Search results for: major dams
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 7534

Search results for: major dams

7534 Finite Difference Method of the Seismic Analysis of Earth Dam

Authors: Alaoua Bouaicha, Fahim Kahlouche, Abdelhamid Benouali

Abstract:

Many embankment dams have suffered failures during earthquakes due to the increase of pore water pressure under seismic loading. After analyzing of the behavior of embankment dams under severe earthquakes, major advances have been attained in the understanding of the seismic action on dams. The present study concerns numerical analysis of the seismic response of earth dams. The procedure uses a nonlinear stress-strain relation incorporated into the code FLAC2D based on the finite difference method. This analysis provides the variation of the pore water pressure and horizontal displacement.

Keywords: Earthquake, Numerical Analysis, FLAC2D, Displacement, Embankment Dam, Pore Water Pressure

Procedia PDF Downloads 373
7533 Size Effects on Structural Performance of Concrete Gravity Dams

Authors: Mehmet Akköse

Abstract:

Concern about seismic safety of concrete dams have been growing around the world, partly because the population at risk in locations downstream of major dams continues to expand and also because it is increasingly evident that the seismic design concepts in use at the time most existing dams were built were inadequate. Most of the investigations in the past have been conducted on large dams, typically above 100m high. A large number of concrete dams in our country and in other parts of the world are less than 50m high. Most of these dams were usually designed using pseudo-static methods, ignoring the dynamic characteristics of the structure as well as the characteristics of the ground motion. Therefore, it is important to carry out investigations on seismic behavior this category of dam in order to assess and evaluate the safety of existing dams and improve the knowledge for different high dams to be constructed in the future. In this study, size effects on structural performance of concrete gravity dams subjected to near and far-fault ground motions are investigated including dam-water-foundation interaction. For this purpose, a benchmark problem proposed by ICOLD (International Committee on Large Dams) is chosen as a numerical application. Structural performance of the dam having five different heights is evaluated according to damage criterions in USACE (U.S. Army Corps of Engineers). It is decided according to their structural performance if non-linear analysis of the dams requires or not. The linear elastic dynamic analyses of the dams to near and far-fault ground motions are performed using the step-by-step integration technique. The integration time step is 0.0025 sec. The Rayleigh damping constants are calculated assuming 5% damping ratio. The program NONSAP modified for fluid-structure systems with the Lagrangian fluid finite element is employed in the response calculations.

Keywords: concrete gravity dams, Lagrangian approach, near and far-fault ground motion, USACE damage criterions

Procedia PDF Downloads 267
7532 Strength Analysis of RCC Dams Subject to the Layer-by-Layer Construction Method

Authors: Archil Motsonelidze, Vitaly Dvalishvili

Abstract:

Existing roller compacted concrete (RCC) dams indicate that the layer-by-layer construction method gives considerable economies as compared with the conventional methods. RCC dams have also gained acceptance in the regions of high seismic activity. Earthquake resistance analysis of RCC gravity dams based on nonlinear finite element technique is presented. An elastic-plastic approach is used to describe the material of a dam while it is under static conditions (period of construction). Seismic force, as an acceleration equivalent to that produced by a real earthquake, is supposed to act when the dam is completed. The materials of the dam and foundation may be nonhomogeneous and anisotropic. The “dam-foundation” system is idealized as a plain strain problem.

Keywords: finite element method, layer-by-layer construction, RCC dams, strength analysis

Procedia PDF Downloads 542
7531 Overtopping Protection Systems for Overflow Earth Dams

Authors: Omid Pourabdollah, Mohsen Misaghian

Abstract:

Overtopping is known as one the most important reasons for the failure of earth dams. In some cases, it has resulted in heavy damages and losses. Therefore, enhancing the safety of earth dams against overtopping has received much attention in the past four decades. In this paper, at first, the overtopping phenomena and its destructive consequences will be introduced. Then, overtopping failure mechanism of embankments will be described. Finally, different types of protection systems for stabilization of earth dams against overtopping will be presented. These include timber cribs, riprap and gabions, reinforced earth, roller compacted concrete, and the precast concrete blocks.

Keywords: embankment dam, overtopping, roller compacted concrete, wedge concrete block

Procedia PDF Downloads 152
7530 Challenges of Design, Cost and Surveying in Dams

Authors: Ali Mohammadi

Abstract:

The construction of Embankment dams is considered one of the most challenging construction projects, for which several main reasons can be mentioned. Excavation and embankment must be done in a large area, and its design is based on preliminary studies, but at the time of construction, it is possible that excavation does not match with the stability or slope of the rock, or the design is incomplete, and corrections should be made in order to be able to carry out excavation and embankment. Also, the progress of the work depends on the main factors, the lack of each of which can slow down the construction of the dams, and lead to an increase in costs, and control of excavations and embankments and calculations of their volumes are done in this collection. In the following, we will investigate three Embankment dams in Iran that faced these challenges and how they overcame these challenges. KHODA AFARIN on the Aras River between the two countries of IRAN and AZARBAIJAN, SIAH BISHEH PUMPED STORAGE on CHALUS River and GOTVAND on KARUN River are among the most important dams built in Iran.

