9848 Challenges and Opportunities for Implementing Integrated Project Delivery Method in Public Sector Construction
Authors: Ahsan Ahmed, Ming Lu, Syed Zaidi, Farhan Khan
Abstract:
The Integrated Project Delivery (IPD) method has been proposed as the solution to tackle complexity and fragmentation in the real world while addressing the construction industry’s growing needs for productivity and sustainability. Although the private sector has taken the initiative in implementing IPD and taken advantage of new technology such as building information modeling (BIM) in delivering projects, IPD remains less known and rarely used in public sector construction. The focus of this paper is set on the use of IPD in projects in public sector, which is potentially complemented by the use of analytical functionalities for workface planning and construction oriented design enabled by recent research advances in BIM. Experiences and lessons learned from implementing IPD in the private sector and in BIM-based construction automation research would play a vital role in reducing barriers and eliminating issues in connection with project delivery in the public sector. The paper elaborates issues challenges, contractual relationships and the interactions throughout the planning, design and construction phases in the context of implementing IPD on construction projects in the public sector. A slab construction case is used as a ‘sandbox’ model to elaborate (1) the ideal way of communication, integration, and collaboration among all the parties involved in project delivery in planning and (2) the execution of projects by using IDP principles and optimization, simulation analyses.Keywords: integrated project delivery, IPD, building information modeling, BIM
Procedia PDF Downloads 2029847 PPPs as Panacea to Delivery of Public Sector Construction Project in Zimbabwe
Authors: Ringisai Abigail Mawondo-Dhliwayo, Kahilu Kajimo-Shakantu
Abstract:
Due to financial challenges which governments in general face, it is becoming more difficult for many to continually use their limited resources to undertake infrastructural development. Governments increasingly now need other delivery approaches, in particular, the Public-Private Partnerships which make it possible for the public sector to achieve infrastructural development without incurring any/minimum cost. The literature reviewed outlined that benefits of PPPs include timely delivery of quality projects with cost limits. The methodology utilized for the empirical study comprised six interviews and sixty questionnaires which were undertaken and administered by construction consultants and government officials involved in PPPs projects. The results obtained showed that PPPs are not widely used in Zimbabwe although the need for their use exists. The study also found some challenges which prevent or derail the rate at which PPPs are utilized, of which the primary one was a political influence. It is concluded that despite limitations, PPPs remain the most effective and viable option for the delivery of government projects. The study recommends that policy and framework for the implementation of PPPs be developed. More useful information could have been obtained if final users of PPPs projects were included in the sample for data collection.Keywords: construction projects, procurement, public private partnerships, public sector
Procedia PDF Downloads 2589846 Improving Public Sectors’ Policy Direction on Large Infrastructure Investment Projects: A Developmental Approach
Authors: Ncedo Cameron Xhala
Abstract:
Several public sector institutions lack policy direction on how to successfully implement their large infrastructure investment projects. It is significant to improve strategic policy direction in public sector institutions in order to improve planning, management and implementation of large infrastructure investment projects. It is significant to improve an understanding of internal and external pressures that exerts pressure on large infrastructure projects. The significance is to fulfill the public sector’s mandate, align the sectors’ scarce resources, stakeholders and to improve project management processes. The study used a case study approach which was underpinned by a constructionist approach. The study used a theoretical sampling technique when selecting study participants, and was followed by a snowball sampling technique that was used to select an identified case study project purposefully. The study was qualitative in nature, collected and analyzed qualitative empirical data from the purposefully selected five subject matter experts and has analyzed the case study documents. The study used a semi-structured interview approach, analysed case study documents in a qualitative approach. The interviews were on a face-to-face basis and were guided by an interview guide with focused questions. The study used a three coding process step comprising of one to three steps when analysing the qualitative empirical data. Findings reveal that an improvement of strategic policy direction in public sector institutions improves the integration in planning, management and on implementation on large infrastructure investment projects. Findings show the importance of understanding the external and internal pressures when implementing public sector’s large infrastructure investment projects. The study concludes that strategic policy direction in public sector institutions results in improvement of planning, financing, delivery, monitoring and evaluation and successful implementation of the public sector’s large infrastructure investment projects.Keywords: implementation, infrastructure, investment, management
Procedia PDF Downloads 1519845 The Sectoral Differences in the Use of Construction Incentive
Authors: Qiuwen Ma, Sai On Cheung
Abstract:
