1343 Payment Problems, Cash Flow and Profitability of Construction Project: A System Dynamics Model

Authors: Wenhua Hou, Xing Liu, Deqiang Chen

Abstract:

The ubiquitous payment problems within construction industry of China are notoriously hard to be resolved, thus lead to a series of impacts to the industry chain. Among of them, the most direct result is affecting the normal operation of contractors negatively. A wealth of research has already discussed reasons of the payment problems by introducing a number of possible improvement strategies. But the causalities of these problems are still far from harsh reality. In this paper, the authors propose a model for cash flow system of construction projects by introducing System Dynamics techniques to explore causal facets of the payment problem. The effects of payment arrears on both cash flow and profitability of project are simulated into four scenarios by using data from real projects. Simulating results show visible clues to help contractors quantitatively determining the consequences for the construction project that arise from payment delay.

Keywords: payment problems, cash flow, profitability, system dynamics.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2742
1342 Analysis of the Communication Methods of an iCIM 3000 System within the Frame of Research Purpose

Authors: Radovan Holubek, Daynier Rolando Delgado Sobrino, Roman Ruzarovsky

Abstract:

Current trends in manufacturing are characterized by production broadening, innovation cycle shortening, and the products having a new shape, material and functions. The production strategy focused on time needed change from the traditional functional production structure to flexible manufacturing cells and lines. Production by automated manufacturing system (AMS) is one of the most important manufacturing philosophies in the last years. The main goals of the project we are involved in lies on building a laboratory in which will be located a flexible manufacturing system consisting of at least two production machines with NC control (milling machines, lathe). These machines will be linked to a transport system and they will be served by industrial robots. Within this flexible manufacturing system a station for the quality control consisting of a camera system and rack warehouse will be also located. The design, analysis and improvement of this manufacturing system, specially with a special focus on the communication among devices constitute the main aims of this paper. The key determining factors for the manufacturing system design are: the product, the production volume, the used machines, the disposable manpower, the disposable infrastructure and the legislative frame for the specific cases.

Keywords: Paperless manufacturing, flexible manufacturing, robotized manufacturing, material flow, iCIM.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1804
1341 A Study on the Planning Criteria of Block-Unit Redevelopment to Improve Residential Environment - Focused on Redevelopment Project in Seoul -

Authors: Hong-Nam Choi, Hyeong-Wook Song, Sungwan Hong, Hong-Kyu Kim

Abstract:

In Korea, elements that decide the quality of residential environment are not only diverse, but show deviation as well. However, people do not consider these elements and instead, they try to settle the uniformed style of residential environment, which focuses on the construction development of apartment housing and business based plans. Recently, block-unit redevelopment is becoming the standout alternative plan of standardize redevelopment projects, but constructions become inefficient because of indefinite planning criteria.

 In conclusion, the following research is about analyzing and categorizing the development method and legal ground of redevelopment project district and plan determinant and applicable standard; the purpose of this study is to become a basis in compatible analysis of planning standards that will happen in the future.

Keywords: Shape Restrictions, Improvement of Reagulation, Diversity of Residential Environment, Classification of Redevelopment Project, Planning Criteria of Redevelopment, Special Architectural District (SAD).

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1324
1340 Lean Implementation: An Investigation in Successfully Adopting a Lean Philosophy

Authors: P. Ahern, D. Collery

Abstract:

The implementation of lean thinking in the manufacturing industry revolutionized the traditional approach to large-scale production through the process of identifying the waste in each task and putting in place mitigation measures to eliminate the waste in all its forms. The Irish construction industry, however, has been much slower to adopt the principles of lean, opting instead to stick with the traditional approach to construction project delivery which is inherently wasteful. Lean thinking holds the potential to revolutionize the construction industry in a similar manner to the adoption of lean manufacturing. Lean principles present opportunities for reduced project duration, reduced project cost, improved quality, and elimination of re-works and non-value-added activities. This research has been designed to accumulate research data through available literature, electronic surveys, and interviews. The results show an industry reluctant to accept change and an undefined path to successful lean construction implementation.

