Search results for: project attributes
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 5906

Search results for: project attributes

4916 Boost for Online Language Course through Peer Evaluation

Authors: Kirsi Korkealehto

Abstract:

The purpose of this research was to investigate how the peer evaluation concept was perceived by language teachers developing online language courses. The online language courses in question were developed in language teacher teams within a nationwide KiVAKO-project funded by the Finnish Ministry of Education and Culture. The participants of the project were 86 language teachers of 26 higher education institutions in Finland. The KiVAKO-project aims to strengthen the language capital at higher education institutions by building a nationwide online language course offering on a shared platform. All higher education students can study the courses regardless of their home institutions. The project covers the following languages: Chinese, Estonian, Finnish Sign Language, French, German, Italian, Japanese, Korean, Portuguese, Russian, and Spanish on the levels CEFR A1-C1. The courses were piloted in the autumn term of 2019, and an online peer evaluation session was organised for all project participating teachers in spring 2020. The peer evaluation utilised the quality criteria for online implementation, which was developed earlier within the eAMK-project. The eAMK-project was also funded by the Finnish Ministry of Education and Culture with the aim to improve higher education institution teachers’ digital and pedagogical competences. In the online peer evaluation session, the teachers were divided into Zoom breakout rooms, in each of which two pilot courses were presented by their teachers dialogically. The other language teachers provided feedback on the course on the basis of the quality criteria. Thereafter good practices and ideas were gathered to an online document. The breakout rooms were facilitated by one teacher who was instructed and provided a slide-set prior to the online session. After the online peer evaluation sessions, the language teachers were asked to respond to an online questionnaire for feedback. The questionnaire included three multiple-choice questions using the Likert-scale rating and two open-ended questions. The online questionnaire was answered after the sessions immediately, the questionnaire link and the QR-code to it was on the last slide of the session, and it was responded at the site. The data comprise online questionnaire responses of the peer evaluation session and the researcher’s observations during the sessions. The data were analysed with a qualitative content analysis method with the help of Atlas.ti programme, and the Likert scale answers provided results per se. The observations were used as complementary data to support the primary data. The findings indicate that the working in the breakout rooms was successful, and the workshops proceeded smoothly. The workshops were perceived as beneficial in terms of improving the piloted courses and developing the participants’ own work as teachers. Further, the language teachers stated that the collegial discussions and sharing the ideas were fruitful. The aspects to improve the workshops were to give more time for free discussions and the opportunity to familiarize oneself with the quality criteria and the presented language courses beforehand. The quality criteria were considered to provide a suitable frame for self- and peer evaluations.

Keywords: higher education, language learning, online learning, peer-evaluation

Procedia PDF Downloads 125
4915 Human Factors as the Main Reason of the Accident in Scaffold Use Assessment

Authors: Krzysztof J. Czarnocki, E. Czarnocka, K. Szaniawska

Abstract:

Main goal of the research project is Scaffold Use Risk Assessment Model (SURAM) formulation, developed for the assessment of risk levels as a various construction process stages with various work trades. Finally, in 2016, the project received financing by the National Center for Research and development according to PBS3/A2/19/2015–Research Grant. The presented data, calculations and analyzes discussed in this paper were created as a result of the completion on the first and second phase of the PBS3/A2/19/2015 project. Method: One of the arms of the research project is the assessment of worker visual concentration on the sight zones as well as risky visual point inadequate observation. In this part of research, the mobile eye-tracker was used to monitor the worker observation zones. SMI Eye Tracking Glasses is a tool, which allows us to analyze in real time and place where our eyesight is concentrated on and consequently build the map of worker's eyesight concentration during a shift. While the project is still running, currently 64 construction sites have been examined, and more than 600 workers took part in the experiment including monitoring of typical parameters of the work regimen, workload, microclimate, sound vibration, etc. Full equipment can also be useful in more advanced analyses. Because of that technology we have verified not only main focus of workers eyes during work on or next to scaffolding, but we have also examined which changes in the surrounding environment during their shift influenced their concentration. In the result of this study it has been proven that only up to 45.75% of the shift time, workers’ eye concentration was on one of three work-related areas. Workers seem to be distracted by noisy vehicles or people nearby. In opposite to our initial assumptions and other authors’ findings, we observed that the reflective parts of the scaffoldings were not more recognized by workers in their direct workplaces. We have noticed that the red curbs were the only well recognized part on a very few scaffoldings. Surprisingly on numbers of samples, we have not recognized any significant number of concentrations on those curbs. Conclusion: We have found the eye-tracking method useful for the construction of the SURAM model in the risk perception and worker’s behavior sub-modules. We also have found that the initial worker's stress and work visual conditions seem to be more predictive for assessment of the risky developing situation or an accident than other parameters relating to a work environment.

Keywords: accident assessment model, eye tracking, occupational safety, scaffolding

Procedia PDF Downloads 198
4914 Aircraft Landing Process Simulation Using Multi-Body Multi-Dynamics Software

Authors: Ahmad Kavousi, Ali Delaviz

Abstract:

In this project, the landing process is simulated by using of multi-body dynamics commercial software. Various factors, including landing situations, aircraft structures and climate are used in this simulation. The purpose of this project is to determine the forces exerted on the aircraft landing gears in landing process in various landing conditions. For this purpose, the ADAMS multi-body dynamics software is used. Different scenarios based on FAR-25, including level landing, tail-down landing, crab landing are simulated. Results of dynamic simulation software with landing load factor obtained from the analytical solution are compared. The effect of fuselage elasticity on the landing load is studied. For this purpose, both of elastic and rigid body assumptions are used in the simulation process, and the results are compared and some conclusions are made.

