Search results for: site management.
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 11168

Search results for: site management.

11048 Probabilistic Model for Evaluating Seismic Soil Liquefaction Based on Energy Approach

Authors: Hamid Rostami, Ali Fallah Yeznabad, Mohammad H. Baziar

Abstract:

The energy-based method for evaluating seismic soil liquefaction has two main sections. First is the demand energy, which is dissipated energy of earthquake at a site, and second is the capacity energy as a representation of soil resistance against liquefaction hazard. In this study, using a statistical analysis of recorded data by 14 down-hole array sites in California, an empirical equation was developed to estimate the demand energy at sites. Because determination of capacity energy at a site needs to calculate several site calibration factors, which are obtained by experimental tests, in this study the standard penetration test (SPT) N-value was assumed as an alternative to the capacity energy at a site. Based on this assumption, the empirical equation was employed to calculate the demand energy for 193 liquefied and no-liquefied sites and then these amounts were plotted versus the corresponding SPT numbers for all sites. Subsequently, a discrimination analysis was employed to determine the equations of several boundary curves for various liquefaction likelihoods. Finally, a comparison was made between the probabilistic model and the commonly used stress method. As a conclusion, the results clearly showed that energy-based method can be more reliable than conventional stress-based method in evaluation of liquefaction occurrence.

Keywords: energy demand, liquefaction, probabilistic analysis, SPT number

Procedia PDF Downloads 342
11047 Beyond the White Cube: A Study on the Site Specific Curatorial Practice of Kochi Muziris Biennale

Authors: Girish Chandran, Milu Tigi

Abstract:

Brian O'Doherty's seminal essay, Inside the white Cube theorized and named the dominant mode of display and exhibition of Modern Art museums. Ever since the advent of Biennales and other site-specific public art projects we have seen a departure from the white cube mode of exhibition. The physicality, materiality and context within which an artwork is framed has a role in the production of meaning of public art. Equally, artworks contribute to the meaning and identity of a place. This to and fro relationship between the site and artwork and its influence on the sense of place and production of meaning is being explored in this paper in the context of Kochi Muziris Biennale (KMB). Known as the Peoples biennale with over 5 lakh visitors, it is India's first Biennale and its largest art exhibition of contemporary art. The paper employs place theory and contemporary curatorial theories to present the case. The KMB has an interesting mix of exhibition spaces which includes existing galleries and halls, site-specific projects in public spaces, infill developments and adaptive reuse of heritage and other unused architecture. The biennale was envisioned as an event connecting to the history, socio-political peculiarities of the cultural landscape of Kerala and more specifically Kochi. The paper explains the role of spatial elements in forming a curatorial narrative connected to the above mentioned ambitions.The site-specific nature of exhibition and its use of unused architecture helps in the formation of exhibition spaces unique in type and materiality. The paper argues how this helps in the creation of an 'archeology of the place'. The research elucidates how a composite nature of experience helps connect with the thematic ambitions of the Biennale and how it brings about an aesthetics distinct to KMB.

Keywords: public art, curatorial practice, architecture, place, contemporary art, site specificity

Procedia PDF Downloads 134
11046 Assessment on Communication Students’ Internship Performances from the Employers’ Perspective

Authors: Yesuselvi Manickam, Tan Soon Chin

Abstract:

Internship is a supervised and structured learning experience related to one’s field of study or career goal. Internship allows students to obtain work experience and the opportunity to apply skills learned during university. Internship is a valuable learning experience for students; however, literature on employer assessment is scarce on Malaysian student’s internship experience. This study focuses on employer’s perspective on student’s performances during their three months of internship. The results are based on the descriptive analysis of 45 sets of question gathered from the on-site supervisors of the interns. The survey of 45 on-site supervisor’s feedback was collected through postal mail. It was found that, interns have not met their on-site supervisor’s expectations in many areas. The significance of this study is employer’s assessment on the internship shall be used as feedback to improve on ways how to prepare students for their internship and employments in future.

Keywords: employers perspective, internship, structured learning, student’s performances

Procedia PDF Downloads 276
11045 Seismic Soil-Pile Interaction Considering Nonlinear Soil Column Behavior in Saturated and Dry Soil Conditions

Authors: Mohammad Moeini, Mehrdad Ghyabi, Kiarash Mohtasham Dolatshahi

Abstract:

This paper investigates seismic soil-pile interaction using the Beam on Nonlinear Winkler Foundation (BNWF) approach. Three soil types are considered to cover all the possible responses, as well as nonlinear site response analysis using finite element method in OpenSees platform. Excitations at each elevation that are output of the site response analysis are used as the input excitation to the soil pile system implementing multi-support excitation method. Spectral intensities of acceleration show that the extent of the response in sand is more severe than that of clay, in addition, increasing the PGA of ground strong motion will affect the sandy soil more, in comparison with clayey medium, which is an indicator of the sensitivity of soil-pile systems in sandy soil.

Keywords: BNWF method, multi-support excitation, nonlinear site response analysis, seismic soil-pile interaction

Procedia PDF Downloads 367
11044 Hierarchy and Weight of Influence Factors on Labor Productivity in the Construction Industry of the Nepal

Authors: Shraddha Palikhe, Sunkuk Kim

Abstract:

The construction industry is the most labor intensive in Nepal. It is obvious that construction is a major sector and any productivity enhancement activity in this sector will have a positive impact in the overall improvement of the national economy. Previous studies have stated that Nepal has poor labor productivity among other south Asian countries. Though considerable research has been done on productivity factors in other countries, no study has addressed labor productivity issues in Nepal. Therefore, the main objective of this study is to identify and hierarchy the influence factors for poor labor productivity. In this study, a questionnaire approach is chosen as a method of the survey from thirty experts involved in the construction industry, such as Architects, Civil Engineers, Project Engineers and Site Engineers. A survey was conducted in Nepal, to identify the major factors impacting construction labor productivity. Analytic Hierarchy Process (AHP) analysis method was used to understand the underlying relationships among the factors, categorized into five groups, namely (1) Labor-management group; (2) Material management group; (3) Human labor group; (4) Technological group and (5) External group and was divided into 33 subfactors. AHP was used to establish the relative importance of the criteria. The AHP makes pairwise comparisons of relative importance between hierarchy elements grouped by labor productivity decision criteria. Respondents were asked to answer based on their experience of construction works. On the basis of the respondent’s response, weight of all the factors were calculated and ranked it. The AHP results were tabulated based on weight and ranking of influence factors. AHP model consists of five main criteria and 33 sub-criteria. Among five main criteria, the scenario assigns a weight of highest influential factor i.e. 26.15% to human labor group followed by 23.01% to technological group, 22.97% to labor management group, 17.61% material management group and 10.25% to external group. While in 33 sub-criteria, the most influential factor for poor productivity in Nepal are lack of monetary incentive (20.53%) for human labor group, unsafe working condition (17.55%) for technological group, lack of leadership (18.43%) for labor management group, unavailability of tools at site (25.03%) for material management group and strikes (35.01%) for external group. The results show that AHP model associated criteria are helpful to predict the current situation of labor productivity. It is essential to consider these influence factors to improve the labor productivity in the construction industry of Nepal.

Keywords: construction, hierarchical analysis, influence factors, labor productivity

Procedia PDF Downloads 378
11043 The UNESCO Management Plan for Urban Heritage Sites: A Critical Review of Olinda and Porto, in Brazil and Portugal

Authors: Francine Morales Tavares, Jose Alberto Rio Fernandes

Abstract:

The expanding concept of Heritage and the increased relevance of how heritage places relate to their surroundings is associated with an important shift in public heritage policies and how they consider the development of cities and communities, with an increasingly relevant role of management. Within the current discussions, management plans, mandatory since the year 2005 in areas classified by UNESCO as World Heritage, it is a tool for the reconciliation of cultural heritage demands with the needs of multiple users of a certain area, being especially critical in the case of urban areas with intense touristic pressure. Considering the transformations of the heritage policy management model, this paper discusses the practices on the integration of cultural heritage in urban policies through indicators which were selected from resource manual 'Managing Cultural World Heritage (2013)' and analyzed two case studies: The Management Plan of the Historic Centre of Porto (Portugal) and The Management Plan for the Historic Site of Olinda (Brazil). The empirical evidence concluded that for the historic centre of Porto the increase of tourism is the main aim driver in the management plan, with positive and negative aspects on the heritage management point of view, unlike Olinda, where the plan for the development of local urban policies was identified as essential. Plans also differ in form, content and process but coincide on being unaligned with committed local political leaders’ agendas, with the consequent misunderstandings between theory and practice, planning and management, and critically missing in the field integration of urban policies. Therefore, more debate about management plans, more efficient tools and also, appropriate methodologies to correlate cultural heritage and urban public policy are still lacking.

Keywords: world heritage, management plan, planning, urban policies

Procedia PDF Downloads 125
11042 The Fishery and Electricity Symbiosis Environment and Social Inspection in Taiwan: The Kaohsiung City Example

Authors: Bing-Shun Huang, Hung-Ju Chiu, Wen-Kai Hsieh, Hsiu-Chuan Lin, Ming-Lung Hung

Abstract:

Taiwan's solar photovoltaic target in 2025 is 20 GW, of which the fish-electricity symbiosis target is 4 GW. In the future, many solar photovoltaic installations may cause local environmental or social impacts. Therefore, the Taiwan government inspects the fish-electricity symbiosis to reduce the impact of solar photovoltaics on the local environment or society. This stuy takes the symbiosis of fishery and electricity in Kaohsiung City as an example to explore Taiwan's environmental and social inspection practices. It mainly analyzes the two aspects of environmental ecology and social economy. The results show that the environmental inspection is mainly through site surveys, ecological information mapping, on-site interviews, and public consultation meetings. Social inspection mainly includes document analysis, on-site interviews, site surveys, expert discussions, and public consultations to identify possible local problems. Although the government had recognized the local issues, the future status may also change. It is recommended that future photoelectric companies should reconfirm the current situation of development sites when applying for the installation and propose countermeasures to solve the problem.

Keywords: taiwan, fish-electricity symbiosis, environment, society, inspection

Procedia PDF Downloads 171
11041 Environmental Decision Making Model for Assessing On-Site Performances of Building Subcontractors

Authors: Buket Metin

Abstract:

Buildings cause a variety of loads on the environment due to activities performed at each stage of the building life cycle. Construction is the first stage that affects both the natural and built environments at different steps of the process, which can be defined as transportation of materials within the construction site, formation and preparation of materials on-site and the application of materials to realize the building subsystems. All of these steps require the use of technology, which varies based on the facilities that contractors and subcontractors have. Hence, environmental consequences of the construction process should be tackled by focusing on construction technology options used in every step of the process. This paper presents an environmental decision-making model for assessing on-site performances of subcontractors based on the construction technology options which they can supply. First, construction technologies, which constitute information, tools and methods, are classified. Then, environmental performance criteria are set forth related to resource consumption, ecosystem quality, and human health issues. Finally, the model is developed based on the relationships between the construction technology components and the environmental performance criteria. The Fuzzy Analytical Hierarchy Process (FAHP) method is used for weighting the environmental performance criteria according to environmental priorities of decision-maker(s), while the Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) method is used for ranking on-site environmental performances of subcontractors using quantitative data related to the construction technology components. Thus, the model aims to provide an insight to decision-maker(s) about the environmental consequences of the construction process and to provide an opportunity to improve the overall environmental performance of construction sites.

