Search results for: social cost
15143 Final Costs of Civil Claims
Authors: Behnam Habibi Dargah
Abstract:
The economics of cost-benefit theory seeks to monitor claims and determine their final price. The cost of litigation is important because it is a measure of the efficiency of the justice system. From an economic point of view, the cost of litigation is considered to be the point of equilibrium of litigation, whereby litigation is regarded as a high-risk investment and is initiated when the costs are less than the probable and expected benefits. Costs are economically separated into private and social costs. Private cost includes material (direct and indirect) and spiritual costs. The social costs of litigation are also subsidized-centric due to the public and governmental nature of litigation and cover both types of bureaucratic bureaucracy and the costs of judicial misconduct. Macroeconomic policy in the economics of justice is the reverse engineering of controlling the social costs of litigation by employing selective litigation and working on the judicial culture to achieve rationality in the monopoly system. Procedures for controlling and managing court costs are also circumscribed to economic patterns in the field. Rational cost allocation model and cost transfer model. The rational allocation model deals with cost-tolerance systems, and the transfer model also considers three models of transferability, including legal, judicial and contractual transferability, which will be described and explored in the present article in a comparative manner.Keywords: cost of litigation, economics of litigation, private cost, social cost, cost of litigation
Procedia PDF Downloads 12815142 A Review of the Factors Causing Cost Overrun in Construction Projects in Malaysia
Authors: Kaleem Ullah, Abd Halid Bin Abdullah
Abstract:
This study examines previous literature on cost overrun in construction projects with the specific aim of determining the frequently observed causes of cost overruns in Malaysian construction projects. Cost overrun is one of the major problems in construction projects. Cost overrun is frequently observed in almost every construction projects. This cost overrun in construction projects occurs due to various reasons and many researchers have carried out various studies to identify the cause factors of this issue. The causes of construction cost overrun could vary from country to country because of the difference in political, economic, social and environmental conditions. Likewise, other countries construction projects in Malaysia have also the issue of cost overrun. The concept of cost overrun in construction projects has attracted much attention in recent years and researches are trying to understand the causes of these overruns and their effects to the construction industry as whole. This paper review various research studies carried out in Malaysia which surveyed the cost performance and cause factors of cost overruns in construction projects in Malaysia.Keywords: cause of cost overrun, cost overrun, construction industry in Malaysia, effects of cost overrun
Procedia PDF Downloads 28115141 Optimality of Shapley Value Mechanism under Sybil Strategies
Authors: Bruno Mazorra Roig
Abstract:
In the realm of cost-sharing mechanisms, the vulnerability to Sybil strategies, where agents can create fake identities to manipulate outcomes, has not yet been studied. In this paper, we delve into the intricacies of different cost-sharing mechanisms proposed in the literature, highlighting its non-Sybil-resistance nature. Furthermore, we prove that under mild conditions, a Sybil-proof cost-sharing mechanism for public excludable goods is at least (n/2 + 1)−approximate. This finding reveals an exponential increase in the worst-case social cost in environments where agents are restricted from using Sybil strategies. We introduce the concept of Sybil Welfare Invariant mechanisms, where a mechanism maintains its worst-case welfare under Sybil strategies for every set of prior beliefs with full support even when the mechanism is not Sybil-proof. Finally, we prove that the Shapley value mechanism for public excludable goods holds this property and so deduce that the worst-case social cost of this mechanism is the nth harmonic number Hn under the equilibrium of the game with Sybil strategies, matching the worst-case social cost bound for cost-sharing mechanisms. This finding carries important implications for decentralized autonomous organizations (DAOs), indicating that they are capable of funding public excludable goods efficiently, even when the total number of agents is unknown.Keywords: game theory, mechanism design, cost sharing, false-name proofness
Procedia PDF Downloads 6315140 Reliability-Based Life-Cycle Cost Model for Engineering Systems
Authors: Reza Lotfalian, Sudarshan Martins, Peter Radziszewski
Abstract:
The effect of reliability on life-cycle cost, including initial and maintenance cost of a system is studied. The failure probability of a component is used to calculate the average maintenance cost during the operation cycle of the component. The standard deviation of the life-cycle cost is also calculated as an error measure for the average life-cycle cost. As a numerical example, the model is used to study the average life cycle cost of an electric motor.Keywords: initial cost, life-cycle cost, maintenance cost, reliability
Procedia PDF Downloads 60315139 Effect of Cost Control and Cost Reduction Techniques in Organizational Performance