Keywords: landing gear, landing process, aircraft, multi-body dynamics

Procedia PDF Downloads 496
4913 A Study of the Costs and Benefits of Smart City Projects Including the Scenario of Public-Private Partnerships

Authors: Patrick T. I. Lam, Wenjing Yang

Abstract:

A smart city project embraces benefits and costs which can be classified under direct and indirect categories. Externalities come into the picture, but they are often difficult to quantify. Despite this barrier, policy makers need to carry out cost-benefit analysis to justify the huge investments needed to make a city smart. The recent trend is towards the engagement of the private sector to utilize their resources and expertise, especially in the Information and Communication Technology (ICT) areas, where innovations blossom. This study focuses on the identification of costs (on a life cycle basis) and benefits associated with smart city project developments based on a comprehensive literature review and case studies, where public-private partnerships would warrant consideration, the related costs and benefits are highlighted. The findings will be useful for policy makers of cities.

Keywords: smart city projects, costs and benefits, identification, public-private partnerships

Procedia PDF Downloads 337
4912 Social Space or the Art of Belonging: The Socio-Spatial Approach in the Field of Residential Facilities for Persons with Disabilities

Authors: Sarah Reker

Abstract:

The Convention on the Rights of Persons with Disabilities (CRPD) provides the basis of this study. For all countries which have ratified the convention since its entry into force in 2007, the effective implementation of the requirements often leads to considerable challenges. Furthermore, missing indicators make it difficult to measure progress. Therefore, the aim of the research project is to contribute to analyze the consequences of the implementation process on the inclusion and exclusion conditions for people with disabilities in Germany. Disabled People’s Organisations and other associations consider the social space to be relevant for the successful implementation of the CRPD. Against this background, the research project wants to focus on the relationship between a barrier-free access to the social space and the “full and effective participation and inclusion” (Art. 3) of persons with disabilities. The theoretical basis of the study is the sociological theory of social space (“Sozialraumtheorie”).

Keywords: decentralisation, qualitative research, residential facilities, social space

Procedia PDF Downloads 363
4911 Plotting of an Ideal Logic versus Resource Outflow Graph through Response Analysis on a Strategic Management Case Study Based Questionnaire

Authors: Vinay A. Sharma, Shiva Prasad H. C.

Abstract:

The initial stages of any project are often observed to be in a mixed set of conditions. Setting up the project is a tough task, but taking the initial decisions is rather not complex, as some of the critical factors are yet to be introduced into the scenario. These simple initial decisions potentially shape the timeline and subsequent events that might later be plotted on it. Proceeding towards the solution for a problem is the primary objective in the initial stages. The optimization in the solutions can come later, and hence, the resources deployed towards attaining the solution are higher than what they would have been in the optimized versions. A ‘logic’ that counters the problem is essentially the core of the desired solution. Thus, if the problem is solved, the deployment of resources has led to the required logic being attained. As the project proceeds along, the individuals working on the project face fresh challenges as a team and are better accustomed to their surroundings. The developed, optimized solutions are then considered for implementation, as the individuals are now experienced, and know better of the consequences and causes of possible failure, and thus integrate the adequate tolerances wherever required. Furthermore, as the team graduates in terms of strength, acquires prodigious knowledge, and begins its efficient transfer, the individuals in charge of the project along with the managers focus more on the optimized solutions rather than the traditional ones to minimize the required resources. Hence, as time progresses, the authorities prioritize attainment of the required logic, at a lower amount of dedicated resources. For empirical analysis of the stated theory, leaders and key figures in organizations are surveyed for their ideas on appropriate logic required for tackling a problem. Key-pointers spotted in successfully implemented solutions are noted from the analysis of the responses and a metric for measuring logic is developed. A graph is plotted with the quantifiable logic on the Y-axis, and the dedicated resources for the solutions to various problems on the X-axis. The dedicated resources are plotted over time, and hence the X-axis is also a measure of time. In the initial stages of the project, the graph is rather linear, as the required logic will be attained, but the consumed resources are also high. With time, the authorities begin focusing on optimized solutions, since the logic attained through them is higher, but the resources deployed are comparatively lower. Hence, the difference between consecutive plotted ‘resources’ reduces and as a result, the slope of the graph gradually increases. On an overview, the graph takes a parabolic shape (beginning on the origin), as with each resource investment, ideally, the difference keeps on decreasing, and the logic attained through the solution keeps increasing. Even if the resource investment is higher, the managers and authorities, ideally make sure that the investment is being made on a proportionally high logic for a larger problem, that is, ideally the slope of the graph increases with the plotting of each point.

Keywords: decision-making, leadership, logic, strategic management

Procedia PDF Downloads 108
4910 Multi-Stakeholder Involvement in Construction and Challenges of Building Information Modeling Implementation

Authors: Zeynep Yazicioglu

Abstract:

Project development is a complex process where many stakeholders work together. Employers and main contractors are the base stakeholders, whereas designers, engineers, sub-contractors, suppliers, supervisors, and consultants are other stakeholders. A combination of the complexity of the building process with a large number of stakeholders often leads to time and cost overruns and irregular resource utilization. Failure to comply with the work schedule and inefficient use of resources in the construction processes indicate that it is necessary to accelerate production and increase productivity. The development of computer software called Building Information Modeling, abbreviated as BIM, is a major technological breakthrough in this area. The use of BIM enables architectural, structural, mechanical, and electrical projects to be drawn in coordination. BIM is a tool that should be considered by every stakeholder with the opportunities it offers, such as minimizing construction errors, reducing construction time, forecasting, and determination of the final construction cost. It is a process spreading over the years, enabling all stakeholders associated with the project and construction to use it. The main goal of this paper is to explore the problems associated with the adoption of BIM in multi-stakeholder projects. The paper is a conceptual study, summarizing the author’s practical experience with design offices and construction firms working with BIM. In the transition period to BIM, three of the challenges will be examined in this paper: 1. The compatibility of supplier companies with BIM, 2. The need for two-dimensional drawings, 3. Contractual issues related to BIM. The paper reviews the literature on BIM usage and reviews the challenges in the transition stage to BIM. Even on an international scale, the supplier that can work in harmony with BIM is not very common, which means that BIM's transition is continuing. In parallel, employers, local approval authorities, and material suppliers still need a 2-D drawing. In the BIM environment, different stakeholders can work on the same project simultaneously, giving rise to design ownership issues. Practical applications and problems encountered are also discussed, providing a number of suggestions for the future.