Keywords: section, data transfer, tunnel, free station

Procedia PDF Downloads 65
7529 Roller Compacting Concrete “RCC” in Dams

Authors: Orod Zarrin, Mohsen Ramezan Shirazi

Abstract:

Rehabilitation of dam components such as foundations, buttresses, spillways and overtopping protection require a wide range of construction and design methodologies. Geotechnical Engineering considerations play an important role in the design and construction of foundations of new dams. Much investigation is required to assess and evaluate the existing dams. The application of roller compacting concrete (RCC) has been accepted as a new method for constructing new dams or rehabilitating old ones. In the past 40 years there have been so many changes in the usage of RCC and now it is one of most satisfactory solutions of water and hydropower resource throughout the world. The considerations of rehabilitation and construction of dams might differ due to upstream reservoir and its influence on penetrating and dewatering of downstream, operations requirements and plant layout. One of the advantages of RCC is its rapid placement which allows the dam to be operated quickly. Unlike ordinary concrete it is a drier mix, and stiffs enough for compacting by vibratory rollers. This paper evaluates some different aspects of RCC and focuses on its preparation progress.

Keywords: spillway, vibrating consistency, fly ash, water tightness, foundation

Procedia PDF Downloads 600
7528 Landscape Assessment of the Dam and Motorway Networks that Provide Visual and Recreational Opportunities: Case Study of Artvin (Turkey)

Authors: Banu Karasah, Derya Sarı

Abstract:

Nature changes as a result of human necessities constantly. This change mostly feels in natural water sources which are reconstructed with an effect of dams and motorways. On the other hand, dams and motorways demolish and re-shape nature while the visual quality of landscape gets a new character. Changing and specialization new landscapes will be very important to protection-usage balance to explore sustainable usage facilities. The main cause of the selection of Artvin city is, it has very important geographical location and one of the most attraction points in the World with its biodiversity, conservation areas and natural landscape characteristics. Coruh River is one of the most significant landscape identity element of Artvin. This river begins with Erzurum and falls into the Black Sea in Batumi in Georgia, many dams, and hydroelectric station are located during this basin. Borcka, Muratli and Deriner dams have already been built. Moreover, Deriner is 6th highest dams all over the world. As a result of dams, motorways route were re-shaped and the ways which have already changed because of elevation is directly affected several of natural destruction. In contrast, many different reservoirs in Coruh Basin provide new vista point that has high visual quality. In this study, we would like to evaluate with sustainable landscape design in 76 km river corridor, which is mainly based on Deriner, Borcka and Muratli Dams and determination of their basin-lakes recreational potential and opportunities. Lastly, we are going to give some suggestion about the potential of the corridor.

Keywords: Artvin, dam reservoirs, landscape assessment, river corridor, visual quality

Procedia PDF Downloads 525
7527 Study of the Quality of Surface Water in the Upper Cheliff Basin

Authors: Touhari Fadhila, Mehaiguene Madjid, Meddi Mohamed

Abstract:

This work aims to assess the quality of water dams based on the monitoring of physical-chemical parameters by the National Agency of Water Resources (ANRH) for a period of 10 years (1999-2008). Quality sheets of surface water for the four dams in the region of upper Cheliff (Ghrib, Deurdeur, Harreza, and Ouled Mellouk) show a degradation of the quality (organic pollution expressed in COD and OM) over time. Indeed, the registered amount of COD often exceeds 50 mg/ l, and the OM exceeds 15 mg/l. This pollution is caused by discharges of wastewater and eutrophication. The waters of dams show a very high salinity (TDS = 2574 mg/l in 2008 for the waters of the dam Ghrib, standard = 1500 mg/l). The concentration of nitrogenous substances (NH4+, NO2-) in water is high in 2008 at Ouled Melloukdam. This pollution is caused by the oxidation of nitrogenous organic matter. On the other hand, we studied the relationship between the evolution of quality parameters and filling dams. We observed a decrease in the salinity and COD following an improvement of the filling state of dams, this resides in the dilution water through the contribution of rainwater. While increased levels of nitrates and phosphorus in the waters of four dams studied during the rainy season is compared to the dry period, this increase may be due to leaching from fertilizers used in agricultural soils situated in watersheds.

Keywords: surface water quality, pollution, physical-chemical parameters, upper Cheliff basin.

Procedia PDF Downloads 227
7526 The Effect of Foundation on the Earth Fill Dam Settlement

Authors: Masoud Ghaemi, Mohammadjafar Hedayati, Faezeh Yousefzadeh, Hoseinali Heydarzadeh

Abstract:

Careful monitoring in the earth dams to measure deformation caused by settlement and movement has always been a concern for engineers in the field. In order to measure settlement and deformation of earth dams, usually, the precision instruments of settlement set and combined Inclinometer that is commonly referred to IS instrument will be used. In some dams, because the thickness of alluvium is high and there is no possibility of alluvium removal (technically and economically and in terms of performance), there is no possibility of placing the end of IS instrument (precision instruments of Inclinometer-settlement set) in the rock foundation. Inevitably, have to accept installing pipes in the weak and deformable alluvial foundation that leads to errors in the calculation of the actual settlement (absolute settlement) in different parts of the dam body. The purpose of this paper is to present new and refine criteria for predicting settlement and deformation in earth dams. The study is based on conditions in three dams with a deformation quite alluvial (Agh Chai, Narmashir and Gilan-e Gharb) to provide settlement criteria affected by the alluvial foundation. To achieve this goal, the settlement of dams was simulated by using the finite difference method with FLAC3D software, and then the modeling results were compared with the reading IS instrument. In the end, the caliber of the model and validate the results, by using regression analysis techniques and scrutinized modeling parameters with real situations and then by using MATLAB software and CURVE FITTING toolbox, new criteria for the settlement based on elasticity modulus, cohesion, friction angle, the density of earth dam and the alluvial foundation was obtained. The results of these studies show that, by using the new criteria measures, the amount of settlement and deformation for the dams with alluvial foundation can be corrected after instrument readings, and the error rate in reading IS instrument can be greatly reduced.

