10195 Causes of Construction Delays in Qatar Construction Projects

Authors: Murat Gunduz, Mohanad H. A. AbuHassan

Abstract:

Construction industry mainly focuses on the superstructure, infrastructure, and oil and gas industry. The development of infrastructure projects in developing countries attracted a lot of foreign construction contractors, consultants, suppliers and diversified workforce to interfere and to be evolved in such huge investment. Reducing worksite delays in such projects require knowledge and attention. Therefore, it is important to identify the influencing delay attributes affecting construction projects. The significant project factors affecting construction delays were investigated. Data collection was carried out through an online web survey system to capture significant factors. Significant factors were determined with importance index and relevant recommendations are made. The output of the data analysis would lead the industry experts better assess the impact of construction delays on construction projects.

Keywords: construction industry, delays, importance index, frequency index

Procedia PDF Downloads 319
10194 Machine Learning Based Anomaly Detection in Hydraulic Units of Governors in Hydroelectric Power Plants

Authors: Mehmet Akif Bütüner, İlhan Koşalay

Abstract:

Hydroelectric power plants (HEPPs) are renewable energy power plants with the highest installed power in the world. While the control systems operating in these power plants ensure that the system operates at the desired operating point, it is also responsible for stopping the relevant unit safely in case of any malfunction. While these control systems are expected not to miss signals that require stopping, on the other hand, it is desired not to cause unnecessary stops. In traditional control systems including modern systems with SCADA infrastructure, alarm conditions to create warnings or trip conditions to put relevant unit out of service automatically are usually generated with predefined limits regardless of different operating conditions. This approach results in alarm/trip conditions to be less likely to detect minimal changes which may result in serious malfunction scenarios in near future. With the methods proposed in this research, routine behavior of the oil circulation of hydraulic governor of a HEPP will be modeled with machine learning methods using historical data obtained from SCADA system. Using the created model and recently gathered data from control system, oil pressure of hydraulic accumulators will be estimated. Comparison of this estimation with the measurements made and recorded instantly by the SCADA system will help to foresee failure before becoming worse and determine remaining useful life. By using model outputs, maintenance works will be made more planned, so that undesired stops are prevented, and in case of any malfunction, the system will be stopped or several alarms are triggered before the problem grows.

Keywords: hydroelectric, governor, anomaly detection, machine learning, regression

Procedia PDF Downloads 63
10193 A Model to Assist Military Mission Planners in Identifying and Assessing Variables Impacting Food Security

Authors: Lynndee Kemmet

Abstract:

The U.S. military plays an increasing role in supporting political stability efforts, and this includes efforts to prevent the food insecurity that can trigger political and social instability. This paper presents a model that assists military commanders in identifying variables that impact food production and distribution in their areas of operation (AO), in identifying connections between variables and in assessing the impacts of those variables on food production and distribution. Through use of the model, military units can better target their data collection efforts and can categorize and analyze data within the data categorization framework most widely-used by military forces—PMESII-PT (Political, Military, Economic, Infrastructure, Information, Physical Environment and Time). The model provides flexibility of analysis in that commanders can target analysis to be highly focused on a specific PMESII-PT domain or variable or conduct analysis across multiple PMESII-PT domains. The model is also designed to assist commanders in mapping food systems in their AOs and then identifying components of those systems that must be strengthened or protected.

Keywords: food security, food system model, political stability, US Military

Procedia PDF Downloads 170
10192 Risk-Based Institutional Evaluation of Trans Sumatera Toll Road Infrastructure Development to Improve Time Performance

Authors: Muhammad Ridho Fakhrin, Leni Sagita Riantini, Yusuf Latief

Abstract:

Based on the 2015-2019 RPJMN data, the realization of toll road infrastructure development in Indonesia experienced a delay of 49% or 904 km of the total plan. One of the major causes of delays in development is caused by institutional factors. The case study taken in this research is the construction of the Trans Sumatra Toll Road (JTTS). The purpose of this research is to identify the institutional forms, functions, roles, duties, and responsibilities of each stakeholder and the risks that occur in the Trans Sumatra Toll Road Infrastructure Development. Risk analysis is implemented on functions, roles, duties, responsibilities of each existing stakeholder and is carried out at the Funding Stage, Technical Planning Stage, and Construction Implementation Stage in JTTS. This research is conducted by collecting data through a questionnaire survey, then processed using statistical methods, such as homogeneity, data adequacy, validity, and reliability test, continued with risk assessment based on a risk matrix. The results of this study are the evaluation and development of institutional functions in risk-based JTTS development can improve time performance and minimize delays in the construction process.

Keywords: institutional, risk management, time performance, toll road

Procedia PDF Downloads 123
10191 Productivity and Structural Design of Manufacturing Systems

Authors: Ryspek Usubamatov, Tan San Chin, Sarken Kapaeva

Abstract:

Productivity of the manufacturing systems depends on technological processes, a technical data of machines and a structure of systems. Technology is presented by the machining mode and data, a technical data presents reliability parameters and auxiliary time for discrete production processes. The term structure of manufacturing systems includes the number of serial and parallel production machines and links between them. Structures of manufacturing systems depend on the complexity of technological processes. Mathematical models of productivity rate for manufacturing systems are important attributes that enable to define best structure by criterion of a productivity rate. These models are important tool in evaluation of the economical efficiency for production systems.

