10355 Cost Overrun Causes in Public Construction Projects in Saudi Arabia

Authors: Ibrahim Mahamid, A. Al-Ghonamy, M. Aichouni

Abstract:

This study is conducted to identify causes of cost deviations in public construction projects in Saudi Arabia from contractors’ perspective. 41 factors that might affect cost estimating accuracy were identified through literature review and discussion with some construction experts. The factors were tabulated in a questionnaire form and a field survey included 51 contractors from the Northern Province of Saudi Arabia was performed. The results show that the top five important causes are: wrong estimation method, long period between design and time of implementation, cost of labor, cost of machinary and absence of construction-cost data.

Keywords: cost deviation, public construction, cost estimating, Saudi Arabia, contractors

Procedia PDF Downloads 475
10354 Evaluation of Traditional Methods in Construction and Their Effects on Reinforced-Concrete Buildings Behavior

Authors: E. H. N. Gashti, M. Zarrini, M. Irannezhad, J. R. Langroudi

Abstract:

Using ETABS software, this study analyzed 23 buildings to evaluate effects of mistakes during construction phase on buildings structural behavior. For modelling, two different loadings were assumed: 1) design loading and 2) loading due to the effects of mistakes in construction phase. Research results determined that considering traditional construction methods for buildings resulted in a significant increase in dead loads and consequently intensified the displacements and base-shears of buildings under seismic loads.

Keywords: reinforced-concrete buildings, construction mistakes, base-shear, displacements, failure

Procedia PDF Downloads 270
10353 Development of Intelligent Construction Management System Using Web-Camera Image and 3D Object Image

Authors: Hyeon-Seung Kim, Bit-Na Cho, Tae-Woon Jeong, Soo-Young Yoon, Leen-Seok Kang

Abstract:

Recently, a construction project has been large in the size and complicated in the site work. The web-cameras are used to manage the construction site of such a large construction project. They can be used for monitoring the construction schedule as compared to the actual work image of the planned work schedule. Specially, because the 4D CAD system that the construction appearance is continually simulated in a 3D CAD object by work schedule is widely applied to the construction project, the comparison system between the real image of actual work appearance by web-camera and the simulated image of planned work appearance by 3D CAD object can be an intelligent construction schedule management system (ICON). The delayed activities comparing with the planned schedule can be simulated by red color in the ICON as a virtual reality object. This study developed the ICON and it was verified in a real bridge construction project in Korea. To verify the developed system, a web-camera was installed and operated in a case project for a month. Because the angle and zooming of the web-camera can be operated by Internet, a project manager can easily monitor and assume the corrective action.

Keywords: 4D CAD, web-camera, ICON (intelligent construction schedule management system), 3D object image

Procedia PDF Downloads 507
10352 An Evaluation of the Effectiveness of Health and Safety Induction Practices in the Zambian Construction Industry

Authors: Josephine Mutwale-Ziko, Nonde Lushinga, Inonge Akakandelwa

Abstract:

The study discusses the effectiveness of health and safety induction practices on construction sites against the background of the Zambian construction industry experience. The research design included the literature review of relevant literature. Questionnaires and interviews were administered to regulatory bodies, health, and safety personnel. Observation was also employed on construction sites to assess the health and safety practices being used. Health and safety in the construction industry are not something to be ignored or overlooked. The construction industry needs to take heed of the serious consequences of inadequate health and safety induction practices. The implications of inadequate health and safety induction procedures included among others threats to profitability, corporate social responsibility and increased turnover of the workforce leading to poor productivity. Adequate health and safety practices can improve the health and wellbeing of employees, reduce financial implications on firms and encourage productivity on construction sites. Despite this, accidents are still prevalent on construction sites in Zambia. The overall result of this research denotes that the implementation of health and safety induction practices is inadequate, as indicated by the negligent and non-adherent attitude to health and safety induction aspects on the sites by most stakeholders on construction sites. Therefore, health and safety induction practices are ineffective as preventive measures for reduction of accidents on construction sites in Zambia.

