Search results for: mobilization delays
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 497

Search results for: mobilization delays

407 Variable vs. Fixed Window Width Code Correlation Reference Waveform Receivers for Multipath Mitigation in Global Navigation Satellite Systems with Binary Offset Carrier and Multiplexed Binary Offset Carrier Signals

Authors: Fahad Alhussein, Huaping Liu

Abstract:

This paper compares the multipath mitigation performance of code correlation reference waveform receivers with variable and fixed window width, for binary offset carrier and multiplexed binary offset carrier signals typically used in global navigation satellite systems. In the variable window width method, such width is iteratively reduced until the distortion on the discriminator with multipath is eliminated. This distortion is measured as the Euclidean distance between the actual discriminator (obtained with the incoming signal), and the local discriminator (generated with a local copy of the signal). The variable window width have shown better performance compared to the fixed window width. In particular, the former yields zero error for all delays for the BOC and MBOC signals considered, while the latter gives rather large nonzero errors for small delays in all cases. Due to its computational simplicity, the variable window width method is perfectly suitable for implementation in low-cost receivers.

Keywords: correlation reference waveform receivers, binary offset carrier, multiplexed binary offset carrier, global navigation satellite systems

Procedia PDF Downloads 131
406 The Rise and Effects of Social Movement on Ethnic Relations in Malaysia: The Bersih Movement as a Case Study

Authors: Nur Rafeeda Daut

Abstract:

The significance of this paper is to provide an insight on the role of social movement in building stronger ethnic relations in Malaysia. In particular, it focuses on how the BERSIH movement have been able to bring together the different ethnic groups in Malaysia to resist the present political administration that is seen to manipulate the electoral process and oppress the basic freedom of expression of Malaysians. Attention is given on how and why this group emerged and its mobilisation strategies. Malaysia which is a multi-ethnic and multi-religious society gained its independence from the British in 1957. Like many other new nations, it faces the challenges of nation building and governance. From economic issues to racial and religious tension, Malaysia is experiencing high level of corruption and income disparity among the different ethnic groups. The political parties in Malaysia are also divided along ethnic lines. BERSIH which is translated as ‘clean’ is a movement which seeks to reform the current electoral system in Malaysia to ensure equality, justice, free and fair elections. It was originally formed in 2007 as a joint committee that comprised leaders from political parties, civil society groups and NGOs. In April 2010, the coalition developed as an entirely civil society movement unaffiliated to any political party. BERSIH claimed that the electoral roll in Malaysia has been marred by fraud and other irregularities. In 2015, the BERSIH movement organised its biggest rally in Malaysia which also includes 38 other rallies held internationally. Supporters of BERSIH that participated in the demonstration were comprised of all the different ethnic groups in Malaysia. In this paper, two social movement theories are used: resource mobilization theory and political opportunity structure to explain the emergence and mobilization of the BERSIH movement in Malaysia. Based on these two theories, corruption which is believed to have contributed to the income disparity among Malaysians has generated the development of this movement. The rise of re-islamisation values propagated by certain groups in Malaysia and the shift in political leadership has also created political opportunities for this movement to emerge. In line with the political opportunity structure theory, the BERSIH movement will continue to create more opportunities for the empowerment of civil society and the unity of ethnic relations in Malaysia. Comparison is made on the degree of ethnic unity in the country before and after BERSIH was formed. This would include analysing the level of re-islamisation values and also the level of corruption in relation to economic income under the premiership of the former Prime Minister Mahathir and the present Prime Minister Najib Razak. The country has never seen such uprisings like BERSIH where ethnic groups which over the years have been divided by ethnic based political parties and economic disparity joined together with a common goal for equality and fair elections. As such, the BERSIH movement is a unique case where it illustrates the change of political landscape, ethnic relations and civil society in Malaysia.

Keywords: ethnic relations, Malaysia, political opportunity structure, resource mobilization theory and social movement

Procedia PDF Downloads 348
405 Urban Stratification as a Basis for Analyzing Political Instability: Evidence from Syrian Cities

Authors: Munqeth Othman Agha

Abstract:

The historical formation of urban centres in the eastern Arab world was shaped by rapid urbanization and sudden transformation from the age of the pre-industrial to a post-industrial economy, coupled with uneven development, informal urban expansion, and constant surges in unemployment and poverty rates. The city was stratified accordingly as overlapping layers of division and inequality that have been built on top of each other, creating complex horizontal and vertical divisions based on economic, social, political, and ethno-sectarian basis. This has been further exacerbated during the neoliberal era, which transferred the city into a sort of dual city that is inhabited by heterogeneous and often antagonistic social groups. Economic deprivation combined with a growing sense of marginalization and inequality across the city planted the seeds of political instability, outbreaking in 2011. Unlike other popular uprisings that occupy central squares, as in Egypt and Tunisia, the Syrian uprising in 2011 took place mainly within inner streets and neighborhood squares, mobilizing primarily on more or less upon the lines of stratification. This has emphasized the role of micro-urban and social settings in shaping mobilization and resistance tactics, which necessitates us to understand the way the city was stratified and place it at the center of the city-conflict nexus analysis. This research aims to understand to what extent pre-conflict urban stratification lines played a role in determining the different trajectories of three cities’ neighborhoods (Homs, Dara’a and Deir-ez-Zor). The main argument of the paper is that the way the Syrian city has been stratified creates various social groups within the city who have enjoyed different levels of accessibility to life chances, material resources and social statuses. This determines their relationship with other social groups in the city and, more importantly, their relationship with the state. The advent of a political opportunity will be depicted differently across the city’s different social groups according to their perceived interests and threats, which consequently leads to either political mobilization or demobilization. Several factors, including the type of social structures, built environment, and state response, determine the ability of social actors to transfer the repertoire of contention to collective action or transfer from social actors to political actors. The research uses urban stratification lines as the basis for understanding the different patterns of political upheavals in urban areas while explaining why neighborhoods with different social and urban environment settings had different abilities and capacities to mobilize, resist state repression and then descend into a military conflict. It particularly traces the transformation from social groups to social actors and political actors by applying the Explaining-outcome Process-Tracing method to depict the causal mechanisms that led to including or excluding different neighborhoods from each stage of the uprising, namely mobilization (M1), response (M2), and control (M3).

