Search results for: contract rate
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 8364

Search results for: contract rate

8334 Application of Forward Contract and Crop Insurance as Risk Management Tools of Agriculture: A Case Study in Bangladesh

Authors: M. Bokhtiar Hasan, M. Delowar Hossain, Abu N. M. Wahid

Abstract:

The principal aim of the study is to find out a way to effectively manage the agricultural risks like price volatility, weather risks, and fund shortage. To hedge price volatility, farmers sometimes make contracts with agro-traders but fail to protect themselves effectively due to not having legal framework for such contracts. The study extensively reviews existing literature and find evidence that the majority studies either deal with price volatility or weather risks. If we could address these risks through a single model, it would be more useful to both the farmers and traders. Intrinsically, the authors endeavor in this regard, and the key contribution of this study basically lies in it. Initially, we conduct a small survey aspiring to identify the shortcomings of existing contracts. Later, we propose a model encompassing forward and insurance contracts together where forward contract will be used to hedge price volatility and insurance contract will be used to protect weather risks. Contribution/Originality: The study adds to the existing literature through proposing an integrated model comprising of forward contract and crop insurance which will support both farmers and traders to cope with the agricultural risks like price volatility, weather hazards, and fund shortage. JEL Classifications: O13, Q13

Keywords: agriculture, forward contract, insurance contract, risk management, model

Procedia PDF Downloads 154
8333 Leveraging Unannotated Data to Improve Question Answering for French Contract Analysis

Authors: Touila Ahmed, Elie Louis, Hamza Gharbi

Abstract:

State of the art question answering models have recently shown impressive performance especially in a zero-shot setting. This approach is particularly useful when confronted with a highly diverse domain such as the legal field, in which it is increasingly difficult to have a dataset covering every notion and concept. In this work, we propose a flexible generative question answering approach to contract analysis as well as a weakly supervised procedure to leverage unannotated data and boost our models’ performance in general, and their zero-shot performance in particular.

Keywords: question answering, contract analysis, zero-shot, natural language processing, generative models, self-supervision

Procedia PDF Downloads 194
8332 Quantitative Method of Measurement for the Rights and Obligations of Contracting Parties in Standard Forms of Contract in Malaysia: A Case Study

Authors: Sim Nee Ting, Lan Eng Ng

Abstract:

Standard forms of contract in Malaysia are pre-written, printed contractual documents drafted by recognised authoritative bodies in order to describe the rights and obligations of the contracting parties in all construction projects in Malaysia. Studies and form revisions are usually conducted in a relatively random and qualitative manner, but the search of contractual documents idealization remains. It is not clear how these qualitative findings could be helpful for contractual documents improvements and re-drafting. This study aims to quantitatively and systematically analyse and evaluate the rights and obligations of the contracting parties as stated in the standard forms of contract. The Institution of Engineers Malaysia (IEM) published a new standard form of contract in 2012 with a total of 63 classes but the improvements and changes in the newly revised form that are yet to be analysed. IEM form will be used as the case study for this study. Every clause in this said form were interpreted and analysed according to the involved parties including contractor, engineer and employer. Modified from Matrix Method and Likert Scale, the result analysis were conducted based on a scale from 0 to 1 with five ratings namely “Very Unbalance”, “Unbalance”, “Balance”, “Good Balance” and “Very Good Balance”. It is hoped that quantitative method of form study can be used for future form revisions and any new forms drafting so to reduce on any subjectivity in standard forms of contract studies.

Keywords: contracting parties, Malaysia, obligations, quantitative measurement, rights, standard form of contract

Procedia PDF Downloads 265
8331 The Debacle of the Social Pact: Finding a New Theoretical Framework for Egalitarian Justice

Authors: Abosede Priscilla Ipadeola

Abstract:

The quest for egalitarian justice requires a suitable theoretical foundation that can address the problem of marginalization and subjugation arising from various forms of oppression, such as sexism, racism, classism, and others. Many thinkers and societies have appealed to contractarianism, a theory that has been widely regarded as a doctrine of egalitarianism by some political theorists for about five centuries. Despite its numerous criticisms, the social contract still enjoys a prominent status as a key theory for egalitarian justice. However, Pateman and Mills have contended that the contractarian approach legitimizes gender and racial inequalities by excluding and marginalizing women and people of color from the original agreement. Therefore, the social contract is incapable of generating or fostering equality. This study proposes postcontractarianism, which is a viable alternative to the social contract. Postcontractarianism argues that the basis for egalitarianism cannot be grounded on agreement but rather on understanding. Postcontractarianism draws on Jorge Nef’s idea of mutual vulnerability and Obiri (an African theory of cosmology) to argue for the imperative of social equality.

