Search results for: pubic procurement
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 179

Search results for: pubic procurement

119 The Effect of Applying the Electronic Supply System on the Performance of the Supply Chain in Health Organizations

Authors: Sameh S. Namnqani, Yaqoob Y. Abobakar, Ahmed M. Alsewehri, Khaled M. AlQethami

Abstract:

The main objective of this research is to know the impact of the application of the electronic supply system on the performance of the supply department of health organizations. To reach this goal, the study adopted independent variables to measure the dependent variable (performance of the supply department), namely: integration with suppliers, integration with intermediaries and distributors and knowledge of supply size, inventory, and demand. The study used the descriptive method and was aided by the questionnaire tool that was distributed to a sample of workers in the Supply Chain Management Department of King Abdullah Medical City. After the statistical analysis, the results showed that: The 70 sample members strongly agree with the (electronic integration with suppliers) axis with a p-value of 0.001, especially with regard to the following: Opening formal and informal communication channels between management and suppliers (Mean 4.59) and exchanging information with suppliers with transparency and clarity (Mean 4.50). It also clarified that the sample members agree on the axis of (electronic integration with brokers and distributors) with a p-value of 0.001 and this is represented in the following elements: Exchange of information between management, brokers and distributors with transparency, clarity (Mean 4.18) , and finding a close cooperation relationship between management, brokers and distributors (Mean 4.13). The results also indicated that the respondents agreed to some extent on the axis (knowledge of the size of supply, stock, and demand) with a p-value of 0.001. It also indicated that the respondents strongly agree with the existence of a relationship between electronic procurement and (the performance of the procurement department in health organizations) with a p-value of 0.001, which is represented in the following: transparency and clarity in dealing with suppliers and intermediaries to prevent fraud and manipulation (Mean 4.50) and reduce the costs of supplying the needs of the health organization (Mean 4.50). From the results, the study recommended several recommendations, the most important of which are: that health organizations work to increase the level of information sharing between them and suppliers in order to achieve the implementation of electronic procurement in the supply management of health organizations. Attention to using electronic data interchange methods and using modern programs that make supply management able to exchange information with brokers and distributors to find out the volume of supply, inventory, and demand. To know the volume of supply, inventory, and demand, it recommended the application of scientific methods of supply for storage. Take advantage of information technology, for example, electronic data exchange techniques and documents, where it can help in contact with suppliers, brokers, and distributors, and know the volume of supply, inventory, and demand, which contributes to improving the performance of the supply department in health organizations.

Keywords: healthcare supply chain, performance, electronic system, ERP

Procedia PDF Downloads 112
118 A Review of Critical Factors in Budgetary Financing of Public Infrastructure in Nigeria

Authors: Akintayo Opawole, Godwin O. Jagboro

Abstract:

Research efforts on infrastructure development in Nigeria had not provided adequate assessment of issues essential for policy response by the government to address infrastructure deficiency. One major gap existing in previous studies is the assessment of challenges facing the budgetary financing model. Based on a case study of Osun State in Southwestern Nigeria, factors affecting budgetary financing of public infrastructure were identified from literature and brainstorming. Respondents were: 6 architects, 4 quantity surveyors, 6 town planners, 5 estate surveyors, 4 builders, 21 engineers and 26 economists/accountants ranging from principal to director who have been involved in policy making process with respect to infrastructure development in the public service of Osun state. The identified variables were subjected to factor analysis. The Kaiser-Meyer-Olkin measure of sampling adequacy tests carried out (KMO, 0.785) showed that the data collected were adequate for the analysis and the Bartlett’s test of sphericity (0.000) showed the data upon which the analysis was carried out was reliable. Results showed that factors such as poor collaboration between the state and local government establishments, absence of credible database system and inadequate funding of maintenance were the most significant to infrastructure development in the State. Policy responses to address challenges of infrastructure development in the state were identified to focus on creation of legal framework for liberation policy, enforcement of ‘due process’ in the procurement and establishment of monitoring system for project delivery.

Keywords: development, infrastructure, financing, procurement

Procedia PDF Downloads 389
117 Predictive Value of ¹⁸F-Fdg Accumulation in Visceral Fat Activity to Detect Colorectal Cancer Metastases

Authors: Amil Suleimanov, Aigul Saduakassova, Denis Vinnikov

Abstract:

Objective: To assess functional visceral fat (VAT) activity evaluated by ¹⁸F-fluorodeoxyglucose (¹⁸F-FDG) positron emission tomography/computed tomography (PET/CT) as a predictor of metastases in colorectal cancer (CRC). Materials and methods: We assessed 60 patients with histologically confirmed CRC who underwent 18F-FDG PET/CT after a surgical treatment and courses of chemotherapy. Age, histology, stage, and tumor grade were recorded. Functional VAT activity was measured by maximum standardized uptake value (SUVmax) using ¹⁸F-FDG PET/CT and tested as a predictor of later metastases in eight abdominal locations (RE – Epigastric Region, RLH – Left Hypochondriac Region, RRL – Right Lumbar Region, RU – Umbilical Region, RLL – Left Lumbar Region, RRI – Right Inguinal Region, RP – Hypogastric (Pubic) Region, RLI – Left Inguinal Region) and pelvic cavity (P) in the adjusted regression models. We also report the best areas under the curve (AUC) for SUVmax with the corresponding sensitivity (Se) and specificity (Sp). Results: In both adjusted for age regression models and ROC analysis, 18F-FDG accumulation in RLH (cutoff SUVmax 0.74; Se 75%; Sp 61%; AUC 0.668; p = 0.049), RU (cutoff SUVmax 0.78; Se 69%; Sp 61%; AUC 0.679; p = 0.035), RRL (cutoff SUVmax 1.05; Se 69%; Sp 77%; AUC 0.682; p = 0.032) and RRI (cutoff SUVmax 0.85; Se 63%; Sp 61%; AUC 0.672; p = 0.043) could predict later metastases in CRC patients, as opposed to age, sex, primary tumor location, tumor grade and histology. Conclusions: VAT SUVmax is significantly associated with later metastases in CRC patients and can be used as their predictor.