Keywords: BIM opportunities, collaboration, contract issues about BIM, stakeholders of project

Procedia PDF Downloads 101
4909 Using Building Information Modelling to Mitigate Risks Associated with Health and Safety in the Construction and Maintenance of Infrastructure Assets

Authors: Mohammed Muzafar, Darshan Ruikar

Abstract:

BIM, an acronym for Building Information Modelling relates to the practice of creating a computer generated model which is capable of displaying the planning, design, construction and operation of a structure. The resulting simulation is a data-rich, object-oriented, intelligent and parametric digital representation of the facility, from which views and data, appropriate to various users needs can be extracted and analysed to generate information that can be used to make decisions and to improve the process of delivering the facility. BIM also refers to a shift in culture that will influence the way the built environment and infrastructure operates and how it is delivered. One of the main issues of concern in the construction industry at present in the UK is its record on Health & Safety (H&S). It is, therefore, important that new technologies such as BIM are developed to help improve the quality of health and safety. Historically the H&S record of the construction industry in the UK is relatively poor as compared to the manufacturing industries. BIM and the digital environment it operates within now allow us to use design and construction data in a more intelligent way. It allows data generated by the design process to be re-purposed and contribute to improving efficiencies in other areas of a project. This evolutionary step in design is not only creating exciting opportunities for the designers themselves but it is also creating opportunity for every stakeholder in any given project. From designers, engineers, contractors through to H&S managers, BIM is accelerating a cultural change. The paper introduces the concept behind a research project that mitigates the H&S risks associated with the construction, operation and maintenance of assets through the adoption of BIM.

Keywords: building information modeling, BIM levels, health, safety, integration

Procedia PDF Downloads 250
4908 Benefits of Gamification in Agile Software Project Courses

Authors: Nina Dzamashvili Fogelström

Abstract:

This paper examines concepts of Game-Based Learning and Gamification. Conducted literature survey found an increased interest in the academia in these concepts, limited evidence of a positive effect on student motivation and academic performance, but also certain scepticism for adding games to traditional educational activities. A small-scale empirical study presented in this paper aims to evaluate student experience and usefulness of GameBased Learning and Gamification for a better understanding of the threshold concepts in software engineering project courses. The participants of the study were 22 second year students from bachelor’s program in software engineering at Blekinge Institute of Technology. As a part of the course instruction, the students were introduced to a digital game specifically designed to simulate agile software project. The game mechanics were designed as to allow manipulation of the agile concept of team velocity. After the application of the game, the students were surveyed to measure the degree of a perceived increase in understanding of the studied threshold concept. The students were also asked whether they would like to have games included in their education. The results show that majority of the students found the game helpful in increasing their understanding of the threshold concept. Most of the students have indicated that they would like to see games included in their education. These results are encouraging. Since the study was of small scale and based on convenience sampling, more studies in the area are recommended.

Keywords: agile development, gamification, game based learning, digital games, software engineering, threshold concepts

Procedia PDF Downloads 165
4907 Practice of Developing EFL Coursebooks at Mongolian National University of Education

Authors: Nyamsuren Baljinnyam, Narmandakh Khaltar, Otgonbaatar Olzkhuu

Abstract:

Undergraduate students study English I (elective) and II (compulsory) courses which are included in the General foundation courses in the Teacher Education Curriculum Framework at the Mongolian National University of Education. Teachers at the English Department have designed and developed 2 levels (from pre-intermediate to upper-intermediate) English coursebooks since 2016 and published the second editions of each in 2018 and 2019. Developing coursebooks based on the students’ needs, satisfaction, and dissatisfaction with these instructional materials are essential phenomena in the delivery service of teaching English at the tertiary level. Thus, this study aims at findings from students’ views on English coursebooks which are studied mostly in the first and second semesters of the undergraduate academic program. The purpose of this research project was to determine the overall pedagogical value and suitability of the book to students’ needs and 21st-century teacher education concepts. We have designed a coursebook evaluation checklist with 28 questionnaires, including Morris’s English as a foreign language coursebook evaluation checklist (2017). The study is a 2 phased descriptive survey study that covered 572 and 519 undergraduate students who studied in the spring term of the 2021-2022 academic year and the fall term of the 2022-2023 academic year at 7 branch schools of Mongolian National University of Education (MNUE). Data analysis consists of student responses to each item. Coursebook evaluation data is classified into 3 main categories as “general attributes”, “learning content” and “task evaluation”. Some results of the study indicate the following findings: 97 percent of the total survey participants (in total 1091) have given positive responses to the coursebooks that these are fully aimed at acquiring the students’ language learning skills: reading, writing, listening, and speaking; 78 percent responded that the coursebooks were different from the English Textbooks that they learned in secondary schools; and 91 percent answered that the English coursebooks could give motivation to the students to achieve their self-study.