Keywords: productivity, structure, manufacturing systems, structural design

Procedia PDF Downloads 558
10190 Revolutionizing Mobility: Decoding Electric Vehicles (EVs) and Hydrogen Fuel Cell Vehicles (HFCVs)

Authors: Samarjeet Singh, Shubhank Arya, Shubham Chauhan

Abstract:

In recent years, the rise in carbon emissions and the widespread effects of global warming have brought new energy vehicles into the spotlight. Electric vehicles (EVs) and hydrogen fuel cell vehicles (HFCVs), both producing zero tailpipe emissions, are seen as promising alternatives. This paper examines the working, structural characteristics, and safety designs of EVs and HFCVs, comparing their carbon emissions, charging infrastructure, energy efficiency, and safety features. The analysis reveals that both EVs and HFCVs significantly reduce carbon emissions and enhance safety compared to traditional vehicles, with EVs showing greater emission reductions. Moreover, EVs are advancing more rapidly in terms of charging infrastructure compared to hydrogen energy vehicles. However, HFCVs exhibit lower energy efficiency than EVs. In terms of safety, both types surpass conventional vehicles, though EVs are more prone to overheating and fire hazards due to battery design issues. Current research suggests that EV technology and its supporting infrastructure are more comprehensive, cost-effective, and efficient in reducing carbon emissions. With continued investment in the development of new energy vehicles and potential advancements in hydrogen energy production, the future for HFCVs appears promising. The paper also expresses optimism for innovative solutions that could accelerate the growth of hydrogen energy vehicles.

Keywords: electric vehicles, fuel cell electric vehicles, automotive engineering, energy transition

Procedia PDF Downloads 13
10189 Knowledge Creation Environment in the Iranian Universities: A Case Study

Authors: Mahdi Shaghaghi, Amir Ghaebi, Fariba Ahmadi

Abstract:

Purpose: The main purpose of the present research is to analyze the knowledge creation environment at a Iranian University (Alzahra University) as a typical University in Iran, using a combination of the i-System and Ba models. This study is necessary for understanding the determinants of knowledge creation at Alzahra University as a typical University in Iran. Methodology: To carry out the present research, which is an applied study in terms of purpose, a descriptive survey method was used. In this study, a combination of the i-System and Ba models has been used to analyze the knowledge creation environment at Alzahra University. i-System consists of 5 constructs including intervention (input), intelligence (process), involvement (process), imagination (process), and integration (output). The Ba environment has three pillars, namely the infrastructure, the agent, and the information. The integration of these two models resulted in 11 constructs which were as follows: intervention (input), infrastructure-intelligence, agent-intelligence, information-intelligence (process); infrastructure-involvement, agent-involvement, information-involvement (process); infrastructure-imagination, agent-imagination, information-imagination (process); and integration (output). These 11 constructs were incorporated into a 52-statement questionnaire and the validity and reliability of the questionnaire were examined and confirmed. The statistical population included the faculty members of Alzahra University (344 people). A total of 181 participants were selected through the stratified random sampling technique. The descriptive statistics, binomial test, regression analysis, and structural equation modeling (SEM) methods were also utilized to analyze the data. Findings: The research findings indicated that among the 11 research constructs, the levels of intervention, information-intelligence, infrastructure-involvement, and agent-imagination constructs were average and not acceptable. The levels of infrastructure-intelligence and information-imagination constructs ranged from average to low. The levels of agent-intelligence and information-involvement constructs were also completely average. The level of infrastructure-imagination construct was average to high and thus was considered acceptable. The levels of agent-involvement and integration constructs were above average and were in a highly acceptable condition. Furthermore, the regression analysis results indicated that only two constructs, viz. the information-imagination and agent-involvement constructs, positively and significantly correlate with the integration construct. The results of the structural equation modeling also revealed that the intervention, intelligence, and involvement constructs are related to the integration construct with the complete mediation of imagination. Discussion and conclusion: The present research suggests that knowledge creation at Alzahra University relatively complies with the combination of the i-System and Ba models. Unlike this model, the intervention, intelligence, and involvement constructs are not directly related to the integration construct and this seems to have three implications: 1) the information sources are not frequently used to assess and identify the research biases; 2) problem finding is probably of less concern at the end of studies and at the time of assessment and validation; 3) the involvement of others has a smaller role in the summarization, assessment, and validation of the research.

