Search results for: construction delay
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 4452

Search results for: construction delay

4272 The Influence of Construction Workers Wages and Working Conditions on Productivity in Ghana

Authors: Emmanuel Donkor

Abstract:

Aim/Purpose – This paper examines the influence of construction workers wages and working conditions on productivity in Ghana. Design/methodology/Approach - The study adopted a quantitative research approach with purposive sampling techniques where data was collected using surveys. The data were analyzed using SPSS software version 20.0, which enables the findings of the study to be examined under thematic areas.Findings: - The study revealed that good wages and working condition of workers have a positive correlation on productivity in the construction industry. Increase and improved wages and working conditions can results in higher productivity in the construction industry.Originality/value - This paper is exceptional in the sense that, it does examine the influence of construction workers wages and working conditions on productivity in Ghana. Social value/implications - The paper concludes that workers’ wages and their conditions have a high influence on productivity. It is then recommended that government should train, educate, give good wages to workers and improve on their working condition, give incentives and reduce tax importation on building or construction materials to aid in good productivity of construction firms.

Keywords: construction firms, construction industry, productivity, workers’ wages, working conditions

Procedia PDF Downloads 108
4271 Hybrid Risk Assessment Model for Construction Based on Multicriteria Decision Making Methods

Authors: J. Tamosaitiene

Abstract:

The article focuses on the identification and classification of key risk management criteria that represent the most important sustainability aspects of the construction industry. The construction sector is one of the most important sectors in Lithuania. Nowadays, the assessment of the risk level of a construction project is especially important for the quality of construction projects, the growth of enterprises and the sector. To establish the most important criteria for successful growth of the sector, a questionnaire for experts was developed. The analytic hierarchy process (AHP), the expert judgement method and other multicriteria decision making (MCDM) methods were used to develop the hybrid model. The results were used to develop an integrated knowledge system for the measurement of a risk level particular to construction projects. The article presents a practical case that details the developed system, sustainable aspects, and risk assessment.

Keywords: risk, system, model, construction

Procedia PDF Downloads 134
4270 Advanced Stability Criterion for Time-Delayed Systems of Neutral Type and Its Application

Authors: M. J. Park, S. H. Lee, C. H. Lee, O. M. Kwon

Abstract:

This paper investigates stability problem for linear systems of neutral type with time-varying delay. By constructing various Lyapunov-Krasovskii functional, and utilizing some mathematical techniques, the sufficient stability conditions for the systems are established in terms of linear matrix inequalities (LMIs), which can be easily solved by various effective optimization algorithms. Finally, some illustrative examples are given to show the effectiveness of the proposed criterion.

Keywords: neutral systems, time-delay, stability, Lyapnov method, LMI

Procedia PDF Downloads 323
4269 VANETs Geographic Routing Protocols: A survey

Authors: Ramin Karimi

Abstract:

One of common highly mobile wireless ad hoc networks is Vehicular Ad Hoc Networks. Hence routing in vehicular ad hoc network (VANET) has attracted much attention during the last few years. VANET is characterized by its high mobility of nodes and specific topology patterns. Moreover these networks encounter a significant loss rate and a very short duration of communication. In vehicular ad hoc networks, one of challenging is routing of data due to high speed mobility and changing topology of vehicles. Geographic routing protocols are becoming popular due to advancement and availability of GPS devices. Delay Tolerant Networks (DTNs) are a class of networks that enable communication where connectivity issues like sparse connectivity, intermittent connectivity; high latency, long delay, high error rates, asymmetric data rate, and even no end-to-end connectivity exist. In this paper, we review the existing Geographic Routing Protocols for VANETs and also provide a qualitative comparison of them.

Keywords: vehicular ad hoc networks, mobility, geographic routing, delay tolerant networks

Procedia PDF Downloads 481
4268 Necessity of Using Cellular Lightweights Concrete in Construction Sector

Authors: Soner Guler, Fuat Korkut

Abstract:

Recently, the using of lightweights concretes in construction sector is rapidly increasing all over the world. Faster construction, low density and thermal transmitting coefficient and high fire resistance are the remarkable characteristics of the lightweight concretes. Lightweight concrete can be described as a type of concrete which enhance the volume of the mixture while giving additional advantages such as to reduce the dead weight of the structures. It is lighter than the conventional concrete. The use of lightweight concrete has been widely spread across countries such as USA, United Kingdom, and Sweden. In this study, the necessity of the using of lightweights concretes in the construction sector is emphasized and evaluated briefly for the architectures and civil engineers.

