5157 Multiresolution Mesh Blending for Surface Detail Reconstruction

Authors: Honorio Salmeron Valdivieso, Andy Keane, David Toal

Abstract:

In the area of mechanical reverse engineering, processes often encounter difficulties capturing small, highly localized surface information. This could be the case if a physical turbine was 3D scanned for lifecycle management or robust design purposes, with interest on eroded areas or scratched coating. The limitation partly is due to insufficient automated frameworks for handling -localized - surface information during the reverse engineering pipeline. We have developed a tool for blending surface patches with arbitrary irregularities into a base body (e.g. a CAD solid). The approach aims to transfer small surface features while preserving their shape and relative placement by using a multi-resolution scheme and rigid deformations. Automating this process enables the inclusion of outsourced surface information in CAD models, including samples prepared in mesh handling software, or raw scan information discarded in the early stages of reverse engineering reconstruction.

Keywords: application lifecycle management, multiresolution deformation, reverse engineering, robust design, surface blending

Procedia PDF Downloads 118
5156 Classification of Construction Projects

Authors: M. Safa, A. Sabet, S. MacGillivray, M. Davidson, K. Kaczmarczyk, C. T. Haas, G. E. Gibson, D. Rayside

Abstract:

To address construction project requirements and specifications, scholars and practitioners need to establish a taxonomy according to a scheme that best fits their need. While existing characterization methods are continuously being improved, new ones are devised to cover project properties which have not been previously addressed. One such method, the Project Definition Rating Index (PDRI), has received limited consideration strictly as a classification scheme. Developed by the Construction Industry Institute (CII) in 1996, the PDRI has been refined over the last two decades as a method for evaluating a project's scope definition completeness during front-end planning (FEP). The main contribution of this study is a review of practical project classification methods, and a discussion of how PDRI can be used to classify projects based on their readiness in the FEP phase. The proposed model has been applied to 59 construction projects in Ontario, and the results are discussed.

Keywords: project classification, project definition rating index (PDRI), risk, project goals alignment

Procedia PDF Downloads 650
5155 Examining the Dubbing Strategies Used in the Egyptian Dubbed Version of Mulan (1998)

Authors: Shaza Melies, Saadeya Salem, Seham Kareh

Abstract:

Cartoon films are multisemiotic as various modes integrate in the production of meaning. This study aims to examine the cultural and linguistic specific references in the Egyptian dubbed cartoon film Mulan. The study examines the translation strategies implemented in the Egyptian dubbed version of Mulan to meet the cultural preferences of the audience. The study reached the following findings: Using the traditional translation strategies does not deliver the intended meaning of the source text and causes loss in the intended humor. As a result, the findings showed that in the dubbed version, translators tend to omit, change, or add information to the target text to be accepted by the audience. The contrastive analysis of the Mulan (English and dubbed versions) proves the connotations that the dubbing has taken to be accepted by the target audience. Cartoon films are multisemiotic as various modes integrate in the production of meaning. This study aims to examine the cultural and linguistic specific references in the Egyptian dubbed cartoon film Mulan. The study examines the translation strategies implemented in the Egyptian dubbed version of Mulan to meet the cultural preferences of the audience. The study reached the following findings: Using the traditional translation strategies does not deliver the intended meaning of the source text and causes loss in the intended humor. As a result, the findings showed that in the dubbed version, translators tend to omit, change, or add information to the target text to be accepted by the audience. The contrastive analysis of the Mulan (English and dubbed versions) proves the connotations that the dubbing has taken to be accepted by the target audience.

Keywords: domestication, dubbing, Mulan, translation theories

Procedia PDF Downloads 98
5154 Construction Time - Cost Trade-Off Analysis Using Fuzzy Set Theory

Authors: V. S. S. Kumar, B. Vikram, G. C. S. Reddy

Abstract:

Time and cost are the two critical objectives of construction project management and are not independent but intricately related. Trade-off between project duration and cost are extensively discussed during project scheduling because of practical relevance. Generally when the project duration is compressed, the project calls for an increase in labor and more productive equipments, which increases the cost. Thus, the construction time-cost optimization is defined as a process to identify suitable construction activities for speeding up to attain the best possible savings in both time and cost. As there is hidden tradeoff relationship between project time and cost, it might be difficult to predict whether the total cost would increase or decrease as a result of compressing the schedule. Different combinations of duration and cost for the activities associated with the project determine the best set in the time-cost optimization. Therefore, the contractors need to select the best combination of time and cost to perform each activity, all of which will ultimately determine the project duration and cost. In this paper, the fuzzy set theory is used to model the uncertainties in the project environment for time-cost trade off analysis.