Incentive contracting has been developed to push the agent team for extra effort. Generally, there are three types of incentive arrangement, namely incentive/penalty for super performance/underperformance, risk/reward sharing and future business opportunities. It is found that there are significant differences in the use of incentive arrangement in private and public projects. In Hong Kong, very few public projects have used future business as incentivizer whereas private developers often signal repeated business coupled with heavy penalty. This study was conducted to identify various attributes affecting the use of I/D in both private and public engineering sectors of Hong Kong. The diverging preferences were unveiled with reference to a literature review and semi-structured interviews with industry experts. The findings reveal the public/private sectors would consider the implementation issues regarding the various performance targets. The most deterministic factor for the public sector is about accountability. The private sector is in general skeptical about the need to provide extra for the contractors for what they have already contracted to perform.Keywords: construction incentive, public/private projects, semi-structured interview, hong kong
Procedia PDF Downloads 1039844 Factors Constraining the Utilization of Risk Management Strategies in the Execution of Public Construction Projects in North East Nigeria
Authors: S. U. Kunya, S. A. Mohammad
Abstract:
Construction projects in Nigeria are characterized with risks emanating from delays and accompanying cost-overruns. The aim of the study was to identify and assess factors constraining the utilization of risk management strategies in the execution of public construction project in North-East Nigeria. Data was collected with the aid of a well-structured questionnaire administered to three identified projects in the North-east. Data collected were analysed using the severity index. Findings revealed political involvement, selection of inexperienced contractors and lack of coordinated public sector strategy as the most severe factors constraining the utilization of risk management strategies. The study recommended that: formulation of laws to prevent negative political meddling in construction projects; selection of experienced, risk-informed contractors; and comprehensive risk assessment and planning on all public construction projects.Keywords: factors, Nigeria, north-east, public projects, risk management, strategies, utilization
Procedia PDF Downloads 5329843 Non-Cooperative Game Theory Approach for Ensuring Community Satisfaction on Public-Private Partnership Projects
Authors: Jason Salim, Zhouyang Lu
Abstract:
Private sector involvement in Public Private Partnership (PPP) projects may raise public suspicion, as PPP is often mistaken as merely a partnership between private and government agencies without consideration for greater “public” (community). This public marginalization is crucial to be dealt with because undermining opinion of majority may cause problems such as protests and/ or low demand. Game theory approach applied in this paper shows that probability of public acceptance towards a project is affected by overall public’s perception on Private sectors’ possible profit accumulation from the project. On the contrary, goodwill of the government and private coalition alone is not enough to minimize the probability of public opposition towards a PPP project. Additionally, the threat of loss or damage raised from public opposition does not affect the profit-maximization behavior of Private sectors.Keywords: community satisfaction, game theory, non-cooperative, PPP, public policy
Procedia PDF Downloads 6959842 An Exploratory Study on Challenges of Public Private Partnership Projects in Oman
Authors: Omar Amoudi, Mariya Khalid
Abstract:
The limitation of the public funds for the infrastructure projects and with the deterioration of international oil prices and the negative consequences on the economies of oil producing and exporting countries, Oman has encouraged the partnership between the public and private sectors. As the private sector has a role in planning, financing, designing, operating and the maintenance of the public services. There is no doubt that, the adoption of Public Private Partnership (PPP) strategy faces many challenges which might affect the project seriously if it is not overcome in earlier time. These challenges depend on the level of understanding of the strategy, the roles and regulations and the availability of resources as well. This research aims at identifying the challenges facing the PPP infrastructure projects in Oman based on the similar previous studies supported by questionnaire survey and semi structured interviews. It also seeks to discuss the rationale for adoption in Oman and uncover the current status of PPP strategy. The identified challenges were ranked according to the importance index of each challenge. After analysis of data, it has observed that, the main challenges facing PPPs projects in Oman are high participation cost, high projects cost and regulation changes. The PPP strategy has to be adopted well and with a high level of experience in order to ensure a successful implementation of PPP projects in Oman.Keywords: public private partnership (PPP), challenges, infrastructure, Oman
Procedia PDF Downloads 3039841 Challenges to Effective Public Sector Management in Developing Countries: The Networking and Communication Functions of Public Sector Managers in Nigeria and Ghana
Authors: Ethelbert Chinedu Nwokorie
Abstract:
This empirical study analyzes the impact of communication and networking functions of Nigerian and Ghanaian public sector managers’ on public sector effectiveness. The focus is on which of these management functions public sector managers’ in these countries perform most, why, how and how does it affect effectiveness of public sector organizations in the two countries. This qualitative analysis was done by interviewing middle and top level managers in some selected public sector organizations in the two countries on their practical experiences. Findings reveal that ineffectiveness of public sector organizations in Ghana persists because public sector managers perform more of networking functions to promote their individual carrier success and progression in their various organizations, rather than achieving the organizations goals and objectives. In Nigeria, though majority of the interviewed public sector managers perform more communication functions than networking, they do this mostly by treating files and correspondences, instead of face-to-face communication and interaction with employees’. Hence, they hardly relate directly with their employees’ to find out how they are performing their jobs, their challenges, where they are having problems and why. The findings and recommendations of this study will help in improving effectiveness, quality and service delivery in Nigerian and Ghanaian public sector organizations and beyond.Keywords: effectiveness, communication, employees, management, networking, organization, public sector
Procedia PDF Downloads 4539840 New Public Management at Public Administration in Bangladesh: An Exploratory Study
Authors: Biback Das
Abstract:
New Public Management, a phenomenal tool, which is used to enforcing in public administration in different country’s to enhance the capacities. Since the 1980s, New Public Management (NPM) is primarily focusing to modernize the public sector. From the initial period, many developed countries such as UK, New Zealand, Australia, and the USA are applied in their administration to modernize. Almost 1990s, it has been applied in many developing countries. This study can describe the real situations of NPM based administration. Bangladesh Government has taken many projects to reform the public sector under NPM. Even many Development Agencies like UN, UNDP, World Bank, Asian Development Bank and so on, along with many developed countries also invested and prescribed to take NPM based reform that can to restructure the public sector so that it can maximize the efforts to provide the better service. This study examines using many factors that effects work on Public Administration in Bangladesh and also assessing its endeavor to adopt in it. Although Government has taken such initiatives to implement NPM originated reform, it’s not effectively been implemented to bring positive change about as per NPM objectives. This study mainly examines some initiatives in Bangladesh that have the influence of NPM as well as some drawbacks that can’t help the satisfaction of these initiatives. This article help to identify the efforts of many development agencies providing a fund to enhance the NPM based projects with their specific conditions that are prescribed by them helping to get fund. Therefore, to establish effective public management or to follow NPM model, Bangladesh need having an institutional framework, sound rule of law, proper structure, effective civil service system, appropriate checks, and balances to restructure the public sector help along with donor agencies ad implement in it. Bangladesh Government has applied its recent days to enhance the capabilities in its Public Administration. Moreover, this study mainly identifies how the designing strategies, program formulating, its implementation in various sector such as education, health sector etc. and how to reduce the backdrop the during problem by smooth functioning. This paper is also assessing the influence of many projects like PPP (Public-Private and Partnership) to work along with private organizations for smooth service delivery. Accordingly, this paper briefly reviews how it applies in a global context following the taken many initiatives and the consequences of Bangladesh context.Keywords: new public management, capacity building, conditionalities, service delivery, public-private-partnership
Procedia PDF Downloads 1449839 Feasibility Studies in Public Construction Projects in South Africa: Barriers and Implications
Authors: Kenneth O. Otasowie, Matthew Ikuabe, Clinton Aigbavboa, Ayodeji Oke
Abstract:
The practice of feasibility studies plays a huge role in the success of construction projects. Feasibility studies according to several research should be the reason for embarking on any project. However, it has been discovered that in South Africa (SA), feasibility studies are mainly done in the private sector construction but skipped in the construction of most public projects. Hence, this study aims to evaluate the barriers to feasibility studies practice in public projects and the implications. A survey design was adopted. A total number of One hundred and fifty (150) questionnaires were administered to Quantity Surveyors, Construction managers, Construction project managers, Project managers, Architects and Civil and Structural engineers in Guateng Province, SA and ninety (90) were returned and found suitable for analysis. Collected data was analysed using percentage, mean item score, standard deviation, one-sample t-test. The findings show that political interference and corruption are the most significant barriers to feasibility studies practice in the public construction projects in SA, while late project completion, poor quality infrastructure are among the implication of not conducting feasibility studies in SA public projects. Therefore, the study recommends the development of a framework for public projects execution that will reduce the interference of the political class in the country, that way the risk of late project completion and poor quality infrastructure will be mitigated.Keywords: arriers, feasibility studies, public construction, South Africa.