Keywords: lightweights concretes, low density, low thermal coefficient, construction sector

Procedia PDF Downloads 485
4267 Progress of Research on Community Canteens and Reflections on Planning in China

Authors: Xi Zuo

Abstract:

Against the background of the aging population and changing family structure in China, community canteens have become an important vehicle for community-based home care services and a new space for social interaction. In this paper, we review past studies and the actual construction situation in China, firstly sort out the social interaction of the elderly and the types of places, and on this basis, we find that there is an obvious disconnection between the current construction and the academic research, and the contradiction between social benefit and cost-effectiveness, and therefore we put forward the relevant construction planning and thinking, in order to provide a disciplinary basis and academic support for the construction of community canteens and the construction of elderly-friendly cities. In order to provide disciplinary basis and academic support for the construction of community canteens and the construction of senior-friendly cities.

Keywords: urban and rural planning, community canteens, elderly people, senior-friendly

Procedia PDF Downloads 12
4266 Productivity of Construction Companies Using the Management of Threats and Opportunities ‎in Construction Projects of Iran

Authors: Nima Amani, Ali Salehi Dastjerdi, Fatemeh Ahmadi, Ardalan Sabamehr

Abstract:

The cost overrun of the construction projects has always been one of the main problems of the construction companies caused by the risky nature of the construction projects. Therefore, today, the application of risk management is inevitable. Although in theory, the issue of risk management is divided into the opportunities and threats management, in practice, most of the projects have been focused on the threats management. However, considering the opportunities management and applying the opportunities-response strategies can lead to the improved profitability of the construction projects of the companies. In this paper, a new technique is developed to identify the opportunities in the construction projects using an improved protocol and propose the appropriate opportunities-response strategies to the construction companies to provide them with higher profitability. To evaluate the effectiveness of the protocol for selecting the most appropriate strategies in ‎response to the opportunities and threats, two projects from a construction company in Iran were ‎studied. Both projects selected were in mid-range in terms of size and similar in terms of time, ‎run time and costs. Finally, the output indicates that using the proposed opportunities-response strategies show that the company's profitability in the future can be increased approximately for similar projects.

Keywords: opportunities management, risk-response strategy, opportunity-response strategy, productivity, risk management

Procedia PDF Downloads 198
4265 Research on the Calculation Method of Smartization Rate of Concrete Structure Building Construction

Authors: Hongyu Ye, Hong Zhang, Minjie Sun, Hongfang Xu

Abstract:

In the context of China's promotion of smart construction and building industrialization, there is a need for evaluation standards for the development of building industrialization based on assembly-type construction. However, the evaluation of smart construction remains a challenge in the industry's development process. This paper addresses this issue by proposing a calculation and evaluation method for the smartization rate of concrete structure building construction. The study focuses on examining the factors of smart equipment application and their impact on costs throughout the process of smart construction design, production, transfer, and construction. Based on this analysis, the paper presents an evaluation method for the smartization rate based on components. Furthermore, it introduces calculation methods for assessing the smartization rate of buildings. The paper also suggests a rapid calculation method for determining the smartization rate using Building Information Modeling (BIM) and information expression technology. The proposed research provides a foundation for the swift calculation of the smartization rate based on BIM and information technology. Ultimately, it aims to promote the development of smart construction and the construction of high-quality buildings in China.

Keywords: building industrialization, high quality building, smart construction, smartization rate, component

Procedia PDF Downloads 30
4264 Mobile Application for Construction Sites Management

Authors: A. Khelifi, M. Al Kaabi, B. Al Rawashdeh

Abstract:

The infrastructure is one of the most important pillars of the UAE, where it spends millions of dollars for investments in the construction sectors. The research done by Kuwait Finance House (KFH) Research showed clearly that the UAE investments in the construction sectors have exceeded 30 billion dollars in 2013. There are many construction companies in the UAE and each one of them is taking the responsibilities to build different infrastructures. The large scale construction projects consist of multi human activities which can affect the efficiency and productivity of the running projects. The Construction Administration System is developed to increase the efficiency and productivity at the construction sites. It runs on two platforms: web server and mobile phone and supports two main users: mobile user and institution employee. With Construction Administration Mobile Application the user can manage and control several projects, create several reports and send these reports in Portable Document Format (PDF) formats through emails, view the physical location of each project, capturing and save photos. An institution employee can use the system to view all existing workers and projects, send emails and view the progress of each project.

