Search results for: senior design project
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 16241

Search results for: senior design project

16211 An Influence of Marketing Mix on Hotel Booking Decision: Japanese Senior Traveler Case

Authors: Kingkan Pongsiri

Abstract:

The study of marketing mix influencing on hotel booking decision making: Japanese senior traveler case aims to study the individual factors that are involved in the decision-making reservation for Japanese elderly travelers. Then, it aims to study other factors that influence the decision of tourists booking elderly Japanese people. This is a quantitative research methods, total of 420 completed questionnaires were collect via a Non-Probability sampling techniques. The study found that the majority of samples were female, 53.3 percent of 224 people aged between 66-70 years were 197, representing a 46.9 percent majority, the marital status of marriage is 212 per cent.50.5. Majority of samples have a bachelor degree of education with number of 326 persons (77.6 percentages) 50 percentages of samples (210 people) have monthly income in between 1,501-2,000 USD. The Samples mostly have a length of stay in a short period between 1-14 days counted as 299 people which representing 71.2 percentages of samples. The senior Japanese tourists apparently sensitive to the factors of products/services the most. Then they seem to be sensitive to the price, the marketing promotion and people, respectively. There are two factors identified as moderately influence to the Japanese senior tourists are places or distribution channels and physical evidences.

Keywords: Japanese senior traveler, marketing mix, senior tourist, hotel booking

Procedia PDF Downloads 276
16210 The Need for Implementing Building Information Modelling (BIM) and Integrated Project Delivery (IPD) in the Construction Project: A Case Study in UAE

Authors: C. W. F. Che Wan Putra, M. Alshawi, M. S. Al Ahbabi, M. Jabakhanji

Abstract:

Much of the waste that is generated throughout the life-cycle of a building is mainly related to project stakeholders not having access to information that others have created. This results in waste and high costs. Over the past decade, however, the industry reacted to these challenges by adopting effective procurement approaches, such as partnering and design and build, to improve collaboration and communication among projects’ stakeholders. Most recently, there is a focus on creating and reusing digital project information of stakeholders throughout the life-cycle to facilitate the exchange of information among partners. This shift is based around BIM (Building Information Modelling) and collaborative environment (IPD). The power of collaborative BIM goes beyond improving efficiency. Sustainability, perhaps the most important challenge for the design and construction community, is at the intersection of BIM and collaborative project delivery, drawing strength from both. Due to these benefits, a research study has been carried out to investigate the need of BIM and IPD, on a large scale construction project which is procured on a traditional approach, i.e. design-bid-build. A qualitative research work including a semi-structured interview with project partners was conducted on a typical project in the UAE, whereby the selected project suffered from severe delays and cost overrun. This paper aims to bring about clear evidence to what most likely to happen to a typical construction project in spite of employing very good consultants, project manager and contractors and how these problems could have been avoided if BIM and IPD were deployed.

Keywords: building information modelling (BIM), integrated project delivery (IPD), collaborative environment, case study

Procedia PDF Downloads 383
16209 Overcoming the Impacts of Covid-19 Outbreak Using Value Integrated Project Delivery Model

Authors: G. Ramya

Abstract:

Value engineering is a systematic approach, widely used to optimize the design or process or product in the designing stage. It used to achieve the client's obligation by increasing the functionality and attain the targeted cost in the cost planning. Value engineering effectiveness and benefits decrease along with the progress of the project since the change in the scope of the work and design will account for more cost all along the lifecycle of the project. Integrating the value engineering with other project management activities will promote cost minimization, client satisfaction, and ensure early completion of the project in time. Previous research studies suggested that value engineering can integrate with other project delivery activities, but research studies unable to frame a model that collaborates the project management activities with the job plan of value engineering approach. I analyzed various project management activities and their synergy between each other. The project management activities and processes like a)risk analysis b)lifecycle cost analysis c)lean construction d)facility management e)Building information modelling f)Contract administration, collaborated, and project delivery model planned along with the RIBA plan of work. The key outcome of the research is a value-driven project delivery model, which will succeed in dealing with the economic impact, constraints and conflicts arise due to the COVID-19 outbreak in the Indian construction sector. Benefits associated with the structured framework is construction project delivery that ensures early contractor involvement, mutual risk sharing, and reviving the project with a cost overrun and delay back on track ,are discussed. Keywords: Value-driven project delivery model, Integration, RIBA plan of work Themes: Design Economics

Keywords: value-driven project delivery model, Integration, RIBA

Procedia PDF Downloads 107
16208 Evolution of Design through Documentation of Architecture Design Processes

Authors: Maniyarasan Rajendran

Abstract:

Every design has a process, and every architect deals in the ways best known to them. The design translation from the concept to completion change in accordance with their design philosophies, their tools, availability of resources, and at times the clients and the context of the design as well. The approach to understanding the design process requires formalisation of the design intents. The design process is characterised by change, with the time and the technology. The design flow is just indicative and never exhaustive. The knowledge and experience of stakeholders remain limited to the part they played in the project, and their ability to remember, and is through the Photographs. These artefacts, when circulated can hardly tell what the project is. They can never tell the narrative behind. In due course, the design processes are lost. The Design junctions are lost in the journey. Photographs acted as major source materials, along with its importance in architectural revivalism in the 19th century. From the history, we understand that it has been photographs, that act as the dominant source of evidence. The idea of recording is also followed with the idea of getting inspired from the records and documents. The design concept, the architectural firms’ philosophies, the materials used, the special needs, the numerous ‘Trial-and-error’ methods, design methodology, experience of failures and success levels, and the knowledge acquired, etc., and the various other aspects and methods go through in every project, and they deserve/ought to be recorded. The knowledge can be preserved and passed through generations, by documenting the design processes involved. This paper explores the idea of a process documentation as a tool of self-reflection, creation of architectural firm’ repository, and these implications proceed with the design evolution of the team.

Keywords: architecture, design, documentation, records

Procedia PDF Downloads 350
16207 Analyze and Improve Project Delivery Time Enhancing Business Management System of Review and Approval Process for Project Design Submittals

Authors: Abdulaziz Alnajem, Amit Sharma

Abstract:

Business Case: Project delivery and enhancing activities' completion in the shortest possible time is critical during execution to proceed with the subsequent phases of Procurement, C & C phases of Contracts to have the required Production facilities/Infrastructure in place to achieve the Company strategic objective of 4.0 MBOPD oil production. SOR (Statement of requirement): Design and Engineering phase of Projects execution takes a long time. It is observed that, in most of the cases, company has crossed the Project Design Submittals review time as per the Contract/Company Standards, resulting into delays in projects completion, and cost impact to the company. Study Scope: Scope of the study covers the process from date of first submission of D & E documents by the contractor to final approval by the controlling team to proceed with the procurement of materials. This scope covers projects handled by the company’s project management teams and includes only the internal review process by the company.

Keywords: business management system, project management, oil and gas, analysis, improvement, design, delays

Procedia PDF Downloads 200
16206 Application of Basic Principles of Educational Administration for the Enhancement of Senior Secondary School Principals in Kano State Nigeria

Authors: Ibrahim Auwal

Abstract:

This study focuses on senior secondary education towards the development of younger generation in general terms, and specifically for the enhancement of senior secondary school principals. Investigation was made to correlate between principals’ application of basic principles of educational administration and principals’ productivity in senior secondary schools in Kano State. The instrument used to collect relevant data was self designed Observation Inventory for School Principals (OISP). The observation inventory items were scrutinized by experts from the School of Education Federal College of Education Kano to ascertain the contents validity, and the reliability coefficient was 0.83. Using purposive sampling technique, 30 schools were chosen from 85 senior secondary schools in Kano state and 30 principals were deliberately sampled due to their small number. Pearson Product Moment Correlation (r) Coefficient was used to test the hypothesis generated for the study. The results of the analysis showed that principals’ application of basic principles of educational administration was significantly correlated with principals’ productivity and it promote the performance of the students. Based on the findings, it was recommended that, government should in as much as possible encourage school principals to obtain degrees in relevant and specialized areas in education specifically educational administration and planning so as to get all the necessary knowledge and skills of leader ship procedures that will definitely promote teachers morale, improve students’ academic performance and enhances principals’ productivity in senior secondary schools in Kano State.

Keywords: principles of educational administration, principals of senior secondary schools, Kano, educational sciences

Procedia PDF Downloads 468
16205 Practices in Planning, Design and Construction of Head Race Tunnel of a Hydroelectric Project

Authors: M. S. Thakur, Mohit Shukla

Abstract:

A channel/tunnel, which carries the water to the penstock/pressure shaft is called headrace tunnel (HRT). It is necessary to know the general topography, geology of the area, state of stress and other mechanical properties of the strata. For this certain topographical and geological investigations, in-situ and laboratory tests, and observations are required to be done. These investigations play an important role in a tunnel design as these help in deciding the optimum layout, shape and size and support requirements of the tunnel. The paper includes inputs from Nathpa Jhakri Hydeoelectric project which is India’s highest capacity (1500 MW) operating hydroelectric project. The paper would help the design engineers with various new concepts and preparedness against geological surprises.