Procedia PDF Downloads 919838 Price Compensation Mechanism with Unmet Demand for Public-Private Partnership Projects
Abstract:
Public-private partnership (PPP), as an innovative way to provide infrastructures by the private sector, is being widely used throughout the world. Compared with the traditional mode, PPP emerges largely for merits of relieving public budget constraint and improving infrastructure supply efficiency by involving private funds. However, PPP projects are characterized by large scale, high investment, long payback period, and long concession period. These characteristics make PPP projects full of risks. One of the most important risks faced by the private sector is demand risk because many factors affect the real demand. If the real demand is far lower than the forecasting demand, the private sector will be got into big trouble because operating revenue is the main means for the private sector to recoup the investment and obtain profit. Therefore, it is important to study how the government compensates the private sector when the demand risk occurs in order to achieve Pareto-improvement. This research focuses on price compensation mechanism, an ex-post compensation mechanism, and analyzes, by mathematical modeling, the impact of price compensation mechanism on payoff of the private sector and consumer surplus for PPP toll road projects. This research first investigates whether or not price compensation mechanisms can obtain Pareto-improvement and, if so, then explores boundary conditions for this mechanism. The research results show that price compensation mechanism can realize Pareto-improvement under certain conditions. Especially, to make the price compensation mechanism accomplish Pareto-improvement, renegotiation costs of the government and the private sector should be lower than a certain threshold which is determined by marginal operating cost and distortionary cost of the tax. In addition, the compensation percentage should match with the price cut of the private investor when demand drops. This research aims to provide theoretical support for the government when determining compensation scope under the price compensation mechanism. Moreover, some policy implications can also be drawn from the analysis for better risk-sharing and sustainability of PPP projects.Keywords: infrastructure, price compensation mechanism, public-private partnership, renegotiation
Procedia PDF Downloads 1799837 Key Issues in Transfer Stage of BOT Project: Experience from China
Authors: Wang Liguang, Zhang Xueqing
Abstract:
The build-operate-transfer (BOT) project delivery system has provided effective routes to mobilize private sector funds, innovative technologies, management skills and operational efficiencies for public infrastructure development and have been widely used in China during the last 20 years. Many BOT projects in China will be smoothly transferred to the government soon and the transfer stage, which is considered as the last stage, must be studied carefully and handled well to achieve the overall success of BOT projects. There will be many issues faced by both the public sector and private sector in the transfer stage of BOT projects, including project post-assessment, technology and documents transfer, personal training and staff transition, etc. and sometimes additional legislation is needed for future operation and management of facilities. However, most previous studies focused on the bidding, financing, and building and operation stages instead of transfer stage. This research identifies nine key issues in the transfer stage of BOT projects through a comprehensive study on three cases in China, and the expert interview and expert discussion meetings are held to validate the key issues and give detail analysis. A proposed framework of transfer management is prepared based on the experiences derived and lessons drawn from the case studies and expert interview and discussions, which is expected to improve the transfer management of BOT projects in practice.Keywords: BOT project, key issues, transfer management, transfer stage
Procedia PDF Downloads 2569836 Legal Issues of Implementing Public Projects through Civic Crowdfunding
Authors: Mahdieh Dehghan Nayeri, Hani Arbabi, Seid Pooyan Ghafoori
Abstract:
Civic crowdfunding- crowdfunding public projects- which goes beyond people management- as a significant part of public projects stakeholders- and requires the active engagement of the public in both the financing and decision-making processes of public projects, is expanding. However, in most countries of the world, no specific legal framework has been approved for governing and managing the implementation of projects through this method. Through a systematic literature review, following the Preferred Reporting Items for Systematic Reviews (PRISMA), this article has studied and discussed the legal issues of civic crowdfunded projects in the countries leading the use of this method, in four themes; one related to the legal environment and three related to three leading players in civic crowdfunded projects include the investor, the platform, and the investee. The review showed that despite the increasing attention to people's engagement in public projects -financial and non-financial- not much scientific research has been done to formulate fully structured legal structures. Finally, neglected areas in research have been discussed as a guide for future research.Keywords: civic crowdfunding, equity crowdfunding, public projects, legal issues, crowdsourcing
Procedia PDF Downloads 2259835 Time Management in the Public Sector in Nigeria
Authors: Sunny Ewankhiwimen Aigbomian
Abstract:
Time, is a scarce resource and in everything we do, time is required to accomplish any given task. The need for this presentation is predicated on the way majority of Nigerian especially in the public sector operators see “Time Management”. Time as resources cannot be regained if lost or managed badly. As a significant aspect of human life it should be handled with diligence and utmost seriousness if the public sector is to function as a coordinated entity. In our homes, private life and offices, we schedule different things to ensure that some things do not go the unexpected. When it comes to service delivery on the part of government, it ought to be more serious because government is all about effect and efficient service delivery and “Time” is a significant variable necessary to successful accomplishment. The need for Nigerian government to re-examine time management in her public sector with a view of repositioning the sector to be able to compete well with other public sectors in the world. The peculiarity of Time management in Public Sector in Nigerian context as examined and some useful recommendations of immerse assistance proffered.Keywords: Nigeria, public sector, time management, task
