Search results for: public project
10139 Factors Responsible for Delays in the Execution of Adequately Funded Construction Projects
Authors: Edoghogho Ogbeifun, Charles Mbohwa, J. H. C. Pretorius
Abstract:
Several research report on the factors responsible for the delays in the completion of construction projects has identified the issue of funding as a critical factor; insufficient funding, low cash-flow or lack of funds. Indeed, adequate funding plays pivotal role in the effective execution of construction projects. In the last twenty years (or so), there has been increase in the funds available for infrastructure development in tertiary institution in Nigeria, especially, through the Tertiary Education Trust Fund. This funding body ensures that there is enough fund for each approved project, which is released in three stages during the life of the construction project. However, a random tour of many of the institutions reveals striking evidence of projects not delivered on schedule, to quality and sometime out rightly abandoned. This suggests, therefore, that there are other latent factors, responsible for project delays, that should be investigated. Thus, this research, a pilot scheme, is aimed at unearthing the possible reasons for the delays being experienced in the execution of construction projects for infrastructure upgrade in public tertiary institutions in Nigeria, funded by Tertiary Education Trust Fund. The multiple site case study of qualitative research was adopted. The respondents were the Directors of Physical Planning and the Directors of Works of four Nigerian Public Universities. The findings reveal that delays can be situated within three entities, namely, the funding body, the institutions and others. Therefore, the emerging factors have been classified as external factors (haven to do with the funding body), internal factors (these concern the operations within the institutions) and general factors. The outcome of this pilot exercise provides useful information to guide the Directors as they interact with the funding body as well as challenges themselves to address the loopholes in their internal operations.Keywords: delays, external factors, funding, general factors, Internal factors
Procedia PDF Downloads 15010138 A Literature Review on Sustainability Appraisal Methods for Highway Infrastructure Projects
Authors: S. Kaira, S. Mohamed, A. Rahman
Abstract:
Traditionally, highway infrastructure projects are initiated based on their economic benefits, thereafter environmental, social and governance impacts are addressed discretely for the selected project from a set of pre-determined alternatives. When opting for cost-benefit analysis (CBA), multi-criteria decision-making (MCDM) has been used as the default assessment tool. But this tool has been critiqued as it does not mimic the real-world dynamic environment. Indeed, it is because of the fact that public sector projects like highways have to experience intense exposure to dynamic environments. Therefore, it is essential to appreciate the impacts of various dynamic factors (factors that change or progress with the system) on project performance. Thus, this paper presents various sustainability assessment tools that have been globally developed to determine sustainability performance of infrastructure projects during the design, procurement and commissioning phase. Indeed, identification of the current gaps in the available assessment methods provides a potential to add prominent part of knowledge in the field of ‘road project development systems and procedures’ that are generally used by road agencies.Keywords: dynamic impact factors, micro and macro factors, sustainability assessment framework, sustainability performance
Procedia PDF Downloads 14310137 Analysis of Risks of Adopting Integrated Project Delivery: Application of Bayesian Theory
Abstract:
Integrated project delivery (IPD) is a project delivery method distinguished by a shared risk/rewards mechanism and multiparty agreement. IPD has drawn increasing attention from construction industry due to its reliability to deliver high-performing buildings. However, unavailable IPD specific insurance concerns the industry participants who are interested in IPD implementation. Even though the risk management capability can be enhanced using shared risk mechanism, some risks may occur when the partners do not commit themselves into the integrated practices in a desired manner. This is because the intense collaboration and close integration can not only create added value but bring new opportunistic behaviors and disputes. The study is aimed to investigate the risks of implementing IPD using Bayesian theory. IPD risk taxonomy is presented to identify all potential risks of implementing IPD and a risk network map is developed to capture the interdependencies between IPD risks. The conditional relations between risk occurrences and the impacts of IPD risks on project performances are evaluated and simulated based on Bayesian theory. The probability of project outcomes is predicted by simulation. In addition, it is found that some risks caused by integration are most possible occurred risks. This study can help the IPD project participants identify critical risks of adopting IPD to improve project performances. In addition, it is helpful to develop IPD specific insurance when the pertinent risks can be identified.Keywords: Bayesian theory, integrated project delivery, project risks, project performances
Procedia PDF Downloads 30310136 Designing a Method to Control and Determine the Financial Performance of the Real Cost Sub-System in the Information Management System of Construction Projects
Authors: Alireza Ghaffari, Hassan Saghi
Abstract:
Project management is more complex than managing the day-to-day affairs of an organization. When the project dimensions are broad and multiple projects have to be monitored in different locations, the integrated management becomes even more complicated. One of the main concerns of project managers is the integrated project management, which is mainly rooted in the lack of accurate and accessible information from different projects in various locations. The collection of dispersed information from various parts of the network, their integration and finally the selective reporting of this information is among the goals of integrated information systems. It can help resolve the main problem, which is bridging the information gap between executives and senior managers in the organization. Therefore, the main objective of this study is to design and implement an important subset of a project management information system in order to successfully control the cost of construction projects so that its results can be used to design raw software forms and proposed relationships between different project units for the collection of necessary information.Keywords: financial performance, cost subsystem, PMIS, project management
Procedia PDF Downloads 11410135 Public Art and Public Space in an Emerging Knowledge Economy: The Case of Doha
Authors: Grichting Anna, Al Sada Sara, Caccayam Angelica, Khan Urshi
Abstract:
The Qatar Museums Authority recently announced a series of public art initiatives in Doha with the purpose of 'bringing art out of the walls of the museum' to make it accessible to the public on a daily basis and to encourage discussion and debate. While the installation of sculptures in public spaces is not new in Doha, the practice of integrating art in public spaces and architectural projects is reaching a new dimension as internationally renowned artists – such as Damien Hirst and Richard Serra - are being commissioned to install their works in the public spaces and buildings of the city of Doha as well as in more remote desert locations. This research discusses the changing presence, role and context of public art in Doha, both from a historical and cultural overview, and the different forms and media as well as the typologies of urban and public spaces in which the art is installed. It examines the process of implementing site-specific artworks, looking at questions of scale, history, social meaning and formal aesthetics. The methodologies combine theoretical research on the understanding of public art and its role and placement in public space, as well as empirical research on contemporary public art projects in Doha, based on documentation and interviews and as well as site and context analysis of the urban or architectural spaces within which the art is situated. Surveys and interviews – using social media - in different segments of the contemporary Qatari society, including all nationalities and social groups, are used to measure and qualify the impacts and effects on the population.Keywords: public space, public art, urban design, knowledge economy
Procedia PDF Downloads 52710134 Connecting the Dots: Bridging Academia and National Community Partnerships When Delivering Healthy Relationships Programming
Authors: Nicole Vlasman, Karamjeet Dhillon
Abstract:
Over the past four years, the Healthy Relationships Program has been delivered in community organizations and schools across Canada. More than 240 groups have been facilitated in collaboration with 33 organizations. As a result, 2157 youth have been engaged in the programming. The purpose and scope of the Healthy Relationships Program are to offer sustainable, evidence-based skills through small group implementation to prevent violence and promote positive, healthy relationships in youth. The program development has included extensive networking at regional and national levels. The Healthy Relationships Program is currently being implemented, adapted, and researched within the Resilience and Inclusion through Strengthening and Enhancing Relationships (RISE-R) project. Alongside the project’s research objectives, the RISE-R team has worked to virtually share the ongoing findings of the project through a slow ontology approach. Slow ontology is a practice integrated into project systems and structures whereby slowing the pace and volume of outputs offers creative opportunities. Creative production reveals different layers of success and complements the project, the building blocks for sustainability. As a result of integrating a slow ontology approach, the RISE-R team has developed a Geographic Information System (GIS) that documents local landscapes through a Story Map feature, and more specifically, video installations. Video installations capture the cartography of space and place within the context of singular diverse community spaces (case studies). By documenting spaces via human connections, the project captures narratives, which further enhance the voices and faces of the community within the larger project scope. This GIS project aims to create a visual and interactive flow of information that complements the project's mixed-method research approach. Conclusively, creative project development in the form of a geographic information system can provide learning and engagement opportunities at many levels (i.e., within community organizations and educational spaces or with the general public). In each of these disconnected spaces, fragmented stories are connected through a visual display of project outputs. A slow ontology practice within the context of the RISE-R project documents activities on the fringes and within internal structures; primarily through documenting project successes as further contributions to the Centre for School Mental Health framework (philosophy, recruitment techniques, allocation of resources and time, and a shared commitment to evidence-based products).Keywords: community programming, geographic information system, project development, project management, qualitative, slow ontology
Procedia PDF Downloads 16010133 An Integrated Mixed-Integer Programming Model to Address Concurrent Project Scheduling and Material Ordering
Authors: Babak H. Tabrizi, Seyed Farid Ghaderi
Abstract:
Concurrent planning of project scheduling and material ordering can provide more flexibility to the project scheduling problem, as the project execution costs can be enhanced. Hence, the issue has been taken into account in this paper. To do so, a mixed-integer mathematical model is developed which considers the aforementioned flexibility, in addition to the materials quantity discount and space availability restrictions. Moreover, the activities duration has been treated as decision variables. Finally, the efficiency of the proposed model is tested by different instances. Additionally, the influence of the aforementioned parameters is investigated on the model performance.Keywords: material ordering, project scheduling, quantity discount, space availability