Keywords: fuzzy sets, uncertainty, qualitative factors, decision making

Procedia PDF Downloads 619
5153 3D Scanning Documentation and X-Ray Radiography Examination for Ancient Egyptian Canopic Jar

Authors: Abdelrahman Mohamed Abdelrahman

Abstract:

Canopic jars are one of the vessels of funerary nature used by the ancient Egyptian in mummification process that were used to save the viscera of the mummified body after being extracted from the body and treated. Canopic jars are made of several types of materials like Limestone, Alabaster, and Pottery. The studied canopic jar dates back to Late period, located in the Grand Egyptian Museum (GEM), Giza, Egypt. This jar carved from limestone with carved hieroglyphic inscriptions, and it filled and closed by mortar from inside. Some aspects of damage appeared in the jar, such as dust, dirts, classification, wide crack, weakness of limestone. In this study, we used documentation and investigation modern techniques to document and examine the jar. 3D scanning and X-ray Radiography imaging used in applied study. X-ray imaging showed that the mortar was placed at a time when the jar contained probably viscera where the mortar appeared that not reach up to the base of the inner jar. Through the three-dimensional photography, the jar was documented, and we have 3D model of the jar, and now we have the ability through the computer to see any part of the jar in all its details. After that, conservation procedures have been applied with high accuracy to conserve the jar, including mechanical, wet, and chemical cleaning, filling wide crack in the body of the jar using mortar consisting of calcium carbonate powder mixing with primal E330 S, and consolidation, so the limestone became strong after using paraloid B72 2% concentrate as a consolidate material.

Keywords: vessel, limestone, canopic jar, mortar, 3D scanning, X-ray radiography

Procedia PDF Downloads 49
5152 Agile Project Management: A Real Application in a Multi-Project Research and Development Center

Authors: Aysegul Sarac

Abstract:

The aim of this study is to analyze the impacts of integrating agile development principles and practices, in particular to reduce project lead time in a multi-project environment. We analyze Arçelik Washing Machine R&D Center in which multiple projects are conducted by shared resources. In the first part of the study, we illustrate the current waterfall model system by using a value stream map. We define all activities starting from the first idea of the project to the customer and measure process time and lead time of projects. In the second part of the study we estimate potential improvements and select a set of these improvements to integrate agile principles. We aim to develop a future state map and analyze the impacts of integrating lean principles on project lead time. The main contribution of this study is that we analyze and integrate agile product development principles in a real multi-project system.

Keywords: agile project management, multi project system, project lead time, product development

Procedia PDF Downloads 276
5151 Hybrid Project Management Model Based on Lean and Agile Approach

Authors: Fatima-Zahra Eddoug, Jamal Benhra, Rajaa Benabbou

Abstract:

Several project management models exist in the literature and the most used ones are the hybrids for their multiple advantages. Our objective in this paper is to analyze the existing models, which are based on the Lean and Agile approaches and to propose a novel framework with the convenient tools that will allow efficient management of a general project. To create the desired framework, we were based essentially on 7 existing models. Only the Scrum tool among the agile tools was identified by several authors to be appropriate for project management. In contrast, multiple lean tools were proposed in different phases of the project.

Keywords: agility, hybrid project management, lean, scrum

Procedia PDF Downloads 106
5150 Empirical Study for the Project and the Project Management Dimensions Comparison between SMEs and Large Companies

Authors: Amina Oukennou, Zitouni Beidouri, Otmane Bouksour

Abstract:

Small to Medium-sized enterprises are a very important component of the economy. They are present in the whole industries all over the world. They are considered as the engine for future growth in the economy. Project management is an economical international factor impacting all types of enterprises including the SMEs. This paper has the aim of measuring the weight of using projects and project management in Moroccan SMEs in comparison with the large companies. The study is based on interviews with experts: project managers, managers, directors, and consultants. They were asked questions measuring the weight of using projects, the level of using project management, and the resources employed. Eighteen Moroccan companies from a range of industries and sizes were consulted. All the companies consider projects as a key element in their strategy. Most of them affirm the great usefulness of the approach 'project', especially for the external activities. The main differences lie in the duration and the size of used projects. Despite the commonly shared idea about the importance of the project management, the interviewed persons believe that the project management knowledge has the same importance or less than the technical knowledge. All the companies affirm the need for a simpler version of project management. The content varies from one company to another.

