Search results for: river delineation
1035 The Effects of Land Use Types to Determine the Status of Sustainable River
Authors: Michael Louis Sunaris, Robby Yussac Tallar
Abstract:
The concept of sustainable river is evolving in Indonesia today. Many rivers condition in Indonesia have decreased by quality and quantity. The degradation of this condition is caused by rapid land use change as a result of increased population growth and human activity. It brings the degradation of the existing watersheds including some types of land use that an important factor in determining the status of river sustainability. Therefore, an evaluation method is required to determine the sustainability status of waterbody within watershed. The purpose of this study is to analyze various types of land use in determining the status of river sustainability. This study takes the watersheds of Citarum Upstream as a study area. The results of the analysis prove the index of sustainability status of the river that changes from good to bad or average in the rivers in the study area. The rapid and uncontrolled changes of land use especially in the upper watersheds area are the main causes that happened over time. It was indicated that the cumulative runoff coefficients were increased significantly. These situations indicated that the damage of watersheds has an impact on the water surplus or deficit problem yearly. Therefore, the rivers in Indonesia should be protected and conserved. The sustainability index of the rivers is an index to indicate the condition of watersheds by defining status of rivers in order to achieve sustainable water resource management.Keywords: land use change, runoff coefficient, a simple index, sustainable river
Procedia PDF Downloads 1551034 Impact of Meteorological Events and Sand Excavation on Turbidity and Total Suspended Solids Levels of Imo River
Authors: Ihejirika Chinedu Emeka, Njoku John Didacus, Obenade Moses
Abstract:
This study was aimed at determining the impact of meteorological events (seasonal variations) and sand excavation activities on turbidity and Total Suspended Solids (TSS) of Imo River, Southeastern Nigeria. In-situ measurements of the parameters were carried out at the peaks of two consecutive seasons–dry and rainy season at seven major points of sand excavation along the river, under standard analytical methods. There were significant variations in seasons (P<0.05) for turbidity and TSS at all locations. The average turbidity concentration of locations were 36.71 NTU, during the rainy season, and 17 NTU in a dry season, while the average TSS concentration were 27.14 mg/L, during the rainy season, and 8.86mg/L in a dry season. Turbidity correlated positively (strongly) with TSS (r=0.956) at R–Square=0.91. Turbidity and TSS values were higher during the rainy season than the dry season. Turbidity increased when Total Suspended Solids increased. Sand excavation increased turbidity and TSS values of Imo River. The river had moderate water quality during the rainy season and unimpaired water quality during a dry season. The river was not very clear in both seasons, but clearer in a dry season than in rainy season. The increase in turbidity and TSS can lead to the destruction of aquatic biodiversity and stagnation of ecosystem processes. Exposure of aquatic animals to the recorded turbidity level in a rainy season can lead to stress.Keywords: biodiversity destruction, meteorological events, pollution, sand excavation
Procedia PDF Downloads 4931033 20th-Century River Course Changes and Their Relation to Sediment Carbon Distribution Patterns in the Yellow River Delta
Authors: Dongxue Li, Zhonghua Ning, Yi’na Li, Baoshan Cui, Wasner Daniel, Sebastian Dötterl
Abstract:
Most of the world's coastal alluvial plains can be significant carbon (C) eservoirs in which upland sediments are deposited and bury former topsoil, thereby contributing to soil C preservation, especially in river-controlled deltas like the Yellow River Delta, China. These deltas are affected by the continuous large amount of sediment transport and strong river dynamics from the upper reaches, which makes the river course in the deltas change frequently. However, the impact of varying river course changes on C stocks in these estuary wetlands is unclear. To investigate this, we drilled five 2 m cores along a sediment deposition sequence of the Yellow River Delta, which shifted its main course flow in the delta several times throughout the 20th century. Covering 80 years of sediment deposition, we explored both soil C stocks and their potential sources, and identified key soil physicochemical and hydrometeorological variables that correlate to C density and deposition rate. Further, the spatiotemporal C distribution and its relationship with these variables was examined. Our results showed that sediments at a soil depth of 200 cm in the main courses of the Yellow River corresponded to deposition ages ranging from 1942 to 1989. The oldest course has the lowest C stocks and showed C-enriched compared with younger courses. Contributions of soil C stemming from fresh particulate organic carbon from deposited upstream sources were significantly higher than local, in-situ vegetation. In addition, the carbon of the oldest and relatively young courses tends to be affected by interaction effects of hydrometeorological and physiochemical varibales, and that of the middle courses tends to be affected by independent variables. Our findings can help prioritize conservation efforts across different river courses and provide quantitative support for global carbon emission reduction by assessing sediment carbon reservoirs.Keywords: alluvial plains, coastal wetland, core drilling, course diversion, organic carbon, sediment deposition rate, soil deposition
Procedia PDF Downloads 271032 An Investigation into the Impact of the Relocation of Tannery Industry on Water Quality Parameters of Urban River Buriganga
Authors: Md Asif Imrul, Maria Rafique, M. Habibur Rahman
Abstract:
The study deals with an investigation into the impact of the relocation of tannery industry on water quality parameters of Buriganga. For this purpose, previous records have been collected from authentic data resources and for the attainment of present values, several samples were collected from three major locations of the Buriganga River during summer and winter seasons in 2018 to determine the distribution and variation of water quality parameters. Samples were collected six ft below the river water surface. Analysis indicates slightly acidic to slightly alkaline (6.8-7.49) in nature. Bio-Chemical Oxygen Demand, Total Dissolved Solids, Total Solids (TS) & Total Suspended Solids (TSS) have been found greater in summer. On the other hand, Dissolved Oxygen is found greater in rainy seasons. Relocation shows improvement in water quality parameters. Though the improvement related to relocation of tannery industry is not adequate to turn the water body to be an inhabitable place for aquatic lives.Keywords: Buriganga river, river pollution, tannery industry, water quality parameters
