Search results for: construction health and safety regulations
14717 The Role of Risk Management Practices in the Relationship between Risks Factors and Construction Project Performance
Authors: Ali Abdullah Albezaghi
Abstract:
This article aims to introduce a conceptual framework that can facilitate investigations concerning the role of risk management practices in the relationship between construction risks and the construction project's performance. This article is structured based on the extant literature; it reviews theoretical perspectives, highlights the gaps, and illustrates the significance of developing a framework of suggested relationships. Despite growing interest in the role of risks in construction project performance, previous studies have paid little attention to investigating the moderating role of risk management practices on the risk-performance link. This has left researchers and construction project managers with minimal information to explain the conditions under which risk management practices can reduce the impact of project-related risks and improve performance. In this context, this article suggests a viable research model with propositions that assess risk-performance relationships and discusses the potential moderating effects on the domain relationship. This paper adds to the risk management literature by focusing on risk variables that directly impact performance. Further, it also considers the moderating role of risk management practices in such relationships.Keywords: risk management practices, external risks, internal risks, project risks, project performance
Procedia PDF Downloads 13714716 Real Time Adaptive Obstacle Avoidance in Dynamic Environments with Different D-S
Authors: Mohammad Javad Mollakazemi, Farhad Asadi
Abstract:
In this paper a real-time obstacle avoidance approach for both autonomous and non-autonomous dynamical systems (DS) is presented. In this approach the original dynamics of the controller which allow us to determine safety margin can be modulated. Different common types of DS increase the robot’s reactiveness in the face of uncertainty in the localization of the obstacle especially when robot moves very fast in changeable complex environments. The method is validated by simulation and influence of different autonomous and non-autonomous DS such as important characteristics of limit cycles and unstable DS. Furthermore, the position of different obstacles in complex environment is explained. Finally, the verification of avoidance trajectories is described through different parameters such as safety factor.Keywords: limit cycles, nonlinear dynamical system, real time obstacle avoidance, safety margin
Procedia PDF Downloads 44314715 Towards Sustainable Construction in the United Arab Emirates: Challenges and Opportunities
Authors: Yousef Alqaryouti, Mariam Al Suwaidi, Raed Mohmood AlKhuwaildi, Hind Kolthoum, Issa Youssef, Mohammed Al Imam
Abstract:
The UAE has experienced rapid economic growth due to its mature oil production industry, leading to a surge in urbanization and infrastructure development in the construction sector. Sustainable development practices are becoming increasingly important, and the UAE government has taken proactive measures to promote them, including the introduction of sustainable building codes, energy-efficient technologies, and renewable energy sources. Initiatives such as the Masdar City project and the Emirates Green Building Council further demonstrate the government's commitment to a cleaner and healthier environment. By adopting sustainable practices, the UAE can reduce its carbon footprint, lessen its reliance on fossil fuels, and achieve cost savings in the long run. The purpose of this paper is to conduct a thorough review of the current state of sustainability in the construction industry of the UAE. Our research methodology includes a local market survey and qualitative observational analysis of executed housing construction projects by the Mohammed Bin Rashid Housing Establishment. The market survey assesses eleven different challenging factors that affect sustainable construction project delivery. The qualitative observational research is based on data collected from three projects, including construction progress, bill of quantity, and construction program. The study concludes that addressing these challenges requires a collaborative team approach, incentivized contracts, traditional project management practices, an integrated project team, and an increase in sustainability awareness among stakeholders. The recommendations proposed in this study aim to promote and improve the application of sustainability in the UAE's construction industry for the future.Keywords: sustainability, construction, challenges, opportunities, case study, market survey
Procedia PDF Downloads 5714714 Exploring Strategies Used by Victims of Intimate Partner Violence to Increase Sense of Safety: A Systematic Review and Quantitative Study
Authors: Thomas Nally, Jane Ireland, Roxanne Khan, Philip Birch
Abstract:
Intimate Partner Violence (IPV), a significant societal problem, affects individuals worldwide. However, the strategies victims use to keep safe are under-researched. IPV is significantly under-reported, and services often are not able to be accessed by all victims. Thus they are likely to use their own strategies to manage their victimization before being able to seek support. Two studies were completed to understand these strategies. A systematic review of the literature and study completed with professionals who work with victims was undertaken to understand this area. In study one, a systematic review of the literature (n=61 papers), were analyzed using Thematic Analysis. The results indicated that victims use a large array of behaviors to increase their sense of safety and coping with emotions but also experience significant barriers to help-seeking. In study 2, sixty-nine professionals completed a measure exploring the likelihood and effectiveness of various victim strategies regarding increasing their sense of safety. Strategies included in the measure were obtained from those identified in study 1. Findings indicated that professionals perceived victims of IPV to be more likely to employ safety strategies and coping behaviors that may be ineffective but not help-seeking behaviors. Further, the responses were analyzed using Cluster Analysis. Safety strategies resulted in five clusters; perpetrator-directed strategies, prevention strategies, cognitive reappraisal, safety planning and avoidance strategies. Help-Seeking resulted in six clusters; information or practical support, abuse-related support, emotional support, secondary support and informal support. Finally, coping resulted in four clusters; emotional coping, self-directed coping, thought recording/change and cognitive coping. Both studies indicate that victims may use a variety of strategies to manage their safety besides seeking help. Professionals working with victims, using a strength-based approach, should understand what is used and is effective for victims who are unable to leave the relationships or access external support.Keywords: intimate partner violence, help-seeking, professional support, victims, victim coping, victim safety