Keywords: i-System, Ba model , knowledge creation , knowledge management, knowledge creation environment, Iranian Universities

Procedia PDF Downloads 84
10188 Simple Infrastructure in Measuring Countries e-Government

Authors: Sukhbaatar Dorj, Erdenebaatar Altangerel

Abstract:

As alternative to existing e-government measuring models, here proposed a new customer centric, service oriented, simple approach for measuring countries e-Governments. If successfully implemented, built infrastructure will provide a single e-government index number for countries. Main schema is as follows. Country CIO or equal position government official, at the beginning of each year will provide to United Nations dedicated web site 4 numbers on behalf of own country: 1) Ratio of available online public services, to total number of public services, 2) Ratio of interagency inter ministry online public services to total number of available online public services, 3) Ratio of total number of citizen and business entities served online annually to total number of citizen and business entities served annually online and physically on those services, 4) Simple index for geographical spread of online served citizen and business entities. 4 numbers then combined into one index number by mathematical Average function. In addition to 4 numbers 5th number can be introduced as service quality indicator of online public services. If in ordering of countries index number is equal, 5th criteria will be used. Notice: This approach is for country’s current e-government achievement assessment, not for e-government readiness assessment.

Keywords: countries e-government index, e-government, infrastructure for measuring e-government, measuring e-government

Procedia PDF Downloads 301
10187 A Probability Analysis of Construction Project Schedule Using Risk Management Tool

Authors: A. L. Agarwal, D. A. Mahajan

Abstract:

Construction industry tumbled along with other industry/sectors during recent economic crash. Construction business could not regain thereafter and still pass through slowdown phase, resulted many real estate as well as infrastructure projects not completed on schedule and within budget. There are many theories, tools, techniques with software packages available in the market to analyze construction schedule. This study focuses on the construction project schedule and uncertainties associated with construction activities. The infrastructure construction project has been considered for the analysis of uncertainty on project activities affecting project duration and analysis is done using @RISK software. Different simulation results arising from three probability distribution functions are compiled to benefit construction project managers to plan more realistic schedule of various construction activities as well as project completion to document in the contract and avoid compensations or claims arising out of missing the planned schedule.

Keywords: construction project, distributions, project schedule, uncertainty

Procedia PDF Downloads 315
10186 Oil Logistics for Refining to Northern Europe

Authors: Vladimir Klepikov

Abstract:

To develop the programs to supply crude oil to North European refineries, it is necessary to take into account the refineries’ location, crude refining capacity, and the transport infrastructure capacity. Among the countries of the region, we include those having a marine boundary along the Northern Sea and the Baltic Sea (from France in the west to Finland in the east). The paper envisages the geographic allocation of the refineries and contains the evaluation of the refineries’ capacities for the region under review. The sustainable operations of refineries in the region are determined by the transportation system capacity to supply crude oil to them. The assessment of capacity of crude oil transportation to the refineries is conducted. The research is performed for the period of 2005/2015, using the quantitative analysis method. The countries are classified by the refineries’ aggregate capacities and the crude oil output on their territory. The crude oil output capacities in the region in the period under review are determined. The capacities of the region’s transportation system to supply crude oil produced in the region to the refineries are revealed. The analysis suggested that imported raw materials are the main source of oil for the refineries in the region. The main sources of crude oil supplies to North European refineries are reviewed. The change in the refineries’ capacities in the group of countries and each particular country, as well as the utilization of the refineries' capacities in the region in the period under review, was studied. The input suggests that the bulk of crude oil is supplied by marine and pipeline transport. The paper contains the assessment of the crude oil transportation by pipeline transport in the overall crude oil cargo flow. The refineries’ production rate for the groups of countries under the review and for each particular country was the subject of study. Our study yielded the trend towards the increase in the crude oil refining at the refineries of the region and reduction in the crude oil output. If this trend persists in the near future, the cargo flow of imported crude oil and the utilization of the North European logistics infrastructure may increase. According to the study, the existing transport infrastructure in the region is able to handle the increasing imported crude oil flow.

Keywords: European region, infrastructure, oil terminal capacity, pipeline capacity, tanker draft

Procedia PDF Downloads 149
10185 Investigating Willingness to Pay for Water Services in a Newly Established Municipality in Malamulele, Vhembe District Municipality, South Africa

Authors: D. T. Chabalala

Abstract:

Currently South Africa is facing a triple challenge of poverty, unemployment and inequality. As such, communities have limited access to basic municipal services such as water, sanitation and electricity. Citizens such as those residing at Malamulele Township will be responsible to pay for the cost of water services that they consume instead of having the costs subsidised by the newly formed Municipality. The question on whether Malamulele residents would be willing to pay for water services provided for them need to be investigated. This study was conducted in Malamulele Township and surrounding villages. The article is based on a survey of 500 randomly selected households from township and villages surrounding Malamulele. The study uses the contingent valuation method to determine households’ willingness to pay for water services as well as the consequences they possibly will encounter in case their response is negative. The obtained results can be used by the Municipality and other Government Departments in order to better identify the affordable rates and the quantity of water service to be provided. Thus, it will make Municipality water supply services stable and sustainable. It will also be used as a tool to provide inform decisions about a range of infrastructure to enhance water supply systems.

