11008 A Case Study: Social Network Analysis of Construction Design Teams

Authors: Elif D. Oguz Erkal, David Krackhardt, Erica Cochran-Hameen

Abstract:

Even though social network analysis (SNA) is an abundantly studied concept for many organizations and industries, a clear SNA approach to the project teams has not yet been adopted by the construction industry. The main challenges for performing SNA in construction and the apparent reason for this gap is the unique and complex structure of each construction project, the comparatively high circulation of project team members/contributing parties and the variety of authentic problems for each project. Additionally, there are stakeholders from a variety of professional backgrounds collaborating in a high-stress environment fueled by time and cost constraints. Within this case study on Project RE, a design & build project performed at the Urban Design Build Studio of Carnegie Mellon University, social network analysis of the project design team will be performed with the main goal of applying social network theory to construction project environments. The research objective is to determine a correlation between the network of how individuals relate to each other on one’s perception of their own professional strengths and weaknesses and the communication patterns within the team and the group dynamics. Data is collected through a survey performed over four rounds conducted monthly, detailed follow-up interviews and constant observations to assess the natural alteration in the network with the effect of time. The data collected is processed by the means of network analytics and in the light of the qualitative data collected with observations and individual interviews. This paper presents the full ethnography of this construction design team of fourteen architecture students based on an elaborate social network data analysis over time. This study is expected to be used as an initial step to perform a refined, targeted and large-scale social network data collection in construction projects in order to deduce the impacts of social networks on project performance and suggest better collaboration structures for construction project teams henceforth.

Keywords: construction design teams, construction project management, social network analysis, team collaboration, network analytics

Procedia PDF Downloads 177
11007 Interpretation as Ontological Determination and Negotiation

Authors: Nicolas Cuevas-Alvear

Abstract:

The subject of this paper is the concept of interpretation. Its purpose is to expose the need for a new concept of interpretation and to trace the construction route of interpretation as determination and negotiation. The thesis it defends is that interpretation is the determination of events and the negotiation of those determinations in communication. To meet its objective, this manuscript is divided into five sections. The first section introduces the subject and the need for a new concept of interpretation. The second section explicitly formulates the research questions and the objectives of the project for the construction of a new concept of interpretation. The third section presents the state of the art, specifically, the theory of Radical interpretation proposed by Donald Davidson and the theory of the Hermeneutic Circle proposed by Hans Georg Gadamer. In addition, in this section, there is a reconstruction of Ernst Cassirer's explanation of language as a symbolic form. The fourth section is an explanation of the proposal based on the theories presented. Specifically: language as a symbolic form explains interpretation as a determination of events using objective, subjective and intersubjective elements, and these three elements are negotiated in interpretation as communication. The last section is the bibliography proposed to carry out the project.

Keywords: interpretation, metaphysics, semantics, Donald Davidson, ERNST Cassirer

Procedia PDF Downloads 168
11006 On the Construction of Some Optimal Binary Linear Codes

Authors: Skezeer John B. Paz, Ederlina G. Nocon

Abstract:

Finding an optimal binary linear code is a central problem in coding theory. A binary linear code C = [n, k, d] is called optimal if there is no linear code with higher minimum distance d given the length n and the dimension k. There are bounds giving limits for the minimum distance d of a linear code of fixed length n and dimension k. The lower bound which can be taken by construction process tells that there is a known linear code having this minimum distance. The upper bound is given by theoretic results such as Griesmer bound. One way to find an optimal binary linear code is to make the lower bound of d equal to its higher bound. That is, to construct a binary linear code which achieves the highest possible value of its minimum distance d, given n and k. Some optimal binary linear codes were presented by Andries Brouwer in his published table on bounds of the minimum distance d of binary linear codes for 1 ≤ n ≤ 256 and k ≤ n. This was further improved by Markus Grassl by giving a detailed construction process for each code exhibiting the lower bound. In this paper, we construct new optimal binary linear codes by using some construction processes on existing binary linear codes. Particularly, we developed an algorithm applied to the codes already constructed to extend the list of optimal binary linear codes up to 257 ≤ n ≤ 300 for k ≤ 7.

Keywords: bounds of linear codes, Griesmer bound, construction of linear codes, optimal binary linear codes

Procedia PDF Downloads 724
11005 Characterizing Compressive Strength of Compressed Stabilized Earth Blocks as a Function of Mix Design

Authors: Robert K. Hillyard, Jonathan Thomas, Brett A. Story

Abstract:

Compressed Stabilized Earth Blocks (CSEB) are masonry units that combine soil, sand, stabilizer, and water under pressure to form an earth block. These CSEB’s offer a cost-effective building solution for remote construction, using local resources and labor to minimize transportation and material costs. However, CSEB’s, and earthen construction generally have not been widely adopted as standardized construction materials. One shortcoming is the difficulty in standardizing strength values of CSEB units and systems due to the inherent variations in mix design, including production compression. This research presents findings on compressive strengths of full-scale CSEB’s from 60 different mix designs as a function of the amount of cement, sand, soil, and water added to the mixture. The full-scale results are compared with CSEB cylinder cores.