Procedia PDF Downloads 18614713 Overview of Time, Resource and Cost Planning Techniques in Construction Management Research
Authors: R. Gupta, P. Jain, S. Das
Abstract:
One way to approach construction scheduling optimization problem is to focus on the individual aspects of planning, which can be broadly classified as time scheduling, crew and resource management, and cost control. During the last four decades, construction planning has seen a lot of research, but to date, no paper had attempted to summarize the literature available under important heads. This paper addresses each of aspects separately, and presents the findings of an in-depth literature of the various planning techniques. For techniques dealing with time scheduling, the authors have adopted a rough chronological documentation. For crew and resource management, classification has been done on the basis of the different steps involved in the resource planning process. For cost control, techniques dealing with both estimation of costs and the subsequent optimization of costs have been dealt with separately.Keywords: construction planning techniques, time scheduling, resource planning, cost control
Procedia PDF Downloads 48714712 Nanotechnology Innovations for the Sustainable Buildings of the Future
Authors: Ayşin Sev, Meltem Ezel
Abstract:
Sustainability, being the urgent issue of our time, is closely related with the innovations in technology. Nanotechnology (NT), although not a new science, can be regarded relatively a new science for buildings with brand new materials and applications. This paper tends to give a research review of current and near future applications of nanotechnology (NT) for achieving high-performance and healthy buildings for a sustainable future. In the introduction, the driving forces for the sustainability of construction industry are explained. Then, the term NT is defined, and significance of innovations in NT for a sustainable construction industry is revealed. After presenting the application areas of NT and nanomaterials for buildings with a number of cases, challenges in the adoption of this technology are put forward, and finally the impacts of nanoparticles and nanomaterials on human health and environment are discussed.Keywords: nanomaterial, self-healing concrete, self cleaning sensor, nanosensor, steel, wood, aerogel, flexible solar panel
Procedia PDF Downloads 45814711 Building Information Modelling (BIM) and Unmanned Aerial Vehicles (UAV) Technologies in Road Construction Project Monitoring and Management: Case Study of a Project in Cyprus
Authors: Yiannis Vacanas, Kyriacos Themistocleous, Athos Agapiou, Diofantos Hadjimitsis
Abstract:
Building Information Modelling (BIM) technology is considered by construction professionals as a very valuable process in modern design, procurement and project management. Construction professionals of all disciplines can use a single 3D model which BIM technology provides, to design a project accurately and furthermore monitor the progress of construction works effectively and efficiently. Unmanned Aerial Vehicles (UAVs), a technology initially developed for military applications, is now without any difficulty accessible and has already been used by commercial industries, including the construction industry. UAV technology has mainly been used for collection of images that allow visual monitoring of building and civil engineering projects conditions in various circumstances. UAVs, nevertheless, have undergone significant advances in equipment capabilities and now have the capacity to acquire high-resolution imagery from many angles in a cost effective manner, and by using photogrammetry methods, someone can determine characteristics such as distances, angles, areas, volumes and elevations of an area within overlapping images. In order to examine the potential of using a combination of BIM and UAV technologies in construction project management, this paper presents the results of a case study of a typical road construction project where the combined use of the two technologies was used in order to achieve efficient and accurate as-built data collection of the works progress, with outcomes such as volumes, and production of sections and 3D models, information necessary in project progress monitoring and efficient project management.Keywords: BIM, project management, project monitoring, UAV
Procedia PDF Downloads 30314710 Occupational Health Services (OHS) in Hong Kong Hospitals and the Experience of Nurses: A Mixed Methods Study
Authors: Wong Yat Cheung Maggie
Abstract:
Occupational Safety and Health Ordinance (OS&HO) (Chap 509) was enacted in 1997, OHS in HK should be growing and maturing, with a holistic approach to occupational health and safety in the workplace including physical, mental, social and spiritual well-being. The question is “How effective are OHSPs in meeting the current needs of HK health workers?” This study was designed to explore the issue for the first time, to empirically analyse the views of those who work in the system. The study employed a mixed method approach to collect various data from Occupational Health Service Providers (OHSPs), Occupational Health Service Consumers (OHSC): Registered nurses working in the hospital setting. This study was designed in two phases and two stages. Phase I Stage I was a paper survey to collect the data on OHSP. Then Phase I Stage II was a follow-up interview. Phase II Stage I was a paper survey to collect the data on OHSC. Then Phase II Stage II was a follow-up focus group study on OHSC for further clarification of the Phase II and Stage I result. The Phase I result reflects HK OHSPs point of view and their experience in the existing OHS practice in the local hospitals. It reflects various styles of reporting systems, staff profiles background and resource in providing OHS in HK hospitals. However, the basic OHS concern is similar between hospitals. In general, the OHS policies and procedures are available on site even though they may have different foci. The Phase II result is reflecting the HKs OHSCs echoes the OHSP feedback at providing of OHS, OHS concern and related policies and procedure are available on site. However, the most significant feedback from the OHSC at Phase II Stage II shows, nurses experienced various OHS concern most commonly work stress, workplace harassment and back strain without formal or official report to the related parties. The lack of reporting was due to the management handling attitude, stakeholders’ compliance and term of definition still have room to be improved even the related policies and procedures are available on site.Keywords: occupational health service, registered nurse, Hong Kong hospital, mixed method