Procedia PDF Downloads 1571031 Investigation of the Heavy Metal Pollution of the River Ecosystems in the Lake Sevan Basin, Armenia
Authors: G. Gevorgyan, S. Khudaverdyan, A. Vaseashta
Abstract:
The Lake Sevan basin is situated in the eastern part of the Republic of Armenia (Gegharquniq marz/district). The heavy metal pollution of the some tributaries of Lake Sevan was investigated. Water sampling was performed in August and December, 2014 from the 4 observation sites: 1) Sotq river upstream (about 600 meters upstream from the Sotq gold mine); 2) Sotq river mouth; 3) Masrik river mouth; 4) Dzknaget river mouth. Heavy metal (V, Fe, Ni, Cu, As, Mo, Pb) concentrations in the water samples were determined by the standard methods using an atomic absorption spectrophotometer. The results of the study showed that heavy metal content mainly increased from the upstream of the Sotq river to the mouth of the Masrik river which may have been conditioned by the influence of gold mining activity as the Masrik and its tributary-Sotq rivers passing through the gold mining area were exposed to heavy metal pollution. The observation sites can be ranked by pollution degree as follows: №3> №2> №1> №4. The highest heavy metal pollution degree was observed in the Masrik river mouth which may have been conditioned by the direct impact of gold mining activity and the pressure of its tributary–the Sotq river which flows through the gold mining area. The lowest heavy metal pollution degree was registered in the Dzknaget river mouth which flowing through rural areas wasn’t subject to significant heavy metal pollution. According to the observation sites of the Sotq and Masrik rivers, high positive correlation was mainly observed between the concentrations of the investigated heavy metals (except nickel) which indicated that all the heavy metals except the nickel had the same anthropogenic pollution source which was the activity of the Sotq gold mine. In general, it is possible to state that the activity of the Sotq gold mine in the Lake Sevan basin caused the heavy metal pollution of the Sotq and Masrik rivers which may have posed environmental hazards. Heavy metals are nondegradable substances, and heavy metal pollution of freshwater systems may pose risks to the environment and human health through accumulation in the tissues of aquatic organisms, water-food chain as well as oral ingestion and dermal contact.Keywords: Armenia, Lake Sevan basin, gold mining activity, river ecosystems, heavy metal pollution
Procedia PDF Downloads 5821030 Cloud Resources Utilization and Science Teacher’s Effectiveness in Secondary Schools in Cross River State, Nigeria
Authors: Michael Udey Udam
Abstract:
Background: This study investigated the impact of cloud resources, a component of cloud computing, on science teachers’ effectiveness in secondary schools in Cross River State. Three (3) research questions and three (3) alternative hypotheses guided the study. Method: The descriptive survey design was adopted for the study. The population of the study comprised 1209 science teachers in public secondary schools of Cross River state. Sample: A sample of 487 teachers was drawn from the population using a stratified random sampling technique. The researcher-made structured questionnaire with 18 was used for data collection for the study. Research question one was answered using the Pearson Product Moment Correlation, while research question two and the hypotheses were answered using the Analysis of Variance (ANOVA) statistics in the Statistical Package for Social Sciences (SPSS) at a 0.05 level of significance. Results: The results of the study revealed that there is a positive correlation between the utilization of cloud resources in teaching and teaching effectiveness among science teachers in secondary schools in Cross River state; there is a negative correlation between gender and utilization of cloud resources among science teachers in secondary schools in Cross River state; and that there is a significant correlation between teaching experience and the utilization of cloud resources among science teachers in secondary schools in Cross River state. Conclusion: The study justifies the effectiveness of the Cross River state government policy of introducing cloud computing into the education sector. The study recommends that the policy should be sustained.Keywords: cloud resources, science teachers, effectiveness, secondary school
Procedia PDF Downloads 721029 Flood Hazard and Risk Mapping to Assess Ice-Jam Flood Mitigation Measures
Authors: Karl-Erich Lindenschmidt, Apurba Das, Joel Trudell, Keanne Russell
Abstract:
In this presentation, we explore options for mitigating ice-jam flooding along the Athabasca River in western Canada. Not only flood hazard, expressed in this case as the probability of flood depths and extents being exceeded, but also flood risk, in which annual expected damages are calculated. Flood risk is calculated, which allows a cost-benefit analysis to be made so that decisions on the best mitigation options are not based solely on flood hazard but also on the costs related to flood damages and the benefits of mitigation. The river ice model is used to simulate extreme ice-jam flood events with which scenarios are run to determine flood exposure and damages in flood-prone areas along the river. We will concentrate on three mitigation options – the placement of a dike, artificial breakage of the ice cover along the river, the installation of an ice-control structure, and the construction of a reservoir. However, any mitigation option is not totally failsafe. For example, dikes can still be overtopped and breached, and ice jams may still occur in areas of the river where ice covers have been artificially broken up. Hence, for all options, it is recommended that zoning of building developments away from greater flood hazard areas be upheld. Flood mitigation can have a negative effect of giving inhabitants a false sense of security that flooding may not happen again, leading to zoning policies being relaxed. (Text adapted from Lindenschmidt [2022] "Ice Destabilization Study - Phase 2", submitted to the Regional Municipality of Wood Buffalo, Alberta, Canada)Keywords: ice jam, flood hazard, flood risk river ice modelling, flood risk
Procedia PDF Downloads 1841028 Bathymetric Change of Brahmaputra River and Its Influence on Flooding Scenario