Keywords: urban stratification, syrian conflict, social movement, process tracing, divided city

Procedia PDF Downloads 73
404 Global Navigation Satellite System and Precise Point Positioning as Remote Sensing Tools for Monitoring Tropospheric Water Vapor

Authors: Panupong Makvichian

Abstract:

Global Navigation Satellite System (GNSS) is nowadays a common technology that improves navigation functions in our life. Additionally, GNSS is also being employed on behalf of an accurate atmospheric sensor these times. Meteorology is a practical application of GNSS, which is unnoticeable in the background of people’s life. GNSS Precise Point Positioning (PPP) is a positioning method that requires data from a single dual-frequency receiver and precise information about satellite positions and satellite clocks. In addition, careful attention to mitigate various error sources is required. All the above data are combined in a sophisticated mathematical algorithm. At this point, the research is going to demonstrate how GNSS and PPP method is capable to provide high-precision estimates, such as 3D positions or Zenith tropospheric delays (ZTDs). ZTDs combined with pressure and temperature information allows us to estimate the water vapor in the atmosphere as precipitable water vapor (PWV). If the process is replicated for a network of GNSS sensors, we can create thematic maps that allow extract water content information in any location within the network area. All of the above are possible thanks to the advances in GNSS data processing. Therefore, we are able to use GNSS data for climatic trend analysis and acquisition of the further knowledge about the atmospheric water content.

Keywords: GNSS, precise point positioning, Zenith tropospheric delays, precipitable water vapor

Procedia PDF Downloads 198
403 Cosmetic Surgery on the Rise: The Impact of Remote Communication

Authors: Bruno Di Pace, Roxanne H. Padley

Abstract:

Aims: The recent increase in remote video interaction has increased the number of requests for teleconsultations with plastic surgeons in private practice (70% in the UK and 64% in the USA). This study investigated the motivations for such an increase and the underlying psychological impact on patients. Method: An anonymous web-based poll of 8 questions was designed and distributed to patients seeking cosmetic surgery through social networks in both Italy and the UK. The questions gathered responses regarding 1. Reasons for pursuing cosmetic surgery; 2. The effects of delays caused by the SARS-COV-2 pandemic; 3. The effects on mood; 4. The influence of video conferencing on body-image perception. Results: 85 respondents completed the online poll. Overall, 68% of respondents stated that seeing themselves more frequently online had influenced their decision to seek cosmetic surgery. The types of surgeries indicated were predominantly to the upper body and face (82%). Delays and access to surgeons during the pandemic were perceived as negatively impacting patients' moods (95%). Body-image perception and self-esteem were lower than in the pre-pandemic, particularly during lockdown (72%). Patients were more inclined to undergo cosmetic surgery during the pandemic, both due to the wish to improve their “lockdown face” for video conferencing (77%) and also due to the benefits of home recovery while in smart working (58%). Conclusions: Overall, findings suggest that video conferencing has led to a significant increase in requests for cosmetic surgery and the so-called “Zoom Boom” effect.

Keywords: cosmetic surgery, remote communication, telehealth, zoom boom

Procedia PDF Downloads 179
402 Addressing Factors Associated with Vertical HIV Transmission among Pregnant Women in Rwanda

Authors: Murorunkwere Marie Claire

Abstract:

Introduction: In Sub-Saharan Africa and specifically in Rwandan rural areas, mother-to-Child human immunodeficiency virus transmission remains a big challenge. This is mainly due to lack of awareness and ignorance among pregnant rural women, leading to neglect regular taking of prophylactic antiretroviral treatment and to persistently beliefs in traditional healers and home deliveries. This paper explores the factors associated with stagnant reduction in human immunodeficiency virus vertical transmission among pregnant rural women and provides solutions to tackle it. Methodology: The first phase of this research will be a qualitative survey was conducted to assess the knowledge, attitudes and practices towards vertical human immunodeficiency virus transmission among pregnant women in one rural district in Rwanda. The data generated from phase one of this research will be used to address the main factors revealed through community mobilization and motivation on attending required antenatal consultations and hospital deliveries, proper and regular antiretroviral treatment taking, and discouraging beliefs in traditional healers and home deliveries. Refresher training seminars will also be organized for healthcare providers qualified on conducting deliveries about current measures to maximize the reduction of chances that can lead to mother -child contamination (to avoid early rupture of membranes and to prevent any source of contamination). Results: This paper is expected to contribute in a significant reduction of the vertical human immunodeficiency virus transmission burden among pregnant rural women. Conclusion: Strong campaigns on prevention of mother- to-child human immunodeficiency virus transmission and community mobilization of pregnant rural women, and house to house education and continuous reminders as well as training seminars to health care personnel on updated measures is, key in addressing vertical human immunodeficiency virus transmission.

Keywords: attitudes transformation, community mobilisation, pregnant rural women, vertical HIV transmission

Procedia PDF Downloads 80
401 Multi Campus Universities: Exploring Structures and Administrative Relationships:; A Comparative Study of Eight Universities in UK and Five in Pakistan

Authors: Laila Akbarali

Abstract:

In the small scale study, an attempt is made to explore the structure and administrative relationships adopted by Multi Campus Universities [MCU] in UK and Pakistan and how these universities deal with some selected issues with respect to student related functions. For this study, literature on multi-site, divisionalized and other complex organizations related to business and Industry was consulted and an attempt was made to empirically test the normative models in the literature with respect to centralized , deconcentrated and decentralized structures. A questionnaire was used to gather data for this study. Purposive sampling was used. The findings of this study are somewhat different for UK and Pakistan. Contrary to a substantial body of organization theory, the results show that deconcentrated and decentralized universities in the UK are prone to delays in decision making and tend not to sensitive to local needs. In Pakistan on the other hand, deconcentrated and decentralized universities are more sensitive to local needs and there are less delays in decision making. The findings suggest that distance and reporting relationships could perhaps be responsible for the contradiction. The results also suggest that there is better coordination when the subsidiary campus sub-registrar reports to the registrar. The findings also highlight, that in both contexts, leadership at the campus level remains an issue. The results suggest that there may be factors other than structure that allow universities to keep their identity intact. The study highlights that MCU are inclined to use Information Technology and develop broad policies within which they allow their campuses to operate.

Keywords: administrative relationships, Multi-Campus, organization structure, registrar

Procedia PDF Downloads 324
400 Interface Problems in Construction Projects

Authors: Puti F. Marzuki, Adrianto Oktavianus, Almerinda Regina

Abstract:

Interface problems among interacting parties in Indonesian construction projects have most often led to low productivity and completion delay. In the midst of this country’s needs to accelerate construction of public infrastructure providing connectivity among regions and supporting economic growth as well as better living quality, project delays have to be seriously addressed. This paper identifies potential causes factors of interface problems experienced by construction projects in Indonesia. Data are collected through a survey involving the main actors of six important public infrastructure construction projects including railway, LRT, sports stadiums, apartment, and education building construction projects. Five of these projects adopt the design-build project delivery method and one applies the design-bid-build scheme. Interface problems’ potential causes are categorized into contract, management, technical experience, coordination, financial, and environmental factors. Research results reveal that, especially in railway and LRT projects, potential causes of interface problems are mainly technical and managerial in nature. These relate to complex construction execution in highly congested areas. Meanwhile, coordination cause factors are mainly found in the education building construction project with loan from a foreign donor. All of the six projects have to resolve interface problems caused by incomplete or low-quality contract documents. This research also shows that the design-bid-build delivery method involving more parties in construction projects tends to induce more interface problem cause factors than the design-build scheme.

