4192 CLEAN Jakarta Waste Bank Project: Alternative Solution in Urban Solid Waste Management by Community Based Total Sanitation (CBTS) Approach
Authors: Mita Sirait
Abstract:
Everyday Jakarta produces 7,000 tons of solid waste and only about 5,200 tons delivered to landfill out of the city by 720 trucks, the rest are left yet manageable, as reported by Government of Clean Sector. CLEAN Jakarta Project is aimed at empowering community to achieve healthy environment for children and families in urban slum in Semper Barat and Penjaringan sub-district of North Jakarta that consisted of 20,584 people. The project applies Community Based Total Sanitation, an approach to empowering community to achieve total hygiene and sanitation behaviour by triggering activities. As regulated by Ministry of Health, it has 5 pillars: (1) open defecation free, (2) hand-washing with soaps, (3) drinking-water treatment, (4) solid-waste management and (5) waste-water management; and 3 strategic components: 1) demand creation, 2) supply creation and 3) enabling environment. Demand creation is generated by triggering community’s reaction to their daily sanitation habits by exposing them to their surrounding where they can see faeces, waste and other environmental pollutant to stimulate disgusting, embarrassing and responsibility sense. Triggered people then challenged to commit to improving their hygiene practice such as to stop littering and start waste separation. In order to support this commitment, and for supply creation component, the project initiated waste bank with community working group. It facilitated capacity-building trainings, waste bank system formulation and meetings with local authorities to solicit land permit and waste bank decree. As it is of a general banking system, waste bank has customer service, teller, manager, legal paper and provides saving book and money transaction. In 8 months, two waste banks have established with 148 customers, 17 million rupiah cash, and about 9 million of stored recyclables. Approximately 2.5 tons of 15-35 types of recyclable are managed in both waste banks per week. On enabling environment, the project has initiated sanitation working group in community and multi sectors government level, and advocated both parties. The former is expected to promote behaviour change and monitoring in the community, while the latter is expected to support sanitation with regulations, strategies, appraisal and awards; to coordinate partnering and networking, and to replicate best practices to other areas.Keywords: urban community, waste management, Jakarta, community based total sanitation (CBTS)
Procedia PDF Downloads 2944191 Design and Implementation of Power Generation Mechanism Using Speed Breaker
Authors: Roman Kalvin, Anam Nadeem, Saba Arif, Juntakan Taweekun
Abstract:
In the current scenario demand of power is increasing day by day with increasing population. It is needed to sort out this problem with a technique which will not only overcome this energy crisis but also should be environment friendly. This project emphasizes on idea which shows that power could be generated by specially designed speed breaker. This project shows clearly how power can be generated by using Cam Mechanism where basically linear motion is converted into rotatory motion that can be used to generate electricity. When vehicle passes over the speed breaker, presses the cam with the help of connecting rod which rotate main shaft attached with large pulley. A flywheel is coupled with the shaft whose purpose is to normalize the oscillation in the energy and to make the energy unvarying. So, the shafts will spin with firm rpm. These shafts are coupled from end to end with a belt drive. The results show that power generated from this mechanism is 12 watts. The generated electricity does not required any fuel consumption it only generates power which can be used for the street light as well as for the traffic signals.Keywords: revolution per minute, RPM, cam, speed breaker, rotatory motion
Procedia PDF Downloads 2134190 Team Teaching versus Traditional Pedagogical Method
Authors: L. M. H. Mustonen, S. A. Heikkilä
Abstract:
The focus of the paper is to describe team teaching as a HAMK’s pedagogical method, and its impacts to the teachers work. Background: Traditionally it is thought that teaching is a job where one mostly works alone. More and more teachers feel that their work is getting more stressful. Solutions to these problems have been sought in Häme University of Applied sciences’ (From now on referred to as HAMK). HAMK has made a strategic change to move to the group oriented working of teachers. Instead of isolated study courses, there are now larger 15 credits study modules. Implementation: As examples of the method, two cases are presented: technical project module and summer studies module, which was integrated into the EU development project called Energy Efficiency with Precise Control. In autumn 2017, technical project will be implemented third time. There are at least three teachers involved in it and it is the first module of the new students. Main focus is to learn the basic skills of project working. From communicational viewpoint, they learn the basics of written and oral reporting and the basics of video reporting skills. According to our quality control system, the need for the development is evaluated in the end of the module. There are always some differences in each implementation but the basics are the same. The other case summer studies 2017 is new and part of a larger EU project. For the first time, we took a larger group of first to third year students from different study programmes to the summer studies. The students learned professional skills and also skills from different fields of study, international cooperation, and communication skills. Benefits and challenges: After three years, it is possible to consider what the changes mean in the everyday work of the teachers - and of course – what it means to students and the learning process. The perspective is HAMK’s electrical and automation study programme: At first, the change always means more work. The routines born after many years and the course material used for years may not be valid anymore. Teachers are teaching in modules simultaneously and often with some subjects overlapping. Finding the time to plan the modules together is often difficult. The essential benefit is that the learning outcomes have improved. This can be seen in the feedback given by both the teachers and the students. Conclusions: A new type of working environment is being born. A team of teachers designs a module that matches the objectives and ponders the answers to such questions as what are the knowledge-based targets of the module? Which pedagogical solutions will achieve the desired results? At what point do multiple teachers instruct the class together? How is the module evaluated? How can the module be developed further for the next execution? The team discusses openly and finds the solutions. Collegiate responsibility and support are always present. These are strengthening factors of the new communal university teaching culture. They are also strong sources of pleasure of work.Keywords: pedagogical development, summer studies, team teaching, well-being at work
Procedia PDF Downloads 1094189 Achieving Design-Stage Elemental Cost Planning Accuracy: Case Study of New Zealand
Authors: Johnson Adafin, James O. B. Rotimi, Suzanne Wilkinson, Abimbola O. Windapo
Abstract:
An aspect of client expenditure management that requires attention is the level of accuracy achievable in design-stage elemental cost planning. This has been a major concern for construction clients and practitioners in New Zealand (NZ). Pre-tender estimating inaccuracies are significantly influenced by the level of risk information available to estimators. Proper cost planning activities should ensure the production of a project’s likely construction costs (initial and final), and subsequent cost control activities should prevent unpleasant consequences of cost overruns, disputes and project abandonment. If risks were properly identified and priced at the design stage, observed variance between design-stage elemental cost plans (ECPs) and final tender sums (FTS) (initial contract sums) could be reduced. This study investigates the variations between design-stage ECPs and FTS of construction projects, with a view to identifying risk factors that are responsible for the observed variance. Data were sourced through interviews, and risk factors were identified by using thematic analysis. Access was obtained to project files from the records of study participants (consultant quantity surveyors), and document analysis was employed in complementing the responses from the interviews. Study findings revealed the discrepancies between ECPs and FTS in the region of -14% and +16%. It is opined in this study that the identified risk factors were responsible for the variability observed. The values obtained from the analysis would enable greater accuracy in the forecast of FTS by Quantity Surveyors. Further, whilst inherent risks in construction project developments are observed globally, these findings have important ramifications for construction projects by expanding existing knowledge on what is needed for reasonable budgetary performance and successful delivery of construction projects. The findings contribute significantly to the study by providing quantitative confirmation to justify the theoretical conclusions generated in the literature from around the world. This therefore adds to and consolidates existing knowledge.Keywords: accuracy, design-stage, elemental cost plan, final tender sum
Procedia PDF Downloads 2704188 Effects of Video Games and Online Chat on Mathematics Performance in High School: An Approach of Multivariate Data Analysis
Authors: Lina Wu, Wenyi Lu, Ye Li
Abstract:
Regarding heavy video game players for boys and super online chat lovers for girls as a symbolic phrase in the current adolescent culture, this project of data analysis verifies the displacement effect on deteriorating mathematics performance. To evaluate correlation or regression coefficients between a factor of playing video games or chatting online and mathematics performance compared with other factors, we use multivariate analysis technique and take gender difference into account. We find the most important reason for the negative sign of the displacement effect on mathematics performance due to students’ poor academic background. Statistical analysis methods in this project could be applied to study internet users’ academic performance from the high school education to the college education.Keywords: correlation coefficients, displacement effect, multivariate analysis technique, regression coefficients
Procedia PDF Downloads 3674187 A Qualitative Study for Establishing Critical Success Factors for PPPs in Research Reactors
Authors: Khalid Almarri
Abstract:
The UAE is currently developing a peaceful nuclear energy program as part of its low Carbon energy strategy to meet future energy demands. Research of nuclear energy technologies is required to support nuclear energy generation projects and maximize their performance. Research of this type will require building an operating a research reactor (RR), a costly undertaking in most circumstances. Collaboration between government and private parties through public, private partnerships (PPP) can maximize the benefits expected from the adoption of an RR project. The aim of this research is to establish the critical success factors (CSF) for developing an RR project for newcomer countries, with the UAE taken as a case study, through the utilization of public, private partnerships (PPP). The results of this study were arrived at through the use of semi-structured interviews conducted with ten experts in the field of research reactors, using grounded theory method. Underutilization was identified as the main stumbling block that impairs the success of research reactors.Keywords: public private partnerships, research reactors, grounded theory, critical success factors
Procedia PDF Downloads 2824186 Hybrid Strategies of Crisis Intervention for Sexualized Violence Using Digital Media
Authors: Katharina Kargel, Frederic Vobbe
Abstract:
Sexualized violence against children and adolescents using digital media poses particular challenges for practitioners with a focus on crisis intervention (social work, psychotherapy, law enforcement). The technical delimitation of violence increases the burden on those affected and increases the complexity of interdisciplinary cooperation. Urgently needed recommendations for practical action do not yet exist in Germany. Funded by the Federal Ministry of Education and Research, these recommendations for action are being developed in the HUMAN project together with science and practice. The presentation introduces the participatory approach of the HUMAN project. We discuss the application-oriented, casuistic approach of the project and present its results using the example of concrete case-based recommendations for Action. The participants will be presented with concrete prototypical case studies from the project, which will be used to illustrate quality criteria for crisis intervention in cases of sexualized violence using digital media. On the basis of case analyses, focus group interviews and interviews with victims of violence, we present the six central challenges of sexualized violence with the use of digital media, namely: • Diffusion (Ambiguities regarding the extent and significance of violence) , • Transcendence (Space and time independence of the dynamics of violence, omnipresence), • omnipresent anxiety (considering diffusion and transcendence), • being haunted (repeated confrontation with digital memories of violence or the perpetrator), • disparity (conflicts of interpretative power between those affected and the social environment) • simultaneity (of all other factors). We point out generalizable principles with which these challenges can be dealt with professionally. Dealing professionally with sexualized violence using digital media requires a stronger networking of professional actors. A clear distinction must be made between their own mission and the mission of the network partners. Those affected by violence must be shown options for crisis intervention in the context of the aid networks. The different competencies and the professional mission of the offers of help are to be made transparent. The necessity of technical possibilities for deleting abuse images beyond criminal prosecution will be discussed. Those affected are stabilized by multimodal strategies such as a combination of rational emotive therapy, legal support and technical assistance.Keywords: sexualized violence, intervention, digital media, children and youth
Procedia PDF Downloads 2374185 Using Science, Technology, Engineering, Art and Mathematics (STEAM) Project-Based Learning Programs to Transition towards Whole School Pedagogical Shift
Authors: M. Richichi
Abstract:
Evidencing the learning and developmental needs of students in specific educational institutions is central to determining the type of whole school pedagogical shift required. Initiating this transition by designing and implementing STEAM (Science, technology, engineering, art, and mathematics) project-based learning opportunities, in collaboration with industry, exposes teachers to new pedagogical and assessment practices. This experience instills confidence and a renewed sense of energy, which contributes to greater efficacy. Championing teachers in such learning environments leads to “bleeding” of inventive pedagogical understanding and skills as well as motivation. This contributes positively to collective teacher efficacy and the transition towards more cross-disciplinary initiatives and opportunities, and hence an innovative pedagogical shift. Evidence of skill and knowledge development in students, combined with greater confidence, work ethic and interest in STEAM areas, are further indicators of the success of the transitioning process.Keywords: efficacy, pedagogy, transition, STEAM
