Search results for: AI project success factors
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 16223

Search results for: AI project success factors

15893 Collaborative Technology Implementation Success and Knowledge Capacity: Case of Tunisian Banks with Mixed Capital

Authors: Amira Khelil, Habib Affes

Abstract:

Organization resource planning implementation success is important. Today`s competitors in business, in enterprise resource planning and in managing are becoming one of the main tools of achieving competitiveness in business. Resource technologies are considered as an infrastructure to create and maintain business to improve front and back-office efficiency and effectiveness. This study is significant to bring new ideas in determining the key antecedents which are technological resource planning implementation based on knowledge capacity perspectives and help to understand the key success factor in the Tunisian banks. Based on a survey of 150 front office Tunisian agents working in Tunisian banks with mixed capital, using Groupware system, only 51 respondents had given feedback to this survey. By using Warp PLS 3.0, through several tests the relationship between knowledge capability and Groupware implementation success having beta coefficient 0.37 and P-Value <0.01. This result highlights that knowledge capability of bank agent can influence the success of the Groupware implementation.

Keywords: groupware implementation, knowledge capacity, partial least squares method, Tunisian banks

Procedia PDF Downloads 482
15892 A Risk-Based Approach to Construction Management

Authors: Chloe E. Edwards, Yasaman Shahtaheri

Abstract:

Risk management plays a fundamental role in project planning and delivery. The purpose of incorporating risk management into project management practices is to identify and address uncertainties related to key project-related activities. The uncertainties, known as risk events, can relate to project deliverables that are quantifiable and are often measured by impact to project schedule, cost, or environmental impact. Risk management should be incorporated as an iterative practice throughout the planning, execution, and commissioning phases of a project. This paper specifically examines how risk management contributes to effective project planning and delivery through a case study of a transportation project. This case study focused solely on impacts to project schedule regarding three milestones: readiness for delivery, readiness for testing and commissioning, and completion of the facility. The case study followed the ISO 31000: Risk Management – Guidelines. The key factors that are outlined by these guidelines include understanding the scope and context of the project, conducting a risk assessment including identification, analysis, and evaluation, and lastly, risk treatment through mitigation measures. This process requires continuous consultation with subject matter experts and monitoring to iteratively update the risks accordingly. The risk identification process led to a total of fourteen risks related to design, permitting, construction, and commissioning. The analysis involved running 1,000 Monte Carlo simulations through @RISK 8.0 Industrial software to determine potential milestone completion dates based on the project baseline schedule. These dates include the best case, most likely case, and worst case to provide an estimated delay for each milestone. Evaluation of these results provided insight into which risks were the highest contributors to the projected milestone completion dates. Based on the analysis results, the risk management team was able to provide recommendations for mitigation measures to reduce the likelihood of risks occurring. The risk management team also provided recommendations for managing the identified risks and project activities moving forward to meet the most likely or best-case milestone completion dates.

Keywords: construction management, monte carlo simulation, project delivery, risk assessment, transportation engineering

Procedia PDF Downloads 102
15891 Entrepreneur Competencies: An Exploratory Study Applied to Educational Social Enterprise in South East Asia

Authors: D. Songpol, K. Taweesak, T. Sookyuen

Abstract:

A social enterprise is an organization that operates commercial business as a source of income with the aim of addressing social and environmental issues. Though it is clear that this kind of organization will benefit society and environment but in practice, it is found that most of social enterprises’ goals cannot be achieved. The most success factors of social enterprises usually rely on individual characteristics of entrepreneurs, especially in educational business. This study aims to find out the magnitude of influence from the components of entrepreneur competencies to social enterprises in education. There are developmental models of research demonstrating that knowledge, skills and attributes affect the success of social enterprises in term of sustainability, social opportunities and innovation leadership. The 5-scale questionnaire was used to collect data from the social entrepreneurs in education who operates in the South East Asian region of 135 samples and then processed by the methods of structural equation models. The results show that the competency of entrepreneurs in attributes has the greatest impact on the success of social enterprises while the skills and knowledge have respectively impact on the social enterprises’ success as well. The reason why attributes of entrepreneurs have the greatest impact on social enterprise success is because, social enterprise is an organization that does not motivate or provide attractive financial incentives to the entrepreneur. Entrepreneurs, who succeed in developing their organizations, therefore need attribute factor higher than normal entrepreneurs, especially those in education sector that have somewhat few human resources to operate their businesses. More importantly, attribute’s traits such as entrepreneurial passion, self-efficacy, entrepreneurial identity and, innovativeness and perseverance will significantly affect the ideology and tolerance of the entrepreneurs once facing the problem in doing business. In conclusion, the education social enterprise would be successful depending on the performance of the entrepreneurs which derives from higher attributes competency.

Keywords: education, entrepreneur competencies, social enterprise, South East Asia

Procedia PDF Downloads 154
15890 A Framework for ERP Project Evaluation Based on BSC Model: A Study in Iran

Authors: Mohammad Reza Ostad Ali Naghi Kashani, Esfanji Elia

Abstract:

Nowadays, the amounts of companies which tend to have an Enterprise Resource Planning (ERP) application are increasing particularly in developing countries like Iran. ERP projects are expensive, time consuming, and complex, in addition the failure rate is high among these projects. It is important to know whether these projects could meet their goals or not. Furthermore, the area which should be improved should be identified. In this paper we made a framework to evaluate ERP projects success implementation. First, based on literature review we made a framework based on BSC model, financial, customer, processes, learning and knowledge, because of the importance of change management it was added to model. Then an organization was divided in three layers. We choose corporate, managerial, and operational levels. Then to find criteria to assess each aspect, we use Delphi method in two rounds. And for the second round we made a questionnaire and did some statistical tasks on them. Based on the statistical results some of them are accepted and others are rejected.