Keywords: coursebook evaluation, improving English, student satisfaction and dissatisfaction with coursebooks, language learning materials, language tasks, students’ needs

Procedia PDF Downloads 5
4906 Implementing a Prevention Network for the Ortenaukreis

Authors: Klaus Froehlich-Gildhoff, Ullrich Boettinger, Katharina Rauh, Angela Schickler

Abstract:

The Prevention Network Ortenaukreis, PNO, funded by the German Ministry of Education and Research, aims to promote physical and mental health as well as the social inclusion of 3 to 10 years old children and their families in the Ortenau district. Within a period of four years starting 11/2014 a community network will be established. One regional and five local prevention representatives are building networks with stakeholders of the prevention and health promotion field bridging the health care, educational and youth welfare system in a multidisciplinary approach. The regional prevention representative implements regularly convening prevention and health conferences. On a local level, the 5 local prevention representatives implement round tables in each area as a platform for networking. In the setting approach, educational institutions are playing a vital role when gaining access to children and their families. Thus the project will offer 18 month long organizational development processes with specially trained coaches to 25 kindergarten and 25 primary schools. The process is based on a curriculum of prevention and health promotion which is adapted to the specific needs of the institutions. Also to ensure that the entire region is reached demand oriented advanced education courses are implemented at participating day care centers, kindergartens and schools. Evaluation method: The project is accompanied by an extensive research design to evaluate the outcomes of different project components such as interview data from community prevention agents, interviews and network analysis with families at risk on their support structures, data on community network development and monitoring, as well as data from kindergarten and primary schools. The latter features a waiting-list control group evaluation in kindergarten and primary schools with a mixed methods design using questionnaires and interviews with pedagogues, teachers, parents, and children. Results: By the time of the conference pre and post test data from the kindergarten samples (treatment and control group) will be presented, as well as data from the first project phase, such as qualitative interviews with the prevention coordinators as well as mixed methods data from the community needs assessment. In supporting this project, the Federal Ministry aims to gain insight into efficient components of community prevention and health promotion networks as it is implemented and evaluated. The district will serve as a model region, so that successful components can be transferred to other regions throughout Germany. Accordingly, the transferability to other regions is of high interest in this project.

Keywords: childhood research, health promotion, physical health, prevention network, psychological well-being, social inclusion

Procedia PDF Downloads 221
4905 Exploring Weld Rejection Rate Limits and Tracers Effects in Construction Projects

Authors: Abdalaziz M. Alsalhabi, Loai M. Alowa

Abstract:

This paper investigates Weld Rejection Rate (WRR) limits and tracer effects in construction projects, with a specific focus on a Gas Plant Project, a mega-project held by Saudi Aramco (SA) in Saudi Arabia. The study included a comprehensive examination of various factors impacting WRR limits. It commenced by comparing the Company practices with ASME standards, followed by an in-depth analysis of both weekly and cumulative projects' historical WRR data, evaluation of Radiographic Testing (RT) reports for rejected welds, and proposal of mitigation methods to eliminate future rejections. Additionally, the study revealed the causes of fluctuation in WRR data and benchmarked with the industry practices. Furthermore, a case study was conducted to explore the impact of tracers on WRR, providing insights into their influence on the welding process. This paper aims to achieve three primary objectives. Firstly, it seeks to validate the existing practices of WRR limits and advocate for their inclusion within relevant International Industry Standards. Secondly, it aims to validate the effectiveness of the WRR formula that incorporates tracer effects, ensuring its reliability in assessing weld quality. Lastly, this study aims to identify opportunities for process improvement in WRR control, with the ultimate goal of enhancing project processes and ensuring the integrity, safety, and efficiency of constructed assets.

Keywords: weld rejection rate, weld repair rate in joint and linear basis, tracers effects, construction projects

Procedia PDF Downloads 39
4904 Science and Monitoring Underpinning River Restoration: A Case Study

Authors: Geoffrey Gilfillan, Peter Barham, Lisa Smallwood, David Harper

Abstract:

The ‘Welland for People and Wildlife’ project aimed to improve the River Welland’s ecology and water quality, and to make it more accessible to the community of Market Harborough. A joint monitoring project by the Welland Rivers Trust & University of Leicester was incorporated into the design. The techniques that have been used to measure its success are hydrological, geomorphological, and water quality monitoring, species and habitat surveys, and community engagement. Early results show improvements to flow and habitat diversity, water quality and biodiversity of the river environment. Barrier removal has increased stickleback mating activity, and decreased parasitically infected fish in sample catches. The habitats provided by the berms now boast over 25 native plant species, and the river is clearer, cleaner and with better-oxygenated water.

Keywords: community engagement, ecological monitoring, river restoration, water quality

Procedia PDF Downloads 229
4903 Promoters' Perspectives on the Impact of Development Projects: Do They Suffer from Any Forms of Social Injustice?

Authors: Ola Hosny

Abstract:

This paper illustrates promoters’ role in any development project and factors affecting their performance. The paper starts by giving an overview of the Egyptian context and the born of non-formal education. This is then followed by answers to the following questions; who are promoters, why build promoters’ skills, do promoters suffer from any forms of social injustice, what is meant by leadership’s skills, why build promoters’ leadership skills in specific, and finally what is the desired final destination. Given the fact that promoters are the actual implementers on ground of any project, this paper pinpoints the extent to which promoters' capacities should be developed to institutionalize projects' values into the community, transfer knowledge, and be able to act as pillars of change to sustain the maximum achievements from any intervention, illustrating the role of education for sustainable development. The paper wraps-up by a conclusion that reflects the main findings.

