Search results for: project success
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 6848

Search results for: project success

6608 The Impact of the Business Process Reengineering on the Practices of the Human Resources Management in the Franco Tunisian Company-Network

Authors: Nesrine Bougarech, Habib Affes

Abstract:

This research lays the emphasis on the business process reengineering (BPR) which consists in radically altering the organizational processes through the optimal use of information technology (IT) to attain major enhancements in terms of quality, performance and productivity. A survey of the business process reengineering (BPR) was carried out in three French groups and their subsidiaries in Tunisia. The data collected were qualitatively analyzed in an attempt to test the main indicators of the success of a business process reengineering project (BPR) and to compare the importance of these indicators in the context of France versus Tunisia. The study corroborates that the respect of the inherent principles of the business process reengineering (BPR) and the diversity of the human resources involved in the project can lead to better productivity, higher quality of the goods or services and lower cost. Additionally, our results mirror the extent to which the respect of the principles and the diversity of resources are more important in the French companies than in their Tunisian subsidiaries.

Keywords: business process reengineering (BPR), human resources management (HRM), information technology (IT), management

Procedia PDF Downloads 373
6607 Critical Activity Effect on Project Duration in Precedence Diagram Method

Authors: Salman Ali Nisar, Koshi Suzuki

Abstract:

Precedence Diagram Method (PDM) with its additional relationships i.e., start-to-start, finish-to-finish, and start-to-finish, between activities provides more flexible schedule than traditional Critical Path Method (CPM). But, changing the duration of critical activities in PDM network will have anomalous effect on critical path. Researchers have proposed some classification of critical activity effects. In this paper, we do further study on classifications of critical activity effect and provide more information in detailed. Furthermore, we determine the maximum amount of time for each class of critical activity effect by which the project managers can control the dynamic feature (shortening/lengthening) of critical activities and project duration more efficiently.

Keywords: construction project management, critical path method, project scheduling, precedence diagram method

Procedia PDF Downloads 477
6606 Cable De-Commissioning of Legacy Accelerators at CERN

Authors: Adya H. Uluwita, Fernando B. D. S. Pedrosa, Georgi M. Georgiev, Raoul Masterson

Abstract:

CERN is an international organisation funded by 23 countries which provides the particle physics community with excellence in particle accelerators and other related facilities. Founded in 1954, CERN has a wide range of accelerators that allow groundbreaking science to be conducted. Accelerators bring particles to high levels of energy and make them collide with each other or with fixed targets, creating specific conditions that are of high interest to physicists. A chain of accelerators is used to ramp up the energy of particles and eventually inject them into the largest and most recent one of them: the Large Hadron Collider (LHC). Among this chain of machines is, for instance, the Proton Synchrotron, which was started in 1959 and is still in operation. These machines, called "injectors”, keep evolving over time, as well as the related infrastructure. Massive decommissioning of obsolete cables started in 2015 at CERN in the frame of the so-called "injectors de-cabling project phase 1". Its goal was to replace aging cables and remove unused ones, freeing space for new cables necessary for upgrades and consolidation campaigns. To proceed with the de-cabling, a project coordination team was assembled. The start of this project phase led to the investigation of legacy cables throughout the organisation. The identification of cables stacked during half a century proved to be arduous. Phase 1 of the injectors de-cabling was implemented for three years with success after overcoming some difficulties. Phase 2, which started 3 years later, focused on improving safety and structure with the introduction of a quality assurance procedure. This paper discusses the implementation of this quality assurance procedure throughout phase 2 of the project and the transition between the two phases. Over hundreds of kilometres of cable were removed in the injectors complex at CERN from 2015 to 2023.

Keywords: CERN, de-cabling, injectors, quality assurance procedure

Procedia PDF Downloads 17
6605 Sub-Optimum Safety Performance of a Construction Project: A Multilevel Exploration

Authors: Tas Yong Koh, Steve Rowlinson, Yuzhong Shen

Abstract:

In construction safety management, safety climate has long been linked to workers' safety behaviors and performance. For this reason, safety climate concept and tools have been used as heuristics to diagnose a range of safety-related issues by some progressive contractors in Hong Kong and elsewhere. However, as a diagnostic tool, safety climate tends to treat the different components of the climate construct in a linear fashion. Safety management in construction projects, in reality, is a multi-faceted and multilevel phenomenon that resembles a complex system. Hence, understanding safety management in construction projects requires not only the understanding of safety climate but also the organizational-systemic nature of the phenomenon. Our involvement, diagnoses, and interpretations of a range of safety climate-related issues which culminated in the project’s sub-optimum safety performance in an infrastructure construction project have brought about such revelation. In this study, a range of data types had been collected from various hierarchies of the project site organization. These include the frontline workers and supervisors from the main and sub-contractors, and the client supervisory personnel. Data collection was performed through the administration of safety climate questionnaire, interviews, observation, and document study. The findings collectively indicate that what had emerged in parallel of the seemingly linear climate-based exploration is the exposition of the organization-systemic nature of the phenomenon. The results indicate the negative impacts of climate perceptions mismatch, insufficient work planning, and risk management, mixed safety leadership, workforce negative attributes, lapsed safety enforcement and resources shortages collectively give rise to the project sub-optimum safety performance. From the dynamic causation and multilevel perspective, the analyses show that the individual, group, and organizational levels issues are interrelated and these interrelationships are linked to negative safety climate. Hence the adoption of both perspectives has enabled a fuller understanding of the phenomenon of safety management that point to the need for an organizational-systemic intervention strategy. The core message points to the fact that intervention at an individual level will only meet with limited success if the risks embedded in the higher levels in group and project organization are not addressed. The findings can be used to guide the effective development of safety infrastructure by linking different levels of systems in a construction project organization.