Keywords: postcontractarianism, obiri, mutual vulnerability, egalitarianism, the social contract

Procedia PDF Downloads 57
8330 A Rule Adumbrated: Bailment on Terms

Authors: David Gibbs-Kneller

Abstract:

Only parties to a contract can enforce it. This is the privity of the contract. Carriage contracts frequently involve intermediated relationships. While the carrier and cargo-owner will agree on a contract for carriage, there is no privity or consideration between the cargo-owner and third parties. To overcome this, the contract utilizes ‘bailment on terms’ or the rule in Morris. Morris v C W Martin & Sons Ltd is authority for the following: A sub-bailee and bailor may rely on terms of a bailment where the bailor has consented to sub-bailment “on terms”. Bailment on terms can play a significant part in making litigation decisions and determining liability. It is used in standard form contracts and courts have also strived to find consent to bailment on terms in agreements so as to avoid the consequences of privity of contract. However, what this paper exposes is the false legal basis for this model. Lord Denning gave an account adumbrated of the law of bailments to justify the rule in Morris. What Lord Denning was really doing was objecting to the doctrine of privity. To do so, he wrongly asserted there was a lacuna in law that meant third parties could not avail themselves upon terms of a contract. Next, he provided a false analogy between purely contractual rights and possessory liens. Finally, he gave accounts of authorities to say they supported the rule in Morris when they did not. Surprisingly, subsequent case law on the point has not properly engaged with this reasoning. The Pioneer Container held that since the rule in Morris lay in bailments, the decision is not dependent on the doctrine of privity. Yet the basis for this statement was Morris. Once these reasons have been discounted, all bailment on terms rests on is the claim that the law of bailments is an independent source of law. Bailment on terms should not be retained, for it is contrary to established principles in the law of property, tort, and contract. That undermines the certainty of those principles by risking their collapse because there is nothing that keeps bailment on terms within the confines of bailments only. As such, bailment on terms is not good law and should not be used in standard form contracts or by the courts as a means of determining liability. If bailment on terms is a pragmatic rule to retain, it is recommended that rules governing carriage contracts should be amended.

Keywords: bailment, carriage of goods, contract law, privity

Procedia PDF Downloads 206
8329 Renegotiating International Contract Clauses: The Case of Investment Environment Changes in Egypt

Authors: Marwa Zein

Abstract:

The long-term of the contract is one of the major features that distinguish international trade and investment contracts from other internal contracts. This is due to the nature of the contract and the huge works required to be performed from one hand or the desire of the parties to achieve stability in their transactions. However, long-term contracts might expose them to certain events and circumstances that impact the capability of the parties to execute their obligations pursuant to these contracts. During the year 2016, the Egyptian government has taken series of economic decisions which greatly impacted the economic and investment environment. Consequently, many contracts have encountered many problems in their execution due to such changes that greatly influence the performance of their obligation, a matter that necessitated the renegotiation of the conditions of these contracts on the basis of the unpredicted changes that could be listed under the Force Majeure Clause. The principle of fair and equitable treatment in investment placed on an obligation on the Egyptian government to consider the renegotiation of contract clauses based on the new conditions. This paper will discuss the idea of renegotiating international trade and investment contracts in Egypt with reference to the changes the economic environment has witnessed lately.

Keywords: change of circumstances, international contracts, investment contracts, renegotiation

Procedia PDF Downloads 197
8328 Islamic Financial Instrument, Standard Parallel Salam as an Alternative to Conventional Derivatives

Authors: Alireza Naserpoor

Abstract:

Derivatives are the most important innovation which has happened in the past decades. When it comes to financial markets, it has changed the whole way of operations of stock, commodities and currency market. Beside a lot of advantages, Conventional derivatives contracts have some disadvantages too. Some problems have been caused by derivatives contain raising Volatility, increasing Bankruptcies and causing financial crises. Standard Parallel Salam contract as an Islamic financial product meanwhile is a financing instrument can be used for risk management by investors. Standard Parallel Salam is a Shari’ah-Compliant contract. Furthermore, it is an alternative to conventional derivatives. Despite the fact that the unstructured types of that, has been used in several Islamic countries, This contract as a structured and standard financial instrument introduced in Iran Mercantile Exchange in 2014. In this paper after introducing parallel Salam, we intend to examine a collection of international experience and local measure regarding launching standard parallel Salam contract and proceed to describe standard scenarios for trading this instrument and practical experience in Iran Mercantile Exchange about this instrument. Afterwards, we make a comparison between SPS and Futures contracts as a conventional derivative. Standard parallel salam contract as an Islamic financial product, can be used for risk management by investors. SPS is a Shariah-Compliant contract. Furthermore it is an alternative to conventional derivatives. This contract as a structured and standard financial instrument introduced in Iran Mercantile Exchange in 2014. despite the fact that the unstructured types of that, has been used in several Islamic countries. In this article after introducing parallel salam, we intend to examine a collection of international experience and local measure regarding launching standard parallel salam contract and proceed to describe standard scenarios for trading this instrument containing two main approaches in SPS using, And practical experience in IME about this instrument Afterwards, a comparison between SPS and Futures contracts as a conventional derivatives.