Procedia PDF Downloads 37310132 An Assessment on Awareness of Public Transport Policies for Persons with Disabilities in Three South-West Nigerian States
Authors: Julius A. Ademokoya, Grace C. Ilori
Abstract:
Extreme public transport difficulty for persons with disabilities (PWDs) has always been one of the challenges which these individuals experience on a daily basis in Nigeria. Private and public transport vehicles are not disability- friendly. Operators of public transport are often very intolerant of PWDs' conditions. Indeed, many Nigerians believe it is luxury for PWDs to engage in public transport. They are rarely expected to be seen in public much less going to places via public transport means. Initiatives by a few Nigerian states to develop and implement public transport policies for PWDs, therefore, were a huge relief for them and some concerned Nigerians. A few years ago, three southwest Nigerian states (Lagos, Ondo, and Ekiti) came up with some legislative welfare provisions (including transport programmes) for PWDs. This study, therefore, sought to ascertain levels of awareness and implementation of public policies among the PWDs and those expected to implement the policies. The study adopted a mixed method research. Findings across the three states showed that: (1) awareness of public policies among PWDs is low and (2) a considerable scope of the policies is not yet implemented. Recommendations are, therefore, made on how to improve on awareness and implementation of transport policies for PWDs in three south-west Nigerian states.Keywords: awareness, disability rights, implementation persons with disability, transport policies
Procedia PDF Downloads 18310131 Linking Sustainable Public Procurement and the Sustainable Development Goals Targets in Zambia: A Preliminary Investigation
Authors: Charles P. Mukumba, Kahilu K. Shakantu
Abstract:
Achieving the Sustainable Development Goals [SDGs] is a key to achieving transformational results that support Zambia’s development. Public procurement is an integral to the government’s mission to deliver goods and services, in a timely and economic manner beyond the value of money spent. This study explores the link between sustainable public procurement and the SDG targets in Zambia. And to validate the established links with the public sector procurement in Zambia. The study employed qualitative research using semi-structured interviews with 18 public procurement officials. The collected data was analysed using thematic analysis. The findings indicate that public procurement plays a fundamental role in achieving the sustainable development goals [SDGs] by helping to deliver core public services that support SDGs and also by systematising and co-delivering added value along the way. The study further established the importance of sustainable public procurement within the context of development. The interviews were limited to mainstream public sector procurement entities in Lusaka, Zambia. Sustainable public procurement actions have the potential to impact SDG goals. Promoting sustainable public procurement will enhance sustainable development and significantly improve supply chain that would benefit the economy, society and environment. Findings will inform policy-makers how to strategically design sustainable public procurement policy by attuning it to procuring entities objectives and priorities in order to contribute to the attainment of SDGs.Keywords: sustainable public procurement, sustainable development goals, target, Zambia
Procedia PDF Downloads 16310130 Public and Private Spaces Producing Social Connectedness in Traditional Environment: A Study on Old Medina District of Casablanca
Authors: Asmaa Sokrat, Aykut Karaman
Abstract:
Public and private spaces are major components of the morphology of the city. This research aims to study the interactions between public and private domains in terms of urban space in Casablanca. The research focuses on a general vision of a socio-spatial issue. It plans to identify the public, private, and transition (semi-public, semi-private) spaces as the constituent of the urban space. Moreover, the study investigates the link between public and private spaces with the social dimensions. Additionally, the research argues that the public space is a place of social interaction; as a reflection, this interaction is the intersection between urban space and social connectedness. Besides, social interaction can be the key to distinguishing between the public and private spheres. The methodological approach of the research is based on the literature review and field study. The article is targeting a case study on the old Medina of Casablanca, from daily use of the public and private spaces, the urban tissue, and the urban space types. In conclusion, the research exhibits that a public space could influence the privacy of the residents of a local urban area; thus, this privacy is inverted on the social interaction. This social interaction is the link between the urban space and social connectedness. Hence, this equation affects the typology of the private space.Keywords: public sphere, private sphere, social connectedness, old Medina of Casablanca
Procedia PDF Downloads 14410129 Failing Regeneration, Displacement, and Continued Consequences on Future Urban Planning Processes in Distressed Neighborhoods in Tehran
Authors: Razieh Rezabeigi Sani, Alireza Farahani, Mahdi Haghi
Abstract:
Displacement, local discontent, and forced exclusion have become prominent parts of urban regeneration activities in the Global North and South. This paper discusses the processes of massive displacement and neighborhood alteration as the consequences of a large-scale political/ideological placemaking project in central Tehran that transformed people's daily lives in surrounding neighborhoods. The conversion of Imam Hussein Square and connecting 17-Shahrivar Street to a pedestrian plaza in 2016 resulted in adjacent neighborhoods' physical, social, and economic degradation. The project has downgraded the economic and social characteristics of urban life in surrounding neighborhoods, commercialized residential land uses, displaced local people and businesses, and created unprecedented housing modes. This research has been conducted in two stages; first, after the project's implementation between 2017-2018, and second, when the street was reopened after local protests in 2021. In the first phase, 50+ on-site interviews were organized with planners, managers, and dwellers about the decision-making processes, design, and project implementation. We find that the project was based on the immediate political objectives and top-down power exertion of the local government in creating exclusive spaces (for religious ceremonies) without considering locals' knowledge, preferences, lifestyles, and everyday interactions. In the continued research in 2021, we utilized data gathered in facilitation activities and several meetings and interviews with local inhabitants and businesses to explore, design, and implement initiatives for bottom-up planning in these neighborhoods. The top-down and product-oriented (rather than process-oriented) planning, dependency on municipal financing rather than local partnerships, and lack of public participation proved to have continued effects on local participation. The paper concludes that urban regeneration projects must be based on the participation of different private/public actors, sustainable financial resources, and overall social and spatial analysis of the peripheral area before interventions.Keywords: displacement, urban regeneration, distressed neighborhoods, ideological placemaking, Tehran
Procedia PDF Downloads 10910128 Beyond Informality: Relocation from a Traditional Village 'Mit Oqbah' to Masaken El-Barageel and the Role of ‘Urf in Governing Built Environment, Egypt
Authors: Sarah Eldefrawi, Maike Didero
Abstract:
In Egypt, residents’ urban interventions (colloquially named A’hali’s interventions) are always tackled by government, scholars, and media as an encroachment (taeadiyat), chaotic (a’shwa’i) or informal (gheir mokanan) practices. This paper argues that those interventions cannot be simply described as an encroachment on public space or chaotic behaviour. We claim here that they are relevant to traditional governing methods (‘Urf) that were governing Arab cities for many decades. Through an in-depth field study conducted in a real estate public housing project in the city of Giza called 'Masaken El-Barageel', we traced the urban transformations demonstrated in private and public spaces. To understand those transformations, we used wide-range of qualitative research methods such as semi-guided and informal interviews, observations and mapping of the built environment and the newly added interventions. This study was as well strengthened through the contributions of the author in studying nine sectors emerging by Ahali in six districts in Great Cairo. The results of this study indicate that a culturally and socially sensitive framework has to be related to the individual actions toward the spatial and social structures as well as to culturally transmitted views and meanings connected with 'Urf'. The study could trace three crucial principals in ‘urf that influenced these interventions; the eliminating of harm (Al-Marafiq wa Man’ al-Darar), the appropriation of space (Haqq el-Intefa’) and public interest (maslaha a’ma). Our findings open the discussion for the (il) legitimate of a’hali governing methods in contemporary cities.Keywords: Urf, urban governance, public space, public housing, encroachments, chaotic, Egyptian cities
Procedia PDF Downloads 13710127 Benefits of Construction Management Implications and Processes by Projects Managers on Project Completion
Authors: Mamoon Mousa Atout
Abstract:
Projects managers in construction industry usually face a difficult organizational environment especially if the project is unique. The organization lacks the processes to practice construction management correctly, and the executive’s technical managers who have lack of experience in playing their role and responsibilities correctly. Project managers need to adopt best practices that allow them to do things effectively to make sure that the project can be delivered without any delay even though the executive’s technical managers should follow a certain process to avoid any factor might cause any delay during the project life cycle. The purpose of the paper is to examine the awareness level of projects managers about construction management processes, tools, techniques and implications to complete projects on time. The outcome and the results of the study are prepared based on the designed questionnaires and interviews conducted with many project managers. The method used in this paper is a quantitative study. A survey with a sample of 100 respondents was prepared and distributed in a construction company in Dubai, which includes nine questions to examine the level of their awareness. This research will also identify the necessary benefits of processes of construction management that has to be adopted by projects managers to mitigate the maximum potential problems which might cause any delay to the project life cycle.Keywords: construction management, project objectives, resource planing and scheduling, project completion
Procedia PDF Downloads 40710126 The Role of Group Size, Public Employees’ Wages and Control Corruption Institutions in a Game-Theoretical Model of Public Corruption
Authors: Pablo J. Valverde, Jaime E. Fernandez
Abstract:
This paper shows under which conditions public corruption can emerge. The theoretical model includes variables such as the public employee wage (w), a control corruption parameter (c), and the group size of interactions (GS) between clusters of public officers and contractors. The system behavior is analyzed using phase diagrams based on combinations of such parameters (c, w, GS). Numerical simulations are implemented in order to contrast analytic results based on Nash equilibria of the theoretical model. Major findings include the functional relationship between wages and network topology, which attempts to reduce the emergence of corrupt behavior.Keywords: public corruption, game theory, complex systems, Nash equilibrium.