Keywords: willingness to pay, contingent valuation method, water supply systems, Malamulele

Procedia PDF Downloads 209
10184 Undersea Communications Infrastructure: Risks, Opportunities, and Geopolitical Considerations

Authors: Lori W. Gordon, Karen A. Jones

Abstract:

Today’s high-speed data connectivity depends on a vast global network of infrastructure across space, air, land, and sea, with undersea cable infrastructure (UCI) serving as the primary means for intercontinental and ‘long-haul’ communications. The UCI landscape is changing and includes an increasing variety of state actors, such as the growing economies of Brazil, Russia, India, China, and South Africa. Non-state commercial actors, such as hyper-scale content providers including Google, Facebook, Microsoft, and Amazon, are also seeking to control their data and networks through significant investments in submarine cables. Active investments by both state and non-state actors will invariably influence the growth, geopolitics, and security of this sector. Beyond these hyper-scale content providers, there are new commercial satellite communication providers. These new players include traditional geosynchronous (GEO) satellites that offer broad coverage, high throughput GEO satellites offering high capacity with spot beam technology, low earth orbit (LEO) ‘mega constellations’ – global broadband services. And potential new entrants such as High Altitude Platforms (HAPS) offer low latency connectivity, LEO constellations offer high-speed optical mesh networks, i.e., ‘fiber in the sky.’ This paper focuses on understanding the role of submarine cables within the larger context of the global data commons, spanning space, terrestrial, air, and sea networks, including an analysis of national security policy and geopolitical implications. As network operators and commercial and government stakeholders plan for emerging technologies and architectures, hedging risks for future connectivity will ensure that our data backbone will be secure for years to come.

Keywords: communications, global, infrastructure, technology

Procedia PDF Downloads 56
10183 A Project-Orientated Training Concept to Prepare Students for Systems Engineering Activities

Authors: Elke Mackensen

Abstract:

Systems Engineering plays a key role during industrial product development of complex technical systems. The need for systems engineers in industry is growing. However, there is a gap between the industrial need and the academic education. Normally the academic education is focused on the domain specific design, implementation and testing of technical systems. Necessary systems engineering expertise like knowledge about requirements analysis, product cost estimation, management or social skills are poorly taught. Thus, there is the need of new academic concepts for teaching systems engineering skills. This paper presents a project-orientated training concept to prepare students from different technical degree programs for systems engineering activities. The training concept has been initially implemented and applied in the industrial engineering master program of the University of Applied Sciences Offenburg.

Keywords: educational systems engineering training, requirements analysis, system modelling, SysML

Procedia PDF Downloads 323
10182 A Survey on Linear Time Invariant Multivariable Positive Real Systems

Authors: Mojtaba Hakimi-Moghaddam

Abstract:

Positive realness as the most important property of driving point impedance of passive electrical networks appears in the control systems stability theory in 1960’s. There are three important subsets of positive real (PR) systems are introduced by researchers, that is, loos-less positive real (LLPR) systems, weakly strictly positive real (WSPR) systems and strictly positive real (SPR) systems. In this paper, definitions, properties, lemmas, and theorems related to family of positive real systems are summarized. Properties in both frequency domain and state space representation of system are explained. Also, several illustrative examples are presented.

Keywords: real rational matrix transfer functions, positive realness property, strictly positive realness property, Hermitian form asymptotic property, pole-zero properties

Procedia PDF Downloads 249
10181 Contrasting Infrastructure Sharing and Resource Substitution Synergies Business Models

Authors: Robin Molinier

Abstract:

Industrial symbiosis (I.S) rely on two modes of cooperation that are infrastructure sharing and resource substitution to obtain economic and environmental benefits. The former consists in the intensification of use of an asset while the latter is based on the use of waste, fatal energy (and utilities) as alternatives to standard inputs. Both modes, in fact, rely on the shift from a business-as-usual functioning towards an alternative production system structure so that in a business point of view the distinction is not clear. In order to investigate the way those cooperation modes can be distinguished, we consider the stakeholders' interplay in the business model structure regarding their resources and requirements. For infrastructure sharing (following economic engineering literature) the cost function of capacity induces economies of scale so that demand pooling reduces global expanses. Grassroot investment sizing decision and the ex-post pricing strongly depends on the design optimization phase for capacity sizing whereas ex-post operational cost sharing minimizing budgets are less dependent upon production rates. Value is then mainly design driven. For resource substitution, synergies value stems from availability and is at risk regarding both supplier and user load profiles and market prices of the standard input. Baseline input purchasing cost reduction is thus more driven by the operational phase of the symbiosis and must be analyzed within the whole sourcing policy (including diversification strategies and expensive back-up replacement). Moreover, while resource substitution involves a chain of intermediate processors to match quality requirements, the infrastructure model relies on a single operator whose competencies allow to produce non-rival goods. Transaction costs appear higher in resource substitution synergies due to the high level of customization which induces asset specificity, and non-homogeneity following transaction costs economics arguments.

