Search results for: infrastructural projects
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 2231

Search results for: infrastructural projects

1901 Monitoring and Evaluation of the Distributed Agricultural Machinery of the Department of Agriculture Using a Web-Based Information System with a Short Messaging Service Technology

Authors: Jimmy L. Caldoza, Erlito M. Albina

Abstract:

Information Systems are increasingly being used to monitor and assess government projects as well as improve transparency and combat corruption. With reference to existing information systems relevant to monitoring and evaluation systems adopted by various government agencies from other countries, this research paper aims to help the Philippine government, particularly the Department of Agriculture, in assessing the impact of their programs and projects on their target beneficiaries through the development of the web-based Monitoring and Evaluation Information System with the application of a short messaging system (sms) technology.

Keywords: monitoring and evaluation system, web-based information system, short messaging system technology, database structure and management

Procedia PDF Downloads 113
1900 Evaluation of Aggregate Risks in Sustainable Manufacturing Using Fuzzy Multiple Attribute Decision Making

Authors: Gopinath Rathod, Vinod Puranik

Abstract:

Sustainability is regarded as a key concept for survival in the competitive scenario. Industrial risk and diversification of risk type’s increases with industrial developments. In the context of sustainable manufacturing, the evaluation of risk is difficult because of the incomplete information and multiple indicators. Fuzzy Multiple Attribute Decision Method (FMADM) has been used with a three level hierarchical decision making model to evaluate aggregate risk for sustainable manufacturing projects. A case study has been presented to reflect the risk characteristics in sustainable manufacturing projects.

Keywords: sustainable manufacturing, decision making, aggregate risk, fuzzy logic, fuzzy multiple attribute decision method

Procedia PDF Downloads 495
1899 A Study on Factors Affecting (Building Information Modelling) BIM Implementation in European Renovation Projects

Authors: Fatemeh Daneshvartarigh

Abstract:

New technologies and applications have radically altered construction techniques in recent years. In order to anticipate how the building will act, perform, and appear, these technologies encompass a wide range of visualization, simulation, and analytic tools. These new technologies and applications have a considerable impact on completing construction projects in today's (architecture, engineering and construction)AEC industries. The rate of changes in BIM-related topics is different worldwide, and it depends on many factors, e.g., the national policies of each country. Therefore, there is a need for comprehensive research focused on a specific area with common characteristics. Therefore, one of the necessary measures to increase the use of this new approach is to examine the challenges and obstacles facing it. In this research, based on the Delphi method, at first, the background and related literature are reviewed. Then, using the knowledge obtained from the literature, a primary questionnaire is generated and filled by experts who are selected using snowball sampling. It covered the experts' attitudes towards implementing BIM in renovation projects and their view of the benefits and obstacles in this regard. By analyzing the primary questionnaire, the second group of experts is selected among the participants to be interviewed. The results are analyzed using Theme analysis. Six themes, including Management support, staff resistance, client willingness, Cost of software and implementation, the difficulty of implementation, and other reasons, are obtained. Then a final questionnaire is generated from the themes and filled by the same group of experts. The result is analyzed by the Fuzzy Delphi method, showing the exact ranking of the obtained themes. The final results show that management support, staff resistance, and client willingness are the most critical barrier to BIM usage in renovation projects.

Keywords: building information modeling, BIM, BIM implementation, BIM barriers, BIM in renovation

Procedia PDF Downloads 140
1898 Governance Networks of China’s Neighborhood Micro-Redevelopment: The Case of Haikou

Authors: Lin Zhang

Abstract:

Neighborhood redevelopment is vital to improve residents’ living environment, and there has been a national neighborhood micro-redevelopment initiative in China since 2020, which is largely different from the previous large-scale demolition and reconstruction projects. Yet, few studies systematically examine the new interactions of multiple actors in this initiative. China’s neighborhood (micro-) redevelopment is a kind of governance network, and the complexity perspective could reflect the dynamic nature of multiple actors and their relationships in governance networks. In order to better understand the fundamental shifts of governance networks in China’s neighborhood micro-redevelopment, this paper adopted a theoretical framework of complexity in governance networks and analyzed the new governance networks of neighborhood micro-redevelopment projects in Haikou accordingly.

Keywords: neighborhood redevelopment, governance, networks, Haikou

Procedia PDF Downloads 55
1897 Abandoned Mine Methane Mitigation in the United States

Authors: Jerome Blackman, Pamela Franklin, Volha Roshchanka

Abstract:

The US coal mining sector accounts for 6% of total US Methane emissions (2021). 60% of US coal mining methane emissions come from active underground mine ventilation systems. Abandoned mines contribute about 13% of methane emissions from coal mining. While there are thousands of abandoned underground coal mines in the US, the Environmental Protection Agency (EPA) estimates that fewer than 100 have sufficient methane resources for viable methane recovery and use projects. Many abandoned mines are in remote areas far from potential energy customers and may be flooded, further complicating methane recovery. Because these mines are no longer active, recovery projects can be simpler to implement.