Keywords: futures contracts, hedging, shari’ah compliant instruments, standard parallel salam

Procedia PDF Downloads 390
8327 The Effects of Perceived Organizational Support and Abusive Supervision on Employee’s Turnover Intention: The Mediating Roles of Psychological Contract and Emotional Exhaustion

Authors: Seung Yeon Son

Abstract:

Workers (especially, competent personnel) have been recognized as a core contributor to overall organizational effectiveness. Hence, verifying the determinants of turnover intention is one of the most important research issues. This study tested the influence of perceived organizational support and abusive supervision on employee’s turnover intention. In addition, mediating roles of psychological contract and emotional exhaustion were examined. Data from 255 Korean employees supported all hypotheses Implications for research and directions for future research are discussed.

Keywords: abusive supervision, emotional exhaustion, perceived organizational support, psychological contract, turnover intention

Procedia PDF Downloads 493
8326 The Efficacy of Contractual Governance on Task and Relationship Conflict in Construction Projects

Authors: Jingya You, Yongqiang Chen, Yuanyuan Hua, Wenqian Wang

Abstract:

Conflict is commonplace in construction projects, and construction projects always involve designing contracts between the owner and the contractor. However, how the contract affects the level of conflict between the owner and the contractor has not been elaborated. The purpose of this paper is to explain the effects of contractual complexity on the level of conflict, including task conflict and relationship conflict, and then to demonstrate the moderating role played by the interdependence between the owner and the contractor. Using data from owners and general contractors in the Chinese construction industry, this research reveals that contractual control will reduce relationship conflict. Contractual coordination will also reduce relationship conflict by the mediating effect of task conflict. Besides, under high joint interdependence, the positive relationship between task conflict and relationship conflict is strengthened, while high interdependence asymmetry has effects on weakening the relationship between task conflict and relationship conflict. The findings provide guidance for contract designers to draft suitable contracts in order to effectively deal with conflict. Additionally, this research implies that project managers should highlight the importance of contract in conflict management.

Keywords: construction projects, contract governance, interdependence, relationship conflict, task conflict

Procedia PDF Downloads 218
8325 Contractual Complexity and Contract Parties' Opportunistic Behavior in Construction Projects: In a Contractual Function View

Authors: Mengxia Jin, Yongqiang Chen, Wenqian Wang, Yu Wang

Abstract:

The complexity and specificity of construction projects have made common opportunism phenomenon, and contractual governance for opportunism has been a topic of considerable ongoing research. Based on TCE, the research distinguishes control and coordination as different functions of the contract to investigate their complexity separately. And in a nuanced way, the dimensionality of contractual control is examined. Through the analysis of motivation and capability of strong or weak form opportunism, the framework focuses on the relationship between the complexity of above contractual dimensions and different types of opportunistic behavior and attempts to verify the possible explanatory mechanism. The explanatory power of the research model is evaluated in the light of empirical evidence from questionnaires. We collect data from Chinese companies in the construction industry, and the data collection is still in progress. The findings will speak to the debate surrounding the effects of contract complexity on opportunistic behavior. This nuanced research will derive implications for research on the role of contractual mechanisms in dealing with inter-organizational opportunism and offer suggestions for curbing contract parties’ opportunistic behavior in construction projects.

Keywords: contractual complexity, contractual control, contractual coordinatio, opportunistic behavior

Procedia PDF Downloads 384
8324 The Role of BPSK (Consumer Dispute Settlement Body) in the Monitoring of Standard Clause Inclusion within Indonesian Customer Protection Law

Authors: Deviana Yuanitasari

Abstract:

The rapid development of world commerce and trade nowadays has created fast-paced demand in every business activities and transactions. That also includes the need for ready to use and practical form of standard contract. For the company or business owner, the use of standard contract is an alternative way to achieve economic goals faster, effectively and efficiently. In the other hand, for the consumer the practice of using standard contract usually unfavorable, because the contract clauses usually have been defined by the company and cannot be individually negotiated. That means consumer cannot influence the substances of the contract clauses. The purpose of this study is to get deeper understanding and analyze the role of Consumer Dispute Settlement Body in the monitoring of standard clause inclusion by businesses and industries within the context of practicing consumer protection law. Furthermore, this study will focus on the procedure of sanction and the effectiveness of the sanction for the business practitioners which disregard the inclusion of the prohibited standard clause. Therefore, this study will depict the law issues and other phenomenon that related with the role of Consumer Dispute Settlement Body in monitoring the inclusion of standard clause and procedure of sanction for the business practitioners that still use exemption clause within Consumer Protection Law System. This study results that BPSK has been assigned to monitor the inclusion of standard clause and settle consumer dispute. At this stage, BPSK role is passive, which means BPSK only takes an action if there are consumer complaints. The procedure of sanction is not part of BPSK tasks, since should there be a violation of standard clause; BPSK can only ask the business practitioners to remove the prohibited clause and not give a sanction. As a result, the procedure of sanction rule for the Standard Clause violation in this context can be considered as ineffective.