Procedia PDF Downloads 33214709 Manufacturing Commercial Bricks with Construction and Demolition Wastes
Authors: Mustafa Kara, Yasemin Kilic, Bahattin Murat Demir, Ümit Ustaoglu, Cavit Unal
Abstract:
This paper reports utilization of different kind of construction and demolition wastes (C&D) in the production of bricks at industrial scale. Plastered brick waste and tile wastes were collected from ISTAÇ Co. Compost and Recovery Plant, Istanbul, Turkey. Plastered brick waste and tile waste are mixed with brick clay in the proportion of 0-30% and fired at 900ºC. The physical and mechanical properties of the produced bricks were determined and evaluated according to IKIZLER Brick Company Production values, Brick Industry Association (BIA) and Turkish Standards (TS). The resulted showed that plastered brick waste and tile waste can be used to produce good quality brick for various engineering applications in construction and building. The replacement of brick clay by plastered brick waste and tile waste at the levels of 30% has good effects on the compressive strength of the bricks.Keywords: commercial brick, construction and demolition waste, manufacturing, recycling
Procedia PDF Downloads 35714708 Development of Environmentally Clean Construction Materials Using Industrial Waste from Kazakhstan
Authors: Galiya Zhanzakovna Alzhanova, Yelaman Kanatovich Aibuldinov, Zhanar Baktybaevna Iskakova, Gaziz Galymovich Abdiyussupov, Madi Toktasynuly Omirzak, Aizhan Doldashevna Gazizova
Abstract:
The sustainable use of industrial waste has recently increased due to increased environmental problems in landfills. One of the best ways to utilise waste is as a road base material. Industrial waste is a less costly and more efficient way to strengthen local soils than by introducing new additive materials. This study explored the feasibility of utilising red mud, blast furnace slag, and lime production waste to develop environmentally friendly construction materials for stabilising natural loam. Four different ratios of red mud (20, 30, and 40%), blast furnace slag (25, 30, and 35%), lime production waste (4, 6, and 8%), and varied amounts of natural loam were combined to produce nine different mixtures. The results showed that the sample with 40% red mud, 35% blast furnace slag, and 8% lime production waste had the highest strength. The sample's measured compressive strength for 90 days was 7.38 MPa, its water resistance for the same period was 7.12 MPa, and its frost resistance for the same period was 7.35 MP; low linear expansion met the requirements of the Kazakh regulations for first-class building materials. The study of mineral composition showed that there was no contamination with heavy metals or dangerous substances. Road base materials made of red mud, blast furnace slag, lime production waste, and natural loam mix can be employed because of their durability and environmental performance. The chemical and mineral composition of raw materials was determined using X-ray diffraction, X-ray fluorescence, scanning electron microscopy, energy dispersive spectroscopy, atomic absorption spectroscopy, and axial compressive strength were examined.Keywords: blast furnace slag, lime production waste, natural loam stabilizing, red mud, road base material
Procedia PDF Downloads 11014707 Media and Women Empowerment: An Exploration of TV Popular Shows in India
Authors: Mamita Panda
Abstract:
Popular shows are considered to be powerful medium for bringing social change and development. It has the responsibility for not only entertaining, but spreading awareness among common mass which it results social intervention in the major social institutions. Gender construction in one of these social institutions where one can build their capacity to construct a better human society. Mass media in general, TV in particular has an important intervening factor in responding to these processes. The obligatory role of media not only through news but popular shows (serials) becomes compulsion for social formation including construction through gender. This paper attempts to map and examine the gendered contents from serials including viewer’s response to understand the level of influence. The regression analysis shows that socio-economic factors have wider influence on understanding of gender equality including TV popular contents. The social construction of gender through serials remains a serious debatable issue and concern thereafter.Keywords: construction, empowerment, gender, media and women
Procedia PDF Downloads 50414706 The Report of Co-Construction into a Trans-National Education Teaching Team
Authors: Juliette MacDonald, Jun Li, Wenji Xiang, Mingwei Zhao
Abstract:
Shanghai International College of Fashion and Innovation (SCF) was created as a result of a collaborative partnership agreement between the University of Edinburgh and Donghua University. The College provides two programmes: Fashion Innovation and Fashion Interior Design and the overarching curriculum has the intention of developing innovation and creativity within an international learning, teaching, knowledge exchange and research context. The research problem presented here focuses on the multi-national/cultural faculty in the team, the challenges arising from difficulties in communication and the associated limitations of management frameworks. The teaching faculty at SCF are drawn from China, Finland, Korea, Singapore and the UK with input from Flying Faculty from Fashion and Interior Design, Edinburgh College of Art (ECA), for 5 weeks each semester. Rather than fully replicating the administrative and pedagogical style of one or other of the institutions within this joint partnership the aim from the outset was to create a third way which acknowledges the quality assurance requirements of both Donghua and Edinburgh, the academic and technical needs of the students and provides relevant development and support for all the SCF-based staff and Flying Academics. It has been well acknowledged by those who are involved in teaching across cultures that there is often a culture shock associated with transnational education but that the experience of being involved in the delivery of a curriculum at a Joint Institution can also be very rewarding for staff and students. It became clear at SCF that if a third way might be achieved which encourages innovative