Keywords: CSEB, compressive strength, earth construction, mix design

Procedia PDF Downloads 68
11004 Cost Overrun in Delivery of Public Projects in the Saudi Construction Industry: A Review

Authors: A. Aljohani, D. Moore, D. D. Ahiaga-Dagbui

Abstract:

Cost overruns are endemic in the delivery of construction projects. The problem is global. It occurs irrespective of type and size of the project, its location, procurement method or client. The size of overruns can be as high as 200% in some cases. Projects thus unfortunately often make the news headlines, not for their immense socio-economic contribution to society, but for being poorly procured. In Saudi Arabia, two-thirds of construction projects are publicly procured by the Saudi government, which has been invested Billions of dollars in infrastructure projects each year as part of an ambitious strategic development agenda to shift from mainly oil dependency to multi-source dependency. However, reports show that about 3,000 public projects face diverse issues related to time and cost overrun. As part of an on-going study to develop a framework for effective public procurement for the Saudi Arabian construction industry, this paper reports the initial findings of the causes of cost overruns in the context of the Gulf State. It also evaluates the interface between some of the front-end loading issues in public procurement in Saudi and their effects on project performance. A systematic review of the existing literature on construction cost overruns, with focus on the Saudi Arabian construction industry has been used. One of the initial findings is that a fixed-price contract is usually used by the client in an attempt to transfer all financial risks to the contractors. This has the unintended consequence of creating a turbulent environment for the delivery of the project which leads to project abandonment by contractors, poor quality of work and substantial rework. Further work is being undertaken to empirically verify the initial findings reported in this paper and their generalizability for the construction industry as a whole.

Keywords: cost overrun, public procurement, Saudi Arabia, construction projects

Procedia PDF Downloads 245
11003 Construction Time - Cost Trade-Off Analysis Using Fuzzy Set Theory

Authors: V. S. S. Kumar, B. Vikram, G. C. S. Reddy

Abstract:

Time and cost are the two critical objectives of construction project management and are not independent but intricately related. Trade-off between project duration and cost are extensively discussed during project scheduling because of practical relevance. Generally when the project duration is compressed, the project calls for an increase in labor and more productive equipments, which increases the cost. Thus, the construction time-cost optimization is defined as a process to identify suitable construction activities for speeding up to attain the best possible savings in both time and cost. As there is hidden tradeoff relationship between project time and cost, it might be difficult to predict whether the total cost would increase or decrease as a result of compressing the schedule. Different combinations of duration and cost for the activities associated with the project determine the best set in the time-cost optimization. Therefore, the contractors need to select the best combination of time and cost to perform each activity, all of which will ultimately determine the project duration and cost. In this paper, the fuzzy set theory is used to model the uncertainties in the project environment for time-cost trade off analysis.

Keywords: fuzzy sets, uncertainty, qualitative factors, decision making

Procedia PDF Downloads 623
11002 Optimizing Bridge Deck Construction: A deep Neural Network Approach for Limiting Exterior Grider Rotation

Authors: Li Hui, Riyadh Hindi

Abstract:

In the United States, bridge construction often employs overhang brackets to support the deck overhang, the weight of fresh concrete, and loads from construction equipment. This approach, however, can lead to significant torsional moments on the exterior girders, potentially causing excessive girder rotation. Such rotations can result in various safety and maintenance issues, including thinning of the deck, reduced concrete cover, and cracking during service. Traditionally, these issues are addressed by installing temporary lateral bracing systems and conducting comprehensive torsional analysis through detailed finite element analysis for the construction of bridge deck overhang. However, this process is often intricate and time-intensive, with the spacing between temporary lateral bracing systems usually relying on the field engineers’ expertise. In this study, a deep neural network model is introduced to limit exterior girder rotation during bridge deck construction. The model predicts the optimal spacing between temporary bracing systems. To train this model, over 10,000 finite element models were generated in SAP2000, incorporating varying parameters such as girder dimensions, span length, and types and spacing of lateral bracing systems. The findings demonstrate that the deep neural network provides an effective and efficient alternative for limiting the exterior girder rotation for bridge deck construction. By reducing dependence on extensive finite element analyses, this approach stands out as a significant advancement in improving safety and maintenance effectiveness in the construction of bridge decks.

Keywords: bridge deck construction, exterior girder rotation, deep learning, finite element analysis

Procedia PDF Downloads 34
11001 Development and Characterization of a Bio-Sourced Composite Material Based on Phase Change Material and Hemp Shives

Authors: Hachmi Toifane, Pierre Tittelein, Anh Dung Tran Le, Laurent Zalewsi

Abstract:

This study introduces a composite material composed of bio-sourced phase-change material (PCM) of plant origin combined with hemp shives, developed in response to environmental challenges in the construction sector. The state of the art emphasizes the low thermal storage capacity of bio-based materials and highlights increasing need for developing sustainable materials that offer optimal thermal, mechanical, and hydric performances. The combining of PCM's thermal properties and hygric properties of hemp shives results in a material that combines lightness, strength, and hygrothermal regulation. Various formulations are being assessed and compared to conventional hemp concrete. Thermal characterization includes the measurements of thermal conductivity and numerical simulations to evaluate the thermal storage capacity. The results indicate that the addition of PCM significantly enhances the material's thermal storage capacity, positioning this one as a promising, eco-friendly solution for sustainable construction and for improving the energy efficiency of buildings.