Keywords: business model, capacity, sourcing, synergies

Procedia PDF Downloads 150
10180 Exploring the Relationship between Building Construction Activity and Road-Related Expenditure in Victoria

Authors: Md. Aftabuzzaman, Md. Kamruzzaman

Abstract:

Road-related expenditure and building construction activity are two significant drivers of the Victorian economy. This paper investigates the relationship between building construction activity and road-related expenditure. Data for construction activities were collected from Victorian Building Authority, and road-related expenditure data were explored by the Bureau of Infrastructure and Transport Research Economics. The trend between these two sectors was compared. The analysis found a strong relationship between road-related expenditure and the volume of construction activity, i.e., the more construction activities, the greater the requirement of road-related expenditure, or vice-versa. The road-related expenditure has a two-year lag period, suggesting that the road sector requires two years to respond to the growth in the building sector.

Keywords: building construction activity, infrastructure, road expenditure, Victorian Building Authority

Procedia PDF Downloads 107
10179 Extracting Spatial Information Using Stereo Imageries for Mapping Slum Areas in Karachi, Pakistan

Authors: Mohammed Raza Mehdi, Kamran Ahmed

Abstract:

Mega-city Karachi has numerous unplanned slum areas and squatter settlements with irregular growth of building structures. Due to weak development policy and lack of development control, such settlements are increasing at a rapid pace. Mapping such areas for planning and infrastructure development requires an integrated approach of socio-spatial and technological tools. Therefore in this study, an attempt is made to create GIS information layers on complex inbound built-up areas of slums at the coastal belt of Karachi by using a stereo pair of satellite images. The outcome expected is technological application to aid planning institutions for crisis management and infrastructure development in irregularly developed slum areas of Karachi, Pakistan.

Keywords: slum, satellite imageries, GIS, Karachi, Pakistan

Procedia PDF Downloads 120
10178 Effective Survey Designing for Conducting Opinion Survey to Follow Participatory Approach in a Study of Transport Infrastructure Projects: A Case Study of the City of Kolkata

Authors: Jayanti De

Abstract:

Users of any urban road infrastructure may be classified into various categories. The current paper intends to see whether the opinions on different environmental and transportation criteria vary significantly among different types of road users or not. The paper addresses this issue by using a unique survey data that has been collected from Kolkata, a highly populated city in India. Multiple criteria should be taken into account while planning on infrastructure development programs. Given limited resources, a welfare maximizing government typically resorts to public opinion by designing surveys for prioritization of one project over another. Designing such surveys can be challenging and costly. Deciding upon whom to include in a survey and how to represent each group of consumers/road-users depend crucially on how opinion for different criteria vary across consumer groups. A unique dataset has been collected from various parts of Kolkata to statistically test (using Kolmogorov-Smirnov test) whether assigning of weights to rank the transportation criteria like congestion, air pollution, noise pollution, and morning/evening delay vary significantly across the various groups of users of such infrastructure. The different consumer/user groups in the dataset include pedestrian, private car owner, para-transit (taxi /auto rickshaw) user, public transport (bus) user and freight transporter among others. Very little evidence has been found that ranking of different criteria among these groups vary significantly. This also supports the hypothesis that road- users/consumers form their opinion by using their long-run rather than immediate experience. As a policy prescription, this implies that under-representation or over-representation of a specific consumer group in a survey may not necessarily distort the overall opinion, since opinions across different consumer groups are highly correlated as evident from this particular case study.

Keywords: multi criteria analysis, project-prioritization, road- users, survey designing

Procedia PDF Downloads 259
10177 Investigating the Road Maintenance Performance in Developing Countries

Authors: Jamaa Salih, Francis Edum-Fotwe, Andrew Price

Abstract:

One of the most critical aspects of the management of road infrastructure is the type and scale of maintenance systems adopted and the consequences of their inadequacy. The performance of road maintenance systems can be assessed by a number of important indicators such as: cost, safety, environmental impact, and level of complaints by users. A review of practice reveals that insufficient level of expenditure or poor management of the road network often has serious consequences for the economic and social life of a country in terms of vehicle operating costs (VOC), travel time costs, accident costs and environmental impact. Despite an increase in the attention paid by global road agencies to the environmental and the road users’ satisfaction, the overwhelming evidence from the available literature agree on the lack of similar levels of attention for the two factors in many developing countries. While many sources agree that the road maintenance backlog is caused by either the shortage of expenditures or lack of proper management or both, it appears that managing the available assets particularly in the developing countries is the main issue. To address this subject, this paper will concentrate on exposing the various issues related to this field.

Keywords: environmental impact, performance indicators, road maintenance, users’ satisfaction

Procedia PDF Downloads 337
10176 Evaluation of Cirata Reservoir Sustainability Using Multi Dimensionalscaling (MDS)

Authors: Kholil Kholil, Aniwidayati

Abstract:

MDS (Multi-Dimensional Scaling) is one method that has been widely used to evaluate the use of natural resources. By using Raffish software tool, we will able to analyze sustainability level of the natural resources use. This paper will discuss the level of sustainability of the reservoir using MDS (Multi-Dimensional Scaling) based on five dimensions: (1) Ecology & Layout, (2) Economics, (3) Social & Culture, (4) Regulations & Institutional, and (5) Infrastructure and Technology. MDS analysis results show that the dimension of ecological and layout, institutional and the regulation are lack of sustainability due to the low index score of 45.76 and 42.24. While for the economic, social and culture, and infrastructure and technology dimension reach each score of 63.12, 64.42, and 68.64 (only the sufficient sustainability category). It means that the sustainability performance of Cirata Reservoir seriously threatened.