Keywords: construction sites, management, mobile application, Portable Document Format (PDF)

Procedia PDF Downloads 347
4263 The Sustainability of Health and Safety on Construction Sites in Zamfara State

Authors: Ismaila Oladunni Muhammed, Adegbenga Raphael Ashiru

Abstract:

Construction industry has been attributed to be the engine growth of Nigerian economic and infrastructural development. It promotes infrastructural development and grows an average output of Nigerian Gross Domestic Profit. However, from this great prospect, yearly reports show that consistent accidents on construction sites in Zamfara State has affected a substantial number of workers as they become temporarily or permanently disabled, thereby making many construction sites a death trap. This posed a great threat to the industry’s sustainability, de- motivate workers from working in the industry, and further have negative impact on the economy as well. It is as a result of high construction site accident currently experiencing in Zamfara state that this research was carried out to appraise the sustainability of health and safety of construction workers on sites. The proper practice and compliance to Construction Health and safety laws are very vital to the output and growth of Zamfara State construction sector. However, a quantitative approach was adopted to justify the aforesaid statement which will provide a broader understanding of the study. Descriptive statistical analysis was obtained through Statistical Package for the Social Sciences (SPSS Version 20). Furthermore, the findings from the research highlighted that the performance and output of construction workers on construction sites depends on the proper practice of health and safety. The research findings also recommended ways to enhance employers and employee’s compliance with existing laws guiding health and safety on Zamfara State construction sites. Nevertheless, the purpose of the paper is to appraise the sustainability of Health and Safety on Zamfara State construction sites. This study further provided thorough information for resolving challenges of construction sites accidents to improve construction firm productivity and also ensured construction worker’s safety on site.

Keywords: construction industry, health and safety regulations, causes of accident, construction safety practices

Procedia PDF Downloads 185
4262 Study on Compressive Strength and Setting Time of Fly Ash Concrete after Slump Recovery Using Superplasticizer

Authors: Chaiyakrit Raoupatham, Ram Hari Dhakal, Chalermchai Wanichlamlert

Abstract:

Fresh concrete that is on bound to be rejected due to belated use either from delay construction process or unflavored traffic cause delay on concrete delivering can recover the slump and use once again by introduce second dose of superplasticizer(naphthalene based type F) into system. By adding superplasticizer as solution for recover unusable slump loss concrete may affects other concrete properties. Therefore, this paper was observed setting time and compressive strength of concrete after being re-dose with chemical admixture type F (superplasticizer, naphthalene based) for slump recovery. The concrete used in this study was fly ash concrete with fly ash replacement of 0%, 30% and 50% respectively. Concrete mix designed for test specimen was prepared with paste content (ratio of volume of cement to volume of void in the aggregate) of 1.2 and 1.3, water-to-binder ratio (w/b) range of 0.3 to 0.58, initial dose of superplasticizer (SP) range from 0.5 to 1.6%. The setting time of concrete were tested both before and after re-dosed with different amount of second dose and time of dosing. The research was concluded that addition of second dose of superplasticizer would increase both initial and final setting times accordingly to dosage of addition. As for fly ash concrete, the prolongation effect was higher as the replacement of fly ash is increase. The prolongation effect can reach up to maximum about 4 hours. In case of compressive strength, the re-dosed concrete has strength fluctuation within acceptable range of ±10%.

Keywords: compressive strength, fly ash concrete, second dose of superplasticizer, setting times

Procedia PDF Downloads 248
4261 Dynamic Construction Site Layout Using Ant Colony Optimization

Authors: Yassir AbdelRazig

Abstract:

Evolutionary optimization methods such as genetic algorithms have been used extensively for the construction site layout problem. More recently, ant colony optimization algorithms, which are evolutionary methods based on the foraging behavior of ants, have been successfully applied to benchmark combinatorial optimization problems. This paper proposes a formulation of the site layout problem in terms of a sequencing problem that is suitable for solution using an ant colony optimization algorithm. In the construction industry, site layout is a very important planning problem. The objective of site layout is to position temporary facilities both geographically and at the correct time such that the construction work can be performed satisfactorily with minimal costs and improved safety and working environment. During the last decade, evolutionary methods such as genetic algorithms have been used extensively for the construction site layout problem. This paper proposes an ant colony optimization model for construction site layout. A simple case study for a highway project is utilized to illustrate the application of the model.