Authors: Arup Kumar Sarma, Rohan Kar
Abstract:
The development of physical model of River like Brahmaputra, which finds its origin in the Chema Yundung glacier of Tibet and flows through India and Bangladesh, is always expensive and very much time consuming. With the advancement of computational technique, mathematical modeling has found wide application. MIKE 21C is one such commercial software, developed by Danish Hydraulic Institute (DHI), with the depth-averaged approach and a two-dimensional curvilinear finite-difference model, which is capable of modeling hydrodynamic and morphological processes with some limitations. The main purpose of this study are to generate bathymetry of the River Brahmaputra starting from “Sadia” at upstream to “Dhubri,” at downstream stretching a distance of approximately 695 km, for four different years: 1957, 1971, 1977, and 1981 over the grid generated in the MIKE 21C and to carry out the hydrodynamic simulation for these years to analyze the effect of bathymetry change on the surface water elevation. The study has established that bathymetric change can influence the flood level significantly in some of the river reaches and therefore the modification or updating of regular bathymetry is very much essential for the reliable flood routing in alluvial rivers.Keywords: bathymetry, brahmaputra river, hydrodynamic model, surface water elevation
Procedia PDF Downloads 4511027 Assessment of Water Quality Network in Karoon River by Dynamic Programming Approach (DPA)
Authors: M. Nasri Nasrabadi, A. A. Hassani
Abstract:
Karoon is one of the greatest and longest rivers of Iran, which because of the existence of numerous industrial, agricultural centers and drinking usage, has a strategic situation in the west and southwest parts of Iran, and the optimal monitoring of its water quality is an essential and indispensable national issue. Due to financial constraints, water quality monitoring network design is an efficient way to manage water quality. The most crucial part is to find appropriate locations for monitoring stations. Considering the objectives of water usage, we evaluate existing water quality sampling stations of this river. There are several methods for assessment of existing monitoring stations such as Sanders method, multiple criteria decision making and dynamic programming approach (DPA) which DPA opted in this study. The results showed that due to the drinking water quality index out of 20 existing monitoring stations, nine stations should be retained on the river, that include of Gorgor-Band-Ghir of A zone, Dez-Band-Ghir of B zone, Teir, Pole Panjom and Zargan of C zone, Darkhoein, Hafar, Chobade, and Sabonsazi of D zone. In additional, stations of Dez river have the best conditions.Keywords: DPA, karoon river, network monitoring, water quality, sampling site
Procedia PDF Downloads 3751026 Quantitative Analysis of Nutrient Inflow from River and Groundwater to Imazu Bay in Fukuoka, Japan
Authors: Keisuke Konishi, Yoshinari Hiroshiro, Kento Terashima, Atsushi Tsutsumi
Abstract:
Imazu Bay plays an important role for endangered species such as horseshoe crabs and black-faced spoonbills that stay in the bay for spawning or the passing of winter. However, this bay is semi-enclosed with slow water exchange, which could lead to eutrophication under the condition of excess nutrient inflow to the bay. Therefore, quantification of nutrient inflow is of great importance. Generally, analysis of nutrient inflow to the bays takes into consideration nutrient inflow from only the river, but that from groundwater should not be ignored for more accurate results. The main objective of this study is to estimate the amounts of nutrient inflow from river and groundwater to Imazu Bay by analyzing water budget in Zuibaiji River Basin and loads of T-N, T-P, NO3-N and NH4-N. The water budget computation in the basin is performed using groundwater recharge model and quasi three-dimensional two-phase groundwater flow model, and the multiplication of the measured amount of nutrient inflow with the computed discharge gives the total amount of nutrient inflow to the bay. In addition, in order to evaluate nutrient inflow to the bay, the result is compared with nutrient inflow from geologically similar river basins. The result shows that the discharge is 3.50×107 m3/year from the river and 1.04×107 m3/year from groundwater. The submarine groundwater discharge accounts for approximately 23 % of the total discharge, which is large compared to the other river basins. It is also revealed that the total nutrient inflow is not particularly large. The sum of NO3-N and NH4-N loadings from groundwater is less than 10 % of that from the river because of denitrification in groundwater. The Shin Seibu Sewage Treatment Plant located below the observation points discharges treated water of 15,400 m3/day and plans to increase it. However, the loads of T-N and T-P from the treatment plant are 3.9 mg/L and 0.19 mg/L, so that it does not contribute a lot to eutrophication.Keywords: Eutrophication, groundwater recharge model, nutrient inflow, quasi three-dimensional two-phase groundwater flow model, submarine groundwater discharge
Procedia PDF Downloads 4531025 Assessment of the Water Quality of the Nhue River in Vietnam and its Suitability for Irrigation Water
Authors: Thi Lan Huong Nguyen, Motohei Kanayama, Takahiro Higashi, Van Chinh Le, Thu Ha Doan, Anh Dao Chu
Abstract:
The Nhue River in Vietnam is the main source of irrigation water for suburban agricultural land and fish farm. Wastewater from the industrial plants located along these rivers has been discharged, which has degraded the water quality of the rivers. The present paper describes the chemical properties of water from the river focusing on heavy metal pollution and the suitability of water quality for irrigation. Water from the river was heavily polluted with heavy metals such as Pb, Cu, Zn, Cr, Cd, and Ni. Dissolved oxygen, COD, and total suspended solids, and the concentrations of all heavy metals exceeded the Vietnamese standard for surface water quality in all investigated sites. The concentrations of some heavy metals such as Cu, Cd, Cr and Ni were over the internationally recommended WHO maximum limits for irrigation water. A wide variation in heavy metal concentration of water due to metal types is the result of wastewater discharged from different industrial sources.Keywords: heavy metals, stream water, irrigation, industry
Procedia PDF Downloads 3991024 Delineation of the Geoelectric and Geovelocity Parameters in the Basement Complex of Northwestern Nigeria
Authors: M. D. Dogara, G. C. Afuwai, O. O. Esther, A. M. Dawai
Abstract:
The geology of Northern Nigeria is under intense investigation particularly that of the northwest believed to be of the basement complex. The variability of the lithology is consistently inconsistent. Hence, the need for a close range study, it is, in view of the above that, two geophysical techniques, the vertical electrical sounding employing the Schlumberger array and seismic refraction methods, were used to delineate the geoelectric and geovelocity parameters of the basement complex of northwestern Nigeria. A total area of 400,000 m² was covered with sixty geoelectric stations established and sixty sets of seismic refraction data collected using the forward and reverse method. From the interpretation of the resistivity data, it is suggestive that the area is underlain by not more than five geoelectric layers of varying thicknesses and resistivities when a maximum half electrode spread of 100m was used. The result of the interpreted seismic data revealed two geovelocity layers, with velocities ranging between 478m/s to 1666m/s for the first layer and 1166m/s to 7141m/s for the second layer. The results of the two techniques, suggests that the area of study has an undulating bedrock topography with geoeletric and geovelocity layers composed of weathered rock materials.Keywords: basement complex, delineation, geoelectric, geovelocity, Nigeria
Procedia PDF Downloads 1501023 Flood Hazard Impact Based on Simulation Model of Potential Flood Inundation in Lamong River, Gresik Regency
Authors: Yunita Ratih Wijayanti, Dwi Rahmawati, Turniningtyas Ayu Rahmawati
Abstract:
Gresik is one of the districts in East Java Province, Indonesia. Gresik Regency has three major rivers, namely Bengawan Solo River, Brantas River, and Lamong River. Lamong River is a tributary of Bengawan Solo River. Flood disasters that occur in Gresik Regency are often caused by the overflow of the Lamong River. The losses caused by the flood were very large and certainly detrimental to the affected people. Therefore, to be able to minimize the impact caused by the flood, it is necessary to take preventive action. However, before taking preventive action, it is necessary to have information regarding potential inundation areas and water levels at various points. For this reason, a flood simulation model is needed. In this study, the simulation was carried out using the Geographic Information System (GIS) method with the help of Global Mapper software. The approach used in this simulation is to use a topographical approach with Digital Elevation Models (DEMs) data. DEMs data have been widely used for various researches to analyze hydrology. The results obtained from this flood simulation are the distribution of flood inundation and water level. The location of the inundation serves to determine the extent of the flooding that occurs by referring to the 50-100 year flood plan, while the water level serves to provide early warning information. Both will be very useful to find out how much loss will be caused in the future due to flooding in Gresik Regency so that the Gresik Regency Regional Disaster Management Agency can take precautions before the flood disaster strikes.Keywords: flood hazard, simulation model, potential inundation, global mapper, Gresik Regency
Procedia PDF Downloads 821022 Geomorphological Features and their Significance Along Dhauli Ganga River Valley in North-Eastern Kumaun Himalaya in Pithauragah District, Uttarakhand, India
Authors: Puran Chandra Joshi
Abstract:
The Himalaya is the newest mountain system on this earth. This highest as well as fragile mountain system is still rising up. The tectonic activities have been experienced by this entire area, so the geomorphology of the region is affected by it. As we know, geomorphology is the study of landforms and their processes on the earth surface. These landforms are very important for human beings and other creatures on this planet. Present paper traces out the geomorphological features and their significance along Dhauli Ganga river valley in the Himalaya. Study area falls in higher Himalaya, which has experienced glacial and fluvial processes. Dhauli Ganga river is a considerable tributary of river kali, which is the part of huge Gangetic system. Dhauli originates in the form of two tributaries from valley glaciers of the southern slopes of Kumaun-Tibbet water divide. The upper catchment of this river has been carved by the glacial activity. The area of investigation is a remote regionin, Kumaun Himalaya. The native people do seasonal migration due to harsh winters. In summers, they return back with their cattle. In this season, they also grow potatoes and pulses, especiallybeanson river terraces. This study is important for making policies in the entire area. Area has witnessed big landslide in the recent past. So, the present study becomes more important.Keywords: himalaya, geomorphology, glacial, tectonics
Procedia PDF Downloads 1211021 Stream Channel Changes in Balingara River, Sulawesi Tengah
Authors: Muhardiyan Erawan, Zaenal Mutaqin
Abstract:
Balingara River is one of the rivers with the type Gravel-Bed in Indonesia. Gravel-Bed Rivers easily deformed in a relatively short time due to several variables, that are climate (rainfall), river discharge, topography, rock types, and land cover. To determine stream channel changes in Balingara River used Landsat 7 and 8 and analyzed planimetric or two dimensions. Parameters to determine changes in the stream channel are sinuosity ratio, Brice Index, the extent of erosion and deposition. Changes in stream channel associated with changes in land cover then analyze with a descriptive analysis of spatial and temporal. The location of a stream channel has a low gradient in the upstream, and middle watershed with the type of rock in the form of gravel is more easily changed than other locations. Changes in the area of erosion and deposition influence the land cover changes.Keywords: Brice Index, erosion, deposition, gravel-bed, land cover change, sinuosity ratio, stream channel change
Procedia PDF Downloads 3261020 Contribution of Algerians Local Materials on the Compressive Strengths of Concrete: Experimental and Numerical Study
Authors: Mohamed Lyes Kamel Khouadjia, Bouzidi Mezghiche
Abstract:
The evolution in the civil engineering and carried out more consumption of aggregates and particularly the sand. Due to the depletion of natural reserves of sand, it is necessary to focus on the use of local materials such as crushed sand, river sand and dune sand, mineral additions. The aim of this work is to improve the state of knowledge on the compressive strengths of crushed sands with several mixtures (dune sand, river sand, pozzolan, and slag). The obtained results were compared with numerical results obtained with the software Béton Lab Pro 3.Keywords: crushed sand, river sand, dune sand, pouzzolan, slag, compressive strengths, Béton Lab Pro 3