Procedia PDF Downloads 1294184 Patient Advocates to Improve Access to Justice in Involuntary Hospitalisation
Authors: Zuzana Durajova, Natasa Diatkova, Shreya Bhardwaj
Abstract:
This paper introduces the project START, its activities, goals, evaluation and final results. Over the past few decades, the legal discourse surrounding mental health has resulted in improvement in patient rights (in Netherlands, etc.), the appointment of Ombudspersons for psychiatric patients (in Austria, Sweden) and facilitating the participation of patients in decision-making processes. Czech legislation already recognizes the position of “patient’s advocate” as a person of trust. However, this instrument is not very widely known and rarely used in practice. In the pilot study of the project, legal training for patient advocacy is provided to persons with experience with mental health problems/psychiatric hospitalization chosen from a Czech-based NGO. These persons (patient advocates) visit patients in involuntary hospitalization in one closed ward in the chosen psychiatric institution. During visits, the patient advocates inform patients about their legal standing, their procedural rights and also offer them individual support in contacting their counsel, family members etc. To understand the effect of the intervention, qualitative interviews and participant observations are conducted with the patients, advocates, the hospital management and staff and other identifiable stakeholders, such as government officials responsible for mental health care reform. The interviews are held before, during and after the intervention (support from patient advocates in hospitals). Given the ethical quandaries arising from using psychiatric wards as a field setting, we assume a participatory approach to ensure respect for patient boundaries and dignity. Through this project, we seek to establish a profession of patient advocates based on professional standards.Keywords: patient advocacy, involuntary hospitalization, Czech Republic, patient Rights, professionalization
Procedia PDF Downloads 1974183 Youth Conflict-Related Trauma through Generations: An Ethnography on the Relationship between Health and Society in Post-Conflict Northern Ireland
Authors: Chiara Magliacane
Abstract:
This project aims to analyse the relationship between the post-conflict Northern Irish environment and youth trauma in deprived areas. Using an anthropological perspective and methodology, the study investigates the possible contribution that a socio-cultural perspective can give to the current research on the field, with a special focus on the role of transgenerational trauma. The recognition of the role that socio-economic determinants have on health is usually a challenge for social researchers. In post-conflict Northern Ireland, the overall lack of research about connections between the social context and youth trauma opens the way to the present project. Anthropological studies on social implications of mental disorders have achieved impressive results in many societies; they show how conditions of sufferance and poverty are not intrinsically given, but are the products of historical processes and events. The continuum of violence and the politics of victimhood sustains a culture of silence and fear in deprived areas; this implies the need of investigating the structural and symbolic violence that lies behind the diffusion of mental suffering. The project refers to these concepts from Medical Anthropology and looks at connections between trauma and social, political and economic structures. Accordingly, the study considers factors such as poverty, unemployment, social inequality and gender and class perspectives. At the same time, the project problematises categories such as youth and trauma. 'Trauma' is currently debated within the social sciences since the 'invention' of the Post-Traumatic Stress Disorder (PTSD) in 1980. Current critics made to its clinical conception show how trauma has been mainly analysed as a memory of the past. On the contrary, medical anthropological research focuses on wider perspectives on society and its structures; this is a new and original approach to the study of youth trauma considering that, to author’s best knowledge, there is no research of this kind regarding Northern Ireland. Methods: Qualitative interviews, participant observation. Expected Impact: Local Northern Ireland organizations, i.e. specific charities that provide mental health support. Ongoing and present connections will ensure they will hear about this research.Keywords: health and social inequalities, Northern Ireland, structural violence, youth
Procedia PDF Downloads 2114182 Factors Responsible for Delays in the Execution of Adequately Funded Construction Projects
Authors: Edoghogho Ogbeifun, Charles Mbohwa, J. H. C. Pretorius
Abstract:
Several research report on the factors responsible for the delays in the completion of construction projects has identified the issue of funding as a critical factor; insufficient funding, low cash-flow or lack of funds. Indeed, adequate funding plays pivotal role in the effective execution of construction projects. In the last twenty years (or so), there has been increase in the funds available for infrastructure development in tertiary institution in Nigeria, especially, through the Tertiary Education Trust Fund. This funding body ensures that there is enough fund for each approved project, which is released in three stages during the life of the construction project. However, a random tour of many of the institutions reveals striking evidence of projects not delivered on schedule, to quality and sometime out rightly abandoned. This suggests, therefore, that there are other latent factors, responsible for project delays, that should be investigated. Thus, this research, a pilot scheme, is aimed at unearthing the possible reasons for the delays being experienced in the execution of construction projects for infrastructure upgrade in public tertiary institutions in Nigeria, funded by Tertiary Education Trust Fund. The multiple site case study of qualitative research was adopted. The respondents were the Directors of Physical Planning and the Directors of Works of four Nigerian Public Universities. The findings reveal that delays can be situated within three entities, namely, the funding body, the institutions and others. Therefore, the emerging factors have been classified as external factors (haven to do with the funding body), internal factors (these concern the operations within the institutions) and general factors. The outcome of this pilot exercise provides useful information to guide the Directors as they interact with the funding body as well as challenges themselves to address the loopholes in their internal operations.Keywords: delays, external factors, funding, general factors, Internal factors
Procedia PDF Downloads 1484181 Language and Culture Exchange: Tandem Language Learning for University Students
Authors: Hebe Wong, Luz Fernandez Calventos
Abstract:
Tandem language learning, a language exchange process based on the principles of autonomy and reciprocity, provides opportunities for interlocutors to learn each other’s language by communicating online or face-to-face. While much attention has been paid to the process and outcomes of tandem learning via email, little has been discussed about the effectiveness of face-to-face tandem learning on language and culture exchange for university students. The LACTS (Language and Culture Tandem Scheme), an 8-week project, was set up to study students’ perceptions of conducting tandem learning to assist their language and culture exchange. Students of both post-graduate and undergraduate programmes (N=103) from a Hong Kong SAR university were put in groups of 4 to 6 according to their availability and language preferences and met for an hour a week. While sample task sheets on a range of topics were provided to assist the language exchange, all groups were encouraged to take charge of their meeting format and choose their own topics. At the end of the project, a 19-item questionnaire, which included both open-and closed-ended questions investigating students’ perceptions of reciprocal teaching and cultural exchange, was administered. Thirty-minute individual interviews were conducted to elicit students’ views and experiences in the LACTS activities. Quantitative and qualitative data analysis showed that most students agreed that the project had enhanced their cultural awareness and helped create an inclusive and participatory learning environment. Significant differences were found in students’ confidence in speaking their targeted language after joining the scheme. The interviews also provided rich data on the variety of formats and leadership patterns in student-led meetings, which could shed light on student autonomy and future tandem language learning projects.Keywords: autonomy, reciprocity, tandem language learning, university students
Procedia PDF Downloads 584180 Fostering Students’ Cultural Intelligence: A Social Media Experiential Project
Authors: Lorena Blasco-Arcas, Francesca Pucciarelli
Abstract:
Business contexts have become globalised and digitalised, which requires that managers develop a strong sense of cross-cultural intelligence while working in geographically distant teams by means of digital technologies. How to better equip future managers on these kinds of skills has been put forward as a critical issue in Business Schools. In pursuing these goals, higher education is shifting from a passive lecture approach, to more active and experiential learning approaches that are more suitable to learn skills. For example, through the use of case studies, proposing plausible business problem to be solved by students (or teams of students), these institutions have focused for long in fostering learning by doing. Though, case studies are no longer enough as a tool to promote active teamwork and experiential learning. Moreover, digital advancements applied to educational settings have enabled augmented classrooms, expanding the learning experience beyond the class, which increase students’ engagement and experiential learning. Different authors have highlighted the benefits of digital engagement in order to achieve a deeper and longer-lasting learning and comprehension of core marketing concepts. Clickers, computer-based simulations and business games have become fairly popular between instructors, but still are limited by the fact that are fictional experiences. Further exploration of real digital platforms to implement real, live projects in the classroom seem relevant for marketing and business education. Building on this, this paper describes the development of an experiential learning activity in class, in which students developed a communication campaign in teams using the BuzzFeed platform, and subsequently implementing the campaign by using other social media platforms (e.g. Facebook, Instagram, Twitter…). The article details the procedure of using the project for a marketing module in a Bachelor program with students located in France, Italy and Spain campuses working on multi-campus groups. Further, this paper describes the project outcomes in terms of students’ engagement and analytics (i.e. visits achieved). the project included a survey in order to analyze and identify main aspects related to how the learning experience is influenced by the cultural competence developed through working in geographically distant and culturally diverse teamwork. Finally, some recommendations to use project-based social media tools while working with virtual teamwork in the classroom are provided.Keywords: cultural competences, experiential learning, social media, teamwork, virtual group work
Procedia PDF Downloads 1804179 Nutriscience Project: A Web-Based Intervention to Improve Nutritional Literacy among Families and Educators of Pre-School Children
Authors: R. Barros, J. Azevedo, P. Padrão, M. Gregório, I. Pádua, C. Almeida, C. Rodrigues, P. Fontes, A. Coelho
Abstract:
Recent evidence shows a positive association between nutritional literacy and healthy eating. Traditional nutrition education strategies for childhood obesity prevention have shown weak effect. The Nutriscience project aims to create and evaluate an innovative and multidisciplinary strategy for promoting effective and accessible nutritional information to children, their families, and educators. Nutriscience is a one-year prospective follow-up evaluation study including pre-school children (3-5 y), who attend national schools’ network (29). The project is structured around a web-based intervention, using an on-line interactive platform, and focus on increasing fruit and vegetable consumption, and reducing sugar and salt intake. The platform acts as a social network where educational materials, games, and nutritional challenges are proposed in a gamification approach that promotes family and community social ties. A nutrition Massive Online Open Course is developed for educators, and a national healthy culinary contest will be promoted on TV channel. A parental self-reported questionnaire assessing sociodemographic and nutritional literacy (knowledge, attitudes, skills) is administered (baseline and end of the intervention). We expect that results on nutritional literacy from the presented strategy intervention will give us important information about the best practices for health intervention with kindergarten families. This intervention program using a digital interactive platform could be an educational tool easily adapted and disseminated for childhood obesity prevention.Keywords: childhood obesity, educational tool, nutritional literacy, web-based intervention
Procedia PDF Downloads 3344178 Alphabet Recognition Using Pixel Probability Distribution
Authors: Vaidehi Murarka, Sneha Mehta, Dishant Upadhyay
Abstract:
Our project topic is “Alphabet Recognition using pixel probability distribution”. The project uses techniques of Image Processing and Machine Learning in Computer Vision. Alphabet recognition is the mechanical or electronic translation of scanned images of handwritten, typewritten or printed text into machine-encoded text. It is widely used to convert books and documents into electronic files etc. Alphabet Recognition based OCR application is sometimes used in signature recognition which is used in bank and other high security buildings. One of the popular mobile applications includes reading a visiting card and directly storing it to the contacts. OCR's are known to be used in radar systems for reading speeders license plates and lots of other things. The implementation of our project has been done using Visual Studio and Open CV (Open Source Computer Vision). Our algorithm is based on Neural Networks (machine learning). The project was implemented in three modules: (1) Training: This module aims “Database Generation”. Database was generated using two methods: (a) Run-time generation included database generation at compilation time using inbuilt fonts of OpenCV library. Human intervention is not necessary for generating this database. (b) Contour–detection: ‘jpeg’ template containing different fonts of an alphabet is converted to the weighted matrix using specialized functions (contour detection and blob detection) of OpenCV. The main advantage of this type of database generation is that the algorithm becomes self-learning and the final database requires little memory to be stored (119kb precisely). (2) Preprocessing: Input image is pre-processed using image processing concepts such as adaptive thresholding, binarizing, dilating etc. and is made ready for segmentation. “Segmentation” includes extraction of lines, words, and letters from the processed text image. (3) Testing and prediction: The extracted letters are classified and predicted using the neural networks algorithm. The algorithm recognizes an alphabet based on certain mathematical parameters calculated using the database and weight matrix of the segmented image.Keywords: contour-detection, neural networks, pre-processing, recognition coefficient, runtime-template generation, segmentation, weight matrix