Keywords: social justice, women's empowerment, gender equity, young rural women, promoters

Procedia PDF Downloads 354
4902 Application of Model Tree in the Prediction of TBM Rate of Penetration with Synthetic Minority Oversampling Technique

Authors: Ehsan Mehryaar

Abstract:

The rate of penetration is (RoP) one of the vital factors in the cost and time of tunnel boring projects; therefore, predicting it can lead to a substantial increase in the efficiency of the project. RoP is heavily dependent geological properties of the project site and TBM properties. In this study, 151-point data from Queen’s water tunnel is collected, which includes unconfined compression strength, peak slope index, angle with weak planes, and distance between planes of weaknesses. Since the size of the data is small, it was observed that it is imbalanced. To solve that problem synthetic minority oversampling technique is utilized. The model based on the model tree is proposed, where each leaf consists of a support vector machine model. Proposed model performance is then compared to existing empirical equations in the literature.

Keywords: Model tree, SMOTE, rate of penetration, TBM(tunnel boring machine), SVM

Procedia PDF Downloads 173
4901 The Play Translator’s Score Developing: Methodology for Intercultural Communication

Authors: Akhmylovskaia Larisa, Barysh Andriana

Abstract:

The present paper is introducing the translation score developing methodology and methods in the cross-cultural communication. The ideas and examples presented by the authors illustrate the universal character of translation score developing methods under analysis. Personal experience in the international theatre-making projects, opera laboratories, cross-cultural master-classes, movie and theatre festivals give more opportunities to single out the conditions, forms, means and principles of translation score developing as well as the translator/interpreter’s functions as cultural liaison for multiethnic collaboration.

Keywords: methodology of translation score developing, pre-production, analysis, production, post-production, ethnic scene theory, theatre anthropology, laboratory, master-class, educational project, academic project, Stanislavski terminology meta-language, super-objective, participant observation

Procedia PDF Downloads 324
4900 Non-Chronological Approach in Crane Girder and Composite Steel Beam Installation: Case Study

Authors: Govindaraj Ramanathan

Abstract:

The time delay and the structural stability are major issues in big size projects due to several factors. Improper planning and poor coordination lead to delay in construction, which sometimes result in reworking or rebuilding. This definitely increases the cost and time of project. This situation stresses the structural engineers to plan out of the limits of contemporary technology utilizing non-chronological approach with creative ideas. One of the strategies to solve this issue is through structural integrity solutions in a cost-effective way. We have faced several problems in a project worth 470 million USD, and one such issue is crane girder installation with composite steel beams. We have applied structural integrity approach with the proper and revised planning schedule to solve the problem efficiently with minimal expenses.

Keywords: construction management, delay, non-chronological approach, composite beam, structural integrity

Procedia PDF Downloads 235
4899 The Development of Directed-Project Based Learning as Language Learning Model to Improve Students' English Achievement

Authors: Tri Pratiwi, Sufyarma Marsidin, Hermawati Syarif, Yahya

Abstract:

The 21st-century skills being highly promoted today are Creativity and Innovation, Critical Thinking and Problem Solving, Communication and Collaboration. Communication Skill is one of the essential skills that should be mastered by the students. To master Communication Skills, students must first master their Language Skills. Language Skills is one of the main supporting factors in improving Communication Skills of a person because by learning Language Skills students are considered capable of communicating well and correctly so that the message or how to deliver the message to the listener can be conveyed clearly and easily understood. However, it cannot be denied that English output or learning outcomes which are less optimal is the problem which is frequently found in the implementation of the learning process. This research aimed to improve students’ language skills by developing learning model in English subject for VIII graders of SMP N 1 Uram Jaya through Directed-Project Based Learning (DPjBL) implementation. This study is designed in Research and Development (R & D) using ADDIE model development. The researcher collected data through observation, questionnaire, interview, test, and documentation which were then analyzed qualitatively and quantitatively. The results showed that DPjBL is effective to use, it is seen from the difference in value between the pretest and posttest of the control class and the experimental class. From the results of a questionnaire filled in general, the students and teachers agreed to DPjBL learning model. This learning model can increase the students' English achievement.

Keywords: language skills, learning model, Directed-Project Based Learning (DPjBL), English achievement

Procedia PDF Downloads 164
4898 Play, Practice and Perform: The Pathway to Becoming and Belonging as an Engineer

Authors: Rick Evans

Abstract:

Despite over 40 years of research into why women choose not to enroll or leave undergraduate engineering programs, along with the subsequent and serious efforts to attract more women, women receiving bachelor's degrees in engineering in the US have remained disappointingly low. We know that even despite their struggles to become more welcoming and inclusive, engineering programs remain gendered, raced and classed. However, our research team has found that women who participate and indeed thrive in undergraduate engineering project teams do so in numbers that far exceed their participation in undergraduate programs. We believe part of the answer lies in the ways that project teams facilitate experiential learning, specifically providing opportunities for members to play, practice and perform. We employ a multi-case study method and assume a feminist, activist and interpretive perspective. We seek to generate concrete and context-dependent knowledge in order to explore potentially new variables and hypotheses. Our focus is to learn from those select women who are thriving. For this oral or e-poster presentation, we will focus on the results of the second of our semi-structured interviews – the learning journey interview. During this interview, we ask participants to tell us the story/ies of their participation in project teams. Our results suggest these women find joy in their experience of developing and applying engineering expertise. They experience this joy and develop their expertise in the highly patterned progression of play, practice and performance. Play is a purposeful activity in which someone enters an imaginary world, a world not yet real to them. However, this imaginary world is still very much connected to the real world, in this case, a particular kind of engineering, in that the ways of engaging are already established, codified and rule-governed. As such, these women are novices motivated to join a community of actors. Practice, better understood as practices, a count noun, is an embodied, materially interconnected collection of actions organized around the shared understandings of that community of actors. Those shared understandings reveal a social order – a particular field of engineering. No longer novices, these women begin to develop and display their emergent identities as engineers. Perform is activity meant either to demonstrate competence and/or to enable, even teach play and practice to others. As performers, these women participants become models for others. They direct play and practice, contextualizing both within a field of engineering and the specific aims of the project team community. By playing, practicing and performing engineering, women claim their identities as engineers and, equally important, have those identities acknowledged by team members. If we hope to transform our gendered, raced, classed institutions, we need to learn more about women who thrive within those institutions. We need to learn more about their processes of becoming and belonging as engineers. Our research presentation begins with a description of project teams and our multi-case study method. We then offer detailed descriptions of play, practice, and performance using the voices of women in project teams.

