8748 Analyzing the Effectiveness of Communication Practices and Processes within Project-Based Firms

Authors: Paul Saah, Charles Mbohwa, Nelson Sizwe Madonsela

Abstract:

The capacity to deliver projects on schedule, within budget, and to the pleasure of the client depends on effective communication, which is the lifeblood of project-based businesses. In order to pinpoint areas for development and shed light on the crucial role that communication plays in project success, the aim of this study is to evaluate the efficacy of communication practises and processes inside project-based organisations. In order to analyse concepts and get a greater grasp of their theoretical basis, this study's methodology combines a careful review of the relevant literature with a conceptual analysis of the subject. Data from a varied sample of project-based businesses spanning all industries and sizes were collected via document analysis. The relationship between communication practises, and processes were investigated in connection to key performance measures such as project outcomes, client satisfaction, and team dynamics. According to the study's findings, project-based businesses that adopt effective communication practises, and procedures experience a reduction in unfavourable experiences, stronger integration, and coordination, clarity of purpose, and practises that can hasten problem resolution. However, failing to adopt effective communication practises and procedures in project-based company result in counter issues, including project derailment from the schedule, failure to meet goals, inefficient use of existing resources, and failure to meet organisational goals. Therefore, optimising their communication practises, and procedures are crucial for sustainable growth and competitive advantage as project-based enterprises continue to play a crucial part in today's dynamic business scene.

Keywords: effective communication, project-based firms, communication practices, project success, communication strategies

Procedia PDF Downloads 32
8747 An Effective Approach to Knowledge Capture in Whole Life Costing in Constructions Project

Authors: Ndibarafinia Young Tobin, Simon Burnett

Abstract:

In spite of the benefits of implementing whole life costing technique as a valuable approach for comparing alternative building designs allowing operational cost benefits to be evaluated against any initial cost increases and also as part of procurement in the construction industry, its adoption has been relatively slow due to the lack of tangible evidence, ‘know-how’ skills and knowledge of the practice, i.e. the lack of professionals in many establishments with knowledge and training on the use of whole life costing technique, this situation is compounded by the absence of available data on whole life costing from relevant projects, lack of data collection mechanisms and so on. This has proved to be very challenging to those who showed some willingness to employ the technique in a construction project. The knowledge generated from a project can be considered as best practices learned on how to carry out tasks in a more efficient way, or some negative lessons learned which have led to losses and slowed down the progress of the project and performance. Knowledge management in whole life costing practice can enhance whole life costing analysis execution in a construction project, as lessons learned from one project can be carried on to future projects, resulting in continuous improvement, providing knowledge that can be used in the operation and maintenance phases of an assets life span. Purpose: The purpose of this paper is to report an effective approach which can be utilised in capturing knowledge in whole life costing practice in a construction project. Design/methodology/approach: An extensive literature review was first conducted on the concept of knowledge management and whole life costing. This was followed by a semi-structured interview to explore the existing and good practice knowledge management in whole life costing practice in a construction project. The data gathered from the semi-structured interview was analyzed using content analysis and used to structure an effective knowledge capturing approach. Findings: From the results obtained in the study, it shows that the practice of project review is the common method used in the capturing of knowledge and should be undertaken in an organized and accurate manner, and results should be presented in the form of instructions or in a checklist format, forming short and precise insights. The approach developed advised that irrespective of how effective the approach to knowledge capture, the absence of an environment for sharing knowledge, would render the approach ineffective. Open culture and resources are critical for providing a knowledge sharing setting, and leadership has to sustain whole life costing knowledge capture, giving full support for its implementation. The knowledge capturing approach has been evaluated by practitioners who are experts in the area of whole life costing practice. The results have indicated that the approach to knowledge capture is suitable and efficient.