Procedia PDF Downloads 999834 Public Private Partnership for Infrastructure Projects: Mapping the Key Risks
Authors: Julinda Keçi
Abstract:
In many countries, governments have been promoting the involvement of private sector entities to enter into long-term agreements for the development and delivery of large infrastructure projects, with a focus on overcoming the limitations upon public fund of the traditional approach. The involvement of private sector through public-private partnerships (PPP) brings in new capital investments, value for money and additional risks to handle. Worldwide research studies have shown that an objective, systematic, reliable and user-oriented risk assessment process and an optimal allocation mechanism among different stakeholders is crucial to the successful completion. In this framework this paper, which is the first stage of a research study, aims to identify the main risks for the delivery of PPP projects. A review of cross-countries research projects and case studies was performed to map the key risks affecting PPP infrastructure delivery. The matrix of mapping offers a summary of the frequency of factors, clustered in eleven categories: Construction, Design, Economic, Legal, Market, Natural, Operation, Political, Project finance, Project selection and Relationship. Results will highlight the most critical risk factors, and will hopefully assist the project managers in directing the managerial attention in the further stages of risk allocation.Keywords: construction, infrastructure, public private partnerships, risks
Procedia PDF Downloads 4399833 Incentivize Contracting Partners of Public Projects
Authors: Sai On Cheung, Qiuwen Ma, Fong Chung Lee
Abstract:
Due to increased project complexity and technological advancement in the last decade, the designers and contractors are expected to put more efforts to achieve project goals. To render extra efforts from the agents, incentivization has become one of the primary strategies for the client. Despite increased academia interest in the design of incentive strategies, there is still a need for discussion about the underlying motivations and favourable conditions to make incentives effective. Therefore, this study focuses on the effects of motivations and favourable conditions for the use of incentives in public projects. Questionnaire survey is used as the data collection tool. The questionnaire survey was piloted through interviews with professionals from Hong Kong public sector. A total of 100 responses were collected for this survey. Accountability and organizational effectiveness were found to be the prime objectives of incentives installed by public clients. Furthermore, a list of favourable conditions for incentivization and its consequent effects on cost, schedule, risk and public opinions were identified. To conclude, this study analyses the means and ends of the use of incentives in public projects in Hong Kong.Keywords: incentives, public accountability, project effectiveness, public opinions
Procedia PDF Downloads 689832 Digitalized Public Sector Practices: Opportunities for Open Innovation in Rwanda
Authors: Reem Abou Refaie, Christoph Meinel
Abstract:
The paper explores the impact of the COVID-19 crisis on the internal as well as external digitalized work practices of public service providers as part of a Public-Private Partnership Model. It focuses on the effect of uncertainty on generating Open Innovation practices. Our inquiry relies on semi-structured interviews (n=14) from a case study of Rwanda’s Public Service Delivery System in the context of research cooperation with IremboGov, the country’s One-Stop-Shop Platform for public services. It presents four propositions on harnessing opportunities for OI in the context of the public sector beyond the pandemic response. Practitioners can find characterizations of OI opportunities and gain insights on fostering OI in Public Sector Organizations.Keywords: open innovation, digital transformation, public sector, Rwanda
Procedia PDF Downloads 1289831 An Empirical Investigation of Factors Influencing Construction Project Selection Processes within the Nigeria Public Sector
Authors: Emmanuel U. Unuafe, Oyegoke T. Bukoye, Sandhya Sastry, Yanqing Duan
Abstract:
Globally, there is increasing interest in project management due to a shortage in infrastructure services supply capability. Hence, it is of utmost importance that organisations understand that choosing a particular project over another is an opportunity cost – tying up the organisations resources. In order to devise constructive ways to bring direction, structure, and oversight to the process of project selection has led to the development of tools and techniques by researchers and practitioners. However, despite the development of various frameworks to assist in the appraisal and selection of government projects, failures are still being recorded with government projects. In developing countries, where frameworks are rarely used, the problems are compounded. To improve the situation, this study will investigate the current practice of construction project selection processes within the Nigeria public sector in order to inform theories of decision making from the perspective of developing nations and project management practice. Unlike other research around construction projects in Nigeria this research concentrate on factors influencing the selection process within the Nigeria public sector, which has received limited study. The authors report the findings of semi-structured interviews of top management in the Nigerian public sector and draw conclusions in terms of decision making extant theory and current practice. Preliminary results from the data analysis show that groups make project selection decisions and this forces sub-optimal decisions due to pressure on time, clashes of interest, lack of standardised framework for selecting projects, lack of accountability and poor leadership. Consequently, because decision maker is usually drawn from different fields, religious beliefs, ethnic group and with different languages. The choice of a project by an individual will be greatly influence by experience, political precedence than by realistic investigation as well as his understanding of the desired outcome of the project, in other words, the individual’s ideology and their level of fairness.Keywords: factors influencing project selection, public sector construction project selection, projects portfolio selection, strategic decision-making
Procedia PDF Downloads 3289830 Engineering Management and Practice in Nigeria