Authors: Babatunde Akeem Lawal
Abstract:
In any organization, the primary aim is to maximize profit, but the major challenges facing them is the increase in cost of operation because of this there is increase in cost of production that could lead to inevitable cost control and cost reduction scheme which make it difficult for most organizations to operate at the cost efficient frontier. The study aims to critically examine and evaluate the application of cost control and cost reduction in organization performance and also to review budget as an effective tool of cost control and cost reduction. A descriptive survey research was adopted. A total number of 40 respondent retrieved were used for the study. The analysis of data collected was undertaken by applying appropriate statistical tools. Regression analysis was used to test the hypothesis with the use of SPSS. Based on the findings; it was evident that cost control has a positive impact on organizational performance and also the style of management has a positive impact on organizational performance.Keywords: organization, cost reduction, cost control, performance, budget, profit
Procedia PDF Downloads 60115138 Scheduled Maintenance and Downtime Cost in Aircraft Maintenance Management
Authors: Remzi Saltoglu, Nazmia Humaira, Gokhan Inalhan
Abstract:
During aircraft maintenance scheduling, operator calculates the budget of the maintenance. Usually, this calculation includes only the costs that are directly related to the maintenance process such as cost of labor, material, and equipment. In some cases, overhead cost is also included. However, in some of those, downtime cost is neglected claiming that grounding is a natural fact of maintenance; therefore, it is not considered as part of the analytical decision-making process. Based on the normalized data, we introduce downtime cost with its monetary value and add its seasonal character. We envision that the rest of the model, which works together with the downtime cost, could be checked with the real life cases, through the review of MRO cost and airline spending in the particular and scheduled maintenance events.Keywords: aircraft maintenance, downtime, downtime cost, maintenance cost
Procedia PDF Downloads 35115137 A Comparative Analysis of the Private and Social Benefit-Cost Ratios of Organic and Inorganic Rice Farming: Case Study of Smallholder Farmers in the Aveyime Community, Ghana
Authors: Jerome E. Abiemo, Takeshi Mizunoya
Abstract:
The Aveyime community in the Volta region of Ghana is one of the major hubs for rice production. In the past, rice farmers applied organic pesticides to control pests, and compost as a soil amendment to improve fertility and productivity. However, the introduction of chemical pesticides and fertilizers have led many farmers to convert to inorganic system of rice production, without considering the social costs (e.g. groundwater contamination and health costs) related to the use of pesticides. The study estimates and compares the private and social BCRs of organic and inorganic systems of rice production. Both stratified and simple random sampling techniques were employed to select 300 organic and inorganic rice farmers and 50 pesticide applicators. The respondents were interviewed with pre-tested questionnaires. The Contingent Valuation Method (CVM) which elucidates organic farmers` Willingness-to-Pay (WTP) was employed to estimate the cost of groundwater contamination. The Cost of Illness (COI) analysis was used to estimate the health cost of pesticide-induced poisoning of applicators. The data collated, was analyzed with the aid of Microsoft excel. The study found that high private benefit (e.g. increase in farm yield and income) was the most influential factor for the rapid adoption of pesticides among rice farmers. The study also shows that the social costs of inorganic rice production were high. As such the social BCR of inorganic farming (0.2) was low as compared to organic farming (0.7). Based on the results, it was recommended that government should impose pesticide environmental tax, review current agricultural policies to favour organic farming and promote extension education to farmers on pesticide risk, to ensure agricultural and environmental sustainability.Keywords: benefit-cost-ratio (BCR), inorganic farming, pesticides, social cost
Procedia PDF Downloads 47615136 Cost Benefit Analysis and Adjustments of Corporate Social Responsibility in the Airline Industry
Authors: Roman Asatryan
Abstract:
The decision-making processes in Corporate Social Responsibility (CSR) among firms in general and airlines in particular have to do with the benefits that accrue through those investments. The crux of the matter is not whether to invest in CSR or not, but rather, how firms can quantify the benefits derived from such investments. This paper analyzes the cost benefit adjustment strategies for firms in the airline industry in their CSR strategy adoption and implementation. The adjustment strategies identified will enable firms in the airline industry to have a basis for determining the worth of such CSR investments. This paper discusses the cost and benefit analysis model in order to understand the ways airlines can reduce costs and increase returns on CSR, or balance the cost and benefits. The analysis from this study points to the fact that economic concepts especially the CBA are useful, though they are not without challenges. The challenge arises when it is problematic to express the real impact of the externality in monetary terms. The use of rational maximization of the gains may seem to be a rather optimistic goal mainly because of environmental variability, perceptual uncertainty, and imperfect knowledge about the potential externality. This paper concludes that the CBA model gives a basic understanding of the motivations for investing in intangible assets like CSR. Consequently, it sets the tone for formulating relevant hypothesis in empirical studies in investment in CSR in particular and other intangible assets in business operations.Keywords: cost-benefit analysis, corporate social responsibility, airline industry