Keywords: earth-fill dam, foundation, settlement, finite difference, MATLAB, curve fitting

Procedia PDF Downloads 187
7525 Hydrological Benefits Sharing Concepts in Constructing Friendship Dams on Transboundary Tigris River Between Iraq and Turkey

Authors: Thair Mahmood Altaiee

Abstract:

Because of the increasing population and the growing water requirements from the transboundary water resources within riparian countries in addition to un-proper management of these transboundary water resources, it is likely that a conflicts on the water will be occurred. So it is mandatory to search solutions to mitigate the action and probabilities of these undesired conflicts. One of the solutions for these crises may be sharing the riparian countries in the management of their transboundary water resources and share benefit. Effective cooperation on a transboundary river is any action by the riparian countries that lead to improve management of the river to their mutual acceptance. In principle, friendship dams constructed by riparian countries may play an important role in preventing conflicts like the Turkish-Syrian friendship dam on Asi river (Orontes), Iranian-Tukmenistan dam on Hariroud river, Bulgarian-Turkish dam on Tundzha river, Brazil-Paraguay dam on Parana river, and Aras dam between Iran and Azerbaijan. The objective of this study is to focus the light on the hydrological aspects of cooperation in constructing dams on the transboundary rivers, which may consider an option to prevent conflicts on water between the riparian countries. The various kinds of benefits and external impacts associated with cooperation in dams construction on the transboundary rivers with a real examples will be presented and analyzed. The hydrological benefit sharing from cooperation in dams construction, which type of benefit sharing mechanisms are applicable to dams, and how they vary were discussed. The study considered the cooperative applicability to dams on shared rivers according to selected case study of friendship dams in the world to illustrate the relevance of the cooperation concepts and the feasibility of such propose cooperation between Turkey and Iraq within the Tigris river. It is found that the opportunities of getting benefit from cooperation depend mainly on the hydrological boundary and location of the dam in relation to them. The desire to cooperate on dams construction on transboundary rivers exists if the location of a dam upstream will increase aggregate net benefits. The case studies show that various benefit sharing mechanisms due to cooperation in constructing friendship dams on the riparian countries border are possible for example when the downstream state (Iraq) convinces the upstream state (Turkey) to share building a dam on Tigris river across the Iraqi –Turkish border covering the cost and sharing the net benefit derived from this dam. These initial findings may provide guidance for riparian states engaged in and donors facilitating negotiation on dam projects on transboundary rivers.

Keywords: friendship dams, transboundary rivers, water cooperation, benefit sharing

Procedia PDF Downloads 137
7524 Effect of Moisture Content Compaction in the Geometry Definition of Earth Dams

Authors: Julian B. García, Virginie Q. R. Pinto, André P. Assis

Abstract:

This paper presents numerical flow and slope stability simulations in three typical sections of earth dams built in tropical regions, two homogeneous with different slope inclinations, and the other one heterogeneous with impermeable core. The geotechnical material parameters used in this work were obtained from a lab testing of physical characterization, compaction, consolidation, variable load permeability and saturated triaxial type CD for compacted soil samples with standard proctor energy at optimum moisture content (23%), optimum moisture content + 2% and optimum moisture content +5%. The objective is to analyze the general behavior of earth dams built in rainy regions where optimum moisture is exceeded. The factor of safety is satisfactory for the three sections compacted in all moisture content during the stages of operation and end of construction. On The other hand, the rapid drawdown condition is the critical phase for homogeneus dams configuration, the factor of safety obtained were unsatisfactory. In general, the heterogeneous dam behavior is more efficient due to the fact that the slopes are made up of gravel, which favors the dissipation of pore pressures during the rapid drawdown. For the critical phase, the slopes should have lower inclinations of the upstream and downstream slopes to guarantee stability, although it increases the costs.

Keywords: earth dams, flow, moisture content, slope stability

Procedia PDF Downloads 182
7523 Seismic Integrity Determination of Dams in Urban Areas

Authors: J. M. Mayoral, M. Anaya

Abstract:

The urban and economic development of cities demands the construction of water use and flood control infrastructure. Likewise, it is necessary to determine the safety level of the structures built with the current standards and if it is necessary to define the reinforcement actions. The foregoing is even more important in structures of great importance, such as dams, since they imply a greater risk for the population in case of failure or undesirable operating conditions (e.g., seepage, cracks, subsidence). This article presents a methodology for determining the seismic integrity of dams in urban areas. From direct measurements of the dynamic properties using geophysical exploration and ambient seismic noise measurements, the seismic integrity of the concrete-faced rockfill dam selected as a case of study is evaluated. To validate the results, two accelerometer stations were installed (e.g., free field and crest of the dam). Once the dynamic properties were determined, three-dimensional finite difference models were developed to evaluate the dam seismic performance for different intensities of movement, considering the site response and soil-structure interaction effects. The seismic environment was determined from the uniform hazard spectra for several return periods. Based on the results obtained, the safety level of the dam against different seismic actions was determined, and the effectiveness of ambient seismic noise measurements in dynamic characterization and subsequent evaluation of the seismic integrity of urban dams was evaluated.