Keywords: hemp composite, bio-sourced phase change material, thermal storage, hemp shives

Procedia PDF Downloads 16
11000 A Preliminary Study of the Subcontractor Evaluation System for the International Construction Market

Authors: Hochan Seok, Woosik Jang, Seung-Heon Han

Abstract:

The stagnant global construction market has intensified competition since 2008 among firms that aim to win overseas contracts. Against this backdrop, subcontractor selection is identified as one of the most critical success factors in overseas construction project. However, it is difficult to select qualified subcontractors due to the lack of evaluation standards and reliability. This study aims to identify the problems associated with existing subcontractor evaluations using a correlations analysis and a multiple regression analysis with pre-qualification and performance evaluation of 121 firms in six countries.

Keywords: subcontractor evaluation system, pre-qualification, performance evaluation, correlation analysis, multiple regression analysis

Procedia PDF Downloads 340
10999 The Analysis of the Protection of Historical and Cultural Heritage in the Development of Cities: Taking Quzhou Ancient City as an Example

Authors: Zhen Shu

Abstract:

The historical and cultural heritage demonstrates the wisdom of the entire nation and it has left its own traces in the process of urban construction. It has very important instructional significance for the construction of modern cities and the development of cultural aspects of modern people. The Protection of historical and cultural heritage has become an inevitable choice for the development of modern civilization. This paper discusses the relationship between urban development and historic preservation. And it emphasizes the important value of strengthening the protection of historical and cultural heritage in urban construction, introduces the value of cultural heritage, the process of historic preservation and its problems in Quzhou, Zhejiang Province. In conclusion, we puts forward some Suggestions for strengthening the protection of historical heritage in the process of urban construction.

Keywords: cultural heritage, historic preservation, Quzhou ancient city, urban development

Procedia PDF Downloads 253
10998 Comparison Constructions in the Language of the Qur'an

Authors: Safiah Ahmed Yahya Madkhali

Abstract:

The aim of the present paper is to provide a characterization of the expression of comparison in the language of the Qur’an, the language of the Divine Book of the Muslim nation. It focuses on quantitative as well as qualitative comparisons. While works on comparison constructions in Arabic focus on a type(s) of the comparison construction and exclude another and investigate its behaviour in Standard Arabic, the paper aims to be inclusive of the varied instances that are scalar comparison constructions and describe its aspects in the language of the Qur’an. To the best of my knowledge, comparative constructions in the language of the Qur’an has not been tackled before and hence the characterization provided in the paper would be the contribution of the present work. The paper highlights the several rhetorical features of the construction as present in the different verses in the Qur’an which set them distinct from the ordinary use of the construction in the different verities of the Arabic language.

Keywords: comparison constructions, inequality, comparative, superlative, equality

Procedia PDF Downloads 51
10997 Eco-Design of Construction Industrial Park in China with Selection of Candidate Tenants

Authors: Yang Zhou, Kaijian Li, Guiwen Liu

Abstract:

Offsite construction is an innovative alternative to conventional site-based construction, with wide-ranging benefits. It requires building components, elements or modules were prefabricated and pre-assembly before installed into their final locations. To improve efficiency and achieve synergies, in recent years, construction companies were clustered into construction industrial parks (CIPs) in China. A CIP is a community of construction manufacturing and service businesses located together on a common property. Companies involved in industrial clusters can obtain environment and economic benefits by sharing resources and information in a given region. Therefore, the concept of industrial symbiosis (IS) can be applied to the traditional CIP to achieve sustainable industrial development or redevelopment through the implementation of eco-industrial parks (EIP). However, before designing a symbiosis network between companies in a CIP, candidate support tenants need to be selected to complement the existing construction companies. In this study, an access indicator system and a linear programming model are established to select candidate tenants in a CIP while satisfying the degree of connectivity among the enterprises in the CIP, minimizing the environmental impact, and maximizing the annualized profit of the CIP. The access indicator system comprises three primary indicators and fifteen secondary indicators, is proposed from the perspective of park-based level. The fifteen indicators are classified as three primary indicators including industrial symbiosis, environment performance and economic benefit, according to the three dimensions of sustainability (environment, economic and social dimensions) and the three R's of the environment (reduce, reuse and recycle). The linear programming model is a method to assess the satisfactoriness of all the indicators and to make an optimal multi-objective selection among candidate tenants. This method provides a practical tool for planners of a CIP in evaluating which among the candidate tenants would best complement existing anchor construction tenants. The reasonability and validity of the indicator system and the method is worth further study in the future.