Keywords: cause factors, construction delays, project delivery method, contract documents

Procedia PDF Downloads 255
399 Tardiness and Self-Regulation: Degree and Reason for Tardiness in Undergraduate Students in Japan

Authors: Keiko Sakai

Abstract:

In Japan, all stages of public education aim to foster a zest for life. ‘Zest’ implies solving problems by oneself, using acquired knowledge and skills. It is related to the self-regulation of metacognition. To enhance this, establishing good learning habits is important. Tardiness in undergraduate students should be examined based on self-regulation. Accordingly, we focussed on self-monitoring and self-planning strategies among self-regulated learning factors to examine the causes of tardiness. This study examines the impact of self-monitoring and self-planning learning skills on the degree and reason for tardiness in undergraduate students. A questionnaire survey was conducted, targeted to undergraduate students in University X in the autumn semester of 2018. Participants were 247 (average age 19.7, SD 1.9; 144 males, 101 females, 2 no answers). The survey contained the following items and measures: school year, the number of classes in the semester, degree of tardiness in the semester (subjective degree and objective times), active participation in and action toward schoolwork, self-planning and self-monitoring learning skills, and reason for tardiness (open-ended question). First, the relation between strategies and tardiness was examined by multiple regressions. A statistically significant relationship between a self-monitoring learning strategy and the degree of subjective and objective tardiness was revealed, after statistically controlling the school year and the number of classes. There was no significant relationship between a self-planning learning strategy and the degree of tardiness. These results suggest that self-monitoring skills reduce tardiness. Secondly, the relation between a self-monitoring learning strategy and the reason of tardiness was analysed, after classifying the reason for tardiness into one of seven categories: ‘overslept’, ‘illness’, ‘poor time management’, ‘traffic delays’, ‘carelessness’, ‘low motivation’, and ‘stuff to do’. Chi-square tests and Fisher’s exact tests showed a statistically significant relationship between a self-monitoring learning strategy and the frequency of ‘traffic delays’. This result implies that self-monitoring skills prevent tardiness because of traffic delays. Furthermore, there was a weak relationship between a self-monitoring learning strategy score and the reason-for-tardiness categories. When self-monitoring skill is higher, a decrease in ‘overslept’ and ‘illness’, and an increase in ‘poor time management’, ‘carelessness’, and ‘low motivation’ are indicated. It is suggested that a self-monitoring learning strategy is related to an internal causal attribution of failure and self-management for how to prevent tardiness. From these findings, the effectiveness of a self-monitoring learning skill strategy for reducing tardiness in undergraduate students is indicated.

Keywords: higher-education, self-monitoring, self-regulation, tardiness

Procedia PDF Downloads 135
398 Risk Assessment in Construction of K-Span Buildings in United Arab Emirates (UAE)

Authors: Imtiaz Ali, Imam Mansoor

Abstract:

Investigations as a part of the academic study were undertaken to identify and evaluate the significant risks associated with the construction of K-span buildings in the region of UAE. Primary field data was collected through questionnaires obtaining specific open and close-ended questions from carefully selected construction firms, civil engineers and, construction manager regarding risks associated to K-span building construction. Historical data available for other regions of the same construction technique was available which was compared for identifying various non-critical and critical risk parameters by comparative evaluation techniques to come up with important risks and potential sources for their control and minimization in K-Span buildings that is increasing in the region. The associated risks have been determined with their Relative Importance Index (RII) values of which Risk involved in Change of Design required by Owners carries the highest value (RII=0.79) whereas, Delayed Payment by Owner to Contractor is one of the least (RII=0.42) value. The overall findings suggest that most relative risks as quantified originate or associated with the contractors. It may be concluded that project proponents undertaking K-span projects in planning and budgeting the cost and delays should take into account of risks on high account if changes in design are also required any delays in the material by the supplier would then be a major risk in K-span project delay. Since projects are, less costly, so owners have limited budgets, then they hire small contractors, which are not highly competent contractors. So study suggests that owner should be aware of these types of risks associated with the construction of K-span buildings in order to make it cost effective.

Keywords: k-span buildings, k-span construction, risk management, relative improvement index (RII)

Procedia PDF Downloads 375
397 Systemic Family therapy in the Queensland Foster Care System: The implementation of Integrative Practice as a Purposeful Intervention Implemented with Complex ‘Family’ Systems

Authors: Rachel Jones

Abstract:

Systemic Family therapy in the Queensland Foster Care System is the implementation of Integrative Practice as a purposeful intervention implemented with complex ‘family’ systems (by expanding the traditional concept of family to include all relevant stakeholders for a child) and is shown to improve the overall wellbeing of children (with developmental delays and trauma) in Queensland out of home care contexts. The importance of purposeful integrative practice in the field of systemic family therapy has been highlighted in achieving change in complex family systems. Essentially, it is the purposeful use of multiple interventions designed to meet the myriad of competing needs apparent for a child (with developmental delays resulting from early traumatic experiences - both in utero and in their early years) and their family. In the out-of-home care context, integrative practice is particularly useful to promote positive change for the child and what is an extended concept of whom constitutes their family. Traditionally, a child’s family may have included biological and foster care family members, but when this concept is extended to include all their relevant stakeholders (including biological family, foster carers, residential care workers, child safety, school representatives, Health and Allied Health staff, police and youth justice staff), the use of integrative family therapy can produce positive change for the child in their overall wellbeing, development, risk profile, social and emotional functioning, mental health symptoms and relationships across domains. By tailoring therapeutic interventions that draw on systemic family therapies from the first and second-order schools of family therapy, neurobiology, solution focussed, trauma-informed, play and art therapy, and narrative interventions, disability/behavioural interventions, clinicians can promote change by mixing therapeutic modalities with the individual and their stakeholders. This presentation will unpack the implementation of systemic family therapy using this integrative approach to formulation and treatment for a child in out-of-home care in Queensland (experiencing developmental delays resulting from trauma). It considers the need for intervention for the individual and in the context of the environment and relationships. By reviewing a case example, this study aims to highlight the simultaneous and successful use of pharmacological interventions, psychoeducational programs for carers and school staff, parenting programs, cognitive-behavioural and trauma-informed interventions, traditional disability approaches, play therapy, mapping genograms and meaning-making, and using family and dyadic sessions for the system associated with the foster child. These elements of integrative systemic family practice have seen success in the reduction of symptoms and improved overall well-being of foster children and their stakeholders. Accordingly, a model for best practice using this integrative systemic approach is presented for this population group and preliminary findings for this approach over four years of local data have been reviewed.

