Search results for: Practical Task
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 1725

Search results for: Practical Task

1725 Practical Experiences as Part of Project Management Course

Authors: H. Hussain, N. H. Mohamad

Abstract:

Practical experiences have been one of the successful criteria for the Project Management course for the art and design students. There are series of events that the students have to undergo as part of their practical exercises in the learning context for Project Management courses. These series have been divided into few mini programs that involved the whole individual in each group. Therefore, the events have been one of the bench marks for these students. Through the practical experience, the task that has been given to individual has been performed according to the needs of professional practice and ethics.

Keywords: Practical experiences, project management, art and design students, events, programs.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1271
1724 Vocational Teaching Method: A Conceptual Model in Teaching Automotive Practical Work

Authors: Adnan Ahmad, Yusri Kamin, Asnol Dahar Minghat, Mohd. Khir Nordin, Dayana Farzeha, Ahmad Nabil

Abstract:

The purpose of this study is to identify the teaching method practices of the practical work subject in Vocational Secondary School. This study examined the practice of Vocational Teaching Method in Automotive Practical Work. The quantitative method used the sets of the questionnaire. 283 students and 63 teachers involved from ten VSS involved in this research. Research finding showed in conducting the introduction session teachers prefer used the demonstration method and questioning technique. While in deliver the content of practical task, teachers applied group monitoring and problem solving approach. To conclude the task of automotive practical work, teachers choose re-explain and report writing to make sure students really understand all the process of teaching. VTM-APW also involved the competency-based concept to embed in the model. Derived from factors investigated, research produced the combination of elements in teaching skills and vocational skills which could be used as the best teaching method in automotive practical work for school level. As conclusion this study has concluded that the VTM-APW model is able to apply in teaching to make an improvement with current practices in Vocational Secondary School. Hence, teachers are suggested to use this method to enhance student's knowledge in Automotive and teachers will deliver skills to the current and future workforce relevant with the required competency skilled in workplace.

Keywords: Vocational Teaching Method, Practical Task, Teacher Preferences, Student Preferences.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3936
1723 Directed Approach and Resolution of Practical Cases as a Motivation Tool for Self-Learning and Cooperation

Authors: B. Montero, M. Rico, A. Ares, R. Bouza

Abstract:

The development of competences and practical capacities of students is getting an important incidence into the guidelines of the European Higher Education Area (EHEA). The methodology applied in this work is based on the education through directed resolution of practical cases. All cases are related to professional tasks that the students will have to develop in their future career. The method is intended to form the necessary competences of students of the Marine Engineering and Maritime Transport Degree in the matter of “Physics". The experience was applied in the course of 2011/2012. Students were grouped, and a practical task was assigned to them, that should be developed and solved within the team. The aim was to realize students learning by three ways: their own knowledge, the contribution of their teammates and the teacher's direction. The results of the evaluation were compared with those obtained previously by the traditional teaching method.

Keywords: Cooperation, Marine Engineering, Self-learning skills.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1904
1722 EEG Indices to Time-On-Task Effects and to a Workload Manipulation (Cueing)

Authors: A. T. Kamzanova, G. Matthews, A. M. Kustubayeva, S. M. Jakupov

Abstract:

The aim of this study was to evaluate the sensitivity of a range of EEG indices to time-on-task effects and to a workload manipulation (cueing), during performance of a resource-limited vigilance task. Effects of task period and cueing on performance and subjective state response were consistent with previous vigilance studies and with resource theory. Two EEG indices – the Task Load Index (TLI) and global lower frequency (LF) alpha power – showed effects of task period and cueing similar to those seen with correct detections. Across four successive task periods, the TLI declined and LF alpha power increased. Cueing increased TLI and decreased LF alpha. Other indices – the Engagement Index (EI), frontal theta and upper frequency (UF) alpha failed to show these effects. However, EI and frontal theta were sensitive to interactive effects of task period and cueing, which may correspond to a stronger anxiety response to the uncued task.

