4809 Presenting a Model Based on Artificial Neural Networks to Predict the Execution Time of Design Projects

Authors: Hamed Zolfaghari, Mojtaba Kord

Abstract:

After feasibility study the design phase is started and the rest of other phases are highly dependent on this phase. forecasting the duration of design phase could do a miracle and would save a lot of time. This study provides a fast and accurate Machine learning (ML) and optimization framework, which allows a quick duration estimation of project design phase, hence improving operational efficiency and competitiveness of a design construction company. 3 data sets of three years composed of daily time spent for different design projects are used to train and validate the ML models to perform multiple projects. Our study concluded that Artificial Neural Network (ANN) performed an accuracy of 0.94.

Keywords: time estimation, machine learning, Artificial neural network, project design phase

Procedia PDF Downloads 96
4808 Application of Industrial Ecology to the INSPIRA Zone: Territory Planification and New Activities

Authors: Mary Hanhoun, Jilla Bamarni, Anne-Sophie Bougard

Abstract:

INSPIR’ECO is a 18-month research and innovation project that aims to specify and develop a tool to offer new services for industrials and territorial planners/managers based on Industrial Ecology Principles. This project is carried out on the territory of Salaise Sablons and the services are designed to be deployed on other territories. Salaise-Sablons area is located in the limit of 5 departments on a major European economic axis multimodal traffic (river, rail and road). The perimeter of 330 ha includes 90 hectares occupied by 20 companies, with a total of 900 jobs, and represents a significant potential basin of development. The project involves five multi-disciplinary partners (Syndicat Mixte INSPIRA, ENGIE, IDEEL, IDEAs Laboratory and TREDI). INSPIR’ECO project is based on the principles that local stakeholders need services to pool, share their activities/equipment/purchases/materials. These services aims to : 1. initiate and promote exchanges between existing companies and 2. identify synergies between pre-existing industries and future companies that could be implemented in INSPIRA. These eco-industrial synergies can be related to: the recovery / exchange of industrial flows (industrial wastewater, waste, by-products, etc.); the pooling of business services (collective waste management, stormwater collection and reuse, transport, etc.); the sharing of equipments (boiler, steam production, wastewater treatment unit, etc.) or resources (splitting jobs cost, etc.); and the creation of new activities (interface activities necessary for by-product recovery, development of products or services from a newly identified resource, etc.). These services are based on IT tool used by the interested local stakeholders that intends to allow local stakeholders to take decisions. Thus, this IT tool: - include an economic and environmental assessment of each implantation or pooling/sharing scenarios for existing or further industries; - is meant for industrial and territorial manager/planners - is designed to be used for each new industrial project. - The specification of the IT tool is made through an agile process all along INSPIR’ECO project fed with: - Users expectations thanks to workshop sessions where mock-up interfaces are displayed; - Data availability based on local and industrial data inventory. These input allow to specify the tool not only with technical and methodological constraints (notably the ones from economic and environmental assessments) but also with data availability and users expectations. A feedback on innovative resource management initiatives in port areas has been realized in the beginning of the project to feed the designing services step.

Keywords: development opportunities, INSPIR’ECO, INSPIRA, industrial ecology, planification, synergy identification

Procedia PDF Downloads 162
4807 Digital Twins: Towards an Overarching Framework for the Built Environment

Authors: Astrid Bagireanu, Julio Bros-Williamson, Mila Duncheva, John Currie

Abstract:

Digital Twins (DTs) have entered the built environment from more established industries like aviation and manufacturing, although there has never been a common goal for utilising DTs at scale. Defined as the cyber-physical integration of data between an asset and its virtual counterpart, DT has been identified in literature from an operational standpoint – in addition to monitoring the performance of a built asset. However, this has never been translated into how DTs should be implemented into a project and what responsibilities each project stakeholder holds in the realisation of a DT. What is needed is an approach to translate these requirements into actionable DT dimensions. This paper presents a foundation for an overarching framework specific to the built environment. For the purposes of this research, the UK widely used the Royal Institute of British Architects (RIBA) Plan of Work from 2020 is used as a basis for itemising project stages. The RIBA Plan of Work consists of eight stages designed to inform on the definition, briefing, design, coordination, construction, handover, and use of a built asset. Similar project stages are utilised in other countries; therefore, the recommendations from the interviews presented in this paper are applicable internationally. Simultaneously, there is not a single mainstream software resource that leverages DT abilities. This ambiguity meets an unparalleled ambition from governments and industries worldwide to achieve a national grid of interconnected DTs. For the construction industry to access these benefits, it necessitates a defined starting point. This research aims to provide a comprehensive understanding of the potential applications and ramifications of DT in the context of the built environment. This paper is an integral part of a larger research aimed at developing a conceptual framework for the Architecture, Engineering, and Construction (AEC) sector following a conventional project timeline. Therefore, this paper plays a pivotal role in providing practical insights and a tangible foundation for developing a stage-by-stage approach to assimilate the potential of DT within the built environment. First, the research focuses on a review of relevant literature, albeit acknowledging the inherent constraint of limited sources available. Secondly, a qualitative study compiling the views of 14 DT experts is presented, concluding with an inductive analysis of the interview findings - ultimately highlighting the barriers and strengths of DT in the context of framework development. As parallel developments aim to progress net-zero-centred design and improve project efficiencies across the built environment, the limited resources available to support DTs should be leveraged to propel the industry to reach its digitalisation era, in which AEC stakeholders have a fundamental role in understanding this, from the earliest stages of a project.

Keywords: digital twins, decision-making, design, net-zero, built environment

Procedia PDF Downloads 120
4806 The Politics of Land Grabbing in Ethiopia

Authors: Esayas Geleta

Abstract:

Within the last two decades in many sub-Saharan African countries, a large-scale acquisition (lease, concession, outright purchase) of extensive areas of farmland commonly labeled as ‘idle’ and ‘under-utilized’ has resulted in displacement and dispossession and dispossession without ‘compensation.’ This paper seeks to critically illustrate the processes and the consequences of the ‘land grabbing project’ in Ethiopia. Drawing on the theory of participatory development and empirical studies undertaken in Ethiopia, the paper elucidates the power dynamics that influence how and why dislocation and dispossession occur. The paper then demonstrates why the land-grabbing project, which was hugely supported by many international organizations, has largely failed in Ethiopia. Through a critical analysis of the process of ‘land grabbing’ in Ethiopia, the paper contributes to a more adequate and critical understanding of contemporary land deals and their social and environmental consequences.