Keywords: Barriers, lean construction, lean implementation, lean manufacturing, lean philosophy.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 313
1339 Application of Seismic Isolators in Kutahya City Hospital Project Utilizing Double Friction Pendulum Type Devices

Authors: Kaan Yamanturk, Cihan Dogruoz

Abstract:

Seismic isolators have been utilized around the world to protect the structures, nonstructural components and contents from the damaging effects of earthquakes. In Structural Engineering, seismic isolation is used for protecting buildings and its vibration-sensitive contents from earthquakes. Seismic isolation is a passive control system that lowers effective earthquake forces by utilizing flexible bearings. One of the most significant isolation systems is seismic isolators. In this paper, double pendulum type Teflon coated seismic isolators utilized in a city hospital project by Guris Construction and Engineering Co. Inc, located in Kutahya, Turkey, have been investigated. Totally, 498 seismic isolators were applied in the project. These isolators are double friction pendulum type seismic isolation devices. The review of current practices is also examined in this study. The focus of this study is related to the application of passive seismic isolation systems for buildings as practiced in Kutahya City Hospital Project. Based on the study, the acceleration at the top floor will be 0.18 g and it will decrease 0.01 g in every floor. Therefore, seismic isolators are very important for buildings located in earthquake zones.

Keywords: Maximum considered earthquake, moment resisting frame, seismic isolator, seismic design.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 671
1338 The Challenge of Large-Scale IT Projects

Authors: Ahmet Denker

Abstract:

The trend in the world of Information Technology (IT) is getting increasingly large and difficult projects rather than smaller and easier. However, the data on large-scale IT project success rates provide cause for concern. This paper seeks to answer why large-scale IT projects are different from and more difficult than other typical engineering projects. Drawing on the industrial experience, a compilation of the conditions that influence failure is presented. With a view to improve success rates solutions are suggested.

Keywords: Software engineering, software economics, project management, large-scale projects.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1677
1337 Financial Literacy Testing: Results of Conducted Research and Introduction of a Project

Authors: J. Nesleha, H. Florianova

Abstract:

The goal of the study is to provide results of a conducted study devoted to financial literacy in the Czech Republic and to introduce a project related to financial education in the Czech Republic. Financial education has become an important part of education in the country, yet it is still neglected on the lowest level of formal education–primary schools. The project is based on investigation of financial literacy on primary schools in the Czech Republic. Consequently, the authors aim to formulate possible amendments related to this type of education. The gained dataset is intended to be used for analysis concerning financial education in the Czech Republic. With regard to used methods, the most important one is regression analysis for disclosure of predictors causing different levels of financial literacy. Furthermore, comparison of different groups is planned, for which t-tests are intended to be used. The study also employs descriptive statistics to introduce basic relationship in the data file.

Keywords: Czech Republic, financial education, financial literacy, primary school, regression analysis.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 855
1336 Quantification of Technology Innovation Usinga Risk-Based Framework

Authors: Gerard E. Sleefe

Abstract:

There is significant interest in achieving technology innovation through new product development activities. It is recognized, however, that traditional project management practices focused only on performance, cost, and schedule attributes, can often lead to risk mitigation strategies that limit new technology innovation. In this paper, a new approach is proposed for formally managing and quantifying technology innovation. This approach uses a risk-based framework that simultaneously optimizes innovation attributes along with traditional project management and system engineering attributes. To demonstrate the efficacy of the new riskbased approach, a comprehensive product development experiment was conducted. This experiment simultaneously managed the innovation risks and the product delivery risks through the proposed risk-based framework. Quantitative metrics for technology innovation were tracked and the experimental results indicate that the risk-based approach can simultaneously achieve both project deliverable and innovation objectives.

