17766 Pattern the Location and Area of Earth-Dumping Stations from Vehicle GPS Data in Taiwan

Authors: Chun-Yuan Chen, Ming-Chang Li, Xiu-Hui Wen, Yi-Ching Tu

Abstract:

The objective of this study explores GPS (Global Positioning System) applied to trace construction vehicles such as trucks or cranes, help to pattern the earth-dumping stations of traffic construction in Taiwan. Traffic construction in this research is defined as the engineering of high-speed railways, expressways, and which that distance more than kilometers. Audit the location and check the compliance with regulations of earth-dumping stations is one of important tasks in Taiwan EPA. Basically, the earth-dumping station was known as one source of particulate matter from air pollution during construction process. Due to GPS data can be analyzed quickly and be used conveniently, this study tried to find out dumping stations by modeling vehicles tracks from GPS data during work cycle of construction. The GPS data updated from 13 vehicles related to an expressway construction in central Taiwan. The GPS footprints were retrieved to Keyhole Markup Language (KML) files so that can pattern the tracks of trucks by computer applications, the data was collected about eight months- from Feb. to Oct. in 2017. The results of GPS footprints identified dumping station and outlined the areas of earthwork had been passed to the Taiwan EPA for on-site inspection. Taiwan EPA had issued advice comments to the agency which was in charge of the construction to prevent the air pollution. According to the result of this study compared to the commonly methods in inspecting environment by manual collection, the GPS with KML patterning and modeling method can consumes less time. On the other hand, through monitoring the GPS data from construction vehicles could be useful for administration to development and implementation of strategies in environmental management.

Keywords: automatic management, earth-dumping station, environmental management, Global Positioning System (GPS), particulate matter, traffic construction

Procedia PDF Downloads 155
17765 Lessons-Learned in a Post-Alliance Framework

Authors: Olubukola Olumuyiwa Tokede, Dominic D. Ahiaga-Dagbui, John Morrison

Abstract:

The project environment in construction has been widely criticised for its inability to learn from experience effectively. As each project is bespoke, learning is ephemeral, as it is often confined within its bounds and seldom assimilated with others that are being delivered in the project environment. To engender learning across construction projects, collaborative contractual arrangements, such as alliancing and partnering, have been embraced to aid the transferability of lessons across projects. These cooperative arrangements, however, tend to be costly, and hence construction organisations could revert to less expensive traditional procurement approaches after successful collaborative project delivery. This research, therefore, seeks to assess the lessons-learned in a post-alliance contractual framework. Using a case-study approach, we examine the experiences of a public sector authority who engaged a project facilitator to foster learning during the delivery of a significant piece of critical infrastructure. It was found that the facilitator enabled optimal learning outcomes in post-alliance contractual frameworks by attenuating the otherwise adversarial relationship between clients and contractors. Further research will seek to assess the effectiveness of different knowledge-brokering agencies in construction projects.

Keywords: facilitation, knowledge-brokering, learning, projects

Procedia PDF Downloads 125
17764 A Knowledge-Based Development of Risk Management Approaches for Construction Projects

Authors: Masoud Ghahvechi Pour

Abstract:

Risk management is a systematic and regular process of identifying, analyzing and responding to risks throughout the project's life cycle in order to achieve the optimal level of elimination, reduction or control of risk. The purpose of project risk management is to increase the probability and effect of positive events and reduce the probability and effect of unpleasant events on the project. Risk management is one of the most fundamental parts of project management, so that unmanaged or untransmitted risks can be one of the primary factors of failure in a project. Effective risk management does not apply to risk regression, which is apparently the cheapest option of the activity. However, the main problem with this option is the economic sensitivity, because what is potentially profitable is by definition risky, and what does not pose a risk is economically interesting and does not bring tangible benefits. Therefore, in relation to the implemented project, effective risk management is finding a "middle ground" in its management, which includes, on the one hand, protection against risk from a negative direction by means of accurate identification and classification of risk, which leads to analysis And it becomes a comprehensive analysis. On the other hand, management using all mathematical and analytical tools should be based on checking the maximum benefits of these decisions. Detailed analysis, taking into account all aspects of the company, including stakeholder analysis, will allow us to add what will become tangible benefits for our project in the future to effective risk management. Identifying the risk of the project is based on the theory that which type of risk may affect the project, and also refers to specific parameters and estimating the probability of their occurrence in the project. These conditions can be divided into three groups: certainty, uncertainty, and risk, which in turn support three types of investment: risk preference, risk neutrality, specific risk deviation, and its measurement. The result of risk identification and project analysis is a list of events that indicate the cause and probability of an event, and a final assessment of its impact on the environment.

