical point of view, using project risk management techniques for preparing a proposal is not a total solution for managing the risks of a contract. The objective of this paper is to cover all those activities associated with risk management of a mega project sale’s processes; from entrance to a new market to awarding activities and the review of contract performance. In this study, the risk management happens in six consecutive steps that are divided into three distinct but interdependent phases upstream of the award of the contract: pre-tendering, tendering and closing. In the first step, by preparing standard market risk report, risks of the new market are identified. The next step is the bid or no bid decision making based on the previous gathered data. During the next three steps in tendering phase, project risk management techniques are applied for determining how much contingency reserve must be added or reduced to the estimated cost in order to put the residual risk to an acceptable level. Finally, the last step which happens in closing phase would be an overview of the project risks and final clarification of residual risks. The sales experience of more than 20,000 MW turn-key power plant projects alongside this framework, are used to develop a software that assists the sales team to have a better project risk management.

Keywords: project marketing, risk management, tendering, project management, turn-key projects

Procedia PDF Downloads 308
5556 Integrated Information System on Human Resource Management in Project-Based Organizations

Authors: Akbar Farahani, Afsaneh Hassani, Peyman M. Farkhondeh

Abstract:

Human Resource Management as one of the core processes of the project-based companies, despite its key role in the success and competitive advantage, is relatively unknown. In the project-based companies, due to the accelerated movement of knowledge in the work activities and the temporary nature of the project, the need to develop mechanisms for achieving optimal management of this issues is very challenging. Approach to human resource management in these companies evolves with goals, strategies, and operational processes. Therefore, the need for appropriate tools to facilitate implementation of the optimized human resource management in the project is more than before,Which currently with the development of information technology and modern communication, appropriate to address the optimal approach for dynamic management of human resources in the project have been provided.This is done by using the referral system implemented in Mahab GCE that provides 1: the ability to use humans in projects without geographic limitation and 2:information on the activities and outcomes of referrals.Furthermore, by using this system, recording the lessons learned after any particular activity on projects,accessing quantitative information, procedures, documentation of learned practices that have been stored in the data base as well as using them in future projects is provided.

Keywords: human resource management, project base company, ERP, referrals system

Procedia PDF Downloads 453
5555 Critical Success Factors for Sustainable Smart City Project in India

Authors: Debasis Sarkar

Abstract:

Development of a Smart City would depend upon the development of its infrastructure in a smart way. Primarily based on the ideology of the fourth industrial revolution a Smart City project should have Smart governance, smart health care, smart building, smart transportation, smart mobility, smart energy, smart technology and smart citizen. Considering the Indian scenario of current state of cities in India, it has become very essential to decide the specific parameters which would govern the development of a Smart City project. It has been observed that there are significant parameters beyond Information and Communication Technology (ICT), which govern the development of a Smart City project. This paper is an attempt to identify the Critical Success Factors (CSF) which are significantly responsible for the development of a Smart City project in Western India. Responses to questionnaire survey were analyzed on basis of Likert scale. They were further critically evaluated with help of Factor Comparison Method (FCM) and Analytical Hierarchy Process (AHP). The project authorities need to incorporate Building Information Modeling (BIM) to make the smart city project more collaborative. To make the project more sustainable, use of flyash in the concrete used, reduced usage of cement and steel, use of alternate fuels like biodiesel is recommended.

Keywords: analytical hierarchical process, building information modeling, critical success factors, factor comparison method

Procedia PDF Downloads 227
5554 Archaeology Study of Soul Houses in Ancient Egypt on Five Models in the Grand Egyptian Museum

Authors: Mahmoud Aly, Mohamed Ismail, Mohamed Badereldin, Amro Mostafa

Abstract:

Introduction: The models of soul houses were appeared in the prehistory, old kingdom, and middle kingdom period. They represented the imagination of the deceased about his house in the afterlife, some of these soul houses were two floors, and the study will examine five models of soul houses which were discovered near Saqqara site by an Egyptian mission. These models had been transferred to The Grand Egyptian Museum (GEM) to be ready to display at the new museum. We focus upon five models of soul houses (GEM Numbers, 1276,1280,1281,1282,8711) they related to the old kingdom period. These models were all made of pottery, the five models have oval shape and were decorated with relief. Methodology: The study will focus on the development of soul houses during the different periods in ancient Egypt and the kinds of offerings which will reflect the economic situation in the Egyptian society and kinds of oils which were famous in ancient Egypt. Conclusion: This research focuses on the function of soul house and the kind of offerings which were put in it, This study will be useful for the heritage and ancient civilizations, specially when we talk about opening new museums like The Grand Egyptian Museum, which will display a new collection of soul houses.