Keywords: standard contract, standard clause, consumer protection law, consumer dispute settlement body

Procedia PDF Downloads 334
8323 Supply Chain Coordination under Carbon Trading Mechanism in Case of Conflict

Authors: Fuqiang Wang, Jun Liu, Liyan Cai

Abstract:

This paper investigates the coordination of the conflicting two-stage low carbon supply chain consisting of upstream and downstream manufacturers. The conflict means that the upstream manufacturer takes action for carbon emissions reduction under carbon trading mechanism while the downstream manufacturer’s production cost rises. It assumes for the Stackelberg game that the upstream manufacturer plays as a leader and the downstream manufacturer does as a follower. Four kinds of the situation of decentralized decision making, centralized decision-making, the production cost sharing contract and the carbon emissions reduction revenue sharing contract under decentralized decision making are considered. The backward induction approach is adopted to solve the game. The results show that the more intense the conflict is, the lower the efficiency of carbon emissions reduction and the higher the retail price is. The optimal investment of the decentralized supply chain under the two contracts is unchanged and still lower than that of the centralized supply chain. Both the production cost sharing contract and the carbon emissions reduction revenue sharing contract cannot coordinate the supply chain, because that the sharing cost or carbon emissions reduction sharing revenue will transfer through the wholesale price mechanism. As a result, it requires more complicated contract forms to coordinate such a supply chain.

Keywords: cap-and-trade mechanism, carbon emissions reduction, conflict, supply chain coordination

Procedia PDF Downloads 340
8322 Commitment Based Revenue Sharing Contract

Authors: Muhammad Shafiq, Huynh Trung Luong

Abstract:

In this paper, we proposed a commitment based revenue sharing contract for a supply chain comprising one manufacturer and one retailer facing highly uncertain demand of a short life span fashionable product. In our model, the retailer reserves a commitment level with the manufacturer prior to the selling season. In response, the manufacturer allocates and produces a specific quantity which is the maximum available quantity for the retailer. The retailer is motivated to commit more by offering higher revenue sharing percentage for reserved capacity than non-reserved capacity. Due to asymmetric information, it is found that the manufacturer can optimize quantity allocation decision while the commitment level decision of the retailer may not be optimal.

Keywords: supply chain coordination, revenue sharing contract, commitment based revenue sharing, quantity allocation

Procedia PDF Downloads 487
8321 A Smart Contract Project: Peer-to-Peer Energy Trading with Price Forecasting in Microgrid

Authors: Şakir Bingöl, Abdullah Emre Aydemir, Abdullah Saado, Ahmet Akıl, Elif Canbaz, Feyza Nur Bulgurcu, Gizem Uzun, Günsu Bilge Dal, Muhammedcan Pirinççi

Abstract:

Smart contracts, which can be applied in many different areas, from financial applications to the internet of things, come to the fore with their security, low cost, and self-executing features. In this paper, it is focused on peer-to-peer (P2P) energy trading and the implementation of the smart contract on the Ethereum blockchain. It is assumed a microgrid consists of consumers and prosumers that can produce solar and wind energy. The proposed architecture is a system where the prosumer makes the purchase or sale request in the smart contract and the maximum price obtained through the distribution system operator (DSO) by forecasting. It is aimed to forecast the hourly maximum unit price of energy by using deep learning instead of a fixed pricing. In this way, it will make the system more reliable as there will be more dynamic and accurate pricing. For this purpose, Istanbul's energy generation, energy consumption and market clearing price data were used. The consistency of the available data and forecasting results is observed and discussed with graphs.

Keywords: energy trading smart contract, deep learning, microgrid, forecasting, Ethereum, peer to peer

Procedia PDF Downloads 138
8320 Disruption Coordination of Supply Chain with Loss-Averse Retailer Under Buy-Back Contract

Authors: Yuan Tian, Benhe Gao

Abstract:

This paper aims to investigate a two stage supply chain of one leading supplier and one following retailer that experiences two factors perturbation out of supplier's production cost, retailer's marginal cost and retail price in stochastic demand environment. Granted that risk neutral condition has long been discussed, little attention has been given to disruptions under the premise of risk neutral supplier and risk aversion retailer. We establish the optimal order quantity and revealed the profit distribution coefficient in risk-neutral static model, make adjustment under disruption scenario, and then select utility function method for risk aversion model. Using buy-back contract policy, the improvement of parameters can achieve channel coordination where Pareto optimal is realized.