Keywords: tunnelling, geology, HRT, rockmass

Procedia PDF Downloads 236
16204 "Project" Approach in Urban: A Response to Uncertainty

Authors: Mouhoubi Nedjima, Sassi Boudemagh Souad

Abstract:

In this paper, we will try to demonstrate the importance of the project approach in the urban to deal with uncertainty, the importance of the involvement of all stakeholders in the urban project process and that the absence of an actor can lead to project failure but also the importance of the urban project management. These points are handled through the following questions: Does the urban adhere to the theory of complexity? Does the project approach bring hope and solution to make urban planning "sustainable"? How converging visions of actors for the same project? Is the management of urban project the solution to support the urban project approach?

Keywords: strategic planning, project, urban project stakeholders, management

Procedia PDF Downloads 488
16203 Presenting a Model Based on Artificial Neural Networks to Predict the Execution Time of Design Projects

Authors: Hamed Zolfaghari, Mojtaba Kord

Abstract:

After feasibility study the design phase is started and the rest of other phases are highly dependent on this phase. forecasting the duration of design phase could do a miracle and would save a lot of time. This study provides a fast and accurate Machine learning (ML) and optimization framework, which allows a quick duration estimation of project design phase, hence improving operational efficiency and competitiveness of a design construction company. 3 data sets of three years composed of daily time spent for different design projects are used to train and validate the ML models to perform multiple projects. Our study concluded that Artificial Neural Network (ANN) performed an accuracy of 0.94.

Keywords: time estimation, machine learning, Artificial neural network, project design phase

Procedia PDF Downloads 66
16202 The Impact of Using Building Information Modeling Technology in Construction Projects Management

Authors: Mohammad Ashraf

Abstract:

This research links the use of Building Information Modeling technology in constructions and infrastructure projects, starting from the moment when considering the establishment of a project to demolishing or renovating it, going through the design work, planning, procurement and implementation. BIM Software's which used are Revit, Navisworks and Asta Project in the case study for the Atletico Madrid Stadium project (Wanda Stadium). Also, the project improves through various phases of construction (planning - implementation - management). Besides, the level of the details managed within this project advances gradually. In addition, the construction process problems become about 30 % less than before, resulting from high coordination between designing, implementation and follow through that is done by the project management office (PMO). The current disposition in the industry is to tightly manage the detail contained within the planning and coordination phases of construction, but we miss the opportunity to manage that data as it matures and grows into the execution and commissioning phases.

Keywords: construction management, BIM technology, planning, design, procurements, critical path method

Procedia PDF Downloads 264
16201 Translating Empathy in a Senior Community

Authors: Denver E. Severt, Cynthia Mejia

Abstract:

With a grey wave sweeping across the world and people living longer than ever, more individuals will reside in retirement communities in unprecedented numbers. Enhancing the resident stay within these communities is imperative to reduce past stigmas associated with senior communities. This exploratory quantitative investigation examined interview contents of employees and residents to see if empathy was observed. The results showed the employees across all ranges had a much better grasp of affective empathy, yet with greater experience and age, it was clear that cognitive empathy had to be used with affective empathy in order to gain better trust across the community of residents. Outcomes from the study suggest that future training programs for employees are operationalized to include both affective and cognitive empathy practices. This study is unique in that two scales of empathy were transformed into qualitative questions, and in-depth employee and resident interviews were conducted. The study answers many calls of research to provide more specific studies in senior living communities.

Keywords: senior living community, transformational service research, qualitative research

Procedia PDF Downloads 121
16200 Transitioning Classroom Students to Working Learners: Lived Experiences of Senior High School Work Immersion Students

Authors: Rico Herrero

Abstract:

The study looked into the different lived experiences of senior high school to work immersion and how they were able to cope up in the transition stage from being classroom students into immersion students in work immersion site. The participants of the study were the ten senior high school students from Punta Integrated School. Using interview guide questions, the researchers motivated the participants to reveal their thoughts, feelings, and experiences in the interviews via video recording. The researchers utilized the qualitative research design, but the approach used was grounded theory. The findings revealed the participants’ lived experiences on how to cope or overcome the transition stage during the work immersion program. They unanimously responded to the interview questions. And based on the themes that emerged from the testimonies of the Senior High School students, the classroom learners benefited a lot from authentic learning opportunity of immersion program. Work immersion provides the students the opportunity to learn and develop their skills/ competencies related to the field of specialization. The hands-on training provides them simulation of work. They realized that theoretical learning in school is not enough to be equipped to work. Immersion program also provides venue for values and standard transformation. Senior High School students felt a high demand of self-confidence at the beginning of their race. Good thing, self-esteem of an individual helps bring out one’s potential at its best. Students find it challenging to get along with people in all ages. But, the endeavour absolutely helps them to grow maturely. Participants also realized that it’s not easy to deal with time pressure. Hence, the immersion program taught them to learn about time management. Part of the best training is to expose the learners to the harsh reality. Despite of the things that the school had taught them, still, students realized that they are not yet ready to deal with the demands of work. Furthermore, they also found out that they need to develop an interpersonal skill to improve their human relationships.