Keywords: archaeology study, grand egyptian museum, relief, soul houses

Procedia PDF Downloads 55
5553 Identifying the Determinants of Compliance with Maritime Environmental Legislation in the North and Baltic Sea Area: A Model Developed from Exploratory Qualitative Data Collection

Authors: Thea Freese, Michael Gille, Andrew Hursthouse, John Struthers

Abstract:

Ship operators on the North and Baltic Sea have been experiencing increased political interest in marine environmental protection and cleaner vessel operations. Stricter legislation on SO2 and NOx emissions, ballast water management and other measures of protection are currently being phased in or will come into force in the coming years. These measures benefit the health of the marine environment, while increasing company’s operational costs. In times of excess shipping capacity and linked consolidation in the industry non-compliance with environmental rules is one way companies might hope to stay competitive with both intra- and inter-modal trade. Around 5-15% of industry participants are believed to neglect laws on vessel-source pollution willingly or unwillingly. Exploratory in-depth interviews conducted with 12 experts from various stakeholder groups informed the researchers about variables influencing compliance levels, including awareness and apprehension, willingness to comply, ability to comply and effectiveness of controls. Semi-structured expert interviews were evaluated using qualitative content analysis. A model of determinants of compliance was developed and is presented here. While most vessel operators endeavour to achieve full compliance with environmental rules, a lack of availability of technical solutions, expediency of implementation and operation and economic feasibility might prove a hindrance. Ineffective control systems on the other hand foster willing non-compliance. With respect to motivations, lacking time, lacking financials and the absence of commercial advantages decrease compliance levels. These and other variables were inductively developed from qualitative data and integrated into a model on environmental compliance. The outcomes presented here form part of a wider research project on economic effects of maritime environmental legislation. Research on determinants of compliance might inform policy-makers about actual behavioural effects of shipping companies and might further the development of a comprehensive legal system for environmental protection.

Keywords: compliance, marine environmental protection, exploratory qualitative research study, clean vessel operations, North and Baltic Sea area

Procedia PDF Downloads 362
5552 Engaging Mature Learners through Video Case Studies

Authors: Jacqueline Mary Jepson

Abstract:

This article provides a case study centred on the development of 13 video episodes which have been created to enhance student engagement with a post graduate online course in Project Management. The student group was unique as their online course needed to provide for asynchronistic learning and an adult learning pedagogy. In addition, students had come from a wide range professional backgrounds, with some having no Project Management experience, while others had 20 years or more. Students had to gain an understanding of an advanced body of knowledge and the course needed to achieve the academic requirements to qualify individuals to apply their learning in a range of contexts for professional practice and scholarship. To achieve this, a 13 episode case study was developed along with supportive learning materials based on the relocation of a zoo. This unique project provided a learning environment where the project could evolve over each video episode demonstrating the application of Project Management methodology which was then tied into the learning outcomes for the course and the assessment tasks. Discussion forums provided a way for students to converse and demonstrate their own understanding of content and how Project Management methodology can be applied.

Keywords: project management, adult learning, video case study, asynchronistic education

Procedia PDF Downloads 316
5551 Translation and Sociolinguistics of Classical Books

Authors: Laura de Almeida

Abstract:

This paper aims to present research involving the translation of classical books originally in English and translated into the Portuguese language. The objective is to analyze the linguistic varieties evident and how they appear in the other language the work was translated into. We based our study on the sociolinguistics theory, more specifically, the study of the Black English Vernacular. Our methodology is built on collecting data from the speech characters of the Black English Vernacular from some books such as The Adventures of Huckleberry Finn by Mark Twain. On doing so, we compare the two versions of a book and how they reflected the linguistic variety. Our purpose is to show that some translators do not worry when dealing with linguistic variety. In other words, they just translate the story without taking into account some important linguistic aspects which need attention, such as language variation.

Keywords: classical books, linguistic variation, sociolinguistics, translation

Procedia PDF Downloads 372
5550 BIM Application and Construction Schedule Simulation for the Horizontal Work Area

Authors: Hyeon-Seong Kim, Sang-Mi Park, Seul-Gi Kim, Seon-Ju Han, Leen-Seok Kang

Abstract:

The use of BIM, including 4D CAD system, in a construction project is gradually increasing. Since the building construction works repeatedly in the vertical space, it is relatively easy to confirm the interference effect when applying the BIM, but the interference effect for the civil engineering project is relatively small because the civil works perform non-repetitive processes in the horizontal space. For this reason, it is desirable to apply BIM to the construction phase when applying BIM to the civil engineering project, and the most active BIM tool applied to the construction phase is the 4D CAD function for the schedule management. This paper proposes the application procedure of BIM by the construction phase of civil engineering project and a linear 4D CAD construction methodology suitable for the civil engineering project in which linear work is performed.

