15781 Construction Unit Rate Factor Modelling Using Neural Networks

Authors: Balimu Mwiya, Mundia Muya, Chabota Kaliba, Peter Mukalula

Abstract:

Factors affecting construction unit cost vary depending on a country’s political, economic, social and technological inclinations. Factors affecting construction costs have been studied from various perspectives. Analysis of cost factors requires an appreciation of a country’s practices. Identified cost factors provide an indication of a country’s construction economic strata. The purpose of this paper is to identify the essential factors that affect unit cost estimation and their breakdown using artificial neural networks. Twenty-five (25) identified cost factors in road construction were subjected to a questionnaire survey and employing SPSS factor analysis the factors were reduced to eight. The 8 factors were analysed using the neural network (NN) to determine the proportionate breakdown of the cost factors in a given construction unit rate. NN predicted that political environment accounted 44% of the unit rate followed by contractor capacity at 22% and financial delays, project feasibility, overhead and profit each at 11%. Project location, material availability and corruption perception index had minimal impact on the unit cost from the training data provided. Quantified cost factors can be incorporated in unit cost estimation models (UCEM) to produce more accurate estimates. This can create improvements in the cost estimation of infrastructure projects and establish a benchmark standard to assist the process of alignment of work practises and training of new staff, permitting the on-going development of best practises in cost estimation to become more effective.

Keywords: construction cost factors, neural networks, roadworks, Zambian construction industry

Procedia PDF Downloads 336
15780 Developing Thai-UK Double Degree Programmes: An Exploratory Study Identifying Challenges, Competing Interests and Risks

Authors: Joy Tweed, Jon Pike

Abstract:

In Thailand, a 4.0 policy has been initiated that is designed to prepare and train an appropriate workforce to support the move to a value-based economy. One aspect of support for this policy is a project to encourage the creation of double degree programmes, specifically between Thai and UK universities. This research into the project, conducted with its key players, explores the factors that can either enable or hinder the development of such programmes. It is an area that has received little research attention to date. Key findings focus on differences in quality assurance requirements, attitudes to benefits, risks, and committed levels of institutional support, thus providing valuable input into future policy making. The Transnational Education (TNE) Development Project was initiated in 2015 by the British Council, in conjunction with the Office for Higher Education Commission (OHEC), Thailand. The purpose of the project was to facilitate opportunities for Thai Universities to partner with UK Universities so as to develop double degree programme models. In this arrangement, the student gains both a UK and a Thai qualification, spending time studying in both countries. Twenty-two partnerships were initiated via the project. Utilizing a qualitative approach, data sources included participation in TNE project workshops, peer reviews, and over 20 semi-structured interviews conducted with key informants within the participating UK and Thai universities. Interviews were recorded, transcribed, and analysed for key themes. The research has revealed that the strength of the relationship between the two partner institutions is critical. Successful partnerships are often built on previous personal contact, have senior-level involvement and are strengthened by partnership on different levels, such as research, student exchange, and other forms of mobility. The support of the British Council was regarded as a key enabler in developing these types of projects for those universities that had not been involved in TNE previously. The involvement of industry is apparent in programmes that have high scientific content but not well developed in other subject areas. Factors that hinder the development of partnership programmes include the approval processes and quality requirements of each institution. Significant differences in fee levels between Thai and UK universities provide a challenge and attempts to bridge them require goodwill on the part of the latter that may be difficult to realise. This research indicates the key factors to which attention needs to be given when developing a TNE programme. Early attention to these factors can reduce the likelihood that the partnership will fail to develop. Representatives in both partner universities need to understand their respective processes of development and approval. The research has important practical implications for policy-makers and planners involved with TNE, not only in relation to the specific TNE project but also more widely in relation to the development of TNE programmes in other countries and other subject areas. Future research will focus on assessing the success of the double degree programmes generated by the TNE Development Project from the perspective of universities, policy makers, and industry partners.

Keywords: double-degree, internationalization, partnerships, Thai-UK

Procedia PDF Downloads 84
15779 A Review of Information Systems Development in Developing Countries

Authors: B. N. Asare, O. A. Ajigini

Abstract:

Information systems (IS) are highly important in the operation of private and public organisations in developing and developed countries. Developing countries are saddled with many project failures during the implementation of information systems. However, successful information systems are greatly needed in developing countries in order to enhance their economies. This paper is highly important in view of the high failure rate of information systems in developing countries which needs to be reduced to minimum acceptable levels by means of recommended interventions. This paper centres on a review of IS development in developing countries. The paper presents evidences of the IS successes and failures in developing countries and posits a model to address the IS failures. The proposed model can then be utilised by developing countries to reduce their IS project implementation failure rate. A comparison is drawn between IS development in developing countries and developed countries. The paper provides valuable information to assist in reducing IS failure, and developing IS models and theories on IS development for developing countries.

Keywords: developing countries, information systems, IS development, information systems failure, information systems success, information systems success model

Procedia PDF Downloads 341
15778 Conceptual Modeling of the Relationship between Project Management Practices and Knowledge Absorptive Capacity Using Interpretive Structural Modeling Method

Authors: Seyed Abdolreza Mosavi, Alireza Babakhan, Elham Sadat Hoseinifard

Abstract:

Knowledge-based firms need to design mechanisms for continuous absorptive and creation of knowledge in order to ensure their survival in the competitive arena and to follow the path of development. Considering the project-oriented nature of product development activities in knowledge-based firms on the one hand and the importance of analyzing the factors affecting knowledge absorptive capacity in these firms on the other, the purpose of this study is to identify and classify the factors affecting project management practices on absorptive knowledge capacity. For this purpose, we have studied and reviewed the theoretical literature in the field of project management and absorptive knowledge capacity so as to clarify its dimensions and indexes. Then, using the ISM method, the relationship between them has been studied. To collect data, 21 questionnaires were distributed in project-oriented knowledge-based companies. The results of the ISM method analysis provide a model for the relationship between project management activities and knowledge absorptive capacity, which includes knowledge acquisition capacity, scope management, time management, cost management, quality management, human resource management, communications management, procurement management, risk management, stakeholders management and integration management. Having conducted the MICMAC analysis, we divided the variables into three groups of independent, relational and dependent variables and came up with no variables to be included in the group of autonomous variables.

Keywords: knowledge absorptive capacity, project management practices, knowledge-based firms, interpretive structural modeling

Procedia PDF Downloads 175
15777 A Framework for Successful TQM Implementation and Its Effect on the Organizational Sustainability Development

Authors: Redha Elhuni, M. Munir Ahmad

Abstract:

The main purpose of this research is to construct a generic model for successful implementation of Total Quality Management (TQM) in oil sector, and to find out the effects of this model on the organizational sustainability development (OSD) performance of Libyan oil and gas companies using the structured equation modeling (SEM) approach. The research approach covers both quantitative and qualitative methods. A questionnaire was developed in order to identify the quality factors that are seen by Libyan oil and gas companies to be critical to the success of TQM implementation. Hypotheses were developed to evaluate the impact of TQM implementation on O SD. Data analysis reveals that there is a significant positive effect of the TQM implementation on OSD. 24 quality factors are found to be critical and absolutely essential for successful TQM implementation. The results generated a structure of the TQMSD implementation framework based on the four major road map constructs (Top management commitment, employee involvement and participation, customer-driven processes, and continuous improvement culture).

Keywords: total quality management, critical success factors, oil and gas, organizational sustainability development (SD), Libya

Procedia PDF Downloads 255
15776 Economic Factors Affecting Greenfield Petroleum Refinery and Petrochemical Projects in Africa

Authors: Daniel Muwooya

Abstract:

This paper analyses economic factors that have affected the competitiveness of petroleum refinery and petrochemical projects in sub-Saharan Africa in the past and continue to plague greenfield projects today. Traditional factors like plant sizing and complexity, low-capacity utilization, changing regulatory environment, and tighter product specifications have been important in the past. Additional factors include the development of excess refinery capacity in Asia and the growth of renewable sources of energy – especially for transportation. These factors create both challenges and opportunities for the development of greenfield refineries and petrochemical projects in areas of increased demand growth and new low-cost crude oil production – like sub-Saharan Africa. This paper evaluates the strategies available to project developers and host countries to address contemporary issues of energy transition and the apparent reduction of funds available for greenfield oil and gas projects. The paper also evaluates the structuring of greenfield refinery and petrochemical projects for limited recourse project finance bankability. The methodology of this paper includes analysis of current industry data, conference proceedings, academic papers, and academic books on the subjects of petroleum refinery economics, refinery financing, refinery operations, and project finance generally and specifically in the oil and gas industry; evaluation of expert opinions from journal articles; working papers from international bodies like the World Bank and the International Energy Agency; and experience from playing an active role in the development and financing of US$ 10 Billion greenfield oil development project in Uganda. The paper also applies the discounted cash flow modelling to illustrate the circumstances of an inland greenfield refinery project in Uganda. Greenfield refinery and petrochemical projects are still necessary in sub-Saharan Africa to, among other aspirations, support the transition from traditional sources of energy like biomass to such modern forms as liquefied petroleum gas. Project developers and host governments will be required to structure projects that support global climate change goals without occasioning undue delays to project execution.

Keywords: financing, refinery and petrochemical economics, Africa, project finance

Procedia PDF Downloads 38
15775 Highlighting Strategies Implemented by Migrant Parents to Support Their Child's Educational and Academic Success in the Host Society

Authors: Josee Charette

Abstract:

The academic and educational success of migrant students is a current issue in education, especially in western societies such in the province of Quebec, in Canada. For people who immigrate with school-age children, the success of the family’s migratory project is often measured by the benefits drawn by children from the educational institutions of their host society. In order to support the academic achievement of their children, migrant parents try to develop practices that derive from their representations of school and related challenges inspired by the socio-cultural context of their country of origin. These findings lead us to the following question: How does strategies implemented by migrant parents to manage the representational distance between school of their country of origin and school of their host society support or not the academic and educational success of their child? In the context of a qualitative exploratory approach, we have made interviews in the French , English and Spanish languages with 32 newly immigrated parents and 10 of their children. Parents were invited to complete a network of free associations about «School in Quebec» as a premise for the interview. The objective of this paper is to present strategies implemented by migrant parents to manage the distance between their representations of schools in their country of origin and in the host society, and to explore the influence of this management on their child’s academic and educational trajectories. Data analysis led us to develop various types of strategies, such as continuity, adaptation, resources mobilization, compensation and "return to basics" strategies. These strategies seem to be part of a continuum from oppositional-conflict scenario, in which parental strategies act as a risk factor, to conciliator-integrator scenario, in which parental strategies act as a protective factor for migrant students’ academic and educational success. In conclusion, we believe that our research helps in highlighting strategies implemented by migrant parents to support their child’s academic and educational success in the host society and also helps in providing a more efficient support to migrant parents and contributes to develop a wider portrait of migrant students’ academic achievement.

Keywords: academic and educational achievement of immigrant students, family’s migratory project, immigrants parental strategies, representational distance between school of origin and school of host society

Procedia PDF Downloads 428
15774 Integrated Risk Management as a Framework for Organisational Success

Authors: Olakunle Felix Adekunle

Abstract:

Risk management is recognised as an essential tool to tackle the inevitable uncertainty associated with business and projects at all levels. But it frequently fails to meet expectations, with projects continuing to run late, over budget or under performing, and business is not gaining the expected benefits. The evident disconnect which often occurs between strategic vision and tactical project delivery typically arises from poorly defined project objectives and inadequate attention to the proactive management of risks that could affect those objectives. One of the main failings in the traditional approach to risk management arises from a narrow focus on the downside, restricted to the technical or operational field, addressing tactical threats to processes, performance or people. This shortcoming can be overcome by widening the scope of risk management to encompass both strategic risks and upside opportunities, creating an integrated approach which can bridge the gap between strategy and tactics. Integrated risk management addresses risk across a variety of levels in the organisation, including strategy and tactics, and covering both opportunity and threat. Effective implementation of integrated risk management can produce a number of benefits to the organisation which are not available from the typical limited-scope risk process. This paper explores how to expand risk management to deliver strategic advantage while retaining its use as a tactical tool.

Keywords: risk management, success, organization, strategy, project, tactis, vision

Procedia PDF Downloads 367
15773 A Development of a Conceptual Framework for Safety Culture and Safety Risk Assessment: The Case of Chinese International Construction Projects under the “New Belt and Road” Initiative in Africa

Authors: Bouba Oumarou Aboubakar, HongXia Li, Sardar Annes Farooq

Abstract:

The Belt and Road Initiative’s success strongly depends on the safety of all the million workers on construction projects sites. As the new BRI is directed toward Africa and meets a completely different culture from the Chinese project managers, maintaining low risk for workers risks shall be closely related to cultural sharing and mutual understanding. This is why this work introduces a cultural-wise safety management framework for Chinese Construction projects in Africa. The theoretical contribution of this paper is an improved risk assessment framework that integrates language, culture and difficulty of controlling risk factors into one approach. Practically, this study provides not only a useful tool for project safety management practitioners but the full understanding of all risks that may arise in the BRI projects in Africa.

Keywords: cultural-wise, safety culture, risk assessment, Chinese construction, BRI projects, Africa

Procedia PDF Downloads 63
15772 Stage-Gate Based Integrated Project Management Methodology for New Product Development

Authors: Mert Kıranç, Ekrem Duman, Murat Özbilen

Abstract:

In order to achieve new product development (NPD) activities on time and within budgetary constraints, the NPD managers need a well-designed methodology. This study intends to create an integrated project management methodology for the ones who focus on new product development projects. In the scope of the study, four different management systems are combined. These systems are called as 'Schedule-oriented Stage-Gate Method, Risk Management, Change Management and Earned Value Management'. New product development term is quite common in many different industries such as defense industry, construction, health care/dental, higher education, fast moving consumer goods, white goods, electronic devices, marketing and advertising and software development. All product manufacturers run against each other’s for introducing a new product to the market. In order to achieve to produce a more competitive product in the market, an optimum project management methodology is chosen, and this methodology is adapted to company culture. The right methodology helps the company to present perfect product to the customers at the right time. The benefits of proposed methodology are discussed as an application by a company. As a result, how the integrated methodology improves the efficiency and how it achieves the success of the project are unfolded.

Keywords: project, project management, management methodology, new product development, risk management, change management, earned value, stage-gate

Procedia PDF Downloads 294
15771 Supporting Older Workers in the Workforce: Identifying Best Practices to Increase Participation

Authors: Dr Elliroma Gardiner

Abstract:

Extending the working life of older workers is one important strategy in alleviating the social and economic challenges associated with the ageing population. The Australian government has implemented several strategies to improve the participation rates of older workers, however, the success of these initiatives has been limited. The aim of this project is to identify what workplace practices influence the workforce participation decisions of older workers. Thirty semi-structured interviews were conducted with older Australians who were either recently retired or currently working. Participants were asks about the factors that influenced their decision to retire/continue working and their current (or former) workplace practices. The results of the thematic analysis identified several factors which either supported (i.e., job autonomy and managerial support) or hindered (i.e., perceptions of age discrimination and age-based stereotypes) continued workplace participation. This research has several important applications for organisation managing intergenerational workforces, as well as policy makers interested in increasing the working life of ageing workers.

Keywords: ageing workers, older workers, age discrimination, age diversity

Procedia PDF Downloads 91
15770 To Handle Data-Driven Software Development Projects Effectively

Authors: Shahnewaz Khan

Abstract:

Machine learning (ML) techniques are often used in projects for creating data-driven applications. These tasks typically demand additional research and analysis. The proper technique and strategy must be chosen to ensure the success of data-driven projects. Otherwise, even exerting a lot of effort, the necessary development might not always be possible. In this post, an effort to examine the workflow of data-driven software development projects and its implementation process in order to describe how to manage a project successfully. Which will assist in minimizing the added workload.

Keywords: data, data-driven projects, data science, NLP, software project

Procedia PDF Downloads 57
15769 An Empirical Investigation of Factors Influencing Construction Project Selection Processes within the Nigeria Public Sector

Authors: Emmanuel U. Unuafe, Oyegoke T. Bukoye, Sandhya Sastry, Yanqing Duan

Abstract:

Globally, there is increasing interest in project management due to a shortage in infrastructure services supply capability. Hence, it is of utmost importance that organisations understand that choosing a particular project over another is an opportunity cost – tying up the organisations resources. In order to devise constructive ways to bring direction, structure, and oversight to the process of project selection has led to the development of tools and techniques by researchers and practitioners. However, despite the development of various frameworks to assist in the appraisal and selection of government projects, failures are still being recorded with government projects. In developing countries, where frameworks are rarely used, the problems are compounded. To improve the situation, this study will investigate the current practice of construction project selection processes within the Nigeria public sector in order to inform theories of decision making from the perspective of developing nations and project management practice. Unlike other research around construction projects in Nigeria this research concentrate on factors influencing the selection process within the Nigeria public sector, which has received limited study. The authors report the findings of semi-structured interviews of top management in the Nigerian public sector and draw conclusions in terms of decision making extant theory and current practice. Preliminary results from the data analysis show that groups make project selection decisions and this forces sub-optimal decisions due to pressure on time, clashes of interest, lack of standardised framework for selecting projects, lack of accountability and poor leadership. Consequently, because decision maker is usually drawn from different fields, religious beliefs, ethnic group and with different languages. The choice of a project by an individual will be greatly influence by experience, political precedence than by realistic investigation as well as his understanding of the desired outcome of the project, in other words, the individual’s ideology and their level of fairness.

Keywords: factors influencing project selection, public sector construction project selection, projects portfolio selection, strategic decision-making

Procedia PDF Downloads 311
15768 Impact of Entrepreneurial Education on Entrepreneurial Success through Entrepreneurial Mindset, Professional Growth, and Innovation

Authors: Hummaira Qudsia Yousaf, Sidra Munawar

Abstract:

The study aims to examine in which way entrepreneurial education and attitude affect the entrepreneur’s success with the help of an entrepreneurial mindset, professional growth, and innovation. The target population was the entrepreneurs of successful startups in Pakistan. Data was gathered through an e-questionnaire, and 230 responses were analyzed using the partial least square structural equation modeling (PLS-SEM). Resultantly, entrepreneurial education is an essential component for the development of an entrepreneurial mindset. Also, an entrepreneurial attitude is responsible for the entrepreneurial mindset, which enhances professional growth. Moreover, the study highlighted that innovation is as necessary as mindset and education are for entrepreneurs. Furthermore, the findings confirmed that professional growth brings innovation to the success of entrepreneurs. This study provides proof of how entrepreneurial education and attitude influence pupils’ success in making entrepreneurs. This study extends the scope of education by incorporating predictors, such as professional growth, innovation, and entrepreneurial success. The study is unique due to the usage of innovative techniques for professional growth that ultimately bring career success.

Keywords: entrepreneurial education, entrepreneurial attitude, entrepreneurial mindset, professional growth, entrepreneurial success, innovation

Procedia PDF Downloads 94
15767 Factors Affecting the Success of Premarital Screening Service in Middle Eastern Islamic Countries

Authors: Wafa Al Jabri

Abstract:

Background: In Middle Eastern Islamic Countries (MEICs), there is a high prevalence of genetic blood disorders (GBDs), particularly sickle cell disease and thalassemia. The GBDs are considered a major public health concern, especially with the increase in affected populations along with the associated psychological, social, and financial cost of management. Despite the availability of premarital screening services (PSS) that aim to identify the asymptomatic carriers of GBDs and provide genetic counseling to couples in order toreduce the prevalence of these diseases; yet, the success rate of PSS is very low due to religious and socio-cultural concerns. Purpose: This paper aims to highlight the factors that affect the success of PSS in MEICs. Methods: A literature review of articles located in CINAHL, PubMed, SCOPUS, and MedLinewas carried out using the following terms: “premarital screening,” “success,” “effectiveness,” and “ genetic blood disorders.” Second, a hand search of the reference lists and Google searches were conducted to find studies that did not exist in the primary database searches. Only studies which are conducted in MEICs countries and published in the last five years were included. Studies that were not published in English were excluded. Results: Fourteen articles were included in the review. The results showed that PSS in most of the MEICs was successful in achieving its objective of identifying high-risk marriages; however, the service failed to meetitsultimate goal of reducing the prevalence of GBDs. Various factors seem to hinder the success of PSS, including poor public awareness, late timing of the screening, culture and social stigma, religious beliefs, availability of prenatal diagnosis and therapeutic abortion, emotional factors, and availability of genetic counseling services. However, poor public awareness, late timing of the screening, and unavailability of adequate counseling services were the most common barriers identified. Conclusion: Overcoming the identified barriers by providing effective health education programs, offering the screening test to young adults at an earlier stage, and tailoring the genetic counseling would be crucial steps to provide a framework for an effective PSS in MEICs.

Keywords: premarital screening, success, effectiveness, and genetic blood disorders

Procedia PDF Downloads 66
15766 Major Causes of Delay in Construction Projects

Authors: Y. Gholipour, E. Rezazadeh

Abstract:

Delay is one of the most serious and common problems of construction project that can affect project delivery unfavorably. This research presents the most important causes of delay in large dam projects based on a survey on some executed dam construction in Iran. In this survey a randomly selected samples of owners, consultants and contractors have been involved. The outcome of this survey revealed that scheduled payments, site management, shop drawing review process, unforeseen ground conditions and contractor experience as the most important factors affecting on delay in dam construction projects.

Keywords: delay, dam construction, project management, Iran

Procedia PDF Downloads 418
15765 Constructability Driven Engineering in Oil and Gas Projects

Authors: Srikanth Nagarajan, P. Parthasarathy, Frits Lagers

Abstract:

Lower crude oil prices increased the pressure on oil and gas projects. Being competitive becomes very important and critical for the success in any industry. Increase in size of the project multiplies the magnitude of the issue. Timely completion of projects within the budget and schedule is very important for any project to succeed. A simple idea makes a larger impact on the total cost of the plant. In this robust world, the phases of engineering right from licensing technology, feed, different phases of detail engineering, procurement and construction has been so much compressed that they overlap with each other. Hence constructability techniques have become very important. Here in this paper, the focus will be on how these techniques can be implemented and reduce cost with the help of a case study. Constructability is a process driven by the need to impact project’s construction phase resulting in improved project delivery, costs and schedule. In construction phase of one of our fast-track mega project, it was noticed that there was an opportunity to reduce significant amount of cost and schedule by implementing Constructability study processes. In this case study, the actual methodology adopted during engineering and construction and the way for doing it better by implementing Constructability techniques with collaborative engineering efforts will be explained.

Keywords: being competitive, collaborative engineering, constructability, cost reduction

Procedia PDF Downloads 385
15764 Quantitative Risk Analysis for Major Subsystems and Project Success of a Highthrouput Satellite

Authors: Ibrahim Isa Ali (Pantami), Abdu Jaafaru Bambale, Abimbola Alale, Danjuma Ibrahim Ndihgihdah, Muhammad Alkali, Adamu Idris Umar, Babadoko Dantala Mohammed, Moshood Kareem Olawole

Abstract:

This paper dwells on the risk management required for High throughput Satellite (HTS) project, and major subsystems that pertains to the improved performance and reliability of the spacecraft. The paper gives a clear picture of high‐throughput satellites (HTS) and the associated technologies with performances as they align and differ with the traditional geostationary orbit or Geosynchronous Equatorial Orbit (GEO) Communication Satellites. The paper also highlights critical subsystems and processes in project conceptualization and execution. The paper discusses the configuration of the payload. The need for optimization of resources for the HTS project and successful integration of critical subsystems for spacecraft requires implementation of risk analysis and mitigation from the preliminary design stage; Assembly, Integration and Test (AIT); Launch and in-orbit- Management stage.

Keywords: AIT, HTS, in-orbit management, optimization

Procedia PDF Downloads 65
15763 Factors Effecting the Success and Failure of Social Enterprise in Thailand

Authors: Jatuporn Juyjingam, Pitak Siriwong

Abstract:

This paper presents a study of factors effecting the success and failure of social enterprise in Thailand identifying communication as one of the criteria for measuring the social impact of social enterprise. The study focused on the communication driver of the SCALERS model. The research examines how communication is viewed in Thailand social enterprise. The research aims to determine how selected social enterprise uses communication in their operations. More specifically, the study aims to 1) describe the profile of social enterprise in Thailand, 2) identify the different roles of communication in the operation of social enterprise in Thailand, 3) determine Thailand social enterprise concept of communication. The study made use of the case study and cross case study research designs. For the profiling of the social enterprises, the case study was used. The researchers made use of the cross-case research design in identifying trends across the ten social enterprises and in determining the social entrepreneurs’ concept of communication. Key informant interviews were conducted with the heads or representatives of selected social enterprises, a three-part interview schedule was used to facilitate data gathering. The three parts included are 1) Profile of social enterprise in Thailand 2) How social enterprises apply communication in their operations 3) What is the key success in using communication among social enterprise in Thailand. This study is an exploratory research.

Keywords: communication, social entrepreneurship, social enterprise, sustainability development

Procedia PDF Downloads 472
15762 The Sustainability of Human Resource Planning for Construction Projects

Authors: Adegbenga Ashiru, Adebimpe L. Ashiru

Abstract:

The construction industry is considered to work by diversifying personnel. Hence managing human resource is an issue considered to be a highly challenging task. Nonetheless, HR planning for the construction project is a very critical aspect of managing human resource within an expanding nature of construction industry, and there are rising concerns over the failure of construction planning to achieve its goals in spite of the substantial resources allocated to it and as a result of different planning strategies. To justify the above statement, this research was carried out to examine the sustainability of HR planning for construction project. Based on the researcher’s experience, a quantitative approach was adopted that provided a broader understanding of the research and was analysed using descriptive statistics and inferential statistics. The Statistical Package for the Social Sciences (SPSS) was used to obtain the descriptive and inferential statistical analysis. However, research findings showed that literature sources agreed with varying challenges of HR planning on construction projects which were justified by empirical findings. Also, the paper identified four major factors and the key consideration for Project HR Planning (Organisation’s structure with right individuals at right positions and evaluation current resources) will lead to the efficient utilisation implementation of new HR Planning technique and tools for a construction project. Essentially the main reoccurring theme identified was that management of the construction organisations needs to look into the essential factors needed to be considered at the strategic level. Furthermore, leaders leading a construction project team should consider those essential factors needed at the operational level to clarify the numerous functions of HRM in the construction organisations and avoid inconsistencies among several practices on construction projects. The Sustainability of HR planning for construction project policy was indicated and recommendations were made for further future research.

Keywords: construction industry, HRM planning in construction, SHRM in construction, HR planning in construction

Procedia PDF Downloads 323
15761 Exploring the Role of Building Information Modeling for Delivering Successful Construction Projects

Authors: Muhammad Abu Bakar Tariq

Abstract:

Construction industry plays a crucial role in the progress of societies and economies. Furthermore, construction projects have social as well as economic implications, thus, their success/failure have wider impacts. However, the industry is lagging behind in terms of efficiency and productivity. Building Information Modeling (BIM) is recognized as a revolutionary development in Architecture, Engineering and Construction (AEC) industry. There are numerous interest groups around the world providing definitions of BIM, proponents describing its advantages and opponents identifying challenges/barriers regarding adoption of BIM. This research is aimed at to determine what actually BIM is, along with its potential role in delivering successful construction projects. The methodology is critical analysis of secondary data sources i.e. information present in public domain, which include peer reviewed journal articles, industry and government reports, conference papers, books, case studies etc. It is discovered that clash detection and visualization are two major advantages of BIM. Clash detection option identifies clashes among structural, architectural and MEP designs before construction actually commences, which subsequently saves time as well as cost and ensures quality during execution phase of a project. Visualization is a powerful tool that facilitates in rapid decision-making in addition to communication and coordination among stakeholders throughout project’s life cycle. By eliminating inconsistencies that consume time besides cost during actual construction, improving collaboration among stakeholders throughout project’s life cycle, BIM can play a positive role to achieve efficiency and productivity that consequently deliver successful construction projects.

Keywords: building information modeling, clash detection, construction project success, visualization

Procedia PDF Downloads 233
15760 The Factors that Effect to User Satisfaction of Information System in Bangkok Hospital

Authors: Somchai Buaroong

Abstract:

This research attempted to study information system success in dimensions of the user satisfaction level and to find the association between the independent factors of the user experiences, user knowledge, and user attitude. The study sample was selected using simple random sampling that comprised of 190 users who had used the Bangkok HIS. The data were reported from 165 questionnaires. The results found that the user satisfaction was at a moderate level, user satisfaction on the information quality and system quality was at a moderate level, while satisfaction on service quality was at a high level. The computer knowledge of the user was at a moderate level, and the user attitude was at a positive level. The participation of the user was at a low level and the participation in decision and in evaluation was at a low level; however participation in implementation and in benefit was at a moderate.

Keywords: information system success, hospital information system, user attitude, user satisfaction

Procedia PDF Downloads 292
15759 Association between Severe Acidemia before Endotracheal Intubation and the Lower First Attempt Intubation Success Rate

Authors: Keiko Naito, Y. Nakashima, S. Yamauchi, Y. Kunitani, Y. Ishigami, K. Numata, M. Mizobe, Y. Homma, J. Takahashi, T. Inoue, T. Shiga, H. Funakoshi

Abstract:

Background: A presence of severe acidemia, defined as pH < 7.2, is common during endotracheal intubation for critically ill patients in the emergency department (ED). Severe acidemia is widely recognized as a predisposing factor for intubation failure. However, it is unclear that acidemic condition itself actually makes endotracheal intubation more difficult. We aimed to evaluate if a presence of severe acidemia before intubation is associated with the lower first attempt intubation success rate in the ED. Methods: This is a retrospective observational cohort study in the ED of an urban hospital in Japan. The collected data included patient demographics, such as age, sex, and body mass index, presence of one or more factors of modified LEMON criteria for predicting difficult intubation, reasons for intubation, blood gas levels, airway equipment, intubation by emergency physician or not, and the use of the rapid sequence intubation technique. Those with any of the following were excluded from the analysis: (1) no blood gas drawn before intubation, (2) cardiopulmonary arrest, and (3) under 18 years of age. The primary outcome was the first attempt intubation success rates between a severe acidemic patients (SA) group and a non-severe acidemic patients (NA) group. Logistic regression analysis was used to test the first attempt success rates for intubations between those two groups. Results: Over 5 years, a total of 486 intubations were performed; 105 in the SA group and 381 in the NA group. The univariate analysis showed that the first attempt intubation success rate was lower in the SA group than in the NA group (71.4% vs 83.5%, p < 0.01). The multivariate logistic regression analysis identified that severe acidemia was significantly associated with the first attempt intubation failure (OR 1.9, 95% CI 1.03-3.68, p = 0.04). Conclusions: A presence of severe acidemia before endotracheal intubation lowers the first attempt intubation success rate in the ED.

Keywords: acidemia, airway management, endotracheal intubation, first-attempt intubation success rate

Procedia PDF Downloads 227
15758 Evaluation of the Families' Psychological Nature and the Relationship between the Academic Success According to the Students' Opinion

Authors: Sebnem Erismen, Ahmet Guneyli, Azize Ummanel

Abstract:

The purpose of this study is to explore the relationship between the students' academic success and families' psychological nature. The study based upon the quantitative research, and descriptive model is used. Relational descriptive model is used while evaluating the relation between families’ psychological nature and the academic success level of the students. A total of 523 secondary school students have participated the study. Personal Information Form, Family Structure Evaluation Form (FSEF) and School Reports were employed as the primary methods of data gathering. ANOVA and LSD Scheffe Test were used for analysing the data. Results of the study indicate that there are differences between the FSEF scores according to the students’ and teachers’ gender; however, no differences between the class level and seniority of the teachers were seen. Regarding the academic success of the students, it was seen that majority of them have high points. It was also seen that the academic success level of the students differentiates regarding to the classroom teachers’ gender and seniority. In conclusion, it was seen that there is a relation between the families’ psychological nature and students' academic success.

Keywords: families’ perceived psychological nature, academic success, families effect on the academic success, education

Procedia PDF Downloads 266
15757 Mental Vulnerability and Coping Strategies as a Factor for Academic Success for Pupils with Special Education Needs

Authors: T. Dubayova

Abstract:

Slovak, as well as foreign authors, believe that the influence of non-cognitive factors on a student's academic success or failure is unquestionable. The aim of this paper is to establish a link between the mental vulnerability and coping strategies used by 4th grade elementary school students in dealing with stressful situations and their academic performance, which was used as a simple quantitative indicator of academic success. The research sample consists of 320 students representing the standard population and 60 students with special education needs (SEN), who were assessed by the Strengths and Difficulties Questionnaire (SDQ) by their teachers and the Children’s Coping Strategies Checklist (CCSC-R1) filled in by themselves. Students with SEN recorded an extraordinarily high frequency of mental vulnerability (34.5 %) than students representing the standard population (7 %). The poorest academic performance of students with SEN was associated with the avoidance behavior displayed during stressful situations. Students of the standard population did not demonstrate this association. Students with SEN are more likely to display mental health problems than students of the standard population. This may be caused by the accumulation of and frequent exposure to situations that they perceive as stressful.

Keywords: coping, mental vulnerability, pupil with special education needs, school performance, school success

Procedia PDF Downloads 327
15756 Landslide Susceptibility Mapping: A Comparison between Logistic Regression and Multivariate Adaptive Regression Spline Models in the Municipality of Oudka, Northern of Morocco

Authors: S. Benchelha, H. C. Aoudjehane, M. Hakdaoui, R. El Hamdouni, H. Mansouri, T. Benchelha, M. Layelmam, M. Alaoui

Abstract:

The logistic regression (LR) and multivariate adaptive regression spline (MarSpline) are applied and verified for analysis of landslide susceptibility map in Oudka, Morocco, using geographical information system. From spatial database containing data such as landslide mapping, topography, soil, hydrology and lithology, the eight factors related to landslides such as elevation, slope, aspect, distance to streams, distance to road, distance to faults, lithology map and Normalized Difference Vegetation Index (NDVI) were calculated or extracted. Using these factors, landslide susceptibility indexes were calculated by the two mentioned methods. Before the calculation, this database was divided into two parts, the first for the formation of the model and the second for the validation. The results of the landslide susceptibility analysis were verified using success and prediction rates to evaluate the quality of these probabilistic models. The result of this verification was that the MarSpline model is the best model with a success rate (AUC = 0.963) and a prediction rate (AUC = 0.951) higher than the LR model (success rate AUC = 0.918, rate prediction AUC = 0.901).

Keywords: landslide susceptibility mapping, regression logistic, multivariate adaptive regression spline, Oudka, Taounate

Procedia PDF Downloads 164
15755 A Method to Identify the Critical Delay Factors for Building Maintenance Projects of Institutional Buildings: Case Study of Eastern India

Authors: Shankha Pratim Bhattacharya

Abstract:

In general building repair and renovation projects are minor in nature. It requires less attention as the primary cost involvement is relatively small. Although the building repair and maintenance projects look simple, it involves much complexity during execution. Many of the present research indicate that few uncertain situations are usually linked with maintenance projects. Those may not be read properly in the planning stage of the projects, and finally, lead to time overrun. Building repair and maintenance become essential and periodical after commissioning of the building. In Institutional buildings, the regular maintenance projects also include addition –alteration, modification activities. Increase in the student admission, new departments, and sections, new laboratories and workshops, up gradation of existing laboratories are very common in the institutional buildings in the developing nations like India. The project becomes very critical because it undergoes space problem, architectural design issues, structural modification, etc. One of the prime factors in the institutional building maintenance and modification project is the time constraint. Mostly it required being executed a specific non-work time period. The present research considered only the institutional buildings of the Eastern part of India to analyse the repair and maintenance project delay. A general survey was conducted among the technical institutes to find the causes and corresponding nature of construction delay factors. Five technical institutes are considered in the present study with repair, renovation, modification and extension type of projects. Construction delay factors are categorically subdivided into four groups namely, material, manpower (works), Contract and Site. The survey data are collected for the nature of delay responsible for a specific project and the absolute amount of delay through proposed and actual duration of work. In the first stage of the paper, a relative importance index (RII) is proposed for the delay factors. The occurrence of the delay factors is also judged by its frequency-severity nature. Finally, the delay factors are then rated and linked with the type of work. In the second stage, a regression analysis is executed to establish an empirical relationship between the actual time of a project and the percentage of delay. It also indicates the impact of the factors for delay responsibility. Ultimately, the present paper makes an effort to identify the critical delay factors for the repair and renovation type project in the Eastern Indian Institutional building.

Keywords: delay factor, institutional building, maintenance, relative importance index, regression analysis, repair

Procedia PDF Downloads 231
15754 Risk Assessment of Building Information Modelling Adoption in Construction Projects

Authors: Amirhossein Karamoozian, Desheng Wu, Behzad Abbasnejad

Abstract:

Building information modelling (BIM) is a new technology to enhance the efficiency of project management in the construction industry. In addition to the potential benefits of this useful technology, there are various risks and obstacles to applying it in construction projects. In this study, a decision making approach is presented for risk assessment in BIM adoption in construction projects. Various risk factors of exerting BIM during different phases of the project lifecycle are identified with the help of Delphi method, experts’ opinions and related literature. Afterward, Shannon’s entropy and Fuzzy TOPSIS (Technique for Order Preference by Similarity to Ideal Situation) are applied to derive priorities of the identified risk factors. Results indicated that lack of knowledge between professional engineers about workflows in BIM and conflict of opinions between different stakeholders are the risk factors with the highest priority.

Keywords: risk, BIM, fuzzy TOPSIS, construction projects

Procedia PDF Downloads 196
15753 The Role of Risk Management Practices in the Relationship between Risks Factors and Construction Project Performance

Authors: Ali Abdullah Albezaghi

Abstract:

This article aims to introduce a conceptual framework that can facilitate investigations concerning the role of risk management practices in the relationship between construction risks and the construction project's performance. This article is structured based on the extant literature; it reviews theoretical perspectives, highlights the gaps, and illustrates the significance of developing a framework of suggested relationships. Despite growing interest in the role of risks in construction project performance, previous studies have paid little attention to investigating the moderating role of risk management practices on the risk-performance link. This has left researchers and construction project managers with minimal information to explain the conditions under which risk management practices can reduce the impact of project-related risks and improve performance. In this context, this article suggests a viable research model with propositions that assess risk-performance relationships and discusses the potential moderating effects on the domain relationship. This paper adds to the risk management literature by focusing on risk variables that directly impact performance. Further, it also considers the moderating role of risk management practices in such relationships.

Keywords: risk management practices, external risks, internal risks, project risks, project performance

Procedia PDF Downloads 101
15752 Home Garden: A Food-Based Strategy to Achieve Sustainable Impact on Household Nutrition of Resource-Poor Families in Nepal

Authors: Purushottam P. Khatiwada, Bikash Paudel, Ram B. Rana, Parshuram Biswakarma, Roshan Pudasaini

Abstract:

Nepal has been putting its efforts into securing food and nutrition security for its citizens adopting different models and approaches. Home Garden approach, that integrates vegetables, fruits, small livestock, poultry along with other components like fish, honeybee, mushroom, spices for the promotion of nutritional security of resource-poor and disadvantaged groups was implemented during March 2009 to July 2013 spreading over 16 districts of Nepal covering 115 farmers groups, directly working with 3500 households. Sustained long-term impact of development interventions targeted to the resource-poor and disadvantaged groups has been a recurrent issue for donors, policymakers and practitioners alike. Considering the issue, a post-project evaluation was carried out in a selected project group (Dangibari of Jhapa) after four years of project completion in 2017 in order to evaluate the impact and understand the factors associated with its success. Qualitative information was collected through focus group discussion with group members and associated local institutions. For quantitative information, a quick survey was carried out to the same group members only selecting few indicators. The results are compared with the data obtained from the baseline study conducted by the project in March 2009. The impact of project intervention was evident as compared to the benchmarks established during the baseline, even after four years of project completion. The area under home garden is increased to 729 m² from 386 m² and average food self-sufficiency months increased to 10.22 from 8.11. Seven to eleven fruit species are maintained in the home gardens. An average number of vegetable species grown increased to 15.85 from 9.86. It has resulted in an increase in vegetables self-sufficient month to 8.74 from 4.74 and a huge increase in cash income NPR 6142.8 (USD 59.6) from NPR 385.7 (USD 3.9) from the sale of surplus vegetables. Coaching and mentoring including nutrition sensitization by the project staff at the beginning, inputs and technical support during the project implementation phase and projects effort on the institutional building of disadvantaged farmers were the key drivers of home garden sustainability and expansion. Specifically, package of home garden management trainings provided by the project staff, availability of group funds for buying inputs even after the project, uniting home garden group members in a cooperative, resource leveraging by local institutions through group lobbying, farmers innovations for maintaining home garden diversity and continuous backstopping support by few active members as local resource persons to other members are some additional factors contributing to sustain and/or improve the home garden status by the resource-poor and disadvantaged group.

Keywords: food-based nutrition, home garden, resource-poor and disadvantaged group, sustained impact

Procedia PDF Downloads 115