Search results for: mass timber construction
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 7121

Search results for: mass timber construction

7031 Learning Fashion Construction and Manufacturing Methods from the Past: Cultural History and Genealogy at the Middle Tennessee State University Historic Clothing Collection

Authors: Teresa B. King

Abstract:

In the millennial age, with more students desiring a fashion major yet fewer having sewing and manufacturing knowledge, this increases demand on academicians to adequately educate. While fashion museums have a prominent place for historical preservation, the need for apparel education via working collections of handmade or mass manufactured apparel is lacking in most universities in the United States, especially in the Southern region. Created in 1988, Middle Tennessee State University’s historic clothing collection provides opportunities to study apparel construction methods throughout history, to compare and apply to today’s construction and manufacturing methods, as well as to learn the cyclical nature/importance of historic styles on current and upcoming fashion. In 2019, a class exercise experiment was implemented for which students researched their family genealogy using Ancestry.com, identified the oldest visual media (photographs, etc.) available, and analyzed the garment represented in said media. The student then located a comparable garment in the historic collection and evaluated the construction methods of the ancestor’s time period. A class 'fashion' genealogy tree was created and mounted for public viewing/education. Results of this exercise indicated that student learning increased due to the 'personal/familial connection' as it triggered more interest in historical garments as related to the student’s own personal culture. Students better identified garments regarding the historical time period, fiber content, fabric, and construction methods utilized, thus increasing learning and retention. Students also developed increased learning and recognition of custom construction methods versus current mass manufacturing techniques, which impact today’s fashion industry. A longitudinal effort will continue with the growth of the historic collection and as students continue to utilize the historic clothing collection.

Keywords: ancestry, clothing history, fashion history, genealogy, historic fashion museum collection

Procedia PDF Downloads 114
7030 Forest Harvesting Policies and Practices in Tropical Forest of Terengganu, Malaysia: Industry Experiences

Authors: Mohd Zaki Hamzah, Roslan Rani, Ahmad Bazli Razali, Satiful Bahri Mamat, Abdul Hadi Ripin, Mohd Harun Esa

Abstract:

Ever since 1901, forest management and silviculture practices in Malaysia have been frequently reviewed and updated to take into account changes in forest conditions, markets, timber demand/supply and technical advances that can be achieved in industrial processes, logging and forest harvesting, and currently, the forest management system practiced in Peninsular Malaysia is the Selective Management System (SMS) which was introduced in 1978. This system requires the selection of management regime (felling) based on Pre-Felling Forest Inventory (Pre-F) data to ensure economical harvesting and also ensuring adequate standing stands for subsequent rounds of felling, while maintaining ecological balance and environmental quality. SMS regulates forest harvesting through area and volume controls, with the cutting cycle 30 years. Most of the forest management units (FMU) (in Peninsular Malaysia) implementing SMS have been certified by Forest Stewardship Council (FSC) and/or Program for Endorsement of Forest Certification (PEFC), and one such FMU belongs to Kumpulan Pengurusan Kayu Kayan Terengganu (KPKKT). KPKKT, a timber management subsidiary of Golden Pharos Berhad (GPB), adopts the SMS to manage its 108,900 ha of timber concessionary areas in its role as logs’ supplier for the consumption of three subsidiaries of GPB. KPKKT is also responsible for the sustainable development and management of its concession in accordance with the Sustainable Forest Management (SFM) standards to ensure that it addresses the loss of forest cover and forest degradation, forest-based economic, social and environmental benefits, and ecologically protecting forests while mobilising financial resources for the implementation of sustainable forest management planning, harvesting, monitoring and the marketing of products. This paper will detail out the management and harvesting guidelines imposed by the controlling government agency, and harvesting processes taken by KPKKT to comply with guidelines and eventually supplying timber to the relevant subsidiaries (downstream mills under GPB).

Keywords: sustainable forest management, silviculture, reduce impact logging, forest certification

Procedia PDF Downloads 61
7029 Time Overrun in Pre-Construction Planning Phase of Construction Projects

Authors: Hafiz Usama Imad, Muhammad Akram Akhund, Tauha Hussain Ali, Ali Raza Khoso, Fida Hussain Siddiqui

Abstract:

Construction industry plays a significant role in fulfilling the major requirements of the human being. It is one of the major constituents of every developed country. Although the construction industry of both the developing and developed countries encompasses a major part of the economy, and millions of rupees are utilized every year on various kinds of construction projects. But, this industry is facing numerous hurdles in terms of its budget and timely completion. Construction projects generally consist of several phases like planning, designing, execution, and finishing. This research study aims to determine the significant factors of time overrun in pre-construction planning (PCP) phase of construction projects in Pakistan. Questionnaires were distributed by various means and responses of respondents were compiled and collected data were then analyzed through a statistical technique using SPSS version 24. Major causes of time overrun in pre-construction planning phase; which is an extremely important phase of construction projects, were revealed. The research conclusion will provide a pathway for stakeholders to pay attention to the mentioned causes to overcome the major issue of time overrun.