Keywords: risk, management, knowledge, risk management

Procedia PDF Downloads 49
17763 Investigating Sustainable Construction and Demolition Waste Management Practices in South Africa

Authors: Ademilade J. Aboginije, Clinton O. Aigbavboa

Abstract:

South Africa is among the emerging economy, which has a policy and suitable environment that dynamically stimulates waste management practices of diverting waste away from landfill through prevention, reuse, recycling, and recovery known as the 4R-approaches. The focus of this paper is to investigate the existing structures and processes that are environmentally responsible, then determine the resource-efficiency of the waste management practices in the South Africa construction industry. This paper indicates the results of an investigation carried out by using a systematic review of several related literatures to assess the sustainability of waste management scenarios with secondary material recovery to pinpoint all influential criteria and consequently, highlights a step by step approach to adequately analyze the process by using the indicators that can clearly and fully value the waste management practices in South Africa. Furthermore, a life cycle Analytical tool is used to support the development of a framework which can be applied in measuring the sustainability of existing waste management practices in South Africa. Finding shows that sustainable C&D waste management practices stance a great prospect far more noticeable in terms of job creation and opportunities, saving cost and conserving natural resources when incorporated, especially in the process of recycling and reusing of C&D waste materials in several construction projects in South Africa. However, there are problems such as; inadequacy of waste to energy plants, low compliances to policies and sustainable principles, lack of enough technical capacities confronting the effectiveness of the current waste management practices. Thus, with the increase in the pursuit of sustainable development in most developing countries, this paper determines how sustainability can be measured and used in top-level decision-making policy within construction and demolition waste management for a sustainable built environment.

Keywords: construction industry, green-star rating, life-cycle analysis, sustainability, zero-waste hierarchy

Procedia PDF Downloads 119
17762 Creating Knowledge Networks: Comparative Analysis of Reference Cases

Authors: Sylvia Villarreal, Edna Bravo

Abstract:

Knowledge management focuses on coordinating technologies, people, processes, and structures to generate a competitive advantage and considering that networks are perceived as mechanisms for knowledge creation and transfer, this research presents the stages and practices related to the creation of knowledge networks. The methodology started with a literature review adapted from the systematic literature review (SLR). The descriptive analysis includes variables such as approach (conceptual or practical), industry, knowledge management processes and mythologies (qualitative or quantitative), etc. The content analysis includes identification of reference cases. These cases were characterized based on variables as scope, creation goal, years, network approach, actors and creation methodology. It was possible to do a comparative analysis to determinate similarities and differences in these cases documented in knowledge network scientific literature. Consequently, it was shown that even the need and impact of knowledge networks in organizations, the initial guidelines for their creation are not documented, so there is not a guide of good practices and lessons learned. The reference cases are from industries as energy, education, creative, automotive and textile. Their common points are the human approach; it is oriented to interactions to facilitate the appropriation of knowledge, explicit and tacit. The stages of every case are analyzed to propose the main successful elements.

Keywords: creation, knowledge management, network, stages

Procedia PDF Downloads 289
17761 A Study on Occupational Injuries among Building Construction Workers in Bhubaneswar City Odisha

Authors: Rahul Pal

Abstract:

In India, construction industry plays a vital role in the development of infrastructures. It is one of the most hazardous industries. Construction workers are a group that is particularly vulnerable to health risks because they have few legal protection. India has the world’s highest accident rate among construction workers. This study aimed to investigate the prevalence of occupation injury among construction workers and to find out the factors responsible for such injuries. Methodology: A cross-sectional study using a semi-structured questionnaire among 305 construction workers in Bhubaneswar city. In this study, it was found that the overall prevalence of injury was 43.28% in the previous one year period. Majority of the construction workers were less experience in the construction work. Factors responsible for injuries are fall of the object followed by striking, and majority of the workers reported their injuries to have occurred in the summer season. And most of the construction workers are not using personal protective equipment (PPE). Conclusion: Given the occupational injuries, the majority of the construction workers are injured in this study; there is a need to address this issue to ensure necessary step for the safety and well-being of construction workers.

Keywords: construction, construction workers, occupational injuries, personal protective equipment

Procedia PDF Downloads 185
17760 Subcontractor Development Practices and Processes: A Conceptual Model for LEED Projects

Authors: Andrea N. Ofori-Boadu

Abstract:

The purpose is to develop a conceptual model of subcontractor development practices and processes that strengthen the integration of subcontractors into construction supply chain systems for improved subcontractor performance on Leadership in Energy and Environmental Design (LEED) certified building projects. The construction management of a LEED project has an important objective of meeting sustainability certification requirements. This is in addition to the typical project management objectives of cost, time, quality, and safety for traditional projects; and, therefore increases the complexity of LEED projects. Considering that construction management organizations rely heavily on subcontractors, poor performance on complex projects such as LEED projects has been largely attributed to the unsatisfactory preparation of subcontractors. Furthermore, the extensive use of unique and non-repetitive short term contracts limits the full integration of subcontractors into construction supply chains and hinders long-term cooperation and benefits that could enhance performance on construction projects. Improved subcontractor development practices are needed to better prepare and manage subcontractors, so that complex objectives can be met or exceeded. While supplier development and supply chain theories and practices for the manufacturing sector have been extensively investigated to address similar challenges, investigations in the construction sector are not that obvious. Consequently, the objective of this research is to investigate effective subcontractor development practices and processes to guide construction management organizations in their development of a strong network of high performing subcontractors. Drawing from foundational supply chain and supplier development theories in the manufacturing sector, a mixed interpretivist and empirical methodology is utilized to assess the body of knowledge within literature for conceptual model development. A self-reporting survey with five-point Likert scale items and open-ended questions is administered to 30 construction professionals to estimate their perceptions of the effectiveness of 37 practices, classified into five subcontractor development categories. Data analysis includes descriptive statistics, weighted means, and t-tests that guide the effectiveness ranking of practices and categories. The results inform the proposed three-phased LEED subcontractor development program model which focuses on preparation, development and implementation, and monitoring. Highly ranked LEED subcontractor pre-qualification, commitment, incentives, evaluation, and feedback practices are perceived as more effective, when compared to practices requiring more direct involvement and linkages between subcontractors and construction management organizations. This is attributed to unfamiliarity, conflicting interests, lack of trust, and resource sharing challenges. With strategic modifications, the recommended practices can be extended to other non-LEED complex projects. Additional research is needed to guide the development of subcontractor development programs that strengthen direct involvement between construction management organizations and their network of high performing subcontractors. Insights from this present research strengthen theoretical foundations to support future research towards more integrated construction supply chains. In the long-term, this would lead to increased performance, profits and client satisfaction.