Keywords: whole life costing, knowledge capture, project review, construction industry, knowledge management

Procedia PDF Downloads 236
8746 Selection of Social and Sustainability Criteria for Public Investment Project Evaluation in Developing Countries

Authors: Pintip Vajarothai, Saad Al-Jibouri, Johannes I. M. Halman

Abstract:

Public investment projects are primarily aimed at achieving development strategies to increase national economies of scale and overall improvement in a country. However, experience shows that public projects, particularly in developing countries, struggle or fail to fulfill the immediate needs of local communities. In many cases, the reason for that is that projects are selected in a subjective manner and that a major part of the problem is related to the evaluation criteria and techniques used. The evaluation process is often based on a broad strategic economic effects rather than real benefits of projects to society or on the various needs from different levels (e.g. national, regional, local) and conditions (e.g. long-term and short-term requirements). In this paper, an extensive literature review of the types of criteria used in the past by various researchers in project evaluation and selection process is carried out and the effectiveness of such criteria and techniques is discussed. The paper proposes substitute social and project sustainability criteria to improve the conditions of local people and in particular the disadvantaged groups of the communities. Furthermore, it puts forward a way for modelling the interaction between the selected criteria and the achievement of the social goals of the affected community groups. The described work is part of developing a broader decision model for public investment project selection by integrating various aspects and techniques into a practical methodology. The paper uses Thailand as a case to review what and how the various evaluation techniques are currently used and how to improve the project evaluation and selection process related to social and sustainability issues in the country. The paper also uses an example to demonstrates how to test the feasibility of various criteria and how to model the interaction between projects and communities. The proposed model could be applied to other developing and developed countries in the project evaluation and selection process to improve its effectiveness in the long run.

Keywords: evaluation criteria, developing countries, public investment, project selection methodology

Procedia PDF Downloads 251
8745 Project Abandonment and Its Effect on Host Community: Case Study of Ajaokuta Steel Project, Nigeria

Authors: A. A. Omonori, K. T. Alade, A. F. Lawal

Abstract:

This research was conducted to identify the causes of project abandonment in Nigeria and the effect it has on the host community. The aim of the research was to identify the causes and effects of project failure and abandonment. Project abandonment is a major course of concern in the country as different projects fail and are abandoned at various levels. These projects do not fulfill the purpose for which they were initiated. This is the absolute definition of failure and hence the selection of the Ajaokuta Steel Project as an interesting case study and a typical example of project failure and abandonment. This has been done by conducting field study through the administration of questionnaires. This study was carried out on the Ajaokuta Steel Project to investigate the causes of the abandonment of the project and the effects it has had on the people of Ajaokuta community. Qualitative method of data analysis was used to analyze the findings through frequency tables and ranking. This study brought to light the major factors that led to the abandonment of the Ajaokuta Steel Project. The effects the abandonment of the project has had on the immediate community were identified and recommendations made to prevent the menace of Project abandonment.

Keywords: abandonment, case-study, Nigeria, project

Procedia PDF Downloads 318
8744 An Explorative Study of the Application of Project Management in German Research Projects

Authors: Marcel Randermann, Roland Jochem

Abstract:

Research activities are mostly conducted in form of projects. In fact, research projects take the highest share of all project forms combined. However, project management is very rarely applied purposefully by researchers and scientists. More specifically no project management frameworks, methods or tools are not being used to plan, execute or control research project to ensure research success or improve project quality. In this qualitative study, several interviews were conducted with scientists and research managers from German institutions to gain insights into project management activities, to determine challenges and barriers, and to evaluate premises for successful project management. The analyses show that conventional project management is not easily applicable in scientific environments and researchers’ mindsets prevent a reasonable application.

Keywords: academics, project management methods, research and science projects, scientist's mindset

Procedia PDF Downloads 166
8743 The Influence of Beta Shape Parameters in Project Planning

Authors: Αlexios Kotsakis, Stefanos Katsavounis, Dimitra Alexiou

Abstract:

Networks can be utilized to represent project planning problems, using nodes for activities and arcs to indicate precedence relationship between them. For fixed activity duration, a simple algorithm calculates the amount of time required to complete a project, followed by the activities that comprise the critical path. Program Evaluation and Review Technique (PERT) generalizes the above model by incorporating uncertainty, allowing activity durations to be random variables, producing nevertheless a relatively crude solution in planning problems. In this paper, based on the findings of the relevant literature, which strongly suggests that a Beta distribution can be employed to model earthmoving activities, we utilize Monte Carlo simulation, to estimate the project completion time distribution and measure the influence of skewness, an element inherent in activities of modern technical projects. We also extract the activity criticality index, with an ultimate goal to produce more accurate planning estimations.