Keywords: project dimension, project management, small to medium-sized entreprise, Morocco

Procedia PDF Downloads 283
5149 Project Management Agile Model Based on Project Management Body of Knowledge Guideline

Authors: Mehrzad Abdi Khalife, Iraj Mahdavi

Abstract:

This paper presents the agile model for project management process. For project management process, the Project Management Body of Knowledge (PMBOK) guideline has been selected as platform. Combination of computational science and artificial intelligent methodology has been added to the guideline to transfer the standard to agile project management process. The model is the combination of practical standard, computational science and artificial intelligent. In this model, we present communication model and protocols to keep process agile. Here, we illustrate the collaboration man and machine in project management area with artificial intelligent approach.

Keywords: artificial intelligent, conceptual model, man-machine collaboration, project management, standard

Procedia PDF Downloads 312
5148 Armed Groups and Intra State Conflict: A Study on the Egyptian Case

Authors: Ghzlan Mahmoud Abdel Aziz

Abstract:

This case study aims to identify the intrastate conflicts between the nation state and armed groups. Nowadays, most wars weaken states against armed groups. Thus, it is very important to negotiate with such groups in order to reinforce the law for the protection of victims. These armed groups are the cause of conflicts and they are related with many of humanitarian issues that result out of conflicts. In this age of rivalry; terrorists, insurgents, or transnational criminal parties have surfaced to the top as a reaction to these armed groups in an effort to set up a new world order. Moreover, the intra state conflicts became increasingly treacherous than the interstate conflicts, particularly when nation state systems deal with armed groups which try to influence the state. The unexpected upraising of the Arab Spring during 2011 in parts of the Middle East and North Africa formed various patterns of conflicts. The events of the Arab Spring resulted in current and long term change across the region. Significant modifications in the level, strength and period of armed conflict around the world have been made. Egypt was in the center of these events. It has fought back the armed groups under the name of terrorism and spread common disorder and violence among civilians. On this note, this study focuses on the problem of the transformation in the methods of organized violence within one state rather than between two state or more and analyzes the objectives, strategies, and internal composition of armed groups and the environments that foster them, with a focus on the Egyptian case.

Keywords: armed groups, conflicts, Egyptian armed forces, intrastate conflicts

Procedia PDF Downloads 427
5147 Engineering of Filtration Systems in Egyptian Cement Plants: Industrial Case Study

Authors: Mohamed. A. Saad

Abstract:

The paper represents a case study regarding the conversion of Electro-Static Precipitators (ESP`s) into Fabric Filters (FF). Seven cement production companies were established in Egypt during the period 1927 to 1980 and 6 new companies were established to cope with the increasing cement demand in 1980's. The cement production market shares in Egypt indicate that there are six multinational companies in the local market, they are interested in the environmental conditions improving and so decided to achieve emission reduction project. The experimental work in the present study is divided into two main parts: (I) Measuring Efficiency of Filter Fabrics with detailed description of a designed apparatus. The paper also reveals the factors that should be optimized in order to assist problem diagnosis, solving and increasing the life of bag filters. (II) Methods to mitigate dust emissions in Egyptian cement plants with a special focus on converting the Electrostatic Precipitators (ESP`s) into Fabric Filters (FF) using the same ESP casing, bottom hoppers, dust transportation system, and ESP ductwork. Only the fan system for the higher pressure drop with the fabric filter was replaced. The proper selection of bag material was a prime factor with regard to gas composition, temperature and particle size. Fiberglass with PTFE membrane coated bags was selected. This fabric is rated for a continuous temperature of 250 C and a surge temperature of 280C. The dust emission recorded was less than 20 mg/m3 from the production line fitted with fabric filters which is super compared with the ESP`s working lines stack.

Keywords: Engineering Electrostatic Precipitator, filtration, dust collectors, cement

Procedia PDF Downloads 226
5146 Four-dimensional (4D) Decoding Information Presented in Reports of Project Progress in Developing Countries

Authors: Vahid Khadjeh Anvary, Hamideh Karimi Yazdi

Abstract:

Generally, the tool of comparison between performance of each stage in the life of a project, is the number of project progress during that period, which in most cases is only determined as one-dimensional with referring to one of three factors (physical, time, and financial). In many projects in developing countries there are controversies on accuracy and the way of analyzing progress report of projects that hinders getting definitive and engineering conclusions on the status of project.Identifying weakness points of this kind of one-dimensional look on project and determining a reliable and engineering approach for multi-dimensional decoding information receivable from project is of great importance in project management.This can be a tool to help identification of hidden diseases of project before appearing irreversible symptoms that are usually delays or increased costs of execution. The method used in this paper is defining and evaluating a hypothetical project as an example analyzing different scenarios and numerical comparison of them along with related graphs and tables. Finally, by analyzing different possible scenarios in the project, possibility or impossibility of predicting their occurrence is examine through the evidence.