Keywords: ¹⁸F-FDG, PET/CT, colorectal cancer, predictive value

Procedia PDF Downloads 95
116 Dynamic Determination of Spare Engine Requirements for Air Fighters Integrating Feedback of Operational Information

Authors: Tae Bo Jeon

Abstract:

Korean air force is undertaking a big project to replace prevailing hundreds of old air fighters such as F-4, F-5, KF-16 etc. The task is to develop and produce domestic fighters equipped with 2 complete-type engines each. A large number of engines, however, will be purchased as products from a foreign engine maker. In addition to the fighters themselves, secure the proper number of spare engines serves a significant role in maintaining combat readiness and effectively managing the national defense budget due to high cost. In this paper, we presented a model dynamically updating spare engine requirements. Currently, the military administration purchases all the fighters, engines, and spare engines at acquisition stage and does not have additional procurement processes during the life cycle, 30-40 years. With the assumption that procurement procedure during the operational stage is established, our model starts from the initial estimate of spare engine requirements based on limited information. The model then performs military missions and repair/maintenance works when necessary. During operation, detailed field information - aircraft repair and test, engine repair, planned maintenance, administration time, transportation pipeline between base, field, and depot etc., - should be considered for actual engine requirements. At the end of each year, the performance measure is recorded and proceeds to next year when it shows higher the threshold set. Otherwise, additional engine(s) will be bought and added to the current system. We repeat the process for the life cycle period and compare the results. The proposed model is seen to generate far better results appropriately adding spare engines thus avoiding possible undesirable situations. Our model may well be applied to future air force military operations.

Keywords: DMSMS, operational availability, METRIC, PRS

Procedia PDF Downloads 148
115 Predictive Value of ¹⁸F-Fluorodeoxyglucose Accumulation in Visceral Fat Activity to Detect Epithelial Ovarian Cancer Metastases

Authors: A. F. Suleimanov, A. B. Saduakassova, V. S. Pokrovsky, D. V. Vinnikov

Abstract:

Relevance: Epithelial ovarian cancer (EOC) is the most lethal gynecological malignancy, with relapse occurring in about 70% of advanced cases with poor prognoses. The aim of the study was to evaluate functional visceral fat activity (VAT) evaluated by ¹⁸F-fluorodeoxyglucose (¹⁸F-FDG) positron emission tomography/computed tomography (PET/CT) as a predictor of metastases in epithelial ovarian cancer (EOC). Materials and methods: We assessed 53 patients with histologically confirmed EOC who underwent ¹⁸F-FDG PET/CT after a surgical treatment and courses of chemotherapy. Age, histology, stage, and tumor grade were recorded. Functional VAT activity was measured by maximum standardized uptake value (SUVₘₐₓ) using ¹⁸F-FDG PET/CT and tested as a predictor of later metastases in eight abdominal locations (RE – Epigastric Region, RLH – Left Hypochondriac Region, RRL – Right Lumbar Region, RU – Umbilical Region, RLL – Left Lumbar Region, RRI – Right Inguinal Region, RP – Hypogastric (Pubic) Region, RLI – Left Inguinal Region) and pelvic cavity (P) in the adjusted regression models. We also identified the best areas under the curve (AUC) for SUVₘₐₓ with the corresponding sensitivity (Se) and specificity (Sp). Results: In both adjusted-for regression models and ROC analysis, ¹⁸F-FDG accumulation in RE (cut-off SUVₘₐₓ 1.18; Se 64%; Sp 64%; AUC 0.669; p = 0.035) could predict later metastases in EOC patients, as opposed to age, sex, primary tumor location, tumor grade, and histology. Conclusions: VAT SUVₘₐₓ is significantly associated with later metastases in EOC patients and can be used as their predictor.

Keywords: ¹⁸F-FDG, PET/CT, EOC, predictive value

Procedia PDF Downloads 44
114 Financial Management Performance in Organization Profitability

Authors: Adekunle Olakunle Felix

Abstract:

Research will be based on the financial management importance within organization and its important role in non-economic and economic activities that provide us the useful information about the efficient procurement and utilization of finance in a profitable manner. Due to industrialization, financial management become a vital part of business and it is very important for the business concern that with a good financial management to earn maximum profit.