Keywords: beta distribution, PERT, Monte Carlo simulation, skewness, project completion time distribution

Procedia PDF Downloads 115
8742 Environmental Impact Assessment Methodology of the Tirana–Elbasan Road Project

Authors: Aurora Cerri, Niko Pollojani

Abstract:

The Tirana – Elbasan Road project is the most important highway project in Albania, constructed in the period May 2011 - ongoing. This project included construction of 38 km highway category road including 2.6 km of tunnel. It serves as a corridor connecting the Tirana, Capital of Albania and South-East area, and in the near future it is expected to continue in the direction of Macedonian border. Environmental Impact Assesment procedure for this project is provided by the Albanian Environmental Law No. 10431. This law establishes the regulation of procedures for identifying, assessment and reporting on the effects of certain projects on the environment, and the associated administrative procedures, during the decision-making process by the Ministry of Environment and Tourism for issuing environmental permit, and ensures that all relevant information concerning the environment are provided and considered. Due to the nature and size of the project, during the environmental impact assessment process, the European Union legislation, namely the EIA Directive 85/337 / EEC is considered. Moreover, in some cases, due to the lack of national standards and practical guidelines, when necessary those of EU member countries are considered. This paper presents an analysis of the EIA procedure followed on ‘Tirana – Elbasan’ Road project, with a focus on the application of the main stages of the procedure such as: screening, scoping, review, the EIA report; and consideration of alternatives, measures for impact prevention and reduction, and the public hearing T/discussion.

Keywords: highway, environmental impact assesment, Tirana, prevention

Procedia PDF Downloads 287
8741 Causes of Variation Orders in the Egyptian Construction Industry: Time and Cost Impacts

Authors: A. Samer Ezeldin, Jwanda M. El Sarag

Abstract:

Variation orders are of great importance in any construction project. Variation orders are defined as any change in the scope of works of a project that can be an addition omission, or even modification. This paper investigates the variation orders that occur during construction projects in Egypt. The literature review represents a comparison of causes of variation orders among Egypt, Tanzania, Nigeria, Malaysia and the United Kingdom. A classification of occurrence of variation orders due to owner related factors, consultant related factors and other factors are signified in the literature review. These classified events that lead to variation orders were introduced in a survey with 19 events to observe their frequency of occurrence, and their time and cost impacts. The survey data was obtained from 87 participants that included clients, consultants, and contractors and a database of 42 scenarios was created. A model is then developed to help assist project managers in predicting the frequency of variations and account for a budget for any additional costs and minimize any delays that can take place. Two experts with more than 25 years of experience were given the model to verify that the model was working effectively. The model was then validated on a residential compound that was completed in July 2016 to prove that the model actually produces acceptable results.

Keywords: construction, cost impact, Egypt, time impact, variation orders

Procedia PDF Downloads 142
8740 Towards Optimising Building Information Modelling and Building Management System in Higher Education Institutions Facility Management: A Review

Authors: Zhuoqun Sun, Francisco Sierra, A. Booth

Abstract:

With BIM rapidly implemented in the design and construction stage of a project, researchers begin to focus on improving the operation and maintenance stage with the aid of BIM. Since the increasing amount of electronic equipment installed in the building, building management system becomes mainstream for controlling a building, especially in higher education institutions that can play an important role in terms of reducing carbon emission and improving energy efficiency. Currently, an approach to integrate BIM and BMS to improve HEIs facility management has not been established yet. Thus, this paper aims to analyse the benefits, issues, and trends of BIM and BMS integration and their application in HEIs. A systematic literature review was carried out on SCOPUS by applying the PRISMA methodology. 73 articles have been chosen based on keywords, abstracts, and the full content of the articles. The benefit and existed issues from the articles are analysed. The review shows the need to develop a tool to improve facility management through BIM BMS integration.