Keywords: construction management, general contractor, supply chain, sustainable construction

Procedia PDF Downloads 102
17759 Towards an Environmental Knowledge System in Water Management

Authors: Mareike Dornhoefer, Madjid Fathi

Abstract:

Water supply and water quality are key problems of mankind at the moment and - due to increasing population - in the future. Management disciplines like water, environment and quality management therefore need to closely interact, to establish a high level of water quality and to guarantee water supply in all parts of the world. Groundwater remediation is one aspect in this process. From a knowledge management perspective it is only possible to solve complex ecological or environmental problems if different factors, expert knowledge of various stakeholders and formal regulations regarding water, waste or chemical management are interconnected in form of a knowledge base. In general knowledge management focuses the processes of gathering and representing existing and new knowledge in a way, which allows for inference or deduction of knowledge for e.g. a situation where a problem solution or decision support are required. A knowledge base is no sole data repository, but a key element in a knowledge based system, thus providing or allowing for inference mechanisms to deduct further knowledge from existing facts. In consequence this knowledge provides decision support. The given paper introduces an environmental knowledge system in water management. The proposed environmental knowledge system is part of a research concept called Green Knowledge Management. It applies semantic technologies or concepts such as ontology or linked open data to interconnect different data and information sources about environmental aspects, in this case, water quality, as well as background material enriching an established knowledge base. Examples for the aforementioned ecological or environmental factors threatening water quality are among others industrial pollution (e.g. leakage of chemicals), environmental changes (e.g. rise in temperature) or floods, where all kinds of waste are merged and transferred into natural water environments. Water quality is usually determined with the help of measuring different indicators (e.g. chemical or biological), which are gathered with the help of laboratory testing, continuous monitoring equipment or other measuring processes. During all of these processes data are gathered and stored in different databases. Meanwhile the knowledge base needs to be established through interconnecting data of these different data sources and enriching its semantics. Experts may add their knowledge or experiences of previous incidents or influencing factors. In consequence querying or inference mechanisms are applied for the deduction of coherence between indicators, predictive developments or environmental threats. Relevant processes or steps of action may be modeled in form of a rule based approach. Overall the environmental knowledge system supports the interconnection of information and adding semantics to create environmental knowledge about water environment, supply chain as well as quality. The proposed concept itself is a holistic approach, which links to associated disciplines like environmental and quality management. Quality indicators and quality management steps need to be considered e.g. for the process and inference layers of the environmental knowledge system, thus integrating the aforementioned management disciplines in one water management application.

Keywords: water quality, environmental knowledge system, green knowledge management, semantic technologies, quality management

Procedia PDF Downloads 210
17758 Measuring the Level of Knowledge of Construction Contracts Procedures: A Case Study of Botswana

Authors: Babulayi B. Wilson

Abstract:

Unsatisfactory performance of construction projects in both the industrialised and developing countries indicate that there could be several defects in construction projects phases. Notwithstanding the fact that some project defects are often conceived at the initiation phase of construction projects, insufficient knowledge of contract procedures has been identified as one of the major sources of construction disputes. Contract procedures are a set of rules that outlines the primary obligations and liabilities of parties involved in the implementation of a construction project. Engineering professional bodies often codify contract procedures into standard forms of contract such as the Institution of Civil Engineers (ICE, UK) and Association of Consulting Engineers (ACE, UK) and keep them under constant review by updating any clause to reflect any change in case law or relevant piece of legislation. Even so, it is the responsibility of a professional body or conditions of contract draftsperson to introduce contract-specific clauses that may be necessary for business efficacy but not covered in the chosen standard conditions of contract. In Botswana, the use of clients’ drafted and/or un-adapted for environment of use international forms of contract in conjunction with client-drafted pricing schedules is common. The product of the latter often impact negatively upon contractors’ claims and payments, in that, tender rates and prices can only be deemed to be sufficient if the chosen conditions of contract compliment the pricing schedule (use of standardised procurement documents). In addition, client drafted and the use of borrowed forms of contract such as FIDIC often conflict with domicile law resulting in costly disputes on the part of the client. It is upon the preceding text that the object of the research is to measure the level of knowledge of contract procedures amongst key stakeholders in the Botswana construction industry by requesting a representative sample from the industry and academia to respond to tutorial questions prepared from two commonly used forms of contract for civil works, that is, FIDIC (International Form of Contract) and ICE (UK). The questions were prepared under the following captions: (a) preparation of tender documents (b) obligations of the parties (c) contract administration; and (d) claims, variations, and valuation of variations. After ascertaining that the level of knowledge of contract procedures is insufficient among most practitioners in the Botswana construction industry, major procurement entities, and engineering institutions of learning; a guide to drafting a condition of a construction contract was developed and then validated through seminars and workshops. In the present, the effectiveness of the guide is not yet measured but feedback from seminars and workshops conducted indicates an appreciation of the guide by the majority of major construction industry stakeholders.