Keywords: systemic family therapy, treating families of children with delays, trauma and attachment in families systems, improving practice and functioning of children and families

Procedia PDF Downloads 13
396 Travel Delay and Modal Split Analysis: A Case Study

Authors: H. S. Sathish, H. S. Jagadeesh, Skanda Kumar

Abstract:

Journey time and delay study is used to evaluate the quality of service, the travel time and study can also be used to evaluate the quality of traffic movement along the route and to determine the location types and extent of traffic delays. Components of delay are boarding and alighting, issue of tickets, other causes and distance between each stops. This study investigates the total journey time required to travel along the stretch and the influence the delays. The route starts from Kempegowda Bus Station to Yelahanka Satellite Station of Bangalore City. The length of the stretch is 16.5 km. Modal split analysis has been done for this stretch. This stretch has elevated highway connecting to Bangalore International Airport and the extension of metro transit stretch. From the regression analysis of total journey time it is affected by delay due to boarding and alighting moderately, Delay due to issue of tickets affects the journey time to a higher extent. Some of the delay factors affecting significantly the journey time are evident from F-test at 10 percent level of confidence. Along this stretch work trips are more prevalent as indicated by O-D study. Modal shift analysis indicates about 70 percent of commuters are ready to shift from current system to Metro Rail System. Metro Rail System carries maximum number of trips compared to private mode. Hence Metro is a highly viable choice of mode for Bangalore Metropolitan City.

Keywords: delay, journey time, modal choice, regression analysis

Procedia PDF Downloads 496
395 Health Care using Queuing Theory

Authors: S. Vadivukkarasi, K. Karthi, M. Karthick, C. Dinesh, S. Santhosh, A. Yogaraj

Abstract:

The appointment system was designed to minimize patient’s idle time overlooking patients waiting time in hospitals. This is no longer valid in today’s consumer oriented society. Long waiting times for treatment in the outpatient department followed by short consultations has long been a complaint. Nowadays, customers use waiting time as a decisive factor in choosing a service provider. Queuing theory constitutes a very powerful tool because queuing models require relatively little data and are simple and fast to use. Because of this simplicity and speed, modelers can be used to quickly evaluate and compare various alternatives for providing service. The application of queuing models in the analysis of health care systems is increasingly accepted by health care decision makers. Timely access to care is a key component of high-quality health care. However, patient delays are prevalent throughout health care systems, resulting in dissatisfaction and adverse clinical consequences for patients as well as potentially higher costs and wasted capacity for providers. Arguably, the most critical delays for health care are the ones associated with health care emergencies. The allocation of resources can be divided into three general areas: bed management, staff management, and room facility management. Effective and efficient patient flow is indicated by high patient throughput, low patient waiting times, a short length of stay at the hospital and overtime, while simultaneously maintaining adequate staff utilization rates and low patient’s idle times.

Keywords: appointment system, patient scheduling, bed management, queueing calculation, system analysis

Procedia PDF Downloads 300
394 Combustion Improvements by C4/C5 Bio-Alcohol Isomer Blended Fuels Combined with Supercharging and EGR in a Diesel Engine

Authors: Yasufumi Yoshimoto, Enkhjargal Tserenochir, Eiji Kinoshita, Takeshi Otaka

Abstract:

Next generation bio-alcohols produced from non-food based sources like cellulosic biomass are promising renewable energy sources. The present study investigates engine performance, combustion characteristics, and emissions of a small single cylinder direct injection diesel engine fueled by four kinds of next generation bio-alcohol isomer and diesel fuel blends with a constant blending ratio of 3:7 (mass). The tested bio-alcohol isomers here are n-butanol and iso-butanol (C4 alcohol), and n-pentanol and iso-pentanol (C5 alcohol). To obtain simultaneous reductions in NOx and smoke emissions, the experiments employed supercharging combined with EGR (Exhaust Gas Recirculation). The boost pressures were fixed at two conditions, 100 kPa (naturally aspirated operation) and 120 kPa (supercharged operation) provided with a roots blower type supercharger. The EGR rates were varied from 0 to 25% using a cooled EGR technique. The results showed that both with and without supercharging, all the bio-alcohol blended diesel fuels improved the trade-off relation between NOx and smoke emissions at all EGR rates while maintaining good engine performance, when compared with diesel fuel operation. It was also found that regardless of boost pressure and EGR rate, the ignition delays of the tested bio-alcohol isomer blends are in the order of iso-butanol > n-butanol > iso-pentanol > n-pentanol. Overall, it was concluded that, except for the changes in the ignition delays the influence of bio-alcohol isomer blends on the engine performance, combustion characteristics, and emissions are relatively small.

Keywords: alternative fuel, butanol, diesel engine, EGR (Exhaust Gas Recirculation), next generation bio-alcohol isomer blended fuel, pentanol, supercharging

Procedia PDF Downloads 169
393 Contractors Perspective on Causes of Delays in Power Transmission Projects

Authors: Goutom K. Pall

Abstract:

At the very heart of the power system, power transmission (PT) acts as an essential link between power generation and distribution. Timely completion of PT infrastructures is therefore crucial to support the development of power system as a whole. Yet despite the importance, studies on PT infrastructure development projects are embryonic and, hence, PT projects undergoing widespread delays worldwide. These delay factors are idiosyncratic and identifying the critical delay factors is essential if the PT industry professionals are to complete their projects efficiently and within the expected timeframes. This study identifies and categorizes 46 causes of PT project delay under ten major groups using six sector expert’s recommendations studied by a preliminary questionnaire survey. Based on the experts’ strong recommendations, two new groups are introduced in the final questionnaire survey: sector specific factors (SSF) and general factors (GF). SSF pertain to delay factors applicable only to the PT projects, while GF represents less biased samples with shared responsibilities of all project parties involved in a project. The study then uses 112 data samples from the contractors to rank the delay factors using relative importance index (RII). The results reveal that SSF, GF and external factors are the most critical groups, while the highest ranked delay factors include the right of way (RoW) problems of transmission lines (TL), delay in payments, frequent changes in TL routes, poor communication and coordination among the project parties and accessibility to TL tower locations. Finally, recommendations are made to minimize the identified delay. The findings are expected to be of substantial benefit to professionals in minimizing time overrun in PT projects implementation, as well as power generation, power distribution, and non-power linear construction projects worldwide.