Keywords: accidents, health and safety, inadequate, induction

Procedia PDF Downloads 449
10351 Familiarity With Civil Engineering and Types of Construction and Its Methods

Authors: Mokhtar Nikgoo

Abstract:

Civil engineering is one of the disciplines that shows the application of science in creating construction and civil engineering. That is, everything that returns to the population of a country, such as dams, airports, roads, bridges, towers, tunnels, telecommunication towers, buildings resistant to earthquakes, floods and fires, power plants and light, cheap and quality materials for construction. And the construction is included in the scope of work of the civil engineer. Civil engineering covers a wide range of tasks. That is, for the construction of buildings, bridges, towers, tunnels, roads, silos, or sewage networks, an efficient civil engineer is needed at the beginning, in addition to complying with the technical and operational aspects, he also works economically. Because being economical is a principle in civil engineering. Is. This field at the undergraduate level has three majors: civil-building, civil-mapping and civil-water.

Keywords: civil engineering, construction, surveying, mapping, pile

Procedia PDF Downloads 84
10350 Cost Overrun in Construction Projects

Authors: Hailu Kebede Bekele

Abstract:

Construction delays are suitable where project events occur at a certain time expected due to causes related to the client, consultant, and contractor. Delay is the major cause of the cost overrun that leads to the poor efficiency of the project. The cost difference between completion and the originally estimated is known as cost overrun. The common ways of cost overruns are not simple issues that can be neglected, but more attention should be given to prevent the organization from being devastated to be failed, and financial expenses to be extended. The reasons that may raised in different studies show that the problem may arise in construction projects due to errors in budgeting, lack of favorable weather conditions, inefficient machinery, and the availability of extravagance. The study is focused on the pace of mega projects that can have a significant change in the cost overrun calculation.15 mega projects are identified to study the problem of the cost overrun in the site. The contractor, consultant, and client are the principal stakeholders in the mega projects. 20 people from each sector were selected to participate in the investigation of the current mega construction project. The main objective of the study on the construction cost overrun is to prioritize the major causes of the cost overrun problem. The methodology that was employed in the construction cost overrun is the qualitative methodology that mostly rates the causes of construction project cost overrun. Interviews, open-ended and closed-ended questions group discussions, and rating qualitative methods are the best methodologies to study construction projects overrun. The result shows that design mistakes, lack of labor, payment delay, old equipment and scheduling, weather conditions, lack of skilled labor, payment delays, transportation, inflation, and order variations, market price fluctuation, and people's thoughts and philosophies, the prior cause of the cost overrun that fail the project performance. The institute shall follow the scheduled activities to bring a positive forward in the project life.

Keywords: cost overrun, delay, mega projects, design

Procedia PDF Downloads 62
10349 Mechanisms of Cultural Change Resistance through Cultures

Authors: Horaya Mostafa Ahmed

Abstract:

All cultures are inherently predisposed to change and, at the same time, to resisting change. There are dynamic processes operating that encourage the acceptance of new ideas and things, while there are others that encourage changeless stability. Despite the dramatic changes that have taken place in all human cultures, there are cultures still steadfast and resist change. These cultures resist through some culture mechanisms like, cultural boundaries, ethnocentrism, religion, and cultural relativity. So this paper is an attempt to discover these mechanisms of cultural change resistance and to ask is cultural change always required.

Keywords: cultural change, cultural boundaries, cultural relativity, ethnocentrism, religion, resistance

Procedia PDF Downloads 340
10348 Assessment of Health and Safety Item on Construction Site in Ondo State

Authors: Ikumapayi Catherine Mayowa

Abstract:

The well-being of humans on a construction site is critical; abundant manpower had been lost through accidents which kill or make workers physically unfit to carry out construction activities, these, in turn, have multiple effects on the whole economy. Thus, it is necessary to put all safety items and regulations in place before construction activities can commence. This study was carried out in the Ondo state of Nigeria to investigate and analyze the state of health and safety of construction workers in the state. The study was done using first-hand observations, 50 construction project sites were visited in ten major towns of Ondo state, questionnaires were distributed, and the results were analyzed. The result shows that construction workers are being exposed to many construction site hazards due to lack of inadequate safety programs and lack of appropriate safety equipment for workers on site. From the data gotten from each site visited and the statistical analysis, it can be concluded that occurrences of an accident on construction sites depend significantly on the available safety facilities on the sites. The result of the regression statistics shows that the dependence of the frequency of occurrence of an accident on the availability of safety items on the site is 0.0362 which is less than 0.05 maximum significant level allowed. Therefore, a vital way of sustaining our building strategy is given a detail attention to the provision of adequate health and safety items on construction sites which will reduce the occurrence of accident, loss of manpower and death of skilled workers.