Keywords: MDS, cirata reservoir, carrying capacity, water quality, sustainable development, sedimentation, sustainability index

Procedia PDF Downloads 356
10175 Public-Private Partnership for Critical Infrastructure Resilience

Authors: Anjula Negi, D. T. V. Raghu Ramaswamy, Rajneesh Sareen

Abstract:

Road infrastructure is emphatically one of the top most critical infrastructure to the Indian economy. Road network in the country of around 3.3 million km is the second largest in the world. Nationwide statistics released by Ministry of Road, Transport and Highways reveal that every minute an accident happens and one death every 3.7 minutes. This reported scale in terms of safety is a matter of grave concern, and economically represents a national loss of 3% to the GDP. Union Budget 2016-17 has allocated USD 12 billion annually for development and strengthening of roads, an increase of 56% from last year. Thus, highlighting the importance of roads as critical infrastructure. National highway alone represent only 1.7% of the total road linkages, however, carry over 40% of traffic. Further, trends analysed from 2002 -2011 on national highways, indicate that in less than a decade, a 22 % increase in accidents have been reported, but, 68% increase in death fatalities. Paramount inference is that accident severity has increased with time. Over these years many measures to increase road safety, lessening damage to physical assets, reducing vulnerabilities leading to a build-up for resilient road infrastructure have been taken. In the context of national highway development program, policy makers proposed implementation of around 20 % of such road length on PPP mode. These roads were taken up on high-density traffic considerations and for qualitative implementation. In order to understand resilience impacts and safety parameters, enshrined in various PPP concession agreements executed with the private sector partners, such highway specific projects would be appraised. This research paper would attempt to assess such safety measures taken and the possible reasons behind an increase in accident severity through these PPP case study projects. Delving further on safety features to understand policy measures adopted in these cases and an introspection on reasons of severity, whether an outcome of increased speeds, faulty road design and geometrics, driver negligence, or due to lack of discipline in following lane traffic with increased speed. Assessment exercise would study these aspects hitherto to PPP and post PPP project structures, based on literature review and opinion surveys with sectoral experts. On the way forward, it is understood that the Ministry of Road, Transport and Highway’s estimate for strengthening the national highway network is USD 77 billion within next five years. The outcome of this paper would provide an understanding of resilience measures adopted, possible options for accessible and safe road network and its expansion to policy makers for possible policy initiatives and funding allocation in securing critical infrastructure.

Keywords: national highways, policy, PPP, safety

Procedia PDF Downloads 231
10174 The Reality of Libyan Airports and Future Prospects

Authors: Ramadan Ahmed Abugeddida

Abstract:

Libya is one of the third world countries, has a lot of natural resources, notably oil and gas, as well as attractive tourist sites, in addition to the vast area and diversity of the regions, oil is the main source of income in Libya, which was discovered in the sixties of the last century, which also contributed to the creation of some fundamental changes in the country's infrastructure, such as roads, hospitals, schools, airports, seaports, as well as factories. This paper focuses on airports as one of the most vital institutions in the country, linking the country to the outside world, where dealing with the current situation of airports, in terms of capabilities and infrastructure, as well as the level of services, in other words, to assess the current status of the airports and to identify strengths and weaknesses, as well as general description of the position and what can be done in the future for the advancement of this vital sector. This paper is a part of the doctoral thesis will be carried out by the researcher during the coming period entitled efficiency improvement through implementation of strategic quality management.

Keywords: airports, efficiency improvement, quality, strategy

Procedia PDF Downloads 497
10173 Creating Entrepreneurial Universities: The Swedish Approach of Transformation

Authors: Fawaz Saad, Hamid Alalwany

Abstract:

Sweden has succeeded to maintain a high level of growth and development and has managed to sustain highly ranked position among the world’s developed countries. In this regard, Swedish universities are playing a vital role in supporting innovation and entrepreneurship at all levels and developing Swedish knowledge economy. This paper is aiming to draw on the experiences of two leading Swedish universities, addressing their transformation approach to create entrepreneurial universities and fulfilling their objectives in the era of knowledge economy. The objectives of the paper include: (1) Introducing the Swedish higher education and its characteristics. (2) Examining the infrastructure elements for innovation and Entrepreneurship at two of the Swedish entrepre-neurial universities. (3) Addressing the key aspects of support systems in the initiatives of both Chalmers and Gothenburg universities to support innovation and advance entrepreneurial practices. The paper will contribute to two discourses: (1) Examining the relationship between support systems for innovation and entrepreneurship and the Universities’ policies and practices. (2) Lessons for University leaders to assist the development and implementation of effective innovation and en-trepreneurship policies and practices.