Keywords: BIM, BMS, HEIs, review

Procedia PDF Downloads 133
8739 Faults in the Projects, Deviation in the Cost

Authors: S. Ahmed, P. Dlask, B. Hasan

Abstract:

There are several ways to estimate the cost of the construction project: simple and detailed. The process of estimating cost is usually done during the design stage, which should take long-time and the designer must give attention to all details. This paper explain the causes of the deviations occurring in the cost of the construction project, and determines the reasons of these differences between contractual cost and final cost of the construction project, through the study of literature review related to this field, and benefiting from the experience of workers in the field of building (owners, contractors) through designing a questionnaire, and finding the most ten important reasons and explain the relation between the contractual cost and the final cost according to these reasons. The difference between those values will be showed through diagrams drawn using the statistical program. In addition to studying the effects of overrun costs on the advancing of the project, and identify the most five important effects. According to the results, we can propose the right direction for the final cost evaluation and propose some measures that would help to control and adjust the deviation in the costs.

Keywords: construction projects, building, cost, estimating costs, delay, overrun

Procedia PDF Downloads 265
8738 A Probability Analysis of Construction Project Schedule Using Risk Management Tool

Authors: A. L. Agarwal, D. A. Mahajan

Abstract:

Construction industry tumbled along with other industry/sectors during recent economic crash. Construction business could not regain thereafter and still pass through slowdown phase, resulted many real estate as well as infrastructure projects not completed on schedule and within budget. There are many theories, tools, techniques with software packages available in the market to analyze construction schedule. This study focuses on the construction project schedule and uncertainties associated with construction activities. The infrastructure construction project has been considered for the analysis of uncertainty on project activities affecting project duration and analysis is done using @RISK software. Different simulation results arising from three probability distribution functions are compiled to benefit construction project managers to plan more realistic schedule of various construction activities as well as project completion to document in the contract and avoid compensations or claims arising out of missing the planned schedule.

Keywords: construction project, distributions, project schedule, uncertainty

Procedia PDF Downloads 308
8737 Expert Review on Conceptual Design Model of Assistive Courseware for Low Vision (AC4LV) Learners

Authors: Nurulnadwan Aziz, Ariffin Abdul Mutalib, Siti Mahfuzah Sarif

Abstract:

This paper reports an ongoing project regarding the development of Conceptual Design Model of Assistive Courseware for Low Vision (AC4LV) learners. Having developed the intended model, it has to be validated prior to producing it as guidance for the developers to develop an AC4LV. This study requires two phases of validation process which are through expert review and prototyping method. This paper presents a part of the validation process which is findings from experts review on Conceptual Design Model of AC4LV which has been carried out through a questionnaire. Results from 12 international and local experts from various respectable fields in Human-Computer Interaction (HCI) were discussed and justified. In a nutshell, reviewed Conceptual Design Model of AC4LV was formed. Future works of this study are to validate the reviewed model through prototyping method prior to testing it to the targeted users.

Keywords: assistive courseware, conceptual design model, expert review, low vision learners

Procedia PDF Downloads 516
8736 Simulating the Interaction of Strategy Development and Project Delivery

Authors: Nipun Agarwal, David Paul, Fareed Un Din

Abstract:

Every organization develops a strategy that needs to be implemented and is undertaken through project delivery. In essence, project requirements should exactly replicate an organization’s strategy. In reality this does not happen, and behavioral factors deviate the project delivery from the strategic objectives. This occurs as project stakeholders can have competing objectives. Resultantly, requirements that are implemented through projects are less aligned to the strategy. This paper develops a game theoretic model to simulate why such deviations occur. That explains the difference between strategy development and implementation.

Keywords: strategy, simulation, project management, game theory

Procedia PDF Downloads 100
8735 Machine Learning Approach to Project Control Threshold Reliability Evaluation

Authors: Y. Kim, H. Lee, M. Park, B. Lee

Abstract:

Planning is understood as the determination of what has to be performed, how, in which sequence, when, what resources are needed, and their cost within the organization before execution. In most construction project, it is evident that the inherent nature of planning is dynamic, and initial planning is subject to be changed due to various uncertain conditions of construction project. Planners take a continuous revision process during the course of a project and until the very end of project. However, current practice lacks reliable, systematic tool for setting variance thresholds to determine when and what corrective actions to be taken. Rather it is heavily dependent on the level of experience and knowledge of the planner. Thus, this paper introduces a machine learning approach to evaluate project control threshold reliability incorporating project-specific data and presents a method to automate the process. The results have shown that the model improves the efficiency and accuracy of the monitoring process as an early warning.