Keywords: risk, seismic, soil-structure interaction, urban dams

Procedia PDF Downloads 107
7522 Risk Aversion and Dynamic Games between Hydroelectric Operators under Uncertainty

Authors: Abdessalem Abbassi, Ahlem Dakhlaoui, Lota D. Tamini

Abstract:

This article analyses management of hydropower dams within two different industrial structures: monopolistic and oligopolistic; when hydroelectricity producers are risk averse and face demand uncertainty. In each type of market structure we determine the water release path in closed-loop equilibrium. We show how a monopoly can manage its hydropower dams by additional pumping or storage depending on the relative abundance of water between different regions to smooth the effect of uncertainty on electricity prices. In the oligopolistic case with symmetric rates of risk aversion, we determine the conditions under which the relative scarcity (abundance) of water in the dam of a hydroelectric operator can favor additional strategic pumping (storage) in its competitor’s dams. When there is asymmetry of the risk aversion coefficient, the firm’s hydroelectricity production increases as its competitor’s risk aversion increases, if and only if the average recharge speed of the competitor’s dam exceeds a certain threshold, which is an increasing function of its average water inflows.

Keywords: asymmetric risk aversion, closed-loop Cournot competition, electricity wholesale market, hydropower dams

Procedia PDF Downloads 352
7521 Taleghan Dam Break Numerical Modeling

Authors: Hamid Goharnejad, Milad Sadeghpoor Moalem, Mahmood Zakeri Niri, Leili Sadeghi Khalegh Abadi

Abstract:

While there are many benefits to using reservoir dams, their break leads to destructive effects. From the viewpoint of International Committee of Large Dams (ICOLD), dam break means the collapse of whole or some parts of a dam; thereby the dam will be unable to hold water. Therefore, studying dam break phenomenon and prediction of its behavior and effects reduces losses and damages of the mentioned phenomenon. One of the most common types of reservoir dams is embankment dam. Overtopping in embankment dams occurs because of flood discharge system inability in release inflows to reservoir. One of the most important issues among managers and engineers to evaluate the performance of the reservoir dam rim when sliding into the storage, creating waves is large and long. In this study, the effects of floods which caused the overtopping of the dam have been investigated. It was assumed that spillway is unable to release the inflow. To determine outflow hydrograph resulting from dam break, numerical model using Flow-3D software and empirical equations was used. Results of numerical models and their comparison with empirical equations show that numerical model and empirical equations can be used to study the flood resulting from dam break.

Keywords: embankment dam break, empirical equations, Taleghan dam, Flow-3D numerical model

Procedia PDF Downloads 317
7520 Flood Management Plans in Different Flooding Zones of Gujranwala and Rawalpindi Divisions, Punjab, Pakistan

Authors: Muhammad Naveed

Abstract:

In this paper, flood issues in Gujranwala and Rawalpindi divisions are discussed as a primary importance as these zones are affected continuously from flooding in recent years, provincial variability of the issue, introduce status of the continuous administration measures, their adequacy and future needs in flood administration are secured. Flood issues in these zones are exhibited by Chenab River Basin, Jhelum Rivers Basin. Some unique problems, related to floods in these divisions is lack of major dams on Chenab and Jhelum rivers and also mismanagement of rivers and canal water like dam break stream, and water signing in Tal zones, are additionally mentioned. There are major Nalaas in these regions like Nalaa Lai of Rawalpindi and Nalaa Daik, Nalaa Palkhu, Nalaa Aik of Gujranwala are major cause of floods in these regions other than rivers. Proper management of these Nalaas and moving of nearby population well in time could reduce impacts from flood in these regions. Progress of different flood administration measures, both auxiliary and non-basic, are discussed. Likewise, future needs to accomplish proficient and fruitful flood management measures in Pakistan are additionally brought up. In this paper, we describe different hard and soft engineering techniques to overcome flood situations in these zones as these zones are more vulnerable due to lack of management in canal and river water. Effective management and use of hard and soft techniques are need of time in coming future for controlling greater flooding in flood risk zones to overcome or minimize people’s death as well as agricultural and financial resources as flood and other natural disasters are a major drawback in the economic prosperity of the country.