Keywords: management, business, profitability, organization, financial, efficiency

Procedia PDF Downloads 312
113 Estimate Robert Gordon University's Scope Three Emissions by Nearest Neighbor Analysis

Authors: Nayak Amar, Turner Naomi, Gobina Edward

Abstract:

The Scottish Higher Education Institutes must report their scope 1 & 2 emissions, whereas reporting scope 3 is optional. Scope 3 is indirect emissions which embodies a significant component of total carbon footprint and therefore it is important to record, measure and report it accurately. Robert Gordon University (RGU) reported only business travel, grid transmission and distribution, water supply and transport, and recycling scope 3 emissions. This study estimates the RGUs total scope 3 emissions by comparing it with a similar HEI in scale. The scope 3 emission reporting of sixteen Scottish HEI was studied. Glasgow Caledonian University was identified as the nearest neighbour by comparing its students' full time equivalent, staff full time equivalent, research-teaching split, budget, and foundation year. Apart from the peer, data was also collected from the Higher Education Statistics Agency database. RGU reported emissions from business travel, grid transmission and distribution, water supply, and transport and recycling. This study estimated RGUs scope 3 emissions from procurement, student-staff commute, and international student trip. The result showed that RGU covered only 11% of the scope 3 emissions. The major contributor to scope 3 emissions were procurement (48%), student commute (21%), international student trip (16%), and staff commute (4%). The estimated scope 3 emission was more than 14 times the reported emissions. This study has shown the relative importance of each scope 3 emissions source, which gives a guideline for the HEIs, on where to focus their attention to capture maximum scope 3 emissions. Moreover, it has demonstrated that it is possible to estimate the scope 3 emissions with limited data.

Keywords: HEI, university, emission calculations, scope 3 emissions, emissions reporting

Procedia PDF Downloads 61
112 Analysis of Farm Management Skills in Broiler Poultry Producers in Botswana

Authors: Som Pal Baliyan

Abstract:

The purpose of this quantitative study was to analyze farm management skills in broiler poultryproducers in Botswana. The study adopted a descriptive and correlation research design. The population of the study was the poultry farm operators who had been in broiler poultry farming at least for two years. Based on the information from literature, a questionnaire was constructed for data collection on seven areas of farm management skills namely; planning skills, accounting and financial management skills, production management skills, product procurement and marketing skills, decision making skills, risk management skills, and specific technical skills. The validity and reliability of the questionnaire were accomplished by a panel of experts and by calculating the Cronbach’s alpha coefficient, respectively. Data were collected through a survey of 60 randomly sampled poultry farm operators in Botswana. Data were analyzed through descriptive statistical tools whereby the level of farm management skills were determined by calculating means and standard deviations of the management skills among the broiler producers. The level of farm management skills in broilers producers was discussed. All the seven farm management skills were ranked based on their calculated means. The specific technical skills and risk management skills were the highest and the lowest ranked farm management skills, respectively.Findings revealed that the broiler producers had skills above the average level only in specific technical skills whereas the skill levels in the remaining six farm management skills under study were found below the average level. This prevailing low level of farm management skills can be justified asthe cause of failure or poor performance of the broiler poultry farms in Botswana. Therefore, in order to improve the efficiency and productivityin broiler production in the country, it was recommended that the broiler poultry producers should be adequately trained in areas of planning skills, financial management skills, production management skills, product procurement and marketing skills, decision making skills and risk management skills.

Keywords: poultry production, broiler production, management skills, levels of skills

Procedia PDF Downloads 376
111 Demand-Oriented Supplier Integration in Agile New Product Development Projects

Authors: Guenther Schuh, Stephan Schroeder, Marcel Faulhaber

Abstract:

Companies are facing an increasing pressure to innovate faster, cheaper and more radical in last years, due to shrinking product lifecycles and higher volatility of markets and customer demands. Especially established companies struggle meeting those demands. Thus, many producing companies are adapting their development processes to address this increasing pressure. One approach taken by many companies is the use of agile, highly iterative development processes to reduce development times and costs as well as to increase the fulfilled customer requirements and the realized level of innovation. At the same time decreasing depths of added value and increasing focus on core competencies as well as a growing product complexity result in a high dependency on suppliers and external development partners during the product development. Thus, a successful introduction of agile development methods into the development of physical products requires also a successful integration of the necessary external partners and suppliers into the new processes and procedures and an adaption of the organizational interfaces to external partners according to the new circumstances and requirements of agile development processes. For an effective and efficient product development, the design of customer-supplier-relationships should be demand-oriented. A significant influence on the required design has the characteristics of the procurement object. Examples therefore are the complexity of technical interfaces between supply object and final product or the importance of the supplied component for the major product functionalities. Thus, this paper presents an approach to derive general requirements on the design of supplier integration according to the characteristics of supply objects. First, therefore the most relevant evaluation criteria and characteristics have been identified based on a thorough literature review. Subsequently the resulting requirements on the design of the supplier integration were derived depending on the different possible values of these criteria.

Keywords: iterative development processes, agile new product development, procurement, supplier integration

Procedia PDF Downloads 149
110 The Legal Effects of Coronavirus (COVID-19) on the Implementation of Administrative Contracts in Saudi Arabia: Application of Emergency Circumstances Theory

Authors: Ali Obaid Alyami

Abstract:

In Saudi Arabia, the pandemic of Coronavirus (COVID-19) has been affecting administrative contracts in many different ways. Lots of planned projects were stopped temporarily or implemented partially. Many contractors have suffered financial struggles and the absence of manpower. These administrative contracts are governed by Government Tenders and Procurement Law (GTPL) which was issued by a royal decree in 2019. This law addresses some challenges that could be stumbling blocks in the way of implementing a contract. One significant challenge is emergency circumstances that occur during the implementation of an administrative contract. The law provides some solutions for this disruption, but these solutions may not compensate for the whole damages that contractors suffer. This study will use the doctrinal methodology to analyze the rules of law and their application to the research problem. Most importantly, the issue that arises in this research is the possibility of governmental entities’ consideration, in administrative contracts, of the pandemic Coronavirus (COVID-19) as an emergency circumstance. This study points out the conditions for applying the theory of emergency circumstances on administrative contracts in addition to the definition of the theory and analyzing its elements. The other significant question is the limits on governmental entities to make a change in an administrative contract to achieve contractual rebalancing. GPTL and its implementing regulation set the conditions and limits of contractual rebalancing. However, this study finds that although GTPL provides rules for contractual rebalancing, there are some other mechanisms that contractors may take to fully compensate for the damages. For instance, when the loss cannot be minimized by GTPL, contractors might file lawsuits before the administrative judiciary. The study concludes that GTPL is a very comprehensive law system that stipulates specific rules for contractual rebalance and treats the emergency circumstances that obstruct the performance of administrative contracts.