Keywords: construction process, construction technology, decision making, environmental performance, subcontractor

Procedia PDF Downloads 218
11040 Area Exclosure as a Government Strategy to Restore Woody Plant Species Diversity: Case Study in Southern Ethiopia

Authors: Tsegaw Abebe, Temesgen Abebe

Abstract:

Land degradation is one of a serious environmental challenge in Ethiopia and is one of the major underlying causes for declining agricultural productivity. The Ethiopia government realized the significance of environmental restoration specifically on deforested and degraded land after the 1973 and 1984/85 major famines that struck the country. Among the various conservation strategies, the establishment of area exclosures have been regarded as an effective response to halt and reverse the problems of land degradation. There are limited studies in Ethiopia dealing how the conversion of free grazing lands and degraded lands by closures increase biomass accumulation. However, these studies are not sufficient to conclude about the strength of area closures to restore degraded vegetations at the diverse agro-ecological condition. The overall objective of this study was, therefore, to assess and evaluate the usefulness of area closure technique in enhancing rehabilitation of degraded ecosystem and thereby increase the natural capital in the study site (southern Ethiopia). Woody plant species were collected from area exclosure for eight year and adjacent degraded land with similar landscape positions using systematic sampling plot design technique. Woody species diversity was determined by Shannon diversity. Comparative assessment result of woody plant species analysis showed that the density of woody species in the exclosure and degraded site were 778 and 222 individuals per hectare, respectively. A total of 16 woody species, representing 12 families were recorded in the study site. Out of the 12 families, all were recorded in the exclosure while 5 were recorded in the degraded site. Out of the 16 species, 15 were recorded in the exclosure while six were in the degraded site. A total of 10 species were recorded in the exclosure, which were absent in the degraded site. Similarly, one species was recorded in the degraded site which was not present in the exclosure. The results showed that protecting of degraded site from human and animal disturbances promotes woody plant species regenerations and productivity Apart from increasing woody plant species, the local communities have benefited from the exclosure in the form of both products (grass harvesting) and services (ecological). Due to this reason the local communities have positive attitudes and contribute a lot for the success of enclosures in the study site. The present study clearly showed that area closure interventions should be oriented towards managing and improving the productivity of the degraded land, in such a way that both the need for conservation of biodiversity and environmental sustainability, and the demands of the local people for biomass resources can be achieved.

Keywords: degraded land, exclosure, land restoration, woody vegetation

Procedia PDF Downloads 389
11039 Structural and Magnetic Properties of Mn-Doped 6H-SiC

Authors: M. Al Azri, M. Elzain, K. Bouziane, S. M. Chérif

Abstract:

n-Type 6H-SiC(0001) substrates were implanted with three fluencies of Mn+ 5x1015 Mn/cm2 (Mn content: 0.7%), 1x1016 (~2 %), and 5x1016 cm–2 (7%) with implantation energy of 80 keV and substrate temperature of 365ºC. The samples were characterized using Rutherford Backscattering and Channeling Spectroscopy (RBS/C), High-Resolution X-Ray Diffraction technique (HRXRD), micro-Raman Spectroscopy (μRS), and Superconducting Quantum Interference Device (SQUID) techniques. The aim of our work is to investigate implantation induced defects with dose and to study any correlation between disorder-composition and magnetic properties. In addition, ab-initio calculations were used to investigate the structural and magnetic properties of Mn-doped 6H-SiC. Various configurations of Mn sites and vacancy types were considered. The calculations showed that a substitutional Mn atom at Si site possesses larger magnetic moment than Mn atom at C site. A model is introduced to explain the dependence of the magnetic structure on site occupation. The magnetic properties of ferromagnetically (FM) and antiferromagnetically (AFM) coupled pairs of Mn atoms with and without neighboring vacancies have also been explored.

Keywords: ab-initio calculations, diluted magnetic semiconductors, magnetic properties, silicon carbide

Procedia PDF Downloads 291
11038 A Comprehensive Comparative Study on Seasonal Variation of Parameters Involved in Site Characterization and Site Response Analysis by Using Microtremor Data

Authors: Yehya Rasool, Mohit Agrawal

Abstract:

The site characterization and site response analysis are the crucial steps for reliable seismic microzonation of an area. So, the basic parameters involved in these fundamental steps are required to be chosen properly in order to efficiently characterize the vulnerable sites of the study region. In this study, efforts are made to delineate the variations in the physical parameter of the soil for the summer and monsoon seasons of the year (2021) by using Horizontal-to-Vertical Spectral Ratios (HVSRs) recorded at five sites of the Indian Institute of Technology (Indian School of Mines), Dhanbad, Jharkhand, India. The data recording at each site was done in such a way that less amount of anthropogenic noise was recorded at each site. The analysis has been done for five seismic parameters like predominant frequency, H/V ratio, the phase velocity of Rayleigh waves, shear wave velocity (Vs), compressional wave velocity (Vp), and Poisson’s ratio for both the seasons of the year. From the results, it is observed that these parameters majorly vary drastically for the upper layers of soil, which in turn may affect the amplification ratios and probability of exceedance obtained from seismic hazard studies. The HVSR peak comes out to be higher in monsoon, with a shift in predominant frequency as compared to the summer season of the year 2021. Also, the drastic reduction in shear wave velocity (up to ~10 m) of approximately 7%-15% is also perceived during the monsoon period with a slight decrease in compressional wave velocity. Generally, the increase in the Poisson ratios is found to have higher values during monsoon in comparison to the summer period. Our study may be very beneficial to various agricultural and geotechnical engineering projects.