Keywords: BIM, 4D CAD, linear 4D simulation, VR

Procedia PDF Downloads 374
5549 The Use of Modern Technologies and Computers in the Archaeological Surveys of Sistan in Eastern Iran

Authors: Mahyar MehrAfarin

Abstract:

The Sistan region in eastern Iran is a significant archaeological area in Iran and the Middle East, encompassing 10,000 square kilometers. Previous archeological field surveys have identified 1662 ancient sites dating from prehistoric periods to the Islamic period. Research Aim: This article aims to explore the utilization of modern technologies and computers in archaeological field surveys in Sistan, Iran, and the benefits derived from their implementation. Methodology: The research employs a descriptive-analytical approach combined with field methods. New technologies and software, such as GPS, drones, magnetometers, equipped cameras, satellite images, and software programs like GIS, Map source, and Excel, were utilized to collect information and analyze data. Findings: The use of modern technologies and computers in archaeological field surveys proved to be essential. Traditional archaeological activities, such as excavation and field surveys, are time-consuming and costly. Employing modern technologies helps in preserving ancient sites, accurately recording archaeological data, reducing errors and mistakes, and facilitating correct and accurate analysis. Creating a comprehensive and accessible database, generating statistics, and producing graphic designs and diagrams are additional advantages derived from the use of efficient technologies in archaeology. Theoretical Importance: The integration of computers and modern technologies in archaeology contributes to interdisciplinary collaborations and facilitates the involvement of specialists from various fields, such as geography, history, art history, anthropology, laboratory sciences, and computer engineering. The utilization of computers in archaeology spanned across diverse areas, including database creation, statistical analysis, graphics implementation, laboratory and engineering applications, and even artificial intelligence, which remains an unexplored area in Iranian archaeology. Data Collection and Analysis Procedures: Information was collected using modern technologies and software, capturing geographic coordinates, aerial images, archeogeophysical data, and satellite images. This data was then inputted into various software programs for analysis, including GIS, Map source, and Excel. The research employed both descriptive and analytical methods to present findings effectively. Question Addressed: The primary question addressed in this research is how the use of modern technologies and computers in archeological field surveys in Sistan, Iran, can enhance archaeological data collection, preservation, analysis, and accessibility. Conclusion: The utilization of modern technologies and computers in archaeological field surveys in Sistan, Iran, has proven to be necessary and beneficial. These technologies aid in preserving ancient sites, accurately recording archaeological data, reducing errors, and facilitating comprehensive analysis. The creation of accessible databases, statistics generation, graphic designs, and interdisciplinary collaborations are further advantages observed. It is recommended to explore the potential of artificial intelligence in Iranian archaeology as an unexplored area. The research has implications for cultural heritage organizations, archaeology students, and universities involved in archaeological field surveys in Sistan and Baluchistan province. Additionally, it contributes to enhancing the understanding and preservation of Iran's archaeological heritage.

Keywords: Iran, sistan, archaeological surveys, computer use, modern technologies

Procedia PDF Downloads 53
5548 Understanding Complexity at Pre-Construction Stage in Project Planning of Construction Projects

Authors: Mehran Barani Shikhrobat, Roger Flanagan

Abstract:

The construction planning and scheduling based on using the current tools and techniques is resulted deterministic in nature (Gantt chart, CPM) or applying a very little probability of completion (PERT) for each task. However, every project embodies assumptions and influences and should start with a complete set of clearly defined goals and constraints that remain constant throughout the duration of the project. Construction planners continue to apply the traditional methods and tools of “hard” project management that were developed for “ideal projects,” neglecting the potential influence of complexity on the design and construction process. The aim of this research is to investigate the emergence and growth of complexity in project planning and to provide a model to consider the influence of complexity on the total project duration at the post-contract award pre-construction stage of a project. The literature review showed that complexity originates from different sources of environment, technical, and workflow interactions. They can be divided into two categories of complexity factors, first, project tasks, and second, project organisation management. Project tasks may originate from performance, lack of resources, or environmental changes for a specific task. Complexity factors that relate to organisation and management refer to workflow and interdependence of different parts. The literature review highlighted the ineffectiveness of traditional tools and techniques in planning for complexity. However, this research focus on understanding the fundamental causes of the complexity of construction projects were investigated through a questionnaire with industry experts. The results were used to develop a model that considers the core complexity factors and their interactions. System dynamics were used to investigate the model to consider the influence of complexity on project planning. Feedback from experts revealed 20 major complexity factors that impact project planning. The factors are divided into five categories known as core complexity factors. To understand the weight of each factor in comparison, the Analytical Hierarchy Process (AHP) analysis method is used. The comparison showed that externalities are ranked as the biggest influence across the complexity factors. The research underlines that there are many internal and external factors that impact project activities and the project overall. This research shows the importance of considering the influence of complexity on the project master plan undertaken at the post-contract award pre-construction phase of a project.

Keywords: project planning, project complexity measurement, planning uncertainty management, project risk management, strategic project scheduling

Procedia PDF Downloads 76
5547 Developing a Recommendation Library System based on Android Application

Authors: Kunyanuth Kularbphettong, Kunnika Tenprakhon, Pattarapan Roonrakwit

Abstract:

In this paper, we present a recommendation library application on Android system. The objective of this system is to support and advice user to use library resources based on mobile application. We describe the design approaches and functional components of this system. The system was developed based on under association rules, Apriori algorithm. In this project, it was divided the result by the research purposes into 2 parts: developing the Mobile application for online library service and testing and evaluating the system. Questionnaires were used to measure user satisfaction with system usability by specialists and users. The results were satisfactory both specialists and users.

Keywords: online library, Apriori algorithm, Android application, black box

Procedia PDF Downloads 462