Keywords: delay, project delay, power transmission projects, time-overruns

Procedia PDF Downloads 178
392 Transformer Life Enhancement Using Dynamic Switching of Second Harmonic Feature in IEDs

Authors: K. N. Dinesh Babu, P. K. Gargava

Abstract:

Energization of a transformer results in sudden flow of current which is an effect of core magnetization. This current will be dominated by the presence of second harmonic, which in turn is used to segregate fault and inrush current, thus guaranteeing proper operation of the relay. This additional security in the relay sometimes obstructs or delays differential protection in a specific scenario, when the 2nd harmonic content was present during a genuine fault. This kind of scenario can result in isolation of the transformer by Buchholz and pressure release valve (PRV) protection, which is acted when fault creates more damage in transformer. Such delays involve a huge impact on the insulation failure, and chances of repairing or rectifying fault of problem at site become very dismal. Sometimes this delay can cause fire in the transformer, and this situation becomes havoc for a sub-station. Such occurrences have been observed in field also when differential relay operation was delayed by 10-15 ms by second harmonic blocking in some specific conditions. These incidences have led to the need for an alternative solution to eradicate such unwarranted delay in operation in future. Modern numerical relay, called as intelligent electronic device (IED), is embedded with advanced protection features which permit higher flexibility and better provisions for tuning of protection logic and settings. Such flexibility in transformer protection IEDs, enables incorporation of alternative methods such as dynamic switching of second harmonic feature for blocking the differential protection with additional security. The analysis and precautionary measures carried out in this case, have been simulated and discussed in this paper to ensure that similar solutions can be adopted to inhibit analogous issues in future.

Keywords: differential protection, intelligent electronic device (IED), 2nd harmonic inhibit, inrush inhibit

Procedia PDF Downloads 300
391 Coupling of Reticular and Fuzzy Set Modelling in the Analysis of the Action Chains from Socio-Ecosystem, Case of the Renewable Natural Resources Management in Madagascar

Authors: Thierry Ganomanana, Dominique Hervé, Solo Randriamahaleo

Abstract:

Management of Malagasy renewable natural re-sources allows, in the case of forest, the mobilization of several actors with norms and/or territory. The interaction in this socio-ecosystem is represented by a graph of two different relationships in which most of action chains, from individual activities under the continuous of forest dynamic and discrete interventions by institutional, are also studied. The fuzzy set theory is adapted to graduate the elements of the set Illegal Activities in the space of sanction’s institution by his severity and in the space of degradation of forest by his extent.

Keywords: fuzzy set, graph, institution, renewable resource, system

Procedia PDF Downloads 88
390 Planning Railway Assets Renewal with a Multiobjective Approach

Authors: João Coutinho-Rodrigues, Nuno Sousa, Luís Alçada-Almeida

Abstract:

Transportation infrastructure systems are fundamental in modern society and economy. However, they need modernizing, maintaining, and reinforcing interventions which require large investments. In many countries, accumulated intervention delays arise from aging and intense use, being magnified by financial constraints of the past. The decision problem of managing the renewal of large backlogs is common to several types of important transportation infrastructures (e.g., railways, roads). This problem requires considering financial aspects as well as operational constraints under a multidimensional framework. The present research introduces a linear programming multiobjective model for managing railway infrastructure asset renewal. The model aims at minimizing three objectives: (i) yearly investment peak, by evenly spreading investment throughout multiple years; (ii) total cost, which includes extra maintenance costs incurred from renewal backlogs; (iii) priority delays related to work start postponements on the higher priority railway sections. Operational constraints ensure that passenger and freight services are not excessively delayed from having railway line sections under intervention. Achieving a balanced annual investment plan, without compromising the total financial effort or excessively postponing the execution of the priority works, was the motivation for pursuing the research which is now presented. The methodology, inspired by a real case study and tested with real data, reflects aspects of the practice of an infrastructure management company and is generalizable to different types of infrastructure (e.g., railways, highways). It was conceived for treating renewal interventions in infrastructure assets, which is a railway network may be rails, ballasts, sleepers, etc.; while a section is under intervention, trains must run at reduced speed, causing delays in services. The model cannot, therefore, allow for an accumulation of works on the same line, which may cause excessively large delays. Similarly, the lines do not all have the same socio-economic importance or service intensity, making it is necessary to prioritize the sections to be renewed. The model takes these issues into account, and its output is an optimized works schedule for the renewal project translatable in Gantt charts The infrastructure management company provided all the data for the first test case study and validated the parameterization. This case consists of several sections to be renewed, over 5 years and belonging to 17 lines. A large instance was also generated, reflecting a problem of a size similar to the USA railway network (considered the largest one in the world), so it is not expected that considerably larger problems appear in real life; an average of 25 years backlog and ten years of project horizon was considered. Despite the very large increase in the number of decision variables (200 times as large), the computational time cost did not increase very significantly. It is thus expectable that just about any real-life problem can be treated in a modern computer, regardless of size. The trade-off analysis shows that if the decision maker allows some increase in max yearly investment (i.e., degradation of objective ii), solutions improve considerably in the remaining two objectives.

Keywords: transport infrastructure, asset renewal, railway maintenance, multiobjective modeling

Procedia PDF Downloads 146
389 Using ANN in Emergency Reconstruction Projects Post Disaster

Authors: Rasha Waheeb, Bjorn Andersen, Rafa Shakir

Abstract:

Purpose The purpose of this study is to avoid delays that occur in emergency reconstruction projects especially in post disaster circumstances whether if they were natural or manmade due to their particular national and humanitarian importance. We presented a theoretical and practical concepts for projects management in the field of construction industry that deal with a range of global and local trails. This study aimed to identify the factors of effective delay in construction projects in Iraq that affect the time and the specific quality cost, and find the best solutions to address delays and solve the problem by setting parameters to restore balance in this study. 30 projects were selected in different areas of construction were selected as a sample for this study. Design/methodology/approach This study discusses the reconstruction strategies and delay in time and cost caused by different delay factors in some selected projects in Iraq (Baghdad as a case study).A case study approach was adopted, with thirty construction projects selected from the Baghdad region, of different types and sizes. Project participants from the case projects provided data about the projects through a data collection instrument distributed through a survey. Mixed approach and methods were applied in this study. Mathematical data analysis was used to construct models to predict delay in time and cost of projects before they started. The artificial neural networks analysis was selected as a mathematical approach. These models were mainly to help decision makers in construction project to find solutions to these delays before they cause any inefficiency in the project being implemented and to strike the obstacles thoroughly to develop this industry in Iraq. This approach was practiced using the data collected through survey and questionnaire data collection as information form. Findings The most important delay factors identified leading to schedule overruns were contractor failure, redesigning of designs/plans and change orders, security issues, selection of low-price bids, weather factors, and owner failures. Some of these are quite in line with findings from similar studies in other countries/regions, but some are unique to the Iraqi project sample, such as security issues and low-price bid selection. Originality/value we selected ANN’s analysis first because ANN’s was rarely used in project management , and never been used in Iraq to finding solutions for problems in construction industry. Also, this methodology can be used in complicated problems when there is no interpretation or solution for a problem. In some cases statistical analysis was conducted and in some cases the problem is not following a linear equation or there was a weak correlation, thus we suggested using the ANN’s because it is used for nonlinear problems to find the relationship between input and output data and that was really supportive.