Keywords: ERP, BSC, ERP project evaluation, IT projects

Procedia PDF Downloads 316
15889 A Proposal of Advanced Key Performance Indicators for Assessing Six Performances of Construction Projects

Authors: Wi Sung Yoo, Seung Woo Lee, Youn Kyoung Hur, Sung Hwan Kim

Abstract:

Large-scale construction projects are continuously increasing, and the need for tools to monitor and evaluate the project success is emphasized. At the construction industry level, there are limitations in deriving performance evaluation factors that reflect the diversity of construction sites and systems that can objectively evaluate and manage performance. Additionally, there are difficulties in integrating structured and unstructured data generated at construction sites and deriving improvements. In this study, we propose the Key Performance Indicators (KPIs) to enable performance evaluation that reflects the increased diversity of construction sites and the unstructured data generated, and present a model for measuring performance by the derived indicators. The comprehensive performance of a unit construction site is assessed based on 6 areas (Time, Cost, Quality, Safety, Environment, Productivity) and 26 indicators. We collect performance indicator information from 30 construction sites that meet legal standards and have been successfully performed. And We apply data augmentation and optimization techniques into establishing measurement standards for each indicator. In other words, the KPI for construction site performance evaluation presented in this study provides standards for evaluating performance in six areas using institutional requirement data and document data. This can be expanded to establish a performance evaluation system considering the scale and type of construction project. Also, they are expected to be used as a comprehensive indicator of the construction industry and used as basic data for tracking competitiveness at the national level and establishing policies.

Keywords: key performance indicator, performance measurement, structured and unstructured data, data augmentation

Procedia PDF Downloads 30
15888 Antecedents of Knowledge Sharing: Investigating the Influence of Knowledge Sharing Factors towards Postgraduate Research Supervision

Authors: Arash Khosravi, Mohamad Nazir Ahmad

Abstract:

Today’s economy is a knowledge-based economy in which knowledge is a crucial facilitator to individuals, as well as being an instigator of success. Due to the impact of globalization, universities face new challenges and opportunities. Accordingly, they ought to be more innovative and have their own competitive advantages. One of the most important goals of universities is the promotion of students as professional knowledge workers. Therefore, knowledge sharing and transferring at tertiary level between students and supervisors is vital in universities, as it decreases the budget and provides an affordable way of doing research. Knowledge-sharing impact factors can be categorized into three groups, namely: organizational, individual and technical factors. There are some individual barriers to knowledge sharing, namely: lack of time and trust, lack of communication skills and social networks. IT systems such as e-learning, blogs and portals can increase knowledge sharing capability. However, it must be stated that IT systems are only tools and not solutions. Individuals are still responsible for sharing information and knowledge. This paper proposes new research model to examine the effect of individual factors and organisational factors, namely: learning strategy, trust culture, supervisory support, as well as technological factor on knowledge sharing in a research supervision process at the University of Technology Malaysia.

Keywords: knowledge management, knowledge sharing, research supervision, knowledge transferring

Procedia PDF Downloads 436
15887 The Significance of a Well-Defined Systematic Approach in Risk Management for Construction Projects within Oil Industry

Authors: Batool Ismaeel, Umair Farooq, Saad Mushtaq

Abstract:

Construction projects in the oil industry can be very complex, having unknown outcomes and uncertainties that cannot be easily predicted. Each project has its unique risks generated by a number of factors which, if not controlled, will impact the successful completion of the project mainly in terms of schedule, cost, quality, and safety. This paper highlights the historic risks associated with projects in the south and east region of Kuwait Oil Company (KOC) collated from the company’s lessons learned database. Starting from Contract Award through to handover of the project to the Asset owner, the gaps in project execution in terms of managing risk will be brought to discussion and where a well-defined systematic approach in project risk management reflecting many claims, change of scope, exceeding budget, delays in engineering phase as well as in the procurement and fabrication of long lead items should be adopted. This study focuses on a proposed feasible approach in risk management for engineering, procurement and construction (EPC) level projects including the various stakeholders involved in executing the works from International to local contractors and vendors in KOC. The proposed approach covers the areas categorized into organizational, design, procurement, construction, pre-commissioning, commissioning and project management in which the risks are identified and require management and mitigation. With the effective deployment and implementation of the proposed risk management system and the consideration of it as a vital key in achieving the project’s target, the outcomes will be more predictable in the future, and the risk triggers will be managed and controlled. The correct resources can be allocated on a timely basis for the company for avoiding any unpredictable outcomes during the execution of the project. It is recommended in this paper to apply this risk management approach as an integral part of project management and investigate further in the future, the effectiveness of this proposed system for newly awarded projects and compare the same with those projects of similar budget/complexity that have not applied this approach to risk management.