Procedia PDF Downloads 3231019 The Analysis of Priority Flood Control Management Using Analysis Hierarchy Process
Authors: Pravira Rizki Suwarno, Fanny Aliza Savitri, Priseyola Ayunda Prima, Pipin Surahman, Mahelga Levina Amran, Khoirunisa Ulya Nur Utari, Nora Permatasari
Abstract:
The Bogowonto River or commonly called the Bhagawanta River, is one of the rivers on Java Island. It is located in Central Java, Indonesia. Its watershed area is 35 km² with 57 km long. This river covers three regencies, namely Wonosobo Regency and Magelang Regency in the upstream and Purworejo Regency in the south and downstream. The Bogowonto River experiences channel narrowing and silting. It is caused by garbage along the river that comes from livestock and household waste. The narrowing channel and siltation cause a capacity reduction of the river to drain flood discharge. Comprehensive and sustainable actions are needed in dealing with current and future floods. Based on these current conditions, a priority scale is required. Therefore, this study aims to determine the priority scale of flood management in Purworejo Regency using the Analytical Hierarchy Process (AHP) method. This method will determine the appropriate actions based on the rating. In addition, there will be field observations through distributing questionnaires to several parties, including the stakeholders and the community. The results of this study will be in 2 (two) forms of actions, both structurally covering water structures and non-structural, including social, environmental, and law enforcement.Keywords: analytical hierarchy process, bogowonto, flood control, management
Procedia PDF Downloads 2041018 Spatial Orientation of Land Use Activities along Buffalo River Estuary: A Study in Buffalo City Metropolitan Municipality, Eastern Cape South Africa
Authors: A. Ngunga, M. K. Soviti, S. Nakin
Abstract:
South Africa is one of the developing countries rich in estuary ecosystem. Previous studies have identified many impacts of land use activities on the pollution status of the estuaries. These land use activity and related practices are often blamed for the many pollution problems affecting the estuaries. For example, the estuarine ecosystems on a global scale are experiencing vast transformations from anthropogenic influences; Buffalo River Estuary is one of the influenced estuaries whereby the sources of pollution are unknown. These problems consequently lead to the degradation of the estuaries. The aim of the research was to establish the factors that have the potential to impact pollution status of Buffalo river estuary. Study focuses on Identifying and mapping land use activities along Buffalo River Estuary. Questionnaire survey, structured interviews, direct observation, GPS survey and ArcGIS mapping were the methods used for data collection in the area, and results were analyzed and presented by ANOVA and Microsoft Excel statistical methods. The results showed that harbour is the main source of pollution, in Buffalo River Estuary, through Ballast water discharge. Therefore that requires more concern for protecting and cleaning the estuary.Keywords: estuary, land-use activities, pollution, mapping, water pollution
Procedia PDF Downloads 1931017 Seasonal Variation of the Impact of Mining Activities on Ga-Selati River in Limpopo Province, South Africa
Authors: Joshua N. Edokpayi, John O. Odiyo, Patience P. Shikwambana
Abstract:
Water is a very rare natural resource in South Africa. Ga-Selati River is used for both domestic and industrial purposes. This study was carried out in order to assess the quality of Ga-Selati River in a mining area of Limpopo Province-Phalaborwa. The pH, Electrical Conductivity (EC) and Total Dissolved Solids (TDS) were determined using a Crinson multimeter while turbidity was measured using a Labcon Turbidimeter. The concentrations of Al, Ca, Cd, Cr, Fe, K, Mg, Mn, Na and Pb were analysed in triplicate using a Varian 520 flame atomic absorption spectrometer (AAS) supplied by PerkinElmer, after acid digestion with nitric acid in a fume cupboard. The average pH of the river from eight different sampling sites was 8.00 and 9.38 in wet and dry season respectively. Higher EC values were determined in the dry season (138.7 mS/m) than in the wet season (96.93 mS/m). Similarly, TDS values were higher in dry (929.29 mg/L) than in the wet season (640.72 mg/L) season. These values exceeded the recommended guideline of South Africa Department of Water Affairs and Forestry (DWAF) for domestic water use (70 mS/m) and that of the World Health Organization (WHO) (600 mS/m), respectively. Turbidity varied between 1.78-5.20 and 0.95-2.37 NTU in both wet and dry seasons. Total hardness of 312.50 mg/L and 297.75 mg/L as the concentration of CaCO3 was computed for the river in both the wet and the dry seasons and the river water was categorised as very hard. Mean concentration of the metals studied in both the wet and the dry seasons are: Na (94.06 mg/L and 196.3 mg/L), K (11.79 mg/L and 13.62 mg/L), Ca (45.60 mg/L and 41.30 mg/L), Mg (48.41 mg/L and 44.71 mg/L), Al (0.31 mg/L and 0.38 mg/L), Cd (0.01 mg/L and 0.01 mg/L), Cr (0.02 mg/L and 0.09 mg/L), Pb (0.05 mg/L and 0.06 mg/L), Mn (0.31 mg/L and 0.11 mg/L) and Fe (0.76 mg/L and 0.69 mg/L). Results from this study reveal that most of the metals were present in concentrations higher than the recommended guidelines of DWAF and WHO for domestic use and the protection of aquatic life.Keywords: contamination, mining activities, surface water, trace metals
Procedia PDF Downloads 3141016 Application of ANN and Fuzzy Logic Algorithms for Runoff and Sediment Yield Modelling of Kal River, India
Authors: Mahesh Kothari, K. D. Gharde
Abstract:
The ANN and fuzzy logic (FL) models were developed to predict the runoff and sediment yield for catchment of Kal river, India using 21 years (1991 to 2011) rainfall and other hydrological data (evaporation, temperature and streamflow lag by one and two day) and 7 years data for sediment yield modelling. The ANN model performance improved with increasing the input vectors. The fuzzy logic model was performing with R value more than 0.95 during developmental stage and validation stage. The comparatively FL model found to be performing well to ANN in prediction of runoff and sediment yield for Kal river.Keywords: transferred function, sigmoid, backpropagation, membership function, defuzzification
Procedia PDF Downloads 5671015 Hydrodynamics of Shear Layers at River Confluences by Formation of Secondary Circulation
Authors: Ali Aghazadegan, Ali Shokri, Julia Mullarney
Abstract:
River confluences are areas where there is a lot of mixing, which is often caused by the formation of shear layers and helical motions. The hydrodynamics of secondary circulation at river confluences with low flow discharge ratios and a 90° junction angle are investigated in this study. The analysis is based on Delft 3D modelling, which includes a three-dimensional time-averaged velocity field, turbulence, and water surface levels that have been validated using laboratory data. Confluence structure was characterized by shear layer, secondary circulation, and mixing at the junction and post confluence channel. This study analysis formation of the shear layer by generation of secondary circulations in variation discharge ratios. The values of streamwise, cross-wise, and vertical components are used to estimate the secondary circulation observed within and downstream of the tributary mouth. These variables are estimated for three horizontal planes at Z = [0.14; 0.07; 0.02] and for eight cross-sections at X = [-0.1; 0.00; 0.10; 0.2; 0.30; 0.4; 0.5; 0.6] within a range of 0.05 Y 0.30.Keywords: river confluence, shear layer, secondary circulation, hydrodynamics
Procedia PDF Downloads 941014 Feedback from Experiments on Managing Methods against Japanese Knotweed on a River Appendix of the RhôNe between 2015 and 2020
Authors: William Brasier, Nicolas Rabin, Celeste Joly
Abstract:
Japanese knotweed (Fallopia japonica) is very present on the banks of the Rhone, colonizing more and more areas along the river. The Compagnie Nationale du Rhone (C.N.R.), which manages the river, has experimented with several control techniques in recent years. Since 2015, 15 experimental plots have been monitored on the banks of a restored river appendix to measure the effect of three control methods: confinement by felt, repeated mowing and the planting of competing species and/or species with allelopathic power: Viburnum opulus, Rhamnus frangula, Sambucus ebulus and Juglans regia. Each year, the number of stems, the number of elderberry plants, the height of the plants and photographs were collected. After six years of monitoring, the results showed that the density of knotweed stems decreased by 50 to 90% on all plots. The control methods are sustainable and are gradually gaining in efficiency. The establishment of native plants coupled with regular manual maintenance can reduce the development of Japanese knotweed. Continued monitoring over the next few years will determine the kinetics of the total eradication (i.e. 0 stem/plot) of the Japanese knotweed by these methods.Keywords: fallopia japonica, interspecific plant competition , Rhone river, riparian trees
Procedia PDF Downloads 1271013 Impact of Environmental Pollution on Oxidative Stress Indices in African Cat Fish (Clarias gariepinus) from Araromi River in Ondo State, Nigeria
Authors: Arojojoye Oluwatosin Adetola, Nwaechefu Olajumoke Olufunlayo, Ademola Adetokunbo Oyagbemi, Jeremiah Moyinoluwalogo Afolabi, Asaolu Racheal Oluwabukola
Abstract:
The effects of man’s activities on the environment include depletion of natural resources alongside pollution of water bodies. Petroleum exploration in the Niger Delta region of Nigeria has compromised the aquatic environment with grave consequences on the entire ecosystem. In this study, we assessed the environmental safety of Araromi River, located in an oil-producing area in Ondo State, in the Niger Delta region of Nigeria by determining the levels of heavy metals (copper, cadmium, chromium, nickel, lead) and some biomarkers of oxidative stress (malondialdehyde, glutathione-S-transferase, glutathione peroxidase, catalase, superoxide dismutase, myeloperoxidase and reduced glutathione) in Clarias gariepinus (350-400g) from the river using standard methods. Clarias gariepinus from a clean fish farm in the same geographical location as the reference site (Ilesannmi fishery) was used as a control. Water samples from both sites were also analysed for some physicochemical parameters, heavy metals, and bacterial contamination. Our findings show a significant increase in malondialdehyde level (index of lipid peroxidation) as well as alterations in antioxidant status in the organs of Clarias gariepinus from Araromi River compared with control. A significant increase in bacterial contaminants, heavy metal pollutants, and particulate matter deposits were also observed in the water sample from Araromi River compared with control. In conclusion, high levels of indicators of environmental pollution observed in the water sample from Araromi River coupled with induction of oxidative stress in Clarias gariepinus from the river show that Araromi River is polluted; therefore, consumption of fishes and other aquatic organisms from the river may be unsafe for the people in that community.Keywords: Araromi River, Clarias gariepinus, environmental pollution, heavy metals, oxidative stress
Procedia PDF Downloads 1611012 Evaluation of Reliability Flood Control System Based on Uncertainty of Flood Discharge, Case Study Wulan River, Central Java, Indonesia
Authors: Anik Sarminingsih, Krishna V. Pradana
Abstract:
The failure of flood control system can be caused by various factors, such as not considering the uncertainty of designed flood causing the capacity of the flood control system is exceeded. The presence of the uncertainty factor is recognized as a serious issue in hydrological studies. Uncertainty in hydrological analysis is influenced by many factors, starting from reading water elevation data, rainfall data, selection of method of analysis, etc. In hydrological modeling selection of models and parameters corresponding to the watershed conditions should be evaluated by the hydraulic model in the river as a drainage channel. River cross-section capacity is the first defense in knowing the reliability of the flood control system. Reliability of river capacity describes the potential magnitude of flood risk. Case study in this research is Wulan River in Central Java. This river occurring flood almost every year despite some efforts to control floods such as levee, floodway and diversion. The flood-affected areas include several sub-districts, mainly in Kabupaten Kudus and Kabupaten Demak. First step is analyze the frequency of discharge observation from Klambu weir which have time series data from 1951-2013. Frequency analysis is performed using several distribution frequency models such as Gumbel distribution, Normal, Normal Log, Pearson Type III and Log Pearson. The result of the model based on standard deviation overlaps, so the maximum flood discharge from the lower return periods may be worth more than the average discharge for larger return periods. The next step is to perform a hydraulic analysis to evaluate the reliability of river capacity based on the flood discharge resulted from several methods. The selection of the design flood discharge of flood control system is the result of the method closest to bankfull capacity of the river.Keywords: design flood, hydrological model, reliability, uncertainty, Wulan river