Keywords: engineering education, gender, identity, project teams

Procedia PDF Downloads 123
4897 Support for Refugee Entrepreneurs Through International Aid

Authors: Julien Benomar

Abstract:

The World Bank report published in April 2023 called “Migrants, Refugees and Society” allows us to first distinguish migrants in search of economic opportunities and refugees that flee a situation of danger and choose their destination based on their immediate need for safety. Amongst those two categories, the report distinguished people having professional skills adapted to the labor market of the host country and those who have not. Out of that distinction of four categories, we choose to focus our research on refugees that do not have professional skills adapted to the labor market of the host country. Given that refugees generally have no recourse to public assistance schemes and cannot count on the support of their entourage or support network, we propose to examine the extent to which external assistance, such as international humanitarian action, is likely to accompany refugees' transition to financial empowerment through entrepreneurship. To this end, we propose to carry out a case study structured in three stages: (i) an exchange with a Non-Governmental Organisation (NGO) active in supporting refugee populations from Congo and Burundi to Rwanda, enabling us to (i.i) define together a financial empowerment income, and (i. ii) learn about the content of the support measures taken for the beneficiaries of the humanitarian project; (ii) monitor the population of 118 beneficiaries, including 73 refugees and 45 Rwandans (reference population); (iii) conduct a participatory analysis to identify the level of performance of the project and areas for improvement. The case study thus involved the staff of an international NGO active in helping refugees from Rwanda since 2015 and the staff of a Luxembourg NGO that has been funding this economic aid project through entrepreneurship since 2021. The case study thus involved the staff of an international NGO active in helping refugees from Rwanda since 2015 and the staff of a Luxembourg NGO, which has been funding this economic aid through an entrepreneurship project since 2021, and took place over a 48-day period between April and May 2023. The main results are of two types: (i) the need to associate indicators for monitoring the impact of the project on the indirect beneficiaries of the project (refugee community) and (ii) the identification of success factors making it possible to bring concrete and relevant responses to the constraints encountered. The first result thus made it possible to identify the following indicators: Indicator of community potential ((jobs, training or mentoring) promoted by the activity of the entrepreneur), Indicator of social contribution (tax paid by the entrepreneur), Indicator of resilience (savings and loan capacity generated, and finally impact on social cohesion. The second result made it possible to identify that among the 7 success factors tested, the sector of activity chosen and the level of experience in the sector of the future activity are those that stand out the most clearly.

Keywords: entrepreuneurship, refugees, financial empowerment, international aid

Procedia PDF Downloads 77
4896 The Effects of Land Grabbing on Livelihood Assets and Its Implication on Food Production in Ghana: A Case Study of Bui Dam Construction Project

Authors: Charles Kwaku Oppong

Abstract:

This study examined the effects of the agricultural land grabbed for the Bui Dam project on the livelihoods assets of the affected people and its implication on food production. Both quantitative and qualitative data were collected through the use of focus group discussions, questionnaire administration, interview guide, and observations. It was found that the land grabbing incident in the study communities as a result of the Bui Dam construction has resulted in the improvements in the physical assets of the affected people. The findings also indicated that local food crop production and the quantity of fish catch have dwindled after the land grabs. Contrary to this, the local people’s access to the natural capital, particularly the local land for agricultural activities has been worsened. The study recommends alternative sustainable livelihood for the affected people by the local government.

Keywords: land grabbing, livelihood, asset, food production

Procedia PDF Downloads 164
4895 A Critical Review of Risk-Based Approach for Project Management Office Development

Authors: Alin Veronika, Yusuf Latief

Abstract:

This critical review meticulously delineates and elucidates the considerable deficiencies and voids that exist within the extant body of literature concerning the development strategies associated with risk-based Project Management Offices (PMOs). Although the advantages and positive outcomes linked to the establishment and functioning of PMOs are regularly articulated and acknowledged in various academic discourses, the empirical evidence that supports these claims frequently demonstrates a significant shortfall in methodological rigor and often encounters challenges when attempting to distinctly isolate and delineate the unique contributions and impacts of PMOs in contrast to other multifaceted organizational factors that may also play a role. This comprehensive review systematically scrutinizes and evaluates the current research landscape pertaining to the critical success factors that include, but are not limited to, strategic alignment, organizational structure, human capital, operational efficiency, technology, and the overarching influence of organizational culture, thereby identifying notable limitations within this research domain and proposing targeted areas for further scholarly investigation. Furthermore, the analysis accentuates the imperative need for the development and implementation of more sophisticated, nuanced risk assessment and mitigation frameworks that are specifically designed to cater to the unique operational characteristics of PMOs while simultaneously advocating for an elevated focus on the profound influence exerted by organizational culture and its various subcultures on the overall effectiveness and success of PMOs.

