5835 Agile Project Management: A Real Application in a Multi-Project Research and Development Center

Authors: Aysegul Sarac

Abstract:

The aim of this study is to analyze the impacts of integrating agile development principles and practices, in particular to reduce project lead time in a multi-project environment. We analyze Arçelik Washing Machine R&D Center in which multiple projects are conducted by shared resources. In the first part of the study, we illustrate the current waterfall model system by using a value stream map. We define all activities starting from the first idea of the project to the customer and measure process time and lead time of projects. In the second part of the study we estimate potential improvements and select a set of these improvements to integrate agile principles. We aim to develop a future state map and analyze the impacts of integrating lean principles on project lead time. The main contribution of this study is that we analyze and integrate agile product development principles in a real multi-project system.

Keywords: agile project management, multi project system, project lead time, product development

Procedia PDF Downloads 276
5834 The International Legal Protection of Foreign Investment Through Bilateral Investment Treaties and Double Taxation Treaties in the Context of International Investment Law and International Tax Law

Authors: Abdulmajeed Abdullah Alqarni

Abstract:

This paper is devoted a study of the current frameworks applicable to foreign investments at the levels of domestic and international law, with a particular focus on the legitimate balance to be achieved between the rights of the host state and the legal protections owed to foreign investors. At the wider level of analysis, the paper attempts to map and critically examine the relationship between foreign investment and economic development. In doing so, the paper offers a study in how current discourses and practices on investment law can reconcile the competing interests of developing and developed countries. The study draws on the growing economic imperative for developing nations to create a favorable investment climate capable of attracting private foreign investment. It notes that that over the past decades, an abundance of legal standards that establish substantive and procedural protections for legal forms of foreign investments in the host countries have evolved and crystalized. The study then goes on to offer a substantive analysis of legal reforms at the domestic level in countries such as Saudi Arabia before going on to provide an in- depth and substantive examination of the most important instruments developed at the levels of international law: bilateral investment agreements and double taxation agreements. As to its methods, the study draws on case studies and from data assessing the link between double taxation and economic development. Drawing from the extant literature and doctrinal research, and international and comparative jurisprudence, the paper excavates and critically examines contemporary definitions and norms of international investment law, many of which have been given concrete form and specificity in an ever-expanding number of bilateral and multilateral investment treaties. By reconsidering the wider challenges of conflicts of law and jurisdiction, and the competing aims of the modern investment law regime, the study reflects on how bilateral investment treaties might succeed in achieving the dual aims of rights protection and economic sovereignty. Through its examination of the double taxation phenomena, the study goes on to identify key practical challenges raised by the implementation of bilateral treaties whilst also assessing the sufficiency of the domestic and international legal solutions that are proposed in response. In its final analysis, the study aims to contribute to existing scholarship by assessing contemporary legal and economic barriers to the free flow of investment with due regard for the legitimate concerns and diversity of developing nations. It does by situating its analysis of the domestic enforcement of international investment instrument in its wider historical and normative context. By focusing on the economic and legal dimensions of foreign investment, the paper also aims to offer an interdisciplinary and holistic perspective on contemporary issues and developments in investment law while offering practical reform proposals that can be used to be achieve a more equitable balance between the rights and interests of states and private entities in an increasingly trans nationalized sphere of investment regulation and treaty arbitration.

Keywords: foreign investment, bilateral investment treaties, international tax law, double taxation treaties

Procedia PDF Downloads 56
5833 Hybrid Project Management Model Based on Lean and Agile Approach

Authors: Fatima-Zahra Eddoug, Jamal Benhra, Rajaa Benabbou

Abstract:

Several project management models exist in the literature and the most used ones are the hybrids for their multiple advantages. Our objective in this paper is to analyze the existing models, which are based on the Lean and Agile approaches and to propose a novel framework with the convenient tools that will allow efficient management of a general project. To create the desired framework, we were based essentially on 7 existing models. Only the Scrum tool among the agile tools was identified by several authors to be appropriate for project management. In contrast, multiple lean tools were proposed in different phases of the project.

Keywords: agility, hybrid project management, lean, scrum

Procedia PDF Downloads 107
5832 Empirical Study for the Project and the Project Management Dimensions Comparison between SMEs and Large Companies

Authors: Amina Oukennou, Zitouni Beidouri, Otmane Bouksour

Abstract:

Small to Medium-sized enterprises are a very important component of the economy. They are present in the whole industries all over the world. They are considered as the engine for future growth in the economy. Project management is an economical international factor impacting all types of enterprises including the SMEs. This paper has the aim of measuring the weight of using projects and project management in Moroccan SMEs in comparison with the large companies. The study is based on interviews with experts: project managers, managers, directors, and consultants. They were asked questions measuring the weight of using projects, the level of using project management, and the resources employed. Eighteen Moroccan companies from a range of industries and sizes were consulted. All the companies consider projects as a key element in their strategy. Most of them affirm the great usefulness of the approach 'project', especially for the external activities. The main differences lie in the duration and the size of used projects. Despite the commonly shared idea about the importance of the project management, the interviewed persons believe that the project management knowledge has the same importance or less than the technical knowledge. All the companies affirm the need for a simpler version of project management. The content varies from one company to another.