Keywords: construction, project completion, risk management, uncertainties

Procedia PDF Downloads 148
15886 Using ANN in Emergency Reconstruction Projects Post Disaster

Authors: Rasha Waheeb, Bjorn Andersen, Rafa Shakir

Abstract:

Purpose The purpose of this study is to avoid delays that occur in emergency reconstruction projects especially in post disaster circumstances whether if they were natural or manmade due to their particular national and humanitarian importance. We presented a theoretical and practical concepts for projects management in the field of construction industry that deal with a range of global and local trails. This study aimed to identify the factors of effective delay in construction projects in Iraq that affect the time and the specific quality cost, and find the best solutions to address delays and solve the problem by setting parameters to restore balance in this study. 30 projects were selected in different areas of construction were selected as a sample for this study. Design/methodology/approach This study discusses the reconstruction strategies and delay in time and cost caused by different delay factors in some selected projects in Iraq (Baghdad as a case study).A case study approach was adopted, with thirty construction projects selected from the Baghdad region, of different types and sizes. Project participants from the case projects provided data about the projects through a data collection instrument distributed through a survey. Mixed approach and methods were applied in this study. Mathematical data analysis was used to construct models to predict delay in time and cost of projects before they started. The artificial neural networks analysis was selected as a mathematical approach. These models were mainly to help decision makers in construction project to find solutions to these delays before they cause any inefficiency in the project being implemented and to strike the obstacles thoroughly to develop this industry in Iraq. This approach was practiced using the data collected through survey and questionnaire data collection as information form. Findings The most important delay factors identified leading to schedule overruns were contractor failure, redesigning of designs/plans and change orders, security issues, selection of low-price bids, weather factors, and owner failures. Some of these are quite in line with findings from similar studies in other countries/regions, but some are unique to the Iraqi project sample, such as security issues and low-price bid selection. Originality/value we selected ANN’s analysis first because ANN’s was rarely used in project management , and never been used in Iraq to finding solutions for problems in construction industry. Also, this methodology can be used in complicated problems when there is no interpretation or solution for a problem. In some cases statistical analysis was conducted and in some cases the problem is not following a linear equation or there was a weak correlation, thus we suggested using the ANN’s because it is used for nonlinear problems to find the relationship between input and output data and that was really supportive.

Keywords: construction projects, delay factors, emergency reconstruction, innovation ANN, post disasters, project management

Procedia PDF Downloads 160
15885 Prioritization of the Failure Factors of Rural Cooperatives in Iran: The Case of Isfahan Province

Authors: Maryam Najafi, Mahdi Rajabi

Abstract:

Although the rural cooperatives are an effective way for rural development in Iran, their potential is not applied effectively. The investigation of the failures of rural cooperatives helps the authorities to improve the routine procedures and eliminate the current barriers to the success of these cooperatives, and to remove the defects in order to have a more efficient policy. Therefore, this research aims to prioritize the failure factors of rural cooperatives in Isfahan province via the survey research method. For this purpose, the effective factors of these failures were investigated by the available research documents and then by the new information which was obtained from 20 questionnaires from the experts of Central Organization Rural Cooperatives in Isfahan province. The questionnaire results were analyzed by Analytical Hierarchy Process (AHP), Excel, and Expert Choice software. The results of this research showed that the most important failure factor of these cooperatives is the lack of the participation culture of cooperative members and then the performance of Central Organization Rural Cooperatives, and also loss of confidence of the members in the cooperation.

Keywords: cooperative, rural cooperatives, failure factors, analytical hierarchy process

Procedia PDF Downloads 121
15884 Factors Affecting the Adoption of Cloud Business Intelligence among Healthcare Sector: A Case Study of Saudi Arabia

Authors: Raed Alsufyani, Hissam Tawfik, Victor Chang, Muthu Ramachandran

Abstract:

This study investigates the factors that influence the decision by players in the healthcare sector to embrace Cloud Business Intelligence Technology with a focus on healthcare organizations in Saudi Arabia. To bring this matter into perspective, this study primarily considers the Technology-Organization-Environment (TOE) framework and the Human Organization-Technology (HOT) fit model. A survey was hypothetically designed based on literature review and was carried out online. Quantitative data obtained was processed from descriptive and one-way frequency statistics to inferential and regression analysis. Data were analysed to establish factors that influence the decision to adopt Cloud Business intelligence technology in the healthcare sector. The implication of the identified factors was measured, and all assumptions were tested. 66.70% of participants in healthcare organization backed the intention to adopt cloud business intelligence system. 99.4% of these participants considered security concerns and privacy risk have been the most significant factors in the adoption of cloud Business Intelligence (CBI) system. Through regression analysis hypothesis testing point that usefulness, service quality, relative advantage, IT infrastructure preparedness, organization structure; vendor support, perceived technical competence, government support, and top management support positively and significantly influence the adoption of (CBI) system. The paper presents quantitative phase that is a part of an on-going project. The project will be based on the consequences learned from this study.