Procedia PDF Downloads 3904177 The Underestimation of Cultural Risk in the Execution of Megaprojects
Authors: Alan Walsh, Peter Walker, Michael Ellis
Abstract:
There is a real danger that both practitioners and researchers considering risks associated with megaprojects ignore or underestimate the impacts of cultural risk. The paper investigates the potential impacts of a failure to achieve cultural unity between the principal actors executing a megaproject. The principle relationships include the relationships between the principle Contractors and the project stakeholders or the project stakeholders and their principle advisors, Western Consultants. This study confirms that cultural dissonance between these parties can delay or disrupt the megaproject execution and examines why cultural issues should be prioritized as a significant risk factor in megaproject delivery. This paper addresses the practical impacts and potential mitigation measures, which may reduce cultural dissonance for a megaproject's delivery. This information is retrieved from on-going case studies in live infrastructure megaprojects in Europe and the Middle East's GCC states, from Western Consultants' perspective. The collaborating researchers each have at least 30 years of construction experience and are engaged in architecture, project management and contracts management, dealing with megaprojects in Europe or the GCC. After examining the cultural interfaces they have observed during the execution of megaprojects, they conclude that globally, culture significantly influences their efficient delivery. The study finds that cultural risk is ever-present, where different nationalities co-manage megaprojects and that cultural conflict poses a real threat to the timely delivery of megaprojects. The study indicates that the higher the cultural distance between the principal actors, the more pronounced the risk, with the risk of cultural dissonance more prominent in GCC megaprojects. The findings support a more culturally aware and cohesive team approach and recommend cross-cultural training to mitigate the effects of cultural disparity.Keywords: cultural risk underestimation, cultural distance, megaproject characteristics, megaproject execution
Procedia PDF Downloads 1074176 Intersections and Cultural Landscape Interpretation, in the Case of Ancient Messene in the Peloponnese
Authors: E. Maistrou, P. Themelis, D. Kosmopoulos, K. Boulougoura, A. M. Konidi, K. Moretti
Abstract:
InterArch is an ongoing research project that is running since September 2020 and aims to propose a digital application for the enhancement of the cultural landscape, which emphasizes the contribution of physical space and time in digital data organization. The research case study refers to Ancient Messene in the Peloponnese, one of the most important archaeological sites in Greece. The project integrates an interactive approach to the natural environment, aiming at a manifold sensory experience. It combines the physical space of the archaeological site with the digital space of archaeological and cultural data while, at the same time, it embraces storytelling processes by engaging an interdisciplinary approach that familiarizes the user to multiple semantic interpretations. The research project is co‐financed by the European Union and Greek national funds, through the Operational Program Competitiveness, Entrepreneurship, and Innovation, under the call RESEARCH - CREATE – INNOVATE (project code: Τ2ΕΔΚ-01659). It involves mutual collaboration between academic and cultural institutions and the contribution of an IT applications development company. New technologies and the integration of digital data enable the implementation of non‐linear narratives related to the representational characteristics of the art of collage. Various images (photographs, drawings, etc.) and sounds (narrations, music, soundscapes, audio signs, etc.) could be presented according to our proposal through new semiotics of augmented and virtual reality technologies applied in touch screens and smartphones. Despite the fragmentation of tangible or intangible references, material landscape formations, including archaeological remains, constitute the common ground that can inspire cultural narratives in a process that unfolds personal perceptions and collective imaginaries. It is in this context that cultural landscape may be considered an indication of space and historical continuity. It is in this context that history could emerge, according to our proposal, not solely as a previous inscription but also as an actual happening. As a rhythm of occurrences suggesting mnemonic references and, moreover, evolving history projected on the contemporary ongoing cultural landscape.Keywords: cultural heritage, digital data, landscape, archaeological sites, visitors’ itineraries
Procedia PDF Downloads 804175 Signature Bridge Design for the Port of Montreal
Authors: Juan Manuel Macia
Abstract:
The Montreal Port Authority (MPA) wanted to build a new road link via Souligny Avenue to increase the fluidity of goods transported by truck in the Viau Street area of Montreal and to mitigate the current traffic problems on Notre-Dame Street. With the purpose of having a better integration and acceptance of this project with the neighboring residential surroundings, this project needed to include an architectural integration, bringing some artistic components to the bridge design along with some landscaping components. The MPA is required primarily to provide direct truck access to Port of Montreal with a direct connection to the future Assomption Boulevard planned by the City of Montreal and, thus, direct access to Souligny Avenue. The MPA also required other key aspects to be considered for the proposal and development of the project, such as the layout of road and rail configurations, the reconstruction of underground structures, the relocation of power lines, the installation of lighting systems, the traffic signage and communication systems improvement, the construction of new access ramps, the pavement reconstruction and a summary assessment of the structural capacity of an existing service tunnel. The identification of the various possible scenarios began by identifying all the constraints related to the numerous infrastructures located in the area of the future link between the port and the future extension of Souligny Avenue, involving interaction with several disciplines and technical specialties. Several viaduct- and tunnel-type geometries were studied to link the port road to the right-of-way north of Notre-Dame Street and to improve traffic flow at the railway corridor. The proposed design took into account the existing access points to Port of Montreal, the built environment of the MPA site, the provincial and municipal rights-of-way, and the future Notre-Dame Street layout planned by the City of Montreal. These considerations required the installation of an engineering structure with a span of over 60 m to free up a corridor for the future urban fabric of Notre-Dame Street. The best option for crossing this span length was identified by the design and construction of a curved bridge over Notre-Dame Street, which is essentially a structure with a deck formed by a reinforced concrete slab on steel box girders with a single span of 63.5m. The foundation units were defined as pier-cap type abutments on drilled shafts to bedrock with rock sockets, with MSE-type walls at the approaches. The configuration of a single-span curved structure posed significant design and construction challenges, considering the major constraints of the project site, a design for durability approach, and the need to guarantee optimum performance over a 75-year service life in accordance with the client's needs and the recommendations and requirements defined by the standards used for the project. These aspects and the need to include architectural and artistic components in this project made it possible to design, build, and integrate a signature infrastructure project with a sustainable approach, from which the MPA, the commuters, and the city of Montreal and its residents will benefit.Keywords: curved bridge, steel box girder, medium span, simply supported, industrial and urban environment, architectural integration, design for durability