Keywords: supply chain coordination, disruption management, buy-back contract, lose aversion

Procedia PDF Downloads 327
8319 Circular Economy and Remedial Frameworks in Contract Law

Authors: Reza Beheshti

Abstract:

This paper examines remedies for defective manufactured goods in commercial circular economic transactions. The linear ‘take-make-dispose’ model fits well with the conventional remedial framework in which damages are considered the primary remedy. Damages under English Sales Law encourages buyers to look for a substitute seller with broadly similar goods to the ones agreed on in the original contract, enter into contract with this new seller and hence terminate the original contract. By doing so, the buyer ends the contractual relationship. This seems contrary to the core principles of the circular economy: keeping products, components, and materials in longer use, which can partly be achieved by product refurbishment. This process involves returning a product to good working condition by replacing or repairing major components that are faulty or close to failure and making ‘cosmetic’ changes to update the appearance of a product. This remedy has not been widely accepted or applied in commercial cases, which in turn flags up the secondary nature of performance-related remedies. This paper critically analyses the laws concerning the seller’s duty to cure in English law and the extent to which they correspond with core principles of the circular economy. In addition, this paper takes into account the potential of circular economic transactions being characterised as something other than sales. In such situations, the likely outcome will be a license to use products, which may limit the choice of remedy further. Consequently, this paper suggests an outline remedial framework specifically for commercial circular economic transactions in manufactured goods.

Keywords: circular economy, contract law, remedies, English Sales Law

Procedia PDF Downloads 153
8318 Comparison of Buyback Contracts and Concession Regimes in the Regime of the Common Law System and the Islamic Legal Regime

Authors: Javid Zarei

Abstract:

International buyback contracts are a type of contract service. These kinds of contracts are the most important instrument for attracting foreign investors in accordance with Iran's laws. These contracts have been the basis of commercial and economic relations between Iran and foreign companies for about 30 years. The legal structure of this type of contract has gradually evolved, so today, an advanced generation of it under the title of Iran Petroleum Contract is being used in the industry of Iran. This article has analytically examined the issue of Iran's commercial contracts in the oil industry and contracting services and allocated sections to examine the strengths and weaknesses of these oil contracts. Also, this research is an attempt to examine and compare the Concession regime with the Buyback contracts, each of which is derived from the common law legal system and the Islamic legal system, respectively.

Keywords: buyback contracts, concession regime, ownership, common law legal system, Islamic legal system of Iran

Procedia PDF Downloads 82
8317 Change to the Location/Ownership and Control of Liquid Metering Skids

Authors: Mahmoud Jumah

Abstract:

This paper presents the circumstances and decision making in case of change management in any industrial processes, and the effective strategic planning ensured to provide with the on time completion of projects. In this specific case, the Front End Engineering Design and the awarded Lump Sum Turn Key Contract had provided for full control and ownership of all Liquid Metering Skids by Controlling Team. The demarcation and location were changed, and the Ownership and Control of the Liquid Metering Skids inside the boundaries of the Asset Owner were transferred from Controlling Team to Asset Owner after the award of the LSTK Contract. The requested changes resulted in Adjustment Order and the relevant scope of work is an essential part of the original Contract. The majority of equipment and materials (i.e. liquid metering skids, valves, piping, etc.) has already been in process.

Keywords: critical path, project change management, stakeholders problem solving, strategic planning

Procedia PDF Downloads 267
8316 A Risk Management Framework for Selling a Mega Power Plant Project in a New Market

Authors: Negar Ganjouhaghighi, Amirali Dolatshahi

Abstract:

The origin of most risks of a mega project usually takes place in the phases before closing the contract. As a practical point of view, using project risk management techniques for preparing a proposal is not a total solution for managing the risks of a contract. The objective of this paper is to cover all those activities associated with risk management of a mega project sale’s processes; from entrance to a new market to awarding activities and the review of contract performance. In this study, the risk management happens in six consecutive steps that are divided into three distinct but interdependent phases upstream of the award of the contract: pre-tendering, tendering and closing. In the first step, by preparing standard market risk report, risks of the new market are identified. The next step is the bid or no bid decision making based on the previous gathered data. During the next three steps in tendering phase, project risk management techniques are applied for determining how much contingency reserve must be added or reduced to the estimated cost in order to put the residual risk to an acceptable level. Finally, the last step which happens in closing phase would be an overview of the project risks and final clarification of residual risks. The sales experience of more than 20,000 MW turn-key power plant projects alongside this framework, are used to develop a software that assists the sales team to have a better project risk management.

Keywords: project marketing, risk management, tendering, project management, turn-key projects

Procedia PDF Downloads 329
8315 The Existence of Field Corn Networks on the Thailand-Burma Border under the Patron-Client Contract Farming System

Authors: Kettawa Boonprakarn, Jedsarid Sangkaphan, Bejapornd Deekhuntod, Nuntharat Suriyo

Abstract:

This study aimed to investigate the existence of field corn networks on the Thailand-Burma border under the patron-client contract farming system. The data of this qualitative study were collected through in-depth interviews with nine key informants. The results of the study revealed that the existence of the field corn networks was associated with the relationship where farmers had to share their crops with protectors in the areas under the influence of the KNU (Karen National Union) and the DKBA (Democratic Karen Buddhist Army) or Burmese soldiers. A Mae Liang, the person who starts a network has a connection with a Thaokae, Luk Rai Hua Chai or the head of a group of farmers, and farmers. They are under the patron-client system with trust and loyalty that enable the head of the group and the farmers in the Burma border side to remain under the same Mae Liang even though the business has been passed down to later generations.