Keywords: cloud computing, business intelligence, HOT-fit model, TOE, healthcare and innovation adoption

Procedia PDF Downloads 164
15883 Effect of Project Control Practices on the Performance of Building Construction Companies in Uganda: A Case Study of Kampala City

Authors: Tukundane Hillary

Abstract:

This research paper analytically evaluates the project control practice levels used by the building construction companies within Kampala, Uganda. The research also assesses the outcome of project control practices on the productivity of the companies. The research was performed to ascertain the current control practices among 160 respondents from various construction companies registered with the Uganda Registration Services Bureau. This research used amalgamation from multiple literature to obtain the variables. The research adopts 34 standard control practices from four vital project control duties: planning, monitoring, analyzing, and reporting. These project control tasks were organized using mean response ratings grounded on their relevance to the construction companies. Results showed that evaluating performance with the use of curves (4.32), timely access to information and encouragement (4.55), report representation using quantitative tools 4.75, and cost value comparison application during analysis (4.76) were rated least among the control practices. On the other hand, the top project control practices included formulation of the project schedule (8.88), Project feasibility validation (8.86), Budgeting for each activity (8.84), Key project route definition (8.81), Team awareness of the budget (8.77), Setting realistic targets for projects (8.50) and Consultation from subcontractors (8.74). From the results obtained by the sample respondents specified, it can be concluded that planning is the most vital project control task practiced in the building construction industry in Uganda. In addition, this research ascertained a substantial relationship between project control practices and the performance of building construction companies. Accordingly, this research recommends that project control practices be effectively observed by both contracting and consulting companies to enhance their overall performance and governance.

Keywords: cost value, project control, cost control, time control, project performance, control practices

Procedia PDF Downloads 63
15882 A Principal-Agent Model for Sharing Mechanism in Integrated Project Delivery Context

Authors: Shan Li, Qiuwen Ma

Abstract:

Integrated project delivery (IPD) is a project delivery method distinguished by a shared risk/rewards mechanism and multiparty agreement. IPD has drawn increasingly attention from construction industry because of its efficiency of solving adversarial problems and reliability to deliver high-performing buildings. However, some evidence showed that some project participants obtained less profit from IPD projects than the typical projects. They attributed it to the unfair IPD sharing mechanism, which resulted in additional time and cost of negotiation on the sharing fractions among project participants. The study is aimed to investigate the reward distribution by constructing a principal-agent model. Based on cooperative game theory, it is examined how to distribute the shared project rewards between client and non-client parties, and identify the sharing fractions among non-client parties. It is found that at least half of the project savings should be allocated to the non-client parties to motivate them to create more project value. Second, the client should raise his sharing fractions when the integration among project participants is efficient. In addition, the client should allocate higher sharing fractions to the non-client party who is more able. This study can help the IPD project participants make fair and motivated sharing mechanisms.

Keywords: cooperative game theory, IPD, principal agent model, sharing mechanism

Procedia PDF Downloads 284
15881 The Battle Against Corruption in Indonesia’s Municipalities

Authors: Edy Wahyu Susilo

Abstract:

This research discusses a comparative analysis of various anti-corruption responses of three Indonesian City Governments (Jakarta, Surabaya, and Medan) and completes previous findings on the effectiveness of the city anti-corruption program. Some factors (transparency, accountability, leadership, law enforcement, and bureaucratic reform) have been chosen in this study to diagnose the main role in the success and the failure of anti-corruption programs in these cities. These factors diagnose the relationship between factors and their dominancy, which is then utilized to create the city’s strategic anti-corruption programs. Although this study found leadership had a dominant influence both in encouraging and discouraging the performance of city transformation drastically, however, it is not the only factor that determined the performance of the city in the fight against corruption. It needs other factors as an ideal balancing element to achieve an anti-corruption program, namely KPK’s intervention and public engagement. Based on the dominance factors found, this research then develops an appropriate strategy using a policy evaluation approach to create a real practical guide regardless of the existence of good or bad leadership in the city. This research is expected to be a useful reference for stakeholders, especially the government, as a blueprint to prevent corruption by considering several important steps and guidance in efforts to eradicate corruption in the city, especially in Indonesia.

Keywords: intervention, KPK (corruption eradication commission), law enforcements, leadership, policy evaluation

Procedia PDF Downloads 92
15880 The Impact of Motivation on English Language Learning: A Study of HSC Students of Jatir Janak Bangabandhu Sheikh Mujibur Rahman Government College, Dhaka, Bangladesh

Authors: Farina Yasmin

Abstract:

Motivation is an important issue in an EFL setting where very little exposure to English in everyday life is clearly evident. In Bangladesh, English is taught as a foreign language. Language teachers cannot effectively teach a language if they do not understand the relationship between motivation and its effect on foreign language learning. The main purpose of this research is to explore the fact why HSC students are less motivated towards English language learning, what factors are affecting motivation, how to motivate them and the role of motivation in their success. The research questions were (a) what are the reasons of lack of motivation? and (b) what are the impacts of motivation on English language learning? The study was both qualitative and quantitative in nature. The data was collected via pretest - posttest, interviews, and a questionnaire on the five point Likert scale. Triangulation of the data was made for the validity of the research. The population of this research consisted of 50 HSC level students from Jatir Janak Bangabandhu Sheikh Mujibur Rahman Government College, Dhaka, Bangladesh. The data was analyzed with means, comparison and t-test. The results showed that there is a strong relation between motivation and success in foreign language learning. Finally, some pedagogical implications and suggestions were presented to arouse the students’ motivation to learn English.

