8602 Perception of Agricultural Extension Agents of Private Sector Participation in Extension Services in Ogun State, Nigeria

Authors: E. O. Fakoya, B. G. Abiona, J. O. Soetan

Abstract:

The study determined Perception of Agricultural Extension Agents of Private Sector Participation in Extension Services in Ogun State, Nigeria. Data were collected from 80 respondents with a well-structured questionnaire. The result of the findings showed that there is need for private sector participation in extension services (=4.313), private extension services has facilities than public extension services (=4.97). Private sector participated in extension services by: giving of loans and credits to farmers (=4.50). Major constraints identified by the respondents were: Transportation problem (=2.88) and lack of fund (=2.77) A significant relationship (P<0.05) exists between factors affecting public extension services(r = 0.641, p = 0.00) and private sector participation in extension services. It was concluded from the study that there is need for private sector to participate in extension service in order to improve productivity of the farmers.

Keywords: agricultural extension, extension agent, private sector, perception

Procedia PDF Downloads 561
8601 Trends of Public-Private Partnership Infrastructure in Thailand

Authors: Wasaporn Techapeeraparnich

Abstract:

Bringing private investor involving in providing public infrastructure have been increasingly used worldwide, and there is no exception for developing countries like Thailand. Recently, there is a huge investment opportunity for public-private partnership (PPP) in Thailand, especially in the transportation sector. This paper analyses the development of the PPP since the early beginning of PPP in different service sectors. It also summarizes the development of PPP and its application in terms of usage, opportunities and trends particularly in the transport sector. The results are aimed to draw some lessons learned for future development.

Keywords: case study, public-private partnership, transportation, Thailand

Procedia PDF Downloads 412
8600 The Nature of Problems Faced by Organization in Recruitment: A Comparative Analysis between Public and Private Sector of Russia

Authors: Zarema Urustamova, Chunsheng Shi, Ghulam Mujtaba Kayani 

Abstract:

This research paper helps to understand the comparative analysis of recruitment problems which majorly faced by HRD of Public/Semi-Govt. and private sectors of Russia. The natures of different recruitment problems faced by HRD are different in both sector of Russia. Recruitment is one of very critical and important decision taken by HR department and some recruitment problems are highly faced by HR department of public/semi Govt. sector but are not major problems for private sector. Moreover, some problems are majorly influence in private sector but are not major problems in public/semi-govt. sector of Russia in recruitment. It is also identified that some recruitment problems are majorly affect in recruitment in both sectors. This paper helps to understand the recruitment problems faced by HR department while recruiting the new employee in both sectors. This paper also identified that “environment” and “prejudice” in public sector have higher affect and considered as a major problems in employee recruitment and “reference”, “selection standards” are considered as a least affecting problems of recruitment in public sector. Further, in private sector, “prejudice” and “culture” are major issues and “selection standards” and “reference” is considered as least affecting recruitment problems in private sector of Russia. So, HR department will be able to hire right person on right time, and it is possible when different HR departments focus to overcome these recruitment problems more efficiently and effectively.

Keywords: Govt. /Semi-Govt. vs. private sector, HR department, recruitment problems, Russia

Procedia PDF Downloads 361
8599 Barriers to Job Localization Policy in Private Sector: Case Study from Oman

Authors: Yahya Al Nahdi

Abstract:

Even though efforts to increase the participation of nationals in the workforce have been in place for more than a decade in the Sultanate of Oman, the results are not impressive. Citizens’ workforce participation – it is argued in the literature – is hindered by institutional, as well as attitudinal concerns. The purpose of this study was to determine barriers to Omanization (employment of Omani nationals) in the private sector as perceived by the senior managers in government and private sector. Data were collected predominantly through in-depth, semi-structured interviews with managers who directly deal with Omanization policies from both the public and private sector. Results from the data analysis have shown that the majority of participants acknowledged a work preference in the movement (public sector). The private sector employees' compensation and benefits package was perceived to be less attractive than that offered in the government (public sector). The negative perceptions (stereotypes) shared by expatriates regarding work attitudes and competencies of citizens in the local labour market was also overwhelmingly perceived as a major hindrance. Furthermore, institutional issues such as, ineffectiveness of rules and regulation regarding Omanization, inappropriate quota system and lack of public awareness towards private sector’s jobs, are also perceived problematic to successful Omanization. Finally, results from the data analysis were used in recommending strategies for potential consideration in the pursuit of a successful Omanization programme.

Keywords: localization, job security, labour force structure, Omanization, private sector, public sector

Procedia PDF Downloads 379
8598 Non-Cooperative Game Theory Approach for Ensuring Community Satisfaction on Public-Private Partnership Projects

Authors: Jason Salim, Zhouyang Lu

Abstract:

Private sector involvement in Public Private Partnership (PPP) projects may raise public suspicion, as PPP is often mistaken as merely a partnership between private and government agencies without consideration for greater “public” (community). This public marginalization is crucial to be dealt with because undermining opinion of majority may cause problems such as protests and/ or low demand. Game theory approach applied in this paper shows that probability of public acceptance towards a project is affected by overall public’s perception on Private sectors’ possible profit accumulation from the project. On the contrary, goodwill of the government and private coalition alone is not enough to minimize the probability of public opposition towards a PPP project. Additionally, the threat of loss or damage raised from public opposition does not affect the profit-maximization behavior of Private sectors.