Procedia PDF Downloads 39215135 Construction Time - Cost Trade-Off Analysis Using Fuzzy Set Theory
Authors: V. S. S. Kumar, B. Vikram, G. C. S. Reddy
Abstract:
Time and cost are the two critical objectives of construction project management and are not independent but intricately related. Trade-off between project duration and cost are extensively discussed during project scheduling because of practical relevance. Generally when the project duration is compressed, the project calls for an increase in labor and more productive equipments, which increases the cost. Thus, the construction time-cost optimization is defined as a process to identify suitable construction activities for speeding up to attain the best possible savings in both time and cost. As there is hidden tradeoff relationship between project time and cost, it might be difficult to predict whether the total cost would increase or decrease as a result of compressing the schedule. Different combinations of duration and cost for the activities associated with the project determine the best set in the time-cost optimization. Therefore, the contractors need to select the best combination of time and cost to perform each activity, all of which will ultimately determine the project duration and cost. In this paper, the fuzzy set theory is used to model the uncertainties in the project environment for time-cost trade off analysis.Keywords: fuzzy sets, uncertainty, qualitative factors, decision making
Procedia PDF Downloads 64915134 A Prediction of Electrical Cost for High-Rise Building Construction
Authors: Picha Sriprachan
Abstract:
The increase in electricity prices affects the cost of high-rise building construction. The objectives of this research are to study the electrical cost, trend of electrical cost and to forecast electrical cost of high-rise building construction. The methods of this research are: 1) to study electrical payment formats, cost data collection methods, and the factors affecting electrical cost of high-rise building construction, 2) to study the quantity and trend of cumulative percentage of the electrical cost, and 3) to forecast the electrical cost for different types of high-rise buildings. The results of this research show that the average proportion between electrical cost and the value of the construction project is 0.87 percent. The proportion of electrical cost for residential, office and commercial, and hotel buildings are closely proportional. If construction project value increases, the proportion of electrical cost and the value of the construction project will decrease. However, there is a relationship between the amount of electrical cost and the value of the construction project. During the structural construction phase, the amount of electrical cost will increase and during structural and architectural construction phase, electrical cost will be maximum. The cumulative percentage of the electrical cost is related to the cumulative percentage of the high-rise building construction cost in the same direction. The amount of service space of the building, number of floors and the duration of the construction affect the electrical cost of construction. The electrical cost of construction forecasted by using linear regression equation is close to the electrical cost forecasted by using the proportion of electrical cost and value of the project.Keywords: high-rise building construction, electrical cost, construction phase, architectural phase
Procedia PDF Downloads 38915133 Cost Overrun Causes in Public Construction Projects in Saudi Arabia
Authors: Ibrahim Mahamid, A. Al-Ghonamy, M. Aichouni
Abstract:
This study is conducted to identify causes of cost deviations in public construction projects in Saudi Arabia from contractors’ perspective. 41 factors that might affect cost estimating accuracy were identified through literature review and discussion with some construction experts. The factors were tabulated in a questionnaire form and a field survey included 51 contractors from the Northern Province of Saudi Arabia was performed. The results show that the top five important causes are: wrong estimation method, long period between design and time of implementation, cost of labor, cost of machinary and absence of construction-cost data.Keywords: cost deviation, public construction, cost estimating, Saudi Arabia, contractors
Procedia PDF Downloads 47415132 Chaotic Dynamics of Cost Overruns in Oil and Gas Megaprojects: A Review
Authors: O. J. Olaniran, P. E. D. Love, D. J. Edwards, O. Olatunji, J. Matthews
Abstract:
Cost overruns are a persistent problem in oil and gas megaprojects. Whilst the extant literature is filled with studies on incidents and causes of cost overruns, underlying theories to explain their emergence in oil and gas megaprojects are few. Yet, a way to contain the syndrome of cost overruns is to understand the bases of ‘how and why’ they occur. Such knowledge will also help to develop pragmatic techniques for better overall management of oil and gas megaprojects. The aim of this paper is to explain the development of cost overruns in hydrocarbon megaprojects through the perspective of chaos theory. The underlying principles of chaos theory and its implications for cost overruns are examined and practical recommendations proposed. In addition, directions for future research in this fertile area provided.Keywords: chaos theory, oil and gas, cost overruns, megaprojects
Procedia PDF Downloads 55815131 Construction Unit Rate Factor Modelling Using Neural Networks
Authors: Balimu Mwiya, Mundia Muya, Chabota Kaliba, Peter Mukalula
Abstract:
Factors affecting construction unit cost vary depending on a country’s political, economic, social and technological inclinations. Factors affecting construction costs have been studied from various perspectives. Analysis of cost factors requires an appreciation of a country’s practices. Identified cost factors provide an indication of a country’s construction economic strata. The purpose of this paper is to identify the essential factors that affect unit cost estimation and their breakdown using artificial neural networks. Twenty-five (25) identified cost factors in road construction were subjected to a questionnaire survey and employing SPSS factor analysis the factors were reduced to eight. The 8 factors were analysed using the neural network (NN) to determine the proportionate breakdown of the cost factors in a given construction unit rate. NN predicted that political environment accounted 44% of the unit rate followed by contractor capacity at 22% and financial delays, project feasibility, overhead and profit each at 11%. Project location, material availability and corruption perception index had minimal impact on the unit cost from the training data provided. Quantified cost factors can be incorporated in unit cost estimation models (UCEM) to produce more accurate estimates. This can create improvements in the cost estimation of infrastructure projects and establish a benchmark standard to assist the process of alignment of work practises and training of new staff, permitting the on-going development of best practises in cost estimation to become more effective.Keywords: construction cost factors, neural networks, roadworks, Zambian construction industry
Procedia PDF Downloads 36115130 Identification of Factors Influencing Costs in Green Projects
Authors: Nazirah Zainul Abidin, Nurul Zahirah Mokhtar Azizi
Abstract:
Cost has always been the leading concern in green building development. The perception that construction cost for green building is higher than conventional buildings has only made the discussion of green building cost more difficult. Understanding the factors that will influence the cost of green construction is expected to shed light into what makes green construction more or at par with conventional projects, or perhaps, where cost can be optimised. This paper identifies the elements of cost before shifting the attention to the influencing factors. Findings from past studies uncovered various factors related to cost which are grouped into five focal themes i.e. awareness, knowledge, financial, technical, and government support. A conceptual framework is produced in a form of a flower diagram indicating the cost influencing factors of green building development. These factors were found to be both physical and non-physical aspects of a project. The framework provides ground for the next stage of research that is to further explore how these factors influence the project cost and decision making.Keywords: green project, factors influencing cost, hard cost, soft cost
Procedia PDF Downloads 34415129 Maintenance Alternatives Related to Costs of Wind Turbines Using Finite State Markov Model
Authors: Boukelkoul Lahcen
Abstract:
The cumulative costs for O&M may represent as much as 65%-90% of the turbine's investment cost. Nowadays the cost effectiveness concept becomes a decision-making and technology evaluation metric. The cost of energy metric accounts for the effect replacement cost and unscheduled maintenance cost parameters. One key of the proposed approach is the idea of maintaining the WTs which can be captured via use of a finite state Markov chain. Such a model can be embedded within a probabilistic operation and maintenance simulation reflecting the action to be done. In this paper, an approach of estimating the cost of O&M is presented. The finite state Markov model is used for decision problems with number of determined periods (life cycle) to predict the cost according to various options of maintenance.Keywords: cost, finite state, Markov model, operation and maintenance
Procedia PDF Downloads 53215128 Mobile Devices and E-Learning Systems as a Cost-Effective Alternative for Digitizing Paper Quizzes and Questionnaires in Social Work
Authors: K. Myška, L. Pilařová
Abstract:
The article deals with possibilities of using cheap mobile devices with the combination of free or open source software tools as an alternative to professional hardware and software equipment. Especially in social work, it is important to find cheap yet functional solution that can compete with complex but expensive solutions for digitizing paper materials. Our research was focused on the analysis of cheap and affordable solutions for digitizing the most frequently used paper materials that are being commonly used by terrain workers in social work. We used comparative analysis as a research method. Social workers need to process data from paper forms quite often. It is still more affordable, time and cost-effective to use paper forms to get feedback in many cases. Collecting data from paper quizzes and questionnaires can be done with the help of professional scanners and software. These technologies are very powerful and have advanced options for digitizing and processing digitized data, but are also very expensive. According to results of our study, the combination of open source software and mobile phone or cheap scanner can be considered as a cost-effective alternative to professional equipment.Keywords: digitalization, e-learning, mobile devices, questionnaire
Procedia PDF Downloads 15015127 Evaluation of the Costs and Benefits of Mumbai Sewage Disposal Project, India
Authors: Indrani Gupta, Leena Vachasiddha, Rakesh Kumar
Abstract:
Municipal Corporation of Greater Mumbai intends to undertake Mumbai Sewage Disposal (MSDP) for improvement of environment in and around Mumbai city. Sewage generated from the city currently gets partly into the inadequate collection system for treatment and the rest into nearby marine water body through drains. This paper addresses the cost benefit analysis of MSDP works for better compliance of sewage treatment and disposal. Cost benefit analysis indicates that the investment in sewage treatment is economically beneficial and will provide immense social, environmental, health and economic benefits. Monetary values of positive benefits such as avoided health costs, enhanced fish catches and improved tourism have been quantified. The total capital cost of the project is estimated to be about INR 51,510 million and operation and maintenance cost is about INR 2240.6 million per year. The cost benefit analysis indicates that a benefit of about 25,882 million per year can be achieved due to the implementation of this project. Other than these benefits, better marine ecosystem quality; higher property cost; improved recreational opportunities were not included because of lack of information.Keywords: waste water treatment, cost-benefit analysis, health, tourism, fisheries
Procedia PDF Downloads 33215126 Optimal Replacement Period for a One-Unit System with Double Repair Cost Limits
Authors: Min-Tsai Lai, Taqwa Hariguna
Abstract:
This paper presents a periodical replacement model for a system, considering the concept of single and cumulative repair cost limits simultaneously. The failures are divided into two types. Minor failure can be corrected by minimal repair and serious failure makes the system breakdown completely. When a minor failure occurs, if the repair cost is less than a single repair cost limit L1 and the accumulated repair cost is less than a cumulative repair cost limit L2, then minimal repair is executed, otherwise, the system is preventively replaced. The system is also replaced at time T or at serious failure. The optimal period T minimizing the long-run expected cost per unit time is verified to be finite and unique under some specific conditions.Keywords: repair-cost limit, cumulative repair-cost limit, minimal repair, periodical replacement policy
Procedia PDF Downloads 36515125 Faults in the Projects, Deviation in the Cost
Authors: S. Ahmed, P. Dlask, B. Hasan
Abstract:
There are several ways to estimate the cost of the construction project: simple and detailed. The process of estimating cost is usually done during the design stage, which should take long-time and the designer must give attention to all details. This paper explain the causes of the deviations occurring in the cost of the construction project, and determines the reasons of these differences between contractual cost and final cost of the construction project, through the study of literature review related to this field, and benefiting from the experience of workers in the field of building (owners, contractors) through designing a questionnaire, and finding the most ten important reasons and explain the relation between the contractual cost and the final cost according to these reasons. The difference between those values will be showed through diagrams drawn using the statistical program. In addition to studying the effects of overrun costs on the advancing of the project, and identify the most five important effects. According to the results, we can propose the right direction for the final cost evaluation and propose some measures that would help to control and adjust the deviation in the costs.Keywords: construction projects, building, cost, estimating costs, delay, overrun
Procedia PDF Downloads 29415124 Application of Transportation Linear Programming Algorithms to Cost Reduction in Nigeria Soft Drinks Industry
Authors: Salami Akeem Olanrewaju
Abstract:
The transportation models or problems are primarily concerned with the optimal (best possible) way in which a product produced at different factories or plants (called supply origins) can be transported to a number of warehouses or customers (called demand destinations). The objective in a transportation problem is to fully satisfy the destination requirements within the operating production capacity constraints at the minimum possible cost. The objective of this study is to determine ways of minimizing transport cost in order to maximum profit. Data were gathered from the records of the Distribution Department of 7-Up Bottling Company Plc. Ilorin, Kwara State, Nigeria. The data were analyzed using SPSS (Statistical Package for Social Sciences) while applying the three methods of solving a transportation problem. The three methods produced the same results; therefore, any of the method can be adopted by the company in transporting its final products to the wholesale dealers in order to minimize total production cost.Keywords: cost minimization, resources utilization, distribution system, allocation problem