Keywords: brain activity, EEG, task engagement, vigilance task.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2325
1721 Design of an Artificial Intelligence Based Automatic Task Planner or a Robotic System

Authors: T. C. Manjunath, C. Ardil

Abstract:

This paper deals with the design and the implementation of an automatic task planner for a robot, irrespective of whether it is a stationary robot or a mobile robot. The aim of the task planner nothing but, they are planning systems which are used to plan a particular task and do the robotic manipulation. This planning system is embedded into the system software in the computer, which is interfaced to the computer. When the instructions are given using the computer, this is transformed into real time application using the robot. All the AI based algorithms are written and saved in the control software, which acts as the intelligent task planning system.

Keywords: AI, Robot, Task Planner, RT, Algorithm, Specs, Controller.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 620
1720 An Approach to Task Modeling for User Interface Design

Authors: Costin Pribeanu

Abstract:

The model-based approach to user interface design relies on developing separate models capturing various aspects about users, tasks, application domain, presentation and dialog structures. This paper presents a task modeling approach for user interface design and aims at exploring mappings between task, domain and presentation models. The basic idea of our approach is to identify typical configurations in task and domain models and to investigate how they relate each other. A special emphasis is put on applicationspecific functions and mappings between domain objects and operational task structures. In this respect, we will address two layers in task decomposition: a functional (planning) layer and an operational layer.

Keywords: task modeling, user interface design, unit tasks, basic tasks, operational task model.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1878
1719 Task Modeling for User Interface Design: A Layered Approach

Authors: Costin Pribeanu

Abstract:

The model-based approach to user interface design relies on developing separate models that are capturing various aspects about users, tasks, application domain, presentation and dialog representations. This paper presents a task modeling approach for user interface design and aims at exploring the mappings between task, domain and presentation models. The basic idea of our approach is to identify typical configurations in task and domain models and to investigate how they relate each other. A special emphasis is put on application-specific functions and mappings between domain objects and operational task structures. In this respect, we will distinguish between three layers in the task decomposition: a functional layer, a planning layer, and an operational layer.

Keywords: task modeling, user interface design, unit tasks, basic tasks, operational task model

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1595
1718 A Task-Based Design Approach for Augmented Reality Systems

Authors: Costin Pribeanu, Rytis Vilkonis, Dragoş Daniel Iordache

Abstract:

User interaction components of Augmented Reality (AR) systems have to be tested with users in order to find and fix usability problems as early as possible. In this paper we will report on a user-centered design approach for AR systems following the experience acquired during the design and evaluation of a software prototype for an AR-based educational platform. In this respect we will focus on the re-design of the user task based on the results from a formative usability evaluation. The basic idea of our approach is to describe task scenarios in a tabular format, to develop a task model in a task modeling environment and then to simulate the execution.

Keywords: AR-based educational systems, task-based design, usability evaluation.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2485
1717 Improving Students’ Participation in Group Tasks: Case Study of Adama Science and Technology University

Authors: Fiseha M. Guangul, Annissa Muhammed, Aja O. Chikere

Abstract:

Group task is one method to create the conducive environment for the active teaching-learning process. Performing group task with active involvement of students will benefit the students in many ways. However, in most cases all students do not participate actively in the group task, and hence the intended benefits are not acquired. This paper presents the improvements of students’ participation in the group task and learning from the group task by introducing different techniques to enhance students’ participation. For the purpose of this research Carpentry and Joinery II (WT-392) course from Wood Technology Department at Adama Science and Technology University was selected, and five groups were formed. Ten group tasks were prepared and the first five group tasks were distributed to the five groups in the first day without introducing the techniques that are used to enhance participation of students in the group task. On another day, the other five group tasks were distributed to the same groups and various techniques were introduced to enhance students’ participation in the group task. The improvements of students’ learning from the group task after the implementation of the techniques. After implementing the techniques the evaluation showed that significant improvements were obtained in the students’ participation and learning from the group task.