Keywords: project dimension, project management, small to medium-sized entreprise, Morocco

Procedia PDF Downloads 283
5831 Project Management Agile Model Based on Project Management Body of Knowledge Guideline

Authors: Mehrzad Abdi Khalife, Iraj Mahdavi

Abstract:

This paper presents the agile model for project management process. For project management process, the Project Management Body of Knowledge (PMBOK) guideline has been selected as platform. Combination of computational science and artificial intelligent methodology has been added to the guideline to transfer the standard to agile project management process. The model is the combination of practical standard, computational science and artificial intelligent. In this model, we present communication model and protocols to keep process agile. Here, we illustrate the collaboration man and machine in project management area with artificial intelligent approach.

Keywords: artificial intelligent, conceptual model, man-machine collaboration, project management, standard

Procedia PDF Downloads 312
5830 Critical Factors Influencing Effective Communication Among Stakeholders on Construction Project Delivery in Jigawa State, Nigeria

Authors: Shazali Abdulahi

Abstract:

Project planning is the first phase in project life cycle which relates to the use of schedules such as Gantt charts to plan and subsequently report the project progress within the project environment. Likewise, project execution is the third phase in project lifecycle, is the phase where the work of the project must get done correctly and it’s the longest phase in the project lifecycle therefore, they must be effectively communicated, now today Communication has become the crucial element of every organization. During construction project delivery, information needs to be accurately and timely communicating among project stakeholders in order to realize the project objective. Effective communication among stakeholders during construction project delivery is one of the major factors that impact construction project delivery. Therefore, the aim of the research work is to examine the critical factors influencing effective communication among stakeholders on construction project delivery from the perspective of construction professionals (Architects, Builders, Quantity surveyors, and Civil engineers). A quantitative approach was adopted. This entailed the used of structured questionnaire to one (108) construction professionals in public and private organization within dutse metropolis. Frequency, mean, ranking and multiple linear regression using SPSS vision 25 software were used to analyses the data. The results show that Leadership, Trust, Communication tools, Communication skills, Stakeholders involvement, Cultural differences, and Communication technology were the most critical factors influencing effective communication among stakeholders on construction project delivery. The hypothesis revealed that, effective communication among stakeholders has significant effects on construction project delivery. This research work will profit the construction stakeholders in construction industry, by providing adequate knowledge regarding the factors influencing effective communication among stakeholders, so that necessary steps to be taken to improve project performance. Also, it will provide knowledge about the appropriate strategies to employ in order to improve communication among stakeholders.

Keywords: effetive communication, ineffective communication, stakeholders, project delivery

Procedia PDF Downloads 15
5829 Stimulating Policy for Attracting Foreign Direct Investment in Georgia

Authors: G. Erkomaishvili, M. Kobalava, T. Lazariashvili, N. Damenia

Abstract:

Current state of foreign direct investment (FDI) in Georgia is analyzed and evaluated in the paper, the existing legislative background for regulating investments and stimulating policies to attract investments are shown. It is noted that in developing countries encouragement of investment activity, support and implementation are of the most important tasks, implying a consistent investment policy, investor-friendly tax regime and the legal system, reducing administrative barriers and restrictions, fare competitive conditions and business development infrastructure. The work deals with the determining factor of FDIs and the main directions of stimulation, as well as prospective industries where new investments are needed. Contributing and hindering factors and stimulating measures are analyzed. As a result of the research, the direct and indirect factors attracting FDI have been identified. Facilitating factors to FDI inflow are as follows: simplicity of starting business, geopolitical location, low taxes, access to credit, ease of ownership registration, natural resources, low burden of regulations, low level of corruption and low crime rates. Hindering factors to FDI inflow are as follows: small market, lack of policy for attracting investments, low qualification of the workforce (despite the large number of unemployed people it is difficult to find workers with necessary special skills and qualifications), high interest rates, instability of national currency exchange rate, presence of conflict zones within the country and so forth.