approaches to fashion education whilst balancing the expectations of Chinese and western concepts of education and the aims of two institutions, then it was going to be necessary to construct a framework which developed close working relationships for the entire teaching team, so not only between academics and students but also between technicians and administrators at ECA and SCF. The attempts at co-construction and integration are built on the sharing of cultural and educational experiences and knowledge as well as provision of opportunities for reflection on the pedagogical purpose of the curriculum and its delivery. Methods on evaluating the effectiveness of these aims include a series of surveys and interviews and analysis of data drawn from teaching projects delivered to the students along with graduate successes from the last five years, since SCF first opened its doors. This paper will provide examples of best practice developed by SCF which have helped guide the faculty and embed common core values and aims of co-construction regulations and management, whilst building a pro-active TNE (Trans-National Education) team which enhances the learning experience for staff and students alike.Keywords: cultural co-construction, educational team management, multi-cultural challenges, TNE integration for teaching teams
Procedia PDF Downloads 12014705 Human Trafficking in Your Backyard: Know the Signs and How to Help
Authors: Jessie Fazel, Kristen Smith
Abstract:
Human trafficking is a multi-billion-dollar criminal industry that affects 24.9 million people around the world. There are several different types of trafficking, the most common being sex trafficking, labor trafficking, and domestic servitude. Survival sex is common in the pediatric population, as they engage in sex for food, a place to sleep, or other basic needs. Statistics show that health care workers are at a unique advantage to help identify victims and get them the help they need, as 88% of trafficked victims encounter a health care worker while being trafficked. Unfortunately, victims don’t usually self-identify that they are being trafficked and the situations they face can vary dramatically. It is imperative to remember that traditional red flags are not always present in the pediatric population. Risk factors and red flags with their history and physical exam are one of the best indicators that health care providers need to be vigilant in looking at. There are numerous barriers for disclosure in the healthcare setting. Periods of time before and after disclosure are often emotionally difficult and could be dangerous for the victim. It is extremely important to have a plan in place for intervention if the victim does disclose trafficking. A trauma informed approach to medical and mental health interventions, that focus on safety, are vital in this population. This is happening where you live and you can make a difference in their lives.Keywords: human trafficking, public health, emergency medicine, sexual health
Procedia PDF Downloads 3214704 Diversity of Microbial Ground Improvements
Authors: V. Ivanov, J. Chu, V. Stabnikov
Abstract:
Low cost, sustainable, and environmentally friendly microbial cements, grouts, polysaccharides and bioplastics are useful in construction and geotechnical engineering. Construction-related biotechnologies are based on activity of different microorganisms: urease-producing, acidogenic, halophilic, alkaliphilic, denitrifying, iron- and sulphate-reducing bacteria, cyanobacteria, algae, microscopic fungi. The bio-related materials and processes can be used for the bioaggregation, soil biogrouting and bioclogging, biocementation, biodesaturation of water-satured soil, bioencapsulation of soft clay, biocoating, and biorepair of the concrete surface. Altogether with the most popular calcium- and urea based biocementation, there are possible and often are more effective such methods of ground improvement as calcium- and magnesium based biocementation, calcium phosphate strengthening of soil, calcium bicarbonate biocementation, and iron- or polysaccharide based bioclogging. The construction-related microbial biotechnologies have a lot of advantages over conventional construction materials and processes.Keywords: ground improvement, biocementation, biogrouting, microorganisms
Procedia PDF Downloads 22914703 Concerns, Attitudes and Perceptions of Mothers about Child Vulnerability for Sexual Abuse
Authors: Rukhsana Kausar, Khadija Rasheed
Abstract:
This research explored general concerns, attitudes and perceptions of Pakistani mothers about their children’s vulnerability for sexual abuse and it also examined the effect of education and work status of mothers on their concerns and attitudes about the safety of their children. The sample consisted of 166 mothers comprising of 4 groups i.e. educated-working mothers, uneducated working mothers, educated non-working mothers and uneducated non-working mothers. This research comprised of two studies. Study 1 was carried out to construct two separate scales namely Maternal Concerns and Attitudes Scale for safety of Daughters (MCA-SD) and Maternal Concerns and Attitudes Scale for safety of Sons (MCA-SS) for assessing maternal concerns and attitudes about safety and protection of daughters and sons. These scales were used in study 2 with the objective to explore mothers’ general concerns, attitudes and perceptions of about child vulnerability for sexual abuse. Data were analyzed using two-way analysis of variance and independent-samples t-test. Educated mothers had more sense of responsibility, ensured more safety and provide more information about self-protection to their children as compared to uneducated mothers. Similarly non-working mothers showed more sense of responsibility and provided more information on self-protection to their children as compared to working mothers. Moreover, mothers living in nuclear family system trusted more on their relatives and other people for the protection of their children and ensured more safety of children than those living in joint family system. Findings have very important implications for protecting children from likely sexual abuse.Keywords: mothers’ concerns, attitudes, perceptions, child vulnerability, child sexual abuse
Procedia PDF Downloads 44114702 Damage Assessment and Repair for Older Brick Buildings
Authors: Tim D. Sass
Abstract:
The experience of engineers and architects practicing today is typically limited to current building code requirements and modern construction methods and materials. However, many cities have a mix of new and old buildings with many buildings constructed over one hundred years ago when building codes and construction methods were much different. When a brick building sustains damage, a structural engineer is often hired to determine the cause of damage as well as determine the necessary repairs. Forensic studies of dozens of brick buildings shows an appreciation of historical building methods and materials is needed to correctly identify the cause of damage and design an appropriate repair. Damage on an older, brick building can be mistakenly attributed to storms or seismic events when the real source of the damage is deficient original construction. Assessing and remediating damaged brickwork on older brick buildings requires an understanding of the original construction, an understanding of older repair methods, and, an understanding of current building code requirements.Keywords: brick, damage, deterioration, facade
Procedia PDF Downloads 22714701 Evaluating the Implementation of Machine Learning Techniques in the South African Built Environment
Authors: Peter Adekunle, Clinton Aigbavboa, Matthew Ikuabe, Opeoluwa Akinradewo
Abstract:
The future of machine learning (ML) in building may seem like a distant idea that will take decades to materialize, but it is actually far closer than previously believed. In reality, the built environment has been progressively increasing interest in machine learning. Although it could appear to be a very technical, impersonal approach, it can really make things more personable. Instead of eliminating humans out of the equation, machine learning allows people do their real work more efficiently. It is therefore vital to evaluate the factors influencing the implementation and challenges of implementing machine learning techniques in the South African built environment. The study's design was one of a survey. In South Africa, construction workers and professionals were given a total of one hundred fifty (150) questionnaires, of which one hundred and twenty-four (124) were returned and deemed eligible for study. Utilizing percentage, mean item scores, standard deviation, and Kruskal-Wallis, the collected data was analyzed. The results demonstrate that the top factors influencing the adoption of machine learning are knowledge level and a lack of understanding of its potential benefits. While lack of collaboration among stakeholders and lack of tools and services are the key hurdles to the deployment of machine learning within the South African built environment. The study came to the conclusion that ML adoption should be promoted in order to increase safety, productivity, and service quality within the built environment.Keywords: machine learning, implementation, built environment, construction stakeholders
Procedia PDF Downloads 13214700 A Study on Consumer Awareness, Safety Perceptions and Practices About Food Preservatives and Flavouring Agents Used in Packed / Canned Foods from South India
Authors: Harsha Kumar H. N., Anshu Kumar Jha, Khushboo Kamal Taneja, Krishan Kabra, Mohamed Hafeez Sadiq
Abstract:
Introduction: The increasing use of preservatives and flavouring agents has the potential to cause health problem among the people. There are no published studies from India exploring the awareness, safety perception, & practices about Food Preservatives (FPs) and Flavouring Agents (FAs). So this study was conducted with the objectives of assessing the awareness, safety perceptions & practices about Food Preservatives (FPs), Flavouring Agents (FAs) in commonly bought / purchased packed food items. Materials & method: This cross-sectional study was conducted in January 2012. Sample size of 126 was computed using the formula for infinite population. People who bought packed food items in malls were approached and requested to fill a pre-tested semi-structured questionnaire. The questionnaire explored awareness, safety perception & practices of FPs & FAs. Data was then analyzed using SPSS version 10.0. Chi-square test was used to know if the observed differences were statistically significant. ‘p’ value <0.05 was considered significant. Results: Totally 123 people (males- 48.8% and females-51.2%) participated (response rate of 97.6%) in the study. Majority of the people were aware about presence of ‘FPs’ (91.7%) and ‘FAs’ (84.9%) though their knowledge was inadequate. Breakup of the study subjects according to level of awareness about FPs was as follows (%): Good (37.4), Satisfactory (40.6), Poor (22) & FAs (%): Good (49.6), Satisfactory (36) & Poor (14). Distribution according to type of practices for FPs was as follows (%): Favourable (14), Unfavourable (86) & FAs (%): Favourable (30.5), Unfavourable (69.5). There was a gap between knowledge and practices. Conclusion: Though there was awareness, the knowledge was inadequate. Unfavourable practices were observed. The gaps in the knowledge and unhealthy practices need to be addressed by public awareness campaign.Keywords: food preservatives, flavouring agents, knowledge and practices, general population
Procedia PDF Downloads 53214699 A Case Study: Social Network Analysis of Construction Design Teams
Authors: Elif D. Oguz Erkal, David Krackhardt, Erica Cochran-Hameen
Abstract:
Even though social network analysis (SNA) is an abundantly studied concept for many organizations and industries, a clear SNA approach to the project teams has not yet been adopted by the construction industry. The main challenges for performing SNA in construction and the apparent reason for this gap is the unique and complex structure of each construction project, the comparatively high circulation of project team members/contributing parties and the variety of authentic problems for each project. Additionally, there are stakeholders from a variety of professional backgrounds collaborating in a high-stress environment fueled by time and cost constraints. Within this case study on Project RE, a design & build project performed at the Urban Design Build Studio of Carnegie Mellon University, social network analysis of the project design team will be performed with the main goal of applying social network theory to construction project environments. The research objective is to determine a correlation between the network of how individuals relate to each other on one’s perception of their own professional strengths and weaknesses and the communication patterns within the team and the group dynamics. Data is collected through a survey performed over four rounds conducted monthly, detailed follow-up interviews and constant observations to assess the natural alteration in the network with the effect of time. The data collected is processed by the means of network analytics and in the light of the qualitative data collected with observations and individual interviews. This paper presents the full ethnography of this construction design team of fourteen architecture students based on an elaborate social network data analysis over time. This study is expected to be used as an initial step to perform a refined, targeted and large-scale social network data collection in construction projects in order to deduce the impacts of social networks on project performance and suggest better collaboration structures for construction project teams henceforth.Keywords: construction design teams, construction project management, social network analysis, team collaboration, network analytics