Keywords: construction safety management, dynamic causation, multilevel analysis, safety climate

Procedia PDF Downloads 145
6604 Development of Verification System of Workspace Clashes Between Construction Activities

Authors: Hyeon-Seung Kim, Sang-Mi Park, Min-Seo Kim, Jong-Myeung Shin, Leen-Seok Kang

Abstract:

Recently, the use of Building Information Modeling (BIM) in public construction works has become mandatory in some countries and it is anticipated that BIM will be applied to the actual field of civil engineering projects. However, the BIM system is still focused on the architectural project and the design phase. Because the civil engineering project is linear type project and is focused on the construction phase comparing with architectural project, 3D simulation is difficult to visualize them. This study suggests a method and a prototype system to solve workspace conflictions among construction activities using BIM simulation tool.

Keywords: BIM, workspace, confliction, visualization

Procedia PDF Downloads 369
6603 A Risk Management Framework for Selling a Mega Power Plant Project in a New Market

Authors: Negar Ganjouhaghighi, Amirali Dolatshahi

Abstract:

The origin of most risks of a mega project usually takes place in the phases before closing the contract. As a practical point of view, using project risk management techniques for preparing a proposal is not a total solution for managing the risks of a contract. The objective of this paper is to cover all those activities associated with risk management of a mega project sale’s processes; from entrance to a new market to awarding activities and the review of contract performance. In this study, the risk management happens in six consecutive steps that are divided into three distinct but interdependent phases upstream of the award of the contract: pre-tendering, tendering and closing. In the first step, by preparing standard market risk report, risks of the new market are identified. The next step is the bid or no bid decision making based on the previous gathered data. During the next three steps in tendering phase, project risk management techniques are applied for determining how much contingency reserve must be added or reduced to the estimated cost in order to put the residual risk to an acceptable level. Finally, the last step which happens in closing phase would be an overview of the project risks and final clarification of residual risks. The sales experience of more than 20,000 MW turn-key power plant projects alongside this framework, are used to develop a software that assists the sales team to have a better project risk management.

Keywords: project marketing, risk management, tendering, project management, turn-key projects

Procedia PDF Downloads 299
6602 Radical Technological Innovation - Comparison of a Critical Success Factors Framework with Existing Literature

Authors: Florian Wohlfeil, Orestis Terzidis, Louisa Hellmann

Abstract:

Radical technological innovations enable companies to reach strong market positions and are thus desirable. On the other hand, the innovation process is related to significant costs and risks. Hence, the knowledge of the factors that influence success is crucial for technology driven companies. In a previous study, we have developed a conceptual framework of 25 Critical Success Factors for radical technological innovations and mapped them to four main categories: Technology, Organization, Market, and Process. We refer to it as the Technology-Organization-Market-Process (TOMP) framework. Taking the TOMP framework as a reference model, we conducted a structured and focused literature review of eleven standard books on the topic of radical technological innovation. With this approach, we aim to evaluate, expand, and clarify the set of Critical Success Factors detailed in the TOMP framework. Overall, the set of factors and their allocation to the main categories of the TOMP framework could be confirmed. However, the factor organizational home is not emphasized and discussed in most of the reviewed literature. On the other hand, an additional factor that has not been part of the TOMP framework is described to be important – strategy fit. Furthermore, the factors strategic alliances and platform strategy appear in the literature but in a different context compared to the reference model.

Keywords: Critical Success Factors, radical technological innovation, TOMP framework, innovation process

Procedia PDF Downloads 628
6601 Engaging Mature Learners through Video Case Studies

Authors: Jacqueline Mary Jepson

Abstract:

This article provides a case study centred on the development of 13 video episodes which have been created to enhance student engagement with a post graduate online course in Project Management. The student group was unique as their online course needed to provide for asynchronistic learning and an adult learning pedagogy. In addition, students had come from a wide range professional backgrounds, with some having no Project Management experience, while others had 20 years or more. Students had to gain an understanding of an advanced body of knowledge and the course needed to achieve the academic requirements to qualify individuals to apply their learning in a range of contexts for professional practice and scholarship. To achieve this, a 13 episode case study was developed along with supportive learning materials based on the relocation of a zoo. This unique project provided a learning environment where the project could evolve over each video episode demonstrating the application of Project Management methodology which was then tied into the learning outcomes for the course and the assessment tasks. Discussion forums provided a way for students to converse and demonstrate their own understanding of content and how Project Management methodology can be applied.