Keywords: construction industrial park, China, industrial symbiosis, offsite construction, selection of support tenants

Procedia PDF Downloads 244
10996 Maturity Level of Knowledge Management in Whole Life Costing in the UK Construction Industry: An Empirical Study

Authors: Ndibarefinia Tobin

Abstract:

The UK construction industry has been under pressure for many years to produce economical buildings which offer value for money, not only during the construction phase, but more importantly, during the full life of the building. Whole life costing is considered as an economic analysis tool that takes into account the total investment cost in and ownership, operation and subsequent disposal of a product or system to which the whole life costing method is being applied. In spite of its importance, the practice is still crippled by the lack of tangible evidence, ‘know-how’ skills and knowledge of the practice i.e. the lack of professionals with the knowledge and training on the use of the practice in construction project, this situation is compounded by the absence of available data on whole life costing from relevant projects, lack of data collection mechanisms and so on. The aforementioned problems has forced many construction organisations to adopt project enhancement initiatives to boost their performance on the use of whole life costing techniques so as to produce economical buildings which offer value for money during the construction stage also the whole life of the building/asset. The management of knowledge in whole life costing is considered as one of the many project enhancement initiative and it is becoming imperative in the performance and sustainability of an organisation. Procuring building projects using whole life costing technique is heavily reliant on the knowledge, experience, ideas and skills of workers, which comes from many sources including other individuals, electronic media and documents. Due to the diversity of knowledge, capabilities and skills of employees that vary across an organisation, it is significant that they are directed and coordinated efficiently so as to capture, retrieve and share knowledge in order to improve the performance of the organisation. The implementation of knowledge management concept has different levels in each organisation. Measuring the maturity level of knowledge management in whole life costing practice will paint a comprehensible picture of how knowledge is managed in construction organisations. Purpose: The purpose of this study is to identify knowledge management maturity in UK construction organisations adopting whole life costing in construction project. Design/methodology/approach: This study adopted a survey method and conducted by distributing questionnaires to large construction companies that implement knowledge management activities in whole life costing practice in construction project. Four level of knowledge management maturity was proposed on this study. Findings: From the results obtained in the study shows that 34 contractors at the practiced level, 26 contractors at managed level and 12 contractors at continuously improved level.

Keywords: knowledge management, whole life costing, construction industry, knowledge

Procedia PDF Downloads 220
10995 Late Payment Issues Faced by Subcontractors in the Malaysian Construction Industry

Authors: Nur Emma Mustaffa, Hii Ping Ping

Abstract:

Late payment is a common issue in the construction industry and the subcontractors are not spared from it. This study has been carried out with the objectives to identify the implications of late payment issues toward the subcontractors and the strategies adopted by them to overcome the late payment issues. In terms of the strategies which can be adopted in overcoming the late payment, the subcontractors may suspend or slow down the construction process, making periodic follow up with the client, demand the rights to interest on late payment or the issuance of a promissory note by the client. The focus of the study is primarily on Grade 4 to Grade 7 contractors in Johor Bahru, Malaysia who carried out subcontracting works and registered under Construction Industry Development Board (CIDB). Employing survey as the main research method for data collection, the analysis would therefore mainly be adopting Likert Scale Analysis, Ranking Analysis and Frequency Distribution Analysis. This research showed the main implication of late payment issues towards subcontractors is created financial hardship to them. Besides, the most effective strategy adopted by the subcontractors to overcome the late payment issues is follow-up with client using formal procedure. From the findings, most of the subcontractors had low level of experiences and frequency in the adoption of Construction Industry Payment and Adjudication Act (CIPAA) 2012 to solve the payment disputes in the construction industry. In a nutshell, it is hoped that these findings will become guidance to the subcontractors to overcome the late payment issues in their future projects.

Keywords: subcontractors, implications, strategies, CIPAA 2012, payment

Procedia PDF Downloads 139
10994 Building in-Addition-School-Family Partnership

Authors: Lulu Sun

Abstract:

In Addition is an after-school mathematics program in which students and their parents build mathematical confidence and competence by solving problems they curious about. It is a program consists of mix-grade from 4th to 6th grade of 10 to 20 students, including math problem solving and other activities. This partnership will focus on the relationship between the In-Addition and the parents’ engagement; in this kind of partnership, it has the In-Addition program teaching and the family engagement. This partnership is purpose to building cooperation between the program and parents, strengthening the links between the program and families.