Keywords: community satisfaction, game theory, non-cooperative, PPP, public policy

Procedia PDF Downloads 676
8597 Conflicts of Interest in the Private Sector and the Significance of the Public Interest Test

Authors: Opemiposi Adegbulu

Abstract:

Conflicts of interest is an elusive, diverse and engaging subject, a cross-cutting problem of governance; all levels of governance, ranging from local to global, public to corporate or financial sectors. In all these areas, its mismanagement could lead to the distortion of decision-making processes, corrosion of trust and the weakening of administration. According to Professor Peters, an expert in the area, conflict of interest, a problem at the root of many scandals has “become a pervasive ethical concern in our professional, organisational, and political life”. Conflicts of interest corrode trust, and like in the public sector, trust is mandatory for the market, consumers/clients, shareholders and other stakeholders in the private sector. However, conflicts of interest in the private sector are distinct and must be treated in like manner when regulatory efforts are made to address them. The research looks at identifying conflicts of interest in the private sector and differentiating them from those in the public sector. The public interest is submitted as a criterion which allows for such differentiation. This is significant because it would for the use of tailor-made or sector-specific approaches to addressing this complex issue. This is conducted through extensive review of literature and theories on the definition of conflicts of interest. This study will employ theoretical, doctrinal and comparative methods. The nature of conflicts of interest in the private sector will be explored, through an analysis of the public sector where the notion of conflicts of interest appears more clearly identified, reasons, why they are of business ethics concern, will be advanced, and then, once again, looking at public sector solutions and other solutions, the study will identify ways of mitigating and managing conflicts in the private sector. An exploration of public sector conflicts of interest and solutions will be carried out because the typologies of conflicts of interest in both sectors appear very similar at the core and thus, lessons can be learnt with regards to the management of these issues in the private sector. Conflicts of interest corrode trust, and like in the public sector, trust is mandatory for the market, consumers/clients, shareholders and other stakeholders in the private sector. This research will then focus on some specific challenges to understanding and identifying conflicts of interest in the private sector; origin, diverging theories, the psychological barrier to the definition, similarities with public sector conflicts of interest due to the notions of corrosion of trust, ‘being in a particular kind of situation,’ etc. The notion of public interest will be submitted as a key element at the heart of the distinction between public sector and private sector conflicts of interests. It will then be proposed that the appreciation of the notion of conflicts of interest differ according to sector, country to country, based on the public interest test, using the United Kingdom (UK), the United States of America (US), France and the Philippines as illustrations.

Keywords: conflicts of interest, corporate governance, global governance, public interest

Procedia PDF Downloads 375
8596 Delay in the Diagnosis of Tuberculosis and Initiation of TB Treatment in the Private and Public Health Sectors, Udaipur District, Rajasthan, India, Nov 2013

Authors: Yogita Tulsian, R. S. Gupta, K. F. Laserson

Abstract:

Background: Delays in the diagnosis and treatment of TB facilitates disease transmission in the community, so we conducted a study to evaluate the burden of and risk factors for delay in TB diagnosis and initiation of TB treatment among patients in the private and public sectors in Udaipur district, Rajasthan, India. Methods: A retrospective cohort study was conducted among 100 new sputum-positive TB. Patients were interviewed in the intensive phase of treatment September 2013-November 2013 Long total diagnosis delay (TDD) was defined as a time interval between first symptom to confirmed diagnosis > 30 days. Long health treatment delay (HTD) was defined as a time interval between confirmed diagnosis to treatment initiation > 7 days. Results: We observed a median TDD of 55 days (range: 7-136 days) in the public sector and of 92 days (11-380 days) in the private sector. Long TDD in the private sector was significantly associated with middle-higher socio-economic status (Risk Ratio (RR): 2;95% CI: 1.3-3). The reasons reported from the private sector for long TDD were suspect TB patients not advised for sputum examination (RR: 42; 95% CI:2.6-660), practise of self-medication (RR: 17.4; 95% CI: 1.1-267), or lack of awareness (RR: 9.7;95% CI: 0.6-145). The median HTD in the public sector was 3 days (range: 0-14 days), and in the private sector, 2 days (range: 0-11 days) (non-significant difference). Conclusions: Long TDD in private sector may be improved through sputum referral for all suspect TB cases and better education to all regarding TB.

Keywords: diagnosis delay, treatment delay, privatesector, public sector

Procedia PDF Downloads 402
8595 The Sectoral Differences in the Use of Construction Incentive

Authors: Qiuwen Ma, Sai On Cheung

Abstract:

Incentive contracting has been developed to push the agent team for extra effort. Generally, there are three types of incentive arrangement, namely incentive/penalty for super performance/underperformance, risk/reward sharing and future business opportunities. It is found that there are significant differences in the use of incentive arrangement in private and public projects. In Hong Kong, very few public projects have used future business as incentivizer whereas private developers often signal repeated business coupled with heavy penalty. This study was conducted to identify various attributes affecting the use of I/D in both private and public engineering sectors of Hong Kong. The diverging preferences were unveiled with reference to a literature review and semi-structured interviews with industry experts. The findings reveal the public/private sectors would consider the implementation issues regarding the various performance targets. The most deterministic factor for the public sector is about accountability. The private sector is in general skeptical about the need to provide extra for the contractors for what they have already contracted to perform.