Keywords: construction industry, Pakistan, pre-construction planning phase, time overrun

Procedia PDF Downloads 225
7028 A Prediction of Electrical Cost for High-Rise Building Construction

Authors: Picha Sriprachan

Abstract:

The increase in electricity prices affects the cost of high-rise building construction. The objectives of this research are to study the electrical cost, trend of electrical cost and to forecast electrical cost of high-rise building construction. The methods of this research are: 1) to study electrical payment formats, cost data collection methods, and the factors affecting electrical cost of high-rise building construction, 2) to study the quantity and trend of cumulative percentage of the electrical cost, and 3) to forecast the electrical cost for different types of high-rise buildings. The results of this research show that the average proportion between electrical cost and the value of the construction project is 0.87 percent. The proportion of electrical cost for residential, office and commercial, and hotel buildings are closely proportional. If construction project value increases, the proportion of electrical cost and the value of the construction project will decrease. However, there is a relationship between the amount of electrical cost and the value of the construction project. During the structural construction phase, the amount of electrical cost will increase and during structural and architectural construction phase, electrical cost will be maximum. The cumulative percentage of the electrical cost is related to the cumulative percentage of the high-rise building construction cost in the same direction. The amount of service space of the building, number of floors and the duration of the construction affect the electrical cost of construction. The electrical cost of construction forecasted by using linear regression equation is close to the electrical cost forecasted by using the proportion of electrical cost and value of the project.

Keywords: high-rise building construction, electrical cost, construction phase, architectural phase

Procedia PDF Downloads 360
7027 Rational Probabilistic Method for Calculating Thermal Cracking Risk of Mass Concrete Structures

Authors: Naoyuki Sugihashi, Toshiharu Kishi

Abstract:

The probability of occurrence of thermal cracks in mass concrete in Japan is evaluated by the cracking probability diagram that represents the relationship between the thermal cracking index and the probability of occurrence of cracks in the actual structure. In this paper, we propose a method to directly calculate the cracking probability, following a probabilistic theory by modeling the variance of tensile stress and tensile strength. In this method, the relationship between the variance of tensile stress and tensile strength, the thermal cracking index, and the cracking probability are formulated and presented. In addition, standard deviation of tensile stress and tensile strength was identified, and the method of calculating cracking probability in a general construction controlled environment was also demonstrated.

Keywords: thermal crack control, mass concrete, thermal cracking probability, durability of concrete, calculating method of cracking probability

Procedia PDF Downloads 303
7026 Assessing the Influence of Using Traditional Methods of Construction on Cost and Quality of Building Construction

Authors: Musoke Ivan, Birungi Racheal

Abstract:

The construction trend is characterized by increased use of modern methods yet traditional methods are cheaper in terms of costs, in addition to the benefits it offers to the construction sector, like providing more jobs that could have been worked with the intensive machines. The purpose of this research was to assess the influence of using Traditional methods of construction (TMC) on the costs and quality of building structures and determine the different ways. Traditional methods of construction (TMC) can be applicable and integrated into the construction trend, and propose ways how this can be a success. The study adopted a quantitative method approach targeting various construction professionals like Architects, Quantity surveyors, Engineers, and Construction Managers. Questionnaires and analyses of literature were used to obtain research data and findings. Simple random sampling was used to select 40 construction professionals to which questionnaires were administered. The data was then analyzed using Microsoft Excel. The findings of the research indicate that Traditional methods of construction (TMCs) in Uganda are cheaper in terms of costs, but the quality is still low. This is attributed to a lack of skilled labour and efficient supervision while undertaking tasks leading to low quality. The study identifies strategies that would improve Traditional methods of construction (TMC), which include the employment of skilled manpower and effective supervision. It also identifies the need by stakeholders like the government, clients, and professionals to appreciate Traditional methods of construction (TMCs) and allow for a levelled ground for Traditional Methods of Construction and Modern methods of construction (MMCs).