Keywords: flood management, rivers, major dams, agricultural and financial loss, future management and control

Procedia PDF Downloads 190
7519 Overview of Environmental and Economic Theories of the Impact of Dams in Different Regions

Authors: Ariadne Katsouras, Andrea Chareunsy

Abstract:

The number of large hydroelectric dams in the world has increased from almost 6,000 in the 1950s to over 45,000 in 2000. Dams are often built to increase the economic development of a country. This can occur in several ways. Large dams take many years to build so the construction process employs many people for a long time and that increased production and income can flow on into other sectors of the economy. Additionally, the provision of electricity can help raise people’s living standards and if the electricity is sold to another country then the money can be used to provide other public goods for the residents of the country that own the dam. Dams are also built to control flooding and provide irrigation water. Most dams are of these types. This paper will give an overview of the environmental and economic theories of the impact of dams in different regions of the world. There is a difference in the degree of environmental and economic impacts due to the varying climates and varying social and political factors of the regions. Production of greenhouse gases from the dam’s reservoir, for instance, tends to be higher in tropical areas as opposed to Nordic environments. However, there are also common impacts due to construction of the dam itself, such as, flooding of land for the creation of the reservoir and displacement of local populations. Economically, the local population tends to benefit least from the construction of the dam. Additionally, if a foreign company owns the dam or the government subsidises the cost of electricity to businesses, then the funds from electricity production do not benefit the residents of the country the dam is built in. So, in the end, the dams can benefit a country economically, but the varying factors related to its construction and how these are dealt with, determine the level of benefit, if any, of the dam. Some of the theories or practices used to evaluate the potential value of a dam include cost-benefit analysis, environmental impacts assessments and regressions. Systems analysis is also a useful method. While these theories have value, there are also possible shortcomings. Cost-benefit analysis converts all the costs and benefits to dollar values, which can be problematic. Environmental impact assessments, likewise, can be incomplete, especially if the assessment does not include feedback effects, that is, they only consider the initial impact. Finally, regression analysis is dependent on the available data and again would not necessarily include feedbacks. Systems analysis is a method that can allow more complex modelling of the environment and the economic system. It would allow a clearer picture to emerge of the impacts and can include a long time frame.

Keywords: comparison, economics, environment, hydroelectric dams

Procedia PDF Downloads 191
7518 Potentially Toxic Cyanobacteria and Quantification of Microcystins/Nodularins and Cylindspermopsine in Four Dams of Guanajuato, Mexico

Authors: Laura Valdés-Santiago, José Luis Castro-Guillén, Jorge Noé García-Chávez, Rosalba Alonso-Rodríguez, Rafael Vargas-Bernal

Abstract:

The quality and availability of the water contained in dams (artificial bodies of water) are at risk due to the presence of uncontrolled growths of cyanobacteria capable of producing cyanotoxins that affect the ecosystem and harm the health of humans and animals. The physicochemical properties were measured, and the degree of eutrophy of four dams from Guanajuato was determined. They presented a pH of 6.1 to 8.4, conductivity of 121 to 415 μS/cm², chlorophyll of 0.43-42.43 μg/L, NO₃- 0-1.2 mg/L and PO₄3- 0.11 to 0.84 mg/L; considering these parameters, the prey most prone to the development of cyanobacterial blooms were El Palote dam, La Purísima dam, and Allende dam, but not El Conejo dam. The potentially toxic cyanobacteria identified were Planktothrix agardhii, Oscillatoria sp., Raphidiopsis sp., and Microcystis sp., Microcystin-LR, Nodularin, and Cylindrospermopsin were quantified, presenting values between 0.08-0.42 and 0.02-2.05 ppb, respectively, the water bodies with the highest concentration were El Palote dam and La Purísima dam. Microcystin-LR and/or Nodularin levels are within the guideline values for human consumption in drinking water established by the World Health Organization for Microcystin-LR and for Cylindrospermopsin by the Oregon Health Authority (OHA) in all dams. This work is relevant due to the use of these bodies of water for agriculture and human consumption in the state, and the presence of toxin-producing cyanobacteria can represent an environmental, ecotoxicological, and health problem, so it is recommended to establish a program of frequent monitoring of cyanobacteria and cyanotoxins in the state's dams.

Keywords: Planktrothrix agardhii, Raphidiopsis sp., Microcystis sp., Cyanobacterial blooms, Cyanotoxins

Procedia PDF Downloads 70
7517 Artificial Neural Network Modeling and Genetic Algorithm Based Optimization of Hydraulic Design Related to Seepage under Concrete Gravity Dams on Permeable Soils

Authors: Muqdad Al-Juboori, Bithin Datta

Abstract:

Hydraulic structures such as gravity dams are classified as essential structures, and have the vital role in providing strong and safe water resource management. Three major aspects must be considered to achieve an effective design of such a structure: 1) The building cost, 2) safety, and 3) accurate analysis of seepage characteristics. Due to the complexity and non-linearity relationships of the seepage process, many approximation theories have been developed; however, the application of these theories results in noticeable errors. The analytical solution, which includes the difficult conformal mapping procedure, could be applied for a simple and symmetrical problem only. Therefore, the objectives of this paper are to: 1) develop a surrogate model based on numerical simulated data using SEEPW software to approximately simulate seepage process related to a hydraulic structure, 2) develop and solve a linked simulation-optimization model based on the developed surrogate model to describe the seepage occurring under a concrete gravity dam, in order to obtain optimum and safe design at minimum cost. The result shows that the linked simulation-optimization model provides an efficient and optimum design of concrete gravity dams.