Keywords: physical progress, time progress, financial progress, delays, critical path

Procedia PDF Downloads 347
5145 Optimization of Beneficiation Process for Upgrading Low Grade Egyptian Kaolin

Authors: Nagui A. Abdel-Khalek, Khaled A. Selim, Ahmed Hamdy

Abstract:

Kaolin is naturally occurring ore predominantly containing kaolinite mineral in addition to some gangue minerals. Typical impurities present in kaolin ore are quartz, iron oxides, titanoferrous minerals, mica, feldspar, organic matter, etc. The main coloring impurity, particularly in the ultrafine size range, is titanoferrous minerals. Kaolin is used in many industrial applications such as sanitary ware, table ware, ceramic, paint, and paper industries, each of which should be of certain specifications. For most industrial applications, kaolin should be processed to obtain refined clay so as to match with standard specifications. For example, kaolin used in paper and paint industries need to be of high brightness and low yellowness. Egyptian kaolin is not subjected to any beneficiation process and the Egyptian companies apply selective mining followed by, in some localities, crushing and size reduction only. Such low quality kaolin can be used in refractory and pottery production but not in white ware and paper industries. This paper aims to study the amenability of beneficiation of an Egyptian kaolin ore of El-Teih locality, Sinai, to be suitable for different industrial applications. Attrition scrubbing and classification followed by magnetic separation are applied to remove the associated impurities. Attrition scrubbing and classification are used to separate the coarse silica and feldspars. Wet high intensity magnetic separation was applied to remove colored contaminants such as iron oxide and titanium oxide. Different variables affecting of magnetic separation process such as solid percent, magnetic field, matrix loading capacity, and retention time are studied. The results indicated that substantial decrease in iron oxide (from 1.69% to 0.61% ) and TiO2 (from 3.1% to 0.83%) contents as well as improving iso-brightness (from 63.76% to 75.21% and whiteness (from 79.85% to 86.72%) of the product can be achieved.

Keywords: Kaolin, titanoferrous minerals, beneficiation, magnetic separation, attrition scrubbing, classification

Procedia PDF Downloads 328
5144 Surgical Imaging in Ancient Egypt

Authors: Mohamed Ahmed Madkour, Haitham Magdy Hamad

Abstract:

This research aims to study of the surgery science and imaging in ancient Egypt, and how to diagnose the surgical cases, whether due to injuries or disease that requires surgical intervention, Medical diagnosis and how to treat it. The ancient Egyptian physician tried to change over from magic and theological thinking to become a stand-alone experimental science, they were able to distinguish between diseases and they divide them into internal and external diseases even this division exists to date in modern medicine. There is no evidence to recognize the amount of human knowledge in the prehistoric knowledge of medicine and surgery except skeleton. It is not far from the human being in those times familiar with some means of treatment, Surgery in the Stone age was rudimentary, Flint stone was used after trimming in a certain way as a lancet to slit and open the skin. Wooden tree branches were used to make splints to treat bone fractures. Surgery developed further when copper was discovered, it led to the advancement of Egyptian civilization, then modern and advanced tools appeared in the operating theater like a knife or a scalpel. The climate and environmental conditions have preserved medical papyri and human remains that have confirmed their knowledge of surgical methods including sedation. The ancient Egyptians reached a great importance in surgery, evidenced by the scenes that depict the pathological image and the surgical process, but the image alone is not sufficient to prove the pathology, its presence in ancient Egypt and its treatment method. As there are a number of medical papyri, especially Edwin Smith and Ebris, which prove the ancient Egyptian surgeon's knowledge of the pathological condition that It requires a surgical intervention, otherwise its diagnosis and the method of treatment will not be described with such accuracy through these texts. Some surgeries are described in the department of surgery at Ebris papyrus. The level of surgery in ancient Egypt was high, and they performed surgery such as hernias and Aneurysm, however we have not received a lengthy explanation of the various surgeries and the surgeon has usually only said “treated surgically”. It is evident in the Ebris papyrus that they used sharp surgical tools and cautery in operations where bleeding is expected, such as hernias, arterial sacs and tumors.