Keywords: HVSR, shear wave velocity profile, Poisson ratio, microtremor data

Procedia PDF Downloads 64
11037 A Review: The Impact of Core Quality the Empirical Review of Critical Factors on the Causes of Delay in Road Constructions Projects in the GCC Countries

Authors: Sulaiman Al-Hinai, Setyawan Widyarto

Abstract:

The aim of this study is to identify the critically dominating factors on the delays of road constructions in the GCC countries and their effects on project delivery in Arab countries. Towards the achieved of the objectives the study used the empirical literature from the all relevant online sources and database as many as possible. The findings of this study have summarized and short listed of the success factors in the two categories such as internal and external factors have caused to be influenced to delay of road constructions in the Arab regions. However, in the category of internal factors, there are 63 factors short listed from seven group of factors which has revealed to effects on the delay of road constructions especially, the consultant related factors, the contractor related factors, designed related factors, client related factors, labor related factors, material related issues, equipment related issues respectively. Moreover, for external related factors are also considered to summarized especially natural disaster (flood, hurricanes and cyclone etc.), conflict, war, global financial crisis, compensation delay to affected property owner, price fluctuated, unexpected ground conditions (soil and high-water level), changing of government regulations and laws, delays in obtaining permission from municipality, loss of time by traffic control and restrictions at job site, problem with inhabitant of community, delays in providing service from utilities (water and electricity’s) and accident during constructions accordingly. The present study also concluded the effects of above factors which has delay road constructions through increasing of cost and overrun it, taken overtime, creating of disputes, going for lawsuits, finally happening of abandon of projects. Thus, the present study has given the following recommendations to overcome of above problems by increasing of detailed site investigations, ensure careful monitoring and regular meetings, effective site management, collaborative working and effective coordination’s, proper and comprehensive planning and scheduling and ensure full and intensive commitment from all parties accordingly.

Keywords: Arab GCC countries, critical success factors, road constructions delay, project management

Procedia PDF Downloads 101
11036 Assessment of Post-surgical Donor-Site Morbidity in Vastus lateralis Free Flap for Head and Neck Reconstructive Surgery: An Observational Study

Authors: Ishith Seth, Lyndel Hewitt, Takako Yabe, James Wykes, Jonathan Clark, Bruce Ashford

Abstract:

Background: Vastus lateralis (VL) can be used to reconstruct defects of the head and neck. Whilst the advantages are documented, donor-site morbidity is not well described. This study aimed to assess donor-site morbidity after VL flap harvest. The results will determine future directions for preventative and post-operative care to improve patient health outcomes. Methods: Ten participants (mean age 55 years) were assessed for the presence of donor-site morbidity after VL harvest. Musculoskeletal (pain, muscle strength, muscle length, tactile sensation), quality of life (SF-12), and lower limb function (lower extremity function, gait (function and speed), sit to stand were assessed using validated and standardized procedures. Outcomes were compared to age-matched healthy reference values or the non-operative side. Analyses were conducted using descriptive statistics and non-parametric tests. Results: There was no difference in muscle strength (knee extension), muscle length, ability to sit-to-stand, or gait function (all P > 0.05). Knee flexor muscle strength was significantly less on the operated leg compared to the non-operated leg (P=0.02) and walking speed was slower than age-matched healthy values (P<0.001). Thigh tactile sensation was impaired in 89% of participants. Quality of life was significantly less for the physical health component of the SF-12 (P<0.001). The mental health component of the SF-12 was similar to healthy controls (P=0.26). Conclusion: There was no effect on donor site morbidity with regards to knee extensor strength, pain, walking function, ability to sit-to-stand, and muscle length. VL harvest affected donor-site knee flexion strength, walking speed, tactile sensation, and physical health-related quality of life.

Keywords: vastus lateralis, morbidity, head and neck, surgery, donor-site morbidity

Procedia PDF Downloads 214
11035 Importance of Occupational Safety and Health in Dam Construction Site

Authors: Naci Büyükkaraciğan, Yildirim Akyol

Abstract:

Large plants that covering the back and accumulate water of a river valley for energy production, drinking, irrigation water supply, economic benefits that serve many purposes, such as regulation of flood protection, are called dams. Place, in which unites in order to achieve an optimum balance between manpower for Lowest cost and economic as belonging to that structure to create machines, materials and construction of the project, is called as the site. Dam construction sites are combined sites in together in many businesses. Therefore, there can be found in the many workers and machines are many accidents in this type of construction sites. The necessity of systematic and scientific studies due to various reasons arises in order to be protected from conditions that could damage the health, During the execution of the work on construction sites. Occupational health and safety of the study, called the case, also in the European Union has begun to be addressed by weight since the 1980s. In particular, issued in 1989 89/391/EEC on occupational health and safety directive, occupational health and adopted the Directive within the framework of the security field, and then exposed to a large number of individual directive within this framework on the basis of the directive. Turkey's Law No. 6331 entered into force in June 2012 on the subject. In this study, measures related to the construction site of the dam should be taken with occupational safety and health have been examined and tried to put forward recommendations on the subject.

Keywords: civil engineering, dam, occupational safety and health, site organizations

Procedia PDF Downloads 312
11034 Micro-Hydrokinetic for Remote Rural Electrification

Authors: S. P. Koko, K. Kusakana, H. J. Vermaak

Abstract:

Standalone micro-hydrokinetic river (MHR) system is one of the promising technologies to be used for remote rural electrification. It simply requires the flow of water instead of elevation or head, leading to expensive civil works. This paper demonstrates an economic benefit offered by a standalone MHR system when compared to the commonly used standalone systems such as solar, wind and diesel generator (DG) at the selected study site in Kwazulu Natal. Wind speed and solar radiation data of the selected rural site have been taken from national aeronautics and space administration (NASA) surface meteorology database. The hybrid optimization model for electric renewable (HOMER) software was used to determine the most feasible solution when using MHR, solar, wind or DG system to supply 5 rural houses. MHR system proved to be the best cost-effective option to consider at the study site due to its low cost of energy (COE) and low net present cost (NPC).