Keywords: artificial neural network, concrete gravity dam, genetic algorithm, seepage analysis

Procedia PDF Downloads 218
7516 Dams Operation Management Criteria during Floods: Case Study of Dez Dam in Southwest Iran

Authors: Ali Heidari

Abstract:

This paper presents the principles for improving flood mitigation operation in multipurpose dams and maximizing reservoir performance during flood occurrence with a focus on the real-time operation of gated spillways. The criteria of operation include the safety of dams during flood management, minimizing the downstream flood risk by decreasing the flood hazard and fulfilling water supply and other purposes of the dam operation in mid and long terms horizons. The parameters deemed to be important include flood inflow, outlet capacity restrictions, downstream flood inundation damages, economic revenue of dam operation, and environmental and sedimentation restrictions. A simulation model was used to determine the real-time release of the Dez dam located in the Dez rivers in southwest Iran, considering the gate regulation curves for the gated spillway. The results of the simulation model show that there is a possibility to improve the current procedures used in the real-time operation of the dams, particularly using gate regulation curves and early flood forecasting system results. The Dez dam operation data shows that in one of the best flood control records, % 17 of the total active volume and flood control pool of the reservoir have not been used in decreasing the downstream flood hazard despite the availability of a flood forecasting system.

Keywords: dam operation, flood control criteria, Dez dam, Iran

Procedia PDF Downloads 220
7515 Two-Dimensional Seismic Response of Concrete Gravity Dams Including Base Sliding

Authors: Djamel Ouzandja, Boualem Tiliouine

Abstract:

The safety evaluation of the concrete gravity dams subjected to seismic excitations is really very complex as the earthquake response of the concrete gravity dam depends upon its contraction joints with foundation soil. This paper presents the seismic response of concrete gravity dams considering friction contact and welded contact. Friction contact is provided using contact elements. Two-dimensional (2D) finite element model of Oued Fodda concrete gravity dam, located in Chlef at the west of Algeria, is used for this purpose. Linear and nonlinear analyses considering dam-foundation soil interaction are performed using ANSYS software. The reservoir water is modeled as added mass using the Westergaard approach. The Drucker-Prager model is preferred for dam and foundation rock in nonlinear analyses. The surface-to-surface contact elements based on the Coulomb's friction law are used to describe the friction. These contact elements use a target surface and a contact surface to form a contact pair. According to this study, the seismic analysis of concrete gravity dams including base sliding. When the friction contact is considered in joints, the base sliding displacement occurs along the dam-foundation soil contact interface. Besides, the base sliding may generally decrease the principal stresses in the dam.

Keywords: concrete gravity dam, dynamic soil-structure interaction, friction contact, sliding

Procedia PDF Downloads 405
7514 Differential Effects of Parity, Stress and Fluoxetine Treatment on Locomotor Activity and Swimming Behavior in Rats

Authors: Nur Hidayah Kaz Abdul Aziz, Norhalida Hashim, Zurina Hassan

Abstract:

Peripartum period is a time where women are vulnerable to depression, and stress may further increase the risk of its occurrence. Use of selective serotonin reuptake inhibitors (SSRI) in the treatment of postpartum depression is a common practice. Comparison of antidepressant treatment, however, is rarely studied between gestated and nulliparous animals exposed to stress. This study was aimed to investigate the effect of parity and stress, as well as fluoxetine (an SSRI) treatment after stress exposure on the behavior of rats. Gestating and nulliparous Sprague Dawley rats were either subjected to chronic stressors or left undisturbed throughout the gestation period. After parturition, all stressors were stopped and some of the stressed rats were treated with fluoxetine (10mg/kg). Hence, the final groups formed were: 1. Non-stressed nulliparous rats, 2. Non-stressed dams, 3. Stressed nulliparous rats, 4. Stressed dams, 5. Fluoxetine-treated stressed nulliparous rats, and 6. Fluoxetine-treated stressed dams. Rats were tested in open field test (OFT), novel object recognition test (NOR) and forced swim test (FST) after weaning of pups. Gestational stress significantly reduced the locomotor activity of rats in OFT (p<0.05), while fluoxetine significantly increased the activity in nulliparous rats (p<0.001) but not the dams. While no differences were observed in NOR, stress and parity inhibited the rats from performing swimming behavior in FST. However, climbing and immobile behaviors in FST were found to have no significant differences, although there is a tendency of effect of treatment for immobility parameter (p=0.06) where fluoxetine-treated stressed dams were being the least immobile. In conclusion, the effects of parity and stress, as well as fluoxetine treatment, depended on the type of behavioral test performed.

Keywords: stress, parity, SSRI, behavioral tests

Procedia PDF Downloads 169
7513 Application of the Hit or Miss Transform to Detect Dams Monitored for Water Quality Using Remote Sensing in South Africa

Authors: Brighton Chamunorwa

Abstract:

The current remote sensing of water quality procedures does not provide a step representing physical visualisation of the monitored dam. The application of the remote sensing of water quality techniques may benefit from use of mathematical morphology operators for shape identification. Given an input of dam outline, morphological operators such as the hit or miss transform identifies if the water body is present on input remotely sensed images. This study seeks to determine the accuracy of the hit or miss transform to identify dams monitored by the water resources authorities in South Africa on satellite images. To achieve this objective the study download a Landsat image acquired in winter and tested the capability of the hit or miss transform using shapefile boundaries of dams in the crocodile marico catchment. The results of the experiment show that it is possible to detect most dams on the Landsat image after the adjusting the erosion operator to detect pixel matching a percentage similarity of 80% and above. Successfully implementation of the current study contributes towards optimisation of mathematical morphology image operators. Additionally, the effort helps develop remote sensing of water quality monitoring with improved simulation of the conventional procedures.