Procedia PDF Downloads 2931011 Surface Water Pollution by Open Refuse Dumpsite in North Central of Nigeria
Authors: Abimbola Motunrayo Folami, Ibironke Titilayo Enitan, Feroz Mohomed Swalaha
Abstract:
Water is a vital resource that is important in ensuring the growth and development of any country. To sustain the basic human needs and the demands for agriculture, industry, conservational and ecosystem, enough quality and quantity water is needed. Contamination of water resources is now a global and public health concern. Hence, this study assessed the water quality of Ndawuse River by measuring the physicochemical parameters and heavy metals concentrations of the river using standard methods. In total, 16 surface water samples were obtained from five locations along the river, from upstream to downstream as well as samples from the dumpsite. The results obtained were compared with the standard limits set by both the World Health Organization and the Federal Environmental Protection Agency for domestic purposes. The results of the measured parameters indicated that biological oxygen demand (85.88 mg/L), turbidity (44.51 NTU), Iron (0.014 - 3.511 mg /L) and chromium (0.078 - 0.14 mg /L) were all above the standard limits. The results further showed that the quality of surface water is being significantly affected by human activities around the Ndawuse River which could pose an adverse health risk to several communities that rely on this river as their primary source of water. Therefore, there is a need for strict enforcement of environmental laws to protect the aquatic ecosystem and to avoid long term cumulative exposure risk that heavy metals may pose on human health.Keywords: Abuja, contaminants, heavy metals, Ndawuse River, Nigeria, surface water
Procedia PDF Downloads 1561010 Flood Control Structures in the River Göta Älv to Protect Gothenburg City (Sweden) during the 21st Century: Preliminary Evaluation
Authors: M. Irannezhad, E. H. N. Gashti, U. Moback, B. Kløve
Abstract:
Climate change because of increases in concentration level of greenhouse gases emissions to the atmosphere will result in mean sea level rise about +1 m by 2100. To prevent coastal floods resulted from the sea level rising, different flood control structures have been built, e.g. the Thames barrier on the Thames River in London (UK), with acceptable protection levels at least so far. Gothenburg located on the southwest coast of Sweden, with the River Göta älv running through it, is one of vulnerable cities to the accelerated rises in mean sea level. Developing a water level model by MATLAB, we evaluated using a sea barrage in the Göta älv River as the flood control structure for protecting the Gothenburg city during this century. Considering three operational scenarios for two barriers in upstream and downstream, the highest sea level was estimated to + 2.95 m above the current mean sea level by 2100. To verify flood protection against such high sea levels, both barriers have to be closed. To prevent high water level in the River Göta älv reservoir, the barriers would be open when the sea level is low. The suggested flood control structures would successfully protect the city from flooding events during this century.Keywords: climate change, flood control structures, gothenburg, sea level rising, water level mode
Procedia PDF Downloads 3541009 Assessment of the Fertility Status of the Fadama Soils Found along Five Major River Catchments in Kano
Authors: Garba K. Adamu
Abstract:
This research was carried out in the catchments of five major rivers in Kano State. The catchments have considerable Fadama lands; these include: River Gari which is located in the northwestern part of Kano state, Rivers Challawa and Watari from southernparts of Kano and Katsina states. River Tomas from the northern parts of Kano state, River Jakara which has its source from the Old Kano city, part of Central Business Districts and Industrial Estates. The study was carried out with aim of assessing the fertility status of the Fadama soils found in these major river catchments. A transect was designed to collect samples along farming villages in the five river channels for the study. The findings indicate that the soils are predominantly sandy. The bulk density values vary significantly and range from 0.98mg/m to 1.36mg/m. The pH values for all the sites studied ranges from slightly acidic to slightly alkaline. The OC ranged from low to very low in the sites. The EC ranges from 66.3µs/cm to 198µs/cm for all the sites. The mean CEC ranges from 3.864 cm/kg to 10.114 Cmol/kg. The range of values for the SAR was 0.0106 to 0.069. Nitrogen ranges from0.03 to 0.1230ppm. The range of P value fell between 9.9 to 41.1mg/kg.Ca values ranges from 1.0170 to 14.9850 and K values ranges from 4.6550 – 64.40.Mg values range from 0.1380 to 1.8580 and Zn values range from 1.0170 to 14.9850. The Fe values ranged from 15.6500mg/kg to 69.8000mg/kg. The B values range from0.2060 to13.5450. Generally, the values obtained shows a low to medium fertility levels for all the parameters tested and the areas will require the in cooperation of organic manure and chemical fertilizers to improve soil structure and supplements other macro nutrients.Keywords: assessment, Fadama soils, fertility status, river catchment
Procedia PDF Downloads 3221008 Physical Habitat Simulation and Comparison within a Lerma River Reach, with Respect to the Same but Modified Reach, to Create a Linear Park
Authors: Garcia-Rodriguez Ezequiel, Luis A. Ochoa-Franco, Adrian I. Cervantes-Servin
Abstract:
In this work, the Ictalurus punctatus species estimated available physical habitat is compared with the estimated physical habitat for the same but modified river reach, with the aim of creating a linear park, along a length of 5 500 m. To determine the effect of ecological park construction, on physical habitat of the Lerma river stretch of study, first, the available habitat for the Ictalurus punctatus species was estimated through the simulation of the physical habitat, by using surveying, hydraulics, and habitat information gotten at the river reach in its actual situation. Second, it was estimated the available habitat for the above species, upon the simulation of the physical habitat through the proposed modification for the ecological park creation. Third, it is presented a comparison between both scenarios in terms of available habitat estimated for Ictalurus punctatus species, concluding that in cases of adult and spawning life stages, changes in the channel to create an ecological park would produce a considerable loss of potentially usable habitat (PUH), while in the case of the juvenile life stage PUH remains virtually unchanged, and in the case of life stage fry the PUH would increase due to the presence of velocities and depths of lesser magnitude, due to the presence of minor flow rates and lower volume of the wet channel. It is expected that habitat modification for linear park construction may produce the lack of Ictalurus punktatus species conservation at the river reach of the study.Keywords: Habitat modification, Ictalurus punctatus, Lerma, river, linear park