Keywords: contract procedures, conditions of contract, professional practice, construction law, forms of contract

Procedia PDF Downloads 179
17757 Implementation of Knowledge and Attitude Management Based on Holistic Approach in Andragogy Learning, as an Effort to Solve the Environmental Problems of Post-Coal Mining Activity

Authors: Aloysius Hardoko, Susilo

Abstract:

The root cause of the problem after the environmental damage due to coal mining activities defined as the province of East Kalimantan corridor masterplan economic activity accelerated the expansion of Indonesia's economic development (MP3EI) is the behavior of adults. Adult behavior can be changed through knowledge management and attitude. Based on the root of the problem, the objective of the research is to apply knowledge management and attitude based on holistic approach in learning andragogy as an effort to solve environmental problems after coal mining activities. Research methods to achieve the objective of using quantitative research with pretest postes group design. Knowledge management and attitudes based on a holistic approach in adult learning are applied through initial learning activities, core and case-based cover of environmental damage. The research instrument is a description of the case of environmental damage. The data analysis uses t-test to see the effect of knowledge management attitude based on holistic approach before and after adult learning. Location and sample of representative research of adults as many as 20 people in Kutai Kertanegara District, one of the districts in East Kalimantan province, which suffered the worst environmental damage. The conclusion of the research result is the application of knowledge management and attitude in adult learning influence to adult knowledge and attitude to overcome environmental problem post-coal mining activity.

Keywords: knowledge management and attitude, holistic approach, andragogy learning, environmental Issue

Procedia PDF Downloads 197
17756 Active Development of Tacit Knowledge Using Social Media and Learning Communities

Authors: John Zanetich

Abstract:

This paper uses a pragmatic research approach to investigate the relationships between Active Development of Tacit Knowledge (ADTK), social media (Facebook) and classroom learning communities. This paper investigates the use of learning communities and social media as the context and means for changing tacit knowledge to explicit and presents a dynamic model of the development of a classroom learning community. The goal of this study is to identify the point that explicit knowledge is converted to tacit knowledge and to test a way to quantify the exchange using social media and learning communities.

Keywords: tacit knowledge, knowledge management, college programs, experiential learning, learning communities

Procedia PDF Downloads 350
17755 The Learning Impact of a 4-Dimensional Digital Construction Learning Environment

Authors: Chris Landorf, Stephen Ward

Abstract:

This paper addresses a virtual environment approach to work integrated learning for students in construction-related disciplines. The virtual approach provides a safe and pedagogically rigorous environment where students can apply theoretical knowledge in a simulated real-world context. The paper describes the development of a 4-dimensional digital construction environment and associated learning activities funded by the Australian Office for Learning and Teaching. The environment was trialled with over 1,300 students and evaluated through questionnaires, observational studies and coursework analysis. Results demonstrate a positive impact on students’ technical learning and collaboration skills, but there is need for further research in relation to critical thinking skills and work-readiness.

Keywords: architectural education, construction industry, digital learning environments, immersive learning

Procedia PDF Downloads 391
17754 The Effects of Integrating Knowledge Management and e-Learning: Productive Work and Learning Coverage

Authors: Ashraf Ibrahim Awad

Abstract:

It is important to formulate suitable learning environments ca-pable to be customized according to value perceptions of the university. In this paper, light is shed on the concepts of integration between knowledge management (KM), and e-learning (EL) in the higher education sector of the economy in Abu Dhabi Emirate, United Arab Emirates (UAE). A discussion on and how KM and EL can be integrated and leveraged for effective education and training is presented. The results are derived from the literature and interviews with 16 of the academics in eight universities in the Emirate. The conclusion is that KM and EL have much to offer each other, but this is not yet reflected at the implementation level, and their boundaries are not always clear. Interviews have shown that both concepts perceived to be closely related and, responsibilities for these initiatives are practiced by different departments or units.

Keywords: knowledge management, e-learning, learning integration, universities, UAE

Procedia PDF Downloads 492
17753 Effect of “Evidence Based Diabetes Management” Educational Sessions on Primary Care Physicians

Authors: Surjeet Bakshi, Surabhi Sharma

Abstract:

Objective: To assess the impact of educational sessions by reputed regional faculties on knowledge of primary care physicians on evidence based diabetes management methods and practice. Study Design: Retrospective pre-post intervention study. Methodology: Nine cities in Kerala from August to October, 2012 were selected for the study. 125 MBBS doctors participated in the study. 11 regional faculties provided six educational sessions throughout the period. Validated questionnaires were used to evaluate the knowledge of the participants on evidence based diabetes management methods before and after the intervention. Results: The mean score on pre-test was 8 and the mean score on post-test was 9. A paired t-test was conducted on participant’s pre- and post test score and the results were statistically significant (p<0.001). Conclusion: Even though the general attitude to and level of knowledge of diabetes management is good among the primary care physicians in India, there do exist some knowledge gaps which might influence their future practices when it comes to counselling and information on diabetes management methods. In the present study, the performance and awareness level of the participants have expressively improved among primary care physicians. There is a significant improvement in the test score and the training conducted. It seems that if such study programmes are included in the students study programme, it will give higher score in the knowledge and attitude towards diabetes management.