Keywords: grounded theory, lived experiences, senior high school, work immersion

Procedia PDF Downloads 129
16199 Potential of Visualization and Information Modeling on Productivity Improvement and Cost Saving: A Case Study of a Multi-Residential Construction Project

Authors: Sara Rankohi, Lloyd Waugh

Abstract:

Construction sites are information saturated. Digitalization is hitting construction sites to meet the incredible demand of knowledge sharing and information documentations. From flying drones, 3D Lasers scanners, pocket mobile applications, to augmented reality glasses and smart helmet, visualization technologies help real-time information imposed straight onto construction professional’s field of vision. Although these technologies are very applicable and can have the direct impact on project cost and productivity, experience shows that only a minority of construction professionals quickly adapt themselves to benefit from them in practice. The majority of construction managers still tend to apply traditional construction management methods. This paper investigates a) current applications of visualization technologies in construction projects management, b) the direct effect of these technologies on productivity improvement and cost saving of a multi-residential building project via a case study on Mac Taggart Senior Care project located in Edmonton, Alberta. The research shows the imaged based technologies have a direct impact on improving project productivity and cost savings.

Keywords: image-based technologies, project management, cost, productivity improvement

Procedia PDF Downloads 339
16198 Project Design Deliverables Sequence (PDD)

Authors: Nahed Al-Hajeri

Abstract:

There are several reasons which lead to a delay in project completion, out of all, one main reason is the delay in deliverable processing, i.e. submission and review of documents. Most of the project cycles start with a list of deliverables but without a sequence of submission of the same, means without a direction to move, leading to overlapping of activities and more interdependencies. Hence Project Design Deliverables (PDD) is developed as a solution to Organize Transmittals (Documents/Drawings) received from contractors/consultants during different phases of an EPC (Engineering, Procurement, and Construction) projects, which gives proper direction to the stakeholders from the beginning, to reduce inter-discipline dependency, avoid overlapping of activities, provide a list of deliverables, sequence of activities, etc. PDD attempts to provide a list and sequencing of the engineering documents/drawings required during different phases of a Project which will benefit both client and Contractor in performing planned activities through timely submission and review of deliverables. This helps in ensuring improved quality and completion of Project in time. The successful implementation begins with a detailed understanding the specific challenges and requirements of the project. PDD will help to learn about vendor document submissions including general workflow, sequence and monitor the submission and review of the deliverables from the early stages of Project. This will provide an overview for the Submission of deliverables by the concerned during the projects in proper sequence. The goal of PDD is also to hold responsible and accountability of all stakeholders during complete project cycle. We believe that successful implementation of PDD with a detailed list of documents and their sequence will help organizations to achieve the project target.

Keywords: EPC (Engineering, Procurement, and Construction), project design deliverables (PDD), econometrics sciences, management sciences

Procedia PDF Downloads 380
16197 Evaluating the Relationship between Overconfidence of Senior Managers and Abnormal Cash Fluctuations with Respect to Financial Flexibility in Companies Listed in Tehran Stock Exchange

Authors: Hadi Mousavi, Majid Davoudi Nasr

Abstract:

Executives can maximize profits by recognizing the factors that affect investment and using them to obtain the optimal level of investment. Inefficient markets have shortcomings that can impact the optimal level of investment, leading to the process of over-investment or under-investment. In the present study, the relationship between the overconfidence of senior managers and abnormal cash fluctuations with respect to financial flexibility in companies listed in the Tehran stock exchange from 2009 to 2013 were evaluated. In this study, the sample consists of 84 companies selected by a systematic elimination method and 420 year-companies in total. In this research, EVIEWS software was used to test the research hypotheses by linear regression and correlation coefficient and after designing and testing the research hypothesis. After designing and testing research hypotheses that have been used to each hypothesis, it was concluded that there was a significant relationship between the overconfidence of senior managers and abnormal cash fluctuations, and this relationship was not significant at any level of financial flexibility. Moreover, the findings of the research showed that there was a significant relationship between senior manager’s overconfidence and positive abnormal cash flow fluctuations in firms, and this relationship is significant only at the level of companies with high financial flexibility. Finally, the results indicate that there is no significant relationship between senior managers 'overconfidence and negative cash flow abnormalities, and the relationship between senior managers' overconfidence and negative cash flow fluctuations at the level of companies with high financial flexibility was confirmed.