Keywords: construction sites, health, safety, welfare

Procedia PDF Downloads 328
10347 Appraisal of Incentive Schemes for Employees: A Case of Construction Smes

Authors: B. M. Arthur-Aidoo, C. O. Aigbavboa, W. D. Thwala

Abstract:

The performance of construction employees cannot be underestimated if the success of construction projects are to be achieved. This is because the construction industry has been characterised as labour oriented sector, which most of its activities being executed by labour. In the construction sector, employees are driven by incentive schemes which perform encourage and motivate workers for higher efficiency and higher output. The construction sector, however, depends mainly on its labour. In view of the sector's high dependency on its employees, that there must be a significant incentive scheme which must be established to act as a stimulus to drive high performance from employees among the various known incentive packages. This study, therefore, seeks to appraise the incentive packages adopted by construction SMEs. To establish reliable findings that will contribute to knowledge, the study utilised an exploratory approach via semi-structured interviews among sampled construction professionals with the requisite expertise on employees' incentive schemes. The study further established that although incentive schemes are classified in various ways and mediums that act as stimuli to encourage high performance among employees, some are more influential and impacts performance than others. Additionally, the study concludes that medical allowance, holiday with pay, free working tools, and training for employees were ranked the most influential incentives that promote high outputs by workers within the construction SME sector.

Keywords: appraisal, construction, employees, incentive, small and medium-sized enterprises, SMEs

Procedia PDF Downloads 137
10346 The Influence of Construction Workers Wages and Working Conditions on Productivity in Ghana

Authors: Emmanuel Donkor

Abstract:

Aim/Purpose – This paper examines the influence of construction workers wages and working conditions on productivity in Ghana. Design/methodology/Approach - The study adopted a quantitative research approach with purposive sampling techniques where data was collected using surveys. The data were analyzed using SPSS software version 20.0, which enables the findings of the study to be examined under thematic areas.Findings: - The study revealed that good wages and working condition of workers have a positive correlation on productivity in the construction industry. Increase and improved wages and working conditions can results in higher productivity in the construction industry.Originality/value - This paper is exceptional in the sense that, it does examine the influence of construction workers wages and working conditions on productivity in Ghana. Social value/implications - The paper concludes that workers’ wages and their conditions have a high influence on productivity. It is then recommended that government should train, educate, give good wages to workers and improve on their working condition, give incentives and reduce tax importation on building or construction materials to aid in good productivity of construction firms.

Keywords: construction firms, construction industry, productivity, workers’ wages, working conditions

Procedia PDF Downloads 135
10345 Hybrid Risk Assessment Model for Construction Based on Multicriteria Decision Making Methods

Authors: J. Tamosaitiene

Abstract:

The article focuses on the identification and classification of key risk management criteria that represent the most important sustainability aspects of the construction industry. The construction sector is one of the most important sectors in Lithuania. Nowadays, the assessment of the risk level of a construction project is especially important for the quality of construction projects, the growth of enterprises and the sector. To establish the most important criteria for successful growth of the sector, a questionnaire for experts was developed. The analytic hierarchy process (AHP), the expert judgement method and other multicriteria decision making (MCDM) methods were used to develop the hybrid model. The results were used to develop an integrated knowledge system for the measurement of a risk level particular to construction projects. The article presents a practical case that details the developed system, sustainable aspects, and risk assessment.

Keywords: risk, system, model, construction

Procedia PDF Downloads 167
10344 Managing Multiple Change Projects in Supply Chains: A Case Study of a Moroccan Multi-Technical Services Company

Authors: Abdelouahab Errida, Bouchra Lotfi, Elalami Semma

Abstract:

In this paper, we try to address the topic of multiple change management by adopting an engineered research methodology, conducted within a Moroccan company during its implementation of several change projects that aim at improving its supply chain management performance. Firstly, we present the key concepts related to our research, namely change management, multiproject management and supply chain management. Then, we try to assess how the change management and multi-project management are applied in this company. Finally, we try to propose an approach that will help managers in dealing with multiple change projects. This approach proposes to integrate change management, project management and multi-project management for managing change projects according to three organizational levels: executive level, project portfolio level and change project level.