Keywords: machine learning, project control, project progress monitoring, schedule

Procedia PDF Downloads 222
8734 Construction Project Planning Using Fuzzy Critical Path Approach

Authors: Omar M. Aldenali

Abstract:

Planning is one of the most important phases of the management science and network planning, which represents the project activities relationship. Critical path is one of the project management techniques used to plan and control the execution of a project activities. The objective of this paper is to implement a fuzzy logic approach to arrange network planning on construction projects. This method is used to finding out critical path in the fuzzy construction project network. The trapezoidal fuzzy numbers are used to represent the activity construction project times. A numerical example that represents a house construction project is introduced. The critical path method is implemented on the fuzzy construction network activities, and the results showed that this method significantly affects the completion time of the construction projects.

Keywords: construction project, critical path, fuzzy network project, planning

Procedia PDF Downloads 109
8733 A Review of Information Systems Development in Developing Countries

Authors: B. N. Asare, O. A. Ajigini

Abstract:

Information systems (IS) are highly important in the operation of private and public organisations in developing and developed countries. Developing countries are saddled with many project failures during the implementation of information systems. However, successful information systems are greatly needed in developing countries in order to enhance their economies. This paper is highly important in view of the high failure rate of information systems in developing countries which needs to be reduced to minimum acceptable levels by means of recommended interventions. This paper centres on a review of IS development in developing countries. The paper presents evidences of the IS successes and failures in developing countries and posits a model to address the IS failures. The proposed model can then be utilised by developing countries to reduce their IS project implementation failure rate. A comparison is drawn between IS development in developing countries and developed countries. The paper provides valuable information to assist in reducing IS failure, and developing IS models and theories on IS development for developing countries.

Keywords: developing countries, information systems, IS development, information systems failure, information systems success, information systems success model

Procedia PDF Downloads 337
8732 Dilemmas of HRM in a Project-Oriented Organisation

Authors: Katarzyna Piwowar-Sulej

Abstract:

The functioning of a project-oriented organisation creates new and different, from the traditional ones, conditions for human resources management. In the analysed case HRM is primarily characterized by a double-track nature – on the one hand within the framework of permanent structures (departments) and, on the other, within the area of particular projects. The purpose of the article is to present the dilemmas associated with the development of selected HRM areas in project-oriented organisations. Theoretical discussion was supplemented by the results of empirical research.

Keywords: human resources management, tracks of HRM, project, project-oriented organisation

Procedia PDF Downloads 240
8731 Analysis of Particle Reinforced Metal Matrix Composite Crankshaft

Authors: R. S. Vikaash, S. Vinodh, T. S. Sai Prashanth

Abstract:

Six sigma is a defect reduction strategy enabling modern organizations to achieve business prosperity. The practitioners are in need to select best six sigma project among the available alternatives to achieve customer satisfaction. In this circumstance, this article presents a study in which six sigma project selection is formulated as Multi-Criteria Decision-Making(MCDM) problem and the best project has been found using AHP. Five main governing criteria and 14 sub criteria are being formulated. The decision maker’s inputs were gathered and computations were performed. The project with the high values from the set of projects is selected as the best project. Based on calculations, Project “P1”is found to be the best and further deployment actions have been undertaken in the organization.