Keywords: project management, adult learning, video case study, asynchronistic education

Procedia PDF Downloads 306
6600 BIM Application and Construction Schedule Simulation for the Horizontal Work Area

Authors: Hyeon-Seong Kim, Sang-Mi Park, Seul-Gi Kim, Seon-Ju Han, Leen-Seok Kang

Abstract:

The use of BIM, including 4D CAD system, in a construction project is gradually increasing. Since the building construction works repeatedly in the vertical space, it is relatively easy to confirm the interference effect when applying the BIM, but the interference effect for the civil engineering project is relatively small because the civil works perform non-repetitive processes in the horizontal space. For this reason, it is desirable to apply BIM to the construction phase when applying BIM to the civil engineering project, and the most active BIM tool applied to the construction phase is the 4D CAD function for the schedule management. This paper proposes the application procedure of BIM by the construction phase of civil engineering project and a linear 4D CAD construction methodology suitable for the civil engineering project in which linear work is performed.

Keywords: BIM, 4D CAD, linear 4D simulation, VR

Procedia PDF Downloads 366
6599 A Student Centered Learning Environment in Engineering Education: Design and a Longitudinal Study of Impact

Authors: Tom O'Mahony

Abstract:

This article considers the design of a student-centered learning environment in engineering education. The learning environment integrates a number of components, including project-based learning, collaborative learning, two-stage assignments, active learning lectures, and a flipped-classroom. Together these elements place the individual learner and their learning at the center of the environment by focusing on understanding, enhancing relevance, applying learning, obtaining rich feedback, making choices, and taking responsibility. The evolution of this environment from 2014 to the present day is outlined. The impact of this environment on learners and their learning is evaluated via student questionnaires that consist of both open and closed-ended questions. The closed questions indicate that students found the learning environment to be really interesting and enjoyable (rated as 4.7 on a 5 point scale) and encouraged students to adopt a deep approach towards studying the course materials (rated as 4.0 on a 5 point scale). A content analysis of the open-ended questions provides evidence that the project, active learning lectures, and flipped classroom all contribute to the success of this environment. Furthermore, this analysis indicates that the two-stage assessment process, in which feedback is provided between a draft and final assignment, is the key component and the dominant theme. A limitation of the study is the small class size (less than 20 learners per year), but, to some degree, this is compensated for by the longitudinal nature of the study.

Keywords: deep approaches, formative assessment, project-based learning, student-centered learning

Procedia PDF Downloads 80
6598 A Case Study to Observe How Students’ Perception of the Possibility of Success Impacts Their Performance in Summative Exams

Authors: Rochelle Elva

Abstract:

Faculty in Higher Education today are faced with the challenge of convincing their students of the importance of learning and mastery of skills. This is because most students often have a single motivation -to get high grades. If it appears that this goal will not be met, they lose their motivation, and their academic efforts wane. This is true even for students in the competitive fields of STEM, including Computer Science majors. As educators, we have to understand our students and leverage what motivates them to achieve our learning outcomes. This paper presents a case study that utilizes cognitive psychology’s Expectancy Value Theory and Motivation Theory to investigate the effect of sustained expectancy for success on students’ learning outcomes. In our case study, we explore how students’ motivation and persistence in their academic efforts are impacted by providing them with an unexpected possible path to success that continues to the end of the semester. The approach was tested in an undergraduate computer science course with n = 56. The results of the study indicate that when presented with the real possibility of success, despite existing low grades, both low and high-scoring students persisted in their efforts to improve their performance. Their final grades were, on average, one place higher on the +/-letter grade scale, with some students scoring as high as three places above their predicted grade.

Keywords: expectancy for success and persistence, motivation and performance, computer science education, motivation and performance in computer science

Procedia PDF Downloads 49
6597 Understanding Complexity at Pre-Construction Stage in Project Planning of Construction Projects

Authors: Mehran Barani Shikhrobat, Roger Flanagan

Abstract:

The construction planning and scheduling based on using the current tools and techniques is resulted deterministic in nature (Gantt chart, CPM) or applying a very little probability of completion (PERT) for each task. However, every project embodies assumptions and influences and should start with a complete set of clearly defined goals and constraints that remain constant throughout the duration of the project. Construction planners continue to apply the traditional methods and tools of “hard” project management that were developed for “ideal projects,” neglecting the potential influence of complexity on the design and construction process. The aim of this research is to investigate the emergence and growth of complexity in project planning and to provide a model to consider the influence of complexity on the total project duration at the post-contract award pre-construction stage of a project. The literature review showed that complexity originates from different sources of environment, technical, and workflow interactions. They can be divided into two categories of complexity factors, first, project tasks, and second, project organisation management. Project tasks may originate from performance, lack of resources, or environmental changes for a specific task. Complexity factors that relate to organisation and management refer to workflow and interdependence of different parts. The literature review highlighted the ineffectiveness of traditional tools and techniques in planning for complexity. However, this research focus on understanding the fundamental causes of the complexity of construction projects were investigated through a questionnaire with industry experts. The results were used to develop a model that considers the core complexity factors and their interactions. System dynamics were used to investigate the model to consider the influence of complexity on project planning. Feedback from experts revealed 20 major complexity factors that impact project planning. The factors are divided into five categories known as core complexity factors. To understand the weight of each factor in comparison, the Analytical Hierarchy Process (AHP) analysis method is used. The comparison showed that externalities are ranked as the biggest influence across the complexity factors. The research underlines that there are many internal and external factors that impact project activities and the project overall. This research shows the importance of considering the influence of complexity on the project master plan undertaken at the post-contract award pre-construction phase of a project.