Keywords: change management, multi-project management, project management, change portfolio, supply chain management,

Procedia PDF Downloads 236
10343 Delay Studies in Construction: Synthesis, Critical Evaluation, and the Way Forward

Authors: Abdullah Alsehaimi

Abstract:

Over decades, there have been many studies of delay in construction, and this type of study continues to be popular in construction management research. A synthesis and critical evaluation of delay studies in developing countries reveals that poor project management is cited as one of the main causes of delay. However, despite such consensus, most of the previous studies fall short in providing clear recommendations demonstrating how project management practice could be improved. Moreover, the majority of recommendations are general and not devoted to solving the difficulties associated with particular delay causes. This paper aims to demonstrate that the root cause of this state of affairs is that typical research into delay tends to be descriptive and explanatory, making it inadequate for solving persistent managerial problems in construction. It is contended that many problems in construction could be mitigated via alternative research approaches, i.e. action and constructive research. Such prescriptive research methods can assist in the development and implementation of innovative tools tackling managerial problems of construction, including that of delay. In so doing, those methods will better connect research and practice, and thus strengthen the relevance of academic construction management.

Keywords: construction delay, action research, constructive research, industrial engineering

Procedia PDF Downloads 423
10342 Necessity of Using Cellular Lightweights Concrete in Construction Sector

Authors: Soner Guler, Fuat Korkut

Abstract:

Recently, the using of lightweights concretes in construction sector is rapidly increasing all over the world. Faster construction, low density and thermal transmitting coefficient and high fire resistance are the remarkable characteristics of the lightweight concretes. Lightweight concrete can be described as a type of concrete which enhance the volume of the mixture while giving additional advantages such as to reduce the dead weight of the structures. It is lighter than the conventional concrete. The use of lightweight concrete has been widely spread across countries such as USA, United Kingdom, and Sweden. In this study, the necessity of the using of lightweights concretes in the construction sector is emphasized and evaluated briefly for the architectures and civil engineers.

Keywords: lightweights concretes, low density, low thermal coefficient, construction sector

Procedia PDF Downloads 511
10341 Progress of Research on Community Canteens and Reflections on Planning in China

Authors: Xi Zuo

Abstract:

Against the background of the aging population and changing family structure in China, community canteens have become an important vehicle for community-based home care services and a new space for social interaction. In this paper, we review past studies and the actual construction situation in China, firstly sort out the social interaction of the elderly and the types of places, and on this basis, we find that there is an obvious disconnection between the current construction and the academic research, and the contradiction between social benefit and cost-effectiveness, and therefore we put forward the relevant construction planning and thinking, in order to provide a disciplinary basis and academic support for the construction of community canteens and the construction of elderly-friendly cities. In order to provide disciplinary basis and academic support for the construction of community canteens and the construction of senior-friendly cities.

Keywords: urban and rural planning, community canteens, elderly people, senior-friendly

Procedia PDF Downloads 62
10340 Productivity of Construction Companies Using the Management of Threats and Opportunities ‎in Construction Projects of Iran

Authors: Nima Amani, Ali Salehi Dastjerdi, Fatemeh Ahmadi, Ardalan Sabamehr

Abstract:

The cost overrun of the construction projects has always been one of the main problems of the construction companies caused by the risky nature of the construction projects. Therefore, today, the application of risk management is inevitable. Although in theory, the issue of risk management is divided into the opportunities and threats management, in practice, most of the projects have been focused on the threats management. However, considering the opportunities management and applying the opportunities-response strategies can lead to the improved profitability of the construction projects of the companies. In this paper, a new technique is developed to identify the opportunities in the construction projects using an improved protocol and propose the appropriate opportunities-response strategies to the construction companies to provide them with higher profitability. To evaluate the effectiveness of the protocol for selecting the most appropriate strategies in ‎response to the opportunities and threats, two projects from a construction company in Iran were ‎studied. Both projects selected were in mid-range in terms of size and similar in terms of time, ‎run time and costs. Finally, the output indicates that using the proposed opportunities-response strategies show that the company's profitability in the future can be increased approximately for similar projects.