Keywords: hit or miss transform, mathematical morphology, remote sensing, water quality monitoring

Procedia PDF Downloads 145
7512 Site Suitability Analysis for Multipurpose Dams Using Geospatial Technologies

Authors: Saima Iftikhar Rida Shabbir, Zeeshan Hassan

Abstract:

Water shortage, energy crisis and natural misfortunes are the glitches which reduce the efficacy of agricultural ecosystems especially in Pakistan where these are more frequent besides being intense. Accordingly, the agricultural water resources, food security and country’s economy are at risk. To address this, we have used Geospatial techniques incorporating ASTER Global DEM, Geological map, rainfall data, discharge data, Landsat 5 image of Swat valley in order to assess the viability of selected sites. The sites have been studied via GIS tools, Hydrological investigation and multiparametric analysis for their potentialities of collecting and securing the rain water; regulating floods by storing the surplus water bulks by check dams and developing them for power generation. Our results showed that Siat1-1 was very useful for low-cost dam with main objective of as Debris dam; Site-2 and Site 3 were check dams sites having adequate storing reservoir so as to arrest the inconsistent flow accompanied by catering the sedimentation effects and the debris flows; Site 4 had a huge reservoir capacity but it entails enormous edifice cost over very great flood plain. Thus, there is necessity of active Hydrological developments to estimate the flooded area using advanced and multifarious GIS and remote sensing approaches so that the sites could be developed for harnessing those sites for agricultural and energy drives.

Keywords: site suitability, check dams, SHP, terrain analysis, volume estimation

Procedia PDF Downloads 308
7511 Necessary Steps for Optimizing Electricity Generation Programs from Ahvaz Electricity Plants, Iran

Authors: Sara Zadehomidi

Abstract:

Iran, a geographically arid and semi-arid country, experiences varying levels of rainfall across its territory. Five major and important rivers, namely Karun, Dez, Karkheh, Jarrahi, and Hendijan, are valuable assets of the Khuzestan province. To address various needs, including those of farmers (especially during hot seasons with no rainfall), drinking water requirements, industrial and environmental, and most importantly, electricity production, dams have been constructed on several of these rivers, with some dams still under construction. The outflow of water from dam reservoirs must be managed in a way that not only preserves the reservoir's potential effectively but also ensures the maximum revenue from electricity generation. Furthermore, it should meet the other mentioned requirements. In this study, scientific methods such as optimization using Lingo software were employed to achieve these objectives. The results, when executed and adhering to the proposed electricity production program with Lingo software, indicate a 35.7% increase in electricity sales revenue over a one-year examination period. Considering that several electricity plants are currently under construction, the importance and necessity of utilizing computer systems for expediting and optimizing the electricity generation program planning from electricity plants will become evident in the future.

Keywords: Ahvaz, electricity generation programs, Iran, optimizing

Procedia PDF Downloads 54
7510 Effectiveness of Infrastructure Flood Control Due to Development Upstream Land Use: Case Study of Ciliwung Watershed

Authors: Siti Murniningsih, Evi Anggraheni

Abstract:

Various infrastructures such as dams, flood control dams and reservoirs have been developed in the 19th century until the 20th century. These infrastructures are very effective in controlling the river flows and in preventing inundation in the urban area prone to flooding. Flooding in the urban area often brings large impact, affecting every aspect of life and also environment. Ciliwung is one of the rivers allegedly contributes to the flooding problems in Jakarta; various engineering work has been done in Ciliwung river to help controlling the flooding. One of the engineering work is to build Ciawi Dam and Sukamahi Dam. In this research, author is doing the flood calculation with Nakayasu Method, while the previous flooding in that case study is computed using Level Pool Routine. The effectiveness of these dams can be identified by using flood simulation of existing condition and compare it to the flood simulation after the dam construction. The final goal of this study is to determine the effectiveness of flood mitigation infrastructure located at upstream area in reducing the volume of flooding in Jakarta.

Keywords: effectiveness, flood simulation, infrastructure flooding, level pool routine

Procedia PDF Downloads 250
7509 Analysis of the Occurrence of Hydraulic Fracture Phenomena in Roudbar Lorestan Dam

Authors: Masoud Ghaemi, MohammadJafar Hedayati, Faezeh Yousefzadeh, Hoseinali Heydarzadeh

Abstract:

According to the statistics of the International Committee on Large Dams, internal erosion and piping (scour) are major causes of the destruction of earth-fill dams. If such dams are constructed in narrow valleys, the valley walls will increase the arching of the dam body due to the transfer of vertical and horizontal stresses, so the occurrence of hydraulic fracturing in these embankments is more likely. Roudbar Dam in Lorestan is a clay-core pebble earth-fill dam constructed in a relatively narrow valley in western Iran. Three years after the onset of impoundment, there has been a fall in dam behavior. Evaluation of the dam behavior based on the data recorded on the instruments installed inside the dam body and foundation confirms the occurrence of internal erosion in the lower and adjacent parts of the core on the left support (abutment). The phenomenon of hydraulic fracturing is one of the main causes of the onset of internal erosion in this dam. Accordingly, the main objective of this paper is to evaluate the validity of this hypothesis. To evaluate the validity of this hypothesis, the dam behavior during construction and impoundment has been first simulated with a three-dimensional numerical model. Then, using validated empirical equations, the safety factor of the occurrence of hydraulic fracturing phenomenon upstream of the dam score was calculated. Then, using the artificial neural network, the failure time of the given section was predicted based on the maximum stress trend created. The study results show that steep slopes of valley walls, sudden changes in coefficient, and differences in compressibility properties of dam body materials have caused considerable stress transfer from core to adjacent valley walls, especially at its lower levels. This has resulted in the coefficient of confidence of the occurrence of hydraulic fracturing in each of these areas being close to one in each of the empirical equations used.