Keywords: project planning, project complexity measurement, planning uncertainty management, project risk management, strategic project scheduling

Procedia PDF Downloads 68
6596 Familiarity with Engineering Project Management And Their Duties In Projects

Authors: Mokhtar Nikgoo

Abstract:

Today's industrial world has undergone tremendous changes in certain periods. These changes are called environmental changes. And they have a direct impact on organizations and bodies. Therefore, the importance of knowing these changes is clear. This importance has caused the manufacturing organizations to move towards multiple products and constantly change and expand their system. This research tries to show how the organization moves in this category by defining the basic steps of implementing a project. One of the most important features of a hard-to-order production organization is the definition of different production projects from different customers. Therefore, the lack of sufficient understanding of the type of work causes the project to be defined for the organization in question, and the managers of the organization (in every organizational level) are constantly involved with different projects. In the implementation of the production project of the aforementioned organizations, directing the facilities and people of the organization towards the implementation of the project is of particular importance. Therefore, it is felt necessary to define the project manager and his basic duties. Considering the importance of this topic, the project chapter deals with project management and its importance and examines all the different issues in that category from the perspective of implementation. A project includes certain activities of the organization that require the use of different resources and all the activities of the organization in order to implement the project with defined facilities and at the designated times. Project management is planning, organizing and controlling the organization's resources for a short-term goal that has been created for short-term and medium-term goals and objectives. Project management has the important task of centering and integrating (coordinating) task and line managers. In other words, project management requires having a strong and appropriate relationship with the internal people of the system to carry out the assigned activities and must have a general and technical knowledge related to various activities in the project environment. It seems that everything with project management in It is communication. One of the characteristics of production organizations under the order is the relationship between the customer (customers) and the organization until the completion of the defined project. Due to the nature of the work, it is necessary for a person to establish this relationship between the client and the organization's people and to establish this relationship in such a way that it does not cause a lack of coordination in the organization's activities. Therefore, project management has a very important role at this stage, because the relationship between the client and his organization will be any problems and problems and points of view that the client has, he must inform the management so that he can implement the cases with its analysis and special processes. To be transferred to other departments and line managers.

Keywords: project management, crisis management, project delays bill, project duration

Procedia PDF Downloads 22
6595 Indicators for Success of Obesity Reduction Programs in Adolescents; Body Composition and Body Mass Index: Evaluating a School-Based Health Promotion Project in Iran after 12 Weeks of Intervention

Authors: Saeid Doaei

Abstract:

Background: Obesity in adolescence is a primary risk factor for obesity in adulthood. The objective of this study was the assessment of the effect of a comprehensive lifestyle intervention on different anthropometric indices in 12 to 16 years old boy adolescents. Methods: 96 adolescent boys of two schools of District 5 of Tehran have participated in this study. The schools were randomly assigned as intervention school (n=53) and control school (n=43). The height and weight of students were measured with a calibrated tape line and digital scale respectively and their BMI were calculated. The amounts of body fat percent (BF) and body muscle (BM) percent were determined by Bio Impedance Analyzer (BIA) considering the age, gender and height of students at baseline and after intervention. The intervention was implemented in the intervention school, according to the Ottawa charter principles. Results: 12 weeks of intervention decreased body fat percent in the intervention group in comparison with the control group (decreased by 1.81 % in the intervention group and increased by .39 % in the control group, P < .01). However, weight, BMI and BM did not change significantly. Conclusion: The result of this study showed that the implementation of comprehensive intervention in obese adolescents may improve the body composition, although these changes may not be reflected in BMI. It is possible that BMI is not a good indicator in assessment of the success of obesity management intervention.

Keywords: obesity, childhood, BMI, nutrition

Procedia PDF Downloads 230
6594 The Role of Risk Management Practices in the Relationship between Risks Factors and Construction Project Performance

Authors: Ali Abdullah Albezaghi

Abstract:

This article aims to introduce a conceptual framework that can facilitate investigations concerning the role of risk management practices in the relationship between construction risks and the construction project's performance. This article is structured based on the extant literature; it reviews theoretical perspectives, highlights the gaps, and illustrates the significance of developing a framework of suggested relationships. Despite growing interest in the role of risks in construction project performance, previous studies have paid little attention to investigating the moderating role of risk management practices on the risk-performance link. This has left researchers and construction project managers with minimal information to explain the conditions under which risk management practices can reduce the impact of project-related risks and improve performance. In this context, this article suggests a viable research model with propositions that assess risk-performance relationships and discusses the potential moderating effects on the domain relationship. This paper adds to the risk management literature by focusing on risk variables that directly impact performance. Further, it also considers the moderating role of risk management practices in such relationships.

Keywords: risk management practices, external risks, internal risks, project risks, project performance

Procedia PDF Downloads 94
6593 Mental Vulnerability and Coping Strategies as a Factor for Academic Success for Pupils with Special Education Needs

Authors: T. Dubayova

Abstract:

Slovak, as well as foreign authors, believe that the influence of non-cognitive factors on a student's academic success or failure is unquestionable. The aim of this paper is to establish a link between the mental vulnerability and coping strategies used by 4th grade elementary school students in dealing with stressful situations and their academic performance, which was used as a simple quantitative indicator of academic success. The research sample consists of 320 students representing the standard population and 60 students with special education needs (SEN), who were assessed by the Strengths and Difficulties Questionnaire (SDQ) by their teachers and the Children’s Coping Strategies Checklist (CCSC-R1) filled in by themselves. Students with SEN recorded an extraordinarily high frequency of mental vulnerability (34.5 %) than students representing the standard population (7 %). The poorest academic performance of students with SEN was associated with the avoidance behavior displayed during stressful situations. Students of the standard population did not demonstrate this association. Students with SEN are more likely to display mental health problems than students of the standard population. This may be caused by the accumulation of and frequent exposure to situations that they perceive as stressful.