Keywords: opportunities management, risk-response strategy, opportunity-response strategy, productivity, risk management

Procedia PDF Downloads 228
10339 Research on the Calculation Method of Smartization Rate of Concrete Structure Building Construction

Authors: Hongyu Ye, Hong Zhang, Minjie Sun, Hongfang Xu

Abstract:

In the context of China's promotion of smart construction and building industrialization, there is a need for evaluation standards for the development of building industrialization based on assembly-type construction. However, the evaluation of smart construction remains a challenge in the industry's development process. This paper addresses this issue by proposing a calculation and evaluation method for the smartization rate of concrete structure building construction. The study focuses on examining the factors of smart equipment application and their impact on costs throughout the process of smart construction design, production, transfer, and construction. Based on this analysis, the paper presents an evaluation method for the smartization rate based on components. Furthermore, it introduces calculation methods for assessing the smartization rate of buildings. The paper also suggests a rapid calculation method for determining the smartization rate using Building Information Modeling (BIM) and information expression technology. The proposed research provides a foundation for the swift calculation of the smartization rate based on BIM and information technology. Ultimately, it aims to promote the development of smart construction and the construction of high-quality buildings in China.

Keywords: building industrialization, high quality building, smart construction, smartization rate, component

Procedia PDF Downloads 70
10338 Mobile Application for Construction Sites Management

Authors: A. Khelifi, M. Al Kaabi, B. Al Rawashdeh

Abstract:

The infrastructure is one of the most important pillars of the UAE, where it spends millions of dollars for investments in the construction sectors. The research done by Kuwait Finance House (KFH) Research showed clearly that the UAE investments in the construction sectors have exceeded 30 billion dollars in 2013. There are many construction companies in the UAE and each one of them is taking the responsibilities to build different infrastructures. The large scale construction projects consist of multi human activities which can affect the efficiency and productivity of the running projects. The Construction Administration System is developed to increase the efficiency and productivity at the construction sites. It runs on two platforms: web server and mobile phone and supports two main users: mobile user and institution employee. With Construction Administration Mobile Application the user can manage and control several projects, create several reports and send these reports in Portable Document Format (PDF) formats through emails, view the physical location of each project, capturing and save photos. An institution employee can use the system to view all existing workers and projects, send emails and view the progress of each project.

Keywords: construction sites, management, mobile application, Portable Document Format (PDF)

Procedia PDF Downloads 375
10337 The Sustainability of Health and Safety on Construction Sites in Zamfara State

Authors: Ismaila Oladunni Muhammed, Adegbenga Raphael Ashiru

Abstract:

Construction industry has been attributed to be the engine growth of Nigerian economic and infrastructural development. It promotes infrastructural development and grows an average output of Nigerian Gross Domestic Profit. However, from this great prospect, yearly reports show that consistent accidents on construction sites in Zamfara State has affected a substantial number of workers as they become temporarily or permanently disabled, thereby making many construction sites a death trap. This posed a great threat to the industry’s sustainability, de- motivate workers from working in the industry, and further have negative impact on the economy as well. It is as a result of high construction site accident currently experiencing in Zamfara state that this research was carried out to appraise the sustainability of health and safety of construction workers on sites. The proper practice and compliance to Construction Health and safety laws are very vital to the output and growth of Zamfara State construction sector. However, a quantitative approach was adopted to justify the aforesaid statement which will provide a broader understanding of the study. Descriptive statistical analysis was obtained through Statistical Package for the Social Sciences (SPSS Version 20). Furthermore, the findings from the research highlighted that the performance and output of construction workers on construction sites depends on the proper practice of health and safety. The research findings also recommended ways to enhance employers and employee’s compliance with existing laws guiding health and safety on Zamfara State construction sites. Nevertheless, the purpose of the paper is to appraise the sustainability of Health and Safety on Zamfara State construction sites. This study further provided thorough information for resolving challenges of construction sites accidents to improve construction firm productivity and also ensured construction worker’s safety on site.