Keywords: diabetes, management, primary care physicians, evidence base, improvement score, knowledge

Procedia PDF Downloads 347
17752 The Challenges for Engineers to Change the Construction Method in Brazil

Authors: Yuri B. Cesarino, Vinícius R. Domingues, Darym J. F. Campos

Abstract:

Developing countries have some restrains towards the adoption of new technologies and construction methods. Some nations, such as Brazil, still use conventional construction methodologies, knowing its lesser cost-effectiveness. This research has been conducted to demonstrate how industrialized construction methods should be implemented in Brazil, especially in times of need. Using the common sense among different authors with different perspectives, it is clear that the second method is more suitable for construction development because of its great advantages. However, it is unlikely for this process to be adopted in the country as a result of several social-economic restraints. Nonetheless, Brazilian engineers have a major challenge ahead of them, and it will take more than creativity to solve such an issue.

Keywords: Brazilian engineers, construction methods, industrialized construction, infrastructure

Procedia PDF Downloads 267
17751 The Sustainability of Human Resource Planning for Construction Projects

Authors: Adegbenga Ashiru, Adebimpe L. Ashiru

Abstract:

The construction industry is considered to work by diversifying personnel. Hence managing human resource is an issue considered to be a highly challenging task. Nonetheless, HR planning for the construction project is a very critical aspect of managing human resource within an expanding nature of construction industry, and there are rising concerns over the failure of construction planning to achieve its goals in spite of the substantial resources allocated to it and as a result of different planning strategies. To justify the above statement, this research was carried out to examine the sustainability of HR planning for construction project. Based on the researcher’s experience, a quantitative approach was adopted that provided a broader understanding of the research and was analysed using descriptive statistics and inferential statistics. The Statistical Package for the Social Sciences (SPSS) was used to obtain the descriptive and inferential statistical analysis. However, research findings showed that literature sources agreed with varying challenges of HR planning on construction projects which were justified by empirical findings. Also, the paper identified four major factors and the key consideration for Project HR Planning (Organisation’s structure with right individuals at right positions and evaluation current resources) will lead to the efficient utilisation implementation of new HR Planning technique and tools for a construction project. Essentially the main reoccurring theme identified was that management of the construction organisations needs to look into the essential factors needed to be considered at the strategic level. Furthermore, leaders leading a construction project team should consider those essential factors needed at the operational level to clarify the numerous functions of HRM in the construction organisations and avoid inconsistencies among several practices on construction projects. The Sustainability of HR planning for construction project policy was indicated and recommendations were made for further future research.

Keywords: construction industry, HRM planning in construction, SHRM in construction, HR planning in construction

Procedia PDF Downloads 336
17750 Application of the EU Commission Waste Management Methodology Level(s) to a Construction and a Demolition in North-West Romania.

Authors: Valean Maria

Abstract:

Construction and demolition waste management is a timely topic, due to the urgency of its transition to sustainability. This sector is responsible for over a third of the waste generated in the E.U., while the legislation requires a proportion of at least 70% preparation for reuse and recycle, excluding backfilling. To this end, the E.U. Commission has provided the Level(s) methodology, allowing for the standardized planning and reporting of waste quantities across all levels of the construction process, from the architecture, to the demolition, from the estimation stage, to the actual measurements at the end of the operations. We applied Level(s) for the first time to the Romanian context, a developing E.U. country in which illegal dumping of contruction waste in nature and landfills, are still common practice. We performed the desk study of the buildings’ documents, followed by field studies of the sites, and finally the insertion and calculation of statistical data of the construction and demolition waste. We learned that Romania is far from the E.U. average in terms of the initial estimations of waste, with some numbers being higher, others lower, and that the price of evacuation to landfills is significantly lower in the developing country, a possible barrier to adopting the new regulations. Finally, we found that concrete is the predominant type waste, in terms of quantity as well as cost of disposal. Further directions of research are provided, such as mapping out all of the alternative facilities in the region and the calculation of the financial costs and of the CO2 footprint, for preparing and delivering waste sustainably, for a more sound and locally adapted model of waste management.

Keywords: construction, waste, management, levels, EU

Procedia PDF Downloads 68
17749 Shape Management Method for Safety Evaluation of Bridge Based on Terrestrial Laser Scanning Using Least Squares

Authors: Gichun Cha, Dongwan Lee, Junkyeong Kim, Aoqi Zhang, Seunghee Park

Abstract:

All the world are studying the construction technology of double deck tunnel in order to respond to the increasing urban traffic demands and environmental changes. Advanced countries have the construction technology of the double deck tunnel structure. but the domestic country began research on it. Construction technologies are important. But Safety evaluation of structure is necessary to prevent possible accidents during construction. Thus, the double deck tunnel was required the shape management of middle slabs. The domestic country is preparing the construction of double deck tunnel for an alternate route and a pleasant urban environment. Shape management of double deck tunnel has been no research because it is a new attempted technology. The present, a similar study is bridge structure for the shape management. Bridge is implemented shape model using terrestrial laser scanning(TLS). Therefore, we proceed research on the bridge slabs because there is a similar structure of double deck tunnel. In the study, we develop shape management method of bridge slabs using TLS. We select the Test-bed for measurement site. This site is bridge located on Sungkyunkwan University Natural Sciences Campus. This bridge has a total length of 34m, the vertical height of 8.7m from the ground. It connects Engineering Building #1 and Engineering Building #2. Point cloud data for shape management is acquired the TLS and We utilized the Leica ScanStation C10/C5 model. We will confirm the Maximum displacement area of middle slabs using Least-Squares Fitting. We expect to raise stability for double deck tunnel through shape management for middle slabs.