Keywords: innovation, risk assessment, product development, technology management.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1599
1335 Identification of Factors Influencing Costs in Green Projects

Authors: Nazirah Zainul Abidin, Nurul Zahirah Mokhtar Azizi

Abstract:

Cost has always been the leading concern in green building development. The perception that construction cost for green building is higher than conventional buildings has only made the discussion of green building cost more difficult. Understanding the factors that will influence the cost of green construction is expected to shed light into what makes green construction more or at par with conventional projects, or perhaps, where cost can be optimised. This paper identifies the elements of cost before shifting the attention to the influencing factors. Findings from past studies uncovered various factors related to cost which are grouped into five focal themes i.e. awareness, knowledge, financial, technical, and government support. A conceptual framework is produced in a form of a flower diagram indicating the cost influencing factors of green building development. These factors were found to be both physical and non-physical aspects of a project. The framework provides ground for the next stage of research that is to further explore how these factors influence the project cost and decision making.

Keywords: Green project, factors influencing cost, hard cost, soft cost.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1510
1334 A Frugal Bidding Procedure for Replicating WWW Content

Authors: Samee Ullah Khan, C. Ardil

Abstract:

Fine-grained data replication over the Internet allows duplication of frequently accessed data objects, as opposed to entire sites, to certain locations so as to improve the performance of largescale content distribution systems. In a distributed system, agents representing their sites try to maximize their own benefit since they are driven by different goals such as to minimize their communication costs, latency, etc. In this paper, we will use game theoretical techniques and in particular auctions to identify a bidding mechanism that encapsulates the selfishness of the agents, while having a controlling hand over them. In essence, the proposed game theory based mechanism is the study of what happens when independent agents act selfishly and how to control them to maximize the overall performance. A bidding mechanism asks how one can design systems so that agents- selfish behavior results in the desired system-wide goals. Experimental results reveal that this mechanism provides excellent solution quality, while maintaining fast execution time. The comparisons are recorded against some well known techniques such as greedy, branch and bound, game theoretical auctions and genetic algorithms.

Keywords: Internet, data content replication, static allocation, mechanism design, equilibrium.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1404
1333 Identification of Training Topics for the Improvement of the Relevant Cognitive Skills of Technical Operators in the Railway Domain

Authors: Giulio Nisoli, Jonas Brüngger, Karin Hostettler, Nicole Stoller, Katrin Fischer

Abstract:

Technical operators in the railway domain are experts responsible for the supervisory control of the railway power grid as well as of the railway tunnels. The technical systems used to master these demanding tasks are constantly increasing in their degree of automation. It becomes therefore difficult for technical operators to maintain the control over the technical systems and the processes of their job. In particular, the operators must have the necessary experience and knowledge in dealing with a malfunction situation or unexpected event. For this reason, it is of growing importance that the skills relevant for the execution of the job are maintained and further developed beyond the basic training they receive, where they are educated in respect of technical knowledge and the work with guidelines. Training methods aimed at improving the cognitive skills needed by technical operators are still missing and must be developed. Goals of the present study were to identify which are the relevant cognitive skills of technical operators in the railway domain and to define which topics should be addressed by the training of these skills. Observational interviews were conducted in order to identify the main tasks and the organization of the work of technical operators as well as the technical systems used for the execution of their job. Based on this analysis, the most demanding tasks of technical operators could be identified and described. The cognitive skills involved in the execution of these tasks are those, which need to be trained. In order to identify and analyze these cognitive skills a cognitive task analysis (CTA) was developed. CTA specifically aims at identifying the cognitive skills that employees implement when performing their own tasks. The identified cognitive skills of technical operators were summarized and grouped in training topics. For every training topic, specific goals were defined. The goals regard the three main categories; knowledge, skills and attitude to be trained in every training topic. Based on the results of this study, it is possible to develop specific training methods to train the relevant cognitive skills of the technical operators.

Keywords: Cognitive skills, cognitive task analysis, technical operators in the railway domain, training topics.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 691
1332 A Fast Replica Placement Methodology for Large-scale Distributed Computing Systems

Authors: Samee Ullah Khan, C. Ardil

Abstract:

Fine-grained data replication over the Internet allows duplication of frequently accessed data objects, as opposed to entire sites, to certain locations so as to improve the performance of largescale content distribution systems. In a distributed system, agents representing their sites try to maximize their own benefit since they are driven by different goals such as to minimize their communication costs, latency, etc. In this paper, we will use game theoretical techniques and in particular auctions to identify a bidding mechanism that encapsulates the selfishness of the agents, while having a controlling hand over them. In essence, the proposed game theory based mechanism is the study of what happens when independent agents act selfishly and how to control them to maximize the overall performance. A bidding mechanism asks how one can design systems so that agents- selfish behavior results in the desired system-wide goals. Experimental results reveal that this mechanism provides excellent solution quality, while maintaining fast execution time. The comparisons are recorded against some well known techniques such as greedy, branch and bound, game theoretical auctions and genetic algorithms.

