Identification of Factors Influencing Costs in Green Projects
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 32804
Identification of Factors Influencing Costs in Green Projects

Authors: Nazirah Zainul Abidin, Nurul Zahirah Mokhtar Azizi

Abstract:

Cost has always been the leading concern in green building development. The perception that construction cost for green building is higher than conventional buildings has only made the discussion of green building cost more difficult. Understanding the factors that will influence the cost of green construction is expected to shed light into what makes green construction more or at par with conventional projects, or perhaps, where cost can be optimised. This paper identifies the elements of cost before shifting the attention to the influencing factors. Findings from past studies uncovered various factors related to cost which are grouped into five focal themes i.e. awareness, knowledge, financial, technical, and government support. A conceptual framework is produced in a form of a flower diagram indicating the cost influencing factors of green building development. These factors were found to be both physical and non-physical aspects of a project. The framework provides ground for the next stage of research that is to further explore how these factors influence the project cost and decision making.

Keywords: Green project, factors influencing cost, hard cost, soft cost.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1126421

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1428

References:


[1] J. Hussein, “Opportunities and Challenges in Sustainable Construction,” Construction Industry Development Board (CIDB) News, issue 1, pp 8 – 9, 2009.
[2] World Green Building Trends, Developing Markets Accelerate Global Green Growth, Dodge Data & Analytic, http://www.naturalleader.com, 2016.
[3] McGraw-Hill, Smart Market Report World Green Building Trends. Retrieved: http://www.worldgbc.org/files/8613/6295/6420/World_Green_Building_Trends_SmartMarket_Report_2013.pdf, 2013.
[4] N.Z. Abidin, “Investigating the awareness and application of sustainable construction concept by Malaysian developers,” Habitat International, vol. 34, 421-426, 2010.
[5] B. Bordass, “Cost and Value: Fact and Fiction”, Building Research and Information, vol. 28, no. 5/6, pp. 338 – 352, 2012.
[6] B. Sonagar, and R. Fieldson, “Towards a Sustainable Construction Practice,” Construction Information Quarterly, vol. 10, pp.101 – 108, 2008.
[7] S. Bond, and G. Perrett, “The Key Drivers and Barriers to Sustainable Development of Commercial Property in New Zealand,” Journal of Sustainable Real Estate, Vol. 4, No. 1, 48-77, 2012.
[8] M. Isa, M.M. Rahman, I. Sipan, and T.K. Hwa, “Factors Affecting Green Office Building Investment in Malaysia,” Procedia - Social and Behavioral Sciences, vol. 105, no. 3, pp. 138–148. 2013.
[9] C. Choi, “Removing Market Barriers to Green Development: Principles and Action Projects to Promote Widespread Adoption of Green Development Practices,” Journal of Sustainable Real Estate, vol. 1, no.1, pp. 107-138, 2009.
[10] X. Zhang, A. Platten, and L. Shen, “Green property development practice in China: Costs and barriers,” Building and Environment, vol. 46, 2153-2160, 2011.
[11] M.H. Issa, J.H.Rankin, and A.J. Christian, “Canadian practitioners' perception of research work investigating the cost premiums, long-term costs and health and productivity benefits of green buildings,” Building and Environment, vol. 45 , pp. 1698-1711, 2010.
[12] Emerging Professional's Companion, 2C - Construction Costs. AIA and NCARB. 2013.
[13] S. Kubba, Handbook of Green Building Design and Construction: Leeds, Breeam, and Green Globes. Herndon, Virginia: Butterworth-Heinemann, 2012.
[14] N.S. Collier, C.A. Collier, and D.A. Halperin, Construction Funding: The Process of Real Estate Development, Appraisal, and Finance. 4th Ed. New Jersey: John Wiley & Sons, 2007.
[15] N.Z.M. Azizi, N.Z. Abidin, and A.R. Nuruddin, “Soft Cost Elements that affect Developers’ Decision to Build Green,” International Journal of Civil Science and Engineering, vol. 7, no. 10, pp. 886 – 890, 2013.
[16] M. Klinger, and M. Susong, The Construction Project: Phases, People, Terms, Paperwork, Processes. United States of America: American Bar Association, 2006.
[17] J. Yudelson, Green Building Through Integrated Design. New York: McGraw Hill, 2009, pp. 44-143.
[18] O. Tatari, and M. Kucukvar, “Cost premium prediction of certified green buildings: A neural network approach,” Building and Environment, vol. 46, pp. 1081-1086, 2011.
[19] Building and Construction Authority (BCA), “Green Mark Scheme,” Retrieved: http://www.bca.gov.sg/GreenMark/green_mark_buildings.html, 2009.
[20] G. Kats, Greening America's schools costs and benefits. Massachusetts: Capital E, 2006.
[21] Davis Langdon, “The cost & benefit of achieving green buildings,” Davis Langdon and Seah International, Sydney, Australia, 2007.