Keywords: organizational culture, project management office, risk management, risk-based PMO development

Procedia PDF Downloads 10
4894 Co-Design of Accessible Speech Recognition for Users with Dysarthric Speech

Authors: Elizabeth Howarth, Dawn Green, Sean Connolly, Geena Vabulas, Sara Smolley

Abstract:

Through the EU Horizon 2020 Nuvoic Project, the project team recruited 70 individuals in the UK and Ireland to test the Voiceitt speech recognition app and provide user feedback to developers. The app is designed for people with dysarthric speech, to support communication with unfamiliar people and access to speech-driven technologies such as smart home equipment and smart assistants. Participants with atypical speech, due to a range of conditions such as cerebral palsy, acquired brain injury, Down syndrome, stroke and hearing impairment, were recruited, primarily through organisations supporting disabled people. Most had physical or learning disabilities in addition to dysarthric speech. The project team worked with individuals, their families and local support teams, to provide access to the app, including through additional assistive technologies where needed. Testing was user-led, with participants asked to identify and test use cases most relevant to their daily lives over a period of three months or more. Ongoing technical support and training were provided remotely and in-person throughout the testing period. Structured interviews were used to collect feedback on users' experiences, with delivery adapted to individuals' needs and preferences. Informal feedback was collected through ongoing contact between participants, their families and support teams and the project team. Focus groups were held to collect feedback on specific design proposals. User feedback shared with developers has led to improvements to the user interface and functionality, including faster voice training, simplified navigation, the introduction of gamification elements and of switch access as an alternative to touchscreen access, with other feature requests from users still in development. This work offers a case-study in successful and inclusive co-design with the disabled community.

Keywords: co-design, assistive technology, dysarthria, inclusive speech recognition

Procedia PDF Downloads 110
4893 Deterministic Modelling to Estimate Economic Impact from Implementation and Management of Large Infrastructure

Authors: Dimitrios J. Dimitriou

Abstract:

It is widely recognised that the assets portfolio development is helping to enhance economic growth, productivity and competitiveness. While numerous studies and reports certify the positive effect of investments in large infrastructure investments on the local economy, still, the methodology to estimate the contribution in economic development is a challenging issue for researchers and economists. The key question is how to estimate those economic impacts in each economic system. This paper provides a compact and applicable methodological framework providing quantitative results in terms of the overall jobs and income generated into the project life cycle. According to a deterministic mathematical approach, the key variables and the modelling framework are presented. The numerical case study highlights key results for a new motorway project in Greece, which is experienced economic stress for many years, providing the opportunity for comparisons with similar cases.

Keywords: quantitative modelling, economic impact, large transport infrastructure, economic assessment

Procedia PDF Downloads 201
4892 Conflicts Identification Approach among Stakeholders in Goal-Oriented Requirements Analysis

Authors: Muhammad Suhaib

Abstract:

Requirements Analysis are the most important part of software Engineering for both system application development, and project requirements. Conflicts often arise during the requirements gathering and analysis phase. This research aims to identify conflicts during the requirements gathering phase in software development life cycle, Research, Development, and Technology converted the world into a global village. During requirements elicitation/gathering phase it’s very difficult to understand the main objective of stakeholders, after completion of requirements elicitation task final results are used for Software Requirements Specification (SRS), SRS is the highly important outcome of the requirements analysis phase. this is the foundation between the developers and stakeholders or customers, proposed methodology will be helpful to identify those conflicts in a very easy manner during the initial phase of the project.

Keywords: goal oriented requirements analysis, conflicts identification model, requirements analysis, requirements engineering

Procedia PDF Downloads 132
4891 Using ANN in Emergency Reconstruction Projects Post Disaster

Authors: Rasha Waheeb, Bjorn Andersen, Rafa Shakir

Abstract:

Purpose The purpose of this study is to avoid delays that occur in emergency reconstruction projects especially in post disaster circumstances whether if they were natural or manmade due to their particular national and humanitarian importance. We presented a theoretical and practical concepts for projects management in the field of construction industry that deal with a range of global and local trails. This study aimed to identify the factors of effective delay in construction projects in Iraq that affect the time and the specific quality cost, and find the best solutions to address delays and solve the problem by setting parameters to restore balance in this study. 30 projects were selected in different areas of construction were selected as a sample for this study. Design/methodology/approach This study discusses the reconstruction strategies and delay in time and cost caused by different delay factors in some selected projects in Iraq (Baghdad as a case study).A case study approach was adopted, with thirty construction projects selected from the Baghdad region, of different types and sizes. Project participants from the case projects provided data about the projects through a data collection instrument distributed through a survey. Mixed approach and methods were applied in this study. Mathematical data analysis was used to construct models to predict delay in time and cost of projects before they started. The artificial neural networks analysis was selected as a mathematical approach. These models were mainly to help decision makers in construction project to find solutions to these delays before they cause any inefficiency in the project being implemented and to strike the obstacles thoroughly to develop this industry in Iraq. This approach was practiced using the data collected through survey and questionnaire data collection as information form. Findings The most important delay factors identified leading to schedule overruns were contractor failure, redesigning of designs/plans and change orders, security issues, selection of low-price bids, weather factors, and owner failures. Some of these are quite in line with findings from similar studies in other countries/regions, but some are unique to the Iraqi project sample, such as security issues and low-price bid selection. Originality/value we selected ANN’s analysis first because ANN’s was rarely used in project management , and never been used in Iraq to finding solutions for problems in construction industry. Also, this methodology can be used in complicated problems when there is no interpretation or solution for a problem. In some cases statistical analysis was conducted and in some cases the problem is not following a linear equation or there was a weak correlation, thus we suggested using the ANN’s because it is used for nonlinear problems to find the relationship between input and output data and that was really supportive.