Keywords: Entrepreneurial University, Chalmers University, Gothenburg University, innovation and entrepreneurship policies, entrepreneurial transformation

Procedia PDF Downloads 482
10172 Grassroots Innovation for Greening Bangladesh's Urban Slums: The Role of Local Agencies

Authors: Razia Sultana

Abstract:

The chapter investigates the roles of local Non-Governmental Organisations (NGOs) and Community Based Organisations (CBOs) in climate change adaptation through grassroots innovation in urban slums in Dhaka, Bangladesh. The section highlights green infrastructure as an innovative process to mitigate the challenges emanating from climate change at the bottom of the pyramid. The research draws on semi-structured in-depth interviews with 11 NGOs and 2 CBOs working in various slums in Dhaka. The study explores the activities of local agencies relating to urban green infrastructure (UGI) and its possible mitigation of a range of climate change impacts: thermal discomfort, heat stress, flooding and the urban heat island. The main argument of the chapter is unlike the Global North stakeholders’ activities relating to UGI in cities of the Global South have not been expanded on a large scale. Moreover, UGI as a risk management strategy is underutilised in the developing countries. The study finds that, in the context of Bangladesh, climate change adaptation through green infrastructure in cities is still nascent for local NGOs and CBOs. Mostly their activities are limited to addressing the basic needs of slum communities such as water and sanitation. Hence urban slum dwellers have been one of the most vulnerable groups in that they are deprived of the city’s basic ecological services. NGOs are utilizing UGI in an innovative way despite various problems in slums. For instance, land scarcity and land insecurity in slums are two key areas where UGI faces resistance. There are limited instances of NGOs using local and indigenous techniques to encourage slum dwellers to adopt UGI for creating sustainable environments. It is in this context that the paper is an attempt to showcase some of the grassroots innovation that NGOs are currently adopting in slums. Also, some challenges and opportunities are discussed to address UGI as a strategy for climate change adaptation in slums.

Keywords: climate change adaptation, green infrastructure, Dhaka, slums, NGOs

Procedia PDF Downloads 134
10171 Hybrid Concrete Construction (HCC) for Sustainable Infrastructure Development in Nigeria

Authors: Muhammad Bello Ibrahim, M. Auwal Zakari, Aliyu Usman

Abstract:

Hybrid concrete construction (HCC) combines all the benefits of pre-casting with the advantages of cast in-situ construction. Merging the two, as a hybrid structure, results in even greater construction speed, value, and the overall economy. Its variety of uses has gained popularity in the United States and in Europe due to its distinctive benefits. However, the increase of its application in some countries (including Nigeria) has been relatively slow. Several researches have shown that hybrid construction offers an ultra-high performance concrete that offers superior strength, durability and aesthetics with design flexibility and within sustainability credentials, based on the available and economically visible technologies. This paper examines and documents the criterion that will help inform the process of deciding whether or not to adopt hybrid concrete construction (HCC) technology rather than more traditional alternatives. It also the present situation of design, construction and research on hybrid structures.

Keywords: hybrid concrete construction, Nigeria, sustainable infrastructure development, design flexibility

Procedia PDF Downloads 528
10170 Public-Private Partnership Projects in Canada: A Case Study Approach

Authors: Samuel Carpintero

Abstract:

Public-private partnerships (PPP) arrangements have emerged all around the world as a response to infrastructure deficits and the need to refurbish existing infrastructure. The motivations of governments for embarking on PPPs for the delivery of public infrastructure are manifold, and include on-time and on-budget delivery as well as access to private project management expertise. The PPP formula has been used by some State governments in United States and Canada, where the participation of private companies in financing and managing infrastructure projects has increased significantly in the last decade, particularly in the transport sector. On the one hand, this paper examines the various ways used in these two countries in the implementation of PPP arrangements, with a particular focus on risk transfer. The examination of risk transfer in this paper is carried out with reference to the following key PPP risk categories: construction risk, revenue risk, operating risk and availability risk. The main difference between both countries is that in Canada the demand risk remains usually within the public sector whereas in the United States this risk is usually transferred to the private concessionaire. The aim is to explore which lessons can be learnt from both models than might be useful for other countries. On the other hand, the paper also analyzes why the Spanish companies have been so successful in winning PPP contracts in North America during the past decade. Contrary to the Latin American PPP market, the Spanish companies do not have any cultural advantage in the case of the United States and Canada. Arguably, some relevant reasons for the success of the Spanish groups are their extensive experience in PPP projects (that dates back to the late 1960s in some cases), their high technical level (that allows them to be aggressive in their bids), and their good position and track-record in the financial markets. The article’s empirical base consists of data provided by official sources of both countries as well as information collected through face-to-face interviews with public and private representatives of the stakeholders participating in some of the PPP schemes. Interviewees include private project managers of the concessionaires, representatives of banks involved as financiers in the projects, and experts in the PPP industry with close knowledge of the North American market. Unstructured in-depth interviews have been adopted as a means of investigation for this study because of its powers to achieve honest and robust responses and to ensure realism in the collection of an overall impression of stakeholders’ perspectives.