Keywords: ancient Egypt, archaeology, Egyptian history, ancient asurgical imaging, Egyptian civilization, civilization

Procedia PDF Downloads 44
5143 CAG Repeat Polymorphism of Androgen Receptor and Female Sexual Functions in Egyptian Female Population

Authors: Azza Gaber Farag, Yasser Atta Shehata, Sara Elsayed Elghazouly, Mustafa Elsayed Elshaib, Nesreen Gamal Elden Elhelbawy

Abstract:

Background: Androgen receptor (AR) polymorphism in cytosine adenineguanine (CAG) repeat has an effect on the functional capacity of AR in males. However, little researches in this field are available regarding female sexual function. Aim: To investigate the possible link between polymorphism in the CAG repeat of AR gene and female sexual function in a sample of the Egyptian population. Materials and methods: 500 Egyptian married females completed a questionnaire regarding sociodemographic, reproductive, and sexual data. AR CAG repeat length was analyzed for those having female sexual dysfunctions (FSD) using real-time PCR. Results: The most sensitive domain to AR CAG repeat length was the orgasm domain that showed significant positive correlations with short allele (p=0.001), long allele (p=.015), biallellic mean (p=.000), and X weighted biallelic mean (p=.000). The satisfaction domain had significant positive correlations with the biallelic mean (p=.035), and the X weighted biallelic mean (p=. 032). However, the pain domain was of significant negative correlations with AR polymorphism of short allele (p=.002), biallelic mean (p=.013), and X weighted biallelic mean (p = . 011). Conclusions: AR polymorphism could represent a non-negligible aspect in female sexual function. The lower AR CAG repeat polymorphism was of significant impact on FSD, affecting mainly female orgasm followed by pain disorders that finally reflected On her sexual satisfaction.

Keywords: female sexual dysfunction, androgen receptor, CAG repeat polymorphism, androgen

Procedia PDF Downloads 144
5142 The Successful in Construction Project via Effectiveness of Project Team

Authors: Zarabizan Zakaria, Hayati Zainal

Abstract:

The construction industry is one of the most important sectors that contribute to the nation’s economy and catalyze towards the growth of other industries. However, some construction projects have not been completed on its stipulated time and duration, scope and budget due to several factors. This problem arises due to the weaknesses of human factors, especially from ineffective leadership quality practiced by project managers and contractors in managing project teams. Therefore, a construction project should impose the element of Project Team. The project team is formed in the implementation of the project which includes the project brief, project scope, customer requirements and provided designs. Many organizations in the construction sector use teams to meet today's global competition and customer expectations, however, team effectiveness evaluation is required. In insuring the construction team is successful and effectiveness, the construction department must encourage, measure, set up, and evaluate or review the effectiveness of project team that was formed. In order to produce a better outcome for a high-end project, an effective and efficient project team is required which also help in increasing overall productivity. The purpose of this study is to determine the role of team effectiveness in the construction project team based on the overall construction project performance. It examines several different factors which related to team effectiveness. It also examines the relationship between team effectiveness factor and project performance aspect. Team Effect Review and Project Performance Review are developed to be used for data collection. Data collected were analyzed using several statistical tests. Results obtained from data analysis are validated using semi-structured interviews. Besides that, a comprehensive survey were developed to assess the way construction project teams in order to maintain its effectiveness throughout the project phase. In order to determine a project successful it has been found that Project Team Leadership is the most important factor. In addition, the definition of team effectiveness in the construction project team is developed based on the perspective of project clients and project team members. The results of this study are expected to provide an idea on the factors that are needed to be focused on improving the team's effectiveness towards project performance aspects. At the same time, the definition of team effectiveness from team members and owner views has been developed in order to provide a better understanding of the word team's effectiveness in construction projects.

Keywords: project team, leadership, construction project, project successful

Procedia PDF Downloads 146
5141 Gender and Older People: Reframing Gender Analysis through Lifecycle Lens

Authors: Supriya Akerkar

Abstract:

The UN Decade on Healthy Ageing (2021-2030) provides a new opportunity to address ageing and gender issues in different societies. The concept of gender has been used to unpack and analyse the power and constructions of gender relations in different societies. Such analysis has been employed and used to inform policy and practices of governments and non-governmental organisations to further gender equalities in their work. Yet, experiences of older women and men are often left out of such mainstream gender analysis, marginalising their existence and issues. This paper argues that new critical analytical tools are needed to capture the realities and issues of interest to older women and men. In particular, it argues that gender analysis needs to integrate analytical concepts of ageing and lifecycle approach in its framework. The paper develops such a framework by critical interrogation of the gender analysis tools that are currently applied for framing gender issues in international development and humanitarian work. Informed by the realities and experiences of older women and men, developed through a synthesis of available literature, the paper will develop a new framework for gender analysis that can be used by governments and non-government organisations in their work to further gender justice across the life cycle.

Keywords: ageing, gender, older people, social inclusion

Procedia PDF Downloads 203
5140 Integrated Formulation of Project Scheduling and Material Procurement Considering Different Discount Options

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

On-time availability of materials in the construction sites plays an outstanding role in successful achievement of project’s deliverables. Thus, this paper has investigated formulation of project scheduling and material procurement at the same time, by a mixed-integer programming model, aiming to minimize/maximize penalty/reward to deliver the project and minimize material holding, ordering, and procurement costs, respectively. We have taken both all-units and incremental discount possibilities into consideration to address more flexibility from the procurement side with regard to real world conditions. Finally, the applicability and efficiency of the mathematical model is tested by different numerical examples.