Keywords: abandoned mines, coal mine methane, coal mining, methane emissions, methane mitigation, recovery and use

Procedia PDF Downloads 44
1896 An Empirical Investigation of Factors Influencing Construction Project Selection Processes within the Nigeria Public Sector

Authors: Emmanuel U. Unuafe, Oyegoke T. Bukoye, Sandhya Sastry, Yanqing Duan

Abstract:

Globally, there is increasing interest in project management due to a shortage in infrastructure services supply capability. Hence, it is of utmost importance that organisations understand that choosing a particular project over another is an opportunity cost – tying up the organisations resources. In order to devise constructive ways to bring direction, structure, and oversight to the process of project selection has led to the development of tools and techniques by researchers and practitioners. However, despite the development of various frameworks to assist in the appraisal and selection of government projects, failures are still being recorded with government projects. In developing countries, where frameworks are rarely used, the problems are compounded. To improve the situation, this study will investigate the current practice of construction project selection processes within the Nigeria public sector in order to inform theories of decision making from the perspective of developing nations and project management practice. Unlike other research around construction projects in Nigeria this research concentrate on factors influencing the selection process within the Nigeria public sector, which has received limited study. The authors report the findings of semi-structured interviews of top management in the Nigerian public sector and draw conclusions in terms of decision making extant theory and current practice. Preliminary results from the data analysis show that groups make project selection decisions and this forces sub-optimal decisions due to pressure on time, clashes of interest, lack of standardised framework for selecting projects, lack of accountability and poor leadership. Consequently, because decision maker is usually drawn from different fields, religious beliefs, ethnic group and with different languages. The choice of a project by an individual will be greatly influence by experience, political precedence than by realistic investigation as well as his understanding of the desired outcome of the project, in other words, the individual’s ideology and their level of fairness.

Keywords: factors influencing project selection, public sector construction project selection, projects portfolio selection, strategic decision-making

Procedia PDF Downloads 308
1895 An Examination of Business Ethics and Corporate Social Responsibility: A Case Study of Zenith Bank PLC Jalingo

Authors: Abubakar Mohammed Bakoji

Abstract:

The paper examine business ethics through it pursuit for corporate social responsibility to the society in which the business long existed, Zenith bank PLC was selected as case study for it longer period of its business in the state, in order to achieve the research objective of the paper which sought the following: i. To examine relationship between business ethics and corporate social responsibility in Zenith bank PLC Jalingo; ii. To establish whether or not such ethics statement that acclaim corporate social responsibility are adhere to by the Zenith bank PLC Jalingo; iii. To determine the benefit drive by the society on the corporate social responsibility of Zenith bank PLC Jalingo to the people of the state of their operation. The research was conducted using qualitative research design approach, where convenience sampling technique was adopted using semi structured interview to one of the key staff of Zenith bank PLC Jalingo and five other beneficiaries of Zenith bank PLC corporate social responsibility projects served as respondents. The data obtained was analyze using content analysis and the result of the findings revealed that Zenith bank PLC has a Good business ethics and they adhere to the ethics, that they have completed several viable projects to the state as their corporate social responsibility and the beneficiaries and the respondents beneficiaries has confirmed and have produced evidence of how the projects has assisted in stifle their hardship. Hence, business ethics has a significant relationship with corporate social responsibility in Zenith bank PLC Jalingo.

Keywords: business ethics, Corporate Social Responsibility, Zenith Bank PLC, business ethics

Procedia PDF Downloads 445
1894 Relationship among Teams' Information Processing Capacity and Performance in Information System Projects: The Effects of Uncertainty and Equivocality

Authors: Ouafa Sakka, Henri Barki, Louise Cote

Abstract:

Uncertainty and equivocality are defined in the information processing literature as two task characteristics that require different information processing responses from managers. As uncertainty often stems from a lack of information, addressing it is thought to require the collection of additional data. On the other hand, as equivocality stems from ambiguity and a lack of understanding of the task at hand, addressing it is thought to require rich communication between those involved. Past research has provided weak to moderate empirical support to these hypotheses. The present study contributes to this literature by defining uncertainty and equivocality at the project level and investigating their moderating effects on the association between several project information processing constructs and project performance. The information processing constructs considered are the amount of information collected by the project team, and the richness and frequency of formal communications among the team members to discuss the project’s follow-up reports. Data on 93 information system development (ISD) project managers was collected in a questionnaire survey and analyzed it via the Fisher Test for correlation differences. The results indicate that the highest project performance levels were observed in projects characterized by high uncertainty and low equivocality in which project managers were provided with detailed and updated information on project costs and schedules. In addition, our findings show that information about user needs and technical aspects of the project is less useful to managing projects where uncertainty and equivocality are high. Further, while the strongest positive effect of interactive use of follow-up reports on performance occurred in projects where both uncertainty and equivocality levels were high, its weakest effect occurred when both of these were low.