Keywords: construction industry, health and safety regulations, causes of accident, construction safety practices

Procedia PDF Downloads 212
10336 Comparative Study on Inhibiting Factors of Cost and Time Control in Nigerian Construction Practice

Authors: S. Abdulkadir, I. Y. Moh’d, S. U. Kunya, U. Nuruddeen

Abstract:

The basis of any contract formation between the client and contractor is the budgeted cost and the estimated duration of projects. These variables are paramount important to project's sponsor in a construction projects and in assessing the success or viability of construction projects. Despite the availability of various techniques of cost and time control, many projects failed to achieve their initial estimated cost and time. The paper evaluate the inhibiting factors of cost and time control in Nigerian construction practice and comparing the result with the United Kingdom practice as identified by one researcher. The populations of the study are construction professionals within Bauchi and Gombe state, Nigeria, a judgmental sampling employed in determining the size of respondents. Descriptive statistics used in analyzing the data in SPSS. Design change, project fraud and corruption, financing and payment of completed work found to be common among the top five inhibiting factors of cost and time control in the study area. Furthermore, the result had shown some comprising with slight contrast as in the case of United Kingdom practice. Study recommend the adaptation of mitigation measures developed in the UK prior to assessing its effectiveness and so also developing a mitigating measure for other top factors that are not within the one developed in United Kingdom practice. Also, it recommends a wider assessing comparison on the modify inhibiting factors of cost and time control as revealed by the study to cover almost all part of Nigeria.

Keywords: comparison, cost, inhibiting factor, United Kingdom, time

Procedia PDF Downloads 440
10335 Socioeconomic Status and Gender Influence on Linguistic Change: A Case Study on Language Competence and Confidence of Multilingual Minority Language Speakers

Authors: Stefanie Siebenhütter

Abstract:

Male and female speakers use language differently and with varying confidence levels. This paper contrasts gendered differences in language use with socioeconomic status and age factors. It specifically examines how Kui minority language use and competence are conditioned by the variable of gender and discusses potential reasons for this variation by examining gendered language awareness and sociolinguistic attitudes. Moreover, it discusses whether women in Kui society function as 'leaders of linguistic change', as represented in Labov’s sociolinguistic model. It discusses whether societal role expectations in collectivistic cultures influence the model of linguistic change. The findings reveal current Kui speaking preferences and give predictions on the prospective language use, which is a stable situation of multilingualism because the current Kui speakers will socialize and teach the prospective Kui speakers in the near future. It further confirms that Lao is losing importance in Kui speaker’s (female’s) daily life.

Keywords: gender, identity construction, language change, minority language, multilingualism, sociolinguistics, social Networks

Procedia PDF Downloads 177
10334 The Different Ways to Describe Regular Languages by Using Finite Automata and the Changing Algorithm Implementation

Authors: Abdulmajid Mukhtar Afat

Abstract:

This paper aims at introducing finite automata theory, the different ways to describe regular languages and create a program to implement the subset construction algorithms to convert nondeterministic finite automata (NFA) to deterministic finite automata (DFA). This program is written in c++ programming language. The program reads FA 5tuples from text file and then classifies it into either DFA or NFA. For DFA, the program will read the string w and decide whether it is acceptable or not. If accepted, the program will save the tracking path and point it out. On the other hand, when the automation is NFA, the program will change the Automation to DFA so that it is easy to track and it can decide whether the w exists in the regular language or not.

Keywords: finite automata, subset construction, DFA, NFA

Procedia PDF Downloads 426
10333 Dynamic Construction Site Layout Using Ant Colony Optimization

Authors: Yassir AbdelRazig

Abstract:

Evolutionary optimization methods such as genetic algorithms have been used extensively for the construction site layout problem. More recently, ant colony optimization algorithms, which are evolutionary methods based on the foraging behavior of ants, have been successfully applied to benchmark combinatorial optimization problems. This paper proposes a formulation of the site layout problem in terms of a sequencing problem that is suitable for solution using an ant colony optimization algorithm. In the construction industry, site layout is a very important planning problem. The objective of site layout is to position temporary facilities both geographically and at the correct time such that the construction work can be performed satisfactorily with minimal costs and improved safety and working environment. During the last decade, evolutionary methods such as genetic algorithms have been used extensively for the construction site layout problem. This paper proposes an ant colony optimization model for construction site layout. A simple case study for a highway project is utilized to illustrate the application of the model.