Authors: Harold Jideofor
Abstract:
The application of Project Management (PM) tools and techniques in the public sector is gradually becoming an important issue in developing economies, especially in a country like Nigeria where projects of different size and structures are undertaken. The paper examined the application of the project management practice in the public sector in Nigeria. The PM lifecycles, tools, and techniques were presented. The study was carried out in Lagos because of its metropolitan nature and rapidly growing economy. Twenty-three copies of questionnaire were administered to 23 public institutions in Lagos to generate primary data. The descriptive analysis techniques using percentages and table presentations coupled with the coefficient of correlation were used for data analysis. The study revealed that application of PM tools and techniques is an essential management approach that tends to achieve specified objectives within specific time and budget limits through the optimum use of resources. Furthermore, the study noted that there is a lack of in-depth knowledge of PM tools and techniques in public sector institutions sampled, also a high cost of the application was also observed by the respondents. The study recommended among others that PM tools and techniques should be applied gradually especially in old government institutions where resistance to change is perceived to be high.Keywords: project management, public sector, practice, Nigeria
Procedia PDF Downloads 3429829 Factors Leading to the Renegotiation of Private Finance Initiative Design-Build-Finance-Operate Road Projects in the UK
Authors: Ajibola Fatokun, Akintola Akintoye, Champika Liyanage
Abstract:
The issue of renegotiation has not received public sector applause because of the outcomes recorded over years. Numerous reasons have been adduced by the stakeholders for the renegotiation of PPP road projects. In some instances, the reason can also be the factor leading to the renegotiation of PFI (DBFO) road projects. Thus, a number of factors inform the decision of the primary stakeholders to renegotiate the contract. This paper, therefore, evaluates and assesses the factors leading to the renegotiation of PFI (DBFO) road projects in the UK. Qualitative interviews involving both public and private stakeholders were extensively adopted on five PFI (DBFO) case study road projects in order to address the aim of this study. This serves to complement the findings of the literature with respect to the factors leading to the renegotiation of PPP road projects. The findings of this research reveal the respective factors leading to the renegotiations of PFI (DBFO) road projects in the UK. However, the prominent factors are a change in scope of the works necessitating works removal and an addition of assets, change in standards and obsolete specification occasioned by the long duration of the PFI road project concession among others.Keywords: renegotiation, factors, Private Finance Initiative (PFI), design-build-finance-operate (DBFO) road projects
Procedia PDF Downloads 3429828 Risk Variables and Implications in Nigeria of Publicly Funded Construction Works Cessation
Authors: Nnadi Ezekiel Oluwaseun Ejiofor
Abstract:
The foundation of this study is the identification of risk variables and their implications on abandoned construction projects in Nigeria. The study's particular goals are to pinpoint the risk factors that lead to the abandonment of public building projects in Nigeria. This study used a hybrid research design that included case studies and descriptive survey research methods. Professionals who work directly in the built environment and are employed by Ministries and Departmental Agencies (MDAs), the public sector, or the private sector are the study's target demographic. This study used a descriptive survey and case study research design to gather data. Nigeria is experiencing a high rate of project abandonment due to housing deficit issues. Factors contributing to this include The study reveals factors contributing to public project abandonment in Abuja FCT include poor cashflow 4.96, inconsistent government policies 4.89, lack of accountability, high corruption, incompetent contractors, non-availability of building materials, lack of utilities, wrong materials, infrastructural facilities, poor planning, and undefined contracts. The study reveals that abandoned projects have a huge impact on the construction industry, such as wastage of resources with a mean value of 3.35, distrust of economic growth, 3.28, and so on. The study found a significant relationship between risk factors and public building construction in Abuja through a T-test value of 0.037, rejecting the null hypothesis and indicating a positive correlation.Keywords: cost, tetfund, construction projects, public university
Procedia PDF Downloads 589827 Attributes of Ethical Leadership and Ethical Guidelines in Malaysian Public Sector
Authors: M. Norazamina, A. Azizah, Y. Najihah Marha, A. Suraya
Abstract:
Malaysian Public Sector departments or agencies are responsible to provide efficient public services with zero corruption. However, corruption continues to occur due to the absence of ethical leadership and well-execution of ethical guidelines. Thus, the objective of this paper is to explore the attributes of ethical leadership and ethical guidelines. This study employs a qualitative research by analyzing data from interviews with key informers of public sector using conceptual content analysis (NVivo11). The study reveals eight attributes of ethical leadership which are role model, attachment, ethical support, knowledgeable, discipline, leaders’ spirituality encouragement, virtue values and shared values. Meanwhile, five attributes (guidelines, communication, check and balance, concern on stakeholders and compliance) of ethical guidelines are identified. These identified attributes should become the ethical identity and ethical direction of Malaysian Public Sector. This could enhance the public trust as well as the international community trust towards the public sector.Keywords: check and balance, ethical guidelines, ethical leadership, public sector, spirituality encouragement
Procedia PDF Downloads 2599826 Analyzing Competition in Public Construction Projects
Authors: Khaled Hesham Hyari, Amjad Almani
Abstract:
Construction projects in the public sector are commonly awarded through competitive bidding. In the last decade, the Construction projects environment in the Middle East went through many changes. These changes have been caused by different factors including the economic crisis, delays in monthly payments, international competition and reduced number of projects. These factors had a great impact on the bidding behaviors of contractors and their pricing strategies. This paper examines the competition characteristics in public construction projects through an analysis of bidding results of contractors in public construction projects over a period of 6 years (2006-2011) in Jordan. The analyzed projects include all categories of projects such as infrastructure, buildings, transportation and engineering services (design and supervision contracts). Data for the projects were obtained from the General Tender’s Directorate in Jordan and includes 462 projects. The analysis performed in this projects includes, studying the bid spread in all projects as it is an indication of the level of competition in the analyzed bids. The analysis studied the factors that affect bid spread such as number of bidders, Value of the project, Project category and years. It also studying the “Signal to Noise Ratio” in all projects as it is an indication of the accuracy of cost estimating performed by competing bidders and bidder´s evaluation of project risks. The analysis performed includes the relationship between signal to noise ratio and different parameters such as project category, number of bidders and changes over years. Moreover, the analysis includes determining the bidder´s aggressiveness in bidding as it is an indication of competition level in such projects. This was performed by determining the pack price which can be considered as the true value of the project and comparing it with the lowest bid submitted for each project to determine the level of aggressiveness in submitted bids. The analysis performed in this project should prove to be useful to owners in understanding bidding behaviors of contractors and pointing out areas that needs improvement in preparing bidding documents. Also the project should be useful to contractors in understanding the competitive bidding environment and should help them to improve their bidding strategies to maximize the success rate in obtaining contracts.Keywords: construction projects, competitive bidding, public construction, competition
Procedia PDF Downloads 3349825 The Implementation of Information Security Audits in Public Sector: Perspective from Indonesia
Authors: Nur Imroatun Sholihat, Gresika Bunga Sylvana
Abstract:
Currently, cyber attack became an incredibly serious problem due to its increasing trend all over the world. Therefore, information security becomes prominent for every organization including public sector organization. In Indonesia, unfortunately, Ministry of Finance (MoF) is the only public sector organization that has already formally established procedure to assess its information security adequacy by performing information security audits (November 2017). We assess the implementation of information security audits in the MoF using qualitative data obtained by interviewing IT auditors and by analysis of related documents. For this reason, information security audit practice in the MoF could become the acceptable benchmark for all other public sector organizations in Indonesia. This study is important because, to the best of the author’s knowledge, our research into information security audits practice in Indonesia’s public sector have not been found yet. Results showed that information security audits performed mostly by doing pentest (penetration testing) to MoF’s critical applications.Keywords: information security audit, information technology, Ministry of Finance of Indonesia, public sector organization
Procedia PDF Downloads 2379824 The Challenges of Innovation Leadership in the Public Sector
Authors: Shaker A. Aladwan
Abstract:
This paper aims to explore the Barriers to innovation leadership in Jordanian public sector organizations. Qualitative approach was adopted, and content analysis was used to analyze the 18 assessment reports which are extracted from the public innovation award in Jordan, then, 20 semi-structured interviews were conducted with the key persons who are involved with innovation initiatives in the public sector organizations in Jordan. Several Barriersthat face the innovation leadership in the Jordanian public sector organizations. Managerially, the challenges include lack of innovation vision, implementation lack of innovation core values, lack of strategic planning for innovation, bad bureaucracy culture, and excessive centralization. Technically, the challenges include lack of task assignment for employees, lack of resources, lack of innovative training programs, lack of knowledge sharing, and the failure of governments to formulate policies and regulations. most of the studies focused on innovation in the non-public sector organizations, and most of them were conducted in the American and Western countries, which are different in terms of culture, kinds of innovation, barriers, and drivers. Thus, this paper provides new insights into barriers to innovation leadership in the public sector and in a new research context. This paper also provides a theoretical contribution by diagnosing the barriers facing innovation within the context of public administration in developing countries.Keywords: innovation, excellence award, challenges, public sector, jordan
Procedia PDF Downloads 1279823 Exploring the Implementation of Building Information Modelling Level 2 in the UK Construction Industry: The Case of Small and Medium-Sized Enterprises
Authors: Khaled Abu Awwad, Abdussalam Shibani, Michel Ghostin
Abstract:
In the last few years, building information modelling (BIM) has been acknowledged as a new technology capable of transforming the construction sector to a collaborated industry. The implementation of BIM in the United Kingdom (UK) construction sector has increased significantly in the last decade, particularly after the UK government mandated the use of BIM in all public projects by 2016. Despite this, there are many indicators that BIM implementation is the main concern for large companies, while small and medium-sized enterprises (SMEs) are lagging behind in adopting and implementing this new technology. This slow adoption of BIM leads to an uncompetitive disadvantage in public projects and possible private projects. On the other hand, there is limited research focusing on the implementation of BIM Level 2 within SMEs. Therefore, the aim of this study is to bridge this gap and provide a conceptual framework to aid SMEs in implementing BIM Level 2. This framework is a result of interpreting qualitative data obtained by conducting semi-structured interviews with BIM experts in the UK construction industry.Keywords: building information modelling, critical success factors, small and medium-sized enterprises, United Kingdom