Keywords: foreign direct investment, investor, investment attracting marketing policies, reinvestment

Procedia PDF Downloads 230
5828 Four-dimensional (4D) Decoding Information Presented in Reports of Project Progress in Developing Countries

Authors: Vahid Khadjeh Anvary, Hamideh Karimi Yazdi

Abstract:

Generally, the tool of comparison between performance of each stage in the life of a project, is the number of project progress during that period, which in most cases is only determined as one-dimensional with referring to one of three factors (physical, time, and financial). In many projects in developing countries there are controversies on accuracy and the way of analyzing progress report of projects that hinders getting definitive and engineering conclusions on the status of project.Identifying weakness points of this kind of one-dimensional look on project and determining a reliable and engineering approach for multi-dimensional decoding information receivable from project is of great importance in project management.This can be a tool to help identification of hidden diseases of project before appearing irreversible symptoms that are usually delays or increased costs of execution. The method used in this paper is defining and evaluating a hypothetical project as an example analyzing different scenarios and numerical comparison of them along with related graphs and tables. Finally, by analyzing different possible scenarios in the project, possibility or impossibility of predicting their occurrence is examine through the evidence.

Keywords: physical progress, time progress, financial progress, delays, critical path

Procedia PDF Downloads 347
5827 The Revitalization of South-south Cooperation: Evaluation of South African Direct Investment in Cameroon

Authors: Albert Herve Nkolo Mpoko

Abstract:

The Foreign Direct Investment (FDI) landscape in Cameroon has garnered significant attention from both European and Asian nations due to perceived benefits such as capital infusion, technology transfer, and potential for economic expansion. However, it is noteworthy that South Africa's investment presence remains comparatively subdued in Cameroon, lagging behind that of Europe and Asia. Equally surprising is the limited footprint of Africa's economic powerhouse within other African economies. This study delved into four specific facets of South African investment in Cameroon. Initially, it focused on identifying South African companies operating within Cameroon. Subsequently, the analysis encompassed assessing the correlation between South African investment and poverty alleviation. Additionally, the study examined the nexus between South African investment and technological advancement, and underscored the significance of investment incentives in both countries Key findings of the research shed light on several crucial points. South Africa ought to reassess its economic engagement with Francophone Africa, particularly Cameroon. Despite existing policies aimed at fostering investment, there remains substantial ground to cover in this realm. The proliferation of South African enterprises in Cameroon holds the potential to ameliorate poverty and foster employment opportunities across both nations. The advent of South African firms in Cameroon can catalyse technological advancements within the region. Data collection involved surveying 100 executives from the respective administrations and conducting ten interviews. The gathered data underwent triangulation, wherein quantitative findings were juxtaposed with qualitative insights. In conclusion, the study underscores the underutilization of Cameroon by South Africa, emphasizing the untapped potential for mutual economic growth. Furthermore, it posits that the success of South Africa's multinational corporations abroad could serve as a pivotal pillar for sustaining its domestic economy.

Keywords: FDI, transfer of technology, South-South cooperation, mutual economic growth

Procedia PDF Downloads 8
5826 The Successful in Construction Project via Effectiveness of Project Team

Authors: Zarabizan Zakaria, Hayati Zainal

Abstract:

The construction industry is one of the most important sectors that contribute to the nation’s economy and catalyze towards the growth of other industries. However, some construction projects have not been completed on its stipulated time and duration, scope and budget due to several factors. This problem arises due to the weaknesses of human factors, especially from ineffective leadership quality practiced by project managers and contractors in managing project teams. Therefore, a construction project should impose the element of Project Team. The project team is formed in the implementation of the project which includes the project brief, project scope, customer requirements and provided designs. Many organizations in the construction sector use teams to meet today's global competition and customer expectations, however, team effectiveness evaluation is required. In insuring the construction team is successful and effectiveness, the construction department must encourage, measure, set up, and evaluate or review the effectiveness of project team that was formed. In order to produce a better outcome for a high-end project, an effective and efficient project team is required which also help in increasing overall productivity. The purpose of this study is to determine the role of team effectiveness in the construction project team based on the overall construction project performance. It examines several different factors which related to team effectiveness. It also examines the relationship between team effectiveness factor and project performance aspect. Team Effect Review and Project Performance Review are developed to be used for data collection. Data collected were analyzed using several statistical tests. Results obtained from data analysis are validated using semi-structured interviews. Besides that, a comprehensive survey were developed to assess the way construction project teams in order to maintain its effectiveness throughout the project phase. In order to determine a project successful it has been found that Project Team Leadership is the most important factor. In addition, the definition of team effectiveness in the construction project team is developed based on the perspective of project clients and project team members. The results of this study are expected to provide an idea on the factors that are needed to be focused on improving the team's effectiveness towards project performance aspects. At the same time, the definition of team effectiveness from team members and owner views has been developed in order to provide a better understanding of the word team's effectiveness in construction projects.