Keywords: program-family, family engagement, positive bias, partnership

Procedia PDF Downloads 171
10993 Applications of Engineering Geology in Hydro Power Tunnel Projects in Himalayan Geological Regime

Authors: Rameh Chauhan

Abstract:

Tunnel construction in Himalayan rock is a challenging task due to fragile nature of the strata. Tunnel excavation carried out from lower Himalayas to high Himalayas in different metamorphic rock. Therefore application of engineering geology plays a vital role during various stage of the tunneling projects. Engineering geology is defined as application of geology to construction of civil structures through engineering practice. It is applied to the design, construction and performance aspects of engineering structure on the surface or sub-surface like dam, underground and surface power house, cut slopes, tunnels and underground storage cavern for nuclear material. But this paper emphasized mostly on underground structures like big caverns of Power house, desilting chambers, and tunnels of various sizes. Construction of these structures in the fragile rock conditions of Himalayan geology from Western Himalayas to Eastern Himalayas necessitated the application of the engineering geology on the micro-scale base for the stability, performance, and longevity of the civil structures. Number of hydropower projects have been constructed, some of them are under construction and under investigation stage. These projects are located in various parts of Himalayas under various seismic-tectonic zones. Tunneling works are involved in these projects. This paper represents the various engineering geological practices adopted in investigation and construction stage of various projects based on experiences gained during past construction histories in Himalayan geology of young mountains in very fragile geological conditions. Highlighting and sharing of use of these techniques on various platforms will definitely enhance the knowledge for carrying out the construction of various projects for the development of society. Construction of the tunnels, surface, and sub-surface caverns, dams, highway, metro, highway tunnels are all based on engineering geological parameters in combinations with other engineering considerations.

Keywords: cavern-power house, desilting chambers and tunnels, seismic-tectonic-zones, earthquake-prone zones based on intensities

Procedia PDF Downloads 198
10992 Mobile Cloud Application in Design Build Bridge Construction

Authors: Meng Sun, Bin Wei

Abstract:

In the past decades, design-build has become a more popular project delivery system especially for the large scaled infrastructure project in North America. It provides a one-stop shopping system for the client therefore improves the efficiency of construction, and reduces the risks and overall cost for the clients. Compared to the project with traditional delivery method, design-build project requires contractor and designer to work together efficiently to deliver the best-value solutions through the construction process. How to facilitate a solid integration and efficient interaction between contractor and designer often affects the schedule, budget and quality of the construction therefore becomes a key factor to the success of a design-build project. This paper presents a concept of using modern mobile cloud technology to provide an integrated solution during the design-build construction. It uses mobile cloud architecture to provide a platform for real-time field progress, change request approval, job progress log, and project time entry with devices integration for field information and communications. The paper uses a real filed change notice as an example to demonstrate how mobile cloud technology applies in a design-build project and how it can improve the project efficiency.

Keywords: cloud, design-build, field change notice, mobile application

Procedia PDF Downloads 221
10991 Improving Anchor Technology for Adapting the Weak Soil

Authors: Sang Hee Shin

Abstract:

The technical improving project is for using the domestic construction technology in the weak soil condition. The improved technology is applied directly under local construction site at OOO, OOO. Existing anchor technology was developed for the case of soft ground as N value 10 or less. In case of soft ground and heavy load, the attachment site per one strand is shortened due to the distributed interval so that the installation site is increased relatively and being economically infeasible. In addition, in case of high tensile load, adhesion phenomenon between wedge and block occurs. To solve these problems, it strengthens the function of the attached strands to treat a ‘bulbing’ on the strands. In the solution for minimizing the internal damage and strengthening the removal function, it induces lubricating action using the film and the attached film, and it makes the buffer structure using wedge lubricating structure and the spring. The technology is performed such as in-house testing and the field testing. The project can improve the reliability of the standardized quality technique. As a result, it intended to give the technical competitiveness.

Keywords: anchor, improving technology, removal anchor, soil reinforcement, weak soil

Procedia PDF Downloads 187
10990 Mechanical, Physical and Durability Properties of Cement Mortars Added with Recycled PP/PE-Based Food Packaging Waste Material

Authors: Livia Guerini, Christian Paglia

Abstract:

In Switzerland, only a fraction of plastic waste from food packaging is collected and recycled for further use in the food industry. Therefore, reusing these waste plastics for building applications can be an attractive alternative to disposal in order to reduce the problem of waste management and to make up for the depletion of raw materials needed for construction. In this study, experiments were conducted on the mechanical properties (compressive and flexural strength, elastic modulus), physical properties (density, workability, porosity, and water permeability) and durability (freeze/thaw resistance) of cementitious mortars with additions of recycled low-/high-density polyethylene (LDPE/HDPE)/ polypropylene (PP) regrind (addition of 5% and 10% by weight) and LDPE sheets (addition of 0.5% and 1.5% by weight) coming from food packaging. The results show that as the addition of plastic material increases, the density and mechanical properties of the mortars decrease compared to conventional ones. Porosity is similar in all the mixtures made, while the workability and the permeability are affected not only by the amount added but also by the shape of the plastic aggregate. Freeze/thaw resistance, on the other hand, is significantly higher in mortars with plastic aggregates than in traditional mortar. This feature may be interesting for the realization of outdoor mortars in cold environments.