Keywords: construction incentive, public/private projects, semi-structured interview, hong kong

Procedia PDF Downloads 74
8594 Assets Misappropriation in the Malaysian Public and Private Sectors

Authors: I. K. Norziaton, M. D. Ridhuan, A. N. Nur Adura

Abstract:

Assets misappropriation is becoming a major concern in organizations. Over the years, the Malaysian Auditor General has reported high occurrences of assets misappropriation at the federal, state and even local governments. It is surprising that assets misappropriation is not the only major concern in the public sector but it has also indicates a common sight in private sector. The current situation is rather disconcerting because employees are accountable to perform their jobs at the interest of the organizations. Various researches in the past has found that the incidence of assets misappropriation occurs when employees used the official vehicles, internet connection, computers, stationery and facilities for personal and family benefits. The issue of assets misappropriation has continue to be a major concern for organizations and its impact on the reputation and financial health can be enormous. Even though the issue seems to be trivial, yet, if it is left untreated, the symptoms will become an incurable disease that it will cause major leakages to the organizations. Hence, this paper highlights the common practices of assets misappropriation in public and private sectors. It also discusses why the acts of assets misappropriation occurs. Using the data through questionnaire survey, a total of 250 questionnaires were distributed to the private and public sectors employees. However 173 (69.2%) were returned and usable. This paper concludes that it is vital to promote awareness to the public and private sectors employees on issues of assets misappropriation. Assets misappropriation could have been avoided provided that the officers in charge are more vigilant, competent and practice high level of integrity in discharging their responsibilities towards the organizations.

Keywords: assets misappropriation, fraud, public sector, private sector

Procedia PDF Downloads 175
8593 Infrastructure Investment Law Formulation to Ensure Low Transaction Cost at Policy Level: Case Study of Public Private Partnership Project at the Ministry of Public Works and Housing of the Republic of Indonesia

Authors: Yolanda Indah Permatasari, Sudarsono Hardjosoekarto

Abstract:

Public private partnership (PPP) scheme was considered as an alternative source of funding for infrastructure provision. However, the performance of PPP scheme and interest of private sector to participate in the provision of infrastructure was still practically low. This phenomenon motivates the research to reconstruct the form of collaborative governance at the policy level from the perspective of transaction cost of the PPP scheme. Soft-system methodology (SSM)-based action research was used as this research methodology. The result of this study concludes that the emergence of transaction cost sources at the policy level is caused by the absence of a law that governs infrastructure investment, especially the implementation of PPP scheme. This absence is causing the imbalance in risk allocation and risk mitigation between the public and private sector. Thus, this research recommended the formulation of infrastructure investment law that aims to minimize asymmetry information, to anticipate the principal-principal problems, and to provide legal basis that ensures risk certainty and guarantee fair risk allocation between public and private sector.

Keywords: public governance, public private partnership, soft system methodology, transaction cost

Procedia PDF Downloads 121
8592 Time Management in the Public Sector in Nigeria

Authors: Sunny Ewankhiwimen Aigbomian

Abstract:

Time, is a scarce resource and in everything we do, time is required to accomplish any given task. The need for this presentation is predicated on the way majority of Nigerian especially in the public sector operators see “Time Management”. Time as resources cannot be regained if lost or managed badly. As a significant aspect of human life it should be handled with diligence and utmost seriousness if the public sector is to function as a coordinated entity. In our homes, private life and offices, we schedule different things to ensure that some things do not go the unexpected. When it comes to service delivery on the part of government, it ought to be more serious because government is all about effect and efficient service delivery and “Time” is a significant variable necessary to successful accomplishment. The need for Nigerian government to re-examine time management in her public sector with a view of repositioning the sector to be able to compete well with other public sectors in the world. The peculiarity of Time management in Public Sector in Nigerian context as examined and some useful recommendations of immerse assistance proffered.

Keywords: Nigeria, public sector, time management, task

Procedia PDF Downloads 75
8591 Digitalized Public Sector Practices: Opportunities for Open Innovation in Rwanda

Authors: Reem Abou Refaie, Christoph Meinel

Abstract:

The paper explores the impact of the COVID-19 crisis on the internal as well as external digitalized work practices of public service providers as part of a Public-Private Partnership Model. It focuses on the effect of uncertainty on generating Open Innovation practices. Our inquiry relies on semi-structured interviews (n=14) from a case study of Rwanda’s Public Service Delivery System in the context of research cooperation with IremboGov, the country’s One-Stop-Shop Platform for public services. It presents four propositions on harnessing opportunities for OI in the context of the public sector beyond the pandemic response. Practitioners can find characterizations of OI opportunities and gain insights on fostering OI in Public Sector Organizations.