Keywords: land grabbing, human rights, dispossession, resistance, governance

Procedia PDF Downloads 81
4805 Integrated Risk Management as a Framework for Organisational Success

Authors: Olakunle Felix Adekunle

Abstract:

Risk management is recognised as an essential tool to tackle the inevitable uncertainty associated with business and projects at all levels. But it frequently fails to meet expectations, with projects continuing to run late, over budget or under performing, and business is not gaining the expected benefits. The evident disconnect which often occurs between strategic vision and tactical project delivery typically arises from poorly defined project objectives and inadequate attention to the proactive management of risks that could affect those objectives. One of the main failings in the traditional approach to risk management arises from a narrow focus on the downside, restricted to the technical or operational field, addressing tactical threats to processes, performance or people. This shortcoming can be overcome by widening the scope of risk management to encompass both strategic risks and upside opportunities, creating an integrated approach which can bridge the gap between strategy and tactics. Integrated risk management addresses risk across a variety of levels in the organisation, including strategy and tactics, and covering both opportunity and threat. Effective implementation of integrated risk management can produce a number of benefits to the organisation which are not available from the typical limited-scope risk process. This paper explores how to expand risk management to deliver strategic advantage while retaining its use as a tactical tool.

Keywords: risk management, success, organization, strategy, project, tactis, vision

Procedia PDF Downloads 395
4804 School Emergency Drills Evaluation through E-PreS Monitoring System

Authors: A. Kourou, A. Ioakeimidou, V. Avramea

Abstract:

Planning for natural disasters and emergencies is something every school or educational institution must consider, regardless of its size or location. Preparedness is the key to save lives if a disaster strikes. School disaster management mirrors individual and family disaster prevention, and wider community disaster prevention efforts. This paper presents the usage of E-PreS System as a helpful, managerial tool during the school earthquake drill, in order to support schools in developing effective disaster and emergency plans specific to their local needs. The project comes up with a holistic methodology using real-time evaluation involving different categories of actors, districts, steps and metrics. The main outcomes of E-PreS project are the development of E-PreS web platform that host the needed data of school emergency planning; the development of E-PreS System; the implementation of disaster drills using E-PreS System in educational premises and local schools; and the evaluation of E-PreS System. Taking into consideration that every disaster drill aims to test and valid school plan and procedures; clarify and train personnel in roles and responsibilities; improve interagency coordination; identify gaps in resources; improve individual performance; and identify opportunities for improvement, E-PreS Project was submitted and approved by the European Commission (EC).

Keywords: disaster drills, earthquake preparedness, E-PreS System, school emergency plans

Procedia PDF Downloads 227
4803 A Method to Identify the Critical Delay Factors for Building Maintenance Projects of Institutional Buildings: Case Study of Eastern India

Authors: Shankha Pratim Bhattacharya

Abstract:

In general building repair and renovation projects are minor in nature. It requires less attention as the primary cost involvement is relatively small. Although the building repair and maintenance projects look simple, it involves much complexity during execution. Many of the present research indicate that few uncertain situations are usually linked with maintenance projects. Those may not be read properly in the planning stage of the projects, and finally, lead to time overrun. Building repair and maintenance become essential and periodical after commissioning of the building. In Institutional buildings, the regular maintenance projects also include addition –alteration, modification activities. Increase in the student admission, new departments, and sections, new laboratories and workshops, up gradation of existing laboratories are very common in the institutional buildings in the developing nations like India. The project becomes very critical because it undergoes space problem, architectural design issues, structural modification, etc. One of the prime factors in the institutional building maintenance and modification project is the time constraint. Mostly it required being executed a specific non-work time period. The present research considered only the institutional buildings of the Eastern part of India to analyse the repair and maintenance project delay. A general survey was conducted among the technical institutes to find the causes and corresponding nature of construction delay factors. Five technical institutes are considered in the present study with repair, renovation, modification and extension type of projects. Construction delay factors are categorically subdivided into four groups namely, material, manpower (works), Contract and Site. The survey data are collected for the nature of delay responsible for a specific project and the absolute amount of delay through proposed and actual duration of work. In the first stage of the paper, a relative importance index (RII) is proposed for the delay factors. The occurrence of the delay factors is also judged by its frequency-severity nature. Finally, the delay factors are then rated and linked with the type of work. In the second stage, a regression analysis is executed to establish an empirical relationship between the actual time of a project and the percentage of delay. It also indicates the impact of the factors for delay responsibility. Ultimately, the present paper makes an effort to identify the critical delay factors for the repair and renovation type project in the Eastern Indian Institutional building.

Keywords: delay factor, institutional building, maintenance, relative importance index, regression analysis, repair

Procedia PDF Downloads 249
4802 Socioeconomic Impacts of Innovative Housing Construction Technologies in Slum Upgrading: Case of Mathare Valley Nairobi, Kenya

Authors: Edmund M. Muthigani

Abstract:

Background: Adequate, decent housing is a universal human right integral component. Resources’ costs and intensified rural-urban migration have increased the demand for affordable housing in urban areas. Modern knowledge-based economy uses innovation. The construction industry uses product and process innovation to provide adequate and decent low-cost housing. Kenya adopted innovation practices in slum upgrading that used cost-effectively locally available building materials. This study objectively looked at the outcomes, social and economic impacts of innovative housing technologies construction in the Mathare valley slums upgrading project. Methods: This post-occupancy study used an exploratory-descriptive research design. Random sampling was used to sample 384 users of low-cost housing projects in Mathare Valley, Nairobi County. Research instruments included semi-structured questionnaires and interview guides. Pilot study, validity and reliability tests ensured the quality of a study. Ethical considerations included university approval and consent. Statistical package for social sciences (SPSS) software version 21 was applied to compute the descriptive and inferential statistics. Findings: Slum-upgrading had a significant-positive outcome on improved houses and community. Social impacts included communal facilities, assurance of security of tenure, and retained frameworks of establishments. Economic impacts included employment; affordable and durable units (p values <0.05). The upgrading process didn’t influence rent fees, was corrupt and led to the displacement of residents. Conclusion: Slum upgrading process impacted positively. Similar projects should consider residents in decision-making.