Keywords: arching, artificial neural network, FLAC3D, hydraulic fracturing, internal erosion, pore water pressure

Procedia PDF Downloads 173
7508 Assess Changes in Groundwater Dynamics Caused by Mini Dam Construction in Arid Zone of District Killa Abdullah, Pakistan

Authors: Akhtar Malik Muhammad, Agha Mirwais

Abstract:

Dams are considered to recharge aquifers by raising the water table, especially the ones near wells. The present study investigates the impact of dams on groundwater recharge in Jilga, Pakistan. The comparative analysis of changes in the groundwater table of the year 2012 and 2019 was carried out using ArcGIS 10.5 through the kriging method and remote sensing techniques to evaluate the mini dam's impact on the upstream area. Arc Info Spatial Analyze extension was used to find static water level maps of the years. The water table was observed minimum 67.08 feet and maximum 130.09 feet in 2012 whereas in 2019 the minimum water table level 49.89 feet and maximum 115.85 feet. Groundwater recharge with different ratio was noted, but the most significant was at Rabbani dam with 26ft due to supported lithology conditions and the lowest recharge was found at Garang dam14ft. The overall positive trend indicates the rehabilitation of dead karez and agriculture activities by increasing 36% the vegetation area in 2019. An over 6% increase in human settlement indicates socioeconomic development. Thus, it highlights the need for preferential focus on the construction of the dam so that the water level could be sustained to cater to the agricultural and domestic needs of the local population around the year

Keywords: water table, GIS, land cover, mini dams, agriculture

Procedia PDF Downloads 79
7507 Employing GIS to Analyze Areas Prone to Flooding: Case Study of Thailand

Authors: Sanpachai Huvanandana, Settapong Malisuwan, Soparwan Tongyuak, Prust Pannachet, Anong Phoepueak, Navneet Madan

Abstract:

Many regions of Thailand are prone to flooding due to tropical climate. A commonly increasing precipitation in this continent results in risk of flooding. Many efforts have been implemented such as drainage control system, multiple dams, and irrigation canals. In order to decide where the drainages, dams, and canal should be appropriately located, the flooding risk area should be determined. This paper is aimed to identify the appropriate features that can be used to classify the flooding risk area in Thailand. Several features have been analyzed and used to classify the area. Non-supervised clustering techniques have been used and the results have been compared with ten years average actual flooding area.

Keywords: flood area clustering, geographical information system, flood features

Procedia PDF Downloads 288
7506 An Assessment of Bathymetric Changes in the Lower Usuma Reservoir, Abuja, Nigera

Authors: Rayleigh Dada Abu, Halilu Ahmad Shaba

Abstract:

Siltation is a serious problem that affects public water supply infrastructures such as dams and reservoirs. It is a major problem which threatens the performance and sustainability of dams and reservoirs. It reduces the dam capacity for flood control, potable water supply, changes water stage, reduces water quality and recreational benefits. The focus of this study is the Lower Usuma reservoir. At completion the reservoir had a gross storage capacity of 100 × 106 m3 (100 million cubic metres), a maximum operational level of 587.440 m a.s.l., with a maximum depth of 49 m and a catchment area of 241 km2 at dam site with a daily designed production capacity of 10,000 cubic metres per hour. The reservoir is 1,300 m long and feeds the treatment plant mainly by gravity. The reservoir became operational in 1986 and no survey has been conducted to determine its current storage capacity and rate of siltation. Hydrographic survey of the reservoir by integrated acoustic echo-sounding technique was conducted in November 2012 to determine the level and rate of siltation. The result obtained shows that the reservoir has lost 12.0 meters depth to siltation in 26 years of its operation; indicating 24.5% loss in installed storage capacity. The present bathymetric survey provides baseline information for future work on siltation depth and annual rates of storage capacity loss for the Lower Usuma reservoir.

Keywords: sedimentation, lower Usuma reservoir, acoustic echo sounder, bathymetric survey

Procedia PDF Downloads 509
7505 The Mitidja between Drought and Water Pollution

Authors: Aziez Ouahiba, Remini Boualam, Habi Mohamed

Abstract:

the growth and the development of a pay are strongly related to the existence or the absence of water in this area, The sedentary lifestyle of the population makes that water demand is increasing and the different brandishing (dams, tablecloths or other) are increasingly solicited. In normal time rain and snow of the winter period reloads the slicks and the wadis that fill dams. Over these two decades, global warming fact that temperature is increasingly high and rainfall is increasingly low which induces a charge less and less important tablecloths, add to that the strong demand in irrigation. Our study will focus on the variation of rainfall and irrigation, their effects on the degree of pollution of the groundwater in this area based on statistical analyses by the Xlstat (ACP, correlation...) software for a better explanation of these results and determine the hydrochemistry of different groups or polluted areas pou be able to offer adequate solutions for each area.

Keywords: rainfall, groundwater of mitidja, irrigation, pollution

Procedia PDF Downloads 395