Keywords: administrative contracts, emergency circumstances, balance of contract, administrative judiciary, government tenders, procurement law

Procedia PDF Downloads 47
109 Multi-Criteria Bid/No Bid Decision Support Framework for General Contractors: A Case of Pakistan

Authors: Nida Iftikhar, Jamaluddin Thaheem, Bilal Iftikhar

Abstract:

In the construction industry, adequate and effective decision-making can mean the difference between success and failure. Bidding is the most important element of the construction business since it is a mean by which contractors obtain work. This is probably the only option for any contractor firm to sustain in the market and achieve its objective of earning the profits by winning tenders. The capability to select most appropriate ventures not only defines the success and wellbeing of contractor firms but also their survival and sustainability in the industry. The construction practitioners are usually on their own when it comes to deciding on bidding for a project or not. Usually, experience-based solutions are offered where a lot of subjectivity is involved. This research has been opted considering the local construction industry of Pakistan in order to examine the critical success factors from contractors’ perspective while making bidding decisions, listing and evaluating critical factors in order of their importance, categorization of these factors into decision support & decision oppose groups and to develop a framework to help contractors in the decision-making process. Literature review, questionnaires, and structured interviews are used for identification and quantification of factors affecting bid/no bid decision-making. Statistical methods of ranking analysis and analytical hierarchy process of multi-criteria decision-making method are used for analysis. It is found that profitability, need for work and financial health of client are the most decisive factors in bid/no bid decision-making while project size, project type, fulfilling the tender conditions imposed by the client and relationship, identity & reputation of the client are least impact factors in bid/no bid decision-making. Further, to verify the developed framework, case studies have been conducted to evaluate the bid/no bid decision-making in building procurement. This is the first of its nature study in the context of the local construction industry and recommends using a holistic decision-making framework for such business-critical deliberations.

Keywords: bidding, bid decision-making, construction procurement, contractor

Procedia PDF Downloads 156
108 The Origin Variability of the Obturator Artery

Authors: Halimah Al Hifzi, Waseem Al-Talalwah, Shorok Al Dorazi, Hassan Al Mousa, Zainab Al-Hashim, Roger Soames

Abstract:

The obturator artery is one branches of anterior division of the internal iliac artery. It passes on the lateral wall of pelvis to escape into thigh region via obturator foremen. Based on previous research studies, it found to be extremely variable in origin and course. It may arise from internal or external iliac artery. The current study includes 82 dissected specimens to investigate the origin of the obturator artery and explain the clinical importance. The obturator artery arises from the internal iliac artery in 75% either from its anterior or posterior division in 46.9% or 25% respectively. Further, it arises neither from the anterior nor posterior division of the internal iliac artery but it arises between them in 3.1%. In 25%, the obturator artery arises from the external iliac artery. In case of aneurysmectomy of posterior division, carries a high risk of insufficient of vascular supply for demand structures such as proximal adductors attachment and hip joint. Therefore, vascular surgeons have to pay attention to the posterior division being an origin of the obturator artery beside its usual three classical branches: superior gluteal, iliolumbar and lateral sacral arteries. Further, the obturator artery arising from the external iliac system is in great dangerous of laceration in case of anterior pelvic fracture. Therefore, it may lead to haemorrhagic shock threatening life.

Keywords: obturator artery, external iliac, internal iliac artery, anterior division, posterior division, superior gluteal, iliolumbar and lateral sacral, pubic fracture, aneurysm, shock

Procedia PDF Downloads 318
107 Cooperative Replenishment through Bidding

Authors: Behzad Hezarkhani, Greys Sosic

Abstract:

Collaborative purchasing and replenishment have proven to be beneficial in supply chain management. This talk addresses the situation where buyers, potentially in possession of private procurement channels, carry out cooperative purchasing by submitting their bids to a coordinator. The collaborative organization is faced with two basic decisions: (1) who will be allocated with the products, and (2) how much each party should pay. We discuss mechanisms that could achieve desirable outcomes in this settings with special attention to the strategic behavior of the buyers.

Keywords: supply chain management, group purchasing organizations, game theory, mechanism design

Procedia PDF Downloads 318
106 Learning Curve Effect on Materials Procurement Schedule of Multiple Sister Ships

Authors: Vijaya Dixit Aasheesh Dixit

Abstract:

Shipbuilding industry operates in Engineer Procure Construct (EPC) context. Product mix of a shipyard comprises of various types of ships like bulk carriers, tankers, barges, coast guard vessels, sub-marines etc. Each order is unique based on the type of ship and customized requirements, which are engineered into the product right from design stage. Thus, to execute every new project, a shipyard needs to upgrade its production expertise. As a result, over the long run, holistic learning occurs across different types of projects which contributes to the knowledge base of the shipyard. Simultaneously, in the short term, during execution of a project comprising of multiple sister ships, repetition of similar tasks leads to learning at activity level. This research aims to capture above learnings of a shipyard and incorporate learning curve effect in project scheduling and materials procurement to improve project performance. Extant literature provides support for the existence of such learnings in an organization. In shipbuilding, there are sequences of similar activities which are expected to exhibit learning curve behavior. For example, the nearly identical structural sub-blocks which are successively fabricated, erected, and outfitted with piping and electrical systems. Learning curve representation can model not only a decrease in mean completion time of an activity, but also a decrease in uncertainty of activity duration. Sister ships have similar material requirements. The same supplier base supplies materials for all the sister ships within a project. On one hand, this provides an opportunity to reduce transportation cost by batching the order quantities of multiple ships. On the other hand, it increases the inventory holding cost at shipyard and the risk of obsolescence. Further, due to learning curve effect the production scheduled of each consequent ship gets compressed. Thus, the material requirement schedule of every next ship differs from its previous ship. As more and more ships get constructed, compressed production schedules increase the possibility of batching the orders of sister ships. This work aims at integrating materials management with project scheduling of long duration projects for manufacturing of multiple sister ships. It incorporates the learning curve effect on progressively compressing material requirement schedules and addresses the above trade-off of transportation cost and inventory holding and shortage costs while satisfying budget constraints of various stages of the project. The activity durations and lead time of items are not crisp and are available in the form of probabilistic distribution. A Stochastic Mixed Integer Programming (SMIP) model is formulated which is solved using evolutionary algorithm. Its output provides ordering dates of items and degree of order batching for all types of items. Sensitivity analysis determines the threshold number of sister ships required in a project to leverage the advantage of learning curve effect in materials management decisions. This analysis will help materials managers to gain insights about the scenarios: when and to what degree is it beneficial to treat a multiple ship project as an integrated one by batching the order quantities and when and to what degree to practice distinctive procurement for individual ship.

Keywords: learning curve, materials management, shipbuilding, sister ships

Procedia PDF Downloads 473
105 Method to Calculate the Added Value in Supply Chains of Electric Power Meters

Authors: Andrey Vinajera-Zamora, Norge Coello-Machado, Elke Glistau

Abstract:

The objective of this research is calculate the added value in operations of electric power meters (EPM) supply chains, specifically the EPM of 220v. The tool used is composed by six steps allowing at same time the identification of calibration of EPM as the bottleneck operation according the net added value being at same time the process of higher added value. On the other hand, this methodology allows calculate the amount of money to buy the raw material. The main conclusions are related to the analyze ‘s way and calculating of added value in supply chain integrated by the echelons procurement, production and distribution or any of these.

Keywords: economic value added, supply chain management, value chain, bottleneck detection

Procedia PDF Downloads 270
104 Artificial Intelligence Aided Improvement in Canada's Supply Chain Management

Authors: Mohammad Talebi

Abstract:

Supply chain administration could be a concern for all the countries within the world, whereas there's no special approach towards supportability. Generally, for one decade, manufactured insights applications in keen supply chains have found a key part. In this paper, applications of artificial intelligence in supply chain management have been clarified, and towards Canadian plans for smart supply chain management (SCM), a few notes have been suggested. A hierarchical framework for smart SCM might provide a great roadmap for decision-makers to find the most appropriate approach toward smart SCM. Within the system of decision-making, all the levels included in the accomplishment of smart SCM are included. In any case, more considerations are got to be paid to available and needed infrastructures.

Keywords: smart SCM, AI, SSCM, procurement

Procedia PDF Downloads 64
103 Anatomical, Light and Scanning Electron Microscopical Study of Ostrich (Struthio camelus) Integument

Authors: Samir El-Gendy, Doaa Zaghloul

Abstract:

The current study dealt with the gross and microscopic anatomy of the integument of male ostrich in addition to the histological features of different areas of skin by light and SEM. The ostrich skin is characterized by prominent feather follicles and bristles. The number of feather follicles was determined per cm2 in different regions. The integument of ostrich had many modifications which appeared as callosities and scales, nail and toe pads. They were sternal, pubic and Achilles tendon callosities. The vacuolated epidermal cells were seen mainly in the skin of legs and to a lesser extent in the skin of back and Achilles areas. Higher lipogenic potential was expressed by epidermis from glabrous areas of ostrich skin. The dermal papillae were found in the skin of feathered area of neck and back and this was not a common finding in bird's skin which may give resistance against shearing forces in these regions of ostrich skin. The thickness of the keratin layer of ostrich varied, being thick and characteristically loose in the skin at legs, very thin and wavy at neck, while at Achilles skin area, scale and toe pad were thick and more compact, with the thickest very dense and wavy keratin layer at the nail. The dermis consisted of superficial layer of dense irregular connective tissue characterized by presence of many vacuoles of different sizes just under the basal lamina of the epithelium of epidermis and deep layer of dense regular connective tissue. This result suggested presence of fat droplets in this layer which may be to overcome the lack of good barrier of cutaneous water loss in epidermis.