Keywords: innovation, technologies, slum upgrading, Mathare valley slum, social impact, economic impact

Procedia PDF Downloads 166
4801 Resource Leveling Optimization in Construction Projects of High Voltage Substations Using Nature-Inspired Intelligent Evolutionary Algorithms

Authors: Dimitrios Ntardas, Alexandros Tzanetos, Georgios Dounias

Abstract:

High Voltage Substations (HVS) are the intermediate step between production of power and successfully transmitting it to clients, making them one of the most important checkpoints in power grids. Nowadays - renewable resources and consequently distributed generation are growing fast, the construction of HVS is of high importance both in terms of quality and time completion so that new energy producers can quickly and safely intergrade in power grids. The resources needed, such as machines and workers, should be carefully allocated so that the construction of a HVS is completed on time, with the lowest possible cost (e.g. not spending additional cost that were not taken into consideration, because of project delays), but in the highest quality. In addition, there are milestones and several checkpoints to be precisely achieved during construction to ensure the cost and timeline control and to ensure that the percentage of governmental funding will be granted. The management of such a demanding project is a NP-hard problem that consists of prerequisite constraints and resource limits for each task of the project. In this work, a hybrid meta-heuristic method is implemented to solve this problem. Meta-heuristics have been proven to be quite useful when dealing with high-dimensional constraint optimization problems. Hybridization of them results in boost of their performance.

Keywords: hybrid meta-heuristic methods, substation construction, resource allocation, time-cost efficiency

Procedia PDF Downloads 151
4800 Online Course of Study and Job Crafting for University Students: Development Work and Feedback

Authors: Hannele Kuusisto, Paivi Makila, Ursula Hyrkkanen

Abstract:

Introduction: There have been arguments about the skills university students should have when graduated. Current trends argue that as well as the specific job-related skills the graduated students need problem-solving, interaction and networking skills as well as self-management skills. Skills required in working life are also considered in the Finnish national project called VALTE (short for 'prepared for working life'). The project involves 11 Finnish school organizations. As one result of this project, a five-credit independent online course in study and job engagement as well as in study and job crafting was developed at Turku University of Applied Sciences. The aim of the oral or e-poster presentation is to present the online course developed in the project. The purpose of this abstract is to present the development work of the online course and the feedback received from the pilots. Method: As the University of Turku is the leading partner of the VALTE project, the collaborative education platform ViLLE (https://ville.utu.fi, developed by the University of Turku) was chosen as the online platform for the course. Various exercise types with automatic assessment were used; for example, quizzes, multiple-choice questions, classification exercises, gap filling exercises, model answer questions, self-assessment tasks, case tasks, and collaboration in Padlet. In addition, the free material and free platforms on the Internet were used (Youtube, Padlet, Todaysmeet, and Prezi) as well as the net-based questionnaires about the study engagement and study crafting (made with Webropol). Three teachers with long teaching experience (also with job crafting and online pedagogy) and three students working as trainees in the project developed the content of the course. The online course was piloted twice in 2017 as an elective course for the students at Turku University of Applied Sciences, a higher education institution of about 10 000 students. After both pilots, feedback from the students was gathered and the online course was developed. Results: As the result, the functional five-credit independent online course suitable for students of different educational institutions was developed. The student feedback shows that students themselves think that the developed online course really enhanced their job and study crafting skills. After the course, 91% of the students considered their knowledge in job and study engagement as well as in job and study crafting to be at a good or excellent level. About two-thirds of the students were going to exploit their knowledge significantly in the future. Students appreciated the variability and the game-like feeling of the exercises as well as the opportunity to study online at the time and place they chose themselves. On a five-point scale (1 being poor and 5 being excellent), the students graded the clarity of the ViLLE platform as 4.2, the functionality of the platform as 4.0 and the easiness of operating as 3.9.

Keywords: job crafting, job engagement, online course, study crafting, study engagement

Procedia PDF Downloads 150
4799 Pilot Scale Investigation on the Removal of Pollutants from Secondary Effluent to Meet Botswana Irrigation Standards Using Roughing and Slow Sand Filters

Authors: Moatlhodi Wise Letshwenyo, Lesedi Lebogang

Abstract:

Botswana is an arid country that needs to start reusing wastewater as part of its water security plan. Pilot scale slow sand filtration in combination with roughing filter was investigated for the treatment of effluent from Botswana International University of Science and Technology to meet Botswana irrigation standards. The system was operated at hydraulic loading rates of 0.04 m/hr and 0.12 m/hr. The results show that the system was able to reduce turbidity from 262 Nephelometric Turbidity Units to a range between 18 and 0 Nephelometric Turbidity Units which was below 30 Nephelometric Turbidity Units threshold limit. The overall efficacy ranged between 61% and 100%. Suspended solids, Biochemical Oxygen Demand, and Chemical Oxygen Demand removal efficiency averaged 42.6%, 45.5%, and 77% respectively and all within irrigation standards. Other physio-chemical parameters were within irrigation standards except for bicarbonate ion which averaged 297.7±44 mg L-1 in the influent and 196.22±50 mg L-1 in the effluent which was above the limit of 92 mg L-1, therefore averaging a reduction of 34.1% by the system. Total coliforms, fecal coliforms, and Escherichia coli in the effluent were initially averaging 1.1 log counts, 0.5 log counts, and 1.3 log counts respectively compared to corresponding influent log counts of 3.4, 2.7 and 4.1, respectively. As time passed, it was observed that only roughing filter was able to reach reductions of 97.5%, 86% and 100% respectively for faecal coliforms, Escherichia coli, and total coliforms. These organism numbers were observed to have increased in slow sand filter effluent suggesting multiplication in the tank. Water quality index value of 22.79 for the physio-chemical parameters suggests that the effluent is of excellent quality and can be used for irrigation purposes. However, the water quality index value for the microbial parameters (1820) renders the quality unsuitable for irrigation. It is concluded that slow sand filtration in combination with roughing filter is a viable option for the treatment of secondary effluent for reuse purposes. However, further studies should be conducted especially for the removal of microbial parameters using the system.

Keywords: irrigation, slow sand filter, turbidity, wastewater reuse

Procedia PDF Downloads 152
4798 Waste Management in a Hot Laboratory of Japan Atomic Energy Agency – 1: Overview and Activities in Chemical Processing Facility

Authors: Kazunori Nomura, Hiromichi Ogi, Masaumi Nakahara, Sou Watanabe, Atsuhiro Shibata

Abstract:

Chemical Processing Facility of Japan Atomic Energy Agency is a basic research field for advanced back-end technology developments with using actual high-level radioactive materials such as irradiated fuels from the fast reactor, high-level liquid waste from reprocessing plant. In the nature of a research facility, various kinds of chemical reagents have been offered for fundamental tests. Most of them were treated properly and stored in the liquid waste vessel equipped in the facility, but some were not treated and remained at the experimental space as a kind of legacy waste. It is required to treat the waste in safety. On the other hand, we formulated the Medium- and Long-Term Management Plan of Japan Atomic Energy Agency Facilities. This comprehensive plan considers Chemical Processing Facility as one of the facilities to be decommissioned. Even if the plan is executed, treatment of the “legacy” waste beforehand must be a necessary step for decommissioning operation. Under this circumstance, we launched a collaborative research project called the STRAD project, which stands for Systematic Treatment of Radioactive liquid waste for Decommissioning, in order to develop the treatment processes for wastes of the nuclear research facility. In this project, decomposition methods of chemicals causing a troublesome phenomenon such as corrosion and explosion have been developed and there is a prospect of their decomposition in the facility by simple method. And solidification of aqueous or organic liquid wastes after the decomposition has been studied by adding cement or coagulants. Furthermore, we treated experimental tools of various materials with making an effort to stabilize and to compact them before the package into the waste container. It is expected to decrease the number of transportation of the solid waste and widen the operation space. Some achievements of these studies will be shown in this paper. The project is expected to contribute beneficial waste management outcome that can be shared world widely.