Keywords: abnormal cash fluctuations, overconfidence of senior managers, financial flexibility, accounting

Procedia PDF Downloads 111
16196 Using Design Sprint For Software Engineering Undergraduate Student Projects: A Method Paper

Authors: Sobhani U. Pilapitiya, Tharanga Peiris

Abstract:

Software Engineering curriculums generally consist of industry-based practices such as project-based learning (PBL) which mainly focuses on efficient and innovative product development. These approaches can be tailored and used in project-based modules in software engineering curriculums. However, there are very limited attempts in the area especially related to the Sri Lankan context. This paper describes a tailored pedagogical approach and its results of using design sprint which can be used for project-based modules in SE curriculums. A controlled group of second-year software engineering students was selected for the study. The study results indicate that 100% of students agreed that the Design Sprint approach is effective in group-based projects and 83% of students stated that it minimized the re-work compared to traditional project approaches. The tailored process was effective, easy to implement and produced desired results at the end of the session while providing students an enjoyable experience.

Keywords: design sprint, PBL, software engineering, curriculum

Procedia PDF Downloads 183
16195 Applying the Integrative Design Process in Architectural Firms: An Analytical Study on Egyptian Firms

Authors: Carole A. El Raheb, Hassan K. Abdel-Salam, Ingi Elcherif

Abstract:

An architect carrying the design process alone is the main reason for the deterioration of the quality of the architectural product as the complexity of the projects makes it a multi-disciplinary work; then, the Integrative Design Process (IDP) must be applied in the architectural firm especially from the early design phases to improve the product’s quality and to eliminate the ignorance of the principles of design causing the occurrence of low-grade buildings. The research explores the Integrative Design (ID) principles that fit in the architectural practice. Constraints facing this application are presented with strategies and solutions to overcome them. A survey questionnaire was conducted to collect data from a number of recognized Egyptian Architecture, Engineering and Construction (AEC) firms that explores their opinions on using the IDP. This survey emphasizes the importance of the IDP in firms and presents the reasons preventing the firms from applying the IDP. The aim here is to investigate the potentials of integrating this approach into architectural firms emphasizing the importance of this application which ensures the realization of the project’s goal and eliminates the reduction in the project’s quality.

Keywords: application, architectural firms, integrative design principles, integrative design process, the project quality

Procedia PDF Downloads 216
16194 Gains and Drawbacks in the Delivery of Senior High School Sports Track Program: The Lived Experiences of Physical Education Teachers

Authors: Steffany Anne Poblador, Ruben Jr. Tagare

Abstract:

The Philippine Education System is now undergoing transition as a result of the implementation of Republic Act 10533, commonly referred to as the Enhanced Basic Education Act. Since its implementation in 2013, researchers have been examining the initial impact of this transition; however, investigations into the gains and drawbacks of the Philippine Senior High School Sports Track Program based on teachers’ assessment were scarcely adequate. As a result, this research used a Qualitative Phenomenology Research Design to elicit information on the gains and drawbacks faced by these instructors. Focus group discussions, in-depth interviews, and extensive field observation were conducted with participants from selected schools in Cotabato Province. During the triangulation of the data, five (5) significant themes for gains and six (6) concerns from the research participants emerged. The findings were then used to provide recommendations for a more effective implementation of the Sports Track Program in the Philippine Senior High School program.

Keywords: teachers’ gains and drawbacks, Philippine K to 12 problems, K to 12 transition years, favorable experiences, phenomenology

Procedia PDF Downloads 218
16193 Design, Development, and Implementation of the Pediatric Physical Therapy Senior Clinical Internship Telerehabilitation Program of de la Salle Medical and Health Sciences Institute: The Pandemic Impetus

Authors: Ma. Cecilia D. Licuan

Abstract:

The pandemic situation continues to affect the lives of many people, including children with disabilities and their families, globally, especially in developing countries like the Philippines. The operations of health programs, industries, and economic sectors, as well as academic training institutions, are still challenged in terms of operations and delivery of services. The academic community of the Physical Therapy program is not spared by this circumstance. The restriction posted by the quarantine policies nearly terminated the onsite delivery of training programs for the senior internship level, which challenged the academic institutions to implement flexible learning programs to ensure the continuity of the instructional and learning processes with full consideration of safety and compliance to health protocols. This study aimed to develop a benchmark model that can be used by tertiary-level health institutions in the implementation of the Pediatric Senior Clinical Internship Training Program using Telerehabilitation. It is a descriptive-qualitative paper that utilized documentary analysis and focused on explaining the design, development, and implementation processes used by De La Salle Medical and Health Sciences Institute – College of Rehabilitation Sciences (DLSMHSI-CRS) Physical Therapy Department in its Pediatric Cluster Senior Clinical Internship Training Program covering the pandemic years spanning from the academic year 2020- 2021 to present anchored on needs analysis based on documentary reviews. Results of the study yielded the determination of the Pediatric Telerehabilitation Model; declaration of developed training program outcomes and thrusts and content; explanation of the process integral to the training program’s pedagogy in implementation; and the evaluation procedures conducted for the program. Since the study did not involve human participants, ethical considerations on the use of documents for review were done upon the endorsement of the management of the DLSMHSI-CRS to conduct the study. This paper presents the big picture of how a tertiary-level health sciences institution in the Philippines embraced the senior clinical internship challenges through the operations of its telerehabilitation program. It specifically presents the design, development and implementation processes used by De La Salle Medical and Health Sciences Institute – College of Rehabilitation Sciences Physical Therapy Department in its Pediatric Cluster Senior Clinical Internship Training Program, which can serve as a benchmark model for other institutions as they continue to serve their stakeholders amidst the pandemic.

Keywords: pediatric physical therapy, telerehabilitation, clinical internship, pandemic

Procedia PDF Downloads 106
16192 A Pedagogical Study of Computational Design in a Simulated Building Information Modeling-Cloud Environment

Authors: Jaehwan Jung, Sung-Ah Kim

Abstract:

Building Information Modeling (BIM) provides project stakeholders with various information about property and geometry of entire component as a 3D object-based parametric building model. BIM represents a set of Information and solutions that are expected to improve collaborative work process and quality of the building design. To improve collaboration among project participants, the BIM model should provide the necessary information to remote participants in real time and manage the information in the process. The purpose of this paper is to propose a process model that can apply effective architectural design collaborative work process in architectural design education in BIM-Cloud environment.

Keywords: BIM, cloud computing, collaborative design, digital design education

Procedia PDF Downloads 411
16191 Project Management Framework and Influencing Factors

Authors: Mehrnoosh Askarizadeh

Abstract:

The increasing variations of the business world correspond with a high diversity of theoretical perspectives used in project management research. This diversity is reflected by a variety of influencing factors, which have been the subject of empirical studies. This article aims to systemize the different streams of research on the basis of a literature review and at developing a research framework influencing factors. We will identify fundamental elements of a project management theory. The framework consists of three dimensions: design, context, and goal. Its purpose is to support the combination of different perspectives and the development of strategies for further research.

Keywords: project, goal, project management, influencing factors

Procedia PDF Downloads 522
16190 Optimization of the Rain Harvest Using Multi-Purpose Valley Tanks

Authors: Ahmad Hashad

Abstract:

Valley tanks are a kind of rain harvest which is used as ground water storage to overcome drought seasons in some countries. This research displays the rain harvest evolution and introduces some ideas to develop the valley tanks to be more than water storage. These ideas developed the current valley tanks design to become an integrated renaissance project. The suggested design has some changes making it different than the traditional design of valley tanks. These changes allow for the new design to be more flexible for adding additional capacity, water purification units and water pumping units. The suggested valley tanks project will be designed based on studying the rainfall and evaporation rates, as well as land topography and designed agricultural map linked to seasons of rain and drought.

Keywords: valley tanks, rain harvest, volatile nature, integrated renaissance project

Procedia PDF Downloads 231
16189 Senior Leadership Team Coaching in Action: Creating High-Performance Teams

Authors: Siqi Fang, Jingxi Hou

Abstract:

Positive psychology and coaching psychology share a number of fundamental assumptions and common themes. Blending positive psychology, mindfulness, and coaching psychology, our work in team coaching with leaders enhances both leadership and team effectiveness. Although individual coaching has proven to be effective, this article advocates the benefits of leadership coaching in team settings, because durable changes in leadership behaviors are more likely to occur. Does leadership team coaching really work? Does it help improve senior leadership team effectiveness and productivity? This action research study answers these questions by tracking the progress of three typical senior leadership teams consisting of 31 executives participating in a six-month team coaching program. Assessments (pre- and post), workshops, and feedback based on ego development theories and mindfulness were applied to upgrade the senior leadership teams’ transformational stages and reframe their organizational leadership cultures. Results suggest that the team effectiveness of the three leadership teams increased up to 43 percent according to post-survey feedback from superior, direct report, and peers. Discussion is offered to show that senior leadership team coaching help teams to achieve a consensus on common purposes, establish a foundation of trust, improve collective skills, and promote efficient operation. All factors translate into better team performance. Implications of the results for future executive development programs are discussed and specific recommendations are provided.