Procedia PDF Downloads 714174 Bread Quality Improvement with Special Novel Additives
Authors: Mónika Bartalné-Berceli, Eszter Izsó, Szilveszter Gergely, András Salgó
Abstract:
Nowadays a significant portion of the Earth's population does not have access to healthy food. Either because they can not afford them or because they do not know which they are. The aim of the VIIth Framework CHANCE project (Nr. 266331) supported by the European Union has been to develop relatively cheap food favorable from nutritional point of view and has acceptable quality for consumers. Within the project we dealt with manufacturing of bread belonging to basic foods. We had examined the enrichment of bread products with four kinds of bran, with a special milling product of grain industry (aleurone flour) and with a soy-based sprouted additive. The applied concentration of the six mentioned additives has been optimized and the physical and sensory properties of the bread products were monitored. The weight of the enriched breads increased slightly, however the volume and height decreased slightly compared to the corresponding data of the control bread. The composition of the final product is favorable affected by these additives having highly preferred composition from nutritional point of view.Keywords: bread products, brans, YASO, aleurone flour
Procedia PDF Downloads 3884173 Innovation Ecosystems in Construction Industry
Authors: Cansu Gülser, Tuğce Ercan
Abstract:
The construction sector is a key driver of the global economy, contributing significantly to growth and employment through a diverse array of sub-sectors. However, it faces challenges due to its project-based nature, which often hampers long-term collaboration and broader incentives beyond individual projects. These limitations are frequently discussed in scientific literature as obstacles to innovation and industry-wide change. Traditional practices and unwritten rules further hinder the adoption of new processes within the construction industry. The disadvantages of the construction industry’s project-based structure in fostering innovation and long-term relationships include limited continuity, fragmented collaborations, and a focus on short-term goals, which collectively hinder the development of sustained partnerships, inhibit the sharing of knowledge and best practices, and reduce incentives for investing in innovative processes and technologies. This structure typically emphasizes specific projects, which restricts broader collaborations and incentives that extend beyond individual projects, thus impeding innovation and change. The temporal complexities inherent in project-based sectors like construction make it difficult to address societal challenges through collaborative efforts. Traditional management approaches are inadequate for scaling up innovations and adapting to significant changes. For systemic transformation in the construction sector, there is a need for more collaborative relationships and activities beyond traditional supply chains. This study delves into the concept of an innovation ecosystem within the construction sector, highlighting various research findings. It aims to explore key questions about the components that enhance innovation capacity, the relationship between a robust innovation ecosystem and this capacity, and the reasons why innovation is less prevalent and implemented in this sector compared to others. Additionally, it examines the main factors hindering innovation within companies and identifies strategies to improve these efforts, particularly in developing countries. The innovation ecosystem in the construction sector generates various outputs through interactions between business resources and external components. These outputs include innovative value creation, sustainable practices, robust collaborations, knowledge sharing, competitiveness, and advanced project management, all of which contribute significantly to company market performance and competitive advantage. This article offers insights and strategic recommendations for industry professionals, policymakers, and researchers interested in developing and sustaining innovation ecosystems in the construction sector. Future research should focus on broader samples for generalization, comparative sector analysis, and application-focused studies addressing real industry challenges. Additionally, studying the long-term impacts of innovation ecosystems, integrating advanced technologies like AI and machine learning into project management, and developing future application strategies and policies are also important.Keywords: construction industry, innovation ecosystem, innovation ecosystem components, project management
Procedia PDF Downloads 374172 “Environmental-Friendly” and “People-Friendly” Project for a New North-East Italian Hospital
Authors: Emanuela Zilli, Antonella Ruffatto, Davide Bonaldo, Stefano Bevilacqua, Tommaso Caputo, Luisa Fontana, Carmelina Saraceno, Antonio Sturaroo, Teodoro Sava, Antonio Madia
Abstract:
The new Hospital in Cittadella - ULSS 6 Euganea Health Trust, in the North-East of Italy (400 beds, project completion date in 2026), will partially take the place of the existing building. Interesting features have been suggested in order to project a modern, “environmental-friendly” and “people-friendly” building. Specific multidisciplinary meetings (involving stakeholders and professionals with different backgrounds) have been organized on a periodic basis in order to guarantee the appropriate implementation of logistic and organizational solutions related to eco-sustainability, integration with the context, and the concept of “design for all” and “humanization of care.” The resulting building will be composed of organic shapes determined by the external environment (sun movement, climate, landscape, pre-existing buildings, roads) and the needs of the internal environment (areas of care and diagnostic-treatment paths reorganized with experience gained during the pandemic), with extensive use of renewable energy, solar panels, a 4th-generation heating system, sanitised and maintainable surfaces. There is particular attention to the quality of the staff areas, which include areas dedicated to psycho-physical well-being (relax points, yoga gym), study rooms, and a centralized conference room. Outdoor recreational spaces and gardens for music and watercolour therapy will be included; atai-chi gym is dedicated to oncology patients. Integration in the urban and social context is emphasized through window placement toward the gardens (maternal-infant, mental health, and rehabilitation wards). Service areas such as dialysis, radiology, and labs have views of the medieval walls, the symbol of the city’s history. The new building has been designed to pursue the maximum level of eco-sustainability, harmony with the environment, and integration with the historical, urban, and social context; the concept of humanization of care has been considered in all the phases of the project management.Keywords: environmental-friendly, humanization, eco-sustainability, new hospital
Procedia PDF Downloads 1194171 A Review of Information Systems Development in Developing Countries
Authors: B. N. Asare, O. A. Ajigini
Abstract:
Information systems (IS) are highly important in the operation of private and public organisations in developing and developed countries. Developing countries are saddled with many project failures during the implementation of information systems. However, successful information systems are greatly needed in developing countries in order to enhance their economies. This paper is highly important in view of the high failure rate of information systems in developing countries which needs to be reduced to minimum acceptable levels by means of recommended interventions. This paper centres on a review of IS development in developing countries. The paper presents evidences of the IS successes and failures in developing countries and posits a model to address the IS failures. The proposed model can then be utilised by developing countries to reduce their IS project implementation failure rate. A comparison is drawn between IS development in developing countries and developed countries. The paper provides valuable information to assist in reducing IS failure, and developing IS models and theories on IS development for developing countries.Keywords: developing countries, information systems, IS development, information systems failure, information systems success, information systems success model
Procedia PDF Downloads 3814170 Using a Robot Companion to Detect and Visualize the Indicators of Dementia Progression and Quality of Life of People Aged 65 and Older
Authors: Jeoffrey Oostrom, Robbert James Schlingmann, Hani Alers
Abstract:
This document depicts the research into the indicators of dementia progression, the automation of quality of life assignments, and the visualization of it. To do this, the Smart Teddy project was initiated to make a smart companion that both monitors the senior citizen as well as processing the captured data into an insightful dashboard. With around 50 million diagnoses worldwide, dementia proves again and again to be a bothersome strain on the lives of many individuals, their relatives, and society as a whole. In 2015 it was estimated that dementia care cost 818 billion U.S Dollars globally. The Smart Teddy project aims to take away a portion of the burden from caregivers by automating the collection of certain data, like movement, geolocation, and sound-levels. This paper proves that the Smart Teddy has the potential to become a useful tool for caregivers but won’t pose as a solution. The Smart Teddy still faces some problems in terms of emotional privacy, but its non-intrusive nature, as well as diversity in usability, can make up for it.Keywords: dementia care, medical data visualization, quality of life, smart companion
Procedia PDF Downloads 1414169 A Development of a Conceptual Framework for Safety Culture and Safety Risk Assessment: The Case of Chinese International Construction Projects under the “New Belt and Road” Initiative in Africa
Authors: Bouba Oumarou Aboubakar, HongXia Li, Sardar Annes Farooq
Abstract:
The Belt and Road Initiative’s success strongly depends on the safety of all the million workers on construction projects sites. As the new BRI is directed toward Africa and meets a completely different culture from the Chinese project managers, maintaining low risk for workers risks shall be closely related to cultural sharing and mutual understanding. This is why this work introduces a cultural-wise safety management framework for Chinese Construction projects in Africa. The theoretical contribution of this paper is an improved risk assessment framework that integrates language, culture and difficulty of controlling risk factors into one approach. Practically, this study provides not only a useful tool for project safety management practitioners but the full understanding of all risks that may arise in the BRI projects in Africa.Keywords: cultural-wise, safety culture, risk assessment, Chinese construction, BRI projects, Africa
Procedia PDF Downloads 1144168 The Walkway Project: An Exploration of Informal Public Space Upgrading in Gugulethu, Cape Town
Authors: Kathryn Ewing
Abstract:
Safe and accessible public spaces are vital elements of our South African cities. Public spaces hold the potential to act as important, vibrant places for learning, exchange, and practice. Public walkways, however, are some of the most neglected and extremely dangerous public spaces experienced in the local neighborhood of Gugulethu in Cape Town. Walkways feel insignificant, being recognized as informal and undetermined or retain complex fragments of formal erven. They are generally out of sight connecting minor streets and informal settlements. Community residents refer to the walkways as unsafe and dirty spaces. Local authorities allocate minimal to no municipal budgets nor maintenance plans resulting in a lack of basic services, particularly lighting and green infrastructure. ‘The Walkway Project’ presents a series of urban stories collected from co-design workshops, emotional mapping exercises, and fieldwork, including urban walks and urban talks. The narrative interprets the socio-spatial practice and complexity of informal public space in Gugulethu, Cape Town. The Walkway Project research, interrelated to the Master of Urban Design teaching and design-research studio, has a strong focus on participatory and engaged learning and action research methodology within a deliberate pedagogy. A consolidated urban design implementation plan exposes the impact and challenges of waste and water, opening the debate on relevant local solutions for resilience and safety in Cape Town. A small and neglected passage connecting two streets, commonly referred to as iThemba Walkway, is presented as a case study to show-case strategic urban design intervention strategies for urban upgrading. The iThemba walkway is a community-driven project that demonstrates active and responsible co-design and participatory development opportunities. In March 2021, when visited on an urban walk, the public space was covered by rubble and solid waste. By April 2021, the community cleaned the walkway and created an accessible passage for the school children to pass. Numerous co-design workshops have taken place over the past year. The walkway has emerged as a public space upgrading project facilitated, motivated, and implemented by multiple local partners and residents. Social maps from urban walks and talks illustrate the transformation of iThemba Walkway into an inclusive, safe, resilient, and sustainable urban space, linked to Sustainable Development Goal number 11, sustainable cities and communities. The outcomes of the upgrading project facilitate a deeper understanding of co-design methods, urban upgrading processes, and monitoring of public space and informal urbanism.Keywords: informal, public space, resilience, safety, upgrade, walkways
Procedia PDF Downloads 944167 Internet of Health Things as a Win-Win Solution for Mitigating the Paradigm Shift inside Senior Patient-Physician Shared Health Management
Authors: Marilena Ianculescu, Adriana Alexandru
Abstract:
Internet of Health Things (IoHT) has already proved to be a persuasive means to support a proper assessment of the living conditions by collecting a huge variety of data. For a customized health management of a senior patient, IoHT provides the capacity to build a dynamic solution for sustaining the shift inside the patient-physician relationship by allowing a real-time and continuous remote monitoring of the health status, well-being, safety and activities of the senior, especially in a non-clinical environment. Thus, is created a win-win solution in which both the patient and the physician enhance their involvement and shared decision-making, with significant outcomes. Health monitoring systems in smart environments are becoming a viable alternative to traditional healthcare solutions. The ongoing “Non-invasive monitoring and health assessment of the elderly in a smart environment (RO-SmartAgeing)” project aims to demonstrate that the existence of complete and accurate information is critical for assessing the health condition of the seniors, improving wellbeing and quality of life in relation to health. The researches performed inside the project aim to highlight how the management of IoHT devices connected to the RO-SmartAgeing platform in a secure way by using a role-based access control system, can allow the physicians to provide health services at a high level of efficiency and accessibility, which were previously only available in hospitals. The project aims to identify deficient aspects in the provision of health services tailored to a senior patient’s specificity and to offer a more comprehensive perspective of proactive and preventive medical acts.Keywords: health management, internet of health things, remote monitoring, senior patient