Keywords: chemical processing facility, medium- and long-term management plan of JAEA facilities, STRAD project, treatment of radioactive waste

Procedia PDF Downloads 141
4797 Polish Police in the Fight against Terrorism and Cyberterrorism

Authors: Izabela Nowicka, Jacek Dworzecki

Abstract:

The paper will be presented to selected legal and organizational solutions for the prevention and combating of terrorism by the police in Poland. Development will include information on the organization and functioning of the police anti-terrorist sub-units, whose officers are on the front line of the fight against terrorism. They will be presented to the conditions and cases of use of firearms by police officers in the course of special operations aimed against organizations and terrorist groups, and the perpetrators of criminal acts of terrorism as well as the legal foundation for the Polish police to take immediate counterterrorism operations. Article will be prepared in the context of an international research project entitled. Understand the Dimensions of Organised Crime and Terrorist Networks for Developing Effective and Efficient Security Solutions for First-line-practitioners and Professionals [Project: H2020-FCT-2015, No: 700688].

Keywords: the fight against terrorism, police, Poland, takedown

Procedia PDF Downloads 332
4796 Management Support, Role Ambiguity and Role Ambiguity among Professional Nurses at National Health Insurance Pilot Sites in South Africa: An Interpretive Phenomenology

Authors: Nomcebo N. Mpili, Cynthia Z. Madlabana

Abstract:

The South African Primary Health Care (PHC) system has undergone a number of transformations such as the introduction of National Health Insurance (NHI) to bring about easily accessible universal health coverage and to meet the health needs for all its citizens. This provides ongoing challenges to ensure that health workers are equipped with appropriate knowledge, support, and skills to meet these changes. Therefore it is crucial to understand the experiences and challenges of nurses as the backbone of PHC in providing quality healthcare services. In addition there has been a need to understand nurses’ experiences with management support, role ambiguity and role conflict amongst other challenges in light of the current reforms in healthcare. Indeed these constructs are notorious for having a detrimental impact on the outcomes of change initiatives within any organisation, this is no different in healthcare. This draws a discussion on professional nurses within the South African health care system especially since they have been labelled as the backbone of PHC, meaning any healthcare backlog falls on them. The study made use of semi-structured interviews and adopted the interpretative phenomenological approach (IPA) as the researcher aimed to explore the lived experiences of (n= 18) participants. The study discovered that professional nurses experienced a lack of management support within PHC facilities and that management mainly played an administrative and disciplinary role. Although participants mainly held positive perceptions with regards to changes happening in health care however they also expressed negative experiences in terms of how change initiatives were introduced resulting in role conflict and role ambiguity. Participants mentioned a shortage of staff, inadequate training as well as a lack of management support as some of the key challenges faced in facilities. This study offers unique findings as participants have not only experienced the various reforms within the PHC system however they have also been part of NHI pilot. The authors are not aware of any other studies published that examine management support, role conflict and role ambiguity together especially in South African PHC facilities. In conclusion understanding these challenges may provide insight and opportunities available to improve the current landscape of PHC not only in South Africa but internationally.

Keywords: management support, professional nurse, role ambiguity, role conflict

Procedia PDF Downloads 142
4795 Demonstration of Land Use Changes Simulation Using Urban Climate Model

Authors: Barbara Vojvodikova, Katerina Jupova, Iva Ticha

Abstract:

Cities in their historical evolution have always adapted their internal structure to the needs of society (for example protective city walls during classicism era lost their defense function, became unnecessary, were demolished and gave space for new features such as roads, museums or parks). Today it is necessary to modify the internal structure of the city in order to minimize the impact of climate changes on the environment of the population. This article discusses the results of the Urban Climate model owned by VITO, which was carried out as part of a project from the European Union's Horizon grant agreement No 730004 Pan-European Urban Climate Services Climate-Fit city. The use of the model was aimed at changes in land use and land cover in cities related to urban heat islands (UHI). The task of the application was to evaluate possible land use change scenarios in connection with city requirements and ideas. Two pilot areas in the Czech Republic were selected. One is Ostrava and the other Hodonín. The paper provides a demonstration of the application of the model for various possible future development scenarios. It contains an assessment of the suitability or inappropriateness of scenarios of future development depending on the temperature increase. Cities that are preparing to reconstruct the public space are interested in eliminating proposals that would lead to an increase in temperature stress as early as in the assignment phase. If they have evaluation on the unsuitability of some type of design, they can limit it into the proposal phases. Therefore, especially in the application of models on Local level - in 1 m spatial resolution, it was necessary to show which type of proposals would create a significant temperature island in its implementation. Such a type of proposal is considered unsuitable. The model shows that the building itself can create a shady place and thus contribute to the reduction of the UHI. If it sensitively approaches the protection of existing greenery, this new construction may not pose a significant problem. More massive interventions leading to the reduction of existing greenery create a new heat island space.

Keywords: climate model, heat islands, Hodonin, land use changes, Ostrava

Procedia PDF Downloads 141
4794 Evolution of Design through Documentation of Architecture Design Processes

Authors: Maniyarasan Rajendran

Abstract:

Every design has a process, and every architect deals in the ways best known to them. The design translation from the concept to completion change in accordance with their design philosophies, their tools, availability of resources, and at times the clients and the context of the design as well. The approach to understanding the design process requires formalisation of the design intents. The design process is characterised by change, with the time and the technology. The design flow is just indicative and never exhaustive. The knowledge and experience of stakeholders remain limited to the part they played in the project, and their ability to remember, and is through the Photographs. These artefacts, when circulated can hardly tell what the project is. They can never tell the narrative behind. In due course, the design processes are lost. The Design junctions are lost in the journey. Photographs acted as major source materials, along with its importance in architectural revivalism in the 19th century. From the history, we understand that it has been photographs, that act as the dominant source of evidence. The idea of recording is also followed with the idea of getting inspired from the records and documents. The design concept, the architectural firms’ philosophies, the materials used, the special needs, the numerous ‘Trial-and-error’ methods, design methodology, experience of failures and success levels, and the knowledge acquired, etc., and the various other aspects and methods go through in every project, and they deserve/ought to be recorded. The knowledge can be preserved and passed through generations, by documenting the design processes involved. This paper explores the idea of a process documentation as a tool of self-reflection, creation of architectural firm’ repository, and these implications proceed with the design evolution of the team.