Keywords: economic analysis, micro-hydrokinetic, rural-electrification, cost of energy (COE), net present cost (NPC)

Procedia PDF Downloads 403
11033 Knowledge and Organisational Success: Developing a Scale of Knowledge Framework

Authors: Mohammed Almohammedali, David Edgar, Duncan Peter

Abstract:

The aim of this exploratory research is to further understand how organisations can evaluate their activities, which generate knowledge creation, to meet changing stakeholder expectations. A Scale of Knowledge (SoK) Framework is proposed which links knowledge management and organisational activities to changing stakeholder expectations. The framework was informed by the knowledge management literature, as well as empirical work conducted via a single case study of a multi-site hospital organisation in Saudi Arabia. Eight in-depth semi-structured interviews were conducted with managers from across the organisation regarding current and future stakeholder expectations, organisational strategy/activities and knowledge management. Data were analysed using thematic analysis and a hierarchical value map technique to identify activities that can produce further knowledge and consequently impact on how stakeholder expectations are met. The SoK Framework developed may be useful to practitioners as an analytical aid to determine if current organisational activities produce organisational knowledge which helps them meet (increasingly higher levels of) stakeholder expectations. The limitations of the research and avenues for future development of the proposed framework are discussed.

Keywords: knowledge creation, knowledge management, organisational knowledge, analytical aid, stakeholders

Procedia PDF Downloads 402
11032 The Environmental Damages Related to Urban Sites

Authors: Kherbache Radhwane

Abstract:

We currently live in the world pressed by technological developments necessary for the construction, where the concept of sustainable development is truly rooted in recent years. Construction or demolitions of buildings necessarily generate environmental pollution, both inside and outside the site. Depending on the size and nature of work and the context surrounding these problems can be more or less important as is the case here in Algeria. They may affect the smooth running of the site. Moreover, there are regulations exist or are under development and should be taken into account by the various players in the act of building. This is, for example, the case of new obligations in terms of sorting and recycling of construction waste. Given this situation, it appears increasingly necessary to integrate the building sites in an effort to better respect the environment and its regulation. Several operations were performed according to this principle. The success of a project is that respects its environment through the involvement of each actor of the operation of the site with a low nuisance. As such, the client assisted by his driver and its operating contractor and the company plays a central role as an initiator of the process. It must ensure the establishment of appropriate means of organizational plans and contract.

Keywords: evolution, sustainable development, construction, demolition, building, nuisance, environmental, tailings, construction, regulations

Procedia PDF Downloads 241
11031 Sustainable Renovation of Cultural Buildings Case Study: Red Bay National Historic Site, Canada

Authors: Richard Briginshaw, Hana Alaojeli, Javaria Ahmad, Hamza Gaffar, Nourtan Murad

Abstract:

Sustainable renovations to cultural buildings and sites require a high level of competency in the sometimes conflicting areas of social/historical demands, environmental concerns, and the programmatic and technical requirements of the project. A detailed analysis of the existing site, building and client program are critical to reveal both challenges and opportunities. This forms the starting point for the design process – empirical explorations that search for a balanced and inspired architectural solution to the project. The Red Bay National Historic Site on the Labrador Coast of eastern Canada is a challenging project to explore and resolve these ideas. Originally the site of a 16ᵗʰ century whaling station occupied by Basque sailors from France and Spain, visitors now experience this history at the interpretive center, along with the unique geography, climate, local culture and vernacular architecture of the area. Working with our client, Parks Canada, the project called for significant alterations and expansion to the existing facility due to an increase in the number of annual visitors. Sustainable aspects of the design are focused on sensitive site development, passive energy strategies such as building orientation and building envelope efficiency, active renewable energy systems, carefully considered material selections, water efficiency, and interiors that respond to human comfort and a unique visitor experience.

Keywords: sustainability, renovations and expansion, cultural project, architectural design, green building

Procedia PDF Downloads 148
11030 Arc Flash Analysis: Technique to Mitigate Fire Incidents in Substations

Authors: M. H. Saeed, M. Rasool, M. A. Jawed

Abstract:

Arc Flash Analysis has been a subject of great interest since the electrical fire incidents have been reduced to a great extent after the implementation of arc flash study at different sites. An Arc flash in substations is caused by short circuits over the air or other melted conductors and small shrapnel. Arc flash incidents result in the majority of deaths in substations worldwide. Engro Fertilizers Limited (EFERT) site having a mix of vintage non-internal arc rated and modern arc rated switchgears, carried out an arc flash study of the whole site in accordance with NFPA70E standard. The results not only included optimizing site protection coordination settings but also included marking of Shock and Arc flash protection boundaries in all switchgear rooms. Work permit procedures upgradation is also done in accordance with this study to ensure proper arc rated PPEs and arc flash boundaries protocols are fully observed and followed. With the new safety, protocols working on electrical equipment will be much safer than ever before.

Keywords: Arc flash, non-internal arc rated, protection coordination, shock boundary

Procedia PDF Downloads 153
11029 Sustainable Perspectives and Local Development Potential through Tourism

Authors: Pedro H. S. Messetti, Mary L. G. S. Senna, Afonso R. Aquino

Abstract:

Sustainability is a very important and heavily discussed subject, expanding through tourism as well. The study proposition was to collect data and present it to the competent bodies so they can mold their public politics to improve the conditions of the site. It was hypothesized that the lack of data is currently affecting the quality of life and the sustainable development of the site and the tourism. The research was held in Mateiros, a city in the state of Tocantins (TO)/Brasil, 275km far from the capital city Palmas, being one of the 8 cities that comprises the Jalapão region, an ecotourism and adventure tourism site as well as an environmental protection area (Jalapão State Park). Because of the concentration of tourists during the high season and several tourist attractions being around, the research took place in Mateiros. The methodological procedure had a script of theoretical construction and investigation of the deductive scientific method parameters through a case study in the Jalapão/TO/Brazil region, using it as a tool for a questionnaire given to the competent bodies in an interview system with the UN sustainability indexes as a base. In the three sustainable development scope: environmental, social and economic, the results indicated that the data presented by the interviewed were scarce or nonexistent. It shows that more research is necessary, providing the tools for the ones responsible to propose action plans to improve the site, strengthening the tourism and making it even more sustainable.