Procedia PDF Downloads 20014698 Harmonization of State Law and Local Laws in Coastal and Marine Areas Management
Authors: N. S. B. Ambarini, Tito Sofyan, Edra Satmaidi
Abstract:
Coastal and marine are two potential natural resource one of the pillars of the national economy. The Indonesian archipelago has marine and coastal which is quite spacious. Various important natural resources such as fisheries, mining and so on are in coastal areas and the sea, so that this region is a unique area with a variety of interests to exploit it. Therefore, to preserve a sustainable manner need good management and comprehensive. To the national and local level legal regulations have been published relating to the management of coastal and marine areas. However, in practice it has not been able to function optimally. Substantially has not touched the problems of the region, especially concerning the interests of local communities (local). This study is a legal non-doctrinal approach to socio-legal studies. Based on the results of research in some coastal and marine areas in Bengkulu province - Indonesia, there is a fact that the system of customary law and local wisdom began to weaken implementation. Therefore harmonization needs to be done in implementing laws and regulations that apply to the values of indigenous and local knowledge that exists in the community.Keywords: coastal and marine, harmonization, law, local
Procedia PDF Downloads 34714697 Characterizing Multivariate Thresholds in Industrial Engineering
Authors: Ali E. Abbas
Abstract:
This paper highlights some of the normative issues that might result by setting independent thresholds in risk analyses and particularly with safety regions. A second objective is to explain how such regions can be specified appropriately in a meaningful way. We start with a review of the importance of setting deterministic trade-offs among target requirements. We then show how to determine safety regions for risk analysis appropriately using utility functions.Keywords: decision analysis, thresholds, risk, reliability
Procedia PDF Downloads 31214696 On the Construction of Some Optimal Binary Linear Codes
Authors: Skezeer John B. Paz, Ederlina G. Nocon
Abstract:
Finding an optimal binary linear code is a central problem in coding theory. A binary linear code C = [n, k, d] is called optimal if there is no linear code with higher minimum distance d given the length n and the dimension k. There are bounds giving limits for the minimum distance d of a linear code of fixed length n and dimension k. The lower bound which can be taken by construction process tells that there is a known linear code having this minimum distance. The upper bound is given by theoretic results such as Griesmer bound. One way to find an optimal binary linear code is to make the lower bound of d equal to its higher bound. That is, to construct a binary linear code which achieves the highest possible value of its minimum distance d, given n and k. Some optimal binary linear codes were presented by Andries Brouwer in his published table on bounds of the minimum distance d of binary linear codes for 1 ≤ n ≤ 256 and k ≤ n. This was further improved by Markus Grassl by giving a detailed construction process for each code exhibiting the lower bound. In this paper, we construct new optimal binary linear codes by using some construction processes on existing binary linear codes. Particularly, we developed an algorithm applied to the codes already constructed to extend the list of optimal binary linear codes up to 257 ≤ n ≤ 300 for k ≤ 7.Keywords: bounds of linear codes, Griesmer bound, construction of linear codes, optimal binary linear codes
Procedia PDF Downloads 75514695 Understanding Project Failures in Construction: The Critical Impact of Financial Capacity
Authors: Nnadi Ezekiel Oluwaseun Ejiofor
Abstract:
This research investigates the effects of poor cost estimation, material cost variations, and payment punctuality on the financial health and execution of construction projects in Nigeria. To achieve the objectives of the study, a quantitative research approach was employed, and data was gathered through an online survey of 74 construction industry professionals consisting of quantity surveyors, contractors, and other professionals. The study surveyed input on cost estimation errors, price fluctuations, and payment delays, among other factors. The responses of the respondents were analyzed using a five-point Likert scale and the Relative Importance Index (RII). The findings demonstrated that the errors in cost estimating in the Bill of Quantity (BOQ) have a high degree of negative impact on the reputation and image of the participants in the projects. The greatest effect was experienced on the likelihood of obtaining future endeavors for contractors (mean value = 3.42), followed by the likelihood of obtaining new commissions by quantity surveyors (mean value = 3.40). The level of inaccuracy in costing that undershoots exposes them to risks was most serious in terms of easement of construction and effects of shortage of funds to pursue bankruptcy (hence fears of mean value = 3.78). There was also considerable financial damage as a result of cost underestimation, whereby contractors suffered the worst loss in profit (mean value = 3.88). Every expense comes with its own peculiar risk and uncertainty. Pressure on the cost of materials and every other expense attributed to the building and completion of a structure adds risks to the performance figures of a project. The greatest weight (mean importance score = 4.92) was attributed to issues like market inflation in building materials, while the second greatest weight (mean importance score = 4.76) was due to increased transportation charges. On the other hand, delays in payments arising from issues of the clients like poor availability of funds (RII=0.71) and contracting issues such as disagreements on the valuation of works done (RII=0.72) or other reasons were also found to lead to project delays and additional costs. The results affirm the importance of proper cost estimation on the health of organization finances and project risks and finishes within set time limits. As for the suggestions, it is proposed to progress on the methods of costing, engender better communications with the stakeholders, and manage the delays by way of contracting and financial control. This study enhances the existing literature on construction project management by suggesting ways to deal with adverse cost inaccuracies and availability of materials due to delays in payments which, if addressed, would greatly improve the economic performance of the construction business.Keywords: cost estimation, construction project management, material price fluctuations, payment delays, financial impact