Keywords: Active learning, evaluation method, group task, students participation.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 749
1716 A Comparison Study of Inspector's Performance between Regular and Complex Tasks

Authors: Santirat Nansaarng, Sittichai Kaewkuekool, Supreeya Siripattanakunkajorn

Abstract:

This research was to study a comparison of inspector-s performance between regular and complex visual inspection task. Visual task was simulated on DVD read control circuit. Inspection task was performed by using computer. Subjects were 10 undergraduate randomly selected and test for 20/20. Then, subjects were divided into two groups, five for regular inspection (control group) and five for complex inspection (treatment group) tasks. Result was showed that performance on regular and complex inspectors was significantly difference at the level of 0.05. Inspector performance on regular inspection was showed high percentage on defects detected by using equal time to complex inspection. This would be indicated that inspector performance was affected by visual inspection task.

Keywords: Visual inspection task, regular and complex task.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1257
1715 Task Planning for Service Robots with Limited Feedback

Authors: Chung-Woon Park, Jungwoo Lee, Jong-Tae Lim

Abstract:

In this paper, we propose a novel limited feedback scheme for task planning with service robots. Instead of sending the full service robot state information for the task planning, the proposed scheme send the best-M indices of service robots with a indicator. With the indicator, the proposed scheme significantly reduces the communication overhead for task planning as well as mitigates the system performance degradation in terms of the utility. In addition, we analyze the system performance of the proposed scheme and compare the proposed scheme with the other schemes.

Keywords: Task Planning, Service Robots, Limited Feedback, Scheduling

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1287
1714 The Practical Delivery Room Experience of Nursing Students at Suranaree University of Technology

Authors: Nareeluk Suwannobol, Lakkhana Suwachan

Abstract:

The purpose of this study was to study the practical delivery room experience of nursing students. The respondents were 6 junior nursing students of Suranaree University of Technology who had a direct experience from practicing in a delivery room between January 9 and March 30, 2012 as part of Nursing Care of the Family and Midwifery 3. The data was collected by using in-depth interview, observation, and reflective report. The results of the study found that the practical delivery room experience of nursing students consisted of three issues: 1) stress and coping with stress during practical exercise, 2) changes in daily routine, and 3) source during practical exercise. The results of this study would lead to the understanding of the meaning of the practical exercise of nursing students.

Keywords: Delivery Room, Practical Experience, Nursing Students.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 5623
1713 Robot Task-Level Programming Language and Simulation

Authors: M. Samaka

Abstract:

This paper presents the development of a software application for Off-line robot task programming and simulation. Such application is designed to assist in robot task planning and to direct manipulator motion on sensor based programmed motion. The concept of the designed programming application is to use the power of the knowledge base for task accumulation. In support of the programming means, an interactive graphical simulation for manipulator kinematics was also developed and integrated into the application as the complimentary factor to the robot programming media. The simulation provides the designer with useful, inexpensive, off-line tools for retain and testing robotics work cells and automated assembly lines for various industrial applications.

Keywords: Robot programming, task-level programming, robot languages, robot simulation, robotics software.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3264
1712 The Effects of Perceived Organizational Support, Abusive Supervision, and Exchange Ideology on Employees- Task Performance

Authors: Seung Yeon Son, Heetae Park, Soojin Lee, Seckyoung Loretta Kim, Dongkyu Kim, Seokhwa Yun

Abstract:

Employee-s task performance has been recognized as a core contributor to overall organizational effectiveness. Hence, verifying the determinants of task performance is one of the most important research issues. This study tests the influence of perceived organizational support, abusive supervision, and exchange ideology on employee-s task performance. We examined our hypotheses by collecting self-reported data from 413 Korean employees in different organizations. Our all hypotheses gained support from the results. Implications for research and directions for future research are discussed.