Keywords: action research, ego development, mindfulness, senior leadership team coaching, team effectiveness, transformational stages

Procedia PDF Downloads 348
16188 Prevalence and Risk Factors of Musculoskeletal Disorders among Physical Therapist's Seniors versus Internship Students

Authors: A. H. Bekhet, N. Helmy

Abstract:

Background: Physical therapists are knowledgeable in treatment and prevention of musculoskeletal injuries; however, they have occupational musculoskeletal injuries because Physical therapy profession requires effort that may lead to work-related musculoskeletal disorders. No previous studies among physical therapists have been reported in Egypt. We aim to assess the prevalence and risk factors of musculoskeletal disorders among physical therapist’s seniors versus internship students. Method: We conducted a cross-sectional study in faculty of physical therapy Cairo university Prevalence and risk factors of musculoskeletal injuries were assessed using self-administered questionnaire with closed-ended questions. Seniors therapist was defined as a physical therapist with more than 5 years of work experience. Data were analyzed using SPSS 22.0 for Windows. Results: The study included 106 physical therapists (Junior = 72; senior = 34), the mean age of senior therapists was 30.1 (SD 6.3) years and junior therapists were 22.8 (SD 2.4). Female subjects constituted 83.9% of the studied sample. The mean hours of contact with patients was higher among junior therapists 6.4 (SD 2.6) vs. 5.7 (SD 2.1) among senior therapists. The prevalence of a musculoskeletal injury, once or more in their lifetime, was significantly higher among senior therapists (86% vs. 66.7%; p = 0.04). The highest risk factor in increasing the symptoms of the injury among junior therapists was maintaining a position for a prolonged period of time at 28% while performing manual therapy techniques was the highest risk factor among senior therapists at 32%. 53% of senior therapists have limited their patient contact time as a result of their injury in comparison to 25% of junior therapists (p = 0.09). Conclusion: the presented study shows that the prevalence of musculoskeletal injuries, once or more in their lifetime, is significantly higher among senior therapists.

Keywords: musculoskeletal injuries, occupational injuries, physical therapists, work related disorders

Procedia PDF Downloads 275
16187 Enhancing Project Success: A Case Study of Investment Strategies and Planning Practices in Rwanda’s Housing Projects Managed by Rwanda Social Security Board

Authors: Amina Umulisa

Abstract:

Background: Despite efforts to enhance profitability and project planning, Rwanda has experienced a decline in project success rates, notably in housing projects managed by the Rwanda Social Security Board (RSSB). This study aims to assess the impact of investment strategies and project planning practices on the performance of pension funds projects in Rwanda, focusing on housing projects by RSSB. Methods: Using descriptive and correlational research designs, this study surveyed 109 randomly selected respondents from a pool of 148 workers. Data analysis was conducted using descriptive and inferential statistics in STATA version 18. Results: Findings revealed that 54% of respondents acknowledged the importance of personnel generation. Additionally, 61% agreed with the effectiveness of training programs, and 79% supported the cost of human resource utilization. In terms of project management practices, 65.7% could determine when a project needed adjustments, 65.7% agreed with the approved budget, and 73% supported forecasted expenses. Furthermore, 68% agreed with order placement, 76.0% with using the right materials, and 64.4% with defining project scope. The study found significant associations between order placement and project quality outcomes (r=0.711, P-value <0.001), as well as with time management (Pearson was 0.701 and sing was 0.00) and cost management (r=0.885, P-value <0.001). Moreover, project time targets were found to significantly affect quality management (Pearson was 0.798, sing was 0.000), time management, and cost management (r=0.740, P-value <0.001). Conclusion: The findings highlight the positive association between the project implementation stage and quality management, indicating effective project planning practices among senior staff. However, there is a need to enhance project team collaboration and coordination to improve the performance of constructed houses.

Keywords: project success rates, investment strategies, training programs, cost management

Procedia PDF Downloads 29
16186 Design and Development of a Prototype Vehicle for Shell Eco-Marathon

Authors: S. S. Dol

Abstract:

Improvement in vehicle efficiency can reduce global fossil fuels consumptions. For that sole reason, Shell Global Corporation introduces Shell Eco-marathon where student teams require to design, build and test energy-efficient vehicles. Hence, this paper will focus on design processes and the development of a fuel economic vehicle which satisfying the requirements of the competition. In this project, three components are designed and analyzed, which are the body, chassis and powertrain of the vehicle. Optimum design for each component is produced through simulation analysis and theoretical calculation in which improvement is made as the project progresses.