Keywords: construction projects, delay factors, emergency reconstruction, innovation ANN, post disasters, project management

Procedia PDF Downloads 165
388 Management in the Transport of Pigs to Slaughterhouses in the Valle De Aburrá, Antioquia

Authors: Natalia Uribe Corrales, María Fernanda Benavides Erazo, Santiago Henao Villegas

Abstract:

Introduction: Transport is a crucial link in the porcine chain because it is considered a stressful event in the animal, due to it is a new environment, which generates new interactions, together with factors such as speed, noise, temperature changes, vibrations, deprivation of food and water. Therefore, inadequate handling at this stage can lead to bruises, musculoskeletal injuries, fatigue, and mortality, resulting in canal seizures and economic losses. Objective: To characterize the transport and driving practices for the mobilization of standing pigs directed to slaughter plants in the Valle de Aburrá, Antioquia, Colombia in 2017. Methods: A descriptive cross-sectional study was carried out with the transporters arriving at the slaughterhouses approved by National Institute for Food and Medicine Surveillance (INVIMA) during 2017 in the Valle de Aburrá. The process of obtaining the samples was made from probabilistic sampling. Variables such as journey time, mechanical technical certificate, training in animal welfare, driving speed, material, and condition of floors and separators, supervision of animals during the trip, load density and mortality were analyzed. It was approved by the ethics committee for the use and care of animals CICUA of CES University, Act number 14 of 2015. Results: 190 trucks were analyzed, finding that 12.4% did not have updated mechanical technical certificate; the transporters experience in pig’s transportation was an average of 9.4 years (d.e.7.5). The 85.8% reported not having received training in animal welfare. Other results were that the average speed was 63.04km/hr (d.e 13.46) and the 62% had floors in good condition; nevertheless, the 48% had bad conditions on separators. On the other hand, the 88% did not supervise their animals during the journey, although the 62.2% had an adequate loading density, in relation to the average mortality was 0.2 deaths/travel (d.e. 0.5). Conclusions: Trainers should be encouraged on issues such as proper maintenance of vehicles, animal welfare, obligatory review of animals during mobilization and speed of driving, as these poorly managed indicators generate stress in animals, increasing generation of injuries as well as possible accidents; also, it is necessary to continue to improve aspects such as aluminum floors and separators that favor easy cleaning and maintenance, as well as the appropriate handling in the density of load that generates animal welfare.

Keywords: animal welfare, driving practices, pigs, truck infrastructure

Procedia PDF Downloads 208
387 Optimizing Rehabilitation Transitions: Delays, Determinants, and Outcomes in Hip Fracture Patients

Authors: David Maman, David E. Rothem, Merav Ben Natan, Yaron Berkovich

Abstract:

Introduction: Hip fractures are a major health concern due to their impact on disability, independence, and mortality. Timely rehabilitation is crucial for improving patient outcomes and reducing healthcare costs, yet delays in rehabilitation, often due to challenges in discharge processes, can lead to adverse events and increased healthcare burdens. Aim: The study aimed to investigate two primary aspects related to hip fracture older adults patients: firstly, identifying subgroups more prone to delayed discharge for further rehabilitation; and secondly, exploring the consequences of this delay on short-term outcomes and the incidence of adverse events. Methods: Conducting a retrospective analysis, we examined the medical records of 474 patients aged 65 and older, hospitalized for hip fractures between 2018 and 2022 in a major hospital in the north-central region of Israel. All patients were eligible for further rehabilitation, including options for in-patient or home-based care. Results: Of the studied patients, 61.4% experienced delayed discharge, with an average waiting period of 3.5 days. Factors such as older age, prolonged hospital stay, and the need for in-patient rehabilitation were associated with a higher likelihood of delayed discharge. Those promptly discharged demonstrated lower rates of infections, falls, and mortality. Furthermore, delayed discharge to further rehabilitation correlated with elevated hospitalization costs. Notably, no significant differences were observed in re-hospitalization or repeat surgery rates. Conclusion: This study underscores the pressing need for efficient strategies to ensure timely rehabilitation, particularly for older adults. Implementing such strategies can optimize outcomes, mitigate adverse events, and contribute to a reduction in healthcare costs.

Keywords: hip fracture rehabilitation, delayed discharge, older adults, healthcare coordination, adverse events

Procedia PDF Downloads 28
386 Model for Calculating Traffic Mass and Deceleration Delays Based on Traffic Field Theory

Authors: Liu Canqi, Zeng Junsheng

Abstract:

This study identifies two typical bottlenecks that occur when a vehicle cannot change lanes: car following and car stopping. The ideas of traffic field and traffic mass are presented in this work. When there are other vehicles in front of the target vehicle within a particular distance, a force is created that affects the target vehicle's driving speed. The characteristics of the driver and the vehicle collectively determine the traffic mass; the driving speed of the vehicle and external variables have no bearing on this. From a physical level, this study examines the vehicle's bottleneck when following a car, identifies the outside factors that have an impact on how it drives, takes into account that the vehicle will transform kinetic energy into potential energy during deceleration, and builds a calculation model for traffic mass. The energy-time conversion coefficient is created from an economic standpoint utilizing the social average wage level and the average cost of motor fuel. Vissim simulation program measures the vehicle's deceleration distance and delays under the Wiedemann car-following model. The difference between the measured value of deceleration delay acquired by simulation and the theoretical value calculated by the model is compared using the conversion calculation model of traffic mass and deceleration delay. The experimental data demonstrate that the model is reliable since the error rate between the theoretical calculation value of the deceleration delay obtained by the model and the measured value of simulation results is less than 10%. The article's conclusion is that the traffic field has an impact on moving cars on the road and that physical and socioeconomic factors should be taken into account while studying vehicle-following behavior. The deceleration delay value of a vehicle's driving and traffic mass have a socioeconomic relationship that can be utilized to calculate the energy-time conversion coefficient when dealing with the bottleneck of cars stopping and starting.