Keywords: PPP, concession, infrastructure, construction

Procedia PDF Downloads 274
10169 Counter-Terrorism Policies in the Wider Black Sea Region: Evaluating the Robustness of Constantza Port under Potential Terror Attacks

Authors: A. V. Popa, C. Barna, V. Mihalache

Abstract:

Being the largest port at the Black Sea and functioning as a civil and military nodal point between Europe and Asia, Constantza Port has become a potential target on the terrorist international agenda. The authors use qualitative research based on both face-to-face and online semi-structured interviews with relevant stakeholders (top decision-makers in the Romanian Naval Authority, Romanian Maritime Training Centre, National Company "Maritime Ports Administration" and military staff) in order to detect potential vulnerabilities which might be exploited by terrorists in the case of Constantza Port. Likewise, this will enable bringing together the experts’ opinions on potential mitigation measures. Subsequently, this paper formulates various counter-terrorism policies to enhance the robustness of Constantza Port under potential terror attacks and connects them with the attributions in the field of critical infrastructure protection conferred by the law to the lead national authority for preventing and countering terrorism, namely the Romanian Intelligence Service. Extending the national counterterrorism efforts to an international level, the authors propose the establishment – among the experts of the NATO member states of the Wider Black Sea Region – of a platform for the exchange of know-how and best practices in the field of critical infrastructure protection.

Keywords: Constantza Port, counter-terrorism policies, critical infrastructure protection, security, Wider Black Sea Region

Procedia PDF Downloads 275
10168 eTransformation Framework for the Cognitive Systems

Authors: Ana Hol

Abstract:

Digital systems are in the cognitive wave of the eTransformations and are now extensively aimed at meeting the individuals’ demands, both those of customers requiring services and those of service providers. It is also apparent that successful future systems will not just simply open doors to the traditional owners/users to offer and receive services such as Uber for example does today, but will in the future require more customized and cognitively enabled infrastructures that will be responsive to the system user’s needs. To be able to identify what is required for such systems, this research reviews the historical and the current effects of the eTransformation process by studying: 1. eTransitions of company websites and mobile applications, 2. Emergence of new sheared economy business models as Uber and, 3. New requirements for demand driven, cognitive systems capable of learning and just in time decision making. Based on the analysis, this study proposes a Cognitive eTransformation Framework capable of guiding implementations of new responsive and user aware systems.

Keywords: system implementations, AI supported systems, cognitive systems, eTransformation

Procedia PDF Downloads 215
10167 Socio-Technical Systems: Transforming Theory into Practice

Authors: L. Ngowi, N. H. Mvungi

Abstract:

This paper critically examines the evolution of socio-technical systems theory, its practices, and challenges in system design and development. It examines concepts put forward by researchers focusing on the application of the theory in software engineering. There are various methods developed that use socio-technical concepts based on systems engineering without remarkable success. The main constraint is the large amount of data and inefficient techniques used in the application of the concepts in system engineering for developing time-bound systems and within a limited/controlled budget. This paper critically examines each of the methods, highlight bottlenecks and suggest the way forward. Since socio-technical systems theory only explains what to do, but not how doing it, hence engineers are not using the concept to save time, costs and reduce risks associated with new frameworks. Hence, a new framework, which can be considered as a practical approach is proposed that borrows concepts from soft systems method, agile systems development and object-oriented analysis and design to bridge the gap between theory and practice. The approach will enable the development of systems using socio-technical systems theory to attract/enable the system engineers/software developers to use socio-technical systems theory in building worthwhile information systems to avoid fragilities and hostilities in the work environment.

Keywords: socio-technical systems, human centered design, software engineering, cognitive engineering, soft systems, systems engineering

Procedia PDF Downloads 264
10166 Ecosystem Services Assessment for Urban Nature-Based Solutions Implemented in the Public Space: Case Study of Alhambra Square in Bogotá, Colombia

Authors: Diego Sánchez, Sandra M. Aguilar, José F. Gómez, Gustavo Montaño, Laura P. Otero, Carlos V. Rey, José A. Martínez, Juliana Robles, Jorge E. Burgos, Juan S. López

Abstract:

Bogota is making efforts towards urban resilience through Nature-based Solutions (NbS) incorporation in public projects as a climate change resilience strategy. The urban renovation project on the Alhambra square includes Green Infrastructure (GI), like Sustainable Urban Drainage Systems (SUDS) and Urban Trees (UT), as ecosystem services (ES) boosters. This study analyzes 3 scenarios: (1) the initial situation without NbS, (2) the expected situation including NbS in the design and (3) the projection of the second one after 30 years, calculating the ecosystem services, the stormwater management benefits provided by SUDS and the cultural services. The obtained results contribute to the understanding of the urban NbS benefits in public spaces, providing valuable information to foster investment in sustainable projects and encouraging policy makers to integrate NbS in urban planning.

Keywords: ecosystem services, nature-based solutions, stormwater management, sustainable urban drainage systems

Procedia PDF Downloads 117