Keywords: Abusive supervision, exchange ideology, perceived organizational support, task performance.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2669
1711 Impact of Music on Brain Function during Mental Task using Electroencephalography

Authors: B. Geethanjali, K. Adalarasu, R. Rajsekaran

Abstract:

Music has a great effect on human body and mind; it can have a positive effect on hormone system. Objective of this study is to analysis the effect of music (carnatic, hard rock and jazz) on brain activity during mental work load using electroencephalography (EEG). Eight healthy subjects without special musical education participated in the study. EEG signals were acquired at frontal (Fz), parietal (Pz) and central (Cz) lobes of brain while listening to music at three experimental condition (rest, music without mental task and music with mental task). Spectral powers features were extracted at alpha, theta and beta brain rhythms. While listening to jazz music, the alpha and theta powers were significantly (p < 0.05) high for rest as compared to music with and without mental task in Cz. While listening to Carnatic music, the beta power was significantly (p < 0.05) high for with mental task as compared to rest and music without mental task at Cz and Fz location. This finding corroborates that attention based activities are enhanced while listening to jazz and carnatic as compare to Hard rock during mental task.

Keywords: Music, Brain Function, Electroencephalography (EEG), Mental Task, Features extraction parameters

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 4505
1710 Deviations and Defects of the Sub-Task’s Requirements in Construction Projects

Authors: Abdullah Almusharraf, Andrew Whyte

Abstract:

The sub-task pattern in terms of deviations and defects should be identified and understood in order to improve the quality of practices in construction projects. Therefore, sub-task susceptibility to exposure to deviations and defects has been evaluated and classified via six classifications proposed in this study. Thirty-four case studies of specific sub-tasks (from compression members in constructed concrete structures) were collected from seven construction projects in order to examine the study’s proposed classifications. The study revealed that the sub-task has a high sensitivity to deviation, where 91% of the cases were recorded as deviations; however, only 19% of cases were recorded as defects. Other findings were that the actual work during the execution process is a high source of deviation for this sub-task (74%), while only 26% of the source of deviation was due to both design documentation and the actual work. These findings significantly imply that the study’s proposed classifications could be used to determine the pattern of each sub-task and develop proactive actions to overcome issues of sub-task deviations and defects.

Keywords: Sub-tasks, deviations, defects, quality, construction projects.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2150
1709 Application of Fourier Series Based Learning Control on Mechatronic Systems

Authors: Sandra Baßler, Peter Dünow, Mathias Marquardt

Abstract:

A Fourier series based learning control (FSBLC) algorithm for tracking trajectories of mechanical systems with unknown nonlinearities is presented. Two processes are introduced to which the FSBLC with PD controller is applied. One is a simplified service robot capable of climbing stairs due to special wheels and the other is a propeller driven pendulum with nearly the same requirements on control. Additionally to the investigation of learning the feed forward for the desired trajectories some considerations on the implementation of such an algorithm on low cost microcontroller hardware are made. Simulations of the service robot as well as practical experiments on the pendulum show the capability of the used FSBLC algorithm to perform the task of improving control behavior for repetitive task of such mechanical systems.

Keywords: Climbing stairs, FSBLC, ILC, Service robot.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1377
1708 Dual-Task – Immersion in the Interactions of Simultaneously Performed Tasks

Authors: M. Liebherr, P. Schubert, S. Kersten, C. Dietz, L. Franz, C. T. Haas

Abstract:

With a long history, dual-task has become one of the most intriguing research fields regarding human brain functioning and cognition. However, findings considering effects of taskinterrelations are limited (especially, in combined motor and cognitive tasks). Therefore, we aimed at developing a measurement system in order to analyse interrelation effects of cognitive and motor tasks. On the one hand, the present study demonstrates the applicability of the measurement system and on the other hand first results regarding a systematisation of different task combinations are shown. Future investigations should combine imagine technologies and this developed measurement system.