Keywords: ostrich, light microscopy, scanning electron microscopy, integument, skin modifications

Procedia PDF Downloads 214
102 Basics for Corruption Reduction and Fraud Prevention in Industrial/Humanitarian Organizations through Supplier Management in Supply Chain Systems

Authors: Ibrahim Burki

Abstract:

Unfortunately, all organizations (Industrial and Humanitarian/ Non-governmental organizations) are prone to fraud and corruption in their supply chain management routines. The reputational and financial fallout can be disastrous. With the growing number of companies using suppliers based in the local market has certainly increased the threat of fraud as well as corruption. There are various potential threats like, poor or non-existent record keeping, purchasing of lower quality goods at higher price, excessive entertainment of staff by suppliers, deviations in communications between procurement staff and suppliers, such as calls or text messaging to mobile phones, staff demanding extended periods of notice before they allow an audit to take place, inexperienced buyers and more. But despite all the above-mentioned threats, this research paper emphasize upon the effectiveness of well-maintained vendor/s records and sorting/filtration of vendor/s to cut down the possible threats of corruption and fraud. This exercise is applied in a humanitarian organization of Pakistan but it is applicable to whole South Asia region due to the similarity of culture and contexts. In that firm, there were more than 550 (five hundred and fifty) registered vendors. As during the disasters or emergency phases requirements are met on urgent basis thus, providing golden opportunities for the fake companies or for the brother/sister companies of the already registered companies to be involved in the tendering process without declaration or even under some different (new) company’s name. Therefore, a list of required documents (along with checklist) was developed and sent to all of the vendor(s) in the current database and based upon the receipt of the requested documents vendors were sorted out. Furthermore, these vendors were divided into active (meeting the entire set criterion) and non-active groups. This initial filtration stage allowed the firm to continue its work without a complete shutdown that is only vendors falling in the active group shall be allowed to participate in the tenders by the time whole process is completed. Likewise only those companies or firms meeting the set criterion (active category) shall be allowed to get registered in the future along with a dedicated filing system (soft and hard shall be maintained), and all of the companies/firms in the active group shall be physically verified (visited) by the Committee comprising of senior members of at least Finance department, Supply Chain (other than procurement) and Security department.

Keywords: corruption reduction, fraud prevention, supplier management, industrial/humanitarian organizations

Procedia PDF Downloads 518
101 Measuring the Level of Knowledge of Construction Contracts Procedures: A Case Study of Botswana

Authors: Babulayi B. Wilson

Abstract:

Unsatisfactory performance of construction projects in both the industrialised and developing countries indicate that there could be several defects in construction projects phases. Notwithstanding the fact that some project defects are often conceived at the initiation phase of construction projects, insufficient knowledge of contract procedures has been identified as one of the major sources of construction disputes. Contract procedures are a set of rules that outlines the primary obligations and liabilities of parties involved in the implementation of a construction project. Engineering professional bodies often codify contract procedures into standard forms of contract such as the Institution of Civil Engineers (ICE, UK) and Association of Consulting Engineers (ACE, UK) and keep them under constant review by updating any clause to reflect any change in case law or relevant piece of legislation. Even so, it is the responsibility of a professional body or conditions of contract draftsperson to introduce contract-specific clauses that may be necessary for business efficacy but not covered in the chosen standard conditions of contract. In Botswana, the use of clients’ drafted and/or un-adapted for environment of use international forms of contract in conjunction with client-drafted pricing schedules is common. The product of the latter often impact negatively upon contractors’ claims and payments, in that, tender rates and prices can only be deemed to be sufficient if the chosen conditions of contract compliment the pricing schedule (use of standardised procurement documents). In addition, client drafted and the use of borrowed forms of contract such as FIDIC often conflict with domicile law resulting in costly disputes on the part of the client. It is upon the preceding text that the object of the research is to measure the level of knowledge of contract procedures amongst key stakeholders in the Botswana construction industry by requesting a representative sample from the industry and academia to respond to tutorial questions prepared from two commonly used forms of contract for civil works, that is, FIDIC (International Form of Contract) and ICE (UK). The questions were prepared under the following captions: (a) preparation of tender documents (b) obligations of the parties (c) contract administration; and (d) claims, variations, and valuation of variations. After ascertaining that the level of knowledge of contract procedures is insufficient among most practitioners in the Botswana construction industry, major procurement entities, and engineering institutions of learning; a guide to drafting a condition of a construction contract was developed and then validated through seminars and workshops. In the present, the effectiveness of the guide is not yet measured but feedback from seminars and workshops conducted indicates an appreciation of the guide by the majority of major construction industry stakeholders.

Keywords: contract procedures, conditions of contract, professional practice, construction law, forms of contract

Procedia PDF Downloads 157
100 Transition Pathways of Commercial-Urban Fleet Electrification

Authors: Emily Gould, Walter Wehremeyer, David Greaves, Rodney Turtle

Abstract:

This paper considers current thinking on the pathway for electric vehicles, identifying the development blocks of alternative innovation within the market and analyse technological lock-in. The relationship between transition pathways and technological lock-in is largely under-researched particularly in the field of e-mobility. This paper is based on a study with three commercial-urban fleets that examines strategic decisions in new technology adaption alongside vehicle procurement and driver perspective. The paper will analyse the fleet’s decision matrix upon electric vehicles and seek to understand the influence of company culture, strategy and technology applicability, within the context of transition pathways.

Keywords: electric vehicles, fleets, path dependencies, transition pathways

Procedia PDF Downloads 538
99 Modeling a Closed Loop Supply Chain with Continuous Price Decrease and Dynamic Deterministic Demand

Authors: H. R. Kamali, A. Sadegheih, M. A. Vahdat-Zad, H. Khademi-Zare

Abstract:

In this paper, a single product, multi-echelon, multi-period closed loop supply chain is surveyed, including a variety of costs, time conditions, and capacities, to plan and determine the values and time of the components procurement, production, distribution, recycling and disposal specially for high-tech products that undergo a decreasing production cost and sale price over time. For this purpose, the mathematic model of the problem that is a kind of mixed integer linear programming is presented, and it is finally proved that the problem belongs to the category of NP-hard problems.