Keywords: uncertainty, equivocality, information processing model, management control systems, project control, interactive use, diagnostic use, information system development

Procedia PDF Downloads 262
1893 Built-Own-Lease-Transfer (BOLT): “An Alternative Model to Subsidy Schemes in Public Private Partnership Projects”

Authors: Nirali Shukla, Neel Shah

Abstract:

The World Bank Institute (WBI) is undertaking a review of government interventions aimed at facilitating sustainable investment in public private partnerships (PPPs) in various under developed countries. The study presents best practice for applying financial model to make PPPs financially viable. The lessons presented here, if properly implemented, can help countries use limited funds to attract more private investment, get more infrastructure built and, as a result, achieve greater economic growth. The four countries Brazil, Colombia, Mexico, and India in total develop an average of nearly US$50 billion in PPPs per year. There are a range of policies and institutional arrangements governments use to provide subsidies to PPPs. For example, some countries have created dedicated agencies, or ‘funds’, capitalized with money from the national budget to manage and allocate subsidies. Other countries have established well-defined policies for appropriating subsidies on an ad hoc basis through an annual budget process. In this context, subsidies are direct fiscal contributions or grants paid by the government to a project when revenues from user fees are insufficient to cover all capital and operating costs while still providing private investors with a reasonable rate of return. Without subsidies, some infrastructure projects that would provide economic or social gains, but are not financially viable, would go undeveloped. But the Financial model of BOLT (PPP) model described in this study suggests that it is most feasible option rather than going for subsidy schemes for making infrastructure projects financially viable. The major advantage for implementing this model is the government money is saved and can be used for other projects as well as the private investors are getting better rate of return than subsidized schemes.

Keywords: PPP, BOLT, subsidy schemes, financial model

Procedia PDF Downloads 719
1892 The Role of User Participation on Social Sustainability: A Case Study on Four Residential Areas

Authors: Hasan Taştan, Ayşen Ciravoğlu

Abstract:

The rapid growth of the human population and the environmental degradation associated with increased consumption of resources raises concerns on sustainability. Social sustainability constitutes one of the three dimensions of sustainability together with environmental and economic dimensions. Even though there is not an agreement on what social sustainability consists of, it is a well known fact that it necessitates user participation. The fore, this study aims to observe and analyze the role of user participation on social sustainability. In this paper, the links between user participation and indicators of social sustainability have been searched. In order to achieve this, first of all a literature review on social sustainability has been done; accordingly, the information obtained from researches has been used in the evaluation of the projects conducted in the developing countries considering user participation. These examples are taken as role models with pros and cons for the development of the checklist for the evaluation of the case studies. Furthermore, a case study over the post earthquake residential settlements in Turkey have been conducted. The case study projects are selected considering different building scales (differing number of residential units), scale of the problem (post-earthquake settlements, rehabilitation of shanty dwellings) and the variety of users (differing socio-economic dimensions). Decisionmaking, design, building and usage processes of the selected projects and actors of these processes have been investigated in the context of social sustainability. The cases include: New Gourna Village by Hassan Fathy, Quinta Monroy dwelling units conducted in Chile by Alejandro Aravena and Beyköy and Beriköy projects in Turkey aiming to solve the problem of housing which have appeared after the earthquake happened in 1999 have been investigated. Results of the study possible links between social sustainability indicators and user participation and links between user participation and the peculiarities of place. Results are compared and discussed in order to find possible solutions to form social sustainability through user participation. Results show that social sustainability issues depend on communities' characteristics, socio-economic conditions and user profile but user participation has positive effects on some social sustainability indicators like user satisfaction, a sense of belonging and social stability.

Keywords: housing projects, residential areas, social sustainability, user participation

Procedia PDF Downloads 361
1891 Factors Affecting Contractual Disputes in Construction ProJects in Sri Lanka

Authors: R. M. Rajapaksa

Abstract:

Construction industry is one of the key players in driving the economy of a country to achieve its prosperity. However, a dispute is one of the crucial factors which prevent the completion of construction contracts within the budgeted cost, scheduled time, and accepted quality. Disputes are inevitable in the construction contract. Accordingly, a study has been undertaken to identify the factors affecting contractual disputes in construction projects in Sri Lanka. The study was a mixed approach with major qualitative and minor quantitative. Qualitative study was set in the form of in-depth interviews with eighteen participants, and quantitative study was conducted using a questionnaire with twenty-four respondents from previously implemented projects by the National Water Supply & Drainage Board representing the employer, engineer and the Contractor to identify the factors affecting contractual disputes and to verify most critical factors respectively. Data analysis for qualitative and quantitative studies was carried out by means of transcribing, code & categorizeand average score methods, respectively. The study reveals that there are forty factors affecting the contractual disputes in construction contracts in Sri Lanka. The finding further illustrates that conflicting decisions by inexperience personnel in the higher position of the Employer, ambiguities resulting inadequate descriptions of the preliminary/general items in price schedule, unfair valuation and late confirmation of variations, unfair determination due to lack of experience of the Engineer/Consultant, under certification of progress payments, unfair grant of EOT & application of delay damages, unreasonable claims for variation of works, errors/discrepancies/ambiguities in the contract conditions and discrepancies & errors in designs & specifications are the most critical factors affecting contractual disputes. Finally, the study proposed remedial measures to most critical factors affecting contractual disputes.

Keywords: dispute, contractual, factors, employer, engineer, contractor, construction projects

Procedia PDF Downloads 186
1890 Lean Construction Techniques in Construction Projects of Pakistan

Authors: Aftab Hameed Memon, Shadab Noor, Muhammad Akram Akhund

Abstract:

Lean construction is a philosophy adopted in the construction industry to increase the value of a project by reducing waste and improving construction productivity. Lean emphasizes on maximizing the value of a project with less expenditure. Globally, lean philosophy has received wider popularity in construction sector. Lean construction has supported the practitioners with several tools and techniques to implement at various stages of a construction project. Following the global trends, this study has investigated the lean practice in Pakistan. The level of implementation of different lean tools and techniques altogether with potential benefits experienced by its implementation in construction projects of Pakistan is analyzed. To achieve the targets, the opinion was sought by the practitioners involved in handling construction projects representing four stakeholders that are a client, consultant, contractors and material suppliers through a structured questionnaire. A total of 34 completed questionnaires were collected and then statistically analyzed. The findings of the analysis have highlighted that pull approach, work standardization, just in time, increase visualization tools, integrated project delivery method and fail-safe for quality are common lean techniques implemented in the local construction industry. While reduction in waste, client’s satisfaction, improved communication, visual control and proper task management are major benefits of the lean construction application.

Keywords: lean construction, lean tools and techniques, lean benefits, waste reduction, Pakistan

Procedia PDF Downloads 264
1889 Assessment Methodology of E-government Projects for the Regions of Georgia

Authors: Tina Melkoshvili

Abstract:

Drastic development of information and communication technologies in Georgia has led to the necessity of launching conceptually new, effective, flexible, transparent and society oriented form of government that is e-government. Through applying information technologies, the electronic system enables to raise the efficacy of state governance and increase citizens’ participation in the process. Focusing on the topic of e-government allows us to analyze success stories, attributed benefits and, at the same time, observes challenges hampering the government development process. There are number of methodologies elaborated to study the conditions in the field of electronic governance. They enable us to find out if the government is ready to apply broad opportunities of information and communication technologies and if the government is apt to improve the accessibility and quality of delivering mainly social services. This article seeks to provide comparative analysis of widely spread methodologies used for Electronic government projects’ assessment. It has been concluded that applying current methods of assessment in Georgia is related to difficulties due to inaccessible data and the necessity of involving number of experts. The article presents new indicators for e-government development assessment that reflect efficacy of e-government conception realization in the regions of Georgia and enables to provide quantitative evaluation of regional e-government projects including all significant aspects of development.

Keywords: development methodology, e-government in Georgia, information and communication technologies, regional government

Procedia PDF Downloads 248
1888 Training of Sensors for Early Warning System of Rainfall Induced Landslides

Authors: M. Naresh, Pratik Chaturvedi, Srishti Yadav, Varun Dutt, K. V. Uday

Abstract:

Changes in the Earth’s climate are likely to increase natural hazards such as drought, floods, earthquakes, landslides, etc. The present study focusing on to early warning systems (EWS) of landslides, major issues in Himalayan region without prominence to deforestation, encroachments and un-engineered cutting of slopes and reforming for infrastructural purposes. EWS can be depicted by conducting a series of flume tests using micro-electro mechanical systems sensors data after reaching threshold values under controlled laboratory conditions. Based on the threshold value database, an alert will be sent via SMS.

Keywords: slope-instability, flume test, sensors, early warning system

Procedia PDF Downloads 237
1887 Renewable Energy Integration in Cities of Developing Countries: The Case Study of Tema City, Ghana

Authors: Marriette Sakah, Christoph Kuhn, Samuel Gyamfi

Abstract:

Global electricity demand of households in 2005 is estimated to double by 2025 and nearly double again in 2030. The residential sector promises considerable demand growth through infrastructural and equipment investments, the majority of which is projected to occur in developing countries. This lays bare the urgency for enhanced efficiency in all energy systems combined with exploitation of local potential for renewable energy systems. This study explores options for reducing energy consumption, particularly in residential buildings and providing robust, decentralized and renewable energy supply for African cities. The potential of energy efficiency measures and the potential of harnessing local resources for renewable energy supply are quantitatively assessed. The scale of research specifically addresses the city level, which is regulated by local authorities. Local authorities can actively promote the transition to a renewable-based energy supply system by promoting energy efficiency and the use of alternative renewable fuels in existing buildings, and particularly in planning and development of new settlement areas through the use of incentives, regulations, and demonstration projects. They can also support a more sustainable development by shaping local land use and development patterns in such ways that reduce per capita energy consumption and are benign to the environment. The subject of the current case study, Tema, is Ghana´s main industrial hub, a port city and home to 77,000 families. Residential buildings in Tema consumed 112 GWh of electricity in 2013 or 1.45 MWh per household. If average household electricity demand were to decline at an annual rate of just 2 %, by 2035 Tema would consume only 134 GWh of electricity despite an expected increase in the number of households by 84 %. The work is based on a ground survey of the city’s residential sector. The results show that efficient technologies and decentralized renewable energy systems have great potential for meeting the rapidly growing energy demand of cities in developing countries.

Keywords: energy efficiency, energy saving potential, renewable energy integration, residential buildings, urban Africa

Procedia PDF Downloads 257
1886 Inclusive Education of Roma Students from Socially Disadvantaged Background as a Determinant of Their Social Inclusion in the Slovak Republic

Authors: L. Horňák

Abstract:

The aim of the paper is to analyze a longstanding problem in Slovakia – the effective education of Roma students coming from socially disadvantaged backgrounds. Although it is a relatively small country, there are over 630 communities in the Slovak Republic. The efficiency of the projects was verified by interviews with participants; questionnaires; and direct observations. Evaluation reports which summarized and evaluated the outcomes of the projects only confirmed their success. Slovakia realizes that appropriate social inclusion of marginalized citizens coming from the Roma ethnic group can only be achieved through education based on equality of all students and acceptance of diversity.

Keywords: inclusive education, marginalized communities, Roma pupil, equity in education, socially disadvantaged backgrounds, social inclusion

Procedia PDF Downloads 202
1885 Economic Assessment Methodology to Support Decisions for Transport Infrastructure Development

Authors: Dimitrios J. Dimitriou

Abstract:

The decades after the end of the second War provide evidence that infrastructures investments contibute to economic development, on terms of productivity and income growth. In order to force productivity and increase competitiveness the financing of large transport infrastructure projects are on the top of the agenda in strategic planning process. Such a decision may take form some days to some decades and stakeholders as well as decision makers need tools in order to estimate the economic impact on natioanl economy of such an investment. The key question in such decisions is if the effects caused by the new infrastructure could be able to boost economic development on one hand, and create new jobs and activities on the other. This paper deals with the review of estimation of the mega transport infrastructure projects economic effects in economy.

Keywords: economic impact, transport infrastructure, strategic planning, decision making

Procedia PDF Downloads 259
1884 Chongqing's Urban Regeneration for Maintaining the Historic Urban Landscape: Success and Failure of Achieving Sustainable Development

Authors: Hanyu Wei

Abstract:

The last two decades have witnessed a significant number of regeneration practices in historical Chinese cities with the context of rapid urbanisation and economic development. As a response to the possible loss of place identity in the redevelopment process, city makers recognise the potentials of places with cultural significance for maintaining the original landscape. In Chongqing, the prosperities of human settlement history together with the anti-war and post-industrial culture bring this riverside city with its unique urban landscape. Great amounts of historical sites are identified and subjected to conservation planning approaches for urban revitalisation while also maintaining the historic urban landscape. This paper reviews three practices of cultural-led regeneration projects (Hongyadong, Ciqikou, Danzishi) in Chongqing, detailing the urban design and planning principals for the case sites. The paper also presents the conflicting opinions from groups with different interests. By carrying a systematical sustainability evaluation assessment on those projects, the paper critically analyzes the influence of these projects on the broad socio-economic aspects. Although these regeneration cases are thought to achieve the general success in abstaining economic benefits, they are criticised for the over-tourism issues and damages on the authenticity, which further fails to achieve sustainable development.

Keywords: Chongqing, historic urban landscape, sustainable development, urban regeneration

Procedia PDF Downloads 197
1883 The Role of International Organizations in Educational Reform in Iraq

Authors: Thanaa M. Sulaiman

Abstract:

The Iraqi education system has suffered greatly as a result of wars, political instability, and economic problems. After the fall of Saddam’s regime in 2003, the Iraqi education system was proportionally the most impacted sector. The new administration prioritized educational reforms. International organizations, as well as foreign countries, were in the lead to achieve educational reforms. The current study aims to shed light on the reformation process and the roles of different stakeholders, especially international organizations. It also aims to explore the current problems facing the Iraqi education system. Additionally, it aims to explore the different programs and projects that are funded and implemented by international organizations and the impact of these programs and projects.

Keywords: Iraq, Iraqi education system, educational reform, international organizations

Procedia PDF Downloads 102
1882 Meeting the Challanges of Regulating Artificial Intelligence

Authors: Abdulrahman S. Shryan Aldossary

Abstract:

Globally, artificial intelligence (AI) is already performing legitimate tasks on behalf of humans. In Saudi Arabia, large-scale national projects, primarily based on AI technologies and receiving billions of dollars of funding, are projected for completion by 2030. However, the legal aspect of these projects is seriously vulnerable, given AI’s unprecedented ability to self-learn and act independently. This paper, therefore, identifies the critical legal aspects of AI that authorities and policymakers should be aware of, specifically whether AI can possess identity and be liable for the risk of public harm. The article begins by identifying the problematic characteristics of AI and what should be considered by legal experts when dealing with it. Also discussed are the possible competent institutions that could regulate AI in Saudi Arabia. Finally, a procedural proposal is presented for controlling AI, focused on Saudi Arabia but potentially of interest to other jurisdictions facing similar concerns about AI safety.

Keywords: regulation, artificial intelligence, tech law, automated systems

Procedia PDF Downloads 137
1881 Implementing Activity-Based Costing in Architectural Aluminum Projects: Case Study and Lessons Learned

Authors: Amer Momani, Tarek Al-Hawari, Abdallah Alakayleh

Abstract:

This study explains how to construct an actionable activity-based costing and management system to accurately track and account the total costs of architectural aluminum projects. Two ABC models were proposed to accomplish this purpose. First, the learning and development model was introduced to examine how to apply an ABC model in an architectural aluminum firm for the first time and to be familiar with ABC concepts. Second, an actual ABC model was built on the basis of the results of the previous model to accurately trace the actual costs incurred on each project in a year, and to be able to provide a quote with the best trade-off between competitiveness and profitability. The validity of the proposed model was verified on a local architectural aluminum company.

Keywords: activity-based costing, activity-based management, construction, architectural aluminum

Procedia PDF Downloads 64
1880 Global Learning Supports Global Readiness with Projects with Purpose

Authors: Brian Bilich

Abstract:

A typical global learning program is a two-week project based, culturally immersive and academically relevant experience built around a project with purpose and catered to student and business groups. Global Learning in Continuing Education at Austin Community College promotes global readiness through projects with purpose with special attention given to balancing learning, hospitality and travel. A recent project involved CommunityFirst! Village; a 51-acre planned community which provides affordable, permanent housing for men and women coming out of chronic homelessness. Global Learning students collaborated with residents and staff at the Community First! Village on a project to produce two-dimensional remodeling plans of residents’ tiny homes with a focus on but not limited to design improvements on elements related to accessibility, increased usability of living and storage space and esthetic upgrades to boost psychological and emotional appeal. The goal of project-based learning in the context of global learning in Continuing Educaiton at Austin Community Collegen general is two fold. One, in rapid fashion we develop a project which gives the learner a hands-on opportunity to exercise soft and technical skills, like creativity and communication and analytical thinking. Two, by basing projects on global social conflict issues, the project of purpose promotes the development of empathy for other people and fosters a sense of corporate social responsibility in future generations of business leadership. In the example provide above the project informed the student group on the topic of chronic homelessness and promoted awareness and empathy for this underserved segment of the community. Project-based global learning based on projects with purpose has the potential to cultivate global readiness by developing empathy and strengthening emotional intelligence for future generations.

Keywords: project-based learning, global learning, global readiness, globalization, international exchange, collaboration

Procedia PDF Downloads 31
1879 Media Literacy Development: A Methodology to Systematically Integrate Post-Contemporary Challenges in Early Childhood Education

Authors: Ana Mouta, Ana Paulino

Abstract:

The following text presents the ik.model, a theoretical framework that guided the pedagogical implementation of meaningful educational technology-based projects in formal education worldwide. In this paper, we will focus on how this framework has enabled the development of media literacy projects for early childhood education during the last three years. The methodology that guided educators through the challenge of systematically merging analogic and digital means in dialogic high-quality opportunities of world exploration is explained throughout these lines. The effects of this methodology on early age media literacy development are considered. Also considered is the relevance of this skill in terms of post-contemporary challenges posed to learning.

Keywords: early learning, ik.model, media literacy, pedagogy

Procedia PDF Downloads 287
1878 Digital Design and Fabrication: A Review of Trend and Its Impact in the African Context

Authors: Mohamed Al Araby, Amany Salman, Mostafa Amin, Mohamed Madbully, Dalia Keraa, Mariam Ali, Marah Abdelfatah, Mariam Ahmed, Ahmed Hassab

Abstract:

In recent years, the architecture, engineering, and construction (A.E.C.) industry have been exposed to important innovations, most notably the global integration of digital design and fabrication (D.D.F.) processes in the industry’s workflow. Despite this evolution in that sector, Africa was excluded from the examination of this development. The reason behind this exclusion is the preconceived view of it as a developing region that still employs traditional methods of construction. The primary objective of this review is to investigate the trend of digital construction (D.C.) in the African environment and the difficulties in its regular utilization of it. This objective can be attained by recognizing the notion of distributed computing in Africa and evaluating the impact of the projects deploying this technology on both the immediate and broader contexts. The paper’s methodology begins with the collection of data from 224 initiatives throughout Africa. Then, 50 of these projects were selected based on the criteria of the project's recency, typology variety, and location diversity. After that, a literature-based comparative analysis was undertaken. This study’s findings reveal a pattern of motivation for applying digital fabrication processes. Moreover, it is essential to evaluate the socio-economic effects of these projects on the population living near the analyzed subject. The last step in this study is identifying the influence on the neighboring nations.

Keywords: Africa, digital construction, digital design, fabrication

Procedia PDF Downloads 128
1877 Applying the Underwriting Technique to Analyze and Mitigate the Credit Risks in Construction Project Management

Authors: Hai Chien Pham, Thi Phuong Anh Vo, Chansik Park

Abstract:

Risks management in construction projects is important to ensure the positive feasibility of the projects in which financial risks are most concerned while construction projects always run on a credit basis. Credit risks, therefore, require unique and technical tools to be well managed. Underwriting technique in credit risks, in its most basic sense, refers to the process of evaluating the risks and the potential exposure of losses. Risks analysis and underwriting are applied as a must in banks and financial institutions who are supporters for constructions projects when required. Recently, construction organizations, especially contractors, have recognized the significant increasing of credit risks which caused negative impacts to project performance and profit of construction firms. Despite the successful application of underwriting in banks and financial institutions for many years, there are few contractors who are applying this technique to analyze and mitigate the credit risks of their potential owners before signing contracts with them for delivering their performed services. Thus, contractors have taken credit risks during project implementation which might be not materialized due to the bankruptcy and/or protracted default made by their owners. With this regard, this study proposes a model using the underwriting technique for contractors to analyze and assess credit risks of their owners before making final decisions for the potential construction contracts. Contractor’s underwriters are able to analyze and evaluate the subjects such as owner, country, sector, payment terms, financial figures and their related concerns of the credit limit requests in details based on reliable information sources, and then input into the proposed model to have the Overall Assessment Score (OAS). The OAS is as a benchmark for the decision makers to grant the proper limits for the project. The proposed underwriting model is validated by 30 subjects in Asia Pacific region within 5 years to achieve their OAS, and then compare output OAS with their own practical performance in order to evaluate the potential of underwriting model for analyzing and assessing credit risks. The results revealed that the underwriting would be a powerful method to assist contractors in making precise decisions. The contribution of this research is to allow the contractors firstly to develop their own credit risk management model for proactively preventing the credit risks of construction projects and continuously improve and enhance the performance of this function during project implementation.

Keywords: underwriting technique, credit risk, risk management, construction project

Procedia PDF Downloads 187
1876 Five Years Analysis and Mitigation Plans on Adjustment Orders Impacts on Projects in Kuwait's Oil and Gas Sector

Authors: Rawan K. Al-Duaij, Salem A. Al-Salem

Abstract:

Projects, the unique and temporary process of achieving a set of requirements have always been challenging; Planning the schedule and budget, managing the resources and risks are mostly driven by a similar past experience or the technical consultations of experts in the matter. With that complexity of Projects in Scope, Time, and execution environment, Adjustment Orders are tools to reflect changes to the original project parameters after Contract signature. Adjustment Orders are the official/legal amendments to the terms and conditions of a live Contract. Reasons for issuing Adjustment Orders arise from changes in Contract scope, technical requirement and specification resulting in scope addition, deletion, or alteration. It can be as well a combination of most of these parameters resulting in an increase or decrease in time and/or cost. Most business leaders (handling projects in the interest of the owner) refrain from using Adjustment Orders considering their main objectives of staying within budget and on schedule. Success in managing the changes results in uninterrupted execution and agreed project costs as well as schedule. Nevertheless, this is not always practically achievable. In this paper, a detailed study through utilizing Industrial Engineering & Systems Management tools such as Six Sigma, Data Analysis, and Quality Control were implemented on the organization’s five years records of the issued Adjustment Orders in order to investigate their prevalence, and time and cost impact. The analysis outcome revealed and helped to identify and categorize the predominant causations with the highest impacts, which were considered most in recommending the corrective measures to reach the objective of minimizing the Adjustment Orders impacts. Data analysis demonstrated no specific trend in the AO frequency in past five years; however, time impact is more than the cost impact. Although Adjustment Orders might never be avoidable; this analysis offers’ some insight to the procedural gaps, and where it is highly impacting the organization. Possible solutions are concluded such as improving project handling team’s coordination and communication, utilizing a blanket service contract, and modifying the projects gate system procedures to minimize the possibility of having similar struggles in future. Projects in the Oil and Gas sector are always evolving and demand a certain amount of flexibility to sustain the goals of the field. As it will be demonstrated, the uncertainty of project parameters, in adequate project definition, operational constraints and stringent procedures are main factors resulting in the need for Adjustment Orders and accordingly the recommendation will be to address that challenge.

Keywords: adjustment orders, data analysis, oil and gas sector, systems management

Procedia PDF Downloads 133
1875 A Study of Factors Affecting the Elapsed Time of Housing Renewal Project Implementation in Seoul

Authors: In Su Na, Gunwon Lee, Seiyong Kim

Abstract:

This study analyzed the effect of area variables and economic variables on the length of each period of the project in order to analyze the effect of agreement rate on project implementation in housing renewal projects. In conclusion, as can be seen from these results, a low agreement rate may not translate into project promotion, and a higher agreement rate may not translate into project delay. The expectation of the policy is that the lower the agreement rate, the more projects would be promoted, but that is not the actual effect. From a policy consistency viewpoint, changing the agreement rate frequently, depending on the decision of the public, is not reasonable. The policy of using agreement rate as a necessary condition for project implementation should be reconsidered.

Keywords: Area and Economic Variables, Elapsed time, Housing Renewal Project

Procedia PDF Downloads 435
1874 Usability Evaluation in Practice: Selecting the Appropriate Method

Authors: Hanan Hayat, Russell Lock

Abstract:

The importance of usability in ensuring software quality has been well established in literature and widely accepted by software development practitioners. Consequently, numerous usability evaluation methods have been developed. However, the availability of large variety of evaluation methods alongside insufficient studies that critically analyse them resulted in an ambiguous process of selection amongst non-usability-expert practitioners. This study investigates the factors affecting the selection of usability evaluation methods within a project by interviewing a software development team. The results of the data gathered are then analysed and integrated in developing a framework. The framework developed poses a solution to the selection processes of usability evaluation methods by adjusting to individual projects resources and goals. It has the potential to be further evaluated to verify its applicability and usability within the domain of this study.

Keywords: usability evaluation, evaluating usability in non-user entered designs, usability evaluation methods (UEM), usability evaluation in projects

Procedia PDF Downloads 132
1873 BEATRICE: A Low-Cost Manipulator Arm for an Educational Planetary Rover

Authors: T. Pakulski, L. Kryza, A. Linossier

Abstract:

The BEar Articulated TeleRobotic Inspection and Clasping Extremity is a lightweight, 5 DoF robotic manipulator for the Berlin Educational Assistant Rover (BEAR). BEAR is one of the educational planetary rovers developed under the Space Rover projects at the Chair of Space Technology of the Technische Universität Berlin. The projects serve to conduct research and train engineers by developing rovers for competitions like the European Rover Challenge and the DLR SpaceBot Cup. BEATRICE is the result of a cost-driven design process to deliver a simple but capable platform for a variety of competition tasks: object grasping and manipulation, inspection, instrument wielding and more. The manipulator’s simple mechatronic design, based on a combination of servomotors and stepper motors with planetary gearboxes, also makes it a practical tool for developing embedded control systems. The platform’s initial implementation relies on tele-operated control but is fully instrumented for future autonomous functionality. This paper describes BEATRICE’s development from its preliminary link model to its structural and mechatronic design, embedded control and AI and T. In parallel, it examines the influence of budget constraints and high personnel turnover commonly associated with student teams on the manipulator’s design. Finally, it comments on the utility of robot design projects for educating future engineers.

Keywords: education, low-cost, manipulator, robotics, rover

Procedia PDF Downloads 225
1872 Analyzing Social and Political Constraints in Development Aid Projects in Post Conflict Region of SWAT, Pakistan

Authors: Faizan Sultan

Abstract:

Non-government organizations (NGOs) in Pakistan have the potential to deliver services such as health, education, and rural development through targeting the most vulnerable communities of society. Having this significant importance, NGOs are facing numerous challenges in service delivery. So, there is a need to identify the challenges NGOs face in community development, particularly post-conflict development. The current study has analyzed the social and political constraints in development projects in the post-conflict region of the Swat district of Khyber Pakhtunkhwa. The objectives of this study are “What are the social and political constraints faced by the nongovernmental organizations in the implementation of development aid Projects in post-conflict development of Swat and to examine the challenges in coordination mechanism between government departments, NGOs, and community in reconstruction activities”. This research is based upon both the quantitative and qualitative data that is being gathered from the NGO representatives, government officials, and community members who were involved in post-conflict development interventions in the Swat region. A purposive sampling technique was used to select respondents from the community members/activists (25 in number) and government and NGO officials (10 in number). Based on analysis against our objectives, NGOs have faced numerous constraints such as Insecurity, Negative Perceptions about NGOs, restrictions on women's mobility, government policies and regulations, lack of coordination and networking, trust deficit, and political interference while implementing their project interventions. These findings concluded that constraints have affected project implementation to a greater extent, including women's participation, involvement of marginalized populations, and equal distribution of resources. In the Swat region, NGOs cannot openly discuss sensitive projects such as human rights, gender-based projects, or women empowerment as these issues are very sensitive to the local community due to their cultural values. The community may not allow their females to go outside their homes as this region is a male-dominated society. Similarly, lack of communication and poor networking for the arrangements of the project meetings were also the major constraints.

Keywords: national disaster management authority, millennium development goals, provincial disaster management authority, provincial reconstruction, rehabilitation and settlement authority

Procedia PDF Downloads 29