Keywords: open innovation, digital transformation, public sector, Rwanda

Procedia PDF Downloads 111
8590 Price Compensation Mechanism with Unmet Demand for Public-Private Partnership Projects

Authors: Zhuo Feng, Ying Gao

Abstract:

Public-private partnership (PPP), as an innovative way to provide infrastructures by the private sector, is being widely used throughout the world. Compared with the traditional mode, PPP emerges largely for merits of relieving public budget constraint and improving infrastructure supply efficiency by involving private funds. However, PPP projects are characterized by large scale, high investment, long payback period, and long concession period. These characteristics make PPP projects full of risks. One of the most important risks faced by the private sector is demand risk because many factors affect the real demand. If the real demand is far lower than the forecasting demand, the private sector will be got into big trouble because operating revenue is the main means for the private sector to recoup the investment and obtain profit. Therefore, it is important to study how the government compensates the private sector when the demand risk occurs in order to achieve Pareto-improvement. This research focuses on price compensation mechanism, an ex-post compensation mechanism, and analyzes, by mathematical modeling, the impact of price compensation mechanism on payoff of the private sector and consumer surplus for PPP toll road projects. This research first investigates whether or not price compensation mechanisms can obtain Pareto-improvement and, if so, then explores boundary conditions for this mechanism. The research results show that price compensation mechanism can realize Pareto-improvement under certain conditions. Especially, to make the price compensation mechanism accomplish Pareto-improvement, renegotiation costs of the government and the private sector should be lower than a certain threshold which is determined by marginal operating cost and distortionary cost of the tax. In addition, the compensation percentage should match with the price cut of the private investor when demand drops. This research aims to provide theoretical support for the government when determining compensation scope under the price compensation mechanism. Moreover, some policy implications can also be drawn from the analysis for better risk-sharing and sustainability of PPP projects.

Keywords: infrastructure, price compensation mechanism, public-private partnership, renegotiation

Procedia PDF Downloads 158
8589 Cost Effectiveness of Transcatheter Aortic Valve Replacement vs Surgical Aortic Valve Replacement in a Low-Middle Income Country

Authors: Vasuki Rayapati, Bhanu Duggal

Abstract:

Trans catheter aortic valve replacement (TAVR) is the recommended treatment over surgical aortic valve replacement (SAVR) for high-risk groups, patients >75 years of age with severe symptomatic Aortic stenosis (AS). In high income countries TAVR is more cost effective because of – i) Reduction in total length of stay including less number of days in ICU ii) Non-procedural costs like cost of general anaesthesia are higher for SAVR. In India, there are two kinds of hospitals – Public and Private. Most patients visit public sector hospitals than private sector hospitals. In a LMIC like India, especially in the Public health sector cost of TAVR is prohibitive. In a small study from three (public) hospitals in India, it was envisaged that cost of TAVR should decrease at least by 2/3 to be a cost effective option in Public health sector for severe AS.

Keywords: cost effectiveness, TAVR vs SAVR, LMIC, HTA

Procedia PDF Downloads 88
8588 Private and Public Health Sector Difference on Client Satisfaction: Results from Secondary Data Analysis in Sindh, Pakistan

Authors: Wajiha Javed, Arsalan Jabbar, Nelofer Mehboob, Muhammad Tafseer, Zahid Memon

Abstract:

Introduction: Researchers globally have strived to explore diverse factors that augment the continuation and uptake of family planning methods. Clients’ satisfaction is one of the core determinants facilitating continuation of family planning methods. There is a major debate yet scanty evidence to contrast public and private sectors with respect to client satisfaction. The objective of this study is to compare quality-of-care provided by public and private sectors of Pakistan through a client satisfaction lens. Methods: We used Pakistan Demographic Heath Survey 2012-13 dataset (Sindh province) on a total of 3133 Married Women of Reproductive Age (MWRA) aged 15-49 years. Source of family planning (public/private sector) was the main exposure variable. Outcome variable was client satisfaction judged by ten different dimensions of client satisfaction. Means and standard deviations were calculated for continuous variable while for categorical variable frequencies and percentages were computed. For univariate analysis, Chi-square/Fisher Exact test was used to find an association between clients’ satisfaction in public and private sectors. Ten different multivariate models were made. Variables were checked for multi-collinearity, confounding, and interaction, and then advanced logistic regression was used to explore the relationship between client satisfaction and dependent outcome after adjusting for all known confounding factors and results are presented as OR and AOR (95% CI). Results: Multivariate analyses showed that clients were less satisfied in contraceptive provision from private sector as compared to public sector (AOR 0.92,95% CI 0.63-1.68) even though the result was not statistically significant. Clients were more satisfied from private sector as compared to the public sector with respect to other determinants of quality-of-care (follow-up care (AOR 3.29, 95% CI 1.95-5.55), infection prevention (AOR 2.41, 95% CI 1.60-3.62), counseling services (AOR 2.01, 95% CI 1.27-3.18, timely treatment (AOR 3.37, 95% CI 2.20-5.15), attitude of staff (AOR 2.23, 95% CI 1.50-3.33), punctuality of staff (AOR 2.28, 95% CI 1.92-4.13), timely referring (AOR 2.34, 95% CI 1.63-3.35), staff cooperation (AOR 1.75, 95% CI 1.22-2.51) and complications handling (AOR 2.27, 95% CI 1.56-3.29).