Keywords: EFL, HSC, motivation, success

Procedia PDF Downloads 370
15879 Science and Monitoring Underpinning River Restoration: A Case Study

Authors: Geoffrey Gilfillan, Peter Barham, Lisa Smallwood, David Harper

Abstract:

The ‘Welland for People and Wildlife’ project aimed to improve the River Welland’s ecology and water quality, and to make it more accessible to the community of Market Harborough. A joint monitoring project by the Welland Rivers Trust & University of Leicester was incorporated into the design. The techniques that have been used to measure its success are hydrological, geomorphological, and water quality monitoring, species and habitat surveys, and community engagement. Early results show improvements to flow and habitat diversity, water quality and biodiversity of the river environment. Barrier removal has increased stickleback mating activity, and decreased parasitically infected fish in sample catches. The habitats provided by the berms now boast over 25 native plant species, and the river is clearer, cleaner and with better-oxygenated water.

Keywords: community engagement, ecological monitoring, river restoration, water quality

Procedia PDF Downloads 226
15878 Managing Multiple Change Projects in Supply Chains: A Case Study of a Moroccan Multi-Technical Services Company

Authors: Abdelouahab Errida, Bouchra Lotfi, Elalami Semma

Abstract:

In this paper, we try to address the topic of multiple change management by adopting an engineered research methodology, conducted within a Moroccan company during its implementation of several change projects that aim at improving its supply chain management performance. Firstly, we present the key concepts related to our research, namely change management, multiproject management and supply chain management. Then, we try to assess how the change management and multi-project management are applied in this company. Finally, we try to propose an approach that will help managers in dealing with multiple change projects. This approach proposes to integrate change management, project management and multi-project management for managing change projects according to three organizational levels: executive level, project portfolio level and change project level.

Keywords: change management, multi-project management, project management, change portfolio, supply chain management,

Procedia PDF Downloads 227
15877 The Impact of the Windows Opening on the Design of Buildings in Islamic Architecture

Authors: Salma I. Dwidar, Amal A. Abdel-Sattar

Abstract:

The window openings are the key to the relationship between the inside and the outside of any building. It is the eye that sees from, the lunges of the construction, and the ear to hear. The success of the building, as well as the comfort of the uses, depends mainly on this relationship. Usually, windows are affected by human factors like religious, social, political and economic factors as well as environmental factors like climatic, aesthetic and functional factors. In Islamic architecture, the windows were one of the most important elements of physiological and psychological comfort to the users of the buildings. Windows considered one of the main parameters in designing internal and external facade, where the window openings occupied a big part of the formation of the external facade of the buildings. This paper discusses the importance of the window openings and its relationship to residential buildings in the Islamic architecture. It addresses the rules that have been followed in the design of windows in Islamic architecture to achieve privacy and thermal comfort while there are no technological elements within the dwellings. Also, it demonstrates the effects of windows on the building form and identity and how it gives a distinctive fingerprint of the architecture buildings.

Keywords: window openings, thermal comfort, residential buildings, the Islamic architecture, human considerations

Procedia PDF Downloads 214
15876 The Impact of Management Competency, Project Team, and Process Design to Corporate Performance through Implementing the Self-Development ERP

Authors: Zeplin Jiwa Husada Tarigan, Sautma Ronni Basana, Widjojo Suprapto

Abstract:

Manufacturing companies in East Java develop their own ERP system or alter the ERP system which is developed by other companies to suit their needs. To make their own system, the companies mostly assign several employees from various departments to create a project team, and the employees are from the departments that are going to utilize the ERP system as the integrated data. The project team decides the making of the ERP system from the preparation stage until the going live implementation process. In designing the business process, the top management is working together with the project team until the project is accomplished. The completion of the ERP projects depends on the project to be undertaken itself, the strategy chosen to complete the project, the work method selection, the measurement system to monitor the project, the evaluation system of the project, and, in the end, the declaration of 'going live' of the ERP project. There is an increase in the business performance for the companies that have implemented the information technology or ERP as they manage to integrate all management functions within their companies. To investigate, some questionnaires are distributed to 100 manufacturing companies, and 90 questionnaires are returned; however, there are only 46 companies that develop their own ERP system, so the response rate is 46%. The result of data analysis using PLS shows that the management competency brings impacts to the project team and the process design. The process design is adjusted to the real process in order to implement the ERP, but it does not bring direct impacts to the business performance. The implementation of ERP brings positive impacts to the company business performance.

Keywords: management competency, project team, process design, ERP implementation, business performance

Procedia PDF Downloads 209
15875 The Development of Small and Medium Enterprise Entrepreneurs’ Potential Based on Sufficiency Economics Philosophy

Authors: Luedech Girdwichai, Witthaya Mekhum

Abstract:

This research analyses the factors affecting the success and develops a guideline for self- reliance planning of the entrepreneurs for effective implementation. Samples in this study included 42 awarded winners from the 2nd Sufficiency Economics Philosophy (SEP) National Contest arranged by Office of the Royal Development Projects Board. The results revealed 4 main factors affecting the success as follows: 1) there is a need to encourage unity and cooperation in the enterprise in conducting development plan. 2) The entrepreneur must be a knowledge seeker and lead by example on SEP life. 3) The entrepreneur must be able to apply traditional local wisdom with his present experience and knowledge in defining product identity. 4) The entrepreneur should provide career training for the staffs to develop their competencies. The guideline for self-reliance planning consisted of 4 aspects: 1) Human resource development: the enterprise should develop its staffs especially on integrity, honesty, and public minded. 2) Local community development: there should be a clear target for the local community development. 3) Local community economic development: by encouraging additional incomes through experience sharing. 4) Enterprise development planning: by arranging monthly meeting to conduct the development plan including analysing problems and synthesizing data.