Keywords: food packaging waste, durability properties, mechanical properties, mortar, recycled PE, recycled PP

Procedia PDF Downloads 114
10989 Assessing Suitability of Earthbag Technology for Temporary Housing: Sustainability Challenge

Authors: S. M. Amin Hosseini, Ana Blanco, Albert De La Fuente, Sergio Cavalaro

Abstract:

In emergency situations, it is fundamental to provide with a safe shelter to the population affected. However, the lack of resources and short time often represent a barrier difficult to overcome. A sustainable, rapid and low-cost construction technique is earthbag construction. This technique has spread as an alternative to the construction of emergency shelter, social housing, and even ecovillages. The earthbag construction consists of introducing soil in degradable bags that are stacked to form adobe structures. The present study aims to assess characteristics of the earthbag construction technique based on sustainability requirements and features of other methods used for temporary housing. In this case, after defining the sustainability criteria and emergency situation necessities, this study compares earthbag construction with other types of prefabricated temporary housing. Finally, the most suitable conditions for applying this technique based on the particular local properties and second life scenarios of superadobe temporary housing. The results of the study contribute to promote the earthbag and superadobe techniques as sustainable alternatives for temporary housing. However, the sustainability index of this technology highly depends on affected local conditions and characteristics. Consequently, in order to achieve a high sustainability index, emergency managers need to decide about this technology based on the highlighted results of this study, attention to the importance of specific local conditions and next functions of temporary housing.

Keywords: temporary housing, temporary shelter, earthbag, superadobe, sustainability, emergency

Procedia PDF Downloads 204
10988 LCA and Multi-Criteria Analysis of Fly Ash Concrete Pavements

Authors: Marcela Ondova, Adriana Estokova

Abstract:

Rapid industrialization results in increased use of natural resources bring along serious ecological and environmental imbalance due to the dumping of industrial wastes. Principles of sustainable construction have to be accepted with regard to the consumption of natural resources and the production of harmful emissions. Cement is a great importance raw material in the building industry and today is its large amount used in the construction of concrete pavements. Concerning raw materials cost and producing CO2 emission the replacing of cement in concrete mixtures with more sustainable materials is necessary. To reduce this environmental impact people all over the world are looking for a solution. Over a period of last ten years, the image of fly ash has completely been changed from a polluting waste to resource material and it can solve the major problems of cement use. Fly ash concretes are proposed as a potential approach for achieving substantial reductions in cement. It is known that it improves the workability of concrete, extends the life cycle of concrete roads, and reduces energy use and greenhouse gas as well as amount of coal combustion products that must be disposed in landfills. Life cycle assessment also proved that a concrete pavement with fly ash cement replacement is considerably more environmentally friendly compared to standard concrete roads. In addition, fly ash is cheap raw material, and the costs saving are guaranteed. The strength properties, resistance to a frost or de-icing salts, which are important characteristics in the construction of concrete pavements, have reached the required standards as well. In terms of human health it can´t be stated that a concrete cover with fly ash could be dangerous compared with a cover without fly ash. Final Multi-criteria analysis also pointed that a concrete with fly ash is a clearly proper solution.

Keywords: life cycle assessment, fly ash, waste, concrete pavements

Procedia PDF Downloads 387
10987 Appraisal of Transaction Cost in South African Construction Projects

Authors: Kenneth O. Otasowie, Matthew Ikuabe, Clinton Aigbavboa, Ayodeji Oke

Abstract:

Construction project cost are not only made up of production costs. This cost comprises of many other elements such as the preparation of a bidding document, cost estimations, drafting contractual agreements and monitoring that contractual obligations are met. Several studies have stressed the need for transaction costs (TC) to be defined in a way that covers all phases of a project and not only the pre-contract phase. Hence, this study aims to appraise transaction cost in South African (SA) construction projects by assessing what constitutes transaction cost, influencing factors and possible optimisation measures. A survey design was adopted. A total number of eighty (80) questionnaires were administered to quantity surveyors, procurement managers and project managers in Guateng Province, SA and seventy-two (72) were returned and found suitable for analysis. Collected data was analysed using percentage, mean item score, standard deviation, one-sample t-test. The findings show that external technical interaction, uncertainty, human factors are the most significant constituents of TC in SA, while technical competency, experience in similar project type and project characteristics are the leading influencing factors. Furthermore, understanding project characteristics, clear communication and technically competent project teams are most of the significant measures for optimising TC in SA construction projects. Therefore, this study recommends that a competent project team and a clear communication are fundamental to proper management of TC in SA construction projects.

Keywords: construction projects, project cost, South Africa, transaction cost

Procedia PDF Downloads 76
10986 Characterization and Evaluation of LD Slag and Fly Ash Mixture for Their Possible Utilization in Different Sectors

Authors: Jagdeep Nayak, Biswajit Paul, Anup Gupta

Abstract:

Characterization of coal refuses to fly ash, and steel slag from steel industries have been performed to develop a mixture of both these materials to enhance strength properties of their utilization in other sectors like mine fill, construction work, etc. A large amount of Linz-Donawitz (LD) slag and fly ash waste are generated from steel and thermal power industries respectively. Management of these wastes is problematic, and their reutilization may provide a sustainable waste management option. LD slag and fly ash mixed in different proportions were tested to analyse the micro structural improvement and hardening rate of the matrix. Mixing of activators such as sodium hydroxide and potassium silicate with silica-alumina of LD slag-fly ash mixture, geopolymeric structure were found to be developed. The effect of geo-polymerization behaviour and subsequent structural rearrangement has been studied using compressibility; shear strength and permeability tests followed by micro-graphical analysis. Densification in the mixture was observed along with an improvement of geotechnical properties due to the addition of LD slag. Due to suitable strength characteristics of these two waste materials as mixture, it can be used in the various construction field or may be used as a filling material in mine voids.