Keywords: ant colony, construction site layout, optimization, genetic algorithms

Procedia PDF Downloads 383
10332 The Relationship between Absorptive Capacity and Green Innovation

Authors: R. Hashim, A. J. Bock, S. Cooper

Abstract:

Absorptive capacity generally facilitates the adoption of innovation. How does this relationship change when economic return is not the sole driver of innovation uptake? We investigate whether absorptive capacity facilitates the adoption of green innovation based on a survey of 79 construction companies in Scotland. Based on the results of multiple regression analyses, we confirm that existing knowledge utilisation (EKU), knowledge building (KB) and external knowledge acquisition (EKA) are significant predictors of green process GP), green administrative (GA) and green technical innovation (GT), respectively. We discuss the implications for theories of innovation adoption and knowledge enhancement associated with environmentally-friendly practices.

Keywords: absorptive capacity, construction industry, environmental, green innovation

Procedia PDF Downloads 526
10331 Treatment of the Modern Management Mechanism of the Debris Flow Processes Expected in the Mletiskhevi

Authors: G. Chakhaia, S. Gogilava, L. Tsulukidze, Z. Laoshvili, I. Khubulava, S. Bosikashvili, T. Gugushvili

Abstract:

The work reviewed and evaluated various genesis debris flow phenomena recently formatted in the Mletiskhevi, accordingly it revealed necessity of treatment modern debris flow against measures. Based on this, it is proposed the debris flow against truncated semi cone shape construction, which elements are contained in the car’s secondary tires. its constituent elements (sections), due to the possibilities of amortization and geometric shapes is effective and sustainable towards debris flow hitting force. The construction is economical, because after crossing the debris flows in the river bed, the riverbed is not cleanable, also the elements of the building are resource saving. For assessment of influence of cohesive debris flow at the construction and evaluation of the construction effectiveness have been implemented calculation in the specific assumptions with approved methodology. According to the calculation, it was established that after passing debris flow in the debris flow construction (in 3 row case) its hitting force reduces 3 times, that causes reduce of debris flow speed and kinetic energy, as well as sedimentation on a certain section of water drain in the lower part of the construction. Based on the analysis and report on the debris flow against construction, it can be said that construction is effective, inexpensive, technically relatively easy-to-reach measure, that’s why its implementation is prospective.

Keywords: construction, debris flow, sections, theoretical calculation

Procedia PDF Downloads 193
10330 An Assessment of Existing Material Management Process in Building Construction Projects in Nepal

Authors: Uttam Neupane, Narendra Budha, Subash Kumar Bhattarai

Abstract:

Material management is an essential part in construction project management. There are a number of material management problems in the Nepalese construction industry, which contribute to an inefficient material management system. Ineffective material management can cause waste of time and money thus increasing the problem of time and cost overrun. An assessment of material management system with gap and solution was carried out on 20 construction projects implemented by the Federal Level Project Implementation Unit (FPIU); Kaski district of Nepal. To improve the material management process, the respondents have provided possible solutions to overcome the gaps seen in the current material management process. The possible solutions are preparation of material schedule in line with the construction schedule for material requirement planning, verifications of material and locating of source, purchasing of the required material in advance before commencement of work, classifying the materials, and managing the inventory based on their usage value and eliminating and reduction in wastages during the overall material management process.

Keywords: material management, construction site, inventory, construction project

Procedia PDF Downloads 68
10329 Causes of Variation Orders in the Egyptian Construction Industry: Time and Cost Impacts

Authors: A. Samer Ezeldin, Jwanda M. El Sarag

Abstract:

Variation orders are of great importance in any construction project. Variation orders are defined as any change in the scope of works of a project that can be an addition omission, or even modification. This paper investigates the variation orders that occur during construction projects in Egypt. The literature review represents a comparison of causes of variation orders among Egypt, Tanzania, Nigeria, Malaysia and the United Kingdom. A classification of occurrence of variation orders due to owner related factors, consultant related factors and other factors are signified in the literature review. These classified events that lead to variation orders were introduced in a survey with 19 events to observe their frequency of occurrence, and their time and cost impacts. The survey data was obtained from 87 participants that included clients, consultants, and contractors and a database of 42 scenarios was created. A model is then developed to help assist project managers in predicting the frequency of variations and account for a budget for any additional costs and minimize any delays that can take place. Two experts with more than 25 years of experience were given the model to verify that the model was working effectively. The model was then validated on a residential compound that was completed in July 2016 to prove that the model actually produces acceptable results.