Keywords: traditional methods of construction, integration, cost, quality

Procedia PDF Downloads 30
7025 Creep Behaviour of Heterogeneous Timber-UHPFRC Beams Assembled by Bonding: Experimental and Analytical Investigation

Authors: K. Kong, E. Ferrier, L. Michel

Abstract:

The purpose of this research was to investigate the creep behaviour of the heterogeneous Timber-UHPFRC beams. New developments have been done to further improve the structural performance, such as strengthening of the timber (glulam) beam by bonding composite material combine with an ultra-high performance fibre reinforced concrete (UHPFRC) internally reinforced with or without carbon fibre reinforced polymer (CFRP) bars. However, in the design of wooden structures, in addition to the criteria of strengthening and stiffness, deformability due to the creep of wood, especially in horizontal elements, is also a design criterion. Glulam, UHPFRC and CFRP may be an interesting composite mix to respond to the issue of creep behaviour of composite structures made of different materials with different rheological properties. In this paper, we describe an experimental and analytical investigation of the creep performance of the glulam-UHPFRC-CFRP beams assembled by bonding. The experimental investigations creep behaviour was conducted for different environments: in- and outside under constant loading for approximately a year. The measured results are compared with numerical ones obtained by an analytical model. This model was developed to predict the creep response of the glulam-UHPFRC-CFRP beams based on the creep characteristics of the individual components. The results show that heterogeneous glulam-UHPFRC beams provide an improvement in both the strengthening and stiffness, and can also effectively reduce the creep deflection of wooden beams.

Keywords: carbon fibre-reinforced polymer (CFRP) bars, creep behaviour, glulam, ultra-high performance fibre reinforced concrete (UHPFRC)

Procedia PDF Downloads 377
7024 Research Methodology of Living Environment of Modern Residential Development in St. Petersburg

Authors: Kalina Alina Aidarovna, Khayrullina Yulia Sergeevna

Abstract:

The question of forming quality housing and living environment remains a vexed problem in the current situation of high-rise apartment building in big cities of Russia. At this start up stage of the modern so-called "mass housing" market it needs to identify key quality characteristics on a different scale from apartments to the district. This paper describes the methodology of qualitative assessment of modern mass housing construction, made on the basis of the ITMO university in cooperation with the institute of spatial planning "Urbanika," based on the case study of St. Petersburg’s residential mass housing built in 2011-2014. The methodology of the study of housing and living environment goes back to the native and foreign urbanists of 60s - 80s, such Jane Jacobs, Jan Gehl, Oscar Newman, Krasheninnikov, as well as Sommer, Stools, Kohnen and Sherrod, Krasilnikova, Sychev, Zhdanov, Tinyaeva considering spatial features of living environment in a wide range of its characteristics (environmental control, territorial and personalization, privacy, etc.). Assessment is carrying out on the proposed system of criteria developed for each residential environment scale-district, quarter, courtyard, building surrounding grounds, houses, and flats. Thus the objects of study are planning unit of residential development areas (residential area, neighborhood, quarter) residential units areas (living artist, a house), and households (apartments) consisting of residential units. As a product of identified methodology, after the results of case studies of more than 700 residential complexes in St. Petersburg, we intend the creation of affordable online resource that would allow conducting a detailed qualitative evaluation or comparative characteristics of residential complexes for all participants of the construction market-developers, designers, realtors and buyers. Thereby the main objective of the rating may be achieved to improve knowledge, requirements, and demand for quality housing and living environment among the major stakeholders of the construction market.

Keywords: methodology of living environment, qualitative assessment of mass housing, scale-district, vexed problem

Procedia PDF Downloads 436
7023 Construction Project Planning Using Fuzzy Critical Path Approach

Authors: Omar M. Aldenali

Abstract:

Planning is one of the most important phases of the management science and network planning, which represents the project activities relationship. Critical path is one of the project management techniques used to plan and control the execution of a project activities. The objective of this paper is to implement a fuzzy logic approach to arrange network planning on construction projects. This method is used to finding out critical path in the fuzzy construction project network. The trapezoidal fuzzy numbers are used to represent the activity construction project times. A numerical example that represents a house construction project is introduced. The critical path method is implemented on the fuzzy construction network activities, and the results showed that this method significantly affects the completion time of the construction projects.

Keywords: construction project, critical path, fuzzy network project, planning

Procedia PDF Downloads 111
7022 Using Wearable Technology to Monitor Workers’ Stress for Construction Safety: A Conceptual Framework

Authors: Namhun Lee, Seong Jin Kim

Abstract:

The construction industry represents one of the largest industries in the United States, yet it continues to face several occupational health and safety challenges. Many workers on construction sites are suffering from extended exposure to stressful situations such as poor and hazardous work environments and task complexity. Stress can be commonly defined as a feeling of emotional or physical tension, which can easily impact construction safety and result in a higher rate of job-related injuries in the construction industry. Physiological signals transmitted from wearable biosensors can be used to detect excessive stress. Therefore, workers’ stress should be detected and mitigated to prevent any type of serious incident or accident proactively. By doing this, construction productivity, as well as job satisfaction, would also be improved in the construction industry. To establish a foundation in this field of research, a conceptual framework for using wearable technology for construction safety has been developed for continuous and automatic monitoring of worker’s stress. The conceptual framework will serve as a foothold in future studies on the application of wearable technology for construction safety.