Keywords: client satisfaction, family planning, public private partnership, quality of care

Procedia PDF Downloads 402
8587 Challenges and Opportunities for Implementing Integrated Project Delivery Method in Public Sector Construction

Authors: Ahsan Ahmed, Ming Lu, Syed Zaidi, Farhan Khan

Abstract:

The Integrated Project Delivery (IPD) method has been proposed as the solution to tackle complexity and fragmentation in the real world while addressing the construction industry’s growing needs for productivity and sustainability. Although the private sector has taken the initiative in implementing IPD and taken advantage of new technology such as building information modeling (BIM) in delivering projects, IPD remains less known and rarely used in public sector construction. The focus of this paper is set on the use of IPD in projects in public sector, which is potentially complemented by the use of analytical functionalities for workface planning and construction oriented design enabled by recent research advances in BIM. Experiences and lessons learned from implementing IPD in the private sector and in BIM-based construction automation research would play a vital role in reducing barriers and eliminating issues in connection with project delivery in the public sector. The paper elaborates issues challenges, contractual relationships and the interactions throughout the planning, design and construction phases in the context of implementing IPD on construction projects in the public sector. A slab construction case is used as a ‘sandbox’ model to elaborate (1) the ideal way of communication, integration, and collaboration among all the parties involved in project delivery in planning and (2) the execution of projects by using IDP principles and optimization, simulation analyses.

Keywords: integrated project delivery, IPD, building information modeling, BIM

Procedia PDF Downloads 172
8586 "Good" Discretion Among Private Sector Street Level Bureaucrats

Authors: Anna K. Wood, Terri Friedline

Abstract:

In April and May 2020, the private banking industry approved over 1.7 million emergency small business loans, totaling over $650 billion in federal relief funds as part of the Paycheck Protection Program (PPP). Since the program’s rollout, the extensive evidence of discriminatory lending and misuse of funds has been revealed by investigative journalism and academic studies. This study is based on 41 interviews with frontline banking industry professionals conducted during the days and weeks of the PPP rollout, presenting a real-time narrative of the program rollout through the eyes of those in the role of a street-level bureaucrat. We present two themes from this data about the conditions under which these frontline workers experienced the PPP: Exigent Timelines and Defaulting to Existing Workplace Norms and Practices. We analyze these themes using literature on street-level organizations, bureaucratic discretion, and the differences between public and private sector logic. The results of this study present new directions for theorizing sector-level differences in street-level bureaucratic discretion in the context of mixed-sector collaboration on public service delivery, particularly under conditions of crisis and urgency.

Keywords: street level bureaucracy, social policy, bureaucratic discretion, public private partnerships

Procedia PDF Downloads 86
8585 Assessing the Role of Water Research and Development Investment towards Water Security in South Africa: During the Five Years Period (2009/10 - 2013/14)

Authors: Hlamulo Makelane

Abstract:

The study aims at providing new insights regarding research and development (R&D) public and private activities based on the national R&D survey of the past five years. The main question of the study is what role does water R&D plays on water security; to then analyze what lessons could be extracted to improve the security of water through R&D. In particular, this work concentrates on three main aspects of R&D investments: (i) the level of expenditures, (ii) the sources of funding related to water R&D, and (iii) the personnel working in the field, both for the public and private sectors. The nonlinear regression approached will be used for data analysis based on secondary data gathered from the South African nation R&D survey conducted annually by the Centre for science, technology and innovation indicators (CeSTII).

Keywords: water, R&D, investment, public sector, private sector

Procedia PDF Downloads 215
8584 Does Citizens’ Involvement Always Improve Outcomes: Procedures, Incentives and Comparative Advantages of Public and Private Law Enforcement

Authors: Avdasheva Svetlanaa, Kryuchkova Polinab

Abstract:

Comparative social efficiency of private and public enforcement of law is debated. This question is not of academic interest only, it is also important for the development of the legal system and regulations. Generally, involvement of ‘common citizens’ in public law enforcement is considered to be beneficial, while involvement of interest groups representatives is not. Institutional economics as well as law and economics consider the difference between public and private enforcement to be rather mechanical. Actions of bureaucrats in government agencies are assumed to be driven by the incentives linked to social welfare (or other indicator of public interest) and their own benefits. In contrast, actions of participants in private enforcement are driven by their private benefits. However administrative law enforcement may be designed in such a way that it would become driven mainly by individual incentives of alleged victims. We refer to this system as reactive public enforcement. Citizens may prefer using reactive public enforcement even if private enforcement is available. However replacement of public enforcement by reactive version of public enforcement negatively affects deterrence and reduces social welfare. We illustrate the problem of private vs pure public and private vs reactive public enforcement models with the examples of three legislation subsystems in Russia – labor law, consumer protection law and competition law. While development of private enforcement instead of public (especially in reactive public model) is desirable, replacement of both public and private enforcement by reactive model is definitely not.

Keywords: public enforcement, private complaints, legal errors, competition protection, labor law, competition law, russia

Procedia PDF Downloads 473
8583 Accountability Issues in Nigeria

Authors: Victoria Adikpe

Abstract:

The ills of the Nigerian public sector have been identified at various fora to include lack of financial accountability and poor reporting of government performance. With the enthronement of democracy, citizens’ expectations from the government are drifting from the mere provision of public services to efficiency and accountability. One of the major challenges to achieving accountability in Nigeria is the capability of the cash basis of accounting to meet the reporting requirements of policies and programmes of the government. This paper discussed the growing trend in the debate about the adoption of private sector financial management processes in the public sector as part of the public sector reform programmes. The paper does not claim the ultimate superiority of accrual over cash accounting but shows how it will help to further strengthen the quality of government accounting and reporting.