Keywords: architecture, design, documentation, records

Procedia PDF Downloads 368
4793 The Impacts of the Sit-Stand Workplace Intervention on Cardiometabolic Risk

Authors: Rebecca M. Dagger, Katy Hadgraft, Matthew Teggart, Peter Angell

Abstract:

Background: There is a growing body of evidence that demonstrates the association between sedentary behaviour, cardiometabolic risk and all-cause mortality. Since full time working adults spend approximately 8 hours per day in the workplace, interventions to reduce sedentary behaviour at work may alleviate some of the negative health outcomes associated with sedentary behaviour. The aims of this pilot study were to assess the impacts of using a Sit-Stand workstation on markers of cardiometabolic health in a cohort of desk workers. Methods: Twenty eight participants were recruited and randomly assigned to a control (n=5 males, 9 females, mean age 37 years ± 9.4 years) or intervention group (n= 5 males, 9 females, mean age 42 years ± 12.7 years). All participants attended the labs on 2 occasion’s pre and post intervention, following baseline measurements the intervention participants had the Sit Stand Workstations (Ergotron, USA) installed for a 10 week intervention period. The Sit Stand workstations allow participants to stand or sit at their usual workstation and participants were encouraged to the use the desk in a standing position at regular intervals throughout the working day. Cardiometabolic risk markers assessed were body mass, body composition (using bio impedance analysis; Tanita, Tokyo), fasting blood Total Cholesterol (TC), lipid profiles (HDL-C, LDL-C, TC: HDL-C ratio), triglycerides and fasting glucose (Cholestech LDX), resting systolic and diastolic blood pressure and resting heart rate. ANCOVA controlling for baseline values was used to assess the group difference in changes in risk markers between pre and post intervention. Results: The 10 week intervention was associated with significant reductions in some cardiometabolic risk factors. There were significant group effects on change in body mass (F (1,25)=5.915, p<0.05), total body fat percentage (F(1,25)=12.615, p<0.01), total fat mass (F (1,25)=6.954, p<0.05), and systolic blood pressure (F (1,25)=5.012, p<0.05). There were no other significant group effects on changes in other cardiometabolic risk markers. Conclusion: This pilot study highlights the importance of reducing sedentary behaviour in the workplace for reduction in cardiometabolic risk markers. Further research is required to support these findings.

Keywords: sedentary behaviour, caridometabolic risk, evidence, risk makers

Procedia PDF Downloads 451
4792 The Effectiveness of the Recovering from Child Abuse Programme (RCAP) for the Treatment of CPTSD: A Pilot Study

Authors: Siobhan Hegarty, Michael Bloomfield, Kim Entholt, Dorothy Williams, Helen Kennerley

Abstract:

Complex Post-Traumatic Stress Disorder (CPTSD) confers greater risk of poor outcomes than does Post-Traumatic Stress Disorder (PTSD). Despite this, the current treatment guidelines for CPTSD aim to reduce only the ‘core’ symptoms of re-experiencing, hyper-vigilance and avoidance, while not addressing the Disturbances of Self Organisation (DSO) symptoms that distinguish this novel diagnosis from PTSD. The Recovering from Child Abuse Programme (RCAP) is a group protocol, based on the principles of cognitive behavioural therapy (CBT). Preliminary evidence suggests the program is effective at reducing DSO symptoms. This pilot study is the first to investigate the potential effectiveness of the RCAP for the specific treatment of CPTSD. This study was conducted as a service evaluation in a secondary care, traumatic stress service. Treatment was delivered once a week, in two-hour sessions, to ten existing female CPTSD patients of the service, who had experienced sexual abuse in childhood. The programme was administered by two therapists and two additional facilitators, following the RCAP protocol manual. Symptom severity was measured before the administration of therapy and was tracked across a range of measures (International Trauma Questionnaire; Patient Health Questionnaire; Community Assessment of Psychic Experience; Work and Social Adjustment Scale) at five time points, over the course of treatment. Qualitative appraisal of the programme was gathered via weekly feedback forms and from audio-taped recordings of verbal feedback given during group sessions. Preliminary results suggest the programme causes a slight reduction in CPTSD and depressive symptom severity and preliminary qualitative analysis suggests that the RCAP is both helpful and acceptable to group members. Final results and conclusions will follow completed thematic analysis of results.

Keywords: Child sexual abuse, Cognitive behavioural therapy, Complex post-traumatic stress disorder, Recovering from child abuse programme

Procedia PDF Downloads 134
4791 Development of a PJWF Cleaning Method for Wet Electrostatic Precipitators

Authors: Hsueh-Hsing Lu, Thi-Cuc Le, Tung-Sheng Tsai, Chuen-Jinn Tsai

Abstract:

This study designed and tested a novel wet electrostatic precipitators (WEP) system featuring a Pulse-Air-Jet-Assisted Water Flow (PJWF) to shorten water cleaning time, reduce water usage, and maintain high particle removal efficiency. The PJWF injected cleaning water tangentially at the cylinder wall, rapidly enhancing the momentum of the water flow for efficient dust cake removal. Each PJWF cycle uses approximately 4.8 liters of cleaning water in 18 seconds. Comprehensive laboratory tests were conducted using a single-tube WEP prototype within a flow rate range of 3.0 to 6.0 cubic meters per minute(CMM), operating voltages between -35 to -55 kV, and high-frequency power supply. The prototype, consisting of 72 sets of double-spike rigid discharge electrodes, demonstrated that with the PJWF, -35 kV, and 3.0 CMM, the PM2.5 collection efficiency remained as high as the initial value of 88.02±0.92% after loading with Al2O3 particles at 35.75± 2.54 mg/Nm3 for 20-hr continuous operation. In contrast, without the PJWF, the PM2.5 collection efficiency drastically dropped from 87.4% to 53.5%. Theoretical modeling closely matched experimental results, confirming the robustness of the system's design and its scalability for larger industrial applications. Future research will focus on optimizing the PJWF system, exploring its performance with various particulate matter, and ensuring long-term operational stability and reliability under diverse environmental conditions. Recently, this WEP was combined with a preceding CT (cooling tower) and a HWS (honeycomb wet scrubber) and pilot-tested (40 CMM) to remove SO2 and PM2.5 emissions in a sintering plant of an integrated steel making plant. Pilot-test results showed that the removal efficiencies for SO2 and PM2.5 emissions are as high as 99.7 and 99.3 %, respectively, with ultralow emitted concentrations of 0.3 ppm and 0.07 mg/m3, respectively, while the white smoke is also eliminated at the same time. These new technologies are being used in the industry and the application in different fields is expected to be expanded to reduce air pollutant emissions substantially for a better ambient air quality.