Keywords: coping, mental vulnerability, pupil with special education needs, school performance, school success

Procedia PDF Downloads 322
6592 Impact of Protean Career Attitude on Career Success with the Mediating Effect of Career Insight

Authors: Prabhashini Wijewantha

Abstract:

This study looks at the impact of protean career attitude of employees on their career success and next it looks at the mediation effect of career insights on the above relationship. Career success is defined as the accomplishment of desirable work related outcomes at any point in person’s work experiences over time and it comprises of two sub variables, namely, career satisfaction and perceived employability. Protean career attitude was measured using the eight items from the Self Directedness subscale of the Protean Career Attitude scale developed by Briscoe and Hall, where as career satisfaction was measured by the three item scale developed by Martine, Eddleston, and Veiga. Perceived employability was also evaluated using three items and career insight was measured using fourteen items that were adapted and used by De Vos and Soens. Data were collected from a sample of 300 mid career executives in Sri Lanka deploying the survey strategy and data were analyzed using the SPSS and AMOS software version 20.0. A preliminary analysis of data was initially performed where data were screened and reliability and validity were ensured. Next a simple regression analysis was performed to test the direct impact of protean career attitude on career success and the hypothesis was supported. The Baron and Kenney’s four steps, three regressions approach for mediator testing was used to calculate the mediation effect of career insight on the above relationship and a partial mediation was supported by the data. Finally theoretical and practical implications are discussed.

Keywords: career success, career insight, mid career MBAs, protean career attitude

Procedia PDF Downloads 329
6591 Role of HRM Practices on Business Success: The Case of Small and Medium Enterprises (SMEs)

Authors: Asma Dill

Abstract:

The aim of this study is to explore the role of HRM practices in SMEs success. The role of HRM practices in large enterprises is relatively known, on the other hand, small and medium enterprises (SMEs) companies have not been greatly studied in relation to the HRM practices in the past. Although, there is a lack of literature and empirical research in this area, several studies in the recent years emphasized on the importance of the HRM practices for the success of the SMEs. This study finds out relationship of HRM practices and SMESs performances. The objective is to analyze significant impacts of HRM practices (training, performance appraisal, compensation and employee development) on SMEs success, to determine whether SMEs recognize the importance of HRM practices in their businesses. To carry out this research a survey research strategy was followed. The sample frame for this study consisted of firms that belong to the services and commerce sector, employing at least 50 employees. The final research sample consisted of questionnaires. Descriptive statistical methods have been used during quantitative analysis to explore the relations. The findings of the study revealed that HRM practices have a significant influence on the performance of SMEs, and the better the HRM practice, the higher the performance of the SMEs. HRM practices, including, training, compensation, performance appraisal and employee development, have been found to be significantly and positively related to business success. Outcome of the study will provide useful guidelines to the business organizations. This study contributes to knowledge by providing insights on the impact of HRM practices on SMEs performance.

Keywords: compensation, employee performance, HRM practices, training

Procedia PDF Downloads 144
6590 Create a Dynamic Model in Project Control and Management

Authors: Hamed Saremi, Shahla Saremi

Abstract:

In this study, control and management of construction projects is evaluated through developing a dynamic model in which some means are used in order to evaluating planning assumptions and reviewing the effectiveness of some project control policies based on previous researches about time, cost, project schedule pressure management, source management, project control, adding elements and sub-systems from cost management such as estimating consumption budget from budget due to costs, budget shortage effects and etc. using sensitivity analysis, researcher has evaluated introduced model that during model simulation by VENSIM software and assuming optimistic times and adding information about doing job and changes rate and project is forecasted with 373 days (2 days sooner than forecasted) and final profit $ 1,960,670 (23% amount of contract) assuming 15% inflation rate in year and costs rate accordance with planned amounts and other input information and final profit.

Keywords: dynamic planning, cost, time, performance, project management

Procedia PDF Downloads 438
6589 Project Progress Prediction in Software Devlopment Integrating Time Prediction Algorithms and Large Language Modeling

Authors: Dong Wu, Michael Grenn

Abstract:

Managing software projects effectively is crucial for meeting deadlines, ensuring quality, and managing resources well. Traditional methods often struggle with predicting project timelines accurately due to uncertain schedules and complex data. This study addresses these challenges by combining time prediction algorithms with Large Language Models (LLMs). It makes use of real-world software project data to construct and validate a model. The model takes detailed project progress data such as task completion dynamic, team Interaction and development metrics as its input and outputs predictions of project timelines. To evaluate the effectiveness of this model, a comprehensive methodology is employed, involving simulations and practical applications in a variety of real-world software project scenarios. This multifaceted evaluation strategy is designed to validate the model's significant role in enhancing forecast accuracy and elevating overall management efficiency, particularly in complex software project environments. The results indicate that the integration of time prediction algorithms with LLMs has the potential to optimize software project progress management. These quantitative results suggest the effectiveness of the method in practical applications. In conclusion, this study demonstrates that integrating time prediction algorithms with LLMs can significantly improve the predictive accuracy and efficiency of software project management. This offers an advanced project management tool for the industry, with the potential to improve operational efficiency, optimize resource allocation, and ensure timely project completion.

