3874 The Interrelations between Niemeyer’s Works and the Concept of Typology: A Computer Based Analysis of Form and Structure

Authors: Aline M. C. Santoro, João C. Pantoja, Eduardo P. Rossetti

Abstract:

While the aim of the modernist movement was to deny known typology, the creation of a new formal language also gave it new meaning, which was now related to Form. This is specifically true in the modern capital of Brazil, where Niemeyer sought to demonstrate the manner in which the new materials available, such as reinforced concrete, were able to produce innovative forms. With this study, we aim to demonstrate the relationship between Niemeyer’s forms and the topological typology known as tessellation, through the presentation of two case studies, the Monument to Caxias and the Saint George Orthodox Church. At a first glance, our purpose is to present the definition of Form, especially with relationship to the works of Niemeyer, seeking to identify in them the concepts presented by Moussavi. Afterwards, we will use a computer-based approach to study and model the forms of two of his buildings with the McNeel Rhinoceros program, where, with the aid of diagrams and renderings, we will be able to clearly and legibly represent their organic forms and further understand their structural systems. When we recognise the concept of typology as a starting point for structural form, it can be concluded that the case studies presented here are encompassed by the typology presented by Moussavi since they derive from his basic structural systems.

Keywords: form, Niemeyer, structure, typology, topology

Procedia PDF Downloads 168
3873 A Comparative Case Study on the Relationship between Solar Energy Potential and Block Typology and Density in Shanghai Context

Authors: Dan Zhu, Jie Shi

Abstract:

This study explores the relationship between solar potential and block typology and density by analyzing sixteen existing typical street blocks with different topologies and densities in Shanghai, a representative high-density urban in China. Several indicators are proposed to quantify, and a methodology is conducted to evaluate and compare the solar potential both on façade and roof across various selected urban forms. 1) The importance of appropriate solar energy indicators and geometric parameters to be used in comparative studies, and 2) the relationship between urban typology, density, and solar performance are discussed. In this way, the results reveal the key design attributes contributing to increasing solar potential.

Keywords: block typology, geometric parameters, high-density urban, solar potential

Procedia PDF Downloads 292
3872 Recommending Appropriate Type of Green Roof Considering Urban Typology and Climatic Zoning in Iran

Authors: Ghazal Raheb

Abstract:

Population growth in big cities of Iran has led to limitation of land resources, more consumption of non-renewable sources of energy and many environmental problems. Emerging of overbuilt urban areas and decreasing amount of green spaces cause the appearance of an undesirable landscape in the cities. Green roof technology is a solution to improve environmental concerns in urban areas which combines green spaces with buildings as the private or semi-private spaces. Successful implementation in different areas definitely depends on accommodation of green roof type with the environment and urban and building typology in Iran. This paper is aiming to provide some recommendation for selecting appropriate type of green roof and executive solutions considering to climatic zoning and urban situation in Iran. Two main aspects which have been considered are environmental and urban typology factors.

Keywords: green roof, urban typology, climate zone, landscape

Procedia PDF Downloads 469
3871 Risk Management in Construction Projects

Authors: Mustafa Dogru, Ruveyda Komurlu

Abstract:

Companies and professionals in the construction sector face various risks in every project depending on the characteristics, size, complexity, the location of the projects and the techniques used. Some risks’ effects may increase as the project progresses whereas new risks may emerge. Because of the ever-changing nature of the risks, risk management is a cyclical process that needs to be repeated throughout the project. Since the risks threaten the success of the project, risk management is an important part of the entire project management process. The aims of this study are to emphasize the importance of risk management in construction projects, summarize the risk identification process, and introduce a number of methods for preventing risks such as alternative design, checklists, prototyping and test-analysis-correction technique etc. Following the literature review conducted to list the techniques for preventing risks, case studies has been performed to compare and evaluate the success of the techniques in a number of completed projects with the same typology, performed domestic and international. Findings of the study suggest that controlling and minimizing the level of the risks in construction projects, taking optimal precautions for different risks, and mitigating or eliminating the effects of risks are important in order to prevent additional costs for the project. Additionally, focusing on the risks that have highest impact is the most rational way to minimize the effects of the risks on projects.

Keywords: construction projects, construction management, project management, risk management

Procedia PDF Downloads 282
3870 Typology of Customers in Fitness Centres

Authors: Josef Voracek, Jan Sima

Abstract:

The main purpose of our study is to state the basic types of fitness customers. This paper aims to create a specific customer typology in today’s fitness centres in the region of Prague. Our suggested typology of Prague fitness centres customers is based on answers to the questions: What are the customers like, what are their preferences, and what kinds of services do they use more often in Prague fitness centres? These are the main aspects of the presented typology. A survey was conducted on a sample of 1004 respondents from 48 fitness centres, which ran during May 2012. We used questionnaires and latent class analysis for the assessment and interpretation of data. Gender was especially the main filter criterion. In the population, there were 522 males and 482 females. Data were analysed using the LCA method. We identified 6 segments of typical customers, of which three are male and three are female. Each segment is influenced primarily by the age of customers, from which we can develop further characteristics, such as education, income, marital status, etc. Male segments use the main workout area above all, whilst female segments use a much wider range of services offered, for example, group exercises, personal training, and cardio theatres. LCA method was found to be the most suitable tool, because cluster analysis is very limited in the forms and numbers of variables and indicators. Models of 3 latent classes for each gender are optimal, as it is demonstrated by entropy indices and matrices of the likelihood of the membership to the classes. A probable weak point of the survey is the selection of fitness centres, because of the market in Prague is really specific.

Keywords: customer, fitness, latent class analysis, typology

Procedia PDF Downloads 192
3869 A Typology System to Diagnose and Evaluate Environmental Affordances

Authors: Falntina Ahmad Alata, Natheer Abu Obeid

Abstract:

This paper is a research report of an experimental study on a proposed typology system to diagnose and evaluate the affordances of varying architectural environments. The study focused on architectural environments which have been developed with a shift in their use of adaptive reuse. The novelty in the newly developed environments was tested in terms of human responsiveness and interaction using a variety of selected cases. The study is a follow-up on previous research by the same authors, in which a typology of 16 categories of environmental affordances was developed and introduced. The current study introduced other new categories, which together with the previous ones establish what could be considered a basic language of affordance typology. The experiment was conducted on ten architectural environments while adopting two processes: 1. Diagnostic process, in which the environments were interpreted in terms of their affordances using the previously developed affordance typology, 2. The evaluation process, in which the diagnosed environments were evaluated using measures of emotional experience and architectural evaluation criteria of beauty, economy and function. The experimental study demonstrated that the typology system was capable of diagnosing different environments in terms of their affordances. It also introduced new categories of human interaction: “multiple affordances,” “conflict affordances,” and “mix affordances.” The different possible combinations and mixtures of categories demonstrated to be capable of producing huge numbers of other newly developed categories. This research is an attempt to draw a roadmap for designers to diagnose and evaluate the affordances within different architectural environments. It is hoped to provide future guidance for developing the best possible adaptive reuse according to the best affordance category within their proposed designs.

Keywords: affordance theory, affordance categories, architectural environments, architectural evaluation criteria, adaptive reuse environment, emotional experience, shift in use environment

Procedia PDF Downloads 160
3868 A Study of New Window Typology for Palestinian Residential Building for More Sustainable Building

Authors: Nisreen Ardda

Abstract:

Fenestrations are one of the main building envelope elements that play an important role in home social-ecological l factors. They play a vital role in providing natural lighting and ventilation, visual, thermal, and acoustical comfort, and also provide weather-tightness, privacy, a feeling of openness. In most home buildings, fenestrations are controlled manually by the occupants, which significantly impacts occupants' comfort and energy use. Culture plays a central role in the Palestinians window operation behavior. Improved windows design that provides the desired privacy while maintaining the appropriate function of fenestration (natural lighting, thermal comfort, and visual openness) is becoming a necessity. Therefore, this paper proposes a window typology to achieve the social and environmental factors in residential buildings in the West Bank. The window typology and reference building were designed in Rivet 2021, and natural ventilation was carried out in Design Builder 4.3.0.039. The results showed that the proposed typology provides the desired privacy and the feeling of openness without compromising natural ventilation as the existing window did.

Keywords: window design, passive design, sustainable built environment, building material

Procedia PDF Downloads 163
3867 Effect of Pre-Construction on Construction Schedule and Client Loyalty

Authors: Jong Hoon Kim, Hyun-Soo Lee, Moonseo Park, Min Jeong, Inbeom Lee

Abstract:

Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client satisfaction. A total of 65 construction projects and 93 clients were investigated for this research in an attempt to identify (a) the relationship between pre-construction and schedule reduction, and (b) pre-construction and client loyalty. Based on the quantitative analysis, this research was able to establish a negative correlation based on 65 construction projects between pre-construction and project schedule existed. This finding represents that the more pre-construction is performed for a certain project, the overall construction schedule decreased. Then, to determine the relationship between pre-construction and client satisfaction, Net Promoter Score (NPS) of 93 clients from the 65 projects was utilized. Pre-construction and NPS was further analyzed and a positive correlation was found between the two. This infers that clients tend to be more satisfied with projects with higher ratio of pre-construction than those projects with less pre-construction.

Keywords: client loyalty, NPS, pre-construction, schedule reduction

Procedia PDF Downloads 329
3866 Transition Economies, Typology, and Models: The Case of Libya

Authors: Abderahman Efhialelbum

Abstract:

The period since the fall of the Berlin Wall on November 9, 1989, and the collapse of the former Soviet Union in December 1985 has seen a major change in the economies and labour markets of Eastern Europe. The events also had reverberating effects across Asia and South America and parts of Africa, including Libya. This article examines the typologies and the models of transition economies. Also, it sheds light on the Libyan transition in particular and the impact of Qadhafi’s regime on the transition process. Finally, it illustrates how the Libyan transition process followed the trajectory of other countries using economic indicators such as free trade, property rights, and inflation.

Keywords: transition, economy, typology, model, Libya

Procedia PDF Downloads 116
3865 Renewed Urban Waterfront: Spatial Conditions of a Contemporary Urban Space Typology

Authors: Beate Niemann, Fabian Pramel

Abstract:

The formerly industrially or militarily used Urban Waterfront is a potential area for urban development. Extensive interventions in the urban space come along with the development of these previously inaccessible areas in the city. The development of the Urban Waterfront in the European City is not subject to any recognizable urban paradigm. In this study, the development of the Urban Waterfront as a new urban space typology is analyzed by case studies of Urban Waterfront developments in European Cities. For humans, perceptible spatial conditions are categorized and it is identified whether the themed Urban Waterfront Developments are congruent or incongruent urban design interventions and which deviations the Urban Waterfront itself induce. As congruent urban design, a design is understood, which fits in the urban fabric regarding its similar spatial conditions to the surrounding. Incongruent urban design, however, shows significantly different conditions in its shape. Finally, the spatial relationship of the themed Urban Waterfront developments and their associated environment are compared in order to identify contrasts between new and old urban space. In this way, conclusions about urban design paradigms of the new urban space typology are tried to be drawn.

Keywords: composition, congruence, identity, paradigm, spatial condition, urban design, urban development, urban waterfront

Procedia PDF Downloads 400
3864 Organizational Performance and Impact of Social Innovation

Authors: Alfonso Unceta, Javier Castro-Spila

Abstract:

This paper offers a conceptual and empirical exploration between the organizational performance and the impact of social innovation. The paper contributes on the social innovation field in three domains: a) It provides analytical and empirical evidence linking organizational performance to the impact of social innovation; b) it provides a first outline of impact assessment of social innovation when it is developed by a diversity of heterogeneous actors (systemic social innovation); c) it provides a first outline for the development of innovation policies to support social innovations according to a typology of organizations and a typology of impact.

Keywords: absorptive capacity, social innovation impact, organizational performance, RESINDEX, Basque Country

Procedia PDF Downloads 453
3863 Digital Design and Fabrication: A Review of Trend and Its Impact in the African Context

Authors: Mohamed Al Araby, Amany Salman, Mostafa Amin, Mohamed Madbully, Dalia Keraa, Mariam Ali, Marah Abdelfatah, Mariam Ahmed, Ahmed Hassab

Abstract:

In recent years, the architecture, engineering, and construction (A.E.C.) industry have been exposed to important innovations, most notably the global integration of digital design and fabrication (D.D.F.) processes in the industry’s workflow. Despite this evolution in that sector, Africa was excluded from the examination of this development. The reason behind this exclusion is the preconceived view of it as a developing region that still employs traditional methods of construction. The primary objective of this review is to investigate the trend of digital construction (D.C.) in the African environment and the difficulties in its regular utilization of it. This objective can be attained by recognizing the notion of distributed computing in Africa and evaluating the impact of the projects deploying this technology on both the immediate and broader contexts. The paper’s methodology begins with the collection of data from 224 initiatives throughout Africa. Then, 50 of these projects were selected based on the criteria of the project's recency, typology variety, and location diversity. After that, a literature-based comparative analysis was undertaken. This study’s findings reveal a pattern of motivation for applying digital fabrication processes. Moreover, it is essential to evaluate the socio-economic effects of these projects on the population living near the analyzed subject. The last step in this study is identifying the influence on the neighboring nations.

Keywords: Africa, digital construction, digital design, fabrication

Procedia PDF Downloads 127
3862 Construction Quality Perception of Construction Professionals and Their Expectations from a Quality Improvement Technique in Pakistan

Authors: Muhammad Yousaf Sadiq

Abstract:

The complexity arises in defining the construction quality due to its perception, based on inherent market conditions and their requirements, the diversified stakeholders itself and their desired output. An quantitative survey based approach was adopted in this constructive study. A questionnaire-based survey was conducted for the assessment of construction Quality perception and expectations in the context of quality improvement technique. The survey feedback of professionals of the leading construction organizations/companies of Pakistan construction industry were analyzed. The financial capacity, organizational structure, and construction experience of the construction firms formed basis for their selection. The quality perception was found to be project-scope-oriented and considered as an excess cost for a construction project. Any quality improvement technique was expected to maximize the profit for the employer, by improving the productivity in a construction project. The study is beneficial for the construction professionals to assess the prevailing construction quality perception and the expectations from implementation of any quality improvement technique in construction projects.

Keywords: construction quality, expectation, improvement, perception

Procedia PDF Downloads 443
3861 Lean Implementation Analysis on the Safety Performance of Construction Projects in the Philippines

Authors: Kim Lindsay F. Restua, Jeehan Kyra A. Rivero, Joneka Myles D. Taguba

Abstract:

Lean construction is defined as an approach in construction with the purpose of reducing waste in the process without compromising the value of the project. There are numerous lean construction tools that are applied in the construction process, which maximizes the efficiency of work and satisfaction of customers while minimizing waste. However, the complexity and differences of construction projects cause a rise in challenges on achieving the lean benefits construction can give, such as improvement in safety performance. The objective of this study is to determine the relationship between lean construction tools and their effects on safety performance. The relationship between construction tools applied in construction and safety performance is identified through Logistic Regression Analysis, and Correlation Analysis was conducted thereafter. Based on the findings, it was concluded that almost 60% of the factors listed in the study, which are different tools and effects of lean construction, were determined to have a significant relationship with the level of safety in construction projects.

Keywords: correlation analysis, lean construction tools, lean construction, logistic regression analysis, risk management, safety

Procedia PDF Downloads 147
3860 Study of Management of Waste Construction Materials in Civil Engineering Projects

Authors: Jalindar R. Patil, Harish P. Gayakwad

Abstract:

The increased economic growth across the globe as well as urbanization in developing countries have led into extensive construction activities that generate large amounts of wastes. Material wastage in construction projects resulted into huge financial setbacks to builders and contractors. In addition to this, it may also cause significant effects over aesthetics, health, and the general environment. However in many cities across the globe where construction wastes material management is still a problem. In this paper, the discussion is all about the method for the management of waste construction materials. The objectives of this seminar are to identify the significant source of construction waste globally, to improve the performance of by extracting the major barriers construction waste management and to determine the cost impact on the construction project. These wastes needs to be managed as well as their impacts needs to be ascertained to pave way for their proper management. The seminar includes the details of construction waste management with the reference to construction project. The application of construction waste management in the civil engineering projects is to describe the reduction in the construction wastes.

Keywords: civil engineering, construction materials, waste management, construction activities

Procedia PDF Downloads 483
3859 Green Construction in EGYPT

Authors: Hanan A. Anwar

Abstract:

This paper introduces green building construction in Egypt with different concepts and practices. The following study includes green building applied definition, guidelines, regulations and Standards. Evaluation of cost/benefit of green construction methods and green construction rating systems are presented. Relevant case studies will be reviewed. Four sites will be included.

Keywords: green construction, ecofreindly, self-sufficient town, carbon neutral atmosphere

Procedia PDF Downloads 620
3858 Identity Formation Towards Design Typology of Malay Traditional House in Negeri Sembilan, Malaysia

Authors: Noor Hayati Binti Ismail, Mastor Bin Surat, Raja Nafida Binti Raja Shahminan, Shahrul Kamil Bin Yunus

Abstract:

Traditional Malay house built in the various custom and culture for every state in Malaysia. Each state has its characteristics, design and different concepts that form the distinctive identity. The uniqueness of a traditional house design is a symbolize of Negeri Sembilan society. The purpose of this paper is to introduce the feature, a traditional Malay house in Negeri Sembilan, Malaysia. This typology will describe five types of traditional Malay houses in Negeri Sembilan by briefly about the concept of a traditional Malay house design. The design represents a variety of purposes that are often associated with its own culture and customs practiced by the community. In addition, the design of long tapering roof with both ends of the roof went up a little bit architecture has become an identity of its own in Negeri Sembilan. The study involves several villages of traditional houses in Negeri Sembilan, Malaysia. Data collection was obtained through a process of observation, interviews, questionnaire and taking photos related. Through this research, We are expected to provide awareness and also a reference to the next generation of traditional houses in Malaysia especially in Negeri Sembilan. Identity and uniqueness of traditional houses Negeri Sembilan increasingly difficult to maintain and can be kept from being lost in their own land.

Keywords: design, identity, traditional Malay house, typology

Procedia PDF Downloads 593
3857 The Effect of Artificial Intelligence on Construction Development

Authors: Shady Gamal Aziz Shehata

Abstract:

Difficulty in defining construction quality arises due to perception based on the nature and requirements of the market, the different partners themselves and the results they want. Quantitative research was used in this constructivist research. A case-based study was conducted to assess the structures of positive attitudes and expectations in the context of quality improvement. A survey based on expert opinions was analyzed among construction organizations/companies operating in the construction industry in Pakistan. The financial strength, management structure and construction experience of the construction companies formed the basis of their selection. A good concept is visible at the project level and is seen as the most valuable part of the construction project. Each quality improvement technique was expected to increase the user's profits by improving the efficiency of the construction project. The Survey is useful for construction professionals to evaluate current construction concepts and expectations for the application of quality improvement techniques in construction projects.

Keywords: correlation analysis, lean construction tools, lean construction, logistic regression analysis, risk management, safety construction quality, expectation, improvement, perception

Procedia PDF Downloads 20
3856 Differentiation of Customer Types by Stereotypical Characteristics for Modular and Conventional Construction Methods

Authors: Peter Schnell, Phillip Haag

Abstract:

In the course of the structural transformation of the construction industry, the integration of industrialization and digitization has led to the development of construction methods with an increased degree of prefabrication, such as system or modular construction. Compared to conventional construction, these innovative construction methods are characterized by modified structural and procedural properties and expand the range of construction services. Faced with the supply side, it is possible to identify construction-specific customer types with different characteristics and certain preferences as far as the choice of construction method is concerned. The basis for this finding was qualitative expert interviews. By evaluating the stereotypical customer needs, a corresponding segmentation of the demand side can be made along with the basic orientation and decision behavior. This demarcation supports the target- and needs-oriented customer approach and contributes to cooperative and successful project management.

Keywords: differentiation of customer types, modular construction methods, conventional construction methods, stereotypical customer types

Procedia PDF Downloads 83
3855 Socio-Cultural Behaviors of Individuals in High-Rise Housing

Authors: Raweyah Al-Sedairawi

Abstract:

While high-rise housing detained massive negative connotations on several societies and well-being, this typology did deliver housing demand efficiently. Despite its adverse reference due to declining precedents, high-rise housing is still in global demand. Yet the suitability of this typology is still questioned. In this research, the suitability of high-rise housing as a socio-culturally sustainable solution to meet housing demands will be examined. By questioning what is the potential of high-rise housing as a socio-culturally sustainable solution for housing demands, the research will examine some high-rise housing practices. Through reviewing the literature on the origins of high-rise housing, how and why they were developed, some unsuccessful cases, and some successful cases, with the identification of factors for successful high-rise living. Thus, the research groundings will materialize from existing patterns of housing demands. Whilst most of the literature covers the housing market from an economic, real estate, and political perspective, there is less amount that discloses occupants’ reactions towards this typology and its appropriateness for the reason that income controls individuals’ choices. To bridge the gap, the prospect of implementing the study would be effective. This will be applied through a mixture of a qualitative and a quantitative methodology by conducting questionnaires and focus groups on existing cases of high-net-worth residential towers.

Keywords: architecture, behaviors, high-rise, socio-cultural, sustainability

Procedia PDF Downloads 56
3854 A Study on Occupational Injuries among Building Construction Workers in Bhubaneswar City Odisha

Authors: Rahul Pal

Abstract:

In India, construction industry plays a vital role in the development of infrastructures. It is one of the most hazardous industries. Construction workers are a group that is particularly vulnerable to health risks because they have few legal protection. India has the world’s highest accident rate among construction workers. This study aimed to investigate the prevalence of occupation injury among construction workers and to find out the factors responsible for such injuries. Methodology: A cross-sectional study using a semi-structured questionnaire among 305 construction workers in Bhubaneswar city. In this study, it was found that the overall prevalence of injury was 43.28% in the previous one year period. Majority of the construction workers were less experience in the construction work. Factors responsible for injuries are fall of the object followed by striking, and majority of the workers reported their injuries to have occurred in the summer season. And most of the construction workers are not using personal protective equipment (PPE). Conclusion: Given the occupational injuries, the majority of the construction workers are injured in this study; there is a need to address this issue to ensure necessary step for the safety and well-being of construction workers.

Keywords: construction, construction workers, occupational injuries, personal protective equipment

Procedia PDF Downloads 172
3853 The Challenges for Engineers to Change the Construction Method in Brazil

Authors: Yuri B. Cesarino, Vinícius R. Domingues, Darym J. F. Campos

Abstract:

Developing countries have some restrains towards the adoption of new technologies and construction methods. Some nations, such as Brazil, still use conventional construction methodologies, knowing its lesser cost-effectiveness. This research has been conducted to demonstrate how industrialized construction methods should be implemented in Brazil, especially in times of need. Using the common sense among different authors with different perspectives, it is clear that the second method is more suitable for construction development because of its great advantages. However, it is unlikely for this process to be adopted in the country as a result of several social-economic restraints. Nonetheless, Brazilian engineers have a major challenge ahead of them, and it will take more than creativity to solve such an issue.

Keywords: Brazilian engineers, construction methods, industrialized construction, infrastructure

Procedia PDF Downloads 256
3852 Efficient Management of Construction Logistics: A Challenge to Both Conventional and Technological Systems in the Developing Nations

Authors: Nuruddeen Usman, Ahmad Muhammad Ibrahim

Abstract:

Management of construction logistics at construction sites becomes increasingly complex with rising construction volume, which made it relatively inefficient in the developing nations even with the technological advancement. The objective of this research is to conceptually synthesise the approaches and challenges befall in the course of construction logistic management, with the aim to proffer possible solution to it. Therefore, this study appraised the glitches associated with both conventional and technological methods of construction logistic management that result in its inefficiency. Thus, this investigation found that, both conventional and the technological issues were due to certain obstacles that affect the construction logistic management which resulted into delays, accidents, fraudulent activities, time and cost overrun. Therefore, this study has developed a framework that might bring a lasting solution to the challenges of construction logistic management.

Keywords: construction, conventional, logistic, technological

Procedia PDF Downloads 518
3851 A Probability Analysis of Construction Project Schedule Using Risk Management Tool

Authors: A. L. Agarwal, D. A. Mahajan

Abstract:

Construction industry tumbled along with other industry/sectors during recent economic crash. Construction business could not regain thereafter and still pass through slowdown phase, resulted many real estate as well as infrastructure projects not completed on schedule and within budget. There are many theories, tools, techniques with software packages available in the market to analyze construction schedule. This study focuses on the construction project schedule and uncertainties associated with construction activities. The infrastructure construction project has been considered for the analysis of uncertainty on project activities affecting project duration and analysis is done using @RISK software. Different simulation results arising from three probability distribution functions are compiled to benefit construction project managers to plan more realistic schedule of various construction activities as well as project completion to document in the contract and avoid compensations or claims arising out of missing the planned schedule.

Keywords: construction project, distributions, project schedule, uncertainty

Procedia PDF Downloads 309
3850 Adaptation of Retrofit Strategies for the Housing Sector in Northern Cyprus

Authors: B. Ozarisoy, E. Ampatzi, G. Z. Lancaster

Abstract:

This research project is undertaken in the Turkish Republic of Northern Cyprus (T.R.N.C). The study focuses on identifying refurbishment activities capable of diagnosing and detecting the underlying problems alongside the challenges offered by the buildings’ typology in addition to identifying the correct construction materials in the refurbishment process which allow for the maximisation of expected energy savings. Attention is drawn to, the level of awareness and understanding of refurbishment activity that needs to be raised in the current construction process alongside factors that include the positive environmental impact and the saving of energy. The approach here is to look at buildings that have been built by private construction companies that have already been refurbished by occupants and to suggest additional control mechanisms for retrofitting that can further enhance the process of renewal. The objective of the research is to investigate the occupants’ behaviour and role in the refurbishment activity; to explore how and why occupants decide to change building components and to understand why and how occupants consider using energy-efficient materials. The present work is based on data from this researcher’s first-hand experience and incorporates the preliminary data collection on recent housing sector statistics, including the year in which housing estates were built, an examination of the characteristics that define the construction industry in the T.R.N.C., building typology and the demographic structure of house owners. The housing estates are chosen from 16 different projects in four different regions of the T.R.N.C. that include urban and suburban areas. There is, therefore, a broad representation of the common drivers in the property market, each with different levels of refurbishment activity and this is coupled with different samplings from different climatic regions within the T.R.N.C. The study is conducted through semi-structured interviews to identify occupants’ behaviour as it is associated with refurbishment activity. The interviews provide all the occupants’ demographic information, needs and intentions as they relate to various aspects of the refurbishment process. This research paper presents the results of semi-structured interviews with 70 homeowners in a selected group of 16 housing estates in five different parts of the T.R.N.C. The people who agreed to be interviewed in this study are all residents of single or multi-family housing units. Alongside the construction process and its impact on the environment, the results point out the need for control mechanisms in the housing sector to promote and support the adoption of retrofit strategies and minimize non-controlled refurbishment activities, in line with diagnostic information of the selected buildings. The expected solutions should be effective, environmentally acceptable and feasible given the type of housing projects under review, with due regard for their location, the climatic conditions within which they were undertaken, the socio-economic standing of the house owners and their attitudes, local resources and legislative constraints. Furthermore, the study goes on to insist on the practical and long-term economic benefits of refurbishment under the proper conditions and why this should be fully understood by the householders.

Keywords: construction process, energy-efficiency, refurbishment activity, retrofitting

Procedia PDF Downloads 289
3849 A Review of the Factors Causing Cost Overrun in Construction Projects in Malaysia

Authors: Kaleem Ullah, Abd Halid Bin Abdullah

Abstract:

This study examines previous literature on cost overrun in construction projects with the specific aim of determining the frequently observed causes of cost overruns in Malaysian construction projects. Cost overrun is one of the major problems in construction projects. Cost overrun is frequently observed in almost every construction projects. This cost overrun in construction projects occurs due to various reasons and many researchers have carried out various studies to identify the cause factors of this issue. The causes of construction cost overrun could vary from country to country because of the difference in political, economic, social and environmental conditions. Likewise, other countries construction projects in Malaysia have also the issue of cost overrun. The concept of cost overrun in construction projects has attracted much attention in recent years and researches are trying to understand the causes of these overruns and their effects to the construction industry as whole. This paper review various research studies carried out in Malaysia which surveyed the cost performance and cause factors of cost overruns in construction projects in Malaysia.

Keywords: cause of cost overrun, cost overrun, construction industry in Malaysia, effects of cost overrun

Procedia PDF Downloads 252
3848 BIM Model and Virtual Prototyping in Construction Management

Authors: Samar Alkindy

Abstract:

Purpose: The BIM model has been used to support the planning of different construction projects in the industry by showing the different stages of the construction process. The model has been instrumental in identifying some of the common errors in the construction process through the spatial arrangement. The continuous use of the BIM model in the construction industry has resulted in various radical changes such as virtual prototyping. Construction virtual prototyping is a highly advanced technology that incorporates a BIM model with realistic graphical simulations, and facilitates the simulation of the project before a product is built in the factory. The paper presents virtual prototyping in the construction industry by examining its application, challenges and benefits to a construction project. Methodology approach: A case study was conducted for this study in four major construction projects, which incorporate virtual construction prototyping in several stages of the construction project. Furthermore, there was the administration of interviews with the project manager and engineer and the planning manager. Findings: Data collected from the methodological approach shows a positive response for virtual construction prototyping in construction, especially concerning communication and visualization. Furthermore, the use of virtual prototyping has increased collaboration and efficiency between construction experts handling a project. During the planning stage, virtual prototyping has increased accuracy, reduced planning time, and reduced the amount of rework during the implementation stage. Irrespective of virtual prototyping being a new concept in the construction industry, the findings outline that the approach will benefit the management of construction projects.

Keywords: construction operations, construction planning, process simulation, virtual prototyping

Procedia PDF Downloads 199
3847 Construction 4.0: The Future of the Construction Industry in South Africa

Authors: Temidayo. O. Osunsanmi, Clinton Aigbavboa, Ayodeji Oke

Abstract:

The construction industry is a renowned latecomer to the efficiency offered by the adoption of information technology. Whereas, the banking, manufacturing, retailing industries have keyed into the future by using digitization and information technology as a new approach for ensuring competitive gain and efficiency. The construction industry has yet to fully realize similar benefits because the adoption of ICT is still at the infancy stage with a major concentration on the use of software. Thus, this study evaluates the awareness and readiness of construction professionals towards embracing a full digitalization of the construction industry using construction 4.0. The term ‘construction 4.0’ was coined from the industry 4.0 concept which is regarded as the fourth industrial revolution that originated from Germany. A questionnaire was utilized for sourcing data distributed to practicing construction professionals through a convenience sampling method. Using SPSS v24, the hypotheses posed were tested with the Mann Whitney test. The result revealed that there are no differences between the consulting and contracting organizations on the readiness for adopting construction 4.0 concepts in the construction industry. Using factor analysis, the study discovers that adopting construction 4.0 will improve the performance of the construction industry regarding cost and time savings and also create sustainable buildings. In conclusion, the study determined that construction professionals have a low awareness towards construction 4.0 concepts. The study recommends an increase in awareness of construction 4.0 concepts through seminars, workshops and training, while construction professionals should take hold of the benefits of adopting construction 4.0 concepts. The study contributes to the roadmap for the implementation of construction industry 4.0 concepts in the South African construction industry.

Keywords: building information technology, Construction 4.0, Industry 4.0, smart site

Procedia PDF Downloads 363
3846 Causes of Construction Delays in Qatar Construction Projects

Authors: Murat Gunduz, Mohanad H. A. AbuHassan

Abstract:

Construction industry mainly focuses on the superstructure, infrastructure, and oil and gas industry. The development of infrastructure projects in developing countries attracted a lot of foreign construction contractors, consultants, suppliers and diversified workforce to interfere and to be evolved in such huge investment. Reducing worksite delays in such projects require knowledge and attention. Therefore, it is important to identify the influencing delay attributes affecting construction projects. The significant project factors affecting construction delays were investigated. Data collection was carried out through an online web survey system to capture significant factors. Significant factors were determined with importance index and relevant recommendations are made. The output of the data analysis would lead the industry experts better assess the impact of construction delays on construction projects.

Keywords: construction industry, delays, importance index, frequency index

Procedia PDF Downloads 316
3845 Assessing Indicators, Challenges and Benefits of Sustainable Procurement in Construction Projects

Authors: Taha Anjamrooz, Sareh Rajabi, Salwa Bheiry

Abstract:

Procurement is a key process in construction project management. The present construction procurement practices have been extensively analyzed for disregarding sustainability in the project life cycle. Currently, there is a gap of information on status-quo of sustainable procurement in construction field. Thus, the aim of this study is to review sustainable procurement practices in the construction field. Disregard of three sustainability pillars is one of the major drawbacks of present construction procurement practices. Sustainable procurement is a developing idea that can enhance procurement practices and improve the sustainability performance of the construction projects. At present, sustainable procurement is still not entirely used in the construction projects. A comprehensive literature review indicated that the construction industry is still not entirely informed about the benefits and challenges of using sustainable procurement, and about important indicators that play major impacts on those benefits and challenges. This study assesses the major indicator, benefits and challenges encountered in applying sustainable procurement in the construction industry. In addition, this study investigates understanding of construction professionals on the benefits and challenges of utilizing sustainable procurement for construction projects through selected indicators that are categorized according to society and community needs.

Keywords: sustainability, sustainable development, sustainable procurement, procurement, construction industry

Procedia PDF Downloads 152