Procedia PDF Downloads 1014166 Significance of the 2015 Comprehensive Strategic Partnership Agreement to the Foreign Policies of Australia and Singapore in the Indo-Pacific Region
Authors: Iraj Musa Dawaari
Abstract:
Australia and Singapore signed the Comprehensive Strategic Partnership (CSP) agreement on 29th June 2015. This agreement aims to strengthen security, defense, diplomatic, economic, education, and innovation cooperation, as well as people-to-people relations between the two states. The purpose of this study is to examine rationales underpinning the (2015 CSP) agreement in order to better understand the national and foreign policy priorities of both Australia and Singapore in the period leading up to the signing of the agreement and in the period since. This research project will seek to establish how both countries’ national and foreign policy priorities have developed in recent years in the light of growing tensions between China and the US in the Indo-Pacific region and how the CSP agreement has influenced these priorities. This project also seeks to better understand and analyse why both states signed the CSP agreement in 2015.Keywords: Australia, Singapore, foreign policy, partnership, USA, China, Indo-Pacific Region
Procedia PDF Downloads 1404165 Environmental Impact of Autoclaved Aerated Concrete in Modern Construction: A Case Study from the New Egyptian Administrative Capital
Authors: Esraa A. Khalil, Mohamed N. AbouZeid
Abstract:
Building materials selection is critical for the sustainability of any project. The choice of building materials has a huge impact on the built environment and cost of projects. Building materials emit huge amount of carbon dioxide (CO2) due to the use of cement as a basic component in the manufacturing process and as a binder, which harms our environment. Energy consumption from buildings has increased in the last few years; a huge amount of energy is being wasted from using unsustainable building and finishing materials, as well as from the process of heating and cooling of buildings. In addition, the construction sector in Egypt is taking a good portion of the economy; however, there is a lack of awareness of buildings environmental impacts on the built environment. Using advanced building materials and different wall systems can help in reducing heat consumption, the project’s initial and long-term costs, and minimizing the environmental impacts. Red Bricks is one of the materials that are being used widely in Egypt. There are many other types of bricks such as Autoclaved Aerated Concrete (AAC); however, the use of Red Bricks is dominating the construction industry due to its affordability and availability. This research focuses on the New Egyptian Administrative Capital as a case study to investigate the potential of the influence of using different wall systems such as AAC on the project’s cost and the environment. The aim of this research is to conduct a comparative analysis between the traditional and most commonly used bricks in Egypt, which is Red Bricks, and AAC wall systems. Through an economic and environmental study, the difference between the two wall systems will be justified to encourage the utilization of uncommon techniques in the construction industry to build more affordable, energy efficient and sustainable buildings. The significance of this research is to show the potential of using AAC in the construction industry and its positive influences. The study analyzes the factors associated with choosing suitable building materials for different projects according to the need and criteria of each project and its nature without harming the environment and wasting materials that could be saved or recycled. The New Egyptian Administrative Capital is considered as the country’s new heart, where ideas regarding energy savings and environmental benefits are taken into consideration. Meaning that, Egypt is taking good steps to move towards more sustainable construction. According to the analysis and site visits, there is a potential in reducing the initial costs of buildings by 12.1% and saving energy by using different techniques up to 25%. Interviews with the mega structures project engineers and managers reveal that they are more open to introducing sustainable building materials that will help in saving the environment and moving towards green construction as well as to studying more effective techniques for energy conservation.Keywords: AAC blocks, building material, environmental impact, modern construction, new Egyptian administrative capital
Procedia PDF Downloads 1214164 CPU Architecture Based on Static Hardware Scheduler Engine and Multiple Pipeline Registers
Authors: Ionel Zagan, Vasile Gheorghita Gaitan
Abstract:
The development of CPUs and of real-time systems based on them made it possible to use time at increasingly low resolutions. Together with the scheduling methods and algorithms, time organizing has been improved so as to respond positively to the need for optimization and to the way in which the CPU is used. This presentation contains both a detailed theoretical description and the results obtained from research on improving the performances of the nMPRA (Multi Pipeline Register Architecture) processor by implementing specific functions in hardware. The proposed CPU architecture has been developed, simulated and validated by using the FPGA Virtex-7 circuit, via a SoC project. Although the nMPRA processor hardware structure with five pipeline stages is very complex, the present paper presents and analyzes the tests dedicated to the implementation of the CPU and of the memory on-chip for instructions and data. In order to practically implement and test the entire SoC project, various tests have been performed. These tests have been performed in order to verify the drivers for peripherals and the boot module named Bootloader.Keywords: hardware scheduler, nMPRA processor, real-time systems, scheduling methods
Procedia PDF Downloads 2674163 RASPE: Risk Advisory Smart System for Pipeline Projects in Egypt
Authors: Nael Y. Zabel, Maged E. Georgy, Moheeb E. Ibrahim
Abstract:
A knowledge-based expert system with the acronym RASPE is developed as an application tool to help decision makers in construction companies make informed decisions about managing risks in pipeline construction projects. Choosing to use expert systems from all available artificial intelligence techniques is due to the fact that an expert system is more suited to representing a domain’s knowledge and the reasoning behind domain-specific decisions. The knowledge-based expert system can capture the knowledge in the form of conditional rules which represent various project scenarios and potential risk mitigation/response actions. The built knowledge in RASPE is utilized through the underlying inference engine that allows the firing of rules relevant to a project scenario into consideration. This paper provides an overview of the knowledge acquisition process and goes about describing the knowledge structure which is divided up into four major modules. The paper shows one module in full detail for illustration purposes and concludes with insightful remarks.Keywords: expert system, knowledge management, pipeline projects, risk mismanagement
Procedia PDF Downloads 313