Keywords: software project management, time prediction algorithms, large language models (LLMS), forecast accuracy, project progress prediction

Procedia PDF Downloads 38
6588 Predictors of Behavior Modification Prior to Bariatric Surgery

Authors: Rosemarie Basile, Maria Loizos, John Pallarino, Karen Gibbs

Abstract:

Given that complications can be significant following bariatric surgery and with rates of long-term success measured in excess weight loss varying as low as 33% after five years, an understanding of the psychological factors that may mitigate findings and increase success and result in better screening and supports prior to surgery are critical. An internally oriented locus of control (LOC) has been identified as a predictor for success in obesity therapy, but has not been investigated within the context of bariatric surgery. It is hypothesized that making behavioral changes prior to surgery which mirror those that are required post-surgery may ultimately predict long-term success. 122 subjects participated in a clinical interview and completed self-report measures including the Multidimensional Health Locus of Control Scale, Overeating Questionnaire (OQ), and Lifestyle Questionnaire (LQ). Pearson correlations were computed between locus of control orientation and likelihood to make behavior changes prior to surgery. Pearson correlations revealed a positive correlation between locus of control and likelihood to make behavior changes r = 0.23, p < .05. As hypothesized, there was a significant correlation between internal locus of control and likelihood to make behavior changes. Participants with a higher LOC believe that they are able to make decisions about their own health. Future research will focus on whether this positive correlation is a predictor for future bariatric surgery success.

Keywords: bariatric surgery, behavior modification, health locus of control, overeating questionnaire

Procedia PDF Downloads 281
6587 Building Information Modelling (BIM) and Unmanned Aerial Vehicles (UAV) Technologies in Road Construction Project Monitoring and Management: Case Study of a Project in Cyprus

Authors: Yiannis Vacanas, Kyriacos Themistocleous, Athos Agapiou, Diofantos Hadjimitsis

Abstract:

Building Information Modelling (BIM) technology is considered by construction professionals as a very valuable process in modern design, procurement and project management. Construction professionals of all disciplines can use a single 3D model which BIM technology provides, to design a project accurately and furthermore monitor the progress of construction works effectively and efficiently. Unmanned Aerial Vehicles (UAVs), a technology initially developed for military applications, is now without any difficulty accessible and has already been used by commercial industries, including the construction industry. UAV technology has mainly been used for collection of images that allow visual monitoring of building and civil engineering projects conditions in various circumstances. UAVs, nevertheless, have undergone significant advances in equipment capabilities and now have the capacity to acquire high-resolution imagery from many angles in a cost effective manner, and by using photogrammetry methods, someone can determine characteristics such as distances, angles, areas, volumes and elevations of an area within overlapping images. In order to examine the potential of using a combination of BIM and UAV technologies in construction project management, this paper presents the results of a case study of a typical road construction project where the combined use of the two technologies was used in order to achieve efficient and accurate as-built data collection of the works progress, with outcomes such as volumes, and production of sections and 3D models, information necessary in project progress monitoring and efficient project management.

Keywords: BIM, project management, project monitoring, UAV

Procedia PDF Downloads 274
6586 The Success and Failure of the Solicitor General When the U.S. Government Appears as a Direct Party before the U.S. Supreme Court

Authors: Joseph Ignagni, Rebecca Deen

Abstract:

This paper analyzes the extent to which the U.S. Supreme Court votes to support the position of the United States in cases where the government is a party to the litigation. This study considers the relationship between the Solicitor General’s Office and the U.S. Supreme Court. The Solicitor General has the unique position of being the representative of the Executive Branch and the U.S. government before the Supreme Court. While a great deal of research has looked at the Solicitor General’s success as a “friend of the court,” far less has considered this relationship when the U.S. is a direct party in the litigation. This paper investigates the success rate of the Solicitor General’s Office in these cases. We find that there is considerable variation in the U.S. government’s success rate before the Court depending on the issue, Supreme Court leadership, the ideological direction of the Court and whether the U.S. approached the Court as a petitioner or respondent. We conduct our analysis on the Court’s decisions from 1953-2009. This study adds to our understanding of checks and balances, separation of powers, and inter-institutional relationships between the branches of the federal government of the United States.

Keywords: U.S. president, solicitor general, U.S. Supreme Court, separation of power, checks and balances

Procedia PDF Downloads 325
6585 Appraisal of Transaction Cost in South African Construction Projects

Authors: Kenneth O. Otasowie, Matthew Ikuabe, Clinton Aigbavboa, Ayodeji Oke

Abstract:

Construction project cost are not only made up of production costs. This cost comprises of many other elements such as the preparation of a bidding document, cost estimations, drafting contractual agreements and monitoring that contractual obligations are met. Several studies have stressed the need for transaction costs (TC) to be defined in a way that covers all phases of a project and not only the pre-contract phase. Hence, this study aims to appraise transaction cost in South African (SA) construction projects by assessing what constitutes transaction cost, influencing factors and possible optimisation measures. A survey design was adopted. A total number of eighty (80) questionnaires were administered to quantity surveyors, procurement managers and project managers in Guateng Province, SA and seventy-two (72) were returned and found suitable for analysis. Collected data was analysed using percentage, mean item score, standard deviation, one-sample t-test. The findings show that external technical interaction, uncertainty, human factors are the most significant constituents of TC in SA, while technical competency, experience in similar project type and project characteristics are the leading influencing factors. Furthermore, understanding project characteristics, clear communication and technically competent project teams are most of the significant measures for optimising TC in SA construction projects. Therefore, this study recommends that a competent project team and a clear communication are fundamental to proper management of TC in SA construction projects.