Keywords: wet electrostatic precipitator, pulse-air-jet-assisted water flow, particle removal efficiency, air pollution control

Procedia PDF Downloads 19
4790 "Empowering Minds and Unleashing Curiosity: DIY Biotechnology for High School Students in the Age of Distance Learning"

Authors: Victor Hugo Sanchez Rodriguez

Abstract:

Amidst the challenges posed by pandemic-induced lockdowns, traditional educational models have been disrupted. To bridge the distance learning gap, our project introduces an innovative initiative focused on teaching high school students basic biotechnology techniques. We aim to empower young minds and foster curiosity by encouraging students to create their own DIY biotechnology laboratories using easily accessible materials found at home. This abstract outlines the key aspects of our project, highlighting its importance, methodology, and evaluation approach.In response to the pandemic's limitations, our project targets the delivery of biotechnology education at a distance. By engaging students in hands-on experiments, we seek to provide an enriching learning experience despite the constraints of remote learning. The DIY approach allows students to explore scientific concepts in a practical and enjoyable manner, nurturing their interest in biotechnology and molecular biology. Originally designed to assess professional-level research programs, we have adapted the URSSA to suit the context of biotechnology and molecular biology synthesis for high school students. By applying this tool before and after the experimental sessions, we aim to gauge the program's impact on students' learning experiences and skill development. Our project's significance lies not only in its novel approach to teaching biotechnology but also in its adaptability to the current global crisis. By providing students with a stimulating and interactive learning environment, we hope to inspire educators and institutions to embrace creative solutions during challenging times. Moreover, the insights gained from our evaluation will inform future efforts to enhance distance learning programs and promote accessible science education.

Keywords: DIY biotechnology, high school students, distance learning, pandemic education, undergraduate research student self-assessment (URSSA)

Procedia PDF Downloads 66
4789 Project Work with Design Thinking and Blended Learning: A Practical Report from Teaching in Higher Education

Authors: C. Vogeler

Abstract:

Change processes such as individualization and digitalization have an impact on higher education. Graduates are expected to cooperate in creative work processes in their professional life. During their studies, they need to be prepared accordingly. This includes modern learning scenarios that integrate the benefits of digital media. Therefore, design thinking and blended learning have been combined in the project-based seminar conception introduced here. The presented seminar conception has been realized and evaluated with students of information sciences since September 2017. Within the seminar, the students learn to work on a project. They apply the methods in a problem-based learning scenario. Task of the case study is to arrange a conference on the topic gaming in libraries. In order to collaborative develop creative possibilities of realization within the group of students the design thinking method has been chosen. Design thinking is a method, used to create user-centric, problem-solving and need-driven innovation through creative collaboration in multidisciplinary teams. Central characteristics are the openness of this approach to work results and the visualization of ideas. This approach is now also accepted in the field of higher education. Especially in problem-based learning scenarios, the method offers clearly defined process steps for creative ideas and their realization. The creative process can be supported by digital media, such as search engines and tools for the documentation of brainstorming, creation of mind maps, project management etc. Because the students have to do two-thirds of the workload in their private study, design thinking has been combined with a blended learning approach. This supports students’ preparation and follow-up of the joint work in workshops (flipped classroom scenario) as well as the communication and collaboration during the entire project work phase. For this purpose, learning materials are provided on a Moodle-based learning platform as well as various tools that supported the design thinking process as described above. In this paper, the seminar conception with a combination of design thinking and blended learning is described and the potentials and limitations of the chosen strategy for the development of a course with a multimedia approach in higher education are reflected.

Keywords: blended learning, design thinking, digital media tools and methods, flipped classroom

Procedia PDF Downloads 196
4788 Sukh Initiative: A Family Planning Reproductive Health Project for Squatter Settlement of Karachi, Pakistan

Authors: Arshad Hussain

Abstract:

Background: Sukh Initiative is a multi-donor funded, family planning and reproductive health project, primed by Aman Healthcare Services; implemented through a consortium of local and international organizations, in a selected one million underserved peri-urban population of Karachi, Sindh; which aims at increasing modern contraceptive prevalence rate by 15 percentage point. Objective: To empower women to access contraception by increasing knowledge, improving quality of services and expanding the basket of choices; contributing to the goals of FP2020. Methods: A five years project has a multi-pronged approach with door to door services by LHWs and CHWs in an LHWs covered population and provision of quality FP/RH services both at public and private health care facilities. The project engages youth (12-16 years) both with community and at secondary schools to mentor them for responsible adulthood with life skilled base initiative. A 24/7 availability of youth and FP helpline service provides counselling, referrals in addition with a follow-up mechanism. Results: 131,810 MWRAs were reached by 191 community health workers through 29,693 of community support group meetings and 166,775 house hold visits. These MWRAs were counselled on FP related myths and misconception and referred to 216 providers trained for quality family planning services and maintaining average 64% quality scores in 43 public health and 35 private facilities in the project area. Of those referred 26% MWRAs opted modern contraception with 17.56% in LARCs and 41% PPFP as compared to baseline. Aman TeleHealth is linked with 24/7 counselling, referrals and post services follow-ups to clients, showing 14% proportion of FP call volume. Sukh has a unique role in engaging all partners on youth SRHR issues through family life education sessions, 30 higher sec. schools in Sukh area have been provided LSBE to 16,000 students (aged 15-17), and in community approximately 10, 496 girls and boys have received SRHR information. Conclusion: Through individual counselling, access to quality family planning services and involvement of stakeholders, Suk created an enabling environment to rapid increase in family planning in the project intervention area.