Keywords: traffic field, social economics, traffic mass, bottleneck, deceleration delay

Procedia PDF Downloads 67
385 Cost Overrun in Construction Projects

Authors: Hailu Kebede Bekele

Abstract:

Construction delays are suitable where project events occur at a certain time expected due to causes related to the client, consultant, and contractor. Delay is the major cause of the cost overrun that leads to the poor efficiency of the project. The cost difference between completion and the originally estimated is known as cost overrun. The common ways of cost overruns are not simple issues that can be neglected, but more attention should be given to prevent the organization from being devastated to be failed, and financial expenses to be extended. The reasons that may raised in different studies show that the problem may arise in construction projects due to errors in budgeting, lack of favorable weather conditions, inefficient machinery, and the availability of extravagance. The study is focused on the pace of mega projects that can have a significant change in the cost overrun calculation.15 mega projects are identified to study the problem of the cost overrun in the site. The contractor, consultant, and client are the principal stakeholders in the mega projects. 20 people from each sector were selected to participate in the investigation of the current mega construction project. The main objective of the study on the construction cost overrun is to prioritize the major causes of the cost overrun problem. The methodology that was employed in the construction cost overrun is the qualitative methodology that mostly rates the causes of construction project cost overrun. Interviews, open-ended and closed-ended questions group discussions, and rating qualitative methods are the best methodologies to study construction projects overrun. The result shows that design mistakes, lack of labor, payment delay, old equipment and scheduling, weather conditions, lack of skilled labor, payment delays, transportation, inflation, and order variations, market price fluctuation, and people's thoughts and philosophies, the prior cause of the cost overrun that fail the project performance. The institute shall follow the scheduled activities to bring a positive forward in the project life.

Keywords: cost overrun, delay, mega projects, design

Procedia PDF Downloads 62
384 The Role of Social Media in the Success or Failure of a Revolution: A Comparative Case Study of 2008/2018 Revolutions in Armenia

Authors: Nane Giloyan

Abstract:

The rapid development of social networks in the 21st century increases the interests towards the role and impact of social media on the success or failure of a revolution. Even though studies are investigating the role of social media on the outcome of a revolution, still, the conclusions on this matter are ambiguous so far. Hence, this research aims to investigate the role of social media in the success or failure of a revolution and make a contribution to the literature gap. The study aims to examine the research question whether the use of social media explains the success or failure of revolutions in 2008 and 2018 in Armenia. The research question is investigated through content analysis of two cases; failed revolution in 2008 and the successful revolution in 2018 in Armenia. The secondary data analysis was based on information devoted to two revolutions using local and major international news articles, journal and critical articles, in Armenian, Russian and English, also videos, posts and live streams of the revolutionary leaders. There can be many factors explaining the success or failure of a revolution. However, the investigation of the factors and their role to explain the outcome of a revolution other than the use of social media is beyond the scope of this research study. The study holds other variables constant and concludes that in the cases of 2008 and 2018 revolutions in Armenia the mobilization of society through social media explains the differences in the outcomes (failed or successful). The comparative case study of the revolutions in 2008 and 2018 in Armenia emphasizes the important role and impact of the use of social media on the success or failure of a revolution. The results highlight that the use of the Internet, particularly social media and live streams, by the opposition was the essential difference between two revolutions. Social media platforms, live streams, and communication apps that were absent in the revolutionary situation in 2008 were fundamental to the Armenian Velvet Revolution in 2018. The changes in the situation in favor of the opposition, so the outcome of the protests, were mainly based on the Internet-based mobilization of the society. It is also important to take into consideration that the country experienced a great increase in penetration rates over the decade. The percentage of access to the Internet drastically increased between 2008 and 2018. This fact may help to have a clearer understanding of the use of the Internet and social media by the opposition and the reliance on social media by society. According to the results of the continent analysis, the use of social media to direct the protests and to mobilize the society, have a vital role and positive impact on the outcome of a revolution. Thus the study concludes that it is the use of social media to initiate, organize, and direct the protests that explain the success or failure of two Armenian revolutions.

Keywords: social media, revolution, Armenia, success, failure

Procedia PDF Downloads 129
383 Complexity in a Leslie-Gower Delayed Prey-Predator Model

Authors: Anuraj Singh

Abstract:

The complex dynamics is explored in a prey predator system with multiple delays. The predator dynamics is governed by Leslie-Gower scheme. The existence of periodic solutions via Hopf bifurcation with respect to delay parameters is established. To substantiate analytical findings, numerical simulations are performed. The system shows rich dynamic behavior including chaos and limit cycles.

Keywords: chaos, Hopf bifurcation, stability, time delay

Procedia PDF Downloads 326
382 Analysis of Maternal Death Surveillance and Response: Causes and Contributing Factors in Addis Ababa, Ethiopia, 2022

Authors: Sisay Tiroro Salato

Abstract:

Background: Ethiopia has been implementing the maternal death surveillance and response system to provide real-time actionable information, including causes of death and contributing factors. Analysis of maternal mortality surveillance data was conducted to identify the causes and underlying factors in Addis Ababa, Ethiopia. Methods: We carried out a retrospective surveillance data analysis of 324 maternal deaths reported in Addis Ababa, Ethiopia, from 2017 to 2021. The data were extracted from the national maternal death surveillance and response database, including information from case investigation, verbal autopsy, and facility extraction forms. The data were analyzed by computing frequency and presented in numbers, proportions, and ratios. Results: Of 324 maternal deaths, 92% died in the health facilities, 6.2% in transit, and 1.5% at home. The mean age at death was 28 years, ranging from 17 to 45. The maternal mortality ratio per 100,000 live births was 77for the five years, ranging from 126 in 2017 to 21 in 2021. The direct and indirect causes of death were responsible for 87% and 13%, respectively. The direct causes included obstetric haemorrhage, hypertensive disorders in pregnancy, puerperal sepsis, embolism, obstructed labour, and abortion. The third delay (delay in receiving care after reaching health facilities) accounted for 57% of deaths, while the first delay (delay in deciding to seek health care) and the second delay (delay in reaching health facilities) and accounted for 34% and 24%, respectively. Late arrival to the referral facility, delayed management after admission, andnon-recognition of danger signs were underlying factors. Conclusion: Over 86% of maternal deaths were attributed by avoidable direct causes. The majority of women do try to reach health services when an emergency occurs, but the third delays present a major problem. Improving the quality of care at the healthcare facility level will help to reduce maternal death.