Keywords: discount strategies, material purchasing, project planning, project scheduling

Procedia PDF Downloads 233
5139 Genetic Algorithms Multi-Objective Model for Project Scheduling

Authors: Elsheikh Asser

Abstract:

Time and cost are the main goals of the construction project management. The first schedule developed may not be a suitable schedule for beginning or completing the project to achieve the target completion time at a minimum total cost. In general, there are trade-offs between time and cost (TCT) to complete the activities of a project. This research presents genetic algorithms (GAs) multi-objective model for project scheduling considering different scenarios such as least cost, least time, and target time.

Keywords: genetic algorithms, time-cost trade-off, multi-objective model, project scheduling

Procedia PDF Downloads 394
5138 Identifying Project Delay Factors in the Australian Construction Industry

Authors: Syed Sohaib Bin Hasib, Hiyam Al-Kilidar

Abstract:

Meeting project deadlines is a major challenge for most construction projects. In this study, perceptions of contractors, clients, and consultants are compared relative to a list of factors derived from the review of the extant literature on project delay. 59 causes (categorized into 8 groups) of project delays were identified from the literature. A survey was devised to get insights and ranking of these factors from clients, consultants & contractors in the Australian construction industry. Findings showed that project delays in the Australian construction industry are mainly the result of skill shortages, interference in execution, and poor coordination and communication between the project stakeholders.

Keywords: construction, delay factors, time delay, australian construction industry

Procedia PDF Downloads 141
5137 Assessment of Adequacy of Pile Load Determination Formulas

Authors: Ashraf Eid

Abstract:

Many formulas are set to estimate the pile load capacity based on the in-situ pile load tests. However, discrepancy is obvious between the results of these applications. Some formulas are more adequate than others with respect to soil formation and its characteristics. In this research, attempts were undertaken to evaluate the adequacy of the most well-known formulas based on a series of pile load tests carried out in Port Said city in the northeast of Egypt for major residential projects. Comparisons were undertaken between the different formulas supported by the results of in-situ Cone Penetration Tests (CPT). Based on this study, a guide for engineers for using the proper formula can be adopted with consideration of soil type and characteristics. The Egyptian Code which relies on the results of some formulas is involved in the study as a guiding aspect in the pile design.

Keywords: pile load formula, load test of piles, CPT, Egyptian code

Procedia PDF Downloads 127
5136 A Correlation Between Perceived Usage of Project Management Methodologies and Project Success in Horizon 2020 Projects

Authors: Aurelio Palacardo, Giulio Mangano, Alberto De Marco

Abstract:

Nowadays, the global economic framework is extremely competitive, and it consequently requires an efficient deployment of the resources provided by EU. In this context, Project management practices are intended to be one of the levers for increasing such an efficiency. The objective of this work is to explore the usage of Project Management methodologies and good practices in the European-wide research program “Horizon2020” and establish whether their maturity might impact the project's success. This allows to identify strengths in terms of application of PM methodologies and good practices and, in turn, to provide feedback and opportunities for improvements to be implemented in future programs. In order to achieve this objective, the present research makes use of a survey-based data retrieval and correlation analysis to investigate the level of perceived PM maturity in H2020 projects and the correlation of maturity with project success. The results show the Project Managers involved in H2020 to hold a high level of PM maturity, confirming PM standards, which are imposed by the EU commission as a binding process, are effectively enforced.

Keywords: project management, project management maturity, maturity models, project success

Procedia PDF Downloads 129
5135 Astronomical Panels of Measuring and Dividing Time in Ancient Egypt

Authors: Mohamed Saeed Ahmed Salman

Abstract:

The ancient Egyptians used the stars to measure time or, in a more precise sense, as one of the astronomical means of measuring time. These methods differed throughout the historical ages. They began with simple observations of observing astronomical phenomena and watching them, such as observing the movements of the stars in the sky. The year, to know the days, nights, and other means used to help set the time when the sky overcast, and so the researcher tries through archaeological evidence to demonstrate the knowledge of the ancient Egyptian stars of heaven and movements through the first pre-history. It is not believed that the astronomical information possessed by the Egyptians was limited, and simply, it was reaching a level of almost optimal in terms of importance, and the goal he wanted to reach the ancient Egyptians and also help him to know the time, and the passage of time; which ended in finally trying to find a system of timing and calculation of time. It was noted that there were signs that the stellar creed was known and prosperous, especially since the pre-family ages, and this is evident in the inscriptions that come back to that period. The Egyptians realized that some of the stars remained visible at night; the ancient Egyptians were familiar with the daily journey of the stars. This is what was adopted in many paragraphs of the texts of the pyramids and its references to the rise of the deceased king of the heavenly world between the stars of the eternal sky. It was noted that the ancient Egyptian link between the doctrine of the star, we find that the public The lunar was known to the ancient Egyptians, and sang it for two years, and the stellar solar; but it was based on the appearance of the star Sirius, and this is the first means used to measure time and know the calendar stars.