[22] A. Shendler, and R. Udall, “LEED is Broken: Let’s Fix it”, Retrieved: http://www.grist.org/comments/soapbox/2005/10/26/leed/index1.html, 2005.
[23] Northbridge Environmental Management Consultants, Analyzing the cost of obtaining LEED certification. Arlington, VA: The American Chemistry Council, 2003.
[24] M.S. Klinger, The Construction Project: Phases, People, Terms, Paperwork, Processes. United States of America: American Bar Association, 2006.
[25] N.Z.M. Azizi, and N.Z. Abidin, “Main Elements of Soft Cost in Green Buildings,” International Conference on Sustainable Design and Construction Engineering, Phuket, Dec 2012, pp. 168 – 173, 2012.
[26] N.Z.M. Azizi, N.Z. Abidin, and A.R. Nuruddin, “Identification of Soft Cost Elements in Green Projects: Exploring Experts’ Experience,” Procedia - Social and Behavioral Sciences , pp. 18–26, 2015.
[27] M. Lee, “Incentives and Tax Exemption for Green Technology,” Green Solitions Property Conference, PricewaterhouseCoopers, 2010.
[28] .J. Hoffman, and R. Henn, “Overcoming the Social and Psychological Barriers to Green Building,” Organization & Environment, vol. 21, no. 4 , pp. 390-419, 2008.
[29] V. Mathur, A. Price, S. Austin, and C. Moobela, “Defining, identifying and mapping stakeholders in the assessment of urban sustainability,” International Conference on Whole Life Urban Sustainability and Its Assessment, vol. 18. Retrieved: https://dspace.lboro.ac.uk/xmlui/handle/2134/5202, 2007.
[30] N.A.A. Shariffudin, and N.Z. Abidin, “Professional Engagement Issues in Green Construction Projects,” 3rd International Conference on Livable Cities (ICLC), 30 Nov – 2 Dec, Penang, pp. 215 – 222, 2015.
[31] C. Du Plessis, “A Strategic Framework for Sustainable Construction in Developing Countries,” Construction Management and Economics, vol. 25, no. 1, pp. 67 – 76, Jan. 2007.
[32] L. Robichaud, and V. Anantatmula, “Greening Project Management Practices for Sustainable Construction,” Journal of Management in Engineering, 27(1), 48–57, 2011.
[33] M.R. Esa, M.A. Marhani, R. Yaman, A.A. Hassan, N.H. Rashid, and H. Adnan, “Obstacles in Implementing Green Building Projects in Malaysia,” Australian Journal of Basic and Applied Sciences, vol. 5, no. 12, pp. 1086-1812, 2011.
[34] A. Davis, “Barriers to Building Green,” Retrieved: http://www.architectureweek.com/2001/0822/environment_1-1.html, 2001.
[35] U.S. EPA Region 5, Removing market barriers to green development: Principles and action projects to promote widespead adoption of green development practices. Chicago, Illinois: Delta Institute, 2008.
[36] R. Bandy, C. Danckaert, G. Fetscher, B. Holmes, M. Gale, and M. Mursky, LEED in Upstate New York: An Exploration of Barriers, Resources and Strategies. New York: US Green Building Council (USGBC), 2007.
[37] KeTTHA, National Renewable Energy Policy & Action Plan. Putrajaya: Ministry of Energy, Green Technology and Water, 2008.
[38] T. Häkkinen, and K. Belloni, “Barriers and drivers for sustainable building,” Building Research & Information, pp. 239-255, 2011.
[39] A.R. Lapinski, M.J. Horman, and D.R. Riley, “Lean Processes for Sustainable Project Delivery,” Journal of Construction Engineering and Management, vol. 132, no. 10, pp. 1083 – 1091, Oct. 2006.
[40] N. Zainul Abidin, N. Yusof, A.A.E., Othman, “Enablers and Challenges of a Sustainable Housing Industry in Malaysia,” Construction Innovation: Information, Process and Management. vol. 13, no. 1, pp. 10 – 25, 2013.
[41] Z. Majdalani, M. Ajam, and T. Mezher, “Sustainability in the Construction Industry: A Lebanese Case Study,” Construction Innovation, vol. 6, no. 1, pp. 33 – 46, 2006.
[42] E.M. Van Bueren, and H. Priemus, “Institutional Barrier to Sustainable Construction,” Environment and Planning B: Planning and Design, vol. 1, no. 29, pp. 75 – 86, 2002.
[43] S.M. Sood, and K.C. Peng, “Sustainable Development in the Buildiing Sector: A Green Building Framework in Malaysia,” WASET, vol. 8, no. 2, Malaysia: University Tenaga Nasional, 2011.
[44] EE Solutions, The Cost of LEED Capital cost is a bit higher when you go Green. Retrieved: http://www.ee-solutions.com/solutions/Solutions/Cost%20of%20LEED.aspx, 2012.
[45] BCA Green Mark, BCA Green Mark Assessment Fees for Green Building Projects in Singapore. Retrieved: http://www.bca.gov.sg/greenmark/others/GMfees_new.pdf, 2012.
[46] P.C. D’Antonio, “Costs and Benefits of Commissioning LEED-NC™ Buildings,” National Conference on Building Commissioning, Cambridge: Efficiency Engineering Soultions, pp. 1- 11, 2007.
[47] R. Means, Green Building: Project Planning and Cost Estimating, Volume 24 of RSMeans Series. John Wiley & Sons, 2010.
[48] F. Shafii, Z.A. Ali, and M.Z. Othman, “Achieving Sustainable Construction in the Developing Countries of Southeast Asia,” 6th Asia-Pacific Structural Engineering and Construction Conference, pp. C29-C44. Kuala Lumpur, Malaysia: Universiti Teknologi Malaysia, 2006.