Keywords: ant colony, construction site layout, optimization, genetic algorithms

Procedia PDF Downloads 350
4260 Treatment of the Modern Management Mechanism of the Debris Flow Processes Expected in the Mletiskhevi

Authors: G. Chakhaia, S. Gogilava, L. Tsulukidze, Z. Laoshvili, I. Khubulava, S. Bosikashvili, T. Gugushvili

Abstract:

The work reviewed and evaluated various genesis debris flow phenomena recently formatted in the Mletiskhevi, accordingly it revealed necessity of treatment modern debris flow against measures. Based on this, it is proposed the debris flow against truncated semi cone shape construction, which elements are contained in the car’s secondary tires. its constituent elements (sections), due to the possibilities of amortization and geometric shapes is effective and sustainable towards debris flow hitting force. The construction is economical, because after crossing the debris flows in the river bed, the riverbed is not cleanable, also the elements of the building are resource saving. For assessment of influence of cohesive debris flow at the construction and evaluation of the construction effectiveness have been implemented calculation in the specific assumptions with approved methodology. According to the calculation, it was established that after passing debris flow in the debris flow construction (in 3 row case) its hitting force reduces 3 times, that causes reduce of debris flow speed and kinetic energy, as well as sedimentation on a certain section of water drain in the lower part of the construction. Based on the analysis and report on the debris flow against construction, it can be said that construction is effective, inexpensive, technically relatively easy-to-reach measure, that’s why its implementation is prospective.

Keywords: construction, debris flow, sections, theoretical calculation

Procedia PDF Downloads 155
4259 Analysis of Maternal Death Surveillance and Response: Causes and Contributing Factors in Addis Ababa, Ethiopia, 2022

Authors: Sisay Tiroro Salato

Abstract:

Background: Ethiopia has been implementing the maternal death surveillance and response system to provide real-time actionable information, including causes of death and contributing factors. Analysis of maternal mortality surveillance data was conducted to identify the causes and underlying factors in Addis Ababa, Ethiopia. Methods: We carried out a retrospective surveillance data analysis of 324 maternal deaths reported in Addis Ababa, Ethiopia, from 2017 to 2021. The data were extracted from the national maternal death surveillance and response database, including information from case investigation, verbal autopsy, and facility extraction forms. The data were analyzed by computing frequency and presented in numbers, proportions, and ratios. Results: Of 324 maternal deaths, 92% died in the health facilities, 6.2% in transit, and 1.5% at home. The mean age at death was 28 years, ranging from 17 to 45. The maternal mortality ratio per 100,000 live births was 77for the five years, ranging from 126 in 2017 to 21 in 2021. The direct and indirect causes of death were responsible for 87% and 13%, respectively. The direct causes included obstetric haemorrhage, hypertensive disorders in pregnancy, puerperal sepsis, embolism, obstructed labour, and abortion. The third delay (delay in receiving care after reaching health facilities) accounted for 57% of deaths, while the first delay (delay in deciding to seek health care) and the second delay (delay in reaching health facilities) and accounted for 34% and 24%, respectively. Late arrival to the referral facility, delayed management after admission, andnon-recognition of danger signs were underlying factors. Conclusion: Over 86% of maternal deaths were attributed by avoidable direct causes. The majority of women do try to reach health services when an emergency occurs, but the third delays present a major problem. Improving the quality of care at the healthcare facility level will help to reduce maternal death.

Keywords: maternal death, surveillance, delays, factors

Procedia PDF Downloads 68
4258 Recycling of Sewage Sludge Ash (SSA) as Construction Material

Authors: Z. Chen, C. S. Poon

Abstract:

In Hong Kong, about 1,000 tonnes of sewage sludge were produced every day in 2014 representing a major fraction of the total solid municipal waste. Traditionally, sewage sludge is disposed of at landfills. This disposal method causes environmental issues and uses up precious space in landfills which are becoming saturated one by one. To tackle the disposal problem, Hong Kong government has just built a sewage sludge incinerator. Through incineration the volume of waste can be reduced up to 90% by converting sewage sludge into ash. Whilst sewage sludge ash (SSA) still needs to be disposed of at landfills, research has been conducted at the Hong Kong Polytechnic University on using SSA to substitute cement for the production of construction materials. Results demonstrated that SSA contained many open and isolated pores and thus can reduce the cement dilution effect resulting in only slight decrease in the flexural and compressive strengths of cement mortar. The incorporation of SSA in cement mortar can be up to 20% of the binder, without too much worry about adverse effect on strength development of mortar. There was some enhancement in strength using ground SSA in comparison to the original SSA. The original SSA shortened the relative initial setting time of cement paste but ground SSA caused slight delay in the setting of cement paste. The research also found that increasing the percentage of SSA lead to decreasing workability of cement mortar with the same water/binder ratio, and ground SSA was beneficial to workability although grinding increased the surface area of SSA. This paper summarizes the major findings of the research.