Keywords: Dual-task, interference, cognition, measurement.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2092
1707 Design and Implementation of an AI-Enabled Task Assistance and Management System

Authors: Arun Prasad Jaganathan

Abstract:

In today's dynamic industrial world, traditional task allocation methods often fall short in adapting to evolving operational conditions. This paper presents an AI-enabled task assistance and management system designed to overcome the limitations of conventional approaches. By using artificial intelligence (AI) and machine learning (ML), the system intelligently interprets user instructions, analyzes tasks, and allocates resources based on real-time data and environmental factors. Additionally, geolocation tracking enables proactive identification of potential delays, ensuring timely interventions. With its transparent reporting mechanisms, the system provides stakeholders with clear insights into task progress, fostering accountability and informed decision-making. The paper presents a comprehensive overview of the system architecture, algorithm, and implementation, highlighting its potential to revolutionize task management across diverse industries.

Keywords: Artificial intelligence, machine learning, task allocation, operational efficiency, resource optimization.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 80
1706 Practical Problems as Tools for the Development of Secondary School Students’ Motivation to Learn Mathematics

Authors: M. Rodionov, Z. Dedovets

Abstract:

This article discusses plausible reasoning use for solution to practical problems. Such reasoning is the major driver of motivation and implementation of mathematical, scientific and educational research activity. A general, practical problem solving algorithm is presented which includes an analysis of specific problem content to build, solve and interpret the underlying mathematical model. The author explores the role of practical problems such as the stimulation of students' interest, the development of their world outlook and their orientation in the modern world at the different stages of learning mathematics in secondary school. Particular attention is paid to the characteristics of those problems which were systematized and presented in the conclusions.

Keywords: Mathematics, motivation, secondary school, student, practical problem.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1065
1705 LED Lighting Interviews and Assessment in Forest Machines

Authors: Rauno Pääkkönen, Fabriziomaria Gobba, Leena Korpinen

Abstract:

The objective of the study is to assess the implementation of LED lighting into forest machine work in the dark. In addition, the paper includes a wide variety of important and relevant safety and health parameters. In modern, computerized work in the cab of forest machines, artificial illumination is a demanding task when performing duties, such as the visual inspections of wood and computer calculations. We interviewed entrepreneurs and gathered the following as the most pertinent themes: (1) safety, (2) practical problems, and (3) work with LED lighting. The most important comments were in regards to the practical problems of LED lighting. We found indications of technical problems in implementing LED lighting, like snow and dirt on the surfaces of lamps that dim the emission of light. Moreover, service work in the dark forest is dangerous and increases the risks of on-site accidents. We also concluded that the amount of blue light to the eyes should be assessed, especially, when the drivers are working in a semi-dark cab.

Keywords: Forest machines, health, LED, safety.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2130
1704 An Example of Open Robot Controller Architecture - For Power Distribution Line Maintenance Robot System -

Authors: Yingxin He, Kyouichi Tatsuno

Abstract:

In this paper, we propose an architecture for easily constructing a robot controller. The architecture is a multi-agent system which has eight agents: the Man-machine interface, Task planner, Task teaching editor, Motion planner, Arm controller, Vehicle controller, Vision system and CG display. The controller has three databases: the Task knowledge database, the Robot database and the Environment database. Based on this controller architecture, we are constructing an experimental power distribution line maintenance robot system and are doing the experiment for the maintenance tasks, for example, “Bolt insertion task".

Keywords: Robot controller, Software library, Maintenance robot, Robot language, Agent system.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1402
1703 Pain and Lumbar Muscle Activation before and after Functional Task in Nonspecific Chronic Low Back Pain

Authors: Lídia E. O. Cruz, Adriano P. C. Calvo, Renato J. Soares, Regiane A. Carvalho

Abstract:

Individuals with non-specific chronic low back pain may present altered movement patterns during functional activities. However, muscle behavior before and after performing a functional task with different load conditions is not yet fully understood. The aim of this study is to analyze lumbar muscle activity before and after performing the functional task of picking up and placing an object on the ground (with and without load) in individuals with nonspecific chronic low back pain. 20 subjects with nonspecific chronic low back pain and 20 healthy subjects participated in this study. A surface electromyography was performed in the ilio-costal, longissimus and multifidus muscles to evaluate lumbar muscle activity before and after performing the functional task of picking up and placing an object on the ground, with and without load. The symptomatic participants had greater lumbar muscle activation compared to the asymptomatic group, more evident in performing the task without load, with statistically significant difference (p = 0,033) between groups for the right multifidus muscle. This study showed that individuals with nonspecific chronic low back pain have higher muscle activation before and after performing a functional task compared to healthy participants.

Keywords: Chronic low back pain, functional task, lumbar muscles, muscle activity.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 530
1702 Soft Real-Time Fuzzy Task Scheduling for Multiprocessor Systems

Authors: Mahdi Hamzeh, Sied Mehdi Fakhraie, Caro Lucas

Abstract:

All practical real-time scheduling algorithms in multiprocessor systems present a trade-off between their computational complexity and performance. In real-time systems, tasks have to be performed correctly and timely. Finding minimal schedule in multiprocessor systems with real-time constraints is shown to be NP-hard. Although some optimal algorithms have been employed in uni-processor systems, they fail when they are applied in multiprocessor systems. The practical scheduling algorithms in real-time systems have not deterministic response time. Deterministic timing behavior is an important parameter for system robustness analysis. The intrinsic uncertainty in dynamic real-time systems increases the difficulties of scheduling problem. To alleviate these difficulties, we have proposed a fuzzy scheduling approach to arrange real-time periodic and non-periodic tasks in multiprocessor systems. Static and dynamic optimal scheduling algorithms fail with non-critical overload. In contrast, our approach balances task loads of the processors successfully while consider starvation prevention and fairness which cause higher priority tasks have higher running probability. A simulation is conducted to evaluate the performance of the proposed approach. Experimental results have shown that the proposed fuzzy scheduler creates feasible schedules for homogeneous and heterogeneous tasks. It also and considers tasks priorities which cause higher system utilization and lowers deadline miss time. According to the results, it performs very close to optimal schedule of uni-processor systems.

Keywords: Computational complexity, Deadline, Feasible scheduling, Fuzzy scheduling, Priority, Real-time multiprocessor systems, Robustness, System utilization.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2129
1701 The Correlation between Users’ Star Rating and Usability on Mobile Applications

Authors: Abdulmohsen A. AlBesher, Richard T. Stone

Abstract:

Star rating for mobile applications is a very useful way to differentiate between the best and worst rated applications. However, the question is whether the rating reflects the level of usability or not. The aim of this paper is to find out if the user’ star ratings on mobile apps correlate with the usability of those apps. Thus, we tested three mobile apps, which have different star ratings: low, medium, and high. Participating in the study, 15 mobile phone users were asked to do one single task for each of the three tested apps. After each task, the participant evaluated the app by answering a survey based on the System Usability Scale (SUS). The results found that there is no major correlation between the star rating and the usability. However, it was found that the task completion time and the numbers of errors that may happen while completing the task were significantly correlated to the usability.

Keywords: Mobile applications, SUS, Star rating, Usability.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 920
1700 The Use of Computer Simulation as Technological Education for Crisis Management Staff

Authors: Jiří Barta, Josef Krahulec, Jiří F. Urbánek

Abstract:

Education and practical training crisis management members are a topical issue nowadays. The paper deals with the perspectives and possibilities of "smart solutions" to education for crisis management staff. Currently, there is a large number of simulation tools, which notes that they are suitable for practical training of crisis management staff. The first part of the paper is focused on the introduction of the technology simulation tools. The simulators aim is to create a realistic environment for the practical training of extending units of crisis staff. The second part of the paper concerns the possibilities of using the simulation technology to the education process. The aim of this section is to introduce the practical capabilities and potential of the simulation programs for practical training of crisis management staff.