Keywords: bridge slabs, least squares, safety evaluation, shape management method, terrestrial laser scanning

Procedia PDF Downloads 230
17748 Anti-Corruption, an Important Challenge for the Construction Industry!

Authors: Ahmed Stifi, Sascha Gentes, Fritz Gehbauer

Abstract:

The construction industry is perhaps one of the oldest industry of the world. The ancient monuments like the egyptian pyramids, the temples of Greeks and Romans like Parthenon and Pantheon, the robust bridges, old Roman theatres, the citadels and many more are the best testament to that. The industry also has a symbiotic relationship with other . Some of the heavy engineering industry provide construction machineries, chemical industry develop innovative construction materials, finance sector provides fund solutions for complex construction projects and many more. Construction Industry is not only mammoth but also very complex in nature. Because of the complexity, construction industry is prone to various tribulations which may have the propensity to hamper its growth. The comparitive study of this industry with other depicts that it is associated with a state of tardiness and delay especially when we focus on the managerial aspects and the study of triple constraint (time, cost and scope). While some institutes says the complexity associated with it as a major reason, others like lean construction, refers to the wastes produced across the construction process as the prime reason. This paper introduces corruption as one of the prime factors for such delays.To support this many international reports and studies are available depicting that construction industry is one of the most corrupt sectors worldwide, and the corruption can take place throught the project cycle comprising project selection, planning, design, funding, pre-qualification, tendering, execution, operation and maintenance, and even through the reconstrction phase. It also happens in many forms such as bribe, fraud, extortion, collusion, embezzlement and conflict of interest and the self-sufficient. As a solution to cope the corruption in construction industry, the paper introduces the integrity as a key factor and build a new integrity framework to develop and implement an integrity management system for construction companies and construction projects.

Keywords: corruption, construction industry, integrity, lean construction

Procedia PDF Downloads 365
17747 Genetic Algorithm Optimization of Multiple Resources for Multi-Projects

Authors: A. Samer Ezeldin, Sarah A. Fotouh

Abstract:

Optimization of resources is very important in all fields, as in construction management. Project managers have to face problems regarding management of cost, time and available resources of single projects and more problems arise when managing multiple projects. Most of the studies focused on optimization of resources for a single project, but, this paper will discuss the design and modeling of multiple resources optimization for multiple projects using Genetic Algorithm. Most of the companies in construction industry optimize the resources for single projects only, but with the presence of several mega projects in several developing countries running at the same time, there is a need for a model to enhance the efficiency of available resources and decreases the fluctuation as much as possible. The proposed model calculates the cost of each resource, tries to minimize the cost of extra resources as much as possible and generates the schedule of each project within a selected program.

Keywords: construction management, genetic algorithm, multiple projects, multiple resources, optimization

Procedia PDF Downloads 440
17746 Socio-Cultural Factors to Support Knowledge Management and Organizational Innovation: A Study of Small and Medium-Sized Enterprises in Latvia

Authors: Madara Apsalone

Abstract:

Knowledge management and innovation is key to competitive advantage and sustainable business development in advanced economies. Small and medium-sized enterprises (SMEs) have lower capacity and more constrained resources for long-term and high-uncertainty research and development investments. At the same time, SMEs can implement organizational innovation to improve their performance and further foster other types of innovation. The purpose of this study is to analyze, how socio-cultural factors such as shared values, organizational behaviors, work organization and decision making processes can influence knowledge management and help to develop organizational innovation via an empirical study. Surveying 600 SMEs in Latvia, the author explores the contribution of different socio-cultural factors to organizational innovation and the role of knowledge management and organizational learning in this process. A conceptual model, explaining the impact of organizational team, development, result-orientation and structure is created. The study also proposes insights that contribute to theoretical and practical discussions on fostering innovation of small businesses in small economies.

Keywords: knowledge management, organizational innovation, small and medium-sized enterprises, socio-cultural factors

Procedia PDF Downloads 374
17745 Evaluating the Impact of Cloud Computing on Collaboration Service in Knowledge Management Systems

Authors: Hamid Reza Nikkhah, Abbas Toloei Eshlaghi, Hossein Ali Momeni

Abstract:

One of the most important services of Knowledge Management Systems (KMS) is collaboration service which plays a decisive role in organization efficiency. Cloud computing as one of the latest IT technologies has brought a new paradigm in delivering services and communications. In this research, we evaluate the impact of cloud computing on the collaboration service of KMS and for doing so, four variables of cloud computing and three variables of the collaboration service were detected to be assessed.It was found that cloud computing has a far-fetching direct impact on the collaboration service.