Keywords: Jalapão/Brazil state park, sustainable tourism, UN sustainability indexes

Procedia PDF Downloads 356
11028 Gas Monitoring and Soil Control at the Natural Gas Storage Site (Minerbio, Italy)

Authors: Ana Maria Carmen Ilie, Carmela Vaccaro

Abstract:

Gas migration through wellbore failure, in particular from abandoned wells, is repeatedly identified as the highest risk mechanism. The vadose zone was subject to monitoring system close to the wellbore in Minerbio, methane storage site. The new technology has been well-developed and used with the purpose to provide reliable estimates of leakage parameters. Of these techniques, soil flux sampling at the soil surface, via the accumulation chamber method and soil flux sampling at the depths of 100cm below the ground surface, have been an important technique for characterizing the gas concentrations at the gas storage site. We present results of soil Radon Bq/m3, CO2%, CH4% and O2% concentration gases. Measurements have been taken for radon concentrations with an Durridge RAD7 Company, Inc., USA, instrument. We used for air and soil quality an Biogas ETG instrument monitoring system, with NDIR CO2, CH4 gas sensor and electrochemical O2 gas sensor. The measurements started in September-October 2015, where no outliers have been identified. The measurements have continued in March-April-July-August-September 2016, almost at the same time in the same place around the gas storage site, values measured 15 minutes for each sampling, to determine their concentration, their distribution and to understand the relationship among gases and atmospheric conditions. At a depth of 100 cm, the maximum soil radon gas concentrations were found to be 1770 ±±582 Bq/m3, the soil consists of 64.31% sand, 20.75% silt and 14.94% clay, and with 0.526 ppm of Uranium. The maximum concentration (September 2016), in soil at 100cm below the ground surface, with 83% sand, 8.96% silt and 7.89% clay, was about 0.06% CH4, and in atmosphere 0.06% CH4 at 40°C (T). In the other months the values have been on the range of 0.01% to 0.03% CH4. Since we did not have outliers in the gas storage site, soil-gas samples for isotopic analysis have not been done.

Keywords: leakage gas monitoring, lithology, soil gas, methane

Procedia PDF Downloads 421
11027 The Feasibility of a Protected Launch Site near Melkbosstrand for a Public Transport Ferry across Table Bay, Cape Town

Authors: Mardi Falck, André Theron

Abstract:

Traffic congestion on the Northern side of Table Bay is a major problem. In Gauteng, the implementation of the Gautrain between Pretoria and Johannesburg, solved their traffic congestion. In 2002 two entrepreneurs endeavoured to implement a hovercraft ferry service across the bay from Table View to the Port of Cape Town. However, the EIA process proved that disgruntled residents from the area did not agree with their location for a launch site. 17 years later the traffic problem has not gone away, but instead the congestion has increased. While property prices in the City Bowl of Cape Town are ever increasing, people tend to live more on the outskirts of the CBD and commute to work. This means more vehicles on the road every day and the public transport services cannot keep up with the demand. For this reason, the study area of the previous hovercraft plans is being extended further North. The study’s aim is thus to determine the feasibility of a launch site North of Bloubergstrand to launch and receive a public transport ferry across Table Bay. The feasibility is being established by researching ferry services across the world and on what makes them successful. Different types of ferries and their operational capacities in terms of weather and waves are researched and by establishing the offshore and nearshore wind and wave climate for the area, an appropriate protected launch site is determined. It was concluded that travel time could potentially be halved. A hovercraft proved to be the most feasible ferry type, because it does not require a conventional harbour. Other types of vessels require a protected launch site because of the wave climate. This means large breakwaters that influence the cost substantially. The Melkbos Cultural Centre proved to be the most viable option for the location of the launch site, because it already has buildings and infrastructure. It is recommended that, if a harbour is chosen for the proposed ferry service, it could be used for more services like fishing, eco-tourism and leisure. Further studies are recommended to optimise the feasibility of such a harbour.

Keywords: Cape Town, ferry, public, Table Bay

Procedia PDF Downloads 130
11026 Polyphosphate Kinase 1 Active Site Characterization for the Identification of Novel Antimicrobial Targets

Authors: Sanaa Bardaweel

Abstract:

Inorganic polyphosphate (poly P) is present in all living forms tested to date, from each of the three kingdoms of life. Studied mainly in prokaryotes, poly P and its associated enzymes are vital in diverse basic metabolism, in at least some structural functions and, notably, in stress responses. These plentiful and unrelated roles for poly P are probably the consequence of its presence in life-forms early in evolution. The genomes of many bacterial species, including pathogens, encode a homologue of a major poly P synthetic enzyme, poly P kinase 1 (PPK1). Genetic deletion of ppk1 results in reduced poly P levels and loss of pathogens virulence towards protozoa and animals. Thus far, no PPK1 homologue has been identified in higher-order eukaryotes and, therefore, PPK1 represents a novel target for chemotherapy. The idea of the current study is to purify the PPK1 from Escherichia coli to homogeneity in order to study the effect of active site point mutations on PPK1 catalysis via the application of site-directed mutagenesis strategy. The knowledge obtained about the active site of PPK1 will be utilized to characterize the catalytic and kinetic mechanism of PPK1 with model substrates. Comprehensive understanding of the enzyme kinetic mechanism and catalysis will be used to design and screen a library of synthetic compounds for potential discovery of selective PPK1-inhibitors.