Keywords: potential development, SME entrepreneurs, sufficiency economics philosophy, finance, management

Procedia PDF Downloads 341
15874 Prospective Teachers’ Metacognitive Awareness and Goal Orientation as Predictors of Academic Success

Authors: Gidado Lawal Likko

Abstract:

The study examined the relationship of achievement goals, metacognitive awareness and academic success among students of colleges of education in North Western Nigeria. The study was guided by three objectives. The first two were to find out whether students’ achievement goals and metacognitive awareness correlate with their academic success. 358 students comprising 242 males (67.6%) and 116 females (32.4%) were studied. Correlation survey was employed in the conduct of the study. The instruments used to collect data were students’ bio data form, achievement goals inventory (Roedel, Schraw and Plake, 1994), metacognitive awareness inventory (Schraw & Dennison, 1994) and students’ CGPA (NCCE minimum standard, 2013) was used as the index of academic success. Pearson Product Moment and regression analysis were the statistical techniques used to analyze the data. Results of the analysis indicated that students’ achievement goals (r=0.554, p=0.004) and metacognitive awareness (r= 0.67, p=0.001) positively correlated with their academic success. Similarly, significant relationship exists between achievement goals and metacognitive awareness (r=0.77, p=0.000). Part of the recommendations is the need for the management of all colleges of education to have educational interventions aimed at developing students’ metacognitive awareness which will foster purposeful self-regulation of their learning. This could be achieved by periodic assessment of students’ metacognitive awareness which will serve as feedback as they move from one educational level to another.

Keywords: academic success, goal orientation, metacognitive awareness, prospective teachers

Procedia PDF Downloads 223
15873 Labor Productivity and Organization Performance in Specialty Trade Construction: The Moderating Effect of Safety

Authors: Shalini Priyadarshini

Abstract:

The notion of performance measurement has held great appeal for the industry and research communities alike. This idea is also true for the construction sector, and some propose that performance measurement and productivity analysis are two separate management functions, where productivity is a subset of performance, the latter requiring comprehensive analysis of comparable factors. Labor productivity is considered one of the best indicators of production efficiency. The construction industry continues to account for a disproportionate share of injuries and illnesses despite adopting several technological and organizational interventions that promote worker safety. Specialty trades contractors typically complete a large fraction of work on any construction project, but insufficient body of work exists that address subcontractor safety and productivity issues. Literature review has revealed the possibility of a relation between productivity, safety and other factors and their links to project, organizational, task and industry performance. This research posits that there is an association between productivity and performance at project as well as organizational levels in the construction industry. Moreover, prior exploration of the importance of safety within the performance-productivity framework has been anecdotal at best. Using structured questionnaire survey and organization- and project level data, this study, which is a combination of cross-sectional and longitudinal research designs, addresses the identified research gap and models the relationship between productivity, safety, and performance with a focus on specialty trades in the construction sector. Statistical analysis is used to establish a correlation between the variables of interest. This research identifies the need for developing and maintaining productivity and safety logs for smaller businesses. Future studies can design and develop research to establish causal relationships between these variables.

Keywords: construction, safety, productivity, performance, specialty trades

Procedia PDF Downloads 272
15872 Computed Tomography Guided Bone Biopsies: Experience at an Australian Metropolitan Hospital

Authors: K. Hinde, R. Bookun, P. Tran

Abstract:

Percutaneous CT guided biopsies provide a fast, minimally invasive, cost effective and safe method for obtaining tissue for histopathology and culture. Standards for diagnostic yield vary depending on whether the tissue is being obtained for histopathology or culture. We present a retrospective audit from Western Health in Melbourne Australia over a 12-month period which aimed to determine the diagnostic yield, technical success and complication rate for CT guided bone biopsies and identify factors affecting these results. The digital imaging storage program (Synapse Picture Archiving and Communication System – Fujifilm Australia) was analysed with key word searches from October 2015 to October 2016. Nineteen CT guided bone biopsies were performed during this time. The most common referring unit was oncology, work up imaging included CT, MRI, bone scan and PET scan. The complication rate was 0%, overall diagnostic yield was 74% with a technical success of 95%. When performing biopsies for histologic analysis diagnostic yield was 85% and when performing biopsies for bacterial culture diagnostic yield was 60%. There was no significant relationship identified between size of lesion, distance of lesion to skin, lesion appearance on CT, the number of samples taken or gauge of needle to diagnostic yield or technical success. CT guided bone biopsy at Western Health meets the standard reported at other major clinical centres for technical success and safety. It is a useful investigation in identification of primary malignancy in distal bone metastases.