Procedia PDF Downloads 4741007 In Support of Sustainable Water Resources Development in the Lower Mekong River Basin: Development of Guidelines for Transboundary Environmental Impact Assessment
Authors: Kongmeng Ly
Abstract:
The management of transboundary river basins across developing countries, such as the Lower Mekong River Basin (LMB), is frequently challenging given the development and conservation divergences of the basin countries. Driven by needs to sustain economic performance and reduce poverty, the LMB countries (Cambodia, Lao PDR, Thailand, Viet Nam) are embarking on significant land use changes in the form hydropower dam, to fulfill their energy requirements. This pathway could lead to irreversible changes to the ecosystem of the Mekong River, if not properly managed. Given the uncertain trade-offs of hydropower development and operation, the Lower Mekong River Basin Countries through the technical support of the Mekong River Commission (MRC) Secretariat embarked on decade long the development of Technical Guidelines for Transboundary Environmental Impact Assessment. Through a series of workshops, seminars, national and regional consultations, and pilot studies and further development following the recommendations generated through legal and institutional reviews undertaken over two decades period, the LMB Countries jointly adopted the MRC Technical Guidelines for Transboundary Environmental Impact Assessment (TbEIA Guidelines). These guidelines were developed with particular regard to the experience gained from MRC supported consultations and technical reviews of the Xayaburi Dam Project, Don Sahong Hydropower Project, Pak Beng Hydropower Project, and lessons learned from the Srepok River and Se San River case studies commissioned by the MRC under the generous supports of development partners around the globe. As adopted, the TbEIA Guidelines have been designed as a supporting mechanism to the national EIA legislation, processes and systems in each Member Country. In recognition of the already agreed mechanisms, the TbEIA Guidelines build on and supplement the agreements stipulated in the 1995 Agreement on the Cooperation for the Sustainable Development of the Mekong River Basin and its Procedural Rules, in addressing potential transboundary environmental impacts of development projects and ensuring mutual benefits from the Mekong River and its resources. Since its adoption in 2022, the TbEIA Guidelines have already been voluntary implemented by Lao PDR on its underdevelopment Sekong A Downstream Hydropower Project, located on the Sekong River – a major tributary of the Mekong River. While this implementation is ongoing with results expected in early 2024, the implementation thus far has strengthened cooperation among concerned Member Countries with multiple successful open dialogues organized at national and regional levels. It is hope that lessons learnt from this application would lead to a wider application of the TbEIA Guidelines for future water resources development projects in the LMB.Keywords: transboundary, EIA, lower mekong river basin, mekong river
Procedia PDF Downloads 371006 Integrated Geophysical Surveys for Sinkhole and Subsidence Vulnerability Assessment, in the West Rand Area of Johannesburg
Authors: Ramoshweu Melvin Sethobya, Emmanuel Chirenje, Mihlali Hobo, Simon Sebothoma
Abstract:
The recent surge in residential infrastructure development around the metropolitan areas of South Africa has necessitated conditions for thorough geotechnical assessments to be conducted prior to site developments to ensure human and infrastructure safety. This paper appraises the success in the application of multi-method geophysical techniques for the delineation of sinkhole vulnerability in a residential landscape. Geophysical techniques ERT, MASW, VES, Magnetics and gravity surveys were conducted to assist in mapping sinkhole vulnerability, using an existing sinkhole as a constraint at Venterspost town, West of Johannesburg city. A combination of different geophysical techniques and results integration from those proved to be useful in the delineation of the lithologic succession around sinkhole locality, and determining the geotechnical characteristics of each layer for its contribution to the development of sinkholes, subsidence and cavities at the vicinity of the site. Study results have also assisted in the determination of the possible depth extension of the currently existing sinkhole and the location of sites where other similar karstic features and sinkholes could form. Results of the ERT, VES and MASW surveys have uncovered dolomitic bedrock at varying depths around the sites, which exhibits high resistivity values in the range 2500-8000ohm.m and corresponding high velocities in the range 1000-2400 m/s. The dolomite layer was found to be overlain by a weathered chert-poor dolomite layer, which has resistivities between the range 250-2400ohm.m, and velocities ranging from 500-600m/s, from which the large sinkhole has been found to collapse/ cave in. A compiled 2.5D high resolution Shear Wave Velocity (Vs) map of the study area was created using 2D profiles of MASW data, offering insights into the prevailing lithological setup conducive for formation various types of karstic features around the site. 3D magnetic models of the site highlighted the regions of possible subsurface interconnections between the currently existing large sinkhole and the other subsidence feature at the site. A number of depth slices were used to detail the conditions near the sinkhole as depth increases. Gravity surveys results mapped the possible formational pathways for development of new karstic features around the site. Combination and correlation of different geophysical techniques proved useful in delineation of the site geotechnical characteristics and mapping the possible depth extend of the currently existing sinkhole.Keywords: resistivity, magnetics, sinkhole, gravity, karst, delineation, VES
Procedia PDF Downloads 79