Keywords: construction safety, occupational stress, stress monitoring, wearable biosensors

Procedia PDF Downloads 126
7021 Uptake of Off-Site Construction: Benefit and Future Application

Authors: Faisal Alazzaz, Andrew Whyte

Abstract:

Off-site construction methods have played an important role in the construction sector in the past few decades. It is increasingly becoming a major alternative technique and strategic direction compared to traditional in-situ method. It produces a significant amount of value for the construction industry and the economy more generally. To date, an impressive number of studies have been lunched on the perceived perception of off-site construction. However, it seems that a quantifying benefit on the offsite construction area is lacking. Therefore, this paper examines the recent research literature on the benefits of off- site construction and provides future direction. In the beginning, this paper provides a brief history and current value of the off-site construction followed by a detailed discussion on the benefit of off-site construction. These benefits include but not limited to time saving, quality improvement, relieving skills shortages, cost reduction and productivity improvement. Toward this end, off-site construction should learn from other productive industry similar to services or manufacturing industry by applying operational management tools and techniques with extensive focus on employee empowerment will shed the light on future uptake of Off-site construction. This study is of value in providing scholars have a clear picture of perceived benefit of off-site construction research and give an opportunities for future uptake of off-site method.

Keywords: building projects, employer empowerment, off-site construction benefits, productivity

Procedia PDF Downloads 401
7020 Labour-saving Construction Using Buildability Framework through Strengthening Designers in Delivering More Buildable Designs

Authors: Muhammad Lawal A., Abdullateef Abdulkarim Jimoh

Abstract:

This study is to appraise the labour-saving construction methods achievable using a buildability framework through an improved design system. Adoption of labour-efficient technology and construction techniques will be necessary to supplement good buildable designs. Increased usage of prefabricated, modular, and standardized construction components, simplicity in the design, and the number of integrated elements all work to advance buildable design. The objectives of the study include `determining a more efficient buildability framework for designers to achieve labour-saving construction’. 20 completed building projects in Birnin Kebbi, Nigeria, is used as a case study to buttress the proposition that `a more buildable design using buildability frame result in labour-saving in construction adopting a Singapore study approach.

Keywords: buildability framework, buildable designs, construction, labour-saving construction

Procedia PDF Downloads 70
7019 Sustainable Framework Integration for Construction Project Management: A Multi-Dimensional Analysis

Authors: Tharaki S. Hettiarachchi

Abstract:

Sustainable construction has gained massive attention in the present world as the construction industry is highly responsible for carbon emissions and other types of unsustainable practices. Yet, the construction industry has not been able to completely attain sustainable goals. Therefore, the present study aims to identify the extent to which sustainability has been considered within the scope of construction project management and to analyze the challenges, gaps, and constraints associated. Accordingly, this study develops a sustainable framework to integrate in construction project management. In accomplishing the research aim, this research integrates a qualitative approach while relying on secondary data sources. The data shall be then analyzed with the use of a systematic literature review (SLR) method while following the PRISMA (2020) guideline and represented in a statistical form. The outcomes of this study may become highly significant in identifying the nature of the existing sustainable frameworks associated with construction project management scopes and to develop a new framework to integrate in order to enhance the effectiveness of sustainable applications in construction management. The outcomes of this research may benefit present and future construction professionals and academicians to organize sustainable construction-related knowledge in a useful way to apply in practical implementation for effective project management. Overall, this study directs present and future construction professionals toward an advanced construction project management mechanism.

Keywords: construction, framework development, project management, sustainability

Procedia PDF Downloads 32
7018 Factors Affecting Time Performance in Building Construction Projects

Authors: Ibraheem A. K. Mahameed

Abstract:

The aim of this study is to identify the risks affecting time performance of building construction projects in the West Bank in Palestine from contractors’ viewpoint. 38 risks that might affect time performance of building construction projects were defined through a detailed literature review. These risks have been classified into 6 groups: project, managerial, consultant, financial, external, and construction items. A questionnaire survey was performed to rank the considered risks in terms of severity and frequency. The analysis of the survey indicated that the top five risks affecting time performance of building construction projects in Palestine are: award project to the lowest price, political situation, poor communication and coordination between construction parties, change orders, and financial status of contractor.