Procedia PDF Downloads 24810125 Factors Contributing to Building Construction Project’s Cost Overrun in Jordan
Authors: Ghaleb Y. Abbasi, Sufyan Al-Mrayat
Abstract:
This study examined the contribution of thirty-six factors to building construction project’s cost overrun in Jordan. A questionnaire was distributed to a random sample of 350 stakeholders comprised of owners, consultants, and contractors, of which 285 responded. SPSS analysis was conducted to identify the top five causes of cost overrun, which were a large number of variation orders, inadequate quantities provided in the contract, misunderstanding of the project plan, incomplete bid documents, and choosing the lowest price in the contract bidding. There was an agreement among the study participants in ranking the factors contributing to cost overrun, which indicated that these factors were very commonly encountered in most construction projects in Jordan. Thus, it is crucial to enhance the collaboration among the different project stakeholders to understand the project’s objectives and set a realistic plan that takes into consideration all the factors that might influence the project cost, which might eventually prevent cost overrun.Keywords: cost, overrun, building construction projects, Jordan
Procedia PDF Downloads 11510124 Modeling Metrics for Monitoring Software Project Performance Based on the GQM Model
Authors: Mariayee Doraisamy, Suhaimi bin Ibrahim, Mohd Naz’ri Mahrin
Abstract:
There are several methods to monitor software projects and the objective for monitoring is to ensure that the software projects are developed and delivered successfully. A performance measurement is a method that is closely associated with monitoring and it can be scrutinized by looking at two important attributes which are efficiency and effectiveness both of which are factors that are important for the success of a software project. Consequently, a successful steering is achieved by monitoring and controlling a software project via the performance measurement criteria and metrics. Hence, this paper is aimed at identifying the performance measurement criteria and the metrics for monitoring the performance of a software project by using the Goal Question Metrics (GQM) approach. The GQM approach is utilized to ensure that the identified metrics are reliable and useful. These identified metrics are useful guidelines for project managers to monitor the performance of their software projects.Keywords: component, software project performance, goal question metrics, performance measurement criteria, metrics
Procedia PDF Downloads 36110123 Empirical Study of Correlation between the Cost Performance Index Stability and the Project Cost Forecast Accuracy in Construction Projects
Authors: Amin AminiKhafri, James M. Dawson-Edwards, Ryan M. Simpson, Simaan M. AbouRizk
Abstract:
Earned value management (EVM) has been introduced as an integrated method to combine schedule, budget, and work breakdown structure (WBS). EVM provides various indices to demonstrate project performance including the cost performance index (CPI). CPI is also used to forecast final project cost at completion based on the cost performance during the project execution. Knowing the final project cost during execution can initiate corrective actions, which can enhance project outputs. CPI, however, is not constant during the project, and calculating the final project cost using a variable index is an inaccurate and challenging task for practitioners. Since CPI is based on the cumulative progress values and because of the learning curve effect, CPI variation dampens and stabilizes as project progress. Although various definitions for the CPI stability have been proposed in literature, many scholars have agreed upon the definition that considers a project as stable if the CPI at 20% completion varies less than 0.1 from the final CPI. While 20% completion point is recognized as the stability point for military development projects, construction projects stability have not been studied. In the current study, an empirical study was first conducted using construction project data to determine the stability point for construction projects. Early findings have demonstrated that a majority of construction projects stabilize towards completion (i.e., after 70% completion point). To investigate the effect of CPI stability on cost forecast accuracy, the correlation between CPI stability and project cost at completion forecast accuracy was also investigated. It was determined that as projects progress closer towards completion, variation of the CPI decreases and final project cost forecast accuracy increases. Most projects were found to have 90% accuracy in the final cost forecast at 70% completion point, which is inlined with findings from the CPI stability findings. It can be concluded that early stabilization of the project CPI results in more accurate cost at completion forecasts.Keywords: cost performance index, earned value management, empirical study, final project cost
Procedia PDF Downloads 16010122 Time Management in the Public Sector in Nigeria
Authors: Sunny Ewankhiwimen Aigbomian
Abstract:
Time, is a scarce resource and in everything we do, time is required to accomplish any given task. The need for this presentation is predicated on the way majority of Nigerian especially in the public sector operators see “Time Management”. Time as resources cannot be regained if lost or managed badly. As a significant aspect of human life it should be handled with diligence and utmost seriousness if the public sector is to function as a coordinated entity. In our homes, private life and offices, we schedule different things to ensure that some things do not go the unexpected. When it comes to service delivery on the part of government, it ought to be more serious because government is all about effect and efficient service delivery and “Time” is a significant variable necessary to successful accomplishment. The need for Nigerian government to re-examine time management in her public sector with a view of repositioning the sector to be able to compete well with other public sectors in the world. The peculiarity of Time management in Public Sector in Nigerian context as examined and some useful recommendations of immerse assistance proffered.Keywords: Nigeria, public sector, time management, task
Procedia PDF Downloads 10410121 Expanding Access and Deepening Engagement: Building an Open Source Digital Platform for Restoration-Based Stem Education in the Largest Public-School System in the United States
Authors: Lauren B. Birney
Abstract:
This project focuses upon the expansion of the existing "Curriculum and Community Enterprise for the Restoration of New York Harbor in New York City Public Schools" NSF EHR DRL 1440869, NSF EHR DRL 1839656 and NSF EHR DRL 1759006. This project is recognized locally as “Curriculum and Community Enterprise for Restoration Science,” or CCERS. CCERS is a comprehensive model of ecological restoration-based STEM education for urban public-school students. Following an accelerated rollout, CCERS is now being implemented in 120+ Title 1 funded NYC Department of Education middle schools, led by two cohorts of 250 teachers, serving more than 11,000 students in total. Initial results and baseline data suggest that the CCERS model, with the Billion Oyster Project (BOP) as its local restoration ecology-based STEM curriculum, is having profound impacts on students, teachers, school leaders, and the broader community of CCERS participants and stakeholders. Students and teachers report being receptive to the CCERS model and deeply engaged in the initial phase of curriculum development, citizen science data collection, and student-centered, problem-based STEM learning. The BOP CCERS Digital Platform will serve as the central technology hub for all research, data, data analysis, resources, materials and student data to promote global interactions between communities, Research conducted included qualitative and quantitative data analysis. We continue to work internally on making edits and changes to accommodate a dynamic society. The STEM Collaboratory NYC® at Pace University New York City continues to act as the prime institution for the BOP CCERS project since the project’s inception in 2014. The project continues to strive to provide opportunities in STEM for underrepresented and underserved populations in New York City. The replicable model serves as an opportunity for other entities to create this type of collaboration within their own communities and ignite a community to come together and address the notable issue. Providing opportunities for young students to engage in community initiatives allows for a more cohesive set of stakeholders, ability for young people to network and provide additional resources for those students in need of additional support, resources and structure. The project has planted more than 47 million oysters across 12 acres and 15 reef sites, with the help of more than 8,000 students and 10,000 volunteers. Additional enhancements and features on the BOP CCERS Digital Platform will continue over the next three years through funding provided by the National Science Foundation, NSF DRL EHR 1759006/1839656 Principal Investigator Dr. Lauren Birney, Professor Pace University. Early results from the data indicate that the new version of the Platform is creating traction both nationally and internationally among community stakeholders and constituents. This project continues to focus on new collaborative partners that will support underrepresented students in STEM Education. The advanced Digital Platform will allow for us connect with other countries and networks on a larger Global scale.Keywords: STEM education, environmental restoration science, technology, citizen science
Procedia PDF Downloads 9110120 Collaborative Research between Malaysian and Australian Universities on Learning Analytics: Challenges and Strategies
Authors: Z. Tasir, S. N. Kew, D. West, Z. Abdullah, D. Toohey
Abstract:
Research on Learning Analytics is progressively developing in the higher education field by concentrating on the process of students' learning. Therefore, a research project between Malaysian and Australian Universities was initiated in 2015 to look at the use of Learning Analytics to support the development of teaching practice. The focal point of this article is to discuss and share the experiences of Malaysian and Australian universities in the process of developing the collaborative research on Learning Analytics. Three aspects of this will be discussed: 1) Establishing an international research project and team members, 2) cross-cultural understandings, and 3) ways of working in relation to the practicalities of the project. This article is intended to benefit other researchers by highlighting the challenges as well as the strategies used in this project to ensure such collaborative research succeeds.Keywords: academic research project, collaborative research, cross-cultural understanding, international research project
Procedia PDF Downloads 24610119 An Investigation on the Effect of Railway Track Elevation Project in Taichung Based on the Carbon Emissions
Authors: Kuo-Wei Hsu, Jen-Chih, Chao, Pei-Chen, Wu
Abstract:
With the rapid development of global economy, the increasing population, the highly industrialization, greenhouse gas emission and the ozone layer damage, the Global Warming happens. Facing the impact of global warming, the issue of “green transportation” began to be valued and promoted in each city. Taichung has been elected as the model of low-carbon city in Taiwan. To comply with international trends and the government policy, we tried to promote the energy saving and carbon reduction to create a “low-carbon Taichung with green life and eco-friendly economy”. To cooperate with the “green transportation” project, Taichung has promoted a number of public transports constructions and traffic policy in recent years like BRT, MRT, etc. The elevated railway is one of those important constructions. Cooperating with the green transport policy, elevated railway could help to achieve the carbon reduction for this low-carbon city. The current studies of the carbon emissions associated with railways and roads are focusing on the assessment on paving material, institutional policy and economic benefit. Except for changing the mode of transportation, elevated railways/roads also create space under the bridge. However, there is no research about the carbon emissions of the space underneath the elevated section up until now. This study investigated the effect of railway track elevation project in Taichung based on the carbon emissions and the factors that affect carbon emissions by research related theory and literature analysis. This study concluded that : railway track elevation increased the public transit, the bike lanes, the green areas and walking spaces. In the other hand it reduced the traffic congestions, the use of motorcycles as well as automobiles for carbon emissions.Keywords: low-carbon city, green transportation, carbon emissions, Taichung, Taiwan
Procedia PDF Downloads 53910118 Inclusive Business and Its Contribution to Farmers Wellbeing in Arsi Ethiopia: Empirical Evidence
Authors: Senait G. Worku, Ellen Mangnus
Abstract:
Inclusive business models which integrates low-income people with companies value chain in a commercially viable way has gained momentum for the perceived potential to contribute to poverty alleviation and food security in developing countries. This article investigates the impact of Community Revenue Enhancement through Technology Extension (CREATE) project of Heineken brewery on smallholder farmers’ wellbeing in Arsi zone Oromia regional state of Ethiopia. CREATE is a Public-Private Partnership (PPP) between Ministry of Foreign Affairs of the Netherlands and Heineken N.V. which source malt barely from smallholder farmers in three zones of Oromia. The study assessed the impact of CREATE on malt barley productivity, food security and new asset purchase in Arsi zone by comparing households that participate in the project with non-participating households using propensity score matching method. The finding indicated that households that participated in the CREATE project had higher malt barley productivity and purchased more new assets than non-participating households. However, there is no significant difference on food security status of participating and non-participating households indicating that the project has a profound impact on asset accumulation than on food security improvement.Keywords: inclusive business, malt barley, propensity score matching, wellbeing
Procedia PDF Downloads 16010117 Knowledge Management Challenges within Traditional Procurement System
Authors: M. Takhtravanchi, C. Pathirage
Abstract:
In the construction industry, project members are conveyor of project knowledge which is, often, not managed properly to be used in future projects. As construction projects are temporary and unique, project members are willing to be recruited once a project is completed. Therefore, poor management of knowledge across construction projects will lead to a considerable amount of knowledge loss; the ignoring of which would be detrimental to project performance. This issue is more prominent in projects undertaken through the traditional procurement system, as this system does not incentives project members for integration. Thus, disputes exist between the design and construction phases based on the poor management of knowledge between those two phases. This paper aims to highlight the challenges of the knowledge management that exists within the traditional procurement system. Expert interviews were conducted and challenges were identified and analysed by the Interpretive Structural Modelling (ISM) approach in order to summarise the relationships among them. Two identified key challenges are the Culture of an Organisation and Knowledge Management Policies. A knowledge of the challenges and their relationships will help project manager and stakeholders to have a better understanding of the importance of knowledge management.Keywords: challenges, construction industry, knowledge management, traditional procurement system
Procedia PDF Downloads 43710116 Decision Making during the Project Management Life Cycle of Infrastructure Projects
Authors: Karrar Raoof Kareem Kamoona, Enas Fathi Taher AlHares, Zeynep Isik
Abstract:
The various disciplines in the construction industry and the co-existence of the people in the various disciplines are what builds well-developed, closely-knit interpersonal skills at various hierarchical levels thus leading to a varied way of leadership. The varied decision making aspects during the lifecycle of a project include: autocratic, participatory and last but not least, free-rein. We can classify some of the decision makers in the construction industry in a hierarchical manner as follows: project executive, project manager, superintendent, office engineer and finally the field engineer. This survey looked at how decisions are made during the construction period by the key stakeholders in the project. From the paper it is evident that the three decision making aspects can be used at different times or at times together in order to bring out the best leadership decision. A blend of different leadership styles should be used to enhance the success rate during the project lifecycle.Keywords: leadership style, construction, decision-making, built environment
Procedia PDF Downloads 36410115 Analysis of the Interference from Risk-Determining Factors of Cooperative and Conventional Construction Contracts
Authors: E. Harrer, M. Mauerhofer, T. Werginz
Abstract:
As a result of intensive competition, the building sector is suffering from a high degree of rivalry. Furthermore, there can be observed an unbalanced distribution of project risks. Clients are aimed to shift their own risks into the sphere of the constructors or planners. The consequence of this is that the number of conflicts between the involved parties is inordinately high or even increasing; an alternative approach to counter on that developments are cooperative project forms in the construction sector. This research compares conventional contract models and models with partnering agreements to examine the influence on project risks by an early integration of the involved parties. The goal is to show up deviations in different project stages from the design phase to the project transfer phase. These deviations are evaluated by a survey of experts from the three spheres: clients, contractors and planners. By rating the influence of the participants on specific risk factors it is possible to identify factors which are relevant for a smooth project execution.Keywords: building projects, contract models, partnering, project risks
Procedia PDF Downloads 27810114 The Organizational Structure of the Special Purpose Vehicle in Public-Private Partnership Projects
Authors: Samuel Capintero
Abstract:
Public-private partnerships (PPP) arrangements have emerged all around the world as a response to infrastructure deficits and the need to refurbish existing infrastructure. During the last decade, the Spanish companies have dominated the international market of PPP projects in Latin America, Western Europe and North America, particularly in the transportation sector. Arguably, one of the most influential factors has been the organizational structure of the concessionaire implemented by the Spanish consortiums. The model followed by most Spanish groups has been a bundled model, where the concessionaire integrates the functions of concessionaire, construction and operator companies. This paper examines this model and explores how it has provided the Spanish companies with a comparative advantage in the international PPP market.Keywords: PPP, project management, concessionaire, concession, infrastructure, construction
Procedia PDF Downloads 39210113 Cross-Cultural Analysis of the Impact of Project Atmosphere on Project Success and Failure
Authors: Omer Livvarcin, Mary Kay Park, Michael Miles
Abstract:
The current literature includes a few studies that mention the impact of relations between teams, the business environment, and experiences from previous projects. There is, however, limited research that treats the phenomenon of project atmosphere (PA) as a whole. This is especially true of research identifying parameters and sub-parameters, which allow project management (PM) teams to build a project culture that ultimately imbues project success. This study’s findings identify a number of key project atmosphere parameters and sub-parameters that affect project management success. One key parameter identified in the study is a cluster related to cultural concurrence, including artifacts such as policies and mores, values, perceptions, and assumptions. A second cluster centers on motivational concurrence, including such elements as project goals and team-member expectations, moods, morale, motivation, and organizational support. A third parameter cluster relates to experiential concurrence, with a focus on project and organizational memory, previous internal PM experience, and external environmental PM history and experience). A final cluster of parameters is comprised of those falling in the area of relational concurrence, including inter/intragroup relationships, role conflicts, and trust. International and intercultural project management data was collected and analyzed from the following countries: Canada, China, Nigeria, South Korea and Turkey. The cross-cultural nature of the data set suggests increased confidence that the findings will be generalizable across cultures and thus applicable for future international project management success. The intent of the identification of project atmosphere as a critical project management element is that a clear understanding of the dynamics of its sub-parameters upon projects may significantly improve the odds of success of future international and intercultural projects.Keywords: project management, project atmosphere, cultural concurrence, motivational concurrence, relational concurrence
Procedia PDF Downloads 32010112 Contemporary Challenges in Public Relations in the Context of Globalization
Authors: Marine Kobalava, Eter Narimanishvili, Nino Grigolaia
Abstract:
The paper analyzes the contemporary problems of public relations in Georgia. The approaches to public attitudes towards the relationship with the population of the country are studied on a global scale, the importance of forming the concept of public relations in Georgia in terms of globalization is justified. The basic components of public relations are characterized by the RACE system, namely analyzing research, action, communication, evaluation. The main challenges of public relations are identified in the research process; taking into consideration the scope of globalization, the influence of social, economic, and political changes in Georgia on PR development are identified. The article discusses the public relations as the strategic management function that facilitates communication with the society, recognition of public interests, and their prediction. In addition, the feminization of the sector is considered to be the most important achievement of public relations in the modern world. The conclusion is that the feminization indicator of the field is an unconditional increase in the employment rates of women. In the paper, the problems of globalization and public relations in the industrial countries are studied, the directions of improvement of public relations with the background of peculiarities of different countries and globalization process are proposed. Public relations under globalization are assessed in accordance with the theory of benefits and requirements, and the requirements are classified according to informational, self-identification, integration, social interaction, and other types of signs. In the article, conclusions on the current challenges of public relations in Georgia are made, and the recommendations for their solution, taking into consideration globalization processes in the world, are proposed.Keywords: public relations, globalization, RACE system, public relationship concept, feminization
Procedia PDF Downloads 17710111 Walking the Tightrope: Balancing Project Governance, Complexity, and Servant Leadership for Megaproject Success
Authors: Muhammad Shoaib Iqbal, Shih Ping Ho
Abstract:
Megaprojects are large-scale, complex ventures with significant financial investments, numerous stakeholders, and extended timelines, requiring meticulous management for successful completion. This study explores the interplay between project governance, project complexity, and servant leadership and their combined effects on project success, specifically within the context of Pakistani megaprojects. The primary objectives are to examine the direct impact of project governance on project success, understand the negative influence of project complexity, assess the positive role of servant leadership, explore the moderating effect of servant leadership on the relationship between governance and success, and investigate how servant leadership mitigates the adverse effects of complexity. Using a quantitative approach, survey data were collected from project managers and team members involved in Pakistani megaprojects. Using a Comprehensive empirical model, 257 Valid responses were analyzed. Multiple regression analysis tested the hypothesized relationships and interaction effects using PLS-SEM. Findings reveal that project governance significantly enhances project success, emphasizing the need for robust governance structures. Conversely, project complexity negatively impacts success, highlighting the challenges of managing complex projects. Servant leadership significantly boosts project success by prioritizing team support and empowerment. Although the interaction between governance and servant leadership is not significant, suggesting no significant change in project success, servant leadership significantly mitigates the negative effects of project complexity, enhancing team resilience and adaptability. These results underscore the necessity for a balanced approach integrating strong governance with flexible, supportive leadership. The study offers valuable insights for practitioners, recommending adaptive governance frameworks and promoting servant leadership to improve the management and success rates of megaprojects. This research contributes to the broader understanding of effective project management practices in complex environments.Keywords: project governance, project complexity, servant leadership, project success, megaprojects, Pakistan
Procedia PDF Downloads 4310110 Promoting Innovation Pedagogy in a Capacity Building Project in Indonesia
Authors: Juha Kettunen
Abstract:
This study presents a project that tests and adjusts active European learning and teaching methods in Indonesian universities to increase their external impact on enterprises and other organizations; it also assesses the implementation of the Erasmus+ projects funded by the European Union. The project is based on the approach of innovation pedagogy that responds to regional development needs and integrates applied research and development projects into education to create capabilities for students to participate in development work after graduation. The assessment of the Erasmus+ project resulted in many improvements that can be made to achieve higher quality and innovativeness. The results of this study are useful for those who want to improve the applied research and development projects of higher education institutions.Keywords: higher education, innovations, social network, project management
Procedia PDF Downloads 289