Keywords: project team, leadership, construction project, project successful

Procedia PDF Downloads 146
5825 Evaluation of the Costs and Benefits of Mumbai Sewage Disposal Project, India

Authors: Indrani Gupta, Leena Vachasiddha, Rakesh Kumar

Abstract:

Municipal Corporation of Greater Mumbai intends to undertake Mumbai Sewage Disposal (MSDP) for improvement of environment in and around Mumbai city. Sewage generated from the city currently gets partly into the inadequate collection system for treatment and the rest into nearby marine water body through drains. This paper addresses the cost benefit analysis of MSDP works for better compliance of sewage treatment and disposal. Cost benefit analysis indicates that the investment in sewage treatment is economically beneficial and will provide immense social, environmental, health and economic benefits. Monetary values of positive benefits such as avoided health costs, enhanced fish catches and improved tourism have been quantified. The total capital cost of the project is estimated to be about INR 51,510 million and operation and maintenance cost is about INR 2240.6 million per year. The cost benefit analysis indicates that a benefit of about 25,882 million per year can be achieved due to the implementation of this project. Other than these benefits, better marine ecosystem quality; higher property cost; improved recreational opportunities were not included because of lack of information.

Keywords: waste water treatment, cost-benefit analysis, health, tourism, fisheries

Procedia PDF Downloads 310
5824 Integrated Formulation of Project Scheduling and Material Procurement Considering Different Discount Options

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

On-time availability of materials in the construction sites plays an outstanding role in successful achievement of project’s deliverables. Thus, this paper has investigated formulation of project scheduling and material procurement at the same time, by a mixed-integer programming model, aiming to minimize/maximize penalty/reward to deliver the project and minimize material holding, ordering, and procurement costs, respectively. We have taken both all-units and incremental discount possibilities into consideration to address more flexibility from the procurement side with regard to real world conditions. Finally, the applicability and efficiency of the mathematical model is tested by different numerical examples.

Keywords: discount strategies, material purchasing, project planning, project scheduling

Procedia PDF Downloads 233
5823 Genetic Algorithms Multi-Objective Model for Project Scheduling

Authors: Elsheikh Asser

Abstract:

Time and cost are the main goals of the construction project management. The first schedule developed may not be a suitable schedule for beginning or completing the project to achieve the target completion time at a minimum total cost. In general, there are trade-offs between time and cost (TCT) to complete the activities of a project. This research presents genetic algorithms (GAs) multi-objective model for project scheduling considering different scenarios such as least cost, least time, and target time.

Keywords: genetic algorithms, time-cost trade-off, multi-objective model, project scheduling

Procedia PDF Downloads 394
5822 A Strategic Approach for Promoting Renewable Energy Technologies in Developing Countries

Authors: Hanee Ryu

Abstract:

The supporting policies for renewable energy have been designed to deploy renewable energy technology targeting domestic market. The government encourages market creation through obligations such as FIT or RPS on an energy supplier. With these policy measures, the securing vast market needs to induce technology development. Furthermore, it is crucial that ensuring developing market can make the environment nurture the renewable energy industry. Overseas expansion to countries being in demand is essential under immature domestic market. Extending its business abroad can make the domestic company get the knowledge through learning-by-doing. Besides, operation in the countries to be rich in renewable resources such as weather conditions helps to develop proven track record required for verifying technologies. This paper figures out the factor to hamper the global market entry and build up the strategies to overcome difficulties. Survey conducted renewable energy company having overseas experiences at least once. Based on the survey we check the obstacle against exporting home goods and services. As a result, securing funds is salient fact to proceed to business. It is difficult that only private bank or investment agencies participate in the project under uncertainty which renewable energy development project bears inherently. These uncertainties need public fund such as ODA to encourage private sectors to start a business. Furthermore, international organizations such as IRENA or multilateral development banks as WBG play a role to guarantee the investment including risk insurance against uncertainty. It can also manage excavation business cooperating with developing countries and supplement inadequate government funding involved. With survey results strategies to obtain the order, the international organization places are categorized according to the type of getting a contract. This paper suggests 3 types approaching to the international organization project (going through international competitive bidding, using ODA and project financing) and specifies the role of government to support the domestic firms with running out of funds. Under renewable energy industry environment where hard to being created as a spontaneous market, government policy approach needs to motivate the actors to get into the business. It is one of the good strategies that countries with the low demand of renewable energies participate in the project international agencies order in the developing countries having abundant resources. This provides crucial guidance for the formulation of renewable energy development policy and planning with consideration of business opportunities and funding.