Keywords: delay, time performance, construction, building

Procedia PDF Downloads 437
7017 Achieving Sustainable Rapid Construction Using Lean Principles

Authors: Muhamad Azani Yahya, Vikneswaran Munikanan, Mohammed Alias Yusof

Abstract:

There is the need to take the holistic approach in achieving sustainable construction for a contemporary practice. Sustainable construction is the practice that involved method of human preservation of the environment, whether economically or socially through responsibility, management of resources and maintenance utilizing support. This paper shows the correlation of achieving rapid construction with sustainable concepts using lean principles. Lean principles being used widely in the manufacturing industry, but this research will demonstrate the principles into building construction. Lean principle offers the benefits of stabilizing work flow and elimination of unnecessary work. Therefore, this principle contributes to time and waste reduction. The correlation shows that pulling factor provides the improvement of progress curve and stabilizing the time-quality relation. The finding shows the lean principles offer the elements of rapid construction synchronized with the elements of sustainability.

Keywords: sustainable construction, rapid construction, time reduction, lean construction

Procedia PDF Downloads 213
7016 Causes and Effects of Delays in Construction Projects in Akure, Ondo State, South-West Nigeria

Authors: K.T Alade, A.F Lawal, A.A Omonori

Abstract:

Construction is an everlasting activity across the globe. Likewise, the problem of delay in the construction industry is a global phenomenon. Although there are several reasons that may be responsible for delay during construction, this may vary from place to place and can be reduced to the minimum when identified. This study considered the major causes and effects of delay in the execution of construction projects in Akure, Ondo State, Nigeria. Using literatures, a total number of 30 causes of construction delays were identified. The convenient sampling technique was used to select sixty respondents for a survey. The respondents comprise twenty-two (22) clients, eighteen consultants (18) and twenty (20) contractors. The analyses of the primary data revealed that the three most important causes of delay in construction projects in Akure, Ondo State Nigeria are poor site management and supervision, inadequate contractors experience and client’s financial difficulties. Based on the findings of this study, recommendations were given on how the causes and effects of delay in construction can be mitigated.

Keywords: Akure, causes, construction projects, delay, effects

Procedia PDF Downloads 479
7015 Computational Modeling of Perpendicular to Grain Stress in a Non-Standard Glulam Beam

Authors: Wojciech Gilewski, Anna Al Sabouni-Zawadzka, Jan Pelczynski

Abstract:

This paper focuses on the analysis of tensile stresses perpendicular to the grain in simply supported beams with different geometry made of glued laminated timber. Two types of beams are considered: standard double-tapered beams described in Eurocode 5 and non-standard glulam beams with a flattened apex. The beams are analyzed using two methodology approaches: a code design verification method and a finite element method (FEM) in terms of the linear theory of elasticity with plane stress assumption. The performed analyses proved that both methodologies lead to consistent results in case of standard glulam beams and therefore, the FEM can be used in case of non-standard structures, which are not included in Eurocode 5. Moreover, the FE analysis of the glulam beam with a flattened apex showed that it can be treated as a structure with two apex zones.

Keywords: double-tapered beams, finite element analysis, glued laminated timber, perpendicular to grain stress

Procedia PDF Downloads 210
7014 Characterization of Sorption Behavior and Mass Transfer Properties of Four Central Africa Tropical Woods

Authors: Merlin Simo Tagne, Romain Rémond

Abstract:

This study provides the sorption isotherm, its hysteresis and their mass transfer properties of four Central Africa Tropical woods largely used for building construction: frake, lotofa, sapelle and ayous. Characterization of these three species in particular and Central Africa tropical woods, in general, was necessary to develop conservation and treatment of wood after first transformation using the drying. Isotherms were performed using a dynamic vapor sorption apparatus (Surface Measurement Systems) at 20 and 40°C. The mass diffusivity was determined in steady state using a specific vapometer. Permeability was determined using a specialized device developed to measure over a wide range of permeability values. Permeability and mass transfer properties are determined in the tangential direction with a ‘false’ quartersawn cutting (sapelle and lotofa) and in the radial direction with a ‘false’ flatsawn cutting (ayous and frake). The sample of sapelle, ayous and frake are heartwood when lotofa contains as well as heartwood than sapwood. Results obtained showed that the temperature effect on sorption behavior was low than relative humidity effect. We also observed a low difference between the sorption behavior of our woods and hysteresis of sorption decreases when the temperature increases. Hailwood-Horrobin model’s predicts the isotherms of adsorption and desorption of ours woods and parameters of this model are proposed. Results on the characterization of mass transfer properties showed that, in the steady state, mass diffusivity decreases exponentially when basal density increases. In the phase of desorption, mass diffusivity is great than in the phase of adsorption. The permeability of ours woods are greater than Australian hardwoods but lower than temperate woods. It is difficult to define a relationship between permeability and mass diffusivity.