Procedia PDF Downloads 814694 Inhibitions in Implementing Green Supply Chain Management at Hospitals
Authors: M. Aruna, Uma Gunasilan
Abstract:
Hospitals play an ample role in securing the health of a country. Nevertheless, they also have an unhealthy side. Ecological issues strengthen ill-health throughout the domain which subsequently puts pressure on hospital supply chains. Medical waste indeed is hazardous for environment and subsequently for human. The hospital waste management is of immense prominence due to its infectious and hazardous nature that can source many effects on human health and the environment. Government regulations and public cognizance regarding hospital waste issues have imposed hospital units to admit these strategies. The innovative technologies and instruments have been developed to handle hospital wastes. Green supply chain management practices are common in the United States. In India, Green Supply Chain management (GSCM) has just started to be recognized and practiced. GSCM are green, integrated and ecologically optimized. In Green supply chain management environmental sustainability is found to be an important driver. Eleven barriers are identified in this work. Interpretive Structural Modeling (ISM) technique is used for ranking the obstructions.Keywords: green supply chain management (GSCM), hospital waste management (HWM), interpretive structural modeling (ISM), medical waste (MW)
Procedia PDF Downloads 31914693 Seismic Integrity Determination of Dams in Urban Areas
Authors: J. M. Mayoral, M. Anaya
Abstract:
The urban and economic development of cities demands the construction of water use and flood control infrastructure. Likewise, it is necessary to determine the safety level of the structures built with the current standards and if it is necessary to define the reinforcement actions. The foregoing is even more important in structures of great importance, such as dams, since they imply a greater risk for the population in case of failure or undesirable operating conditions (e.g., seepage, cracks, subsidence). This article presents a methodology for determining the seismic integrity of dams in urban areas. From direct measurements of the dynamic properties using geophysical exploration and ambient seismic noise measurements, the seismic integrity of the concrete-faced rockfill dam selected as a case of study is evaluated. To validate the results, two accelerometer stations were installed (e.g., free field and crest of the dam). Once the dynamic properties were determined, three-dimensional finite difference models were developed to evaluate the dam seismic performance for different intensities of movement, considering the site response and soil-structure interaction effects. The seismic environment was determined from the uniform hazard spectra for several return periods. Based on the results obtained, the safety level of the dam against different seismic actions was determined, and the effectiveness of ambient seismic noise measurements in dynamic characterization and subsequent evaluation of the seismic integrity of urban dams was evaluated.Keywords: risk, seismic, soil-structure interaction, urban dams
Procedia PDF Downloads 11814692 Evaluation of the Patient Identification Process in Healthcare Facilities in a Brazilian City Area
Authors: Carmen Silvia Gabriel, Maria de Fátima Paiva Brito, Mariane de Paula Candido, Vanessa Barato Oliveira
Abstract:
Patient identification is a necessary practice to ensure patient safety in any healthcare environment, including emergency care units, test laboratories, home care and clinics. The present study aimed to provide evidence that can effectively contribute to practices concerning patient identification. Its objective was to investigate patient identification in basic healthcare units through patient safety standards. To do so, a descriptive and non-experimental research outline study was carried out to inquire how patient identification takes place in a particular situation. All technical manager nurses from the chosen healthcare facilities were included in the sample for the study. Data was collected in September of 2014 after approval from the Committee of Ethics. All researched institutions fit the same profile: they’re public facilities for general care with observation beds. None of them has a wristband identification protocol or policy. Only one institution mentioned using some kind of visual identification; namely, body tags separated by colors according to the type of care, but it still does not apply the recommended tags by the Brazilian Ministry of Health. This study allowed the authors to acknowledge how important the commitment from the whole healthcare team in the patient identification process is and also acknowledge how necessary it is to implement institutional policies that may aid the healthcare units in this area to promote a quality and safe patient care.Keywords: patient safety, identification, nursing, emergency care units
Procedia PDF Downloads 40614691 The Current Situation of Veterinary Services and a Reform for Enhancing the Veterinary Services in Developing Countries
Authors: Sufian Abdo Jilo
Abstract:
Veterinary services conserve and maintain animal life and improve the living conditions of human beings through improving rural livelihoods and feeding; veterinary services also address global health crises by preventing risks such as emerging pandemic diseases, antimicrobial resistance, contamination of foods, and environmental health problems at their origin. The purpose of this policy brief is to analyze the way veterinary organizations provide services and to propose an optimal organization for veterinary services in developing countries. The current situation of veterinary institutions in developing countries can't counter the challenge related to animal health and productivity. As a result, reorganization, amalgamation, merging, and consolidation of veterinary health services (veterinary clinics, slaughterhouses, quarantine, and veterinary markets) together with the construction of closer veterinary service facilities and the construction of common areas will help institutions to strengthen cooperation among different veterinarians, which is the first steps for the implementation of a One Health platform and multidisciplinary activities. The improvement and