Keywords: family planning and reproductive health, married women with reproductive age, urban squatter, Pakistan

Procedia PDF Downloads 324
4787 Simulation IDM for Schedule Generation of Slip-Form Operations

Authors: Hesham A. Khalek, Shafik S. Khoury, Remon F. Aziz, Mohamed A. Hakam

Abstract:

Slipforming operation’s linearity is a source of planning complications, and operation is usually subjected to bottlenecks at any point, so careful planning is required in order to achieve success. On the other hand, Discrete-event simulation concepts can be applied to simulate and analyze construction operations and to efficiently support construction scheduling. Nevertheless, preparation of input data for construction simulation is very challenging, time-consuming and human prone-error source. Therefore, to enhance the benefits of using DES in construction scheduling, this study proposes an integrated module to establish a framework for automating the generation of time schedules and decision support for Slipform construction projects, particularly through the project feasibility study phase by using data exchange between project data stored in an Intermediate database, DES and Scheduling software. Using the stored information, proposed system creates construction tasks attribute [e.g. activities durations, material quantities and resources amount], then DES uses all the given information to create a proposal for the construction schedule automatically. This research is considered a demonstration of a flexible Slipform project modeling, rapid scenario-based planning and schedule generation approach that may be of interest to both practitioners and researchers.

Keywords: discrete-event simulation, modeling, construction planning, data exchange, scheduling generation, EZstrobe

Procedia PDF Downloads 374
4786 Improving the Constructability of Highway Design Plans

Authors: R. Edward Minchin Jr.

Abstract:

The U.S. Federal Highway Administration (FHWA) Every Day Counts Program (EDC) has resulted in state DOTs putting evermore emphasis on speeding up the delivery of highway and bridge construction projects for use by the driving public. This has resulted in an increase in the use of alternative construction delivery systems such as design-build (D-B), construction manager at-risk (CMR) or construction manager/general contractor (CM/GC), and adding alternative technical concepts (ATCs) to traditional design-bid-build (DBB) contracts. ATCs have exhibited great potential for delivering substantial benefits like cost savings, increased constructability, and quicker project delivery. Previous research has found that knowledge of project constructability was lacking in state Department of Transportation (DOT) planning, programming, and environmental staffs. Many agencies have therefore relied on a set of ‘acceptable’ design solutions over the years of working with their local resource agencies. The result is that the permitting process for several government agencies has become increasingly restrictive with the result that the DOTs and their industry partners lose the ability to innovate after a permit is approved. The intent of this paper is to report on the research team’s progress in this ongoing effort furnish the United States government with a uniform set of guidelines for the application of constructability reviews during all phases of project development and delivery. The research uses surveys and interviews to determine which states have implemented formal programs to ensure that the constructor is furnished with a set of contract documents that affords said constructor with the best possible opportunity to successfully construct the project with the highest quality standards, within the contract duration and without exceeding the construction budget. Once these states are identified, workshops are held all over the nation, resulting in the team learning the best current practices and giving the team the ability to recommend new practices that will improve the process. The plan is for the FHWA to encourage or require state DOTs to use these practices on all federally funded highway and bridge construction projects. The project deliverable is a Guidebook for FHWA to use in disseminating the recommended practices to the states.

Keywords: alternative construction delivery, alternative technical concepts, constructability, construction design plans

Procedia PDF Downloads 215
4785 Semantic Differences between Bug Labeling of Different Repositories via Machine Learning

Authors: Pooja Khanal, Huaming Zhang

Abstract:

Labeling of issues/bugs, also known as bug classification, plays a vital role in software engineering. Some known labels/classes of bugs are 'User Interface', 'Security', and 'API'. Most of the time, when a reporter reports a bug, they try to assign some predefined label to it. Those issues are reported for a project, and each project is a repository in GitHub/GitLab, which contains multiple issues. There are many software project repositories -ranging from individual projects to commercial projects. The labels assigned for different repositories may be dependent on various factors like human instinct, generalization of labels, label assignment policy followed by the reporter, etc. While the reporter of the issue may instinctively give that issue a label, another person reporting the same issue may label it differently. This way, it is not known mathematically if a label in one repository is similar or different to the label in another repository. Hence, the primary goal of this research is to find the semantic differences between bug labeling of different repositories via machine learning. Independent optimal classifiers for individual repositories are built first using the text features from the reported issues. The optimal classifiers may include a combination of multiple classifiers stacked together. Then, those classifiers are used to cross-test other repositories which leads the result to be deduced mathematically. The produce of this ongoing research includes a formalized open-source GitHub issues database that is used to deduce the similarity of the labels pertaining to the different repositories.

Keywords: bug classification, bug labels, GitHub issues, semantic differences

Procedia PDF Downloads 198
4784 Intelligent Chatbot Generating Dynamic Responses Through Natural Language Processing

Authors: Aarnav Singh, Jatin Moolchandani

Abstract:

The proposed research work aims to build a query-based AI chatbot that can answer any question related to any topic. A chatbot is software that converses with users via text messages. In the proposed system, we aim to build a chatbot that generates a response based on the user’s query. For this, we use natural language processing to analyze the query and some set of texts to form a concise answer. The texts are obtained through web-scrapping and filtering all the credible sources from a web search. The objective of this project is to provide a chatbot that is able to provide simple and accurate answers without the user having to read through a large number of articles and websites. Creating an AI chatbot that can answer a variety of user questions on a variety of topics is the goal of the proposed research project. This chatbot uses natural language processing to comprehend user inquiries and provides succinct responses by examining a collection of writings that were scraped from the internet. The texts are carefully selected from reliable websites that are found via internet searches. This project aims to provide users with a chatbot that provides clear and precise responses, removing the need to go through several articles and web pages in great detail. In addition to exploring the reasons for their broad acceptance and their usefulness across many industries, this article offers an overview of the interest in chatbots throughout the world.

Keywords: Chatbot, Artificial Intelligence, natural language processing, web scrapping

Procedia PDF Downloads 64
4783 Resolving Increased Water-Cut in South and East Kuwait Areas through Water Knock-Out Facility Project

Authors: Sunaitan Al Mutairi, Kumar Vallatharasu, Batool Ismaeel

Abstract:

The Water Knock-Out (WKO) facility project is to handle the undesirable impact of the increasing water production rate in South and East Kuwait (S&EK) areas and break the emulsions and ensure sufficient separation of water at the new upstream facility, to reduce the load on the existing separation equipment in the Gathering Centers (GC). As the existing separation equipment in the Gathering Centers are not efficient to separate the emulsions, the Compact Electrostatic Coalescer (CEC) and Vessel Internal Electrostatic Coalescer (VIEC) technologies have been selected for enhancing the liquid-liquid separation by using the alternating voltage/frequency on electrical fields, to handle the increasing water-cut in S&EK. In the Compact Electrostatic Coalescer (CEC) technology method, the CEC equipment is installed downstream of the inlet separator externally, whereas in the Vessel Internal Electrostatic Coalescer (VIEC) technology method, the VIEC is built inside the treater vessel, downstream of the inlet separator with advanced internals for implementing electrocoalescence of water particles and hence enhancing liquids separation. The CEC and VIEC technologies used in the Water Knockout Facility project has the ability to resolve the increasing water cut in the S&EK area and able to enhance the liquid-liquid separation in the WKO facility separation equipment. In addition, the WKO facility is minimizing the load on the existing Gathering Center’s separation equipment, by tackling the high water-cut wells, upstream of each GC. The required performances at the outlet of the WKO facility are Oil in Water 100ppmv, Water in Oil 15% volume, liquid carryover in gas 0.1 US gal/MMSCFD, for the water cut ranging from 37.5 to 75% volume. The WKO facility project is used to sustain, support and maintain Greater Burgan production at 1.7 Million Barrels of Oil Per Day (MMBOPD), by handling the increasing water production rate.