Keywords: six Sigma, project selection, MCDM, analytic hierarchy process, business prosperity

Procedia PDF Downloads 318
8730 A Strategy of Green Sukuk to Promote Sustainable Development Goals (SDGs) in Indonesia

Authors: Amrial, Yuri Oktaviani, Ziyan Muhammad Farhan

Abstract:

On the phase of shifting paradigm into sustainability, Indonesia is involved in Sustainable Development Goals (SDGs) project. That act is revealed by creating Medium and Long Term Roadmap for Sustainable Finance in Indonesia which collaborated design by Indonesia Financial Service Board (OJK) and Ministry of Environment and Forestry. One of alternative for that infrastructure financing is sharia-based financing, Green Sukuk (Sukuk specified on sustainable infrastructure project). Green Sukuk for infrastructure financing in Indonesia can be issued by the government in the form of Sukuk Project Financing. Moreover, banks in Indonesia can also participate for the issuance of Green Sukuk. So that the banks can create a financing for people who are concerned about environmental issues. By using qualitative methods and literature review, this paper aims to discuss potential, strategy and planning of Green Sukuk for financing sustainable infrastructure in the purpose of SDGs. This paper will benefit for government to give scientific discussion on the strategy of Green Sukuk in promoting sustainable goals infrastructure project in Indonesia.

Keywords: green sukuk, infrastructure, SDGs, sustainable

Procedia PDF Downloads 334
8729 An Introduction to Critical Chain Project Management Methodology

Authors: Ranjini Ramanath, Nanjunda P. Swamy

Abstract:

Construction has existed in our lives since time immemorial. However, unlike any other industry, construction projects have their own unique challenges – project type, purpose and end use of the project, geographical conditions, logistic arrangements, largely unorganized manpower and requirement of diverse skill sets, etc. These unique characteristics bring in their own level of risk and uncertainties to the project, which cause the project to deviate from its planned objectives of time, cost, quality, etc. over the many years, there have been significant developments in the way construction projects are conceptualized, planned, and managed. With the rapid increase in the population, increased rate of urbanization, there is a growing demand for infrastructure development, and it is required that the projects are delivered timely, and efficiently. In an age where ‘Time is Money,' implementation of new techniques of project management is required in leading to successful projects. This paper proposes a different approach to project management, which if applied in construction projects, can help in the accomplishment of the project objectives in a faster manner.

Keywords: critical chain project management methodology, critical chain, project management, construction management

Procedia PDF Downloads 395
8728 A Study on How to Improve PMBOK (Project Management Body of Knowledge) Guidelines Performance by Simulation

Authors: Fatemeh Jaferi, Moslem Parsa, Seyed Mehdi Sajadi

Abstract:

The project-oriented organizations are more appropriate for sustainable environments. Any effective project-oriented organization should institutionalize its project management processes in such a manner to yield the greatest possible profits. The aim of this paper is to study the relationship between the project management PMBOK guideline (Project Management Body of Knowledge) and simulation technology in project-oriented organizations. The methodology involves using five steps for applying these two tools aimed at enhancing project management processes in the Lorestan Gas Corporation, as one of the project-oriented organization. Results show the implementation of such management approach leads to a 5% performance improvement and using PMBOK can be instrumental in effective delay management. The implementation of the aforementioned improvement package was effective in improving the efficiency of organizational processes; in terms of optimizing the resource utilization that has manifested itself in resource losses and cost reductions.

Keywords: project-orientation, processes, PMBOK, optimization, organization, management

Procedia PDF Downloads 370
8727 Role of Leadership in Project Management

Authors: Miriam Filipová, Peter Balco

Abstract:

At present, in Slovak and Czech Republic, the education within the field of Project Management is carried out either within the higher education or via commercial entities, whilst the most used contents are the commonly used methodologies of project management. Obtaining a diploma after completing a university degree or a training certificate does not automatically mean the success of the project or the success of the project manager. The importance of leadership and soft skills in project management is either not included at all within the training of project managers, or it is only partially reflected. From the methodology perspective, the most important things during the preparation and management of the projects are preparation of the project plan, resource planning, and project realization in accordance with the chosen methodology. However, the key element on which the success of the project depends on are the people – whether they are team members on the supplier's side, the stakeholders, or the end users. This research focuses on the real needs of working project managers, on the development of their strengths, expertise, skills, and knowledge regarding leadership and soft skills. At the same time, it looks into identifying the elements that they consider to be key to the success of the projects they have managed and successfully delivered. The result of this research is the input for creating recommendations for a comprehensive education of project managers in the field of leadership and soft skills.