reorganization of the veterinary services institutions will also help the veterinary clinics easily obtain various medical chemicals such as blood and rumen from abattoirs, enhance the surveillance of livestock diseases, enable the community to buy healthy animals from the animal market, and help to reduce economic waste. The services can be performed by a small number of veterinarians through a model of specific areas common to all veterinary services. This model improves the skills and knowledge of veterinarians in all aspects of veterinary medicine and saves students and researchers time. Communities or customers can save time by getting all veterinary services at once. It saves the budget on purchasing medical equipment and medicines at each location and avoids expiration dates on medicines. This model is the latest solution to the global health crisis and should be implemented in the near future to combat the emergence and reemergence of new pathogenic microorganisms.Keywords: abattoir, developing countries, reform, service, veterinary
Procedia PDF Downloads 8514690 Characterizing Compressive Strength of Compressed Stabilized Earth Blocks as a Function of Mix Design
Authors: Robert K. Hillyard, Jonathan Thomas, Brett A. Story
Abstract:
Compressed Stabilized Earth Blocks (CSEB) are masonry units that combine soil, sand, stabilizer, and water under pressure to form an earth block. These CSEB’s offer a cost-effective building solution for remote construction, using local resources and labor to minimize transportation and material costs. However, CSEB’s, and earthen construction generally have not been widely adopted as standardized construction materials. One shortcoming is the difficulty in standardizing strength values of CSEB units and systems due to the inherent variations in mix design, including production compression. This research presents findings on compressive strengths of full-scale CSEB’s from 60 different mix designs as a function of the amount of cement, sand, soil, and water added to the mixture. The full-scale results are compared with CSEB cylinder cores.Keywords: CSEB, compressive strength, earth construction, mix design
Procedia PDF Downloads 10014689 Case-Based Reasoning Application to Predict Geological Features at Site C Dam Construction Project
Authors: Shahnam Behnam Malekzadeh, Ian Kerr, Tyson Kaempffer, Teague Harper, Andrew Watson
Abstract:
The Site C Hydroelectric dam is currently being constructed in north-eastern British Columbia on sub-horizontal sedimentary strata that dip approximately 15 meters from one bank of the Peace River to the other. More than 615 pressure sensors (Vibrating Wire Piezometers) have been installed on bedding planes (BPs) since construction began, with over 80 more planned before project completion. These pressure measurements are essential to monitor the stability of the rock foundation during and after construction and for dam safety purposes. BPs are identified by their clay gouge infilling, which varies in thickness from less than 1 to 20 mm and can be challenging to identify as the core drilling process often disturbs or washes away the gouge material. Without the use of depth predictions from nearby boreholes, stratigraphic markers, and downhole geophysical data, it is difficult to confidently identify BP targets for the sensors. In this paper, a Case-Based Reasoning (CBR) method was used to develop an empirical model called the Bedding Plane Elevation Prediction (BPEP) to help geologists and geotechnical engineers to predict geological features and bedding planes at new locations in a fast and accurate manner. To develop CBR, a database was developed based on 64 pressure sensors already installed on key bedding planes BP25, BP28, and BP31 on the Right Bank, including bedding plane elevations and coordinates. Thirteen (20%) of the most recent cases were selected to validate and evaluate the accuracy of the developed model, while the similarity was defined as the distance between previous cases and recent cases to predict the depth of significant BPs. The average difference between actual BP elevations and predicted elevations for above BPs was ±55cm, while the actual results showed that 69% of predicted elevations were within ±79 cm of actual BP elevations while 100% of predicted elevations for new cases were within ±99cm range. Eventually, the actual results will be used to develop the database and improve BPEP to perform as a learning machine to predict more accurate BP elevations for future sensor installations.Keywords: case-based reasoning, geological feature, geology, piezometer, pressure sensor, core logging, dam construction
Procedia PDF Downloads 8014688 Cost Overrun in Delivery of Public Projects in the Saudi Construction Industry: A Review
Authors: A. Aljohani, D. Moore, D. D. Ahiaga-Dagbui
Abstract:
Cost overruns are endemic in the delivery of construction projects. The problem is global. It occurs irrespective of type and size of the project, its location, procurement method or client. The size of overruns can be as high as 200% in some cases. Projects thus unfortunately often make the news headlines, not for their immense socio-economic contribution to society, but for being poorly procured. In Saudi Arabia, two-thirds of construction projects are publicly procured by the Saudi government, which has been invested Billions of dollars in infrastructure projects each year as part of an ambitious strategic development agenda to shift from mainly oil dependency to multi-source dependency. However, reports show that about 3,000 public projects face diverse issues related to time and cost overrun. As part of an on-going study to develop a framework for effective public procurement for the Saudi Arabian construction industry, this paper reports the initial findings of the causes of cost overruns in the context of the Gulf State. It also evaluates the interface between some of the front-end loading issues in public procurement in Saudi and their effects on project performance. A systematic review of the existing literature on construction cost overruns, with focus on the Saudi Arabian construction industry has been used. One of the initial findings is that a fixed-price contract is usually used by the client in an attempt to transfer all financial risks to the contractors. This has the unintended consequence of creating a turbulent environment for the delivery of the project which leads to project abandonment by contractors, poor quality of work and substantial rework. Further work is being undertaken to empirically verify the initial findings reported in this paper and their generalizability for the construction industry as a whole.Keywords: cost overrun, public procurement, Saudi Arabia, construction projects
Procedia PDF Downloads 270