Keywords: antimicobial, Escherichia coli, inorganic polyphosphate, PPK1-inhibitors

Procedia PDF Downloads 249
11025 Soil Properties and Crop Productivity of Kiln Sites in the Highlands of North-western Ethiopia

Authors: Hanamariam Mekonnen

Abstract:

Ethiopian farmers traditionally produce charcoal under several kilns on cultivated land: particularly in Kasiry micro-watershed Fagita Lekoma district of Northwestern Ethiopia. However, the effects of such soil heating and remnants of charcoal leftover on soils have not been adequately documented. Hence, this study tried to quantify the effects of such kiln sites on selected soil properties and wheat crop performance. Soils from four kiln sites were thus purposively sampled at depths of 0-20 cm, 20-40 cm and 40-60 cm and were compared with the respective soil layers of none-kiln sites from similar adjacent fields. While soil moisture content was sampled at kiln and none-kiln site in wet and dry seasons from each depth. In addition, a pot experiment was conducted using two sources of biochar (Acacia decurrens and Eucalyptus Camaldulensis) with four rates (0, 10, 20, and 40 t/ha) and compared with crops grown from soils of 1kiln sites without biochar application laid out in a CRD with three replications. The data were analyzed using SAS software Version 9.4.The result revealed notable variations of kiln site soils and along soil depth. The appreciable increased (p<0.05) soil pH (5.5 to 5.74), organic carbon (3.89 to 4.27%), TN (0.30 to 0.32%), CEC (32.59 to 35.23 cmolckg-1), Ca (6.44 to 7.9 cmolckg-1), Mg (4.48 to 5.46 cmolckg-1), and significantly (p<0.01) Av. P (30.25 to 46.4 ppm) and K (2.11 to 2.82 cmolckg-1) were recorded from the none-kiln to kiln soils, respectively. On the other hand, ex. acidity and aluminum, available Fe and Mn were reduced from 2.20 to 1.54, 1.95 to 1.31 cmolckg-1 and 57.46 to 41.40 and 5.65 to 3.86 ppm, respectively, from the control to the kiln. Soil texture was significantly affected by soil heating and along soil depth. The sand content was (p<0.05) varied between the value of 23% to 29% from none-kiln to kiln site, and clay content was (p<0.01) increased from 0-20 cm (32%) soil depth to 40-60 cm (43%) deeper soil. Significantly (p<0.05) higher Soil moisture content was recorded at none-kiln site (45.85%) compared to kiln (40.44%) in wet season, whereas in dry season, lower moisture content was revealed at kiln site (26%) compared to none-kiln (30.7%). As wet to dry season, soil moisture was decreased from 43% to 28% respectively. Bulk density (P<0.01) varied between 0.88 to 0.94 gcm-3 from control to kiln in dry season. Similarly, the value of soil pH (6.10), Av. P (58.12), exchangeable bases (Ca (9.83), Mg (6.19) and K (3.67)) were (p<0.01) higher at the 0-20 cm soil depth as compared to the deeper soils, the result of soil moisture (30 to 42%) and CEC (31 to 36 cmolckg-1) increased down the soil profile. After wheat harvest, soil pH, Av. P, CEC, and exchangeable bases (Mg, K and Na) were significantly higher in the kiln soil, while soil moisture and OC increased by the applied biochar of 20 and 40 ton/ha. High yield 2.28 gpot-1 (p<0.01) was recorded in kiln soil, growth parameters of wheat were significantly increased with increasing biochar rates.

Keywords: biochar, kasiry micro-watershed, kiln site, none-kiln site, soil properties

Procedia PDF Downloads 47
11024 An Estimation Process for Progress Rate Based on Labor-Quantity in Republic of Korea

Authors: Dong-Ho Kim, Zheng-Xun Jin, Yong-Woon Cha, Su-Sang Lim, Sang-Won Han, Chang-Taek Hyun

Abstract:

As construction is a labor-intensive industry, it is important to identify and manage labor quantities for accurate progress management of the construction project. However, the progress management that focuses on construction cost calculated based on materials rather than labor quantities has led to a difference in the implementation of cost and progress of the actual construction. In addition, since it is not easy to predict accurate labor quantities in the estimation of labor quantity-based progress rate, there have been limited researches into the progress rate estimation based on labor quantity. Accordingly, this study proposed a process for labor quantity-based progress rate estimation using a standard of estimate to predict accurate progress rate of the construction project in Republic Korea. It is expected that the utilization of the proposed process will help to identify the progress rate closer to that of the actual site management and adjust the workforce in each construction type, thereby contributing to improving construction efficiency.

Keywords: labor based, labor cost, progress management, progress rate, progress payment

Procedia PDF Downloads 312
11023 Offshore Wind Assessment and Analysis for South Western Mediterranean Sea

Authors: Abdallah Touaibia, Nachida Kasbadji Merzouk, Mustapha Merzouk, Ryma Belarbi

Abstract:

accuracy assessment and a better understand of the wind resource distribution are the most important tasks for decision making before installing wind energy operating systems in a given region, there where our interest come to the Algerian coastline and its Mediterranean sea area. Despite its large coastline overlooking the border of Mediterranean Sea, there is still no strategy encouraging the development of offshore wind farms in Algerian waters. The present work aims to estimate the offshore wind fields for the Algerian Mediterranean Sea based on wind data measurements ranging from 1995 to 2018 provided of 24 years of measurement by seven observation stations focusing on three coastline cities in Algeria under a different measurement time step recorded from 30 min, 60 min, and 180 min variate from one to each other, two stations in Spain, two other ones in Italy and three in the coast of Algeria from the east Annaba, at the center Algiers, and to Oran taken place at the west of it. The idea behind consists to have multiple measurement points that helping to characterize this area in terms of wind potential by the use of interpolation method of their average wind speed values between these available data to achieve the approximate values of others locations where aren’t any available measurement because of the difficulties against the implementation of masts within the deep depth water. This study is organized as follow: first, a brief description of the studied area and its climatic characteristics were done. After that, the statistical properties of the recorded data were checked by evaluating wind histograms, direction roses, and average speeds using MatLab programs. Finally, ArcGIS and MapInfo soft-wares were used to establish offshore wind maps for better understanding the wind resource distribution, as well as to identify windy sites for wind farm installation and power management. The study pointed out that Cap Carbonara is the windiest site with an average wind speed of 7.26 m/s at 10 m, inducing a power density of 902 W/m², then the site of Cap Caccia with 4.88 m/s inducing a power density of 282 W/m². The average wind speed of 4.83 m/s is occurred for the site of Oran, inducing a power density of 230 W/m². The results indicated also that the dominant wind direction where the frequencies are highest for the site of Cap Carbonara is the West with 34%, an average wind speed of 9.49 m/s, and a power density of 1722 W/m². Then comes the site of Cap Caccia, where the prevailing wind direction is the North-west, about 20% and 5.82 m/s occurring a power density of 452 W/m². The site of Oran comes in third place with the North dominant direction with 32% inducing an average wind speed of 4.59 m/s and power density of 189 W/m². It also shown that the proposed method is either crucial in understanding wind resource distribution for revealing windy sites over a large area and more effective for wind turbines micro-siting.