Keywords: project management, leadership, soft skills, education, academic degree, certificates, skills, talents, knowledge

Procedia PDF Downloads 129
8726 New Product Development Typologies: An Analysis of Publications and Citations between 1992 and 2012

Authors: Ana Paula Vilas Boas Viveiros Lopes, Marly Monteiro de Carvalho

Abstract:

The new product development for decades has favored companies that can put their products to market quickly and efficiently, providing sustainable competitive advantage difficult to be achieved by their competitors. This paper presents the outcomes of a systematic review of the literature relating to new product development that was published between 1992 and 2012. A hybrid methodological approach that combines bibliometrics, content analysis and semantic analysis was applied. The review discusses the publication patterns, focusing on aspects related to scientific collaboration. The results show that the main academic journal that discusses this theme is “Journal of Product Innovation Management”. Although the first paper relating to this theme was published in 1992, the number of publications on the subject only began to increase substantially in 1999. Most of the studies reviewed in this paper applied qualitative research methods, indicating that most of the research on the theme is still in an exploratory phase.

Keywords: project type, project typology, new product development, sustainable competitive advantage

Procedia PDF Downloads 415
8725 Models, Resources and Activities of Project Scheduling Problems

Authors: Jorge A. Ruiz-Vanoye, Ocotlán Díaz-Parra, Alejandro Fuentes-Penna, José J. Hernández-Flores, Edith Olaco Garcia

Abstract:

The Project Scheduling Problem (PSP) is a generic name given to a whole class of problems in which the best form, time, resources and costs for project scheduling are necessary. The PSP is an application area related to the project management. This paper aims at being a guide to understand PSP by presenting a survey of the general parameters of PSP: the Resources (those elements that realize the activities of a project), and the Activities (set of operations or own tasks of a person or organization); the mathematical models of the main variants of PSP and the algorithms used to solve the variants of the PSP. The project scheduling is an important task in project management. This paper contains mathematical models, resources, activities, and algorithms of project scheduling problems. The project scheduling problem has attracted researchers of the automotive industry, steel manufacturer, medical research, pharmaceutical research, telecommunication, industry, aviation industry, development of the software, manufacturing management, innovation and technology management, construction industry, government project management, financial services, machine scheduling, transportation management, and others. The project managers need to finish a project with the minimum cost and the maximum quality.

Keywords: PSP, Combinatorial Optimization Problems, Project Management; Manufacturing Management, Technology Management.

Procedia PDF Downloads 389
8724 The Egyptian eGovernment Journey

Authors: Ali Abdelsattar Elshabrawy

Abstract:

The Egyptian government is struggling to build it's eGovernment project. They succeeded to build the Egyptian digital portal, which contain links for number of services provided by different ministries. For achieving such success, their are requirements necessary to build such a project such as: internet dissemination, IT literacy, Strategy, disqualification of paper based services. This paper is going to clarify the main obstacles to the Egyptian eGovernment project from both the supply and demand sides. Also will clarify the most critical requirements in this phase of the project lifecycle. This paper should be in great value for the project team and also for many other developing countries that share the same obstacles.

Keywords: the egyptian egovernment project lifecycle, supply side barriers, demand side barriers, egovernment project requirements

Procedia PDF Downloads 120
8723 Assessing Indicators, Challenges and Benefits of Sustainable Procurement in Construction Projects

Authors: Taha Anjamrooz, Sareh Rajabi, Salwa Bheiry

Abstract:

Procurement is a key process in construction project management. The present construction procurement practices have been extensively analyzed for disregarding sustainability in the project life cycle. Currently, there is a gap of information on status-quo of sustainable procurement in construction field. Thus, the aim of this study is to review sustainable procurement practices in the construction field. Disregard of three sustainability pillars is one of the major drawbacks of present construction procurement practices. Sustainable procurement is a developing idea that can enhance procurement practices and improve the sustainability performance of the construction projects. At present, sustainable procurement is still not entirely used in the construction projects. A comprehensive literature review indicated that the construction industry is still not entirely informed about the benefits and challenges of using sustainable procurement, and about important indicators that play major impacts on those benefits and challenges. This study assesses the major indicator, benefits and challenges encountered in applying sustainable procurement in the construction industry. In addition, this study investigates understanding of construction professionals on the benefits and challenges of utilizing sustainable procurement for construction projects through selected indicators that are categorized according to society and community needs.