Keywords: bone biopsy, computed tomography, core biopsy, histopathology

Procedia PDF Downloads 196
15871 The Lived Experience of Risk and Protective Contexts of Blind Successful University Students in Sidist Kilo Campus

Authors: Zelalem Markos Borko

Abstract:

The quality of life of people with blindness is significantly influenced by the level of resilience they possess. A qualitative approach of the descriptive phenomenological design was employed to address basic study objectives. The researcher purposely selected three blind graduate students from Sidist Kilo Campus and conducted a semi-structured interview to gather data. Data were analyzed by using thematic coding techniques. The present study found that personal characteristics such as commitment, living hope, motivation, positive self-esteem, self-confidence, and communication have shaped resiliency for successful university students with visual disabilities. The finding showed that the school environment is the place in which blind students had developed/experienced social, psychological, and economical competency and hope for their academic and entire life success. Furthermore, the finding showed that blind students had experienced individual, family, school, and community-related risks in the success track. Therefore, governmental and non-governmental organizations should provide training for students with visual impairments that focus on the individual traits that shape resilience for academic success, such as commitment, living hope, motivation, positive self-esteem, self-confidence, and communication and also community-oriented training should be to break the social stigma and discriminations for the individuals with the visual impairment.

Keywords: blind students, risk and protective factors, lived experience, success

Procedia PDF Downloads 74
15870 The Impact of Effective Employee Retention Strategies to the Success of the Hotel Industry of Rwanda

Authors: Ange Meghane Hakizimana, Landry Ndikuriyo

Abstract:

Retention of employees in the hospitality industry is a recurrent agenda in the organization involving all the combined efforts to maintain the best available laborer. The general objective of this research is to assess the impact of effective employee retention strategies on the success of the hotel industry at Galileo Hotel, Huye District in Rwanda, for the period of 2019-2021. Herzberg Two Factor Theory and Equity Theory were used. The study adopted a descriptive research design. Descriptive research design allowed us to study the elements in their natural form without making any alterations to them. Secondary data and primary data and the data collected were sorted and entered into the statistical packages for social sciences for analysis (SPSS) version 26. Frequencies, descriptive statistics and percentages were used to analyze and establish extent to which employee retention strategies impact the success of the hotel industry of Rwanda and this was analyzed using regression and correlation analysis. The results revealed that employee training and development had an influence of 24.8% on the success of the hotel industry in Rwanda. According to the results of our study, the employee reward system contributes 20.7% to the success of the hotel industry in Rwanda, the value of t is 3.475 and this is greater than the standard t value score of 1.96, p-value is 0.002. Therefore the employee reward system has a great positive impact on the success of the hotel industry in Rwanda. The results also show that 15.7% of the success of the hospitality industry in Rwanda is due to the work environment of employees. With a t-value of 4.384 and a p-value of 0.000, the above statistics show a positive impact of the employees' working environment on success of the hospitality industry in Rwanda. A priority to the retention of their employees should be given by the hotel industry and its managers because it has already been proven that it is an effective approach to offering good customer service. In addition, employee retention reduces expenses associated with employee recruitment and turnover.

Keywords: success, hotel industry, training and development, employee reward system, employee work environment

Procedia PDF Downloads 91
15869 Overcoming the Impacts of Covid-19 Outbreak Using Value Integrated Project Delivery Model

Authors: G. Ramya

Abstract:

Value engineering is a systematic approach, widely used to optimize the design or process or product in the designing stage. It used to achieve the client's obligation by increasing the functionality and attain the targeted cost in the cost planning. Value engineering effectiveness and benefits decrease along with the progress of the project since the change in the scope of the work and design will account for more cost all along the lifecycle of the project. Integrating the value engineering with other project management activities will promote cost minimization, client satisfaction, and ensure early completion of the project in time. Previous research studies suggested that value engineering can integrate with other project delivery activities, but research studies unable to frame a model that collaborates the project management activities with the job plan of value engineering approach. I analyzed various project management activities and their synergy between each other. The project management activities and processes like a)risk analysis b)lifecycle cost analysis c)lean construction d)facility management e)Building information modelling f)Contract administration, collaborated, and project delivery model planned along with the RIBA plan of work. The key outcome of the research is a value-driven project delivery model, which will succeed in dealing with the economic impact, constraints and conflicts arise due to the COVID-19 outbreak in the Indian construction sector. Benefits associated with the structured framework is construction project delivery that ensures early contractor involvement, mutual risk sharing, and reviving the project with a cost overrun and delay back on track ,are discussed. Keywords: Value-driven project delivery model, Integration, RIBA plan of work Themes: Design Economics

Keywords: value-driven project delivery model, Integration, RIBA

Procedia PDF Downloads 113
15868 Implementing Total Quality Management in Higher Education

Authors: Abbos Utkirov

Abstract:

Total Quality Management (TQM) in the context of educational institutions requires careful planning and the implementation of an annual quality program to achieve its vision effectively. By applying TQM concepts, the higher education system can experience significant improvements. This study aims to examine TQM in higher education, focusing on Critical Success Factors (CSF) and their implementation across all areas. The study ultimately concludes that CSF and their execution play a crucial role in higher education institutions. Some institutions have already benefited from TQM methods by dedicating themselves to the system and using it to achieve their objectives. Through this review, recent studies shed light on how the TQM system can employ various strategies and hypotheses to empower employees, foster a positive and supportive environment, and emphasize the importance of enabling students to unleash their full potential.