Keywords: energy efficient, drag force, chassis, powertrain

Procedia PDF Downloads 306
16185 A Case Study: Social Network Analysis of Construction Design Teams

Authors: Elif D. Oguz Erkal, David Krackhardt, Erica Cochran-Hameen

Abstract:

Even though social network analysis (SNA) is an abundantly studied concept for many organizations and industries, a clear SNA approach to the project teams has not yet been adopted by the construction industry. The main challenges for performing SNA in construction and the apparent reason for this gap is the unique and complex structure of each construction project, the comparatively high circulation of project team members/contributing parties and the variety of authentic problems for each project. Additionally, there are stakeholders from a variety of professional backgrounds collaborating in a high-stress environment fueled by time and cost constraints. Within this case study on Project RE, a design & build project performed at the Urban Design Build Studio of Carnegie Mellon University, social network analysis of the project design team will be performed with the main goal of applying social network theory to construction project environments. The research objective is to determine a correlation between the network of how individuals relate to each other on one’s perception of their own professional strengths and weaknesses and the communication patterns within the team and the group dynamics. Data is collected through a survey performed over four rounds conducted monthly, detailed follow-up interviews and constant observations to assess the natural alteration in the network with the effect of time. The data collected is processed by the means of network analytics and in the light of the qualitative data collected with observations and individual interviews. This paper presents the full ethnography of this construction design team of fourteen architecture students based on an elaborate social network data analysis over time. This study is expected to be used as an initial step to perform a refined, targeted and large-scale social network data collection in construction projects in order to deduce the impacts of social networks on project performance and suggest better collaboration structures for construction project teams henceforth.

Keywords: construction design teams, construction project management, social network analysis, team collaboration, network analytics

Procedia PDF Downloads 182
16184 Anthropometric Analysis for the Design of Workstations in the Interior Spaces of the Manufacturing Industry in Tijuana, Mexico

Authors: J. A. López, J. E. Olguín, C. W. Camargo, G. A. Quijano, R. Martínez

Abstract:

This paper presents an anthropometric study conducted to 300 employees in a maquiladora industry that belongs to the cluster of medical products as part of a research project to pretend simulate workplace conditions under which operators conduct their activities. This project is relevant because traditionally performed a study to design ergonomic workspaces according to anthropometric profile of users, however, this paper demonstrates the importance of making decisions when the infrastructure cannot be adapted for economic whichever put emphasis on user activity.

Keywords: anthropometry, biomechanics, design, ergonomics, productivity

Procedia PDF Downloads 437
16183 Cellular Mobile Telecommunication GSM Radio Base Station Network Planning

Authors: Saeed Alzahrani, Yaser Miaji

Abstract:

The project involves the design and simulation of a Mobile Cellular Telecommunication Network using the software tool CelPlanner. The design is mainly concerned with Global System for Mobile Communications . The design and simulation of the network is done for a small part of the area allocated for us in the terrain area of Shreveport city .The project is concerned with designing a network that is cost effective and which also efficiently meets the required Grade of Service (GOS) AND Quality of Service (QOS).The expected outcome of this project is the design of a network that gives a good coverage for the area allocated to us with minimum co-channel interference and adjacent channel interference. The Handover and Traffic Handling Capacity should also be taken into consideration and should be good for the given area . The Traffic Handling Capacity of the network in a way decides whether the designed network is good or bad . The design also takes into consideration the topographical and morphological information.

Keywords: mobile communication, GSM, radio base station, network planning

Procedia PDF Downloads 421
16182 HEXAFLY-INT Project: Design of a High Speed Flight Experiment

Authors: S. Di Benedetto, M. P. Di Donato, A. Rispoli, S. Cardone, J. Riehmer, J. Steelant, L. Vecchione

Abstract:

Thanks to a coordinated funding by the European Space Agency (ESA) and the European Commission (EC) within the 7th framework program, the High-Speed Experimental Fly Vehicles – International (HEXAFLY-INT) project is aimed at the flight validation of hypersonics technologies enabling future trans-atmospheric flights. The project, which is currently involving partners from Europe, Russian Federation and Australia operating under ESA/ESTEC coordination, will achieve the goal of designing, manufacturing, assembling and flight testing an unpowered high speed vehicle in a glider configuration by 2018. The main technical challenges of the project are specifically related to the design of the vehicle gliding configuration and to the complexity of integrating breakthrough technologies with standard aeronautical technologies, e.g. high temperature protection system and airframe cold structures. Also, the sonic boom impact, which is one of the environmental challenges of the high speed flight, will be assessed. This paper provides a comprehensive and detailed update on all the current projects activities carried out to date on both the vehicle and mission design.

Keywords: design, flight testing, HEXAFLY-INT, hypersonics

Procedia PDF Downloads 455