Keywords: cloud computing, collaboration service, knowledge management systems, cloud computing

Procedia PDF Downloads 504
17744 Empirical Study on Causes of Project Delays

Authors: Khan Farhan Rafat, Riaz Ahmed

Abstract:

Renowned offshore organizations are drifting towards collaborative exertion to win and implement international projects for business gains. However, devoid of financial constraints, with the availability of skilled professionals, and despite improved project management practices through state-of-the-art tools and techniques, project delays have become a norm these days. This situation calls for exploring the factor(s) affecting the bonding between project management performance and project success. In the context of the well-known 3M’s of project management (that is, manpower, machinery, and materials), machinery and materials are dependent upon manpower. Because the body of knowledge inveterate on the influence of national culture on men, hence, the realization of the impact on the link between project management performance and project success need to be investigated in detail to arrive at the possible cause(s) of project delays. This research initiative was, therefore, undertaken to fill the research gap. The unit of analysis for the proposed research excretion was the individuals who had worked on skyscraper construction projects. In reverent studies, project management is best described using construction examples. It is due to this reason that the project oriented city of Dubai was chosen to reconnoiter on causes of project delays. A structured questionnaire survey was disseminated online with the courtesy of the Project Management Institute local chapter to carry out the cross-sectional study. The Construction Industry Institute, Austin, of the United States of America along with 23 high-rise builders in Dubai were also contacted by email requesting for their contribution to the study and providing them with the online link to the survey questionnaire. The reliability of the instrument was warranted using Cronbach’s alpha coefficient of 0.70. The appropriateness of sampling adequacy and homogeneity in variance was ensured by keeping Kaiser–Meyer–Olkin (KMO) and Bartlett’s test of sphericity in the range ≥ 0.60 and < 0.05, respectively. Factor analysis was used to verify construct validity. During exploratory factor analysis, all items were loaded using a threshold of 0.4. Four hundred and seventeen respondents, including members from top management, project managers, and project staff, contributed to the study. The link between project management performance and project success was significant at 0.01 level (2-tailed), and 0.05 level (2-tailed) for Pearson’s correlation. Before initiating the moderator analysis test for linearity, multicollinearity, outliers, leverage points and influential cases, test for homoscedasticity and normality were carried out which are prerequisites for conducting moderator review. The moderator analysis, using a macro named PROCESS, was performed to verify the hypothesis that national culture has an influence on the said link. The empirical findings, when compared with Hofstede's results, showed high power distance as the cause of construction project delays in Dubai. The research outcome calls for the project sponsors and top management to reshape their project management strategy and allow for low power distance between management and project personnel for timely completion of projects.

Keywords: causes of construction project delays, construction industry, construction management, power distance

Procedia PDF Downloads 206
17743 The Role of Knowledge Management in Global Software Engineering

Authors: Samina Khalid, Tehmina Khalil, Smeea Arshad

Abstract:

Knowledge management is essential ingredient of successful coordination in globally distributed software engineering. Various frameworks, KMSs, and tools have been proposed to foster coordination and communication between virtual teams but practical implementation of these solutions has not been found. Organizations have to face challenges to implement knowledge management system. For this purpose at first, a literature review is arranged to investigate about challenges that restrict organizations to implement KMS and then by taking in account these challenges a problem of need of integrated solution in the form of standardized KMS that can easily store tacit and explicit knowledge, has traced down to facilitate coordination and collaboration among virtual teams. Literature review has been already shown that knowledge is a complex perception with profound meanings, and one of the most important resources that contributes to the competitive advantage of an organization. In order to meet the different challenges caused by not properly managing knowledge related to projects among virtual teams in GSE, we suggest making use of the cloud computing model. In this research a distributed architecture to support KM storage is proposed called conceptual framework of KM as a service in cloud. Framework presented is enhanced and conceptual framework of KM is embedded into that framework to store projects related knowledge for future use.

Keywords: management, Globsl software development, global software engineering

Procedia PDF Downloads 512
17742 Identification of Factors Affecting Labor Productivity in Construction Projects of Iran

Authors: Elham Dehghan, A. Shirzadi Javid, Mohsen Tadayon

Abstract:

Labor productivity is very important and gained special concerns among professionals in the construction industry, worldwide. Productivity improvements on labors achieve higher cost savings with minimal investment. Due to the fact that profit margins are small on construction projects, cost savings associated with productivity are crucial to become a successful contractor. This research program studies and highlights the factors affecting labor productivity in Iranian construction industry. A questionnaire was used to gather the relevant data from respondents who involve in managing various types of projects in wide areas in Iran. It involved ranking 57 predefined factors divided into 5 categories: Human/Labor; Financial; Management; Equipments/Materials and Environmental. Total 62 feedbacks were analyzed through the Relative Importance Index (RII) technique. The top ten factors affecting construction labor productivity in Iran are: 1) Professional capability of contractor project manager, 2) skills of contractor’s project management team, 3) professional capability of owner project manager, 4) professional capability of Consulting Project manager, 5) discipline working, 6) delay payments by the owner, 7) material shortages, 8) delays in delivery of materials, 9) turnover power of the owner, 10) poor site management. Recommendations have been made in the study to address these factors. The research has direct benefits to key stakeholders in Iranian construction industry.