Keywords: cash accounting, accrual accounting, accountability, reporting

Procedia PDF Downloads 322
8582 Wage Differentials in Pakistan by Focusing on Wage Differentials in Public and Private Sectors, Formal and Informal Sectors, and Major Occupational Groups

Authors: Asghar Ali, Narjis Khatoon

Abstract:

This study focuses on the presence of wage differentials in Pakistan and also on the determinants that originate it. Since there are a smaller number of studies that are conducted on this topic in Pakistan, the current study aims to contribute in bridging the existing gap in this particular research genre. Hence, this study not only generates the desired results specific focus but it also contributes to the overall empirical work on the Pakistan economy. The preceding works which have been done to research wage determinants and wage differentials have used numerous different theories and approaches to reach their goals. The current study, in order to analyze the determinants of wage differentials in the developing economy, deals with the study of a number of such theories and approaches that are supposed as being beneficial for the purpose. This study undertakes the explanation of wage differentials in Pakistan by focusing on wage differentials in public and private sectors, formal and informal sectors, and major occupational groups. The study uses 'Wage Theory' to examine wage differentials among male and female employees in public and private sectors on varied levels of working conditions. This study also uses 'Segmented Labor Market Theory' to determine the wage differential in both public and private sectors, formal and informal, and major occupational groups in Pakistan. So the author has used various econometric techniques in order to explain and test these theories and to find out the required results. This study has employed seven different cross-sectional Labour Force Surveys for the time period between 2006-07 to 2012-13. Gender equality is not only a policy reform agenda for developing countries but also an important goal of Millennium Development Goals. This study investigates the nexus between wage inequality and economic growth and detects co-integration between gender wage differential and economic growth using ARDL bound test. It is confirmed from the empirical results that there exists long-run relationship between economic growth and wage differential. Our study indicated that half of the total female employees from fourteen major cities of Pakistan were employed in the public sector. Out of total female employees in private sector, 66 percent are employed in the formal sector, and 33 percent are working in the informal sector. Results also indicated that both men and women were paid more in the public sector compared to the private sector counterparts. Among the total female employees, only 9 percent had received any formal training, 52% were married and average years of schooling were 11 years. Further, our findings regarding wage differential between genders indicate that wage gap is lower in public sector as compared to private sector. In proportion, gender wage ratio was found to be 0.96, 0.62 and 0.66 in public, formal private and informal private sectors respectively. This suggests that in this case, private sector female employees with the same pay structure are compensated at a lower endowments rate as then public sector workers as compared to their counter parts.

Keywords: wage differentials, formal, informal, economic growth

Procedia PDF Downloads 174
8581 Balancing Rule of Law, Human Rights and Governance

Authors: Torkan Jabbariraad

Abstract:

This study explores the role of private regulation as a mode of governance that engages non-state actors in establishing and implementing rules or standards for public goods or services. It examines the various forms, functions, and effects of private regulation on the rule of law and human rights and considers the role and duties of public authorities in monitoring and supporting private regulation. It contends that private regulation should be regarded as a beneficial supplement to public regulation rather than a substitute or rival and that public authorities should find a balance between acknowledging the independence and variety of private actors and securing their accountability and legitimacy. It also recommends that applying the principles and values of good governance to private regulation can improve its quality and efficiency. The study relies on various sources and viewpoints from the literature on governance theory, public law, and human rights and suggests further research and discussion on the topic of private regulation and its consequences for society.

Keywords: private regulation, public authority, governance theory, rule of law, human rights

Procedia PDF Downloads 27
8580 Comparing Quality of Care in Family Planning Services in Primary Public and Private Health Care Facilities in Ethiopia

Authors: Gizachew Assefa Tessema, Mohammad Afzal Mahmood, Judith Streak Gomersall, Caroline O. Laurence

Abstract:

Introduction: Improving access to quality family planning services is the key to improving health of women and children. However, there is currently little evidence on the quality and scope of family planning services provided by private facilities, and this compares to the services provided in public facilities in Ethiopia. This is important, particularly in determining whether the government should further expand the roles of the private sector in the delivery of family planning facility. Methods: This study used the 2014 Ethiopian Services Provision Assessment Plus (ESPA+) survey dataset for comparing the structural aspects of quality of care in family planning services. The present analysis used a weighted sample of 1093 primary health care facilities (955 public and 138 private). This study employed logistic regression analysis to compare key structural variables between public and private facilities. While taking the structural variables as an outcome for comparison, the facility type (public vs private) were used as the key exposure of interest. Results: When comparing availability of basic amenities (infrastructure), public facilities were less likely to have functional cell phones (AOR=0.12; 95% CI: 0.07-0.21), and water supply (AOR=0.29; 95% CI: 0.15-0.58) than private facilities. However, public facilities were more likely to have staff available 24 hours in the facility (AOR=0.12; 95% CI: 0.07-0.21), providers having family planning related training in the past 24 months (AOR=4.4; 95% CI: 2.51, 7.64) and possessing guidelines/protocols (AOR= 3.1 95% CI: 1.87, 5.24) than private facilities. Moreover, comparing the availability of equipment, public facilities had higher odds of having pelvic model for IUD demonstration (AOR=2.60; 95% CI: 1.35, 5.01) and penile model for condom demonstration (AOR=2.51; 95% CI: 1.32, 4.78) than private facilities. Conclusion: The present study suggests that Ethiopian government needs to provide emphasis towards the private sector in terms of providing family planning guidelines and training on family planning services for their staff. It is also worthwhile for the public health facilities to allocate funding for improving the availability of basic amenities. Implications for policy and/ or practice: This study calls policy makers to design appropriate strategies in providing opportunities for training a health care providers working in private health facility.