Keywords: construction, cost impact, Egypt, time impact, variation orders

Procedia PDF Downloads 183
10328 Top-Down Construction Method in Concrete Structures: Advantages and Disadvantages of This Construction Method

Authors: Hadi Rouhi Belvirdi

Abstract:

The construction of underground structures using the traditional method, which begins with excavation and the implementation of the foundation of the underground structure, continues with the construction of the main structure from the ground up, and concludes with the completion of the final ceiling, is known as the Bottom-Up Method. In contrast to this method, there is an advanced technique called the Top-Down Method, which has practically replaced the traditional construction method in large projects in industrialized countries in recent years. Unlike the traditional approach, this method starts with the construction of surrounding walls, columns, and the final ceiling and is completed with the excavation and construction of the foundation of the underground structure. Some of the most significant advantages of this method include the elimination or minimization of formwork surfaces, the removal of temporary bracing during excavation, the creation of some traffic facilities during the construction of the structure, and the possibility of using it in limited and high-traffic urban spaces. Despite these numerous advantages, unfortunately, there is still insufficient awareness of this method in our country, to the extent that it can be confidently stated that most stakeholders in the construction industry are unaware of the existence of such a construction method. However, it can be utilized as a very important execution option alongside other conventional methods in the construction of underground structures. Therefore, due to the extensive practical capabilities of this method, this article aims to present a methodology for constructing underground structures based on the aforementioned advanced method to the scientific community of the country, examine the advantages and limitations of this method and their impacts on time and costs, and discuss its application in urban spaces. Finally, some underground structures executed in the Ahvaz urban rail, which are being implemented using this advanced method to the best of our best knowledge, will be introduced.

Keywords: top-down method, bottom-up method, underground structure, construction method

Procedia PDF Downloads 12
10327 Significant Factors to Motivate Small and Medium Enterprise (SME) Construction Firms in the Philippines to Implement ISO 9001:2008

Authors: Joseph Berlin P. Juanzon, Manuel M. Muhi

Abstract:

Motivating SME-based construction firms to adopt different management systems is not a simple task, especially if they are not aware of the benefits that they will gain from the new process-based management system. The implementation of ISO 9001:2008, Quality Management System in the construction industry is an ongoing trend, more so in the Small and Medium Enterprise. However, the level of awareness and readiness of the construction industry in the Philippines is still low as compared to the neighboring countries in Asia and in the western countries where ISO 9001:2008 originated. The purpose of this research is to determine the significant factors that will motivate SME-based construction firms in the Philippines to implement ISO 9001:2008. A field study was conducted on SME based construction firms in the Philippines, wherein a total of 139 respondents out of the 613 SME-based construction firms in CALABARZON areas were surveyed. Results reveal that the three main factors that will motivate SME-based construction firms to implement ISO 9001:2008 are: - if required by their clients, - to qualify for bidding, and - to increase customer satisfaction. Therefore, based on the results and findings, a certification of ISO 9001:2008 from an accredited auditor shall be required by clients as a constituent in accrediting SME-based construction firms and to qualify for bidding.

Keywords: construction, ISO 9001:2008, quality management systems (QMS), small medium enterprise (SME)

Procedia PDF Downloads 395
10326 Causality between the Construction Industry and the GDP in the United Arab Emirates

Authors: Hasan S. Mahmoud, Salwa M. Beheiry, Vian Ahmed

Abstract:

In light of the repercussions of the 2008 global economic crisis, the response of the United Arab Emirates economy and growth, and the vast construction activities that are undergoing, there is a need to investigate the relationship between construction activities and the Gross Domestic Product (GDP). This study aims to investigate the causality relationship between the construction industry in the United Arab Emirates and the GDP of the country in the last decade. For that, this study will investigate the relationship between the growth of the GDP and the growth of construction activities and their value addition to the economy. To ascertain this relationship, Granger Causality method is used to identify the causality between the time-dependent series.

Keywords: construction value addition, Granger causality, growth of gross domestic product, United Arab Emirates

Procedia PDF Downloads 145