Keywords: LD slag, fly-ash, geopolymer, strength property, compressibility

Procedia PDF Downloads 362
10985 Sustainable Smart Contraction: China Eco-district Evolution Research and Future Exploration

Authors: Xincheng He, Weijun Gao, Gangwei Cai

Abstract:

In the process of rapid urbanization, large-scale industrial production, and unreasonable planning and construction have caused various ecological and environmental problems, while hindered the sustainable development of cities. The ecological district not only realizes the coordinated development of society, economy, and environment but also conforms to the trend of smart contraction of the development of cities in China from the periphery to the center. This paper reviews the development of China's ecological district, including the full life cycle process of policy, planning, implementation, and operation. Based on sorting out the concept, connotation, and development status of China’s ecological district, the relationship between the construction of the ecological district and the sustainable city is discussed. Summarizing the development trend of the ecological district, the ecological district should combine the construction of smart cities, actively respond to the digital information era, and improve the construction of the ecological district system. It proposes that the future direction of city's sustainable development needs to change from a thematic focus on ecology to the common urbanization of humanity, society, and nature. Focusing on people-oriented, ecological, and digital future communities will become an important construction method for the city's sustainable smart contraction.

Keywords: eco-district, smart contraction, sustainable development, future community

Procedia PDF Downloads 118
10984 Sustainable Approach for Strategic Planning of Construction of Buildings using Multi-Criteria Decision Making Tools

Authors: Kishor Bhagwat, Gayatri Vyas

Abstract:

Construction industry is earmarked with complex processes depending on the nature and scope of the project. In recent years, developments in this sector are remarkable and have resulted in both positive and negative impacts on the environment and human being. Sustainable construction can be looked upon as one of the solution to overcome the negative impacts since sustainable construction is a vast concept, which includes many parameters, and sometimes the use of multi-criteria decision making [MCDM] tools becomes necessary. The main objective of this study is to determine the weightage of sustainable building parameters with the help of MCDM tools. Questionnaire survey was conducted to examine the perspective of respondents on the importance of weights of the criterion, and the respondents were architects, green building consultants, and civil engineers. This paper presents an overview of research related to Indian and international green building rating systems and MCDM. The results depict that economy, environmental health, and safety, site selection, climatic condition, etc., are important parameters in sustainable construction.

Keywords: green building, sustainability, multi-criteria decision making method [MCDM], analytical hierarchy process [AHP], technique for order preference by similarity to an ideal solution [TOPSIS], entropy

Procedia PDF Downloads 66
10983 Characteristics of Clayey Subgrade Soil Mixed with Cement Stabilizer

Authors: Manju, Praveen Aggarwal

Abstract:

Clayey soil is considered weakest subgrade soil from civil engineering point of view under moist condition. These swelling soils attract and absorb water and losses their strength. Certain inherent properties of these clayey soils need modification for their bulk use in the construction of highways/runways pavements and embankments, etc. In this paper, results of clayey subgrade modified with cement stabilizer is presented. Investigation includes evaluation of specific gravity, Atterberg’s limits, grain size distribution, maximum dry density, optimum moisture content and CBR value of the clayey soil and cement treated clayey soil. A series of proctor compaction and CBR tests (un-soaked and soaked) are carried out on clayey soil and clayey soil mixed with cement stabilizer in 2%, 4% & 6% percentages to the dry weight of soil. In CBR test, under soaked condition best results are obtained with 6% of cement. However, the difference between the CBR value by addition of 4% and 6% cement is not much. Therefore from economical consideration addition of 4% cement gives the best result after soaking period of 90 days.

Keywords: clayey soil, cement, maximum dry density, optimum moisture content, California bearing ratio

Procedia PDF Downloads 311
10982 Furnishing The Envelope; 3D Printed Construction Unit as Furniture

Authors: Maryam Kalkatechi

Abstract:

The paper presents the construction unit that was proposed as a result of researching and finding solutions for challenges of the traditional masonry unit. The concept of ‘unit as arrangements of cells’ was investigated in four categories of structure, handling and assembly, thermal characteristics and weather ability which resulted in construction unit as an independent system which shapes a part of the envelope. Comparing to the traditional wall systems in which the system is in layers, the part system is a monolithic piece by itself. Even though the overall wythe-10 inches- is less than the combined layers-14 inches- in a traditional wall system, it is still seen as a spatial component. The component as a furnishing of envelope is discussed from material application point of view. The algorithm definition of the arrangement cells crafts the relationship between cells and functionality with material. This craft is realized as the envelope furnishing. Three alternative materials in relation to furnishing the envelope are discussed for printing the construction unit; transparent plastic, opaque plastic and glass. The qualities vary in the four categories, however this paper focuses on the visual qualities of materials applied. In a diagram the qualities of the materials are compared in relation to each other.