Keywords: quality of care, family planning, public-private, Ethiopia

Procedia PDF Downloads 325
8579 Public and Private Spaces Producing Social Connectedness in Traditional Environment: A Study on Old Medina District of Casablanca

Authors: Asmaa Sokrat, Aykut Karaman

Abstract:

Public and private spaces are major components of the morphology of the city. This research aims to study the interactions between public and private domains in terms of urban space in Casablanca. The research focuses on a general vision of a socio-spatial issue. It plans to identify the public, private, and transition (semi-public, semi-private) spaces as the constituent of the urban space. Moreover, the study investigates the link between public and private spaces with the social dimensions. Additionally, the research argues that the public space is a place of social interaction; as a reflection, this interaction is the intersection between urban space and social connectedness. Besides, social interaction can be the key to distinguishing between the public and private spheres. The methodological approach of the research is based on the literature review and field study. The article is targeting a case study on the old Medina of Casablanca, from daily use of the public and private spaces, the urban tissue, and the urban space types. In conclusion, the research exhibits that a public space could influence the privacy of the residents of a local urban area; thus, this privacy is inverted on the social interaction. This social interaction is the link between the urban space and social connectedness. Hence, this equation affects the typology of the private space.

Keywords: public sphere, private sphere, social connectedness, old Medina of Casablanca

Procedia PDF Downloads 119
8578 Public Private Partnership for Infrastructure Projects: Mapping the Key Risks

Authors: Julinda Keçi

Abstract:

In many countries, governments have been promoting the involvement of private sector entities to enter into long-term agreements for the development and delivery of large infrastructure projects, with a focus on overcoming the limitations upon public fund of the traditional approach. The involvement of private sector through public-private partnerships (PPP) brings in new capital investments, value for money and additional risks to handle. Worldwide research studies have shown that an objective, systematic, reliable and user-oriented risk assessment process and an optimal allocation mechanism among different stakeholders is crucial to the successful completion. In this framework this paper, which is the first stage of a research study, aims to identify the main risks for the delivery of PPP projects. A review of cross-countries research projects and case studies was performed to map the key risks affecting PPP infrastructure delivery. The matrix of mapping offers a summary of the frequency of factors, clustered in eleven categories: Construction, Design, Economic, Legal, Market, Natural, Operation, Political, Project finance, Project selection and Relationship. Results will highlight the most critical risk factors, and will hopefully assist the project managers in directing the managerial attention in the further stages of risk allocation.

Keywords: construction, infrastructure, public private partnerships, risks

Procedia PDF Downloads 424
8577 Barrier to Implementing Public-Private Mix Approach for Tuberculosis Case Management in Nepal

Authors: R. K. Yadav, S. Baral, H. R. Paudel, R. Basnet

Abstract:

The Public-Private Mix (PPM) approach is a strategic initiative that involves engaging all private and public healthcare providers in the fight against tuberculosis using international healthcare standards. For tuberculosis control in Nepal, the PPM approach could be a milestone. This study aimed to explore the barriers to a public-private mix approach in the management of tuberculosis cases in Nepal. A total of 20 respondents participated in the study. Barriers to PPM were identified in the following three themes: 1) Obstacles related to TB case detection, 2) Obstacles related to patients, and 3) Obstacles related to the healthcare system. PPM implementation was challenged by following subthemes that included staff turnover, low private sector participation in workshops, a lack of training, poor recording and reporting, insufficient joint monitoring and supervision, poor financial benefit, lack of coordination and collaboration, and non-supportive TB-related policies and strategies. The study concludes that numerous barriers exist in the way of effective implementation of the PPM approach, including TB cases detection barriers such as knowledge of TB diagnosis and treatment, HW attitude, workload, patient-related barriers such as knowledge of TB, self-medication practice, stigma and discrimination, financial status, and health system-related barriers such as staff turnover and poor engagement of the private sector in workshops, training, recording, and re-evaluation. Government stakeholders must work together with private sector stakeholders to perform joint monitoring and supervision. Private practitioners should receive training and orientation, and presumptive TB patients should be given adequate time and counseling as well as motivation to visit a government health facility.