Keywords: Crisis management staff, computer simulation, software, technological education.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1566
1699 Radar Task Schedulers based on Multiple Queue

Authors: María I. Jiménez, Alberto Izquierdo, Juan J. Villacorta, Lara del Val, Mariano Raboso

Abstract:

There are very complex communication systems, as the multifunction radar, MFAR (Multi-Function Array Radar), where functions are integrated all together, and simultaneously are performed the classic functions of tracking and surveillance, as all the functions related to the communication, countermeasures, and calibration. All these functions are divided into the tasks to execute. The task scheduler is a key element of the radar, since it does the planning and distribution of energy and time resources to be shared and used by all tasks. This paper presents schedulers based on the use of multiple queue. Several schedulers have been designed and studied, and it has been made a comparative analysis of different performed schedulers. The tests and experiments have been done by means of system software simulation. Finally a suitable set of radar characteristics has been selected to evaluate the behavior of the task scheduler working.

Keywords: Queue Theory, Radar, Scheduler, Task.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2200
1698 The Relationship between Pretend Play and False-Belief in 18-Month-Old Children

Authors: Midori Ban, Ichiro Uchiyama

Abstract:

This experimental study examined the relationship between pretend play and false-belief. Eighteen-month-old children engaged in pretend play with an experimenter using various controlled behaviors and performed a false-belief task. The results showed that the children who understood pretend play performed better on the false-belief task. This suggests that pretended play and false-belief are related at the age of 18 months.

Keywords: 18-month-old, pretend play, false-belief task.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1823
1697 Resource Allocation and Task Scheduling with Skill Level and Time Bound Constraints

Authors: Salam Saudagar, Ankit Kamboj, Niraj Mohan, Satgounda Patil, Nilesh Powar

Abstract:

Task Assignment and Scheduling is a challenging Operations Research problem when there is a limited number of resources and comparatively higher number of tasks. The Cost Management team at Cummins needs to assign tasks based on a deadline and must prioritize some of the tasks as per business requirements. Moreover, there is a constraint on the resources that assignment of tasks should be done based on an individual skill level, that may vary for different tasks. Another constraint is for scheduling the tasks that should be evenly distributed in terms of number of working hours, which adds further complexity to this problem. The proposed greedy approach to solve assignment and scheduling problem first assigns the task based on management priority and then by the closest deadline. This is followed by an iterative selection of an available resource with the least allocated total working hours for a task, i.e. finding the local optimal choice for each task with the goal of determining the global optimum. The greedy approach task allocation is compared with a variant of Hungarian Algorithm, and it is observed that the proposed approach gives an equal allocation of working hours among the resources. The comparative study of the proposed approach is also done with manual task allocation and it is noted that the visibility of the task timeline has increased from 2 months to 6 months. An interactive dashboard app is created for the greedy assignment and scheduling approach and the tasks with more than 2 months horizon that were waiting in a queue without a delivery date initially are now analyzed effectively by the business with expected timelines for completion.

Keywords: Assignment, deadline, greedy approach, hungarian algorithm, operations research, scheduling.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1202
1696 Heuristic for Accelerating Run-Time Task Mapping in NoC-Based Heterogeneous MPSoCs

Authors: M. K. Benhaoua, A. K. Singh, A. E. H. Benyamina, A. Kumar, P. Boulet

Abstract:

In this paper, we propose a new packing strategy to find a free resource for run-time mapping of application tasks to NoC-based Heterogeneous MPSoC. The proposed strategy minimizes the task mapping time in addition to placing the communicating tasks close to each other. To evaluate our approach, a comparative study is carried out for a platform containing single task supported PEs. Experiments show that our strategy provides better results when compared to latest dynamic mapping strategies reported in the literature.

Keywords: Multi-Processor Systems-on-Chip (MPSoCs), Network-on-Chip (NoC), Heterogeneous architectures, Dynamic mapping heuristics.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2259