Keywords: tropical woods, sorption isotherm, diffusion coefficient, gas permeability, Central Africa

Procedia PDF Downloads 464
7013 Hybrid Concrete Construction (HCC) for Sustainable Infrastructure Development in Nigeria

Authors: Muhammad Bello Ibrahim, M. Auwal Zakari, Aliyu Usman

Abstract:

Hybrid concrete construction (HCC) combines all the benefits of pre-casting with the advantages of cast in-situ construction. Merging the two, as a hybrid structure, results in even greater construction speed, value, and the overall economy. Its variety of uses has gained popularity in the United States and in Europe due to its distinctive benefits. However, the increase of its application in some countries (including Nigeria) has been relatively slow. Several researches have shown that hybrid construction offers an ultra-high performance concrete that offers superior strength, durability and aesthetics with design flexibility and within sustainability credentials, based on the available and economically visible technologies. This paper examines and documents the criterion that will help inform the process of deciding whether or not to adopt hybrid concrete construction (HCC) technology rather than more traditional alternatives. It also the present situation of design, construction and research on hybrid structures.

Keywords: hybrid concrete construction, Nigeria, sustainable infrastructure development, design flexibility

Procedia PDF Downloads 525
7012 Major Causes of Delay in Construction Projects

Authors: Y. Gholipour, E. Rezazadeh

Abstract:

Delay is one of the most serious and common problems of construction project that can affect project delivery unfavorably. This research presents the most important causes of delay in large dam projects based on a survey on some executed dam construction in Iran. In this survey a randomly selected samples of owners, consultants and contractors have been involved. The outcome of this survey revealed that scheduled payments, site management, shop drawing review process, unforeseen ground conditions and contractor experience as the most important factors affecting on delay in dam construction projects.

Keywords: delay, dam construction, project management, Iran

Procedia PDF Downloads 417
7011 Lean Mass and Fat Mass Distribution in Ukrainian Postmenopausal Women with Abdominal Овesity and Metabolic Syndrome

Authors: V. V. Povoroznyuk, Lar. P. Martynyuk, N. I. Dzerovych, Lil. P. Martyntyuk

Abstract:

Objective: Menopause-related changes in female body are associated with the greater risk of metabolic syndrome (MS), which includes obesity, dyslipidemia, impaired glucose tolerance, hypertension. The aim of our study was to reveal peculiarities of fat and lean mass distribution between postmenopausal women with abdominal obesity and with MS. Materials and Methods: The sample consisted of 43 postmenopausal 60 – 69 years old women (age: mean = 64,8; S.D. = 0,4); duration of menopause: mean = 14,5; S.D.= 0,9). The diagnosis of MS was considered according to IDF (2005 yr) criteria. Lean and fat mass distrubution were measured by dual-energy X-ray absortiometry, and were compared for the cohorts with and without MS. Data were analyzed using Statistical Package 6.0 (Statsoft). Results: Findings revealed that 24 (55,8 %) of postmenopausal women had MS. In patients with and without MS compared, fat mass was higher in the former group (41248,25±2263,89 and 29817,68±2397,78 respectively; F=11,9; p=0,001) and at different body regions also: gynoid fat (6563,72±348,19 and 5115,21±392,43 respectively; F=7,6; p=0,008), android fat (3815,45±200,8128 and 2798,15±282,79 respectively; F=9,06; p=0,004. Lean mass comparing didn’t show significant differences in female with and without MS (42548,0±1239,18 and 40667,53±1223,78 respectively; F=1,1; p=0,29) and at different body regions also. Conclusion: These findings suggest that in postmenopausal women with MS there is prevalence of fat mass without increasing of lean mass quantity in compare to female with abdominal obesity without MS.

Keywords: lean mass, fat mass, овesity, metabolic syndrome, women, postmenopausal period

Procedia PDF Downloads 434
7010 Development of Construction Cost Optimization System Using Genetic Algorithm Method

Authors: Hyeon-Seung Kim, Young-Hwan Kim, Sang-Mi Park, Min-Seo Kim, Jong-Myeung Shin, Leen-Seok Kang

Abstract:

The project budget at the planned stage might be changed by the insufficient government budget or the design change. There are many cases more especially in the case of a project performed for a long period of time. If the actual construction budget is insufficient comparing with the planned budget, the construction schedule should also be changed to match the changed budget. In that case, most project managers change the planned construction schedule by a heuristic approach without a reasonable consideration on the work priority. This study suggests an optimized methodology to modify the construction schedule according to the changed budget. The genetic algorithm was used to optimize the modified construction schedule within the changed budget. And a simulation system of construction cost histogram in accordance with the construction schedule was developed in the BIM (Building Information Modeling) environment.