Keywords: total quality management (TQM), critical success factor (CSF), organizational performance, quality management practices

Procedia PDF Downloads 86
15867 Five Years Analysis and Mitigation Plans on Adjustment Orders Impacts on Projects in Kuwait's Oil and Gas Sector

Authors: Rawan K. Al-Duaij, Salem A. Al-Salem

Abstract:

Projects, the unique and temporary process of achieving a set of requirements have always been challenging; Planning the schedule and budget, managing the resources and risks are mostly driven by a similar past experience or the technical consultations of experts in the matter. With that complexity of Projects in Scope, Time, and execution environment, Adjustment Orders are tools to reflect changes to the original project parameters after Contract signature. Adjustment Orders are the official/legal amendments to the terms and conditions of a live Contract. Reasons for issuing Adjustment Orders arise from changes in Contract scope, technical requirement and specification resulting in scope addition, deletion, or alteration. It can be as well a combination of most of these parameters resulting in an increase or decrease in time and/or cost. Most business leaders (handling projects in the interest of the owner) refrain from using Adjustment Orders considering their main objectives of staying within budget and on schedule. Success in managing the changes results in uninterrupted execution and agreed project costs as well as schedule. Nevertheless, this is not always practically achievable. In this paper, a detailed study through utilizing Industrial Engineering & Systems Management tools such as Six Sigma, Data Analysis, and Quality Control were implemented on the organization’s five years records of the issued Adjustment Orders in order to investigate their prevalence, and time and cost impact. The analysis outcome revealed and helped to identify and categorize the predominant causations with the highest impacts, which were considered most in recommending the corrective measures to reach the objective of minimizing the Adjustment Orders impacts. Data analysis demonstrated no specific trend in the AO frequency in past five years; however, time impact is more than the cost impact. Although Adjustment Orders might never be avoidable; this analysis offers’ some insight to the procedural gaps, and where it is highly impacting the organization. Possible solutions are concluded such as improving project handling team’s coordination and communication, utilizing a blanket service contract, and modifying the projects gate system procedures to minimize the possibility of having similar struggles in future. Projects in the Oil and Gas sector are always evolving and demand a certain amount of flexibility to sustain the goals of the field. As it will be demonstrated, the uncertainty of project parameters, in adequate project definition, operational constraints and stringent procedures are main factors resulting in the need for Adjustment Orders and accordingly the recommendation will be to address that challenge.

Keywords: adjustment orders, data analysis, oil and gas sector, systems management

Procedia PDF Downloads 155
15866 Project and Experiment-Based Fluid Dynamics Education

Authors: Etsuo Morishita

Abstract:

This paper presents the project and experiment-based fluid dynamics education in Meisei University, a private institution in Tokyo, Japan. We pay attention not only to the basic engineering courses but also to the practical aspect of engineering experience. So, we prepare courses called the Projects from I to VI. The Projects I and II are designed for the first year, III and IV are designated for the second year, V and VI are prepared for the third year, respectively. Each supervisor is responsible for two of these projects every year. When students take the Project V and VI at the third year, we automatically assume that these students will join the lab of the project for the graduation thesis. We would like to show our experience in the Project I in the summer term, 2016. In this project, we introduce a traction flight vehicle called Cat Flyer. This is a kind of a kite towed by a car for example. This is very similar to parasailing, but flight is possible even on the roads. Experiments in mechanical engineering education are also very important, and we would like to explain our course on centrifugal pump, venture, and orifice. Although these are described in detail in the text books of fluid dynamics, it is still crucial to have practical experiments as a student.

Keywords: aerodynamics, experiment, fluid dynamics, project

Procedia PDF Downloads 253
15865 Retail Managers’ Perception on Coca-Cola Company’s Success of Glass Package Recovery and Recycling in Nairobi, Kenya

Authors: Brigitte Wabuyabo-Okonga

Abstract:

Little research has been done to establish the level of success of Coca Cola Company in recycling and reusing their glass bottles. This paper attempts to establish retail managers’ perception of the company’s self acclaimed success. Retail managers of supermarkets in the CBD of Nairobi, Kenya were considered for the study. Data were collected through questionnaires and analyzed using descriptive (mean, frequencies and percentages) and inferential statistics (correlation analysis) were used to analyze the data. The study found out that there is relative success although a lot needs to be done. For example, improving in communicating policy issues and in practice enhance the actual collection of broken and/or non-broken Coca Cola Company glass bottles through providing drop-off points in open areas such as on the streets and in parks.

Keywords: Coca Cola Company glass bottles, Kenya, Nairobi, packaging, retail manager

Procedia PDF Downloads 310
15864 Financial Service of Financial Institution for SME in Thailand

Authors: Charawee Butbumrung

Abstract:

This research aim to study the financial service of the Thailand financial Institution, second is to identify "best practices" offered by four financial institutions, namely, Kasikornthai Bank, Bangkok Bank, Siam Commercial Bank, and Thanachart Bank. In-depth interviews with managers of financial institution and borrowers reveal best practices from each financial institution. Close monitoring of and a close relationship with borrowers appear to be important for early detection of any problem. Another aspect that may be important is building up loyalty and developing reliability among members. A close and informal relationship with borrowers may also help in monitoring and early detection of problems that may arise in non-repayment of loans. Other factors that may be considered important to the success of a financial service scheme are cooperation and coordination among various agencies that provide additional support to borrowers. Indirectly, these support systems contribute to the success of a SME in Thailand.

Keywords: best practices, financial service, financial institution, SME in Thailand

Procedia PDF Downloads 283