Keywords: Iranian construction projects, labor, productivity, relative importance index

Procedia PDF Downloads 256
17741 Assessing the Gap between the Policies and Existing Living Conditions of Migrant Construction Workers: A Case Study of Vijayawada

Authors: Ayushi Mishra

Abstract:

Migrant construction workers or construction labors are one of the majority of the working population in our urban and rural areas. Even after being the majority, their involvement in the upbringing of the economy is hardly ever documented or recognized. Non-permanent or migrant workers face loads of exploitations and susceptibilities than other informal sector workers in India which in turn has affected the productivity of the labors. The relation of their employment and migration and the links of these dynamics to their housing and other basic needs in the city are mostly unstated. Even the urban planning and housing policies do not make thoughtful provision for them, they forcing them to live in extremely wretched conditions. And even if the policies are made, it frequently happens that they are not implemented. As the issue is very much prevalent in today’s time in India with so many large-scale and labor extensive projects going on, this study focuses on the assessment of the gap between the existing government policies and the current scenario of the construction workers in ongoing projects of Vijayawada, Andhra Pradesh. A few of the policies for construction workers conditions a lot of things, out of which only a few are functional which makes this study to assess the reason behind the unorganized living condition and poor physical, the social and mental health of construction workers of Vijayawada. In present, the dignity of construction labors is compromised every day on construction sites, in terms of work and basic rights which leads to many other problems in future. So to work for the betterment of this community, knowledge on the differences is very much required and hence this study is a little effort to replenish the difference and compare the policies with the existing conditions of construction labors in Vijayawada.

Keywords: construction, labours, policy, productivity

Procedia PDF Downloads 314
17740 Knowledge Sharing in Virtual Community: Societal Culture Considerations

Authors: Shahnaz Bashir, Abel Usoro, Imran Khan

Abstract:

Hofstede’s culture model is an important model to study culture between different societies. He collected data from world-wide and performed a comprehensive study. Hofstede’s cultural model is widely accepted and has been used to study cross cultural influences in different areas like cross-cultural psychology, cross cultural management, information technology, and intercultural communication. This study investigates the societal cultural aspects of knowledge sharing in virtual communities.

Keywords: knowledge management, knowledge sharing, societal culture, virtual communities

Procedia PDF Downloads 392
17739 Treatment of the Modern Management Mechanism of the Debris Flow Processes Expected in the Mletiskhevi

Authors: G. Chakhaia, S. Gogilava, L. Tsulukidze, Z. Laoshvili, I. Khubulava, S. Bosikashvili, T. Gugushvili

Abstract:

The work reviewed and evaluated various genesis debris flow phenomena recently formatted in the Mletiskhevi, accordingly it revealed necessity of treatment modern debris flow against measures. Based on this, it is proposed the debris flow against truncated semi cone shape construction, which elements are contained in the car’s secondary tires. its constituent elements (sections), due to the possibilities of amortization and geometric shapes is effective and sustainable towards debris flow hitting force. The construction is economical, because after crossing the debris flows in the river bed, the riverbed is not cleanable, also the elements of the building are resource saving. For assessment of influence of cohesive debris flow at the construction and evaluation of the construction effectiveness have been implemented calculation in the specific assumptions with approved methodology. According to the calculation, it was established that after passing debris flow in the debris flow construction (in 3 row case) its hitting force reduces 3 times, that causes reduce of debris flow speed and kinetic energy, as well as sedimentation on a certain section of water drain in the lower part of the construction. Based on the analysis and report on the debris flow against construction, it can be said that construction is effective, inexpensive, technically relatively easy-to-reach measure, that’s why its implementation is prospective.

Keywords: construction, debris flow, sections, theoretical calculation

Procedia PDF Downloads 170
17738 A Review of the Factors Causing Cost Overrun in Construction Projects in Malaysia

Authors: Kaleem Ullah, Abd Halid Bin Abdullah

Abstract:

This study examines previous literature on cost overrun in construction projects with the specific aim of determining the frequently observed causes of cost overruns in Malaysian construction projects. Cost overrun is one of the major problems in construction projects. Cost overrun is frequently observed in almost every construction projects. This cost overrun in construction projects occurs due to various reasons and many researchers have carried out various studies to identify the cause factors of this issue. The causes of construction cost overrun could vary from country to country because of the difference in political, economic, social and environmental conditions. Likewise, other countries construction projects in Malaysia have also the issue of cost overrun. The concept of cost overrun in construction projects has attracted much attention in recent years and researches are trying to understand the causes of these overruns and their effects to the construction industry as whole. This paper review various research studies carried out in Malaysia which surveyed the cost performance and cause factors of cost overruns in construction projects in Malaysia.

Keywords: cause of cost overrun, cost overrun, construction industry in Malaysia, effects of cost overrun

Procedia PDF Downloads 265
17737 Assessment of Impact of Manpower Training and Development in the Construction Industry

Authors: Olalekan Bamidele Aruleba

Abstract:

This research assessed the impact of manpower training and development in the construction industry. The aim is to determine the effect of training and development on employees for effective organizational growth in the construction industry to identify the training method for each category of employee in the construction industry, challenges to training and development of workers in the construction industry and impact of manpower training and development on employees and employers. Data for the study were obtained through a well-structured questionnaire administered to building professionals in Nigeria construction firm. Eighty (80) questionnaires were distributed among building professionals in three selected local governments within Ondo State and sixty-four (64) were returned. Data collected were analysed using descriptive statistics and ranking. Findings of the study revealed that in house training and in-service training methods were preferred by most construction industry. It concluded that the attitude of top management and lack of fund was seen as the significant challenges militating against training of employees. The study recommended that manpower training and development must be sustained by all stakeholders in the industry in order to improve workers' productivity; the organization should adopt the right method in training each category of employees and carry out the need assessment for training to avoid training wrong employees.

Keywords: construction, development, manpower, training

Procedia PDF Downloads 207