Keywords: exporting strategies, multilateral development banks, promoting in developing countries, renewable energy technologies

Procedia PDF Downloads 495
5821 An Active Solar Energy System to Supply Heating Demands of the Teaching Staff Dormitory of Islamic Azad University Ramhormoz Branch

Authors: M. Talebzadegan, S. Bina, I. Riazi

Abstract:

The purpose of this paper is to present an active solar energy system to supply heating demands of the teaching staff dormitory of the Islamic Azad University of Ramhormoz. The design takes into account the solar radiations and climate data of Ramhormoz town and is based on the daily warm water consumption for health demands of 450 residents of the dormitory, which is equal to 27000 lit of 50-C° water, and building heating requirements with an area of 3500 m² well-protected by heatproof materials. First, heating demands of the building were calculated, then a hybrid system made up of solar and fossil energies was developed and finally, the design was economically evaluated. Since there is only roof space for using 110 flat solar water heaters, the calculations were made to hybridize solar water heating system with heat pumping system in which solar energy contributes 67% of the heat generated. According to calculations, the net present value “N.P.V.” of revenue stream exceeds “N.P.V.” of cash paid off in this project over three years, which makes economically quite promising. The return of investment and payback period of the project is 4 years. Also, the internal rate of return (IRR) of the project was 25%, which exceeds bank rate of interest in Iran and emphasizes the desirability of the project.

Keywords: Solar energy, Heat Demand, Renewable , Pollution

Procedia PDF Downloads 225
5820 Identifying Project Delay Factors in the Australian Construction Industry

Authors: Syed Sohaib Bin Hasib, Hiyam Al-Kilidar

Abstract:

Meeting project deadlines is a major challenge for most construction projects. In this study, perceptions of contractors, clients, and consultants are compared relative to a list of factors derived from the review of the extant literature on project delay. 59 causes (categorized into 8 groups) of project delays were identified from the literature. A survey was devised to get insights and ranking of these factors from clients, consultants & contractors in the Australian construction industry. Findings showed that project delays in the Australian construction industry are mainly the result of skill shortages, interference in execution, and poor coordination and communication between the project stakeholders.

Keywords: construction, delay factors, time delay, australian construction industry

Procedia PDF Downloads 142
5819 A Systematic Approach to Defeat Regional Terrorism and Political Violence in Pakistan: Prospects of Youth Employment through China-Pakistan Economic Corridor

Authors: Muhammad Imran

Abstract:

In recent times, terrorism has been a major area of concern globally. Terrorism is ranked the number one concern across many countries, followed by political violence and poverty. The natural response to terrorism and violence across the countries is to increase expenditure on counterterrorism. This project study aims to explore the importance of job creation through the China-Pakistan Economic Corridor (a leading mega-project of the Belt and Road Initiative) to help Pakistan’s socio-economic situation and lead to minimize terrorism and violence across the country and help Chinese companies complete their multi-billion dollar projects peacefully. During the last two decades, Pakistan has been through severe insurgencies, political violence, and terrorism, which also caused a disturbance in delaying many developmental projects, including the CPEC project, and killed dozens of Chinese citizens working in Pakistan. One major area of debate is whether or not economic factors have any role to play in determining the extent of political violence and terrorism in Pakistan. The notion of a China-Pakistan economic corridor across the Karakorum Mountains to Gawadar faces severe challenges. Counterterrorism concerns are likely to be a persistent source of tension across the CPEC projects in different regions across the CPEC route in Pakistan. China’s promise to help industrialize Pakistan will ultimately lead to youth employment and prosperity. We hypothesize that youth unemployment can explain incidences of terrorism in Pakistan in the recent past. One of the main causes of these adverse situations is the unemployment of youth, who can become readily accessible to militant organizations for recruitment and training. This research project builds on existing research investigating the root causes of political violence and terrorism by considering youth unemployment as a measure of economic deprivation. We focus on the terrorism incident count data for 2001–2022, using negative binomial regression models. Literature suggests that, in the exogenous model, youth unemployment tends to increase political violence and domestic terrorism. Given concerns about the endogeneity of youth unemployment in these models, we will use two kinds of corrections: instrumental variables and lagged variables. To control for endogeneity, we intend to incorporate total population, military expenditure, foreign direct investment, and CPEC investment as instrumental variables.

Keywords: regional terrorism, political violence, youth employment, CPEC, belt and road initiative, Pakistan, China

Procedia PDF Downloads 24
5818 A Correlation Between Perceived Usage of Project Management Methodologies and Project Success in Horizon 2020 Projects

Authors: Aurelio Palacardo, Giulio Mangano, Alberto De Marco

Abstract:

Nowadays, the global economic framework is extremely competitive, and it consequently requires an efficient deployment of the resources provided by EU. In this context, Project management practices are intended to be one of the levers for increasing such an efficiency. The objective of this work is to explore the usage of Project Management methodologies and good practices in the European-wide research program “Horizon2020” and establish whether their maturity might impact the project's success. This allows to identify strengths in terms of application of PM methodologies and good practices and, in turn, to provide feedback and opportunities for improvements to be implemented in future programs. In order to achieve this objective, the present research makes use of a survey-based data retrieval and correlation analysis to investigate the level of perceived PM maturity in H2020 projects and the correlation of maturity with project success. The results show the Project Managers involved in H2020 to hold a high level of PM maturity, confirming PM standards, which are imposed by the EU commission as a binding process, are effectively enforced.