Keywords: closed loop supply chain, continuous price decrease, NP-hard, planning

Procedia PDF Downloads 336
98 Phenotypic Characterization of Desi Naked Neck Chicken and Its Association with Insulin-Like Growth Factor-I (IGF-I) Gene Polymorphism in Pakistan

Authors: Akbar Nawaz Khan, Abdul Ghaffar, Muhammad Naeem Riaz

Abstract:

The study was conducted to investigate the phenotypic features, morphometry and production potentialities of indigenous naked neck chicken (NN) of Pakistan under intensive management condition. A total of 35 NN chicks were randomly selected, and the experiment was performed at Poultry and wildlife research section NARC Islamabad for a period of 22 weeks. The predominant plumage color was black and golden while skin color was observed white. The average shank length, leg length, thigh length, keel length, chest breadth, head width, wing space, wing length, body length, body girth, body height and pubic bone width in adult males and females were 69.19 ± 3.34mm, 117.93 ± 4.42mm, 117.93 ± 4.42mm, 90.87 ± 6.53mm, 95.03 ± 4.56mm, 49.77 ± 2.53mm, 30.63 ± 1.50cm, 27.24 ± 2.71cm, 18.88 ± 0.65cm, 17.77 ± 1.01cm, 25.96 ± 0.56cm, 47.81 ± 1.41cm and 35.69 ± 4.09mm respectively. The average age and live body weight of NN chicken at sexual maturity were recorded as 165.85 days and 1269.38 g. While hen-day egg production of NN was recorded as 45%. The present study was aimed to investigate the existence of polymorphism at IGF-I gene in indigenous naked neck chicken through PCR based Restriction Fragment Length Polymorphism. Based on restriction analysis using Hinf I restriction enzyme, three genotypes were detected designated as AA, AC, and CC. Restriction analysis of PCR amplified product showed the presence of DNA fragments of 622, 378, 244 and 191, (genotypes). The PCR-RFLP analysis is easy, cost effective method which permits the easy characterization of IGF-I gene. This showed the investigated IGF-I genes can serve as good molecular markers for marker assisted selection (MAS) concerning growth related traits in chicken.

Keywords: Desi chicken, naked neck, morphology, morphometry, production potential, egg traits, egg geometry, IGF-I, growth, PCR- RFLP, chicken

Procedia PDF Downloads 357
97 3rd Generation Modular Execution: A Global Breakthrough in Modular Facility Construction System

Authors: Sean Bryner S. Rey, Eric Tanjutco

Abstract:

Modular execution strategies are performed to address the various challenges of any projects and are implemented on each project phase that covers Engineering, Procurement, Fabrication and Construction. It was until the recent years that the intent to surpass mechanical modularization approach were conceptualized to give solution to much greater demands of project components such as site location and adverse weather condition, material sourcing, construction schedule, safety risks and overall plot layout and allocation. The intent of this paper is to introduce the 3rd Generation Modular Execution with an overview of its advantages on project execution and will give emphasis on Engineering, Construction, Operation and Maintenance. Most importantly, the paper will present the key differentiator of 3rd Gen modular execution against other conventional project execution and the merits it bears for the industry.

Keywords: 3rd generation modular, process block, construction, operation & maintenance

Procedia PDF Downloads 446
96 Control Configuration System as a Key Element in Distributed Control System

Authors: Goodarz Sabetian, Sajjad Moshfe

Abstract:

Control system for hi-tech industries could be realized generally and deeply by a special document. Vast heavy industries such as power plants with a large number of I/O signals are controlled by a distributed control system (DCS). This system comprises of so many parts from field level to high control level, and junior instrument engineers may be confused by this enormous information. The key document which can solve this problem is “control configuration system diagram” for each type of DCS. This is a road map that covers all of activities respect to control system in each industrial plant and inevitable to be studied by whom corresponded. It plays an important role from designing control system start point until the end; deliver the system to operate. This should be inserted in bid documents, contracts, purchasing specification and used in different periods of project EPC (engineering, procurement, and construction). Separate parts of DCS are categorized here in order of importance and a brief description and some practical plan is offered. This article could be useful for all instrument and control engineers who worked is EPC projects.

Keywords: control, configuration, DCS, power plant, bus

Procedia PDF Downloads 465
95 The Impact of Using Building Information Modeling Technology in Construction Projects Management

Authors: Mohammad Ashraf

Abstract:

This research links the use of Building Information Modeling technology in constructions and infrastructure projects, starting from the moment when considering the establishment of a project to demolishing or renovating it, going through the design work, planning, procurement and implementation. BIM Software's which used are Revit, Navisworks and Asta Project in the case study for the Atletico Madrid Stadium project (Wanda Stadium). Also, the project improves through various phases of construction (planning - implementation - management). Besides, the level of the details managed within this project advances gradually. In addition, the construction process problems become about 30 % less than before, resulting from high coordination between designing, implementation and follow through that is done by the project management office (PMO). The current disposition in the industry is to tightly manage the detail contained within the planning and coordination phases of construction, but we miss the opportunity to manage that data as it matures and grows into the execution and commissioning phases.