Keywords: construction projects, project cost, South Africa, transaction cost

Procedia PDF Downloads 72
6584 Review of Assessment of Integrated Information System (IIS) in Organisation

Authors: Mariya Salihu Ingawa, Sani Suleiman Isah

Abstract:

The assessment of Integrated Information System (IIS) in organisation is an important initiative to enable the Information System (IS) managers, as well as top management to understand the success status of their investment in IS integration efforts. However, without a proper assessment, an organisation will not know its IIS status, which may affect their judgment on what action should be taken onwards. Current research on IIS assessment is lacking and those related literature on IIS assessment focus more on assessing the technical aspect of IIS. It is argued that assessing technical aspect alone is inadequate since organisational and strategic aspects in IIS should also be considered. Current methods, techniques and tools used by vendors for IIS assessment also are lack of comprehensive measures to fully assess the Integrated Information System in term of technical, organisational and strategic domains. The purpose of this study is to establish critical success factors for measuring success of an Integrated Information System. These factors are used as the basis for constructing an approach to comprehensively assess IIS in an organisation. A comprehensive list of success factors for IIS assessment, established from literature, was initially presented. An expert surveys using both manual and online methods were conducted to verify the factors. Based on the factors, an instrument for IIS assessment was constructed. The results from a case study indicate that through comprehensive assessment approach, not only the level of success been known, but also reveals the contributing factors. This research contributes to the field of Information Systems specifically in the area of Integrated Information System assessment.

Keywords: integrated information system, expert surveys, organisation, assessment

Procedia PDF Downloads 360
6583 Pavement Quality Evaluation Using Intelligent Compaction Technology: Overview of Some Case Studies in Oklahoma

Authors: Sagar Ghos, Andrew E. Elaryan, Syed Ashik Ali, Musharraf Zaman, Mohammed Ashiqur Rahman

Abstract:

Achieving desired density during construction is an important indicator of pavement quality. Insufficient compaction often compromises pavement performance and service life. Intelligent compaction (IC) is an emerging technology for monitoring compaction quality during the construction of asphalt pavements. This paper aims to provide an overview of findings from four case studies in Oklahoma involving the compaction quality of asphalt pavements, namely SE 44th St project (Project 1) and EOC Turnpike project (Project 2), Highway 92 project (Project 3), and 108th Avenue project (Project 4). For this purpose, an IC technology, the intelligent compaction analyzer (ICA), developed at the University of Oklahoma, was used to evaluate compaction quality. Collected data include GPS locations, roller vibrations, roller speed, the direction of movement, and temperature of the asphalt mat. The collected data were analyzed using a widely used software, VETA. The average densities for Projects 1, 2, 3 and 4, were found as 89.8%, 91.50%, 90.7% and 87.5%, respectively. The maximum densities were found as 94.6%, 95.8%, 95.9%, and 89.7% for Projects 1, 2, 3, and 4, respectively. It was observed that the ICA estimated densities correlated well with the field core densities. The ICA results indicated that at least 90% of the asphalt mats were subjected to at least two roller passes. However, the number of passes required to achieve the desired density (94% to 97%) differed from project to project depending on the underlying layer. The results of these case studies show both opportunities and challenges in using IC for monitoring compaction quality during construction in real-time.

Keywords: asphalt pavement construction, density, intelligent compaction, intelligent compaction analyzer, intelligent compaction measure value

Procedia PDF Downloads 124
6582 Identifying and Prioritizing Critical Success Factors (Csfs) in Retaining and Developing Knowledge Workers in Oil and Gas Project–Based Companies

Authors: Ehsan Samimi, Mohammaa Ali Shahosseeni, Ali Abasltian, Shahriar Shafaghi

Abstract:

Background/Objectives: Voluntary turnover and early retirement request by specialists and experienced people in project-based organizations (PBO) has caused many problems in finding suitable experts to execute the projects. Methods/Statistical analysis: The present study is a descriptive and applied research. Research population consists of KWs in oil and gas PBO. The engineers in these organizations were considered as research sample. Interviews and questionnaire were used to gather information. Interviews with experts were used to identify factors and questionnaires were utilized to identify the importance and prioritization. 72 factors were identified and categorized into 9 groups within organizational and HR initiative levels. Results: Results of the research indicate the priority of each group of factors according to the proposed model in the view of KWs in oil, gas and petrochemical industries. On this basis, the following factors have the highest effect ratio based on the respondents’ point of view: 1. knowledge management 2. Performance appraisal system 3. Communication 4.Training and development 5.Job design and analysis 6. Employment policies 7. Career planning 8. Project/organizational factors 9. Salary and rewards. Additionally, in each group the priority of effective sub-factors has been identified as the result of the research .The results support the definitions of KWs and influence of factors examined and specified by similar studies in retention and development of KWs. The high importance of knowledge management and low rank for salary and rewards can be mentioned as example in this regard. Despite the priority of each group of factors the uniqueness of the result is due to identification of effective factors in the specific industry (oil and gas) and type of organization (PBO). Conclusion/Application: The findings of present study can be used to devise plans for retaining and developing KWs in PBO especially in oil and gas industry.