Procedia PDF Downloads 25615123 A Review of the Major Factors of Cost Overrun in Construction Projects
Authors: Hassan Abdelgadir
Abstract:
Cost overruns have harmed the economies and reputations of several construction companies around the world. Many project management systems have been developed to keep track of a project's budget. However, due to several cost overrun difficulties in the construction industry, cost management is still deemed inadequate. As a result, the goal of this term paper is to identify and group prospective construction project cost overrun reasons based on their origin groups.Basically, all potential cost overrun elements were rigorously checked through 1iterature analysis before being divided into seven (7) groups of originating components, including project, contract, client, contractor, consultant, labor, and external. Each potential factor was completely defined with examples.Keywords: construction projects, cost overruns, construction company, factors effect costoverruns
Procedia PDF Downloads 7415122 Evaluating the Location of Effective Product Advertising on Facebook Ads
Authors: Aulia F. Hadining, Atya Nur Aisha, Dimas Kurninatoro Aji
Abstract:
Utilization of social media as a marketing tool is growing rapidly, including for SMEs. Social media allows the user to give product evaluation and recommendations to the public. In addition, the social media facilitate word-of-mouth marketing communication. One of the social media that can be used is Facebook, with Facebook Ads. This study aimed to evaluate the location of Facebook Ads, to obtain an appropriate advertising design. There are three alternatives location consist of desktop, right-hand column and mobile. The effectiveness and efficiency of advertising will be measured based on advertising metrics such as reach, click, Cost per Click (CUC) and Unique Click-Through-Rate (UCTR). Facebook's Ads Manager was used for seven days, targeted by age (18-24), location (Bandung), language (Indonesia) and keywords. The result was 13,999 total reach, as well as 342 clicks. Based on the results of comparison using ANOVA, there was a significant difference for each placement location based on advertising metrics. Mobile location was chosen to be successful ads, because it produces the lowest CUC, amounting to Rp 691,- per click and 14% UCTR. Results of this study showed Facebook Ads was useful and cost-effective media to promote the product of SME, because it could be view by many people in the same time.Keywords: marketing communication, social media, Facebook Ads, mobile location
Procedia PDF Downloads 35215121 A Reflection: Looking the Pattern of Political Party (Gerindra Party) Campaign by Social Media in Indonesia General Election 2014
Authors: Clara Stella Anugerah
Abstract:
This study actually is a reflection of the general election in 2014. The researcher was interested in this case as the assessment of several phenomenons that happened recently. One of them is the use of social media for the campaign. By this modern era, social media becomes closer with society. It gains the communication process, and by the time being communicating others also becomes easier than before. Furthermore, social media can minimize the cost of communication with many people as a far distance that often comes to be an obstacle of communication does not become a big problem anymore. In Indonesia, the advantages of social media were used by a political party, Gerindra, to face the election that was held on 2014. Actually Gerindra is a newly formed political party that was established in 2008. In spite of Gerindra is the new comer in the election, according to the General Election Committee’s data in Indonesia, Gerindra has the biggest budget than others to cost campaign in social media. Because of that, this research wants to look “how is the pattern of Gerindra party’s campaign to face the general election in 2014? To ask that question, the theory used for this research is campaign method based on ICT (Information Communication Technology) by Rummele. According to the rummele, Gerindra was a party that used a product of social media massively, mainly facebook and twitter. According to that observation, this research focus on campaign that had been done by Gerindra in both of those social media by the time window given by KPU (General Election Committee) on Maret 16th until April 5th, 2014. The conclusion was derived by content analysis method that was used in the methodology. In this context, that method was used while interpreting the content uploaded by Gerindra to facebook or twitter, such as picture and writing. Finally, by that method and reflecting the rummele theory, this research inferred that the patern used for Gerindra’s campaign in social media tends to be top-down. It means: Gerindra showed uncommunicative tendency in social media and only want to catch much mass without mentioned a mission and vision clearly.Keywords: Gerindra party, political party, social media, campaign, general election on 2014