Keywords: 5D, BIM, GA, cost optimization

Procedia PDF Downloads 568
7009 Is It Important to Measure the Volumetric Mass Density of Nanofluids?

Authors: Z. Haddad, C. Abid, O. Rahli, O. Margeat, W. Dachraoui, A. Mataoui

Abstract:

The present study aims to measure the volumetric mass density of NiPd-heptane nanofluids synthesized using a one-step method known as thermal decomposition of metal-surfactant complexes. The particle concentration is up to 7.55 g/l and the temperature range of the experiment is from 20°C to 50°C. The measured values were compared with the mixture theory and good agreement between the theoretical equation and measurement were obtained. Moreover, the available nanofluids volumetric mass density data in the literature is reviewed.

Keywords: NiPd nanoparticles, nanofluids, volumetric mass density, stability

Procedia PDF Downloads 373
7008 Impact of Mass Customization for 3D Geographic Information Systems under Turbulent Environments

Authors: Abdo Shabah

Abstract:

Mass customization aims to produce customized goods (allowing economies of scope) at lower cost (to achieve economies of scale) using multiple strategies (modularization and postponement). Through a simulation experiment of organizations under turbulent environment, we aim to compare standardization and mass customization of services and assess the impact of different forms of mass customization (early and late postponement) on performance, quality and consumer satisfaction, on the use of modular dynamic 3D Geographic Information System. Our hypothesis is that mass customization performs better and achieves better quality in turbulent environment than standardization, but only when using early postponement strategies. Using mixed methods study, we try to confirm our hypothesis.

Keywords: mass customization, postponement, experiment, performance, quality, satisfaction, 3D GIS

Procedia PDF Downloads 432
7007 Role of Non-Timber Forest Products in Local Livelihood and Household Economies in Resource-Rich vs. Resource Poor Forest Area of Mizoram

Authors: Uttam Kumar Sahoo, K. Lalhmingsangi, J. H. Lalremruati

Abstract:

Non-timber forest resources particularly the high-value, low volume NTFPs has drawn interest as an activity all over the world during the past three decades that could raise standards of living for the rural folks while being compatible with forest conservation. This is particularly true for the people living in and around or fringes of protected areas. However, the economics that plays between resources’ stock and its utilization by the humans is yet to be validated and evaluated logistically. A study was therefore designed to understand the linkages between resource (especially NTFPs) availability and their utilization, existing threats to this biodiversity conservation and the role of NTFPs within the livelihood systems of those households that are most directly involved in creating conservation threats. About 25% of the households were sampled from the two sites ‘resource-rich’ and ‘resource poor’ area of Dampa Tiger Reserve (Western boundary). Our preliminary findings suggest that the collection of relatively high-volume and low value NTFPs such as fuelwood, fodder has caused degradation of forest resources while the low-volume and high-value NTFPs such as wild edible mushrooms, vegetables, other specialty food products, inputs to crafts, medicinal plants have resulted into species promotion/conservation through their domestication in traditional agroforestry systems including home gardens and/or collateral protection of the Tiger Reserve. It is thus suggested that proper assessment of these biodiversities, their direct and indirect valuation, market and non-market profits etc be carried out in greater details which would result in prescribing effective management plans around the park.

Keywords: household economy, livelihood strategies, non-timber forest products, species conservation

Procedia PDF Downloads 166
7006 The Eco-Efficient Construction: A Review of Embodied Energy in Building Materials

Authors: Francesca Scalisi, Cesare Sposito

Abstract:

The building construction industry consumes a large amount of resources and energy, both during construction (embodied energy) and during the operational phase (operating energy). This paper presents a review of the literature on low carbon and low embodied energy materials in buildings. The embodied energy comprises the energy consumed during the extraction, processing, transportation, construction, and demolition of building materials. While designing a nearly zero energy building, it is necessary to choose and use materials, components, and technologies that allow to reduce the consumption of energy and also to reduce the emissions in the atmosphere during all the Life Cycle Assessment phases. The appropriate choice of building materials can contribute decisively to reduce the energy consumption of the building sector. The increasing worries for the environmental impact of construction materials are witnessed by a lot of studies. The mentioned worries have brought again the attention towards natural materials. The use of more sustainable construction materials and construction techniques represent a major contribution to the eco-efficiency of the construction industry and thus to a more sustainable development.