Keywords: construction management, BIM technology, planning, design, procurements, critical path method

Procedia PDF Downloads 251
94 The Role of Stakeholders in the Development of Sustainable Supply Chain Policy Framework in the Upstream Pharmaceutical Industry in Ghana

Authors: Gifty Kumadey, Albert Tchey Agbenyegah

Abstract:

This study explores the role of stakeholders in developing a sustainable supply chain policy framework in Ghana's pharmaceutical industry. It employs a qualitative research design to analyze policy documents, academic articles, and reports, shedding light on stakeholder involvement. The findings highlight the contributions of government agencies, regulatory bodies, pharmaceutical companies, suppliers, and civil society organizations. Key policies such as green procurement, waste management, and recycling initiatives are identified. However, challenges such as limited transparency, supplier engagement, and regulatory complexity impede implementation. The study recommends strengthening collaboration and promoting transparency to overcome these challenges. The findings provide valuable insights for policymakers, industry stakeholders, and researchers seeking to advance sustainable supply chain practices in Ghana's pharmaceutical industry.

Keywords: stakeholders, sustainable supply chain, policy framework, pharmaceutical industry

Procedia PDF Downloads 61
93 A Literature Review on Sustainability Appraisal Methods for Highway Infrastructure Projects

Authors: S. Kaira, S. Mohamed, A. Rahman

Abstract:

Traditionally, highway infrastructure projects are initiated based on their economic benefits, thereafter environmental, social and governance impacts are addressed discretely for the selected project from a set of pre-determined alternatives. When opting for cost-benefit analysis (CBA), multi-criteria decision-making (MCDM) has been used as the default assessment tool. But this tool has been critiqued as it does not mimic the real-world dynamic environment. Indeed, it is because of the fact that public sector projects like highways have to experience intense exposure to dynamic environments. Therefore, it is essential to appreciate the impacts of various dynamic factors (factors that change or progress with the system) on project performance. Thus, this paper presents various sustainability assessment tools that have been globally developed to determine sustainability performance of infrastructure projects during the design, procurement and commissioning phase. Indeed, identification of the current gaps in the available assessment methods provides a potential to add prominent part of knowledge in the field of ‘road project development systems and procedures’ that are generally used by road agencies.

Keywords: dynamic impact factors, micro and macro factors, sustainability assessment framework, sustainability performance

Procedia PDF Downloads 109
92 The Predictive Value of Serum Bilirubin in the Post-Transplant De Novo Malignancy: A Data Mining Approach

Authors: Nasim Nosoudi, Amir Zadeh, Hunter White, Joshua Conrad, Joon W. Shim

Abstract:

De novo Malignancy has become one of the major causes of death after transplantation, so early cancer diagnosis and detection can drastically improve survival rates post-transplantation. Most previous work focuses on using artificial intelligence (AI) to predict transplant success or failure outcomes. In this work, we focused on predicting de novo malignancy after liver transplantation using AI. We chose the patients that had malignancy after liver transplantation with no history of malignancy pre-transplant. Their donors were cancer-free as well. We analyzed 254,200 patient profiles with post-transplant malignancy from the US Organ Procurement and Transplantation Network (OPTN). Several popular data mining methods were applied to the resultant dataset to build predictive models to characterize de novo malignancy after liver transplantation. Recipient's bilirubin, creatinine, weight, gender, number of days recipient was on the transplant waiting list, Epstein Barr Virus (EBV), International normalized ratio (INR), and ascites are among the most important factors affecting de novo malignancy after liver transplantation

Keywords: De novo malignancy, bilirubin, data mining, transplantation

Procedia PDF Downloads 77
91 Management of Therapeutic Anticancer at Oran Teaching Hospital, Algeria

Authors: S. Boulenouar, M. Sefir, M. Benahmed

Abstract:

All facilities need medication and other pharmaceuticals for their operation. Management and supply is therefore to provide the different services of the facility goods and services in required quantity and quality. The permanent availability of drugs in the facilities is very difficult because most face many difficulties at the inventory management and drug supplies. Therefore, it is necessary for each health facility to know the causes for the malfunction of its management system to cope with them. It is in this context that we have undertaken to conduct this study to know the causes which should be taken into consideration by the concerned authorities to carry out their mission, which is to provide quality health care for the population. In terms of financial resources, the budget for medicines represents a significant part of the budget of the pharmacy. Our study shows that the share of the hospital budget reserved for the drugs procurement represent on average 70% of the budget of the pharmacy. The results show a state of lack of anticancer drugs at Oran teaching hospital. The analysis of the management process allowed us to know the level that the problem of stock-outs of anti-cancer drugs is at. Suggestions were made to that effect to improve the availability for these products and to respond better to the needs of patients.

Keywords: anticancer drugs, health care facility, budget, hospital pharmacist, hospital service

Procedia PDF Downloads 412
90 Statistical Analysis of the Main Causes of Delay Factors of Infrastructure Projects

Authors: Seyed Ali Mohammadiborna, Mehdi Ravanshadnia

Abstract:

Project delays usually detrimentally affect perceptions of project success and can in some instances, result in increased costs and other time-related damages to project stakeholders. One of the realities in the national infrastructure projects is that since the primary stakeholders are state-affiliated, the delay factors of the projects have not been seriously taken into account despite the importance of on-time completion of projects. Project postponement has different economic and social consequences and leads to the technical and economic infeasibility of the infrastructure projects in the form of reduced productivity and exploitation capacity. The present study aimed at investigating delay factors of Iranian national infrastructure projects according to regulatory reports of the Plan and Budget Organization (BPO) of Iran. The present study scrutinized the influence of each of the factors that caused delays in national Iranian infrastructure projects according to the supervision reports of the planning and budget organization in 8 years. For this purpose, the study analyzed the information regarding the impact of 12 key delay factors causing delays in average 4867 projects per year in all provinces. The said factors were classified into the three groups of executive, credit, and financial and environmental-procurement factors.

Keywords: delays, infrastructure, projects, regulatory

Procedia PDF Downloads 112