Keywords: project–based organizations, knowledge workers, HR management, turnover, retaining and developing employees

Procedia PDF Downloads 257
6581 Applying Lean Six Sigma in an Emergency Department, of a Private Hospital

Authors: Sarah Al-Lumai, Fatima Al-Attar, Nour Jamal, Badria Al-Dabbous, Manal Abdulla

Abstract:

Today, many commonly used Industrial Engineering tools and techniques are being used in hospitals around the world for the goal of producing a more efficient and effective healthcare system. A common quality improvement methodology known as Lean Six-Sigma has been successful in manufacturing industries and recently in healthcare. The objective of our project is to use the Lean Six-Sigma methodology to reduce waiting time in the Emergency Department (ED), in a local private hospital. Furthermore, a comprehensive literature review was conducted to evaluate the success of Lean Six-Sigma in the ED. According to the study conducted by Ibn Sina Hospital, in Morocco, the most common problem that patients complain about is waiting time. To ensure patient satisfaction many hospitals such as North Shore University Hospital were able to reduce waiting time up to 37% by using Lean Six-Sigma. Other hospitals, such as John Hopkins’s medical center used Lean Six-Sigma successfully to enhance the overall patient flow that ultimately decreased waiting time. Furthermore, it was found that capacity constraints, such as staff shortages and lack of beds were one of the main reasons behind long waiting time. With the use of Lean Six-Sigma and bed management, hospitals like Memorial Hermann Southwest Hospital were able to reduce patient delays. Moreover, in order to successfully implement Lean Six-Sigma in our project, two common methodologies were considered, DMAIC and DMADV. After the assessment of both methodologies, it was found that DMAIC was a more suitable approach to our project because it is more concerned with improving an already existing process. With many of its successes, Lean Six-Sigma has its limitation especially in healthcare; but limitations can be minimized if properly approached.

Keywords: lean six sigma, DMAIC, hospital, methodology

Procedia PDF Downloads 463
6580 Identifying Critical Success Factors for Data Quality Management through a Delphi Study

Authors: Maria Paula Santos, Ana Lucas

Abstract:

Organizations support their operations and decision making on the data they have at their disposal, so the quality of these data is remarkably important and Data Quality (DQ) is currently a relevant issue, the literature being unanimous in pointing out that poor DQ can result in large costs for organizations. The literature review identified and described 24 Critical Success Factors (CSF) for Data Quality Management (DQM) that were presented to a panel of experts, who ordered them according to their degree of importance, using the Delphi method with the Q-sort technique, based on an online questionnaire. The study shows that the five most important CSF for DQM are: definition of appropriate policies and standards, control of inputs, definition of a strategic plan for DQ, organizational culture focused on quality of the data and obtaining top management commitment and support.

Keywords: critical success factors, data quality, data quality management, Delphi, Q-Sort

Procedia PDF Downloads 185
6579 Tackling Inequalities in Regional Health Care: Accompanying an Inter-Sectoral Cooperation Project between University Medicine and Regional Care Structures

Authors: Susanne Ferschl, Peter Holzmüller, Elisabeth Wacker

Abstract:

Ageing populations, advances in medical sciences and digitalization, diversity and social disparities, as well as the increasing need for skilled healthcare professionals, are challenging healthcare systems around the globe. To address these challenges, future healthcare systems need to center on human needs taking into account the living environments that shape individuals’ knowledge of and opportunities to access healthcare. Moreover, health should be considered as a common good and an integral part of securing livelihoods for all people. Therefore, the adoption of a systems approach, as well as inter-disciplinary and inter-sectoral cooperation among healthcare providers, are essential. Additionally, the active engagement of target groups in the planning and design of healthcare structures is indispensable to understand and respect individuals’ health and livelihood needs. We will present the research project b4 – identifying needs | building bridges | developing health care in the social space, which is situated within this reasoning and accompanies the cross-sectoral cooperation project Brückenschlag (building bridges) in a Bavarian district. Brückenschlag seeks to explore effective ways of health care linking university medicine (Maximalversorgung | maximum care) with regional inpatient, outpatient, rehabilitative, and preventive care structures (Regionalversorgung | regional care). To create advantages for both (potential) patients and the involved cooperation partners, project b4 qualitatively assesses needs and motivations among professionals, population groups, and political stakeholders at individual and collective levels. Besides providing an overview of the project structure as well as of regional population and healthcare characteristics, the first results of qualitative interviews conducted with different health experts will be presented. Interviewed experts include managers of participating hospitals, nurses, medical specialists working in the hospital and registered doctors operating in practices in rural areas. At the end of the project life and based on the identified factors relevant to the success -and also for failure- of participatory cooperation in health care, the project aims at informing other districts embarking on similar systems-oriented and human-centered healthcare projects. Individuals’ health care needs in dependence on the social space in which they live will guide the development of recommendations.

Keywords: cross-sectoral collaboration in health care, human-centered health care, regional health care, individual and structural health conditions

Procedia PDF Downloads 76