Keywords: embodied energy, embodied carbon, life cycle assessment, architecture, sustainability, material construction

Procedia PDF Downloads 305
7005 Experimental Investigation of Cold-Formed Steel-Timber Board Composite Floor Systems

Authors: Samar Raffoul, Martin Heywood, Dimitrios Moutaftsis, Michael Rowell

Abstract:

This paper comprises an experimental investigation into the structural performance of cold formed steel (CFS) and timber board composite floor systems. The tests include a series of small-scale pushout tests and full-scale bending tests carried out using a refined loading system to simulate uniformly distributed constant load. The influence of connection details (screw spacing and adhesives) on floor performance was investigated. The results are then compared to predictions from relevant existing models for composite floor systems. The results of this research demonstrate the significant benefits of considering the composite action of the boards in floor design. Depending on connection detail, an increase in flexural stiffness of up to 40% was observed in the floor system, when compared to designing joists individually.

Keywords: cold formed steel joists, composite action, flooring systems, shear connection

Procedia PDF Downloads 108
7004 Household's Willingness to Pay for Safe Non-Timber Forest Products at Morikouali-Ye Community Forest in Cameroon

Authors: Eke Balla Sophie Michelle

Abstract:

Forest provides a wide range of environmental goods and services among which, biodiversity or consumption goods and constitute public goods. Despite the importance of non-timber forest products (NTFPs) in sustaining livelihood and poverty smoothening in rural communities, they are highly depleted and poorly conserved. Yokadouma is a town where NTFPs is a renewable resource in active exploitation. It has been found that such exploitation is done in the same conditions as other localities that have experienced a rapid depletion of their NTFPs in destination to cities across Cameroon, Central Africa, and overseas. Given these realities, it is necessary to access the consequences of this overexploitation through negative effects on both the population and the environment. Therefore, to enhance participatory conservation initiatives, this study determines the household’s willingness to pay in community forest (CF) of Morikouali-ye, eastern region of Cameroon, for sustainable exploitation of NTFPs using contingent valuation method (CVM) through two approaches, one parametric (Logit model) and the other non-parametric (estimator of the Turnbull lower bound). The results indicate that five species are the most collected in the study area: Irvingia gabonensis, the Ricinodendron heudelotii, Gnetum, the Jujube and bark, their sale contributes significantly to 41 % of total household income. The average willingness to pay through the Logit model and the Turnbull estimator is 6845.2861 FCFA and 4940 FCFA respectively per household per year with a social cost of degradation estimated at 3237820.3253 FCFA years. The probability to pay increases with income, gender, number of women in the household, age, the commercial activity of NTFPs and decreases with the concept of sustainable development.

Keywords: non timber forest product, contingent valuation method, willingness to pay, sustainable development

Procedia PDF Downloads 415
7003 Optimization and Vibration Suppression of Double Tuned Inertial Mass Damper of Damped System

Authors: Chaozhi Yang, Xinzhong Chen, Guoqing Huang

Abstract:

Inerter is a two-terminal inertial element that can produce apparent mass far larger than its physical mass. A double tuned inertial mass damper (DTIMD) is developed by combining a spring with an inerter and a dashpot in series to replace the viscous damper of a tuned mass damper (TMD), and its performance is investigated. Firstly, the DTIMD is optimized numerically with H∞ and H2 methods considering the system’s damping based on the single-degree-of-freedom (SDOF)-DTIMD system, and the optimal structural parameters are obtained. Then, compared with a TMD, the control effect of the DTIMD with the optimal structural parameters on wind-induced vibration of a wind turbine in downwind direction under the shutdown condition is studied. The results demonstrate that the vibration suppression of the DTIMD is superior than that of a TMD at the same mass ratio. And at the identical vibration suppression, the tuned mass of the DTIMD can be reduced by up to 40% compared with a TMD.

Keywords: wind-induced vibration, vibration control, inerter, tuned mass damper, damped system

Procedia PDF Downloads 126
7002 Methodology of Construction Equipment Optimization for Earthwork

Authors: Jaehyun Choi, Hyunjung Kim, Namho Kim

Abstract:

Earthwork is one of the critical civil construction operations that require large-quantities of resources due to its intensive dependency upon construction equipment. Therefore, efficient construction equipment management can highly contribute to productivity improvements and cost savings. Earthwork operation utilizes various combinations of construction equipment in order to meet project requirements such as time and cost. Identification of site condition and construction methods should be performed in advance in order to develop a proper execution plan. The factors to be considered include capacity of equipment assigned, the method of construction, the size of the site, and the surrounding condition. In addition, optimal combination of various construction equipment should be selected. However, in real world practice, equipment utilization plan is performed based on experience and intuition of management. The researchers evaluated the efficiency of various alternatives of construction equipment combinations by utilizing the process simulation model, validated the model from a case study project, and presented a methodology to find optimized plan among alternatives.

Keywords: earthwork operation, construction equipment, process simulation, optimization

Procedia PDF Downloads 403