Keywords: existence, field-corn networks, patron-client system, contract farming

Procedia PDF Downloads 270
8314 Contractual Risk Transfer in Islamic Home Financing: Analysis in Bank Malaysia

Authors: Ahmad Dahlan Salleh, Nik Abdul Rahim Nik Abdul Ghani, Muhamad Firdaus M. Hatta

Abstract:

Risk management has implications on pricing, governance arrangements, business practices and strategy. Nowadays, home financing contract offers more in the risk transfer form to increase bank profit. This is parallel with Islamic jurisprudence method al-Kharaj bi al-thaman (gain accompanies liability for loss) and al-ghurm bil ghunm (gain is justified with risk) that determine the matching between risk transfer and returns. Malaysian financing trend is to buy house. Besides, exists transparency lacking risk transfer issues to the clients because of not been informed clearly. Terms and conditions of each financing also do not reflect clearly that the risk has been transferred to the client, justifying a determination price been made. The assumption on risk occurrence is also inaccurate as each risk is different with the type of financing contract. This makes the Islamic Financial Services Act 2013 in providing standards that transparent and consistent can be used by Islamic financial institution less effective. This study examines how far the level of the risk and obligation incurred by bank and client under various Islamic home financing contract. This research is qualitative by using two methods, document analysis, and semi-structured interviews. Document analysis from literature review to identify profile, themes and risk transfer element in home financing from Islamic jurisprudence perspective. This study finds that need to create a risk transfer parameter by banks which are consistent with risk transfer theory according to Islamic jurisprudence. This study has potential to assist the authority in Islamic finance such as The Central Bank of Malaysia (Bank Negara Malaysia) in regulating Islamic banking industry so that the risk transfer valuation in home financing contract based on home financing good practice and determined risk limits.

Keywords: risk transfer, home financing contract, Sharia compliant, Malaysia

Procedia PDF Downloads 420
8313 Hear My Voice: The Educational Experiences of Disabled Students

Authors: Karl Baker-Green, Ian Woolsey

Abstract:

Historically, a variety of methods have been used to access the student voice within higher education, including module evaluations and informal classroom feedback. However, currently, the views articulated in student-staff-committee meetings bear the most weight and can therefore have the most significant impact on departmental policy. Arguably, these forums are exclusionary as several students, including those who experience severe anxiety, might feel unable to participate in this face-to-face (large) group activities. Similarly, students who declare a disability, but are not in possession of a learning contract, are more likely to withdraw from their studies than those whose additional needs have been formally recognised. It is also worth noting that whilst the number of disabled students in Higher Education has increased in recent years, the percentage of those who have been issued a learning contract has decreased. These issues foreground the need to explore the educational experiences of students with or without a learning contract in order to identify their respective aspirations and needs and therefore help shape education policy. This is in keeping with the ‘Nothing about us without us’, agenda, which recognises that disabled individuals are best placed to understand their own requirements and the most effective strategies to meet these.

Keywords: education, student voice, student experience, student retention

Procedia PDF Downloads 94
8312 Incorporation of Hibah as a Catalyst for Channelling Profits and Compensations in Islamic Transactions

Authors: Ameen Alshugaa, Farrukh Habib

Abstract:

Shariah (the Islamic law) sanctions a plethora of profit-sharing arrangements for financial transactions. However, when it comes to the practice of Islamic banking, it is felt by the scholars and practitioners that many of these arrangements often fail to compensate different parties of a financial transaction compared to conventional banking, due to the Riba (interest / usury) element. This issue is caused by the parties inability to codify these compensations in any contract so as to avoid Riba. Here, hibah (gift) may be regarded as one of the solutions. In essence, hibah is a unilateral charity contract where a party voluntarily gives away something to another party without any counter value. This paper attempts to analyse theoretical and practical aspects of hibah from the perspective of Islamic law, enunciating its legality and detailing its allowance in Islamic banking. It also discusses several practices evaluating the role of hibah in resolving issues related to Riba. In particular, these practices demonstrate the validity of hibah as a way to distribute revenues and compensate parties in Islamic financial transactions, while achieving competitive advantage over conventional banking, and avoiding the element of Riba.

Keywords: hibah (gift), Islamic Finance, Islamic Law of Contract, profit distribution, Shariah

Procedia PDF Downloads 301
8311 The Portuguese Legal Instruments to Combat the Improper Use of the Contract Service

Authors: Ana Lambelho

Abstract:

Nowadays is very common that an activity may be performed independently or dependently. In Portugal, the Labour Law exclusively protects the dependent labour relations. The independent work is regulated by civil law, where the autonomy of the will is the main principle. For companies is more advantageous to hire people under a service agreement since, in that case, the relation is not submitted to the limits established in Labour law and collective bargaining. This practice has nothing wrong, if the performance of work is, in fact, made autonomously. The problem is the increased frequency of the celebration of service agreements to hide a legal relation of subordination. Aware of this and regarding the huge difficulty to demonstrate the existence of subordinated work (that often runs against the employee), the Portuguese legislator devoted some legislative rules in order to facilitate the evidence of legal subordination and, on the other hand, to avoid the misuse of the provision of service agreements. This study focuses precisely on the analysis of this solution, namely the so-called presumption of ‘laboralidade’ and on the lawsuit to recognize the existence of a labour contract. The presumption of the existence of a labour contract is present in the Portuguese legal system since 2003, and received, with the 2009 Labour Code, a new redaction that, according to the doctrine and the jurisprudence, finally approached it to a legal presumption, with the consequent reversal of the burden of proof and, in consequence, made easier to proof the legal subordination, because the employee will just have to plead and prove the existence of two of the elements described in the law to use this presumption. Another change in the Portuguese legal framework is related with the competencies of the Authority for Working Conditions (AWC): now, if during an inspection, the Authority finds a situation that seems to be an undeclared employment situation, it may access the company and, if it does not regularize voluntarily the situation, AWC has a duty to communicate to the public prosecutor, who will begin the lawsuit for the recognition of the existence of an employment contract. To defend the public interest, the action to recognize the existence of an employment contract will follow its terms, even against the employee will. Although the existence of these mechanisms does not solve by itself the problem of evasion of labour law and false ‘green receipts’, it is undeniable that it is an important step in combating fraud in this field.

Keywords: independent work, labour contract, Portugal, service agreement

Procedia PDF Downloads 326
8310 Three-Stage Mining Metals Supply Chain Coordination and Product Quality Improvement with Revenue Sharing Contract

Authors: Hamed Homaei, Iraj Mahdavi, Ali Tajdin

Abstract:

One of the main concerns of miners is to increase the quality level of their products because the mining metals price depends on their quality level; however, increasing the quality level of these products has different costs at different levels of the supply chain. These costs usually increase after extractor level. This paper studies the coordination issue of a decentralized three-level supply chain with one supplier (extractor), one mineral processor and one manufacturer in which the increasing product quality level cost at the processor level is higher than the supplier and at the level of the manufacturer is more than the processor. We identify the optimal product quality level for each supply chain member by designing a revenue sharing contract. Finally, numerical examples show that the designed contract not only increases the final product quality level but also provides a win-win condition for all supply chain members and increases the whole supply chain profit.

Keywords: three-stage supply chain, product quality improvement, channel coordination, revenue sharing

Procedia PDF Downloads 183
8309 Create a Dynamic Model in Project Control and Management

Authors: Hamed Saremi, Shahla Saremi

Abstract:

In this study, control and management of construction projects is evaluated through developing a dynamic model in which some means are used in order to evaluating planning assumptions and reviewing the effectiveness of some project control policies based on previous researches about time, cost, project schedule pressure management, source management, project control, adding elements and sub-systems from cost management such as estimating consumption budget from budget due to costs, budget shortage effects and etc. using sensitivity analysis, researcher has evaluated introduced model that during model simulation by VENSIM software and assuming optimistic times and adding information about doing job and changes rate and project is forecasted with 373 days (2 days sooner than forecasted) and final profit $ 1,960,670 (23% amount of contract) assuming 15% inflation rate in year and costs rate accordance with planned amounts and other input information and final profit.

Keywords: dynamic planning, cost, time, performance, project management

Procedia PDF Downloads 478
8308 Employers’ Preferences when Employing Solo Self-employed: a Vignette Study in the Netherlands

Authors: Lian Kösters, Wendy Smits, Raymond Montizaan

Abstract:

The number of solo self-employed in the Netherlands has been increasing for years. The relative increase is among the largest in the EU. To explain this increase, most studies have focused on the supply side, workers who offer themselves as solo self-employed. The number of studies that focus on the demand side, the employer who hires the solo self-employed, is still scarce. Studies into employer behaviour conducted until now show that employers mainly choose self-employed workers when they have a temporary need for specialist knowledge, but also during projects or production peaks. These studies do not provide insight into the employers’ considerations for different contract types. In this study, interviews with employers were conducted, and available literature was consulted to provide an overview of the several factors employers use to compare different contract types. That input was used to set up a vignette study. This was carried out at the end of 2021 among almost 1000 business owners, HR managers, and business leaders of Dutch companies. Each respondent was given two sets of five fictitious candidates for two possible positions in their organization. They were asked to rank these candidates. The positions varied with regard to the type of tasks (core tasks or support tasks) and the time it took to train new people for the position. The respondents were asked additional questions about the positions, such as the required level of education, the duration, and the degree of predictability of tasks. The fictitious candidates varied, among other things, in the type of contract on which they would come to work for the organization. The results were analyzed using a rank-ordered logit analysis. This vignette setup makes it possible to see which factors are most important for employers when choosing to hire a solo self-employed person compared to other contracts. The results show that there are no indications that employers would want to hire solo self-employed workers en masse. They prefer regular employee contracts. The probability of being chosen with a solo self-employed contract over someone who comes to work as a temporary employee is 32 percent. This probability is even lower than for on-call and temporary agency workers. For a permanent contract, this probability is 46 percent. The results provide indications that employers consider knowledge and skills more important than the solo self-employed contract and that this can compensate. A solo self-employed candidate with 10 years of work experience has a 63 percent probability of being found attractive by an employer compared to a temporary employee without work experience. This suggests that employers are willing to give someone a less attractive contract for the employer if the worker so wishes. The results also show that the probability that a solo self-employed person is preferred over a candidate with a temporary employee contract is somewhat higher in business economics, administrative and technical professions. No significant results were found for factors where it was expected that solo self-employed workers are preferred more often, such as for unpredictable or temporary work.