Keywords: archaeology, Astronmical panels, ancient Egypt, ancient Egyptian

Procedia PDF Downloads 26
5134 The Development of a Digitally Connected Factory Architecture to Enable Product Lifecycle Management for the Assembly of Aerostructures

Authors: Nicky Wilson, Graeme Ralph

Abstract:

Legacy aerostructure assembly is defined by large components, low build rates, and manual assembly methods. With an increasing demand for commercial aircraft and emerging markets such as the eVTOL (electric vertical take-off and landing) market, current methods of manufacturing are not capable of efficiently hitting these higher-rate demands. This project will look at how legacy manufacturing processes can be rate enabled by taking a holistic view of data usage, focusing on how data can be collected to enable fully integrated digital factories and supply chains. The study will focus on how data is flowed both up and down the supply chain to create a digital thread specific to each part and assembly while enabling machine learning through real-time, closed-loop feedback systems. The study will also develop a bespoke architecture to enable connectivity both within the factory and the wider PLM (product lifecycle management) system, moving away from traditional point-to-point systems used to connect IO devices to a hub and spoke architecture that will exploit report-by-exception principles. This paper outlines the key issues facing legacy aircraft manufacturers, focusing on what future manufacturing will look like from adopting Industry 4 principles. The research also defines the data architecture of a PLM system to enable the transfer and control of a digital thread within the supply chain and proposes a standardised communications protocol to enable a scalable solution to connect IO devices within a production environment. This research comes at a critical time for aerospace manufacturers, who are seeing a shift towards the integration of digital technologies within legacy production environments, while also seeing build rates continue to grow. It is vital that manufacturing processes become more efficient in order to meet these demands while also securing future work for many manufacturers.

Keywords: Industry 4, digital transformation, IoT, PLM, automated assembly, connected factories

Procedia PDF Downloads 48
5133 A Study of Factors Affecting the Elapsed Time of Housing Renewal Project Implementation in Seoul

Authors: In Su Na, Gunwon Lee, Seiyong Kim

Abstract:

This study analyzed the effect of area variables and economic variables on the length of each period of the project in order to analyze the effect of agreement rate on project implementation in housing renewal projects. In conclusion, as can be seen from these results, a low agreement rate may not translate into project promotion, and a higher agreement rate may not translate into project delay. The expectation of the policy is that the lower the agreement rate, the more projects would be promoted, but that is not the actual effect. From a policy consistency viewpoint, changing the agreement rate frequently, depending on the decision of the public, is not reasonable. The policy of using agreement rate as a necessary condition for project implementation should be reconsidered.

Keywords: Area and Economic Variables, Elapsed time, Housing Renewal Project

Procedia PDF Downloads 431
5132 Egyptian Women in the Informal Economy: Implications of the Covid-19 Pandemic

Authors: Hagar Wahba

Abstract:

In an attempt to bridge a literature gap, the study explores the different gendered consequences of economic globalization on Egyptian women in informal employment. Under the intersectionality theory, the study highlights issues related to equal economic opportunities among women in different segments of informal employment during Covid-19. Accordingly, this study explores the different vulnerabilities of women in lower segments of the informal sector in Egypt, which intersected with inequalities brought by the pandemic. Therefore, through collecting primary data, the study was able to gain a more intersectional understanding of women’s experiences in informal employment during Covid-19. In women in technology-based work in Egypt were proven to be in a more advantaged position than other women whose jobs depended on face-to-face interactions during the pandemic.