Keywords: Data replication, auctions, static allocation, pricing.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1694
1331 Applying 5S Lean Technology: An Infrastructure for Continuous Process Improvement

Authors: Raid A. Al-Aomar

Abstract:

This paper presents an application of 5S lean technology to a production facility. Due to increased demand, high product variety, and a push production system, the plant has suffered from excessive wastes, unorganized workstations, and unhealthy work environment. This has translated into increased production cost, frequent delays, and low workers morale. Under such conditions, it has become difficult, if not impossible, to implement effective continuous improvement studies. Hence, the lean project is aimed at diagnosing the production process, streamlining the workflow, removing/reducing process waste, cleaning the production environment, improving plant layout, and organizing workstations. 5S lean technology is utilized for achieving project objectives. The work was a combination of both culture changes and tangible/physical changes on the shop floor. The project has drastically changed the plant and developed the infrastructure for a successful implementation of continuous improvement as well as other best practices and quality initiatives.

Keywords: 5S Technique, Continuous Improvement, Kaizen, Lean Technology, Work Methods, Work Standards

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 4907
1330 A Critical Review on the Development of a Theoretical Framework for Managing Environmental Impacts of Construction Project

Authors: Sami Mustafa M. E. Ahmed, Noor Amila Wan Abdullah Zawawi, Zulkipli B. Ghazali

Abstract:

Construction industry is considered as one of the main contributor of natural resources depletion, responsible for high level pollution and it is one of the attributes that pose climate changes and other environmental threats. A lot of efforts had and have been done to reduce and control these impacts. Project Environmental Management (PEM) includes the processes required to ensure that the impacts of the project execution to the surrounding environment will remain within the limits stated in legal permits. The main aim of most of researches conducted managing Environmental Impacts (EI) is to protect earth planet from pollution. Those researches are presenting four major environmental elements; Environmental Management Systems (EMS), Environmental Design (ED), Environmental Planning (EP) and Environmental Impacts Assessments (EIA). Although everything has been said about environmental management for construction projects, but almost everything remains to be said and therefore to be explored or rediscovered because incontestably, almost everything remains to be done. This paper aimed at reviewing some of what has been said about PEM. Also one of its objectives is to explore and rediscover the whole view of managing the EI problems by proposing a framework that based on the relation between these environmental researches.

Keywords: Environmental planning, sustainable design, EIA and EMS.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2419
1329 Resource Leveling Optimization in Construction Projects of High Voltage Substations Using Nature-Inspired Intelligent Evolutionary Algorithms

Authors: Dimitrios Ntardas, Alexandros Tzanetos, Georgios Dounias

Abstract:

High Voltage Substations (HVS) are the intermediate step between production of power and successfully transmitting it to clients, making them one of the most important checkpoints in power grids. Nowadays - renewable resources and consequently distributed generation are growing fast, the construction of HVS is of high importance both in terms of quality and time completion so that new energy producers can quickly and safely intergrade in power grids. The resources needed, such as machines and workers, should be carefully allocated so that the construction of a HVS is completed on time, with the lowest possible cost (e.g. not spending additional cost that were not taken into consideration, because of project delays), but in the highest quality. In addition, there are milestones and several checkpoints to be precisely achieved during construction to ensure the cost and timeline control and to ensure that the percentage of governmental funding will be granted. The management of such a demanding project is a NP-hard problem that consists of prerequisite constraints and resource limits for each task of the project. In this work, a hybrid meta-heuristic method is implemented to solve this problem. Meta-heuristics have been proven to be quite useful when dealing with high-dimensional constraint optimization problems. Hybridization of them results in boost of their performance.