Procedia PDF Downloads 2049822 Key External Causes of Poor Performance of Engineering and Technical Departments within Governmental Construction Projects in Saudi Arabia
Authors: Alaa A. Al-Harthi, Abdulrahman S. Bageis, Bingunath Ingirige
Abstract:
Poor levels of performance and low productivity were highlighted by many previous studies as a major cause of failure in the Saudi construction industry. This paper provides recommendations to address key external indicators that led to poor levels of performance and low productivity in Engineering and Technical Departments (ETDs) within the Saudi governmental agencies. The ETDs are client’s representative on behalf of the Saudi Ministries. This paper represents a part of an investigation which contained external and internal challenges that led to occurrence of the research problem. The paper is focusing on the external challenges which contain 14 indicators. These 14 external indicators had been examined carefully through comprehensive review of the literature then have been tested through quantitative and qualitative methods. 400 questionnaires were distributed to dozens of different bodies. The actual response rate was 47% completed responses. Four semi-structured interviews were conducted with senior practitioners from the Public Construction Sector. The finding showed that the 14 external indicators directly and/or indirectly influence the Public Construction Sector. It was noticed significantly that these indicators have prevented the ETDs from performing properly. It was also found that the 14 external indicators were constant with all kinds of Government Construction Projects in the Saudi context. Addressing the 14 external indicators requires to be planned over the long run which is responsible by relevant Saudi governmental authorities under the umbrella of the Saudi Council of Ministers. The study recommends that Project Management Office (PMO) should be considered in order to improve the performance of the ETDs.Keywords: construction projects' performance, low engineering productivity, public construction sector
Procedia PDF Downloads 6019821 Innovation Knowledge Management for Public Sector in the Thailand
Authors: Supattra Kanchanopast
Abstract:
This article presents the process of change for innovation in the Thai public sector in order to create higher client satisfaction. Change management should concern the potentiality of the change agent or leader, the long-term vision or policy (political side) of the organization, the communication within the organization, suitable organizational culture and structure, preparedness of the personnel, and the fitness of the reward system. Sustaining innovation creation is not sophisticated, as traditionally believed. A basic management principle of identifying clarified and motivating goals needs to be followed by creating support systems after implementation and by ensuring the stakeholders’ benefit, derived from the innovation projects. Finally, creating an amiable atmosphere among the practitioners, including effective evaluation and reward schemes, will support the innovation. However, none of these will ever take place unless support is gained from the leaders of those organizations, and from the staff and clients involved also as well.Keywords: change management, client satisfaction, innovation management, Thai public sector
Procedia PDF Downloads 2529820 The Leadership Criterion: Challenges in Pursuing Excellence in the Jordanian Public Sector
Authors: Shaker Aladwan, Paul Forrester
Abstract:
This paper explores the challenges that face leaders when implementing business excellence programmes in the Jordanian public sector. The study adopted a content analysis approach to analyse the excellence assessment reports that have been produced by the King Abdullah II Centre for Excellence (KACE). The sample comprises ten public organisations which have participated in the King Abdullah Award for Excellence (KAA) more than once and acknowledge in their reports that they have failed to achieve satisfactory results. The key challenges to the implementation of leadership criteria in the public sector in Jordan were found to be poor strategic planning, lack of employee empowerment, weaknesses in benchmarking performance, a lack of financial resources, poor integration and coordination, and poor measurement system: This study proposes a conceptual model for the as assessment of challenges that face managers when seeking to implement excellence in leadership in the Jordanian public sector. Theoretically, this paper fills context gaps in the excellence literature in general and organisational excellence in the public sector in particular. Leadership challenges in the public sector are generally widely studied, but it is important to gain a better understanding of how these challenges can be overcome. In comparison to many existing studies, this research has provided specific and detailed insights these organisational excellence challenges in the public sector and provides a conceptual model for use by other researchers into the future.Keywords: leadership criterion, organisational excellence, challenges, quality awards, public sector, Jordan
Procedia PDF Downloads 3909819 Implementation of Building Information Modeling in Turkish Government Sector Projects
Authors: Mohammad Lemar Zalmai, Mustafa Nabi Kocakaya, Cemil Akcay, Ekrem Manisali
Abstract:
In recent years, the Building Information Modeling (BIM) approach has been developed expeditiously. As people see the benefits of this approach, it has begun to be used widely in construction projects and some countries made it mandatory to get more benefits from it. To promote the implementation of BIM in construction projects, it will be helpful to get some relevant information from surveys and interviews. The purpose of this study is to research the current adoption and implementation of BIM in public projects in Turkey. This study specified the challenges of BIM implementation in Turkey and proposed some solutions to overcome them. In this context, the challenges for BIM implementation and the factors that affect the BIM usage are determined based on previous academic researches and expert opinions by conducting interviews and questionnaire surveys. Several methods are used to process information in order to obtain weights of different factors to make BIM widespread in Turkey. This study concluded interviews' and questionnaire surveys' outcomes and proposed some suggestions to promote the implementation of BIM in Turkey. We believe research findings will be a good reference for boosting BIM implementation in Turkey.Keywords: building information modelling, BIM implementations, Turkish construction industry, Turkish government sector projects
Procedia PDF Downloads 138