Keywords: furnishing envelope, 3D printed construction unit, opaque plastic, transparent plastic, glass

Procedia PDF Downloads 151
10981 Comparing Productivity of the Foreign versus Local Construction Workers Based on Their Level of Technical Training and Cultural Characteristics: Case Study of Kish Island, Iran

Authors: Mansour Rezvani, Mohammad Mahdi Mortaheb

Abstract:

This study considers the employment of foreign workforce in Kish Free Trade and Industrial Zone and aims to investigate the productivity of foreign construction labours as compared to their local counterpart. Moreover, this study compares work skills and experience of foreign and local Iranian construction workers to optimize construction working conditions. The results and findings have been effectively applied to develop a training program to optimize and promote Iranian workforce productivity and effectiveness in construction industry in comparison with foreign workforce. It is hoped that the accumulated findings contribute to decrease demand for foreign workers and skills shortages in construction sectors. Therefore, job vacancies for local residents in Kish and other looking for job people in main lands will be increased. The method of collecting data has been conducted by distributing a questionnaire and interviewing most foreign construction workers, local Iranian construction works and the project managers of five mega projects in Kish Island including Mica mall, Basak, Persian, Damoon and Sarina mall. All data have been analyzed by SPSS and Excel software. A topic-related survey was conducted through a structured questionnaire including 54 employers, 20 contractors and 13 consultants. About 56 factors were identified. After implementing the context validity test, 52 factors were stated in 52 questions based on five major groups consist of: (1) economical, (2) social and cultural, (3) individual, (4) technical, (5) organizational, environmental and legal. Based on the quantified Relative Importance Index, the ten most important factors, ten less important factors, and three most important categories were identified. To date, there is not any comprehensive study that explores the important critical factors in mega construction projects on Kish Island to identify the major problems to decrease demand for foreign workers.

Keywords: cultural characteristics, foreign worker, local construction workers, productivity, technical training

Procedia PDF Downloads 123
10980 Labor Productivity and Organization Performance in Specialty Trade Construction: The Moderating Effect of Safety

Authors: Shalini Priyadarshini

Abstract:

The notion of performance measurement has held great appeal for the industry and research communities alike. This idea is also true for the construction sector, and some propose that performance measurement and productivity analysis are two separate management functions, where productivity is a subset of performance, the latter requiring comprehensive analysis of comparable factors. Labor productivity is considered one of the best indicators of production efficiency. The construction industry continues to account for a disproportionate share of injuries and illnesses despite adopting several technological and organizational interventions that promote worker safety. Specialty trades contractors typically complete a large fraction of work on any construction project, but insufficient body of work exists that address subcontractor safety and productivity issues. Literature review has revealed the possibility of a relation between productivity, safety and other factors and their links to project, organizational, task and industry performance. This research posits that there is an association between productivity and performance at project as well as organizational levels in the construction industry. Moreover, prior exploration of the importance of safety within the performance-productivity framework has been anecdotal at best. Using structured questionnaire survey and organization- and project level data, this study, which is a combination of cross-sectional and longitudinal research designs, addresses the identified research gap and models the relationship between productivity, safety, and performance with a focus on specialty trades in the construction sector. Statistical analysis is used to establish a correlation between the variables of interest. This research identifies the need for developing and maintaining productivity and safety logs for smaller businesses. Future studies can design and develop research to establish causal relationships between these variables.

Keywords: construction, safety, productivity, performance, specialty trades

Procedia PDF Downloads 249
10979 Exploring the Challenges to Usage of Building Construction Cost Indices in Ghana

Authors: Jerry Gyimah, Ernest Kissi, Safowaa Osei-Tutu, Charles Dela Adobor, Theophilus Adjei-Kumi, Ernest Osei-Tutu

Abstract:

Price fluctuation contract is imperative and of paramount essence, in the construction industry as it provides adequate relief and cushioning for changes in the prices of input resources during construction. As a result, several methods have been devised to better help in arriving at fair recompense in the event of price changes. However, stakeholders often appear not to be satisfied with the existing methods of fluctuation evaluation, ostensibly because of the challenges associated with them. The aim of this study was to identify the challenges to the usage of building construction cost indices in Ghana. Data was gathered from contractors and quantity surveying firms. The study utilized a survey questionnaire approach to elicit responses from the contractors and the consultants. Data gathered was analyzed scientifically, using the relative importance index (RII) to rank the problems associated with the existing methods. The findings revealed the following, among others, late release of data, inadequate recovery of costs, and work items of interest not included in the published indices as the main challenges of the existing methods. Findings provide useful lessons for policymakers and practitioners in decision making towards the usage and improvement of available indices.

Keywords: building construction cost indices, challenges, usage, Ghana