Keywords: project management, project management maturity, maturity models, project success

Procedia PDF Downloads 129
5817 A Study of Factors Affecting the Elapsed Time of Housing Renewal Project Implementation in Seoul

Authors: In Su Na, Gunwon Lee, Seiyong Kim

Abstract:

This study analyzed the effect of area variables and economic variables on the length of each period of the project in order to analyze the effect of agreement rate on project implementation in housing renewal projects. In conclusion, as can be seen from these results, a low agreement rate may not translate into project promotion, and a higher agreement rate may not translate into project delay. The expectation of the policy is that the lower the agreement rate, the more projects would be promoted, but that is not the actual effect. From a policy consistency viewpoint, changing the agreement rate frequently, depending on the decision of the public, is not reasonable. The policy of using agreement rate as a necessary condition for project implementation should be reconsidered.

Keywords: Area and Economic Variables, Elapsed time, Housing Renewal Project

Procedia PDF Downloads 431
5816 Materialisation of Good Governance Concept by Effective Investment Dispute Resolution in the European Union

Authors: Jagna Mucha, Anna Kańciak

Abstract:

The concept of good governance constitutes a wide perspective for academic discussion, because it provides a substantial theoretical background for settling many practical problems faced contemporarily by the EU. The basic assumptions of good governance have basically remained unchanged since the 90’s, when the concept was introduced by the World Bank, although the scholarly discussions reveal new facets of the said concept, when related to specific domains. The paper discusses the application of the specific elements of the concept of good governance in the field of the international investment law. Specifically, it seeks to demonstrate that the concept of good governance regulates the issue of international investments in that, among others, it requires the application of the alternative dispute resolution in order to make the investment law enforceable in the best possible way.

Keywords: dispute resolution, european union, investments, good governance

Procedia PDF Downloads 328
5815 Identification of Factors Affecting Labor Productivity in Construction Projects of Iran

Authors: Elham Dehghan, A. Shirzadi Javid, Mohsen Tadayon

Abstract:

Labor productivity is very important and gained special concerns among professionals in the construction industry, worldwide. Productivity improvements on labors achieve higher cost savings with minimal investment. Due to the fact that profit margins are small on construction projects, cost savings associated with productivity are crucial to become a successful contractor. This research program studies and highlights the factors affecting labor productivity in Iranian construction industry. A questionnaire was used to gather the relevant data from respondents who involve in managing various types of projects in wide areas in Iran. It involved ranking 57 predefined factors divided into 5 categories: Human/Labor; Financial; Management; Equipments/Materials and Environmental. Total 62 feedbacks were analyzed through the Relative Importance Index (RII) technique. The top ten factors affecting construction labor productivity in Iran are: 1) Professional capability of contractor project manager, 2) skills of contractor’s project management team, 3) professional capability of owner project manager, 4) professional capability of Consulting Project manager, 5) discipline working, 6) delay payments by the owner, 7) material shortages, 8) delays in delivery of materials, 9) turnover power of the owner, 10) poor site management. Recommendations have been made in the study to address these factors. The research has direct benefits to key stakeholders in Iranian construction industry.

Keywords: Iranian construction projects, labor, productivity, relative importance index

Procedia PDF Downloads 236
5814 Performance Evaluation of Construction Projects by Earned Value Management Method, Using Primavera P6 – A Case Study in Istanbul, Turkey

Authors: Mohammad Lemar Zalmai, Osman Hurol Turkakin, Cemil Akcay, Ekrem Manisali

Abstract:

Most of the construction projects are exposed to time and cost overruns due to various factors and this is a major problem. As a solution to this, the Earned Value Management (EVM) method is considered. EVM is a powerful and well-known method used in monitoring and controlling the project. EVM is a technique that project managers use to track the performance of their project against project baselines. EVM gives an early indication that either project is delayed or not, and the project is either over budget or under budget at any particular day by tracking it. Thus, it helps to improve the management control system of a construction project, to detect and control the problems in potential risk areas and to suggest the importance and purpose of monitoring the construction work. This paper explains the main parameters of the EVM system involved in the calculation of time and cost for construction projects. In this study, the project management software Primavera P6 is used to deals with the project monitoring process of a seven-storeyed (G+6) faculty building whose construction is in progress at Istanbul, Turkey. A comparison between the planned progress of construction activities and actual progress is performed, and the analysis results are interpreted. This case study justifies the benefits of using EVM for project cash flow analysis and forecasting.