Keywords: economic globalisation, informal employment, women, egypt, intersectional feminism, decent work, Covid-19

Procedia PDF Downloads 72
5131 Reviving Sustainable Architecture in Non-Wester Culture

Authors: Khaled Asfour

Abstract:

Going for LEED certification is the latest concern in Egyptian practice that only materialized during the last 4 years. Egyptian Consultant Group (ECG) together with Credit Agricole had the vision to design a headquarters (Cairo) that delivers a serious sustainable design. The bank is a strong advocator of “green banking” and supports renewable energy and energy saving projects. Their HQ in Cairo has passed all the hurdles to become the first platinum LEED certificate holder in Egypt. With this design Egyptian practice has finally re-engaged in a serious way with its long-standing traditions in sustainable architecture. Perhaps the closest to our memory is the medieval houses of Cairo. Few centuries later these qualities disappeared with the advent of Modern Movement that focused more on standard modernist image making than real localized quality of living environments. The first person to note this disappearance was Hassan Fathy half a century ago. Despite international applaud for his efforts he had no effect on prevailing local practice that continued senselessly adopting recycled modernist templates. The Egyptian society was not ready to accept any reference to historic architecture. Disciples of Hassan Fathy, few decades later sought, of tackling the lack of interest in green architecture in a different way. Mohamed Awad introduced in his design sustainable ideals inspired from traditional architecture rather than recycling directly historic forms and images. Despite success, this approach did not go far enough to influence the prevailing practice. Since year 2000 Egyptian economy was ebbing and flowing dramatically. This staggering fluctuation coupled by energy crisis has disillusioned architects and clients on the issue of modern image making. No more shining architecture under the sun with high running cost of fossil fuel. They sought of adopting contemporary green measures that offer pleasant living while saving on energy. A revival is on its way but is very slow and timid. The paper will present this problem of reviving sustainable architecture. How this process can be accelerated in order to give stronger impact on current practice will be addressed through the works of Mario Cucinella and Norman Foster.

Keywords: LEED certification, Hasan Fathy, Medieval architecture, Mario Cucinella, Norman Foster

Procedia PDF Downloads 463
5130 Performance Evaluation of Construction Projects by Earned Value Management Method, Using Primavera P6 – A Case Study in Istanbul, Turkey

Authors: Mohammad Lemar Zalmai, Osman Hurol Turkakin, Cemil Akcay, Ekrem Manisali

Abstract:

Most of the construction projects are exposed to time and cost overruns due to various factors and this is a major problem. As a solution to this, the Earned Value Management (EVM) method is considered. EVM is a powerful and well-known method used in monitoring and controlling the project. EVM is a technique that project managers use to track the performance of their project against project baselines. EVM gives an early indication that either project is delayed or not, and the project is either over budget or under budget at any particular day by tracking it. Thus, it helps to improve the management control system of a construction project, to detect and control the problems in potential risk areas and to suggest the importance and purpose of monitoring the construction work. This paper explains the main parameters of the EVM system involved in the calculation of time and cost for construction projects. In this study, the project management software Primavera P6 is used to deals with the project monitoring process of a seven-storeyed (G+6) faculty building whose construction is in progress at Istanbul, Turkey. A comparison between the planned progress of construction activities and actual progress is performed, and the analysis results are interpreted. This case study justifies the benefits of using EVM for project cash flow analysis and forecasting.

Keywords: earned value management (EVM), construction cost management, construction planning, primavera P6, project management, project scheduling

Procedia PDF Downloads 192
5129 The Effect of Critical Activity on Critical Path and Project Duration in Precedence Diagram Method

Authors: J. Nisar, S. Halim

Abstract:

The additional relationships i.e., start-to-start, finish-to-finish, and start-to-finish, between activity in Precedence Diagram Method (PDM) provides a more flexible schedule than traditional Critical Path Method (CPM). But, changing the duration of critical activities in the PDM network will have an anomalous effect on the critical path and the project completion date. In this study, we classified the critical activities in two groups i.e., 1. activity on single critical path and 2. activity on multi-critical paths, and six classes i.e., normal, reverse, neutral, perverse, decrease-reverse and increase-normal, based on their effects on project duration in PDM. Furthermore, we determined the maximum float of time by which the duration each type of critical activities can be changed without effecting the project duration. This study would help the project manager to clearly understand the behavior of each critical activity on critical path, and he/she would be able to change the project duration by shortening or lengthening activities based on project budget and project deadline.

Keywords: construction management, critical path method, project scheduling network, precedence diagram method

Procedia PDF Downloads 184
5128 Project Management Framework and Influencing Factors

Authors: Mehrnoosh Askarizadeh

Abstract:

The increasing variations of the business world correspond with a high diversity of theoretical perspectives used in project management research. This diversity is reflected by a variety of influencing factors, which have been the subject of empirical studies. This article aims to systemize the different streams of research on the basis of a literature review and at developing a research framework influencing factors. We will identify fundamental elements of a project management theory. The framework consists of three dimensions: design, context, and goal. Its purpose is to support the combination of different perspectives and the development of strategies for further research.

Keywords: project, goal, project management, influencing factors