Keywords: sustainability, sustainable development, sustainable procurement, procurement, construction industry

Procedia PDF Downloads 151
8722 A Case Study of Al-Shifa: A Healthcare Information System in Oman

Authors: Khamis Al-Gharbi, Said M. Gattoufi, Ali H. Al-Badi, Ali Al-Hashmi

Abstract:

The case study presents the progression of a project management of Al-Shifa, a healthcare information system in Oman. The case study describes the evolution of the implementation of a healthcare information system tailored to meet the needs of the healthcare units under the supervision of the Ministry of Health (MOH) in Oman. A focus group methodology was used for collecting the relevant information from the main project's stakeholders. In addition reports about the project made available for the researchers. The case analysis is made based on the Project Management approach developed by the Project Management Institute (PMI). The main finding that there was no formal project management approach adopted by the MOH for the development and implementation of the herewith mentioned healthcare information system project. Furthermore, the project had suffered a scope creep in terms of features, cost and time-schedule. The recommendations of the authors, for the rescue of the project from its current dilemma, consist of technological, administrative and human resources development actions.

Keywords: project management, information system, healthcare, Al-Shifa, Oman

Procedia PDF Downloads 360
8721 A Documentary Review of Theoretical and Practical Elements for a Genre Analysis of Thailand Travel Listicles

Authors: Pinyada Santisarun, Yaowaret Tharawoot, Songyut Akkakoson

Abstract:

This paper reports on a literature review sub-study of a larger research project which has been designed to identify the rhetorical organization of a travel writing genre, together with the use of lexical choices, syntactical structures, and graphological features, based on a randomly-selected corpus of Thailand travel listicles. Conducted as a library-based overview, this study aims to specify theoretical and practical elements for the said larger study. The materials for the review have been retrieved from various Internet sources, covering both public search engines and library databases. Generally, the article focuses on answering questions about the ‘what’ and the ‘how’ of such background elements widely discussed in the literature as the meaning of listicles, how the travel listicles’ patterns and regularities can be categorized to form a new genre, the effect of computer-mediated communication on the travel world, the travel language, and the current situation concerning the importance of travel listicles. The theoretical and practical data derived from this study provide valuable insights into the way in which the genre analysis and lexico-syntactical examination of Thailand travel listicles in the present authors’ larger research project can be properly conducted. The data gained can be added to the expanding body of knowledge in the field of the ESP genre.

Keywords: computer-mediated communication, digital writing, genre-based analysis, online travel writing, tourism language

Procedia PDF Downloads 115
8720 Review in Role of Geotextile on Soil Improvement

Authors: Sandra Ghavam Shirazi, Mohsen Ramezan Shirazi, Mohammadreza Golhashem

Abstract:

Nowadays by development of construction in modern world new techniques are introduced to civil engineering. As for geotechnical problems and demands of soil improvement, engineers are searching for decisive methods to ensure the safety of projects. As a popular material Geotextiles are used in almost every aspect of civil engineering. There is a vast variety of geotextiles and each kind has their own unique characteristics therefor to select the proper geotextile for a specific project their properties must be carefully examined. This review gathers and evaluates different parameters of geotextiles that are used in geotechnical field.

Keywords: geotextile, soft soils, fabric, stabilization, fiber

Procedia PDF Downloads 374
8719 Trends in Solving Assembly Job Shop Scheduling Problem: A Review

Authors: Midhun Paul, T. Radha Ramanan

Abstract:

The objective of this work is to present a state-of-the-art literature review highlighting the challenges in the research of the scheduling of assembly job shop problem and providing an insight on how the future directions of the research would be. The number of work has been substantial that it requires a review to enable one to understand the origin of the research and how it is getting evolved. This review paper presents a comprehensive review of the literature dealing with various studies carried on assembly job shop scheduling. The review details the evolution of the AJS from the perspective of other scheduling problems and also presents a classification scheme. The work also identifies the potential directions for future research, which we believe to be worthwhile considering.

Keywords: assembly job shop, future directions, manufacturing, scheduling

Procedia PDF Downloads 386