Keywords: barrier, tuberculosis, case finding, PPM, nepal

Procedia PDF Downloads 89
8576 New Public Management at Public Administration in Bangladesh: An Exploratory Study

Authors: Biback Das

Abstract:

New Public Management, a phenomenal tool, which is used to enforcing in public administration in different country’s to enhance the capacities. Since the 1980s, New Public Management (NPM) is primarily focusing to modernize the public sector. From the initial period, many developed countries such as UK, New Zealand, Australia, and the USA are applied in their administration to modernize. Almost 1990s, it has been applied in many developing countries. This study can describe the real situations of NPM based administration. Bangladesh Government has taken many projects to reform the public sector under NPM. Even many Development Agencies like UN, UNDP, World Bank, Asian Development Bank and so on, along with many developed countries also invested and prescribed to take NPM based reform that can to restructure the public sector so that it can maximize the efforts to provide the better service. This study examines using many factors that effects work on Public Administration in Bangladesh and also assessing its endeavor to adopt in it. Although Government has taken such initiatives to implement NPM originated reform, it’s not effectively been implemented to bring positive change about as per NPM objectives. This study mainly examines some initiatives in Bangladesh that have the influence of NPM as well as some drawbacks that can’t help the satisfaction of these initiatives. This article help to identify the efforts of many development agencies providing a fund to enhance the NPM based projects with their specific conditions that are prescribed by them helping to get fund. Therefore, to establish effective public management or to follow NPM model, Bangladesh need having an institutional framework, sound rule of law, proper structure, effective civil service system, appropriate checks, and balances to restructure the public sector help along with donor agencies ad implement in it. Bangladesh Government has applied its recent days to enhance the capabilities in its Public Administration. Moreover, this study mainly identifies how the designing strategies, program formulating, its implementation in various sector such as education, health sector etc. and how to reduce the backdrop the during problem by smooth functioning. This paper is also assessing the influence of many projects like PPP (Public-Private and Partnership) to work along with private organizations for smooth service delivery. Accordingly, this paper briefly reviews how it applies in a global context following the taken many initiatives and the consequences of Bangladesh context.

Keywords: new public management, capacity building, conditionalities, service delivery, public-private-partnership

Procedia PDF Downloads 120
8575 Challenges to Effective Public Sector Management in Developing Countries: The Networking and Communication Functions of Public Sector Managers in Nigeria and Ghana

Authors: Ethelbert Chinedu Nwokorie

Abstract:

This empirical study analyzes the impact of communication and networking functions of Nigerian and Ghanaian public sector managers’ on public sector effectiveness. The focus is on which of these management functions public sector managers’ in these countries perform most, why, how and how does it affect effectiveness of public sector organizations in the two countries. This qualitative analysis was done by interviewing middle and top level managers in some selected public sector organizations in the two countries on their practical experiences. Findings reveal that ineffectiveness of public sector organizations in Ghana persists because public sector managers perform more of networking functions to promote their individual carrier success and progression in their various organizations, rather than achieving the organizations goals and objectives. In Nigeria, though majority of the interviewed public sector managers perform more communication functions than networking, they do this mostly by treating files and correspondences, instead of face-to-face communication and interaction with employees’. Hence, they hardly relate directly with their employees’ to find out how they are performing their jobs, their challenges, where they are having problems and why. The findings and recommendations of this study will help in improving effectiveness, quality and service delivery in Nigerian and Ghanaian public sector organizations and beyond.

Keywords: effectiveness, communication, employees, management, networking, organization, public sector

Procedia PDF Downloads 437
8574 Empirical Study on the Organizational Role Stress and its Effect on Private and Government Sector Employees

Authors: Rashmi Shahu

Abstract:

This is a comparative study of the Organizational Role Stress among the private and government sector employees. There was no known similar kind of Organizational Role Stress study in the field area i.e. Nagpur city. Hence, in order to understand the ORS level pertaining to the government and private sector employees in various offices it was taken as the subject for this study. The Method used for this study was the incidental sampling method. The Organizational Role Scale containing 50 statements related to the ten different ORS areas was used for observations. All 60 participants were tested. The results of the study show that there was a significant difference in only one area of ORS i.e. Personal Inadequacy for the participants. The employees from the private sector showed higher Personal Inadequacy than the government employees. Rest of the ORS areas showed no significant difference meaning that the employees were well adjusted in the respective areas.

Keywords: organozational role stress, private sector, government sector, personal inadequacy

Procedia PDF Downloads 345
8573 An Exploratory Study on Challenges of Public Private Partnership Projects in Oman

Authors: Omar Amoudi, Mariya Khalid

Abstract:

The limitation of the public funds for the infrastructure projects and with the deterioration of international oil prices and the negative consequences on the economies of oil producing and exporting countries, Oman has encouraged the partnership between the public and private sectors. As the private sector has a role in planning, financing, designing, operating and the maintenance of the public services. There is no doubt that, the adoption of Public Private Partnership (PPP) strategy faces many challenges which might affect the project seriously if it is not overcome in earlier time. These challenges depend on the level of understanding of the strategy, the roles and regulations and the availability of resources as well. This research aims at identifying the challenges facing the PPP infrastructure projects in Oman based on the similar previous studies supported by questionnaire survey and semi structured interviews. It also seeks to discuss the rationale for adoption in Oman and uncover the current status of PPP strategy. The identified challenges were ranked according to the importance index of each challenge. After analysis of data, it has observed that, the main challenges facing PPPs projects in Oman are high participation cost, high projects cost and regulation changes. The PPP strategy has to be adopted well and with a high level of experience in order to ensure a successful implementation of PPP projects in Oman.

Keywords: public private partnership (PPP), challenges, infrastructure, Oman

Procedia PDF Downloads 278