Procedia PDF Downloads 48415120 An Analytical Method for Maintenance Cost Estimating Relationships of Helicopters Using Linear Programming
Authors: Meesun Sun, Yongmin Kim
Abstract:
Estimating maintenance cost is crucial in defense management because it affects military budgets and availability of equipment. When it comes to estimating maintenance cost of the deployed equipment, time series forecasting can be applied with the actual historical cost data. It is more difficult issue to estimate maintenance cost of new equipment for which the actual costs are not provided. In this underlying context, this study proposes an analytical method for maintenance cost estimating relationships (CERs) development of helicopters using linear programming. The CERs can be applied to a new helicopter because they use non-cost independent variables such as the number of engines, the empty weight and so on. In the Republic of Korea, the maintenance cost of new equipment has been usually estimated by reflecting maintenance cost to unit price ratio of the legacy equipment. This study confirms that the CERs perform well for the 10 types of airmobile helicopters in terms of mean absolute percentage error by applying leave-one-out cross-validation. The suggested method is very useful to estimate the maintenance cost of new equipment and can help in the affordability assessment of acquisition program portfolios for total life cycle systems management.Keywords: affordability analysis, cost estimating relationship, helicopter, linear programming, maintenance cost
Procedia PDF Downloads 13815119 Matrix Completion with Heterogeneous Cost
Authors: Ilqar Ramazanli
Abstract:
The matrix completion problem has been studied broadly under many underlying conditions. The problem has been explored under adaptive or non-adaptive, exact or estimation, single-phase or multi-phase, and many other categories. In most of these cases, the observation cost of each entry is uniform and has the same cost across the columns. However, in many real-life scenarios, we could expect elements from distinct columns or distinct positions to have a different cost. In this paper, we explore this generalization under adaptive conditions. We approach the problem under two different cost models. The first one is that entries from different columns have different observation costs, but within the same column, each entry has a uniform cost. The second one is any two entry has different observation cost, despite being the same or different columns. We provide complexity analysis of our algorithms and provide tightness guarantees.Keywords: matroid optimization, matrix completion, linear algebra, algorithms
Procedia PDF Downloads 10815118 Productive Efficiency in Asean Banking
Authors: Suhartono Suhartono
Abstract:
Issue of cost efficiency is then becoming pivotal point because public expect cost of banking operation reducing and benefited of consumers. This study examines the determinants of cost efficiency of banks operating in 8 member countries of the Association of Southeast Asian Nations (ASEAN). This study uses economics theory approach to examine the existence of economies of scale in the ASEAN Banking market especially on its impact on cost efficiency. We apply concept of average cost (AC) as a proxy for the cost efficiency. We find that economies of scale is existing in the banking market indicating scale and scope economies should be considered in the industrial policy. The stronger capital position is also positive to efficiency means stronger capitalized banks are more efficient. Bank that remunerates better tend to be more efficient as result economic capital effect.Keywords: cost efficiency, ASEAN, economies of scale, issue of cost
Procedia PDF Downloads 37815117 Overcrowding and Adequate Housing: The Potential of Adaptability
Authors: Inês Ramalhete, Hugo Farias, Rui da Silva Pinto
Abstract:
Adequate housing has been a widely discussed theme in academic circles related to low-cost housing, whereas its physical features are easy to deal with, overcrowding (related to social, cultural and economic aspects) is still ambiguous, particularly regarding the set of indicators that can accurately reflect and measure it. This paper develops research on low-cost housing models for developing countries and what is the best method to embed overcrowding as an important parameter for adaptability. A critical review of international overcrowding indicators and their application in two developing countries, Cape Verde and Angola, is presented. The several rationales and the constraints for an accurate assessment of overcrowding are considered, namely baseline data (statistics), which can induce misjudgments, as well as social and cultural factors (such as personal choices of residents). This paper proposes a way to tackle overcrowding through housing adaptability, considering factors such as physical flexibility, functional ambiguity, and incremental expansion schemes. Moreover, a case-study is presented to establish a framework for the theoretical application of the proposed approach.Keywords: adaptive housing, low cost housing, overcrowding, housing model
Procedia PDF Downloads 19115116 Financial Burden of Family for the Children with Autism Spectrum Disorder
Authors: M. R. Bhuiyan, S. M. M. Hossain, M. Z. Islam
Abstract:
Autism Spectrum Disorder (ASD) is the fastest growing serious developmental disorder characterized by social deficits, communicative difficulties, and repetitive behaviors. ASD is an emerging public health issue globally which is associated with huge financial burden to the family, community and the nation. The aim of this study was to assess the financial burden of family for the children with Autism spectrum Disorder. This cross-sectional study was carried out from July 2015 to June 2016 among 154 children with ASD to assess the financial burden of family. Data were collected by face-to-face interview with semi-structured questionnaire following systematic random sampling technique. Majority (73.4%) children were male and mean (±SD) age was 6.66 ± 2.97 years. Most (88.8%) of the children were from urban areas with average monthly family income Tk. 41785.71±23936.45. Average monthly direct cost of the children was Tk.17656.49 ± 9984.35, while indirect cost was Tk. 13462.90 ± 9713.54 and total treatment cost was Tk. 23076.62 ± 15341.09. Special education cost (Tk. 4871.00), cost of therapy (Tk. 4124.07) and travel cost (Tk. 3988.31) were the major types of direct cost, while loss of income (Tk.14570.18) was the chief indirect cost incurred by the families. The study found that majority (59.8%) of the children attended special schools were incurred Tk.20001-78700 as total treatment cost, which were statistically significant (p<0.001). Again, families with higher monthly family income incurred higher treatment cost (r=0.526, p<0.05). Difference between mean direct and indirect cost was found significant (t=4.190, df=61, p<0.001). According to the analysis of variance, mean difference of father’s educational status among direct cost (F=10.337, p<0.001) and total treatment cost (F=7.841, p<0.001), which were statistically significant. The study revealed that maximum children with ASD were under five years, three-fourth were male. According to monthly family income, maximum family were in middle class. The study recommends cost effective interventions and financial safety-net measures to reduce the financial burden of families for the children with ASD.Keywords: autism spectrum disorder, financial burden, direct cost, indirect cost, special education
Procedia PDF Downloads 13615115 Supply Chain Decarbonisation – A Cost-Based Decision Support Model in Slow Steaming Maritime Operations
Authors: Eugene Y. C. Wong, Henry Y. K. Lau, Mardjuki Raman
Abstract:
CO2 emissions from maritime transport operations represent a substantial part of the total greenhouse gas emission. Vessels are designed with better energy efficiency. Minimizing CO2 emission in maritime operations plays an important role in supply chain decarbonisation. This paper reviews the initiatives on slow steaming operations towards the reduction of carbon emission. It investigates the relationship and impact among slow steaming cost reduction, carbon emission reduction, and shipment delay. A scenario-based cost-driven decision support model is developed to facilitate the selection of the optimal slow steaming options, considering the cost on bunker fuel consumption, available speed, carbon emission, and shipment delay. The incorporation of the social cost of cargo is reviewed and suggested. Additional measures on the effect of vessels sizes, routing, and type of fuels towards decarbonisation are discussed.Keywords: slow steaming, carbon emission, maritime logistics, sustainability, green supply chain
Procedia PDF Downloads 45715114 Cost-Benefit Analysis for the Optimization of Noise Abatement Treatments at the Workplace
Authors: Paolo Lenzuni
Abstract:
Cost-effectiveness of noise abatement treatments at the workplace has not yet received adequate consideration. Furthermore, most of the published work is focused on productivity, despite the poor correlation of this quantity with noise levels. There is currently no tool to estimate the social benefit associated to a specific noise abatement treatment, and no comparison among different options is accordingly possible. In this paper, we present an algorithm which has been developed to predict the cost-effectiveness of any planned noise control treatment in a workplace. This algorithm is based the estimates of hearing threshold shifts included in ISO 1999, and on compensations that workers are entitled to once their work-related hearing impairments have been certified. The benefits of a noise abatement treatment are estimated by means of the lower compensation costs which are paid to the impaired workers. Although such benefits have no real meaning in strictly monetary terms, they allow a reliable comparison between different treatments, since actual social costs can be assumed to be proportional to compensation costs. The existing European legislation on occupational exposure to noise it mandates that the noise exposure level be reduced below the upper action limit (85 dBA). There is accordingly little or no motivation for employers to sustain the extra costs required to lower the noise exposure below the lower action limit (80 dBA). In order to make this goal more appealing for employers, the algorithm proposed in this work also includes an ad-hoc element that promotes actions which bring the noise exposure down below 80 dBA. The algorithm has a twofold potential: 1) it can be used as a quality index to promote cost-effective practices; 2) it can be added to the existing criteria used by workers’ compensation authorities to evaluate the cost-effectiveness of technical actions, and support dedicated employers.Keywords: cost-effectiveness, noise, occupational exposure, treatment
Procedia PDF Downloads 319