Keywords: earned value management (EVM), construction cost management, construction planning, primavera P6, project management, project scheduling

Procedia PDF Downloads 192
5813 The Effect of Critical Activity on Critical Path and Project Duration in Precedence Diagram Method

Authors: J. Nisar, S. Halim

Abstract:

The additional relationships i.e., start-to-start, finish-to-finish, and start-to-finish, between activity in Precedence Diagram Method (PDM) provides a more flexible schedule than traditional Critical Path Method (CPM). But, changing the duration of critical activities in the PDM network will have an anomalous effect on the critical path and the project completion date. In this study, we classified the critical activities in two groups i.e., 1. activity on single critical path and 2. activity on multi-critical paths, and six classes i.e., normal, reverse, neutral, perverse, decrease-reverse and increase-normal, based on their effects on project duration in PDM. Furthermore, we determined the maximum float of time by which the duration each type of critical activities can be changed without effecting the project duration. This study would help the project manager to clearly understand the behavior of each critical activity on critical path, and he/she would be able to change the project duration by shortening or lengthening activities based on project budget and project deadline.

Keywords: construction management, critical path method, project scheduling network, precedence diagram method

Procedia PDF Downloads 184
5812 Project Management Framework and Influencing Factors

Authors: Mehrnoosh Askarizadeh

Abstract:

The increasing variations of the business world correspond with a high diversity of theoretical perspectives used in project management research. This diversity is reflected by a variety of influencing factors, which have been the subject of empirical studies. This article aims to systemize the different streams of research on the basis of a literature review and at developing a research framework influencing factors. We will identify fundamental elements of a project management theory. The framework consists of three dimensions: design, context, and goal. Its purpose is to support the combination of different perspectives and the development of strategies for further research.

Keywords: project, goal, project management, influencing factors

Procedia PDF Downloads 513
5811 Historical Geotechnical Study and Evaluation of Project Progress for the Tafila City Center Development Project

Authors: Mohmd Sarireh

Abstract:

The geotechnical study can be employed successfully to assess and follow the expected development or delay in the project construction. The development project of city center or downtown was taken as a case study for the investigation of the project conditions that might support progress or cause delay. The project was proposed to build 7447 m2 by reinforced concrete mainly to serve and support the services provided to people in Tafila. The project construction had faced challenges and obstacles such as soil collapse because of excavation of the weak soil that found in the project site. In addition, the topography of the project area showed a high slope from South-West to North. The slope through the project footprint reached to 83.3% which is considered very high slope. One year and a half proposed to finish the project construction since the 1st of March 2013 and it was planned to be finished by the 31th of August 2014, but the project needs more than one year and a half as extension according to the consultant engineer. The collecting of data was conducted through the interviews with the engineers and officials, and by analyzing the soil reports and samples taken during design and excavation. The major findings came out to weak and fractured soil and construction waste that were found at project site. Also, soil was considered very fine according to the plasticity index (PI) values, in addition to the high depths required for foundation that contribute to the collapse of soil and the increase of project cost. The current project aims to present how the unseen conditions can delay the project construction and increase the cost of the project that rises to JD8.305 Million.

Keywords: geotechnical, management, progress, risk, soil unseen conditions management

Procedia PDF Downloads 194
5810 Asymmetric Information and Composition of Capital Inflows: Stock Market Microstructure Analysis of Asia Pacific Countries

Authors: Farid Habibi Tanha, Hawati Janor, Mojtaba Jahanbazi

Abstract:

The purpose of this study is to examine the effect of asymmetric information on the composition of capital inflows. This study uses the stock market microstructure to capture the asymmetric information. Such an approach allows one to capture the level and extent of the asymmetric information from a firm’s perspective. This study focuses on the two-dimensional measure of the market microstructure in capturing asymmetric information. The composition of capital inflows is measured by running six models simultaneously. By employing the panel data technique, the main finding of this research shows an increase in the asymmetric information of the stock market, in any of the two dimensions of width and depth. This leads to the reduction of foreign investments in both forms of foreign portfolio investment (FPI) and foreign direct investment (FDI), while the reduction in FPI is higher than that of the FDI. The significant effect of asymmetric information on capital inflows implicitly suggests for policymakers to control the changes of foreign capital inflows through transparency in the level of the market.

Keywords: capital flows composition, asymmetric information, stock market microstructure, foreign portfolio investment, foreign direct investment

Procedia PDF Downloads 327
5809 Readiness of Intellectual Capital Measurement: A Review of the Property Development and Investment Industry

Authors: Edward C. W. Chan, Benny C. F. Cheung

Abstract:

In the knowledge economy, the financial indicator is not the unique instrument to gauge the performance of a company. The role of intellectual capital contributing to the company performance is increasing. To measure the company performance due to intellectual capital, the value-added intellectual capital (VAIC) model is adopted to measure the intellectual capital utilisation efficiency of the subject companies. The purpose of this study is to review the readiness of measuring intellectual capital for the Hong Kong listed companies in the property development and property investment industry by using VAIC model. This study covers the financial reports from the representative Hong Kong listed property development companies and property investment companies in the period 2014-2019. The findings from this study indicated the industry is ready for IC measurement employing VAIC framework but not yet ready for using the extended VAIC model.