Keywords: construction projects, delay factors, emergency reconstruction, innovation ANN, post disasters, project management

Procedia PDF Downloads 165
4890 Development of Web-Based Iceberg Detection Using Deep Learning

Authors: A. Kavya Sri, K. Sai Vineela, R. Vanitha, S. Rohith

Abstract:

Large pieces of ice that break from the glaciers are known as icebergs. The threat that icebergs pose to navigation, production of offshore oil and gas services, and underwater pipelines makes their detection crucial. In this project, an automated iceberg tracking method using deep learning techniques and satellite images of icebergs is to be developed. With a temporal resolution of 12 days and a spatial resolution of 20 m, Sentinel-1 (SAR) images can be used to track iceberg drift over the Southern Ocean. In contrast to multispectral images, SAR images are used for analysis in meteorological conditions. This project develops a web-based graphical user interface to detect and track icebergs using sentinel-1 images. To track the movement of the icebergs by using temporal images based on their latitude and longitude values and by comparing the center and area of all detected icebergs. Testing the accuracy is done by precision and recall measures.

Keywords: synthetic aperture radar (SAR), icebergs, deep learning, spatial resolution, temporal resolution

Procedia PDF Downloads 90
4889 Understanding Project Failures in Construction: The Critical Impact of Financial Capacity

Authors: Nnadi Ezekiel Oluwaseun Ejiofor

Abstract:

This research investigates the effects of poor cost estimation, material cost variations, and payment punctuality on the financial health and execution of construction projects in Nigeria. To achieve the objectives of the study, a quantitative research approach was employed, and data was gathered through an online survey of 74 construction industry professionals consisting of quantity surveyors, contractors, and other professionals. The study surveyed input on cost estimation errors, price fluctuations, and payment delays, among other factors. The responses of the respondents were analyzed using a five-point Likert scale and the Relative Importance Index (RII). The findings demonstrated that the errors in cost estimating in the Bill of Quantity (BOQ) have a high degree of negative impact on the reputation and image of the participants in the projects. The greatest effect was experienced on the likelihood of obtaining future endeavors for contractors (mean value = 3.42), followed by the likelihood of obtaining new commissions by quantity surveyors (mean value = 3.40). The level of inaccuracy in costing that undershoots exposes them to risks was most serious in terms of easement of construction and effects of shortage of funds to pursue bankruptcy (hence fears of mean value = 3.78). There was also considerable financial damage as a result of cost underestimation, whereby contractors suffered the worst loss in profit (mean value = 3.88). Every expense comes with its own peculiar risk and uncertainty. Pressure on the cost of materials and every other expense attributed to the building and completion of a structure adds risks to the performance figures of a project. The greatest weight (mean importance score = 4.92) was attributed to issues like market inflation in building materials, while the second greatest weight (mean importance score = 4.76) was due to increased transportation charges. On the other hand, delays in payments arising from issues of the clients like poor availability of funds (RII=0.71) and contracting issues such as disagreements on the valuation of works done (RII=0.72) or other reasons were also found to lead to project delays and additional costs. The results affirm the importance of proper cost estimation on the health of organization finances and project risks and finishes within set time limits. As for the suggestions, it is proposed to progress on the methods of costing, engender better communications with the stakeholders, and manage the delays by way of contracting and financial control. This study enhances the existing literature on construction project management by suggesting ways to deal with adverse cost inaccuracies and availability of materials due to delays in payments which, if addressed, would greatly improve the economic performance of the construction business.

Keywords: cost estimation, construction project management, material price fluctuations, payment delays, financial impact

Procedia PDF Downloads 5
4888 A Feasibility Study of Replacing High Pressure Mercury Vapor and Sodium Vapor Lamp Street Lighting Bulbs with LEDs in Turkish Republic of Northern Cyprus

Authors: Olusola Olorunfemi Bamisile, Mustafa Dagbasi, Serkan Abbasoglu

Abstract:

Feasibility of an Energy Audit program is the main aim of this paper. LEDs are used to replace Sodium Vapor lamps and High Pressured Mercury Vapor lamps that are currently used for the street lighting system in Turkish Republic of Northern Cyprus. 44% of the fossil fuels imported into Turkish Republic of Northern Cyprus are used for electricity generation which makes the reduction in the consumption of electricity very important. This project will save as much as 40,206,210 kWh on site annually and 121,837,000 kWh can be saved from source. The economic environmental and fossil fuels saving of this project is also evaluated.

Keywords: energy conservation management, LEDs, sodium vapor, high pressure mercury vapor, life cycle costing

Procedia PDF Downloads 461
4887 The Face Sync-Smart Attendance

Authors: Bekkem Chakradhar Reddy, Y. Soni Priya, Mathivanan G., L. K. Joshila Grace, N. Srinivasan, Asha P.

Abstract:

Currently, there are a lot of problems related to marking attendance in schools, offices, or other places. Organizations tasked with collecting daily attendance data have numerous concerns. There are different ways to mark attendance. The most commonly used method is collecting data manually by calling each student. It is a longer process and problematic. Now, there are a lot of new technologies that help to mark attendance automatically. It reduces work and records the data. We have proposed to implement attendance marking using the latest technologies. We have implemented a system based on face identification and analyzing faces. The project is developed by gathering faces and analyzing data, using deep learning algorithms to recognize faces effectively. The data is recorded and forwarded to the host through mail. The project was implemented in Python and Python libraries used are CV2, Face Recognition, and Smtplib.

Keywords: python, deep learning, face recognition, CV2, smtplib, Dlib.

Procedia PDF Downloads 55