Keywords: High voltage substations, nature-inspired algorithms, project management, meta-heuristics.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1217
1328 A Relational Case-Based Reasoning Framework for Project Delivery System Selection

Authors: Yang Cui, Yong Qiang Chen

Abstract:

An appropriate project delivery system (PDS) is crucial to the success of a construction projects. Case-based Reasoning (CBR) is a useful support for PDS selection. However, the traditional CBR approach represents cases as attribute-value vectors without taking relations among attributes into consideration, and could not calculate the similarity when the structures of cases are not strictly same. Therefore, this paper solves this problem by adopting the Relational Case-based Reasoning (RCBR) approach for PDS selection, considering both the structural similarity and feature similarity. To develop the feature terms of the construction projects, the criteria and factors governing PDS selection process are first identified. Then feature terms for the construction projects are developed. Finally, the mechanism of similarity calculation and a case study indicate how RCBR works for PDS selection. The adoption of RCBR in PDS selection expands the scope of application of traditional CBR method and improves the accuracy of the PDS selection system.

Keywords: Relational Cased-based Reasoning, Case-based Reasoning, Project delivery system, Selection.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1994
1327 Anthropometric Profile as a Factor of Impact on Employee Productivity in Manufacturing Industry of Tijuana, Mexico

Authors: J. A. López, J. E. Olguín, C. W. Camargo, G. A. Quijano, R. Martínez

Abstract:

This paper presents an anthropometric study conducted to 300 employees in a maquiladora industry that belongs to the cluster of medical products as part of a research project to pretend simulate workplace conditions under which operators conduct their activities. This project is relevant because traditionally performed a study to design ergonomic workspaces according to anthropometric profile of users, however, this paper demonstrates the importance of making decisions when the infrastructure cannot be adapted for economic whichever put emphasis on user activity.

Keywords: Anthropometry, Biomechanics, Design, Ergonomics, Productivity.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2133
1326 Proposal of Solidification/Stabilisation Process of Chosen Hazardous Waste by Cementation

Authors: Bozena Dohnalkova

Abstract:

This paper presents a part of the project solving which is dedicated to the identification of the hazardous waste with the most critical production within the Czech Republic with the aim to study and find the optimal composition of the cement matrix that will ensure maximum content disposal of chosen hazardous waste. In the first stage of project solving – which represents this paper – a specific hazardous waste was chosen, its properties were identified and suitable solidification agents were chosen. Consequently solidification formulas and testing methodology was proposed.

Keywords: Cementation, solidification, waste, binder.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1869
1325 Identifying Understanding Expectations of School Administrators Regarding School Assessment

Authors: Eftah Bte. Moh Hj Abdullah, Izazol Binti Idris, Abd Aziz Bin Abd Shukor

Abstract:

This study aims to identify the understanding expectations of school administrators concerning school assessment. The researcher utilized a qualitative descriptive study on 19 administrators from three secondary schools in the North Kinta district. The respondents had been interviewed on their understanding expectations of school assessment using the focus group discussion method. Overall findings showed that the administrators’ understanding expectations of school assessment was weak; especially in terms of content focus, articulation across age and grade, transparency and fairness, as well as the pedagogical implications. Findings from interviews indicated that administrators explained their understanding expectations of school assessment from the aspect of school management, and not from the aspect of instructional leadership or specifically as assessment leaders. The study implications from the administrators’ understanding expectations may hint at the difficulty of the administrators to function as assessment leaders, in order to reduce their focus as manager, and move towards their primary role in the process of teaching and learning. The administrator, as assessment leaders, would be able to reach assessment goals via collaboration in identifying and listing teacher assessment competencies, how to construct assessment capacity, how to interpret assessment correctly, the use of assessment and how to use assessment information to communicate confidently and effectively to the public.