Keywords: maternal death, surveillance, delays, factors

Procedia PDF Downloads 113
381 Parallel Multisplitting Methods for Differential Systems

Authors: Malika El Kyal, Ahmed Machmoum

Abstract:

We prove the superlinear convergence of asynchronous multi-splitting methods applied to differential equations. This study is based on the technique of nested sets. It permits to specify kind of the convergence in the asynchronous mode.The main characteristic of an asynchronous mode is that the local algorithm not have to wait at predetermined messages to become available. We allow some processors to communicate more frequently than others, and we allow the communication delays to be substantial and unpredictable. Note that synchronous algorithms in the computer science sense are particular cases of our formulation of asynchronous one.

Keywords: parallel methods, asynchronous mode, multisplitting, ODE

Procedia PDF Downloads 526
380 Prospective Study on the Efficacy of Bio Absorbable Screws in Treatment of Osteochondral Fractures

Authors: S. Anwar Sathik, K. Manoj Deepak, K. Venkatachalam

Abstract:

Our study is a prospective study on the use of bio absorbable pins for the treatment of osteochondral fractures after patellar dislocation.22 patients who presented with osteochondral fractures were treated in our institution. They were followed for a minimum of 12 months by regular radiological evaluation. Of the 22 patients, 2 had fragments that detached from the fracture site which was treated arthroscopically. All the patients underwent open reduction and fixation of the pins using bio absorbable crews. They were immobilized in the cast for a minimum of 6 weeks after which mobilization was started according to our protocol. Fracture consolidation was found to occur in 20 of the 22 patients. Thus, Bio absorbable screws can be used as a reliable method of fixation of the osteochondral fragments.

Keywords: osteochondral fracture, bio absorbable pins, patella dislocation, physiotherapy

Procedia PDF Downloads 312
379 Estimating the Traffic Impacts of Green Light Optimal Speed Advisory Systems Using Microsimulation

Authors: C. B. Masera, M. Imprialou, L. Budd, C. Morton

Abstract:

Even though signalised intersections are necessary for urban road traffic management, they can act as bottlenecks and disrupt traffic operations. Interrupted traffic flow causes congestion, delays, stop-and-go conditions (i.e. excessive acceleration/deceleration) and longer journey times. Vehicle and infrastructure connectivity offers the potential to provide improved new services with additional functions of assisting drivers. This paper focuses on one of the applications of vehicle-to-infrastructure communication namely Green Light Optimal Speed Advisory (GLOSA). To assess the effectiveness of GLOSA in the urban road network, an integrated microscopic traffic simulation framework is built into VISSIM software. Vehicle movements and vehicle-infrastructure communications are simulated through the interface of External Driver Model. A control algorithm is developed for recommending an optimal speed that is continuously updated in every time step for all vehicles approaching a signal-controlled point. This algorithm allows vehicles to pass a traffic signal without stopping or to minimise stopping times at a red phase. This study is performed with all connected vehicles at 100% penetration rate. Conventional vehicles are also simulated in the same network as a reference. A straight road segment composed of two opposite directions with two traffic lights per lane is studied. The simulation is implemented under 150 vehicles per hour and 200 per hour traffic volume conditions to identify how different traffic densities influence the benefits of GLOSA. The results indicate that traffic flow is improved by the application of GLOSA. According to this study, vehicles passed through the traffic lights more smoothly, and waiting times were reduced by up to 28 seconds. Average delays decreased for the entire network by 86.46% and 83.84% under traffic densities of 150 vehicles per hour per lane and 200 vehicles per hour per lane, respectively.

Keywords: connected vehicles, GLOSA, intelligent transport systems, vehicle-to-infrastructure communication

Procedia PDF Downloads 171
378 Tracking Patient Pathway for Assessing Public Health and Financial Burden to Community for Pulmonary Tuberculosis: Pointer from Central India

Authors: Ashish Sinha, Pushpend Agrawal

Abstract:

Background: Patients with undiagnosed pulmonary TB predominantly act as reservoirs for its transmission through 10-15 secondary infections in the next 1-5 Yrs. Delays in the diagnosis and treatment may worsen the disease with increase the risk of death. Factors responsible for such delays by tracking patient pathways to treatment may help in planning better interventions. The provision of ‘free diagnosis and treatment’ forms the cornerstone of the National Tuberculosis Elimination Programme (NTEP). OOPE is defined as the money spent by the patient during TB care other than public health facilities. Free TB care at all health facilities could reduce out-of-pocket expenses to the minimum possible levels. Material and Methods: This cross-sectional study was conducted among randomly selected 252 TB patients from Nov – Oct 2022 by taking in-depth interviews following informed verbal consent. We documented their journey from initial symptoms until they reached the public health facility, along with their ‘out-of-pocket expenditure’ (OOPE) pertaining to TB care. Results: Total treatment delay was 91±72 days on average (median: 77days, IQR: 45-104 days), while the isolated patient delay was 31±45 days (median: 15 days, IQR: 0 days to 43 days); diagnostic delay; 57±60 days (median: 42days, IQR 14-78 days), treatment delay 19 ± 18 days (median: 15days, IQR: 11-19 days). A patient delay (> 30 days) was significantly associated with ignorance about classic symptoms of pulmonary TB, adoption of self-medication, illiteracy, and middle and lower social class. Diagnostic delay was significantly higher among those who contacted private health facilities, were unaware of signs and symptoms, had >2 consultations, and not getting an appropriate referral for TB care. Most (97%) of the study participants interviewed claimed to have incurred some expenditure.Median total expenses were 6155(IQR: 2625-15175) rupees. More than half 141 (56%) of the study participants had expenses >5000 rupees. Median transport expenses were 525(IQR: 200-1012) rupees; Median consultation expenses were 700(IQR: 200-1600) rupees; Median investigation expenses were 1000(IQR: 0-3025) rupees and the Median medicine expenses were 3350(IQR: 1300-7525).OOPE for consultation, investigation, and medicine was observed to be significantly higher among patients who ignored classical signs& symptoms of TB, repeated visits to private health facilities, and due to self-medication practices. Transport expenses and delays in seeking care at facilities were observed to have an upward trend with OOP Expenses (r =1). Conclusion: Delay in TB care due to low awareness about signs and symptoms of TB and poor seeking care, lack of proper consultation, and appropriate referrals reported by the study subjects indicate the areas which need proper attention by the program managers. Despite a centrally sponsored programme, the financial burden on TB patients is still in the unacceptable range. OOPE could be reduced as low as possible by addressing the responsible factors linked to it.

Keywords: patient pathway, delay, pulmonary tuberculosis, out of pocket expenses

Procedia PDF Downloads 66