Keywords: emulsion, increasing water-cut, production, separation equipment

Procedia PDF Downloads 243
4782 Building Student Empowerment through Live Commercial Projects: A Reflective Account of Participants

Authors: Nilanthi Ratnayake, Wen-Ling Liu

Abstract:

Prior research indicates an increasing gap between the skills and capabilities of graduates in the contemporary workplace across the globe. The challenge of addressing this issue primarily lies on the hands of higher education institutes/universities. In particular, surveys of UK employers and retailers found that soft skills including communication, numeracy, teamwork, confidence, analytical ability, digital/IT skills, business sense, language, and social skills are highly valued by graduate employers, and in achieving this, there are various assessed and non-assessed learning exercises have already been embedded into the university curriculum. To this end, this research study aims to explore the reflections of postgraduate student participation in a live commercial project (i.e. designing an advertising campaign for open days, summer school etc.) implemented with the intention of offering a transformative experience by deploying this project. Qualitative research methodology has been followed in this study, collecting data from three types of target audiences; students, academics and employers via a series of personal interviews and focus group discussions. Recorded data were transcribed, entered into NVIVO, and analysed using meaning condensation and content analysis. Students reported that they had a very positive impact towards improving self-efficacy, especially in relation to soft skills and confidence in seeking employment opportunities. In addition, this project has reduced cultural barriers for international students in general communications. Academic staff and potential employers who attended on the presentation day expressed their gratitude for offering a lifelong experience for students, and indeed believed that these type of projects contribute significantly to enhance skills and capabilities of students to cater the demands of employers. In essence, key findings demonstrate that an integration of knowledge-based skills into a live commercial project facilitate individuals to make the transition from education to employment in terms of skills, abilities and work behaviours more effectively in comparison to some other activities/assuagements that are currently in place in higher education institutions/universities.

Keywords: soft skills, commercially live project, higher education, student participation

Procedia PDF Downloads 357
4781 Application of Bim Model Data to Estimate ROI for Robots and Automation in Construction Projects

Authors: Brian Romansky

Abstract:

There are many practical, commercially available robots and semi-autonomous systems that are currently available for use in a wide variety of construction tasks. Adoption of these technologies has the potential to reduce the time and cost to deliver a project, reduce variability and risk in delivery time, increase quality, and improve safety on the job site. These benefits come with a cost for equipment rental or contract fees, access to specialists to configure the system, and time needed for set-up and support of the machines while in use. Calculation of the net ROI (Return on Investment) requires detailed information about the geometry of the site, the volume of work to be done, the overall project schedule, as well as data on the capabilities and past performance of available robotic systems. Assembling the required data and comparing the ROI for several options is complex and tedious. Many project managers will only consider the use of a robot in targeted applications where the benefits are obvious, resulting in low levels of adoption of automation in the construction industry. This work demonstrates how data already resident in many BIM (Building Information Model) projects can be used to automate ROI estimation for a sample set of commercially available construction robots. Calculations account for set-up and operating time along with scheduling support tasks required while the automated technology is in use. Configuration parameters allow for prioritization of time, cost, or safety as the primary benefit of the technology. A path toward integration and use of automatic ROI calculation with a database of available robots in a BIM platform is described.

Keywords: automation, BIM, robot, ROI.

Procedia PDF Downloads 85
4780 Developing Thai-UK Double Degree Programmes: An Exploratory Study Identifying Challenges, Competing Interests and Risks

Authors: Joy Tweed, Jon Pike

Abstract:

In Thailand, a 4.0 policy has been initiated that is designed to prepare and train an appropriate workforce to support the move to a value-based economy. One aspect of support for this policy is a project to encourage the creation of double degree programmes, specifically between Thai and UK universities. This research into the project, conducted with its key players, explores the factors that can either enable or hinder the development of such programmes. It is an area that has received little research attention to date. Key findings focus on differences in quality assurance requirements, attitudes to benefits, risks, and committed levels of institutional support, thus providing valuable input into future policy making. The Transnational Education (TNE) Development Project was initiated in 2015 by the British Council, in conjunction with the Office for Higher Education Commission (OHEC), Thailand. The purpose of the project was to facilitate opportunities for Thai Universities to partner with UK Universities so as to develop double degree programme models. In this arrangement, the student gains both a UK and a Thai qualification, spending time studying in both countries. Twenty-two partnerships were initiated via the project. Utilizing a qualitative approach, data sources included participation in TNE project workshops, peer reviews, and over 20 semi-structured interviews conducted with key informants within the participating UK and Thai universities. Interviews were recorded, transcribed, and analysed for key themes. The research has revealed that the strength of the relationship between the two partner institutions is critical. Successful partnerships are often built on previous personal contact, have senior-level involvement and are strengthened by partnership on different levels, such as research, student exchange, and other forms of mobility. The support of the British Council was regarded as a key enabler in developing these types of projects for those universities that had not been involved in TNE previously. The involvement of industry is apparent in programmes that have high scientific content but not well developed in other subject areas. Factors that hinder the development of partnership programmes include the approval processes and quality requirements of each institution. Significant differences in fee levels between Thai and UK universities provide a challenge and attempts to bridge them require goodwill on the part of the latter that may be difficult to realise. This research indicates the key factors to which attention needs to be given when developing a TNE programme. Early attention to these factors can reduce the likelihood that the partnership will fail to develop. Representatives in both partner universities need to understand their respective processes of development and approval. The research has important practical implications for policy-makers and planners involved with TNE, not only in relation to the specific TNE project but also more widely in relation to the development of TNE programmes in other countries and other subject areas. Future research will focus on assessing the success of the double degree programmes generated by the TNE Development Project from the perspective of universities, policy makers, and industry partners.

Keywords: double-degree, internationalization, partnerships, Thai-UK

Procedia PDF Downloads 102