Keywords: Assessment leaders, assessment goals, instructional leadership, understanding expectation of assessment.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1274
1324 Causes of Final Account Closing Delay: A Theoretical Framework

Authors: Zarabizan Zakaria, Syuhaida Ismail, Aminah Md. Yusof

Abstract:

Delay can be defined as time overrun or extension of time to complete the project. There are high possibilities that delay issues in final account closing cannot be avoided especially in construction project in Malaysia which is unique and dynamic in the terms of nature of design and technical skill. Delay in final account closing is a situation when the actual planning (time and budget allocation) of a construction project exceeds the planned schedule or on the other hand, final account closing exceeds the time and other provisions specified in the contract. The causes of delay discussed in this paper are appraised from the literature review. There are two main types of delay: excusable delay and non-excusable delay. The literature reviews on the delay in final account closing which is then translated into a theoretical framework are summarized in the context of construction players and academician perspective. It is anticipated that the finding reported in this paper could assist the planning of future strategies and guidelines of final account closing for the betterment of construction projects in Malaysia.

Keywords: Construction industry, construction contract, final account closing, delay.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 4713
1323 The Neglected Elements of Implementing Strategic Succession Management in Public Organizations

Authors: François Chiocchio, Mahshid Gharibpour

Abstract:

Regardless of the extent to which succession management is implemented in the private sector, it is still overlooked in the public sector. Traditional succession management is evolving providing a better alignment between business strategies and HR strategies. Succession management brings sustainable effectiveness for succession programs through career path development, knowledge and skill transfer, job retention, as well as high-potential candidates’ empowerment for upcoming vacancies. By way of a systematic literature review, we bring into focus strategic succession management in public organizations and discuss best ways of implementation. 

Keywords: Succession management, strategic succession management, public organization, succession management model.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1630
1322 The Analysis on Leadership Skills in UK Automobile Manufacturing Enterprises

Authors: Yanting Cao, Kazumitsu Nawata

Abstract:

The UK has strong economic growth, which attracts other countries to invest there through globalization. This research process will be based on quantitative and qualitative descriptive analysis using interviews. The secondary analysis will involve a case study approach to understand the important aspects of leadership skills. The research outcomes will be identifying the strength and weakness of the leadership skills of UK automobile manufacturing enterprises and suggest the best practices adopted by the respective countries for better results.

Keywords: engineering management, leadership, industrial project management, project managers, automobile manufacturing

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1418
1321 Communication and Quality in Distributed Agile Development: An Empirical Case Study

Authors: R. Green, T. Mazzuchi, S. Sarkani

Abstract:

Through inward perceptions, we intuitively expect distributed software development to increase the risks associated with achieving cost, schedule, and quality goals. To compound this problem, agile software development (ASD) insists one of the main ingredients of its success is cohesive communication attributed to collocation of the development team. The following study identified the degree of communication richness needed to achieve comparable software quality (reduce pre-release defects) between distributed and collocated teams. This paper explores the relevancy of communication richness in various development phases and its impact on quality. Through examination of a large distributed agile development project, this investigation seeks to understand the levels of communication required within each ASD phase to produce comparable quality results achieved by collocated teams. Obviously, a multitude of factors affects the outcome of software projects. However, within distributed agile software development teams, the mode of communication is one of the critical components required to achieve team cohesiveness and effectiveness. As such, this study constructs a distributed agile communication model (DAC-M) for potential application to similar distributed agile development efforts using the measurement of the suitable level of communication. The results of the study show that less rich communication methods, in the appropriate phase, might be satisfactory to achieve equivalent quality in distributed ASD efforts.

Keywords: agile software development (ASD), distributedsoftware teams, media richness theory, software development.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2162
1320 Enhance Construction Visual As-Built Schedule Management Using BIM Technology

Authors: Shu-Hui Jan, Hui-Ping Tserng, Shih-Ping Ho

Abstract:

Construction project control attempts to obtain real-time as-built schedule information and to eliminate project delays by effectively enhancing dynamic schedule control and management. Suitable platforms for enhancing an as-built schedule visually during the construction phase are necessary and important for general contractors. As the application of building information modeling (BIM) becomes more common, schedule management integrated with the BIM approach becomes essential to enhance visual construction management implementation for the general contractor during the construction phase. To enhance visualization of the updated as-built schedule for the general contractor, this study presents a novel system called the Construction BIM-assisted Schedule Management (ConBIM-SM) system for general contractors in Taiwan. The primary purpose of this study is to develop a web ConBIM-SM system for the general contractor to enhance visual as-built schedule information sharing and efficiency in tracking construction as-built schedule. Finally, the ConBIM-SM system is applied to a case study of a commerce building project in Taiwan to verify its efficacy and demonstrate its effectiveness during the construction phase. The advantages of the ConBIM-SM system lie in improved project control and management efficiency for general contractors, and in providing BIM-assisted as-built schedule tracking and management, to access the most current as-built schedule information through a web browser. The case study results show that the ConBIM-SM system is an effective visual as-built schedule management platform integrated with the BIM approach for general contractors in a construction project.

Keywords: BIM, Building information modeling, construction schedule management, as-built schedule management, BIM schedule updating mechanism.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3410
1319 Portfolio Management for Construction Company during Covid-19 Using AHP Technique

Authors: Sareh Rajabi, Salwa Bheiry

Abstract:

In general, Covid-19 created many financial and non-financial damages to the economy and community. Level and severity of covid-19 as pandemic case varies over the region and due to different types of the projects. Covid-19 virus emerged as one of the most imperative risk management factors word-wide recently. Therefore, as part of portfolio management assessment, it is essential to evaluate severity of such risk on the project and program in portfolio management level to avoid any risky portfolio. Covid-19 appeared very effectively in South America, part of Europe and Middle East. Such pandemic infection affected the whole universe, due to lock down, interruption in supply chain management, health and safety requirements, transportations and commercial impacts. Therefore, this research proposes Analytical Hierarchy Process (AHP) to analyze and assess such pandemic case like Covid-19 and its impacts on the construction projects. The AHP technique uses four sub-criteria: Health and safety, commercial risk, completion risk and contractual risk to evaluate the project and program. The result will provide the decision makers with information which project has higher or lower risk in case of Covid-19 and pandemic scenario. Therefore, the decision makers can have most feasible solution based on effective weighted criteria for project selection within their portfolio to match with the organization’s strategies.

Keywords: Portfolio management, risk management, COVID-19, analytical hierarchy process technique.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 832
1318 Risk Evaluation of Information Technology Projects Based on Fuzzy Analytic Hierarchal Process

Authors: H. Iranmanesh, S. Nazari Shirkouhi, M. R. Skandari

Abstract:

Information Technology (IT) projects are always accompanied by various risks and because of high rate of failure in such projects, managing risks in order to neutralize or at least decrease their effects on the success of the project is strongly essential. In this paper, fuzzy analytical hierarchy process (FAHP) is exploited as a means of risk evaluation methodology to prioritize and organize risk factors faced in IT projects. A real case of IT projects, a project of design and implementation of an integrated information system in a vehicle producing company in Iran is studied. Related risk factors are identified and then expert qualitative judgments about these factors are acquired. Translating these judgments to fuzzy numbers and using them as an input to FAHP, risk factors are then ranked and prioritized by FAHP in order to make project managers aware of more important risks and enable them to adopt suitable measures to deal with these highly devastative risks.

Keywords: Information technology projects, Risk evaluation, Analytic hierarchal process, fuzzy logic.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1942
1317 The Conception of Implementation of Vision for European Forensic Science 2020 in Lithuania

Authors: Eglė Bilevičiūtė, Vidmantas Egidijus Kurapka, Snieguolė Matulienė, Sigutė Stankevičiūtė

Abstract:

The Council of European Union (EU Council) has stressed on several occasions the need for a concerted, comprehensive and effective solution to delinquency problems in EU communities. In the context of establishing a European Forensic Science Area and the development of forensic science infrastructure in Europe, EU Council believes that forensic science can significantly contribute to the efficiency of law enforcement, crime prevention and combating crimes. Lithuanian scientists have consolidated to implement a project named “Conception of the vision for European Forensic Science 2020 implementation in Lithuania” (the project is funded for the period of 1 March 2014 - 31 December 2016) with the objective to create a conception of implementation of the vision for European Forensic Science 2020 in Lithuania by 1) evaluating the current status of Lithuania’s forensic system and opportunities for its improvement; 2) analysing achievements and knowledge in investigation of crimes listed in conclusions of EU Council on the vision for European Forensic Science 2020 including creation of a European Forensic Science Area and the development of forensic science infrastructure in Europe: trafficking in human beings, organised crime and terrorism; 3) analysing conceptions of criminalistics, which differ in different EU member states due to the variety of forensic schools, and finding means for their harmonization. Apart from the conception of implementation of the vision for European Forensic Science 2020 in Lithuania, the Project is expected to suggest provisions that will be relevant to other EU countries as well. Consequently, the presented conception of implementation of vision for European Forensic Science 2020 in Lithuania could initiate a project for a common vision of European Forensic Science and contribute to the development of the EU as an area of freedom, security and justice. The article presents main ideas of the project of the conception of the vision for European Forensic Science 2020 of EU Council and analyses its legal background, as well as prospects of and challenges for its implementation in Lithuania and the EU.

Keywords: EUROVIFOR, standardization, Vision for European Forensic Science 2020.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3130
1316 Infrastructure means for Adaptive Camouflage

Authors: Jiri Barta, Albert Srnik

Abstract:

The paper deals with the perspectives and possibilities of "smart solutions" to critical infrastructure protection. It means that common computer aided technologies are used from the perspective of new, better protection of selected infrastructure objects. The paper is focused on the co-product of the Czech Defence Research Project - ADAPTIV. This project is carrying out by the University of Defence, Faculty of Economics and Management at the Department of Civil Protection. The project creates system and technology for adaptive cybernetic camouflage of armed forces objects, armaments, vehicles and troops and of mobilization infrastructure. These adaptive camouflage system and technology will be useful for army tactic activities protection and for decoys generation also. The fourth chapter of the paper concerns the possibilities of using the introduced technology to the protection of selected civil (economically important), critical infrastructure objects. The aim of this section is to introduce the scientific capabilities and potential of the University of Defence research results and solutions for the practice.

Keywords: ADAPTIV, Adaptive camouflage technology, CAMouflage, Cybernetic Active Camouflage

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1542
1315 Development of Star Tracker for Satellite

Authors: S. Yelubayev, V. Ten, B. Albazarov, E. Sarsenbayev, К. Аlipbayev, A. Shamro, Т. Bopeyev, А. Sukhenko

Abstract:

Much attention is paid to the development of space branch in Kazakhstan at present. Two Earth remote sensing satellites of Kazakhstan have been launched successfully. Many projects related to the development of components for satellite are carried in Kazakhstan, in particular the project related to the development of star tracker experimental model. It is planned to use the results of this project for development of star tracker prototype in the future. This article describes the main stages of development of star tracker experimental model.

Keywords: Development, prototype, satellite, star tracker.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2934
1314 Fundamental Variables of Final Account Closing Success in Construction Projects in Malaysia

Authors: Zarabizan Zakaria, Syuhaida Ismail, Aminah Md Yusof

Abstract:

Project management process starts from the planning stage up to the stage of completion (handover of buildings, preparation of the final accounts and the closing balance). Seeing as this process is not easy to be implemented efficiently and effectively, the issue of unsuccessful delivery as per contract in construction has become a major problem for construction projects. These issues have been blamed mainly on inefficient traditional construction practices that continue to dominate the current industry. This is due to several factors, such as environments of construction technology, sophisticated design and customer demand, that are constantly changing and influencing, either directly or indirectly, to the practice of management. Among the identified influences are physical environment, social environment, information environment, political and moral atmosphere. Therefore, this paper is emerged to determine the fundamental variables in the final account closing success in construction project. This aim can be achieved via its objectives of identifying the key constraints to the closing of final accounts in construction projects in Malaysia, investigating solutions to the identified constraints and analysing the relative levels of impact of the identified constraints. It is expected that this paper provides effective measures to avoid or at least reduce the problems in final account closing to the optimum level. It is also anticipated that the finding or outcome reported in this paper could address the unsuccessful contributors in final account closing and define tools for their mitigation for the better development of construction project.

Keywords: Fundamental variables, closing of final account, construction project, Malaysia.