Keywords: employer behaviour, rank-ordered logit analysis, solo self-employment, temporary contract, vignette study

Procedia PDF Downloads 73
8307 Analysing Implementation of Best Practices in Construction Contracts for Dispute Avoidance

Authors: K. C. Iyer, Yogita Manan Bindal, Sumit Kumar Bakshi

Abstract:

Disputes and litigation are becoming inherent to the construction industry in India, and despite construction being one of the major drivers of growth, there have not been many reforms in the government construction contracts. Many of the disputes arising from the government contracts, can be avoided by the proper drafting of contracts and their administration. This study aims to 1) identify the best practices in the construction contract as reviewed from the research papers and additional literature on contract management, 2) obtain perspectives from the industry experts on the implementation of these best practices with regards to likely challenges and relative benefits for implementing the best practices in construction contracts. The best practices for disputes arising due to delay events have been identified through extensive literature survey. The industry perspective is gathered by way of a questionnaire survey to understand the applicability of the identified best practices, the benefits that are likely to be obtained and the challenges that are likely to be faced in the implementation of these practices. The study concludes with the recommended best practices that can be implemented based on the perspectives obtained from the survey. The findings of the study can be used by the industry professionals while drafting construction contracts with a view to avoid disputes related to delay events.

Keywords: best practices, construction contract, delay, dispute avoidance

Procedia PDF Downloads 196
8306 Psychological Contract and Job Embeddedness Perspectives to Understand Cynicism as a Behavioural Response to Pressures in the Workplace

Authors: Merkouche Wassila, Marchand Alain, Renaud Stéphane

Abstract:

Organizations are facing competitive pressures constraining them to modify their practices and change initial work conditions of employees, however, these modifications have to sustain initial quality of work and engagements toward the workforce. We focus on the importance of promises in the perspective of psychological contract. According to this perspective, employees perceiving a breach of the expected obligations from the employer may become unsatisfied at work and develop organizational withdrawal behaviors. These are negative counterproductive behaviours aiming to damage the organisation according to the principle of reciprocity and social exchange. We present an integrative model of the determinants and manifestations of organizational withdrawal (OW), a set of behaviors allowing the employee to leave his job or avoid his assigned work. OW contains two main components often studied in silos: work withdrawal (delays, absenteeism and other adverse behaviors) and job withdrawal (turnover). We use the systemic micro, meso and macro sociological approach designing the individual at the heart of a system containing individual, organizational, and environmental determinants. Under the influence of these different factors, the individual assesses the type of behavior to adopt. We provide better lighting for understanding OW using both psychological contract approach through the perception of its respect by the organization and job embeddedness approach which explains why the employee does not leave the organization and then remains in his post while practicing negative and counterproductive behaviors such as OW. We study specifically cynicism as a type of OW as it is a dimension of burnout. We focus on the antecedents of cynicism to try to prevent it in the workplace.

Keywords: burnout, cynicism, job embeddedness, organizational withdrawal, psychological contract

Procedia PDF Downloads 252
8305 Convertible Lease, Risky Debt and Financial Structure with Growth Option

Authors: Ons Triki, Fathi Abid

Abstract:

The basic objective of this paper is twofold. It resides in designing a model for a contingent convertible lease contract that can ensure the financial stability of a company and recover the losses of the parties to the lease in the event of default. It also aims to compare the convertible lease contract on inefficiencies resulting from the debt-overhang problem and asset substitution with other financing policies. From this perspective, this paper highlights the interaction between investments and financing policies in a dynamic model with existing assets and a growth option where the investment cost is financed by a contingent convertible lease and equity. We explore the impact of the contingent convertible lease on the capital structure. We also check the reliability and effectiveness of the use of the convertible lease contract as a means of financing. Findings show that the rental convertible contract with a sufficiently high conversion ratio has less severe inefficiencies arising from risk-shifting and debt overhang than those entailed by risky debt and pure-equity financing. The problem of underinvestment pointed out by Mauer and Ott (2000) and the problem of overinvestment mentioned by Hackbarth and Mauer (2012) may be reduced under contingent convertible lease financing. Our findings predict that the firm value under contingent convertible lease financing increases globally with asset volatility instead of decreasing with business risk. The study reveals that convertible leasing contracts can stand for a reliable solution to ensure the lessee and quickly recover the counterparties of the lease upon default.

Keywords: contingent convertible lease, growth option, debt overhang, risk-shifting, capital structure

Procedia PDF Downloads 72