Keywords: intellectual capital, intellectual capital measurement, property development, property investment, Skandia navigator, VAIC

Procedia PDF Downloads 86
5808 Quality Management in Construction Project

Authors: Harsh Panchal, Saurabh Amrutkar

Abstract:

Quality management is an essential part of any project that has directly related to the performance of a project. Quality management is depended on multiple factors at different stages in a project, right from time management to construction logistics. A project is a mixture of various components that include iternary management, health and safety, crew productivity, and many more. From the survey conducted, we came to the conclusion that advancement in technology and indigenous approach to any project will result in maximum quality standards and better project performance. In this paper, we discuss various components of the factors above that lead to compromise the quality of a project and how it can be controlled in order to achieve maximum quality assurance using quality planning and total quality management. The paper also focuses on limitations and problems faced in each factor responsible for quality management and to tackle them using techniques and processes based on activities and identifying the sequence, approaching critical path, and duration. The project management concept that deals with the sequence of scope cost time give us an overview regarding the ongoing quality management, in a nutshell, giving us hints to regulate the current procedure for maximum achievable quality. It also deals with the problems faced by engineers that make the mundane work process slow, reducing the quality outcome drastically.

Keywords: management, performance, project, quality

Procedia PDF Downloads 126
5807 Investment Development Path and Motivations for Foreign Direct Investment in Georgia

Authors: Vakhtang Charaia, Mariam Lashkhi

Abstract:

Foreign direct investment (FDI) plays a vital role in global business. It provides firms with new markets and advertising channels, cheaper production facilities, admission to new technology, products, skills and financing. FDI can provide a recipient country/company with a source of new technologies, capital, practice, products, management skills, and as such can be a powerful drive for economic development. It is one of the key elements of stable economic development in many countries, especially in developing ones. Therefore the size of FDI inflow is one of the most crustal factors for economic perfection in small economy countries (like, Georgia), while most of developed ones are net exporters of FDI. Since, FDI provides firms with new markets; admission to new technologies, products and management skills; marketing channels; cheaper production facilities, and financing opportunities. It plays a significant role in Georgian economic development. Increasing FDI inflows from all over the world to Georgia in last decade was achieved with the outstanding reforms managed by the Georgian government. However, such important phenomenon as world financial crisis and Georgian-Russian war put its consequence on the over amount of FDI inflow in Georgia in the last years. It is important to mention that the biggest investor region for Georgia is EU, which is interested in Georgia not only from the economic points of view but from political. The case studies from main EU investor countries show that Georgia has a big potential of investment in different areas, such as; financial sector, energy, construction, tourism industry, transport and communications. Moreover, signing of Association Agreement between Georgia and EU will further boost all the fields of economy in Georgia in both short and long terms. It will attract more investments from different countries and especially from EU. The last, but not least important issue is the calculation of annual FDI inflow to Georgia, which it is calculated differently by different organizations, based on different methodologies, but what is more important is that all of them show significant increase of FDI in last decade, which gives a positive signal to investors and underlines necessity of further improvement of investment climate in the same direction.

Keywords: foreign direct investment (FDI), Georgia, investment development path, investment climate

Procedia PDF Downloads 237
5806 The Urban Project and the Urban Improvement to the Test of the Participation, Case: Project of Modernization of Constantine

Authors: Mouhoubi Nedjima, Sassi Boudemagh Souad

Abstract:

In the framework of the modernization of the city of Constantine, and in order to restore its status as a regional metropolis and introduce it into the network of cities international metropolises, a major urban project was launched: project of modernization and of metropolitanization of the city of Constantine (PMMC). Our research project focuses on the management of the project for the modernization of the city of Constantine (PMMC) focusing on the management of some aspects of the urban project whose participation, with the objective assessment of the managerial approach business. Among the cases revealing taken into account in our research work on the question of participation of actors and their organizations, the operation relating to "the urban improvement in the city of the Brothers FERRAD in the district of Zouaghi". This operation with the objective of improving the living conditions of citizens has faced several challenges and obstacles that have been in major part the factors of its failure. Through this study, we examine the management process and the mode of organization of the actors of the project as well as the level of participation of the citizen to finally propose managerial solutions to conflict situations observed.

Keywords: the urban project, the urban improvement, participation, Constantine

Procedia PDF Downloads 374