Keywords: wind ressources, mediterranean sea, offshore, arcGIS, mapInfo, wind maps, wind farms

Procedia PDF Downloads 115
11022 Drought Resilient Water Supply for Livelihood: Establishment of Groundwater Treatment Plant at Construction Sites in Taichung City

Authors: Shang-Hsin Ou, Yang-Chun Lin, Ke-Hao Cheng

Abstract:

The year 2021 marked a historic drought in Taiwan, posing unprecedented challenges due to record-low rainfall and inadequate reservoir storage. The central region experienced water scarcity, leading to the implementation of "Groundwater Utilization at Construction Sites" for drought-resilient livelihood water supply. This study focuses on the establishment process of temporary groundwater treatment plants at construction sites in Taichung City, serving as a reference for future emergency response and the utilization of construction site groundwater. To identify suitable sites for groundwater reuse projects, site selection operations were carried out based on relevant water quality regulations and assessment principles. Subsequently, the planning and design of temporary water treatment plants were conducted, considering the water quality, quantity, and on-site conditions of groundwater wells associated with construction projects. The study consolidates the major water treatment facilities at each site and addresses encountered challenges during the establishment process. Practical insights gained from operating temporary groundwater treatment plants are presented, including improvements related to stable water quality, water quantity, equipment operation, and hydraulic control. In light of possible future droughts, this study provides an outlook and recommendations to expedite and improve the setup of groundwater treatment plants at construction sites. This includes considering on-site water abstraction, treatment, and distribution conditions. The study's results aim to offer practical guidelines for effectively establishing and managing such treatment plants, while offering experiences and recommendations for other regions facing similar emergencies, water shortages, and drought situations. These endeavors contribute to ensuring sustainable water supply for drought-resilient livelihoods and maintaining societal stability.

Keywords: drought resilience, groundwater treatment, construction site, water supply

Procedia PDF Downloads 50
11021 GIS Model for Sanitary Landfill Site Selection Based on Geotechnical Parameters

Authors: Hecson Christian, Joel Macwan

Abstract:

Landfill site selection in an urban area is a critical issue in the planning process. With the growth of the urbanization, it has a mammoth impact on the economy, ecology, and environmental health of the region. Outsized amount of wastes are produced and the problem gets soared every day. Hence, selection of ideal site for sanitary landfill is a challenge for urban planners and solid waste managers. Disposal site is a function of many parameters. Among all, Geotechnical parameters are very vital as the same is related to surrounding open land. Moreover, the accessible safe and acceptable land is also scarce. Therefore, in this paper geotechnical parameters are used to develop a GIS model to identify an ideal location for landfill purpose. Metropolitan city of Surat is highly populated and fastest growing urban area in India. The research objectives are to conduct field experiments to collect data and to transfer the facts in GIS platform to evolve a model, to find ideal location. Planners’ preferences were obtained to use analytical hierarchical process (AHP) to find weights of each parameter. Integration of GIS and Multi-Criteria Decision Analysis (MCDA) techniques are applied to improve decision-making. It augments an environment for transformation and combination of geographical data and planners’ preferences. GIS performs deterministic overlay and buffer operations. MCDA methods evaluate alternatives based on the decision makers’ subjective values and priorities. Research results have shown many alternative locations. Economic analysis of selected site from actual operations point of view is not included in this research.

Keywords: GIS, AHP, MCDA, Geo-technical

Procedia PDF Downloads 129
11020 Sudan’s Approach to Knowledge Management in Disaster Management

Authors: Mohamed Abdalla Elamein Boshara, Peter Charles Woods, Nour Eldin Mohamed Elshaiekh

Abstract:

Knowledge Management has become very important for Disaster Management response and planning. This paper proposes the implementation of a Knowledge Management System with a sustainable data collection mechanism for reliable and timely information management to support decision makers in making the right decisions in the timely manner.

Keywords: knowledge management, disaster management, incident tracking, web application

Procedia PDF Downloads 751
11019 Historical Geotechnical Study and Evaluation of Project Progress for the Tafila City Center Development Project

Authors: Mohmd Sarireh

Abstract:

The geotechnical study can be employed successfully to assess and follow the expected development or delay in the project construction. The development project of city center or downtown was taken as a case study for the investigation of the project conditions that might support progress or cause delay. The project was proposed to build 7447 m2 by reinforced concrete mainly to serve and support the services provided to people in Tafila. The project construction had faced challenges and obstacles such as soil collapse because of excavation of the weak soil that found in the project site. In addition, the topography of the project area showed a high slope from South-West to North. The slope through the project footprint reached to 83.3% which is considered very high slope. One year and a half proposed to finish the project construction since the 1st of March 2013 and it was planned to be finished by the 31th of August 2014, but the project needs more than one year and a half as extension according to the consultant engineer. The collecting of data was conducted through the interviews with the engineers and officials, and by analyzing the soil reports and samples taken during design and excavation. The major findings came out to weak and fractured soil and construction waste that were found at project site. Also, soil was considered very fine according to the plasticity index (PI) values, in addition to the high depths required for foundation that contribute to the collapse of soil and the increase of project cost. The current project aims to present how the unseen conditions can delay the project construction and increase the cost of the project that rises to JD8.305 Million.

Keywords: geotechnical, management, progress, risk, soil unseen conditions management

Procedia PDF Downloads 196