Keywords: cement replacement, construction material, sewage sludge ash, waste recycling

Procedia PDF Downloads 361
4257 An Assessment of Existing Material Management Process in Building Construction Projects in Nepal

Authors: Uttam Neupane, Narendra Budha, Subash Kumar Bhattarai

Abstract:

Material management is an essential part in construction project management. There are a number of material management problems in the Nepalese construction industry, which contribute to an inefficient material management system. Ineffective material management can cause waste of time and money thus increasing the problem of time and cost overrun. An assessment of material management system with gap and solution was carried out on 20 construction projects implemented by the Federal Level Project Implementation Unit (FPIU); Kaski district of Nepal. To improve the material management process, the respondents have provided possible solutions to overcome the gaps seen in the current material management process. The possible solutions are preparation of material schedule in line with the construction schedule for material requirement planning, verifications of material and locating of source, purchasing of the required material in advance before commencement of work, classifying the materials, and managing the inventory based on their usage value and eliminating and reduction in wastages during the overall material management process.

Keywords: material management, construction site, inventory, construction project

Procedia PDF Downloads 27
4256 Significant Factors to Motivate Small and Medium Enterprise (SME) Construction Firms in the Philippines to Implement ISO 9001:2008

Authors: Joseph Berlin P. Juanzon, Manuel M. Muhi

Abstract:

Motivating SME-based construction firms to adopt different management systems is not a simple task, especially if they are not aware of the benefits that they will gain from the new process-based management system. The implementation of ISO 9001:2008, Quality Management System in the construction industry is an ongoing trend, more so in the Small and Medium Enterprise. However, the level of awareness and readiness of the construction industry in the Philippines is still low as compared to the neighboring countries in Asia and in the western countries where ISO 9001:2008 originated. The purpose of this research is to determine the significant factors that will motivate SME-based construction firms in the Philippines to implement ISO 9001:2008. A field study was conducted on SME based construction firms in the Philippines, wherein a total of 139 respondents out of the 613 SME-based construction firms in CALABARZON areas were surveyed. Results reveal that the three main factors that will motivate SME-based construction firms to implement ISO 9001:2008 are: - if required by their clients, - to qualify for bidding, and - to increase customer satisfaction. Therefore, based on the results and findings, a certification of ISO 9001:2008 from an accredited auditor shall be required by clients as a constituent in accrediting SME-based construction firms and to qualify for bidding.

Keywords: construction, ISO 9001:2008, quality management systems (QMS), small medium enterprise (SME)

Procedia PDF Downloads 357
4255 Causality between the Construction Industry and the GDP in the United Arab Emirates

Authors: Hasan S. Mahmoud, Salwa M. Beheiry, Vian Ahmed

Abstract:

In light of the repercussions of the 2008 global economic crisis, the response of the United Arab Emirates economy and growth, and the vast construction activities that are undergoing, there is a need to investigate the relationship between construction activities and the Gross Domestic Product (GDP). This study aims to investigate the causality relationship between the construction industry in the United Arab Emirates and the GDP of the country in the last decade. For that, this study will investigate the relationship between the growth of the GDP and the growth of construction activities and their value addition to the economy. To ascertain this relationship, Granger Causality method is used to identify the causality between the time-dependent series.

Keywords: construction value addition, Granger causality, growth of gross domestic product, United Arab Emirates

Procedia PDF Downloads 113
4254 Assessment of Impact of Manpower Training and Development in the Construction Industry

Authors: Olalekan Bamidele Aruleba

Abstract:

This research assessed the impact of manpower training and development in the construction industry. The aim is to determine the effect of training and development on employees for effective organizational growth in the construction industry to identify the training method for each category of employee in the construction industry, challenges to training and development of workers in the construction industry and impact of manpower training and development on employees and employers. Data for the study were obtained through a well-structured questionnaire administered to building professionals in Nigeria construction firm. Eighty (80) questionnaires were distributed among building professionals in three selected local governments within Ondo State and sixty-four (64) were returned. Data collected were analysed using descriptive statistics and ranking. Findings of the study revealed that in house training and in-service training methods were preferred by most construction industry. It concluded that the attitude of top management and lack of fund was seen as the significant challenges militating against training of employees. The study recommended that manpower training and development must be sustained by all stakeholders in the industry in order to improve workers' productivity; the organization should adopt the right method in training each category of employees and carry out the need assessment for training to avoid training wrong employees.

Keywords: construction, development, manpower, training

Procedia PDF Downloads 168
4253 Apps Reduce the Cost of Construction

Authors: Ali Mohammadi

Abstract:

Every construction that is done, the most important part of attention for employers and contractors is its cost, and they always try to reduce costs so that they can compete in the market, so they estimate the cost of construction before starting their activities. The costs can be generally divided into four parts: the materials used, the equipment used, the manpower required, and the time required. In this article, we are trying to talk about the three items of equipment, manpower, and time, and examine how the use of apps can reduce the cost of construction, while due to various reasons, it has received less attention in the field of app design. Also, because we intend to use these apps in construction and they are used by engineers and experts, we define these apps as engineering apps because the idea of ​​their design must be by an engineer who works in that field. Also, considering that most engineers are familiar with programming during their studies, they can design the apps they need using simple programming software.

Keywords: layout, as-bilt, monitoring, maps

Procedia PDF Downloads 18
4252 Analysis of Construction Waste Generation and Its Effect in a Construction Site

Authors: R. K. D. G. Kaluarachchi

Abstract:

The generation of solid waste and its effective management are debated topics in Sri Lanka as well as in the global environment. It was estimated that the most of the waste generated in global was originated from construction and demolition of buildings. Thus, the proportion of construction waste in solid waste generation cannot be underestimated. The construction waste, which is the by-product generated and removed from work sites is collected in direct and indirect processes. Hence, the objectives of this research are to identify the proportion of construction waste which can be reused and identify the methods to reduce the waste generation without reducing the quality of the process. A 6-storey building construction site was selected for this research. The site was divided into six zones depending on the process. Ten waste materials were identified by considering the adverse effects on safety and health of people and the economic value of them. The generated construction waste in each zone was recorded per week for a period of five months. The data revealed that sand, cement, wood used for form work and rusted steel rods were the generated waste which has higher economic value in all zones. Structured interviews were conducted to gather information on how the materials are categorized as waste and the capability of reducing, reusing and recycling the waste. It was identified that waste is generated in following processes; ineffective storage of material for a longer time and improper handling of material during the work process. Further, the alteration of scheduled activities of construction work also yielded more waste. Finally, a proper management of construction waste is suggested to reduce and reuse waste.

Keywords: construction-waste, effective management, reduce, reuse

Procedia PDF Downloads 174
4251 Heading for Modern Construction Management: Recommendation for Employers

Authors: Robin Becker, Maike Eilers, Nane Roetmann, Manfred Helmus

Abstract:

The shortage of junior staff in the construction industry is a problem that will be further exacerbated in the coming years by the retirement of the baby-boom generations (1955-1969) from employment. In addition, the current working conditions in the field of construction management are not attractive for young professionals. A survey of students revealed a desire for an increase in flexibility and an improved work-life balance in everyday working life. Students of civil engineering and architecture are basically interested in a career in construction management but have reservations due to the image of the profession and the current working conditions. A survey among experts from the construction industry shows that the profession can become more attractive. This report provides recommendations for action in the form of working modules to improve the working conditions of employees. If these are taken into account, graduates can be attracted to the profession of construction management, and existing staff can be retained more effectively. The aim of this report is to show incentives for employers to respond to the wishes and needs of their current and future employees to the extent that can be implemented.

Keywords: modern construction management, construction industry, work modules, shortage of junior staff, sustainable personnel management, making construction management more attractive, working time model

Procedia PDF Downloads 60
4250 Building Information Modeling Implementation for Managing an Extra Large Governmental Building Renovation Project

Authors: Pornpote Nusen, Manop Kaewmoracharoen

Abstract:

In recent years, there was an observable shift in fully developed countries from constructing new buildings to modifying existing buildings. The issue was that although an effective instrument like BIM (Building Information Modeling) was well developed for constructing new buildings, it was not widely used to renovate old buildings. BIM was accepted as an effective means to overcome common managerial problems such as project delay, cost overrun, and poor quality of the project life cycle. It was recently introduced in Thailand and rarely used in a renovation project. Today, in Thailand, BIM is mostly used for creating aesthetic 3D models and quantity takeoff purposes, though it can be an effective tool to use as a project management tool in planning and scheduling. Now the governmental sector in Thailand begins to recognize the uses of using BIM to manage a construction project, but the knowledge about the BIM implementation to governmental construction projects is underdeveloped. Further studies need to be conducted to maximize its advantages for the governmental sector. An educational extra large governmental building of 17,000 square-meters was used in this research. It is currently under construction for a two-year renovation project. BIM models of the building for the exterior and interior areas were created for the whole five floors. Then 4D BIM with combination of 3D BIM plus time was created for planning and scheduling. Three focus groups had been done with executive committee, contractors, and officers of the building to discuss the possibility of usage and usefulness of BIM approach over the traditional process. Several aspects were discussed in the positive sides, especially several foreseen problems, such as the inadequate accessibility of ways, the altered ceiling levels, the impractical construction plan created through a traditional approach, and the lack of constructability information. However, for some parties, the cost of BIM implementation was a concern, though, this study believes, its uses outweigh the cost.

Keywords: building information modeling, extra large building, governmental building renovation, project management, renovation, 4D BIM

Procedia PDF Downloads 119
4249 Activity-Based Safety Assessment of Real Estate Projects in Western India

Authors: Patel Parul, Harsh Ganvit

Abstract:

The construction industry is the second highest industry after agriculture provides employment in India. In developing countries like India, many construction projects are coming up to meet the demand. On the one hand, construction projects are increasing; on the other hand still, construction companies are struggling with many problems. One of the major problems is to ensure safe working conditions at the construction site. Due to a lack of safety awareness and ignorance of safety aspects, many fatal accidents are very common at the construction site in India. One of the key success factors for construction projects is “Accident-Free Construction Projects”. The construction projects can be divided into various categories like Infrastructure projects, industrial construction and real estate construction. Real estate projects are mainly comprised of commercial and residential projects. In the construction industry, private sectors play a huge role in urban and rural development and also contribute significantly to the growth of the nation. Infrastructure and Industrial projects are mainly executed by well-qualified construction contractors. For such projects, ensuring safety at construction projects is inevitable and probably one of the major clauses of contract documents as well. These projects are monitored from time to time by national agencies and researchers, too. However, Real estate projects are rarely monitored for safety aspects. No systematic contract system is followed for these projects. Safety is the most neglected aspect of these projects. In the current research projects, an attempt is made to carry out safety auditing for about 75 real estate projects. The objective of this work is to collect the activity-based safety survey of real estate projects in western India. The analysis of activity-based safety implementation for real estate projects is discussed in the present work. The activities are divided into three categories based on the data collected. The findings of this work will help local monitoring authorities to implement a safety management plan for real estate projects.

Keywords: construction safety, safety assessment, activity-based safety, real estate projects

Procedia PDF Downloads 20
4248 Study on the Model Predicting Post-Construction Settlement of Soft Ground

Authors: Pingshan Chen, Zhiliang Dong

Abstract:

In order to estimate the post-construction settlement more objectively, the power-polynomial model is proposed, which can reflect the trend of settlement development based on the observed settlement data. It was demonstrated by an actual case history of an embankment, and during the prediction. Compared with the other three prediction models, the power-polynomial model can estimate the post-construction settlement more accurately with more simple calculation.

Keywords: prediction, model, post-construction settlement, soft ground

Procedia PDF Downloads 398
4247 Explore the Effect of Telecare for the Elderly in Preventing and Delaying the Quality of Disability Care with Bluetooth Brainwave Equipment

Authors: Jui-Chen Huang

Abstract:

The purpose of this study is to explore the effects of telecare on preventing and delaying the quality of disability care in elderly people with portable comfort Bluetooth brainwave devices with remote healthcare functions. Through the teaching videos and remotely teaching the elderly, which had ever learned the care courses of the prevent and delay disability, these elderly did muscle strength training. Then this paper explores the effect of training with the data by SPSS 18.0 statistical software. The data is collected with pre-test, post-test and analyze data from the measure of the Bluetooth brain wave equipment including the pressure index, relaxation index, attention and fatigue index of the elderly. In this study, 30 elderly people who had taken preventive and delayed disability care courses were studied to explore the effect of their care quality improvement. The results showed that the pressure index, relaxation index, attention, and fatigue index of the elderly had statistically significant differences in two months. It can be seen that elderly people who have been treated to prevent and delay disability care courses can significantly improve their care quality if they continue to receive intensive training to prevent and delay disability through remote mode. This telecare is applied to the elderly program that has been used to prevent and delay disability care courses. It is worth continuing to promote, and it is recommended that follow-up studies be conducted in a longer-term manner to explore long-term benefits. It can solve the current insufficiency of long-term care resources, but the demand is urgent.

Keywords: telecare, bluetooth brainwave equipment, prevention and delay of disability, the elderly, care quality

Procedia PDF Downloads 125
4246 The Narrative Coherence of Autistic Children’s Accounts of an Experienced Event over Time

Authors: Fuming Yang, Telma Sousa Almeida, Xinyu Li, Yunxi Deng, Heying Zhang, Michael E. Lamb

Abstract:

Twenty-seven children aged 6-15 years with autism spectrum disorder (ASD) and 32 typically developing children were questioned about their participation in a set of activities after a two-week delay and again after a two-month delay, using a best-practice interview protocol. This paper assessed the narrative coherence of children’s reports based on key story grammar elements and temporal features included in their accounts of the event. Results indicated that, over time, both children with ASD and typically developing (TD) children decreased their narrative coherence. Children with ASD were no different from TD peers with regards to story length and syntactic complexity. However, they showed significantly less coherence than TD children. They were less likely to use the gist of the story to organize their narrative coherence. Interviewer prompts influenced children’s narrative coherence. The findings indicated that children with ASD could provide meaningful and reliable testimony about an event they personally experienced, but the narrative coherence of their reports deteriorates over time and is affected by interviewer prompts.

Keywords: autism spectrum disorders, delay, eyewitness testimony, narrative coherence

Procedia PDF Downloads 245
4245 Application of Support Vector Machines in Forecasting Non-Residential

Authors: Wiwat Kittinaraporn, Napat Harnpornchai, Sutja Boonyachut

Abstract:

This paper deals with the application of a novel neural network technique, so-called Support Vector Machine (SVM). The objective of this study is to explore the variable and parameter of forecasting factors in the construction industry to build up forecasting model for construction quantity in Thailand. The scope of the research is to study the non-residential construction quantity in Thailand. There are 44 sets of yearly data available, ranging from 1965 to 2009. The correlation between economic indicators and construction demand with the lag of one year was developed by Apichat Buakla. The selected variables are used to develop SVM models to forecast the non-residential construction quantity in Thailand. The parameters are selected by using ten-fold cross-validation method. The results are indicated in term of Mean Absolute Percentage Error (MAPE). The MAPE value for the non-residential construction quantity predicted by Epsilon-SVR in corporation with Radial Basis Function (RBF) of kernel function type is 5.90. Analysis of the experimental results show that the support vector machine modelling technique can be applied to forecast construction quantity time series which is useful for decision planning and management purpose.

Keywords: forecasting, non-residential, construction, support vector machines

Procedia PDF Downloads 404
4244 Exploring the Critical Success Factors of Construction Stakeholders Team Effectiveness

Authors: Olusegun Akinsiku, Olukayode Oyediran, Koleola Odusami

Abstract:

A construction project is usually made up of a variety of stakeholders whose interests may positively or negatively impact on the outcome of the project execution. The variability of project stakeholders is apparent in their cultural differences, professional background and ethics, and differences in ideas. The need for the effectiveness of construction teams has been investigated as this is an important aspect to meeting client’s expectations in the construction industry. This study adopts a cross-sectional descriptive survey with the purpose of identifying the critical success factors (CSFs) associated with the team effectiveness of construction projects stakeholders, their relationship and the effects on construction project performance. The instrument for data collection was a designed questionnaire which was administered to construction professionals in the construction industry in Lagos State, Nigeria using proportionate stratified sampling. The highest ranked identified CSFs include “team trust”, “esprit de corps among members” and “team cohesiveness”. Using factor analysis and considering the effects of team cohesiveness on project performance, the identified CSFs were categorized into three groups namely cognitive attributes, behavior and processes attributes and affective attributes. All the three groups were observed to have a strong correlation with project performance. The findings of this study are useful in helping construction stakeholders benchmark the team effectiveness factors that will guarantee project success.

Keywords: construction, critical success factors, performance, stakeholders, team effectiveness

Procedia PDF Downloads 103
4243 Formation Control for Linear Multi-Robot System with Switched Directed Topology and Time-Varying Delays

Authors: Yaxiao Zhang, Yangzhou Chen

Abstract:

This study investigate the formation problem for high-order continuous-time multi-robot with bounded symmetric time-varying delay protocol under switched directed communication topology. By using a linear transformation, the formation problem is transformed to stability analysis of a switched delay system. Under the assumption that each communication topology has a directed spanning tree, sufficient conditions are presented in terms of linear matrix inequalities (LMIs) that the multi-robot system can achieve a desired formation by the trade-off among the pre-exist topologies with the help of the scheme of average dwell time. A numeral example is presented to illustrate the effectiveness of the obtained results.

Keywords: multi-robot systems, formation, switched directed topology, symmetric time-varying delay, average